a0...1/21/2020 9:00:53 pm c:\revit p rojects\218166_a-b ase_cd_e.klatt@s2 architecture.com.rv t...

9
Fire Resistance Rating Legend INDICATES FIRE SEPARATION w/ 0 HR F.R.R. REQUIRED (SMOKE RATED) INDICATES FIRE SEPARATION w/ 45 MIN. F.R.R. REQUIRED INDICATES FIRE SEPARATION w/ 1HR. F.R.R. REQUIRED INDICATES FIRE SEPARATION w/ 2 HR. F.R.R. REQUIRED INDICATES EXTENT OF FIBROUS FIREPROOFING (THICKNESS TO ACHIEVE 1 HOUR F.R.R.) APPLIED TO UNDERSIDE OF STRUCTURE ABOVE AND ALL SUPPORTING STRUCTURE U.N.O. INDICATES EXTENT OF FIBROUS FIREPROOFING (THICKNESS TO ACHIEVE 2 HOUR F.R.R.) APPLIED TO UNDERSIDE OF STRUCTURE ABOVE AND ALL SUPPORTING STRUCTURE U.N.O. EXPOSED BUILDING FACE = 412.0 m 2 AREA OF UNPROTECTED OPENINGS = 53.3 m 2 EXPOSED BUILDING FACE = 261 m 2 AREA OF UNPROTECTED OPENINGS =5.2 m 2 REFER TO MECHANICAL FOR TYPE AND LOCATIONS OF FIRE DAMPERS AT EXTERIOR WALL, TYP. EXPOSED BUILDING FACE = 237.0 m 2 AREA OF UNPROTECTED OPENINGS = 122.6 m 2 EXPOSED BUILDING FACE = 372.4 m 2 AREA OF UNPROTECTED OPENINGS = 116.4 m 2 EL. 100.000 T.O. LEVEL 1 SLAB EL. 104.600 T.O. LEVEL 2 SLAB 1 2 3 4 5 7 8 EL. 109.200 T.O. LEVEL 3 SLAB EL. 113.500 U/S ROOF DECK EL. 99.900 T.O. APPARATUS SLAB EL. 114.085 T.O ROOF PARAPET EL. 109.650 T.O ROOF PARAPET 102 COMBINED DAYROOM AND KITCHEN 119 DUTY ROOM LOCKERS 132 PPE LAUNDRY & JANITOR 215 FIRE STUDY 205 MEETING ROOM C203 CORRIDOR C202 CORRIDOR 207 FIRE CLERK 222 RADIO ROOM 304 ECC 302 BF W/C & SH 306 ADMIN ASSISTANT C302 CORRIDOR 123 APP BAY #1 124 APP BAY #2 125 APP BAY #3 6 APPLY INTUMESCENT COATING TO TRUSS, BRACING AND SUPPORTING STRUCTURE TO ACHIEVE 45min F.R.R. MIN. CONSULTANT INFORMATION PROJECT INFORMATION ISSUED DATE SCALE DATE DRAWN BY CHECKED BY PROJECT NO. DRAWING TITLE DRAWING NO. This drawing supercedes previous issues. Do not scale these drawings. Verify all dimensions, elevations and datums, and report any discrepancies to the Architect prior to construction. Dimensions are taken to face of exterior sheathing, face of concrete block, face of stud for interior partitions, and centreline of demising walls, unless noted otherwise on the drawing. The Contract Documents (Drawings and Specifications) are complimentary, what is required by one shall be as binding as required by all. All drawings remain the property of the Architect. These drawings are Copyright , S2 Architecture. These drawings may not be reproduced without the permission of the Architect. 327, 309 W Cordova Street Vancouver, BC, Canada V6B 1E5 T 604.661.8806 www.s2architecture.com PROJECT NORTH TRUE N ORTH 2020 1 : 100 1/21/2020 9:00:43 PM C:\Revit P rojects\218166_A-B ase_CD_e.klatt@s2 architecture.com.rv t Nanaimo Fire Station #1 Replacement 618 & 666 FITZWILLIAM STREET NANAIMO, BRITISH COLUMBIA NH / SS EK 218166 BUILDING CODE ANALYSIS A0.04 SCALE: 1 : 100 A0.04 EAST ELEVATION - SPATIAL SEPARATION 4 SCALE: 1 : 100 A0.04 NORTH ELEVATION - SPATIAL SEPARATION 5 SCALE: 1 : 100 A0.04 DP1.02 SOUTH ELEVATION - SPATIAL SEPARATION 2 SCALE: 1 : 100 A0.04 DP1.02 WEST ELEVATION - SPATIAL SEPARATION 3 SCALE: 1 : 100 A0.04 A0.03 Fire Resistance Rating Section 1 50% REVIEW 06.09.2019 75% REVIEW 18.10.2019 ISSUED FOR BP 23.10.2019 PRE-TENDER REVIEW 15.11.2019 COST ESTIMATE 13.12.2019 CLIENT REVIEW 06.01.2020 TENDER 22.01.2020 BUILDING PERMIT 22.01.2020

