GOVERNMENT OF WEST BENGAL HEALTH & FAMILY WELFARE DEPARTMENT NATIONAL HEALTH MISSION (NHM) GN -29, 2nd FLOOR, GRANTHAGAR BHAWAN, SWASTHYA BHAWAN PREMISES, SECTOR-V SALT LAKE, BIDHANNAGAR, KOLKATA - 700 09l. i~_'" 033 - 2333-0432, A 033 - 2357 - 7930, Email ID: [email protected]; website: www.wbhealth.gov.in Memo No.HFWjNUHM-638j20l5 jPt.Ij 2- 41 Date: {'t.Ol.20l8 From : Addl. Mission Director, NHM Government of West Bengal To : Chief Medical Officer of Health (Murshidabad / North 24 Pgs / Paschim Bardhaman / Purba Bardhaman / Purulia / Uttar Dinajpur / Bankura / Basirhat HD / Cooch Behar / Darjeeling / Howrah / Maida) Sub: Status of New Construction / Renovation work of U-PHCs under NUHM Madam / Sir, Under NUHM In West Bengal, 168 no, of new construction of U-PHCs were approved, at the same time 291 no. of UPHCs were approved renovation and up- gradation. After lapses of considerable time it is observed that renovation work of U-PHCs in most of the ULBs have already been completed and new construction of U-PHCs are also complete in fewULBs. Unfortunately, it is also observed that in some of the ULBs construction work has not yet been started, in spite of our regular reminder. It appears that these ULBs are unable to start the construction work of U-PHC as the allotment was issued in 2013-14, 2014-15 and 2015-16. In this situation, you are requested to look in to the matter urgently, discuss it with concerned ULBauthority whether the ULBwill be able to start construction work immediately. If it is not possible for the ULB to start the construction work with immediate effect they may be asked to refund back the fund allotted to them for construction work by 15 February, 2018. List of ULBs where construction work has not yet been started IS enclosed as Annexure III for new construction and Annexure-IV for renovation (status as on 30/11/17) for taking necessary action. Yours faithfully, A~v(p_ ~()A I~) 11, Addl. Mission Director, NHM Government of West Bengal Page 1 of 2

Upload: vuongcong

Post on 20-Mar-2018

226 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: AA~;;::::;r,t~~ / Bankura / Basirhat HD / Cooch Behar / Darjeeling / Howrah / Maida) Sub:Status ofNewConstruction / Renovation work ofU-PHCsunder NUHM Madam / Sir, Under NUHMIn West

GOVERNMENT OF WEST BENGALHEALTH & FAMILY WELFARE DEPARTMENT

NATIONAL HEALTH MISSION (NHM)GN -29, 2nd FLOOR, GRANTHAGAR BHAWAN,SWASTHYA BHAWAN PREMISES, SECTOR-V

SALT LAKE, BIDHANNAGAR, KOLKATA - 700 09l.i~_'"033 - 2333-0432, A 033 - 2357 - 7930,Email ID: [email protected]; website: www.wbhealth.gov.in

Memo No.HFWjNUHM-638j20l5 jPt.Ij 2- 41 Date: {'t.Ol.20l8

From : Addl. Mission Director, NHMGovernment of West Bengal

To : Chief Medical Officer of Health(Murshidabad / North 24 Pgs / Paschim Bardhaman / Purba Bardhaman / Purulia / UttarDinajpur / Bankura / Basirhat HD / Cooch Behar / Darjeeling / Howrah / Maida)

Sub: Status of New Construction / Renovation work of U-PHCs under NUHM

Madam / Sir,

Under NUHM In West Bengal, 168 no, of new construction of U-PHCs wereapproved, at the same time 291 no. of UPHCs were approved renovation and up­gradation.

After lapses of considerable time it is observed that renovation work of U-PHCs inmost of the ULBs have already been completed and new construction of U-PHCs are alsocomplete in fewULBs.

Unfortunately, it is also observed that in some of the ULBs construction work hasnot yet been started, in spite of our regular reminder. It appears that these ULBs areunable to start the construction work of U-PHC as the allotment was issued in 2013-14,2014-15 and 2015-16.

In this situation, you are requested to look in to the matter urgently, discuss itwith concerned ULB authority whether the ULBwill be able to start construction workimmediately. If it is not possible for the ULB to start the construction work withimmediate effect they may be asked to refund back the fund allotted to them forconstruction work by 15 February, 2018.

List of ULBs where construction work has not yet been started IS enclosed asAnnexure III for new construction and Annexure-IV for renovation (status as on30/11/17) for taking necessary action.

Yours faithfully,

A~v(p_ ~()A I~) 11,Addl. Mission Director, NHMGovernment of West Bengal

Page 1 of 2

Page 2: AA~;;::::;r,t~~ / Bankura / Basirhat HD / Cooch Behar / Darjeeling / Howrah / Maida) Sub:Status ofNewConstruction / Renovation work ofU-PHCsunder NUHM Madam / Sir, Under NUHMIn West

Memo No.HFW/NUHM-638/2015/Pt.l/ 241 /1(3) Date: 11-01.2018

Copy forwarded for information and necessary action to:

1. The Chairperson, (Bankura / Basirhat / Cooch Behar / Old Maida / Dhulian / Jangipur / Kandi

/ Garulia / Katwa / Purulia / Raiganj / Darjeeling / North Barrackpore) Municipality.

2. PA to Mission Director, NHM,Government of West Bengal3. IT cell for web posting

AA~;;::::;r,t~~ 1Government of West Bengal

Page 2 of 2

Page 3: AA~;;::::;r,t~~ / Bankura / Basirhat HD / Cooch Behar / Darjeeling / Howrah / Maida) Sub:Status ofNewConstruction / Renovation work ofU-PHCsunder NUHM Madam / Sir, Under NUHMIn West

-, Annexure-III

Status of Construction of New U-PHCBuilding (uRto November-2017)

AmountFund

Fund Balance atBalance at Total

ULB Year of Entitle I ReleasedReleased

CumulativeULB

District I Unspent % ofSI No. District Name U-PHC Name from Expenditure SUDA Balance physical Remarks

Name Approval Sanctioned to ULB (Rs. (Rs. in(Rs. in Lakh)

State (Rs.in Lakh)

(Rs. in Lakh)Lakh)

(Rs. in (Rs. in completionin Lakh) Lakh) Lakh)

1 Bankura BankuraBankuraUPHC2Ward No19PataolaPump 2013-14 75.00 45.00 0.00 0.00 0.00 45.00 45.00 0% Work not started but tender processHouse Kethardanga completed

2 Bankura BankuraBankuraUPHC3WardNo1 Dasherbandhlane 2013-14 75.00 45.00 0.00 0.00 0.00 45.00 45.00 0% Work not started but tender processnear District Library completed

3 Basirhat HD Basirhat BasirhatUPHC1Ward No. 19BhablaRN 2013-14 75.00 45.00 15.00 0.00 15.00 30.00 45.00 0% Work not started but tender processMukharjeeCharitable Dispensary completed

Basirhat HD Basirhat BasirhatUPHC3WardNo. 16 Hartshpur Natun 2013-14 75.00 45.00 10.00 0.00 10.00 35.00 45.00 0% Work not started but only preparation of4 Bazar plan estimate done

5 Coach BeharCooch CoochBeharUPHC2WardNO.3 Kalabagan 2013-14 75.00 45.00 23.50 1.05 22.45 21.50 43.95 0% Preparation of Plan estimate is yet to beBehar near kalabagan primary school done

Silfguri UPHC10WardNO.5Ganganagarnear 2013-14 75.00 10.00 0.00 0.00 0.00 10.00 10.00 0% Plan estimate submitted to MEO for6 Darjeeling Siliguri MC Park vetting

HowrahHowrah Howrah UPHC13 Ward No 4 Satya 2013-14 75.00 10.00 0.00 0.00 0.00 10.00 10.00 0% Plan estimate yet to be done7MC Narayan Temple Road Saiki a