Upload: others

Post on 22-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

  • Fire Resistance Rating Legend

    INDICATES FIRE SEPARATION w/ 0 HR F.R.R. REQUIRED (SMOKE RATED)

    INDICATES FIRE SEPARATION w/ 45 MIN. F.R.R. REQUIRED

    INDICATES FIRE SEPARATION w/ 1HR. F.R.R. REQUIRED

    INDICATES FIRE SEPARATION w/ 2 HR. F.R.R. REQUIRED

    INDICATES EXTENT OF FIBROUS FIREPROOFING (THICKNESS TO ACHIEVE 1 HOUR F.R.R.) APPLIED TO UNDERSIDE OF STRUCTURE ABOVE AND ALL SUPPORTING STRUCTURE U.N.O.

    INDICATES EXTENT OF FIBROUS FIREPROOFING (THICKNESS TO ACHIEVE 2 HOUR F.R.R.) APPLIED TO UNDERSIDE OF STRUCTURE ABOVE AND ALL SUPPORTING STRUCTURE U.N.O.

    EXPOSED BUILDING FACE = 412.0 m2

    AREA OF UNPROTECTED OPENINGS = 53.3 m2

    EXPOSED BUILDING FACE = 261 m2

    AREA OF UNPROTECTED OPENINGS =5.2 m2

    REFER TO MECHANICAL FOR TYPE AND LOCATIONS OF FIRE DAMPERS AT EXTERIOR WALL, TYP.

    EXPOSED BUILDING FACE = 237.0 m2

    AREA OF UNPROTECTED OPENINGS = 122.6 m2

    EXPOSED BUILDING FACE = 372.4 m2

    AREA OF UNPROTECTED OPENINGS = 116.4 m2

    EL. 100.000T.O. LEVEL 1 SLAB

    EL. 104.600T.O. LEVEL 2 SLAB

    1 2 3 4 5 7 8

    EL. 109.200T.O. LEVEL 3 SLAB

    EL. 113.500U/S ROOF DECK

    EL. 99.900T.O. APPARATUS SLAB

    EL. 114.085T.O ROOF PARAPET

    EL. 109.650T.O ROOF PARAPET

    102

    COMBINEDDAYROOM

    ANDKITCHEN

    119

    DUTYROOM

    LOCKERS

    132

    PPELAUNDRY

    &JANITOR

    215

    FIRESTUDY

    205

    MEETINGROOM

    C203

    CORRIDOR

    C202

    CORRIDOR

    207

    FIRECLERK

    222

    RADIOROOM

    304

    ECC

    302

    BF W/C &SH

    306

    ADMINASSISTANT

    C302

    CORRIDOR

    123

    APP BAY#1

    124

    APP BAY#2

    125

    APP BAY#3

    6

    APPLY INTUMESCENT COATING TO TRUSS, BRACING AND SUPPORTING STRUCTURE TO ACHIEVE 45min F.R.R. MIN.

    CONSULTANT INFORMATION

    PROJECT INFORMATION

    ISSUED DATE

    SCALE

    DATE

    DRAWN BY

    CHECKED BY

    PROJECT NO.

    DRAWING TITLE

    DRAWING NO.

    This drawing supercedes previous issues. Do not scale these drawings.

    Verify all dimensions, elevations and datums, and report any discrepancies to the Architect prior to construction. Dimensions are taken to face of exterior sheathing, face of concrete block, face of stud for interior partitions, and centreline of demising walls, unless noted otherwise on the drawing.

    The Contract Documents (Drawings and Specifications) are complimentary, what is required by one shall be as binding as required by all.

    All drawings remain the property of the Architect. These drawings are Copyright , S2 Architecture. These drawings may not be reproduced without the permission of the Architect.

    327, 309 W Cordova Street

    Vancouver, BC, Canada V6B 1E5

    T 604.661.8806

    www.s2architecture.com

    PROJECT

    NORTH

    TRUENORTH

    2020

    1 : 100

    1/21/2020 9:00:43 PM

    C:\

    Rev

    it P

    roje

    cts\

    2181

    66_A

    -Bas

    e_C

    D_e

    .kla

    tt@s2

    arch

    itect

    ure.

    com

    .rv t

    Nanaimo Fire Station

    #1 Replacement

    618 & 666 FITZWILLIAM

    STREET

    NANAIMO, BRITISHCOLUMBIA

    NH / SS

    EK

    218166

    BUILDING CODE ANALYSIS

    A0.04SCALE: 1 : 100A0.04

    EAST ELEVATION - SPATIAL SEPARATION4SCALE: 1 : 100A0.04

    NORTH ELEVATION - SPATIAL SEPARATION5

    SCALE: 1 : 100A0.04

    DP1.02

    SOUTH ELEVATION - SPATIAL SEPARATION2SCALE: 1 : 100A0.04

    DP1.02

    WEST ELEVATION - SPATIAL SEPARATION3

    SCALE: 1 : 100A0.04

    A0.03

    Fire Resistance Rating Section1

    50% REVIEW 06.09.2019

    75% REVIEW 18.10.2019

    ISSUED FOR BP 23.10.2019

    PRE-TENDER REVIEW 15.11.2019

    COST ESTIMATE 13.12.2019

    CLIENT REVIEW 06.01.2020

    TENDER 22.01.2020

    BUILDING PERMIT 22.01.2020

  • Parking Analysis

    PARKING ANALYSIS PER ZONING BYLAW:OFFICE: 1/22m² FIRST 1000m2 & 25m2 REMAINDERWAREHOUSE/ STORAGE: 1/200m²

    REQUIRED PARKING STALLS1059.5 m² OFFICE AREA = 48 STALLS

    (1000/22=45.45 + 59.5/25 = 2.38)691.1. m² WAREHOUSE AREA = 4 STALLS

    REQUIRED PARKING STALLS: 52 (MINIMUM)PARKING STALLS PROVIDED: 14 ON SITE

    4 OFF SITE 18 TOTAL

    BICYCLE PARKING:OFFICE: SHORT TERM SPACES: 0.1/100m2 GROSS FLOOR AREALONG TERM SPACES: 0.35/100m2 GROSS FLOOR AREA

    REQUIRED:SHORT TERM: 0.1 (2109.2/100) = 3LONG TERM: 0.35 (2109.2/100) = 8TOTAL REQUIRED: 11

    PROVIDED:LONG TERM: 7SHORT TERM: 4TOTAL PROVIDED: 11

    Site AreaEXISTING SITE AREA: 2,528.230 m²

    0.625 ac0.253 ha

    PROPOSED SITE AREA: 3169.2948 m²0.783 ac0.317 ha

    SITE COVERAGE: 1,062.1 m² MAX FAR: 2.3PROPOSED FAR: 2,109.2 / 3169.2948 m² = 0.67

    Building HeightBUILDING HEIGHT (BASED ON AVERAGE, NATURAL OR FINISHED GRADE)

    AVERAGE GRADE: 44.14( 44.20+ 44.20 + 44.10 + 44.06= 176.56/4 )

    MAXIMUM PERMITTED: 12 m

    PROPOSED BUILDING HEIGHT: 15 m

    Site InfoADDRESS:666 FITZWILLIAM ST, NANAIMO, BC V9R 3B5

    BY-LAW ZONING:DOWNTOWN FITZWILLIAM DT2

    SETBACKMAX FRONT YARD SETBACK: 4m

    STORAGE / LANDFILL / REFUSE RECEPTACLES:REQUIRED: 2PROPOSED: 2

    DORM UNITS: PROPOSED: 7

    Floor AreaFLOOR AREA SUMMARY* m2 ft2

    MAIN: 970.9 10,451SECOND: 513.8 5,530THIRD: 371.9 4,003TOTAL: 1,856.6 19,984*as defined by the BC Building Code

    GROSS FLOOR AREAS m2 ft2

    MAIN: 1,062.1 11,432SECOND: 604.1 6,502THIRD: 443.0 4,768TOTAL: 2,109.2 22,702

    Phasing - General Notes

    1. THIS PHASING PLAN PROVIDES INTENT OF SEQUENCING ONLY AND IS TO BE READ IN CONJUNCTION WITH THE REMAINDER OF THE CONTRACT DOCUMENTS.