HowrahHowrah Howrah UPHC14 Ward No.2 A. Naskar 2013-14 75.00 10.00 0.00 0.00 0.00 10.00 10.00 0% Plan estimate yet to be done8MC Para Road

9 HowrahHowrah Howrah UPHC 20 Ward No. 18 Bankim 2013-14 75.00 10.00 0.00 0.00 0.00 10.00 10.00 0% Plan estimate yet to be doneMC Park Panchanantala Road

10 HowrahHowrah Howrah UPHC 21 Ward No. 14 I. C. 2013-14 75.00 10.00 0.00 0.00 0.00 10.00 10.00 0% Plan estimate yet to be doneMC Bose Road Howrah

HowrahHowrah Howrah UPHC 22 Ward No. 56 Bankim 2013-14 75.00 10.00 0.00 0.00 0.00 10.00 10.00 0% Plan estimate yet to be done11MC Behari Ghosh Lane

12 Maldah OldMaida OldMaidaUPHC1Ward NO.5 Adjacent to 2015-16 75.00 30.00 0.00 0.00 0.00 30.00 30.00 0% Work not started but only plan estimateOldMaidaMunicipal Administrative Building vetted by MED

13 Maldah OldMaida OldMaidaUPHC2 WardNo. 15ShibramPally 2015-16 75.00 30.00 0.00 0.00 0.00 30.00 30.00 0%Work not started but only plan estimate

Mangalbari vetted by MEO

14 Murshidabad Dhulian DhulianUPHC2 SachindraNath RoyWardNo. 2014-15 75.00 22.50 22.50 0.00 22.50 0.00 22.50 0% Tender process yet to be done16Dighri

Page 1 of 2

Page 4: AA~;;::::;r,t~~ / Bankura / Basirhat HD / Cooch Behar / Darjeeling / Howrah / Maida) Sub:Status ofNewConstruction / Renovation work ofU-PHCsunder NUHM Madam / Sir, Under NUHMIn West

AIiI~WUz_r•m

Status of Construction of New U-PHCBuilding (uQto November-2017) <''''

Fund Fund Balanceat Balanceat TotalAmount Released Cumulative DistrictI Unspent % ofYearof Entitle I Released ULB51 No. DistrictName ULB U-PHCName from Expenditure SUDA Balance physical RemarksName Approval Sanctioned State (Rs. to ULB(Rs. (Rs.in Lakh) (Rs. in (Rs.in (Rs.in completion(Rs.in Lakh) in Lakh) in Lakh) Lakh) Lakh) Lakh)

15 MurshidabadJangipur UPHC 2 Ward No. 3 Gakulpur 2015-16 75.00 30.00 30.00 0.00 30.00 0.00 30.00 0% Plan Estimate yet to be doneJ\!\athPara

MurshidabadKandi UPHC 1 Ward No. B Jema Bagdanga 2015-16 75.00 30.00 30.00 0.00 30.00 0.00 30.00 0% ender process yet to be done16 Rajbati

17 North 24 Parganas Bidhannaga Bidhannagar UPHC 1 Ward No. 28 potenite 2014-15 75.00 22.50 0.00 0.00 0.00 22.50 22.50 0% Work not started due to litigation.rMC Khashmahal UPHC functioning from khasmahal, w.no 36

18 North 24 Parganas Bidhannaga Bidhannagar UPHC 11 Ward No.7 Rajarhat 2014-15 75.00 22.50 0.00 0.00 0.00 22.50 22.50 0% Plan Estimate yet to be donerMC Gopalpur Mondalganthi Arjunpur

19 North 24 Parganas Bidhannaga Bidhannagar UPHC 12 Ward No. 8 Rajarhat 2014-15 75.00 22.50 0.00 0.00 0.00 22.50 22.50 0% Plan Estimate yet to be donerMC Gopalpur Udayanpatly

20 North 24 Parganas GarutiaGarulta UPHC 2 HAU Water Tank compound 2015-16 75.00 10.00 0.00 0.00 0.00 10.00 10.00 0% Work not started but tender pocessWard No. 10 Garulia main road completed

line-list will be changed due to non

21 Paschim Asansol UPHC 14 Jamuria Ward No. 11 Sripur 2014-15 75.00 25.00 0.00 0.00 0.00 25.00 25.00 0% availability of Land. Procurement ofBardhhaman AsansolMe

Rana Colliery Land for new site is under process. Finalline-list will receive within Dec.-17

Paschim Line-list was not received. Site was not22 Bardhhaman Asansol MCfinalised

23 Paschim Durgapur Durgapur UPHC 10 Ward No.13 Ramkrishna 2013-14 75.00 10.00 0.00 0.00 0.00 10.00 10.00 0% Functional;Bardhhaman Pally Land Dispute for new cost.

24 Purba Bardhhaman Katwa Katwa UPHC 2 Ward No.7 Saheb Bagan 2015-16 75.00 30.00 20.00 0.00 20.00 10.00 30.00 0% Work not started but tender processcompleted

25 Purulia Purulia Purulia UPHC 1 Ward No. 12 Namopara 2013-14 75.00 45.00 45.00 0.00 45.00 0.00 45.00 0% er process completedDurgamondir

Raiganj UPHC 2 Ward No. 02 Sri NIa Sarada Work not started. Due to site problems26 Uttar Dinajpur Raiganj Moni Poura Swasthya Seva Kendra 2013-14 75.00 75.00 22.50 0.00 22.50 52.50 75.00 0%Debsharmapara though tender process completed

Page 2of2

Page 5: AA~;;::::;r,t~~ / Bankura / Basirhat HD / Cooch Behar / Darjeeling / Howrah / Maida) Sub:Status ofNewConstruction / Renovation work ofU-PHCsunder NUHM Madam / Sir, Under NUHMIn West

Annexure-IV ~

Status of Renovation of existing buildina (upto November-2017)

Amount Fund FundCumulative Balance at

Balance at Total

Sl District Year of Entitle I Released Released to District I Unspent % of physicalULB Name U-PHC Name Expenditure ULB Remarks

No. Name Approval Sanctioned from State ULB (Rs. in(Rs. in Lakh) (Rs. in Lakh)

SUDA Balance completion

(Rs, in Lakh) (Rs. in Lakh) Lakh) (Rs. in Lakh) (Rs. in Lakh)

1 Darjeeling DarjeelingDarjeeling UPHC1 Ward No 32 Chotta Ging 2013-14 10.00 10.00 10.00 0.00 10.00 0.00 10.00 0%UPHC

2 Darjeeling DarjeelingDarjeeling UPHC2 Ward No. 17 Naw Jyoti 2013-14 10.00 10.00 10.00 0.00 10.00 0.00 10.00 0%Gram UPHC

3 Darjeeling Siliguri MCSiliguri UPHC9 Ward No. 30 Sri Niwas Seva 2013-14 10.00 10.00 10.00 9.41 0.59 0.00 0.59 0%Sadan

4 Howrah Howrah MCHowrah UPHC12Ward No. 58 Bally Esopd 2014-15 10.00 10.00 0.00 0.00 0.00 10.00 10.00 0% Plan estimate yet to bebuilding at rajan seth lane belur area done

5North 24 North North Barrackpore UPHC1 Anandamath HAU 2014-15 10.00 10.00 0.00 0.00 0.00 10.00 10.00 0% Planestimate vetted byParganas Barrackpore Ward no. 8 Ichapore MED

6North 24 North North Barrackpore UPHC2 Santinagar HAU 2014-15 10.00 10.00 0.00 0.00 0.00 10.00 10.00 0% Planestimate vetted byParganas Barrackpore Ward no. 9 Palta MED

7North 24 North North Barrackpore UPHC3 Monirampore HAU 2014-15 10.00 10.00 0.00 0.00 0.00 10.00 10.00 0% Planestimate vetted byParganas Barrackpore Ward no. 22 Barrackpore MED

Total 70.00 70.00 30.00 9.41 20.59 40.00 60.59