    2. REFER TO SPECIFICATION SECTION 00 21 13 FOR ADDITIONAL CONSTRUCTION SITE & LAYDOWN AREA INFORMATION

    3. INTENT OF PHASING IS AS FOLLOWS:

    PHASE 1:EXISTING BUILDING TO REMAIN OPERATIONAL DURING PHASE 1. PREPARATION OF SITE FOR DEMOLITION / CONSTRUCTION. DEMOLISH EXISTING SITE AS REQUIRED FOR INSTALLATION OF SITE TRAILER AND TEMPORARY BUILDING SUPPORT UTILITIES. PROVIDE TEMPORARY BUILDING SUPPORT UTILITIES. RELOCATE EXISTING GARBAGE BINS TO FRONT OF EXISTING BUILDING.PHASE 2:EXISTING BUILDING TO REMAIN OPERATIONAL DURING PHASE 2. DEMOLITION OF EXISTING PARTIAL SITE IN PREPARATION FOR NEW BUILDING CONSTRUCTION. CONSTRUCTION OF NEW BUILDING c/w CONSTRUCTION OF SITE TO SOUTH, NORTH, AND EAST OF NEW BUILDING. COMMISSIONING & OWNER ACCEPTANCE AND OCCUPANCY OF NEW BUILDING TO OCCUR PRIOR TO COMMENCEMENT OF PHASE 3.PHASE 3: NEW BUILDING TO REMAIN OPERATIONAL DURING PHASE 3. DEMOLITION OF EXISTING BUILDING AND EXISTING REMAINING SITE.PHASE 4: CONSTRUCTION OF REMAINING NEW SITE. ALL TEMPORARY FENCES, HOARDING, AND TEMPORARY RELOCATION OF SERVICES / UTILITIES REMOVED.

    Phasing - Symbol Legend

    INDICATES APPROXIMATE AREA OF TEMPORARY SERVICES

    INDICATES EXTENT AND LOCATION OF BUILDINGS IN SCOPE

    INDICATES EXTENT AND LOCATION OF EXISTING BUILDINGSOUTSIDE OF SCOPE

    MIL

    TO

    N S

    TR

    EE

    T

    FITZWILLIAM

    STREET

    LU

    BB

    OC

    K S

    QU

    AR

    E

    H01

    H14

    H09

    FUEL

    TA

    NK

    & E

    XIS

    TIN

    G S

    TRU

    CTU

    RE

    1500

    MIN

    . CLE

    AR

    AN

    CE

    BET

    WEE

    N

    FUEL TANK & GENERATOR1100 MIN. CLEARANCE BETWEEN

    H10

    H11

    H04

    H08

    H12

    H15

    H07

    EXISTING FIRE

    STATION #1

    EXISTING

    HOUSE

    EXISTING

    APARTMENT

    EXISTING

    COMMUNITY

    SERVICE

    BUILDING

    H13

    H06

    H11

    H05 MIL

    TO

    N S

    TR

    EE

    T

    H01

    EXISTING FIRE

    STATION #1

    EXISTING

    HOUSE

    H20 H21

    H03

    H02

    FITZWILLIAM

    STREET

    LU

    BB

    OC

    K S

    QU

    AR

    E

    H18

    H01

    NEW FIRE STATION #1

    H01

    H03

    H03

    H02

    LUBBOCK SQUARE

    EXISTING

    APARTMENT

    EXISTING

    COMMUNITY

    SERVICE

    BUILDING

    H19

    H19

    H19

    H19

    H19

    H19

    H30

    H03

    H02

    H26

    FITZWILLIAM

    STREET

    H01

    NEW FIRE STATION #1

    H01

    H03

    H03

    H02

    LUBBOCK SQUARE

    H28

    H22

    H30

    H25

    EXISTING

    COMMUNITY

    SERVICE

    BUILDING

    H26

    MIL

    TO

    N S

    TR

    EE

    T

    H27

    H01

    H28

    TYP.

    H28

    EXISTING

    HOUSE

    EXISTING

    APARTMENT

    H29

    H29

    H28

    H28

    H03

    H02

    H26

    FITZWILLIAM

    STREET

    NEW FIRE STATION #1

    H01

    H03

    H03

    H25

    H02

    LUBBOCK SQUARE

    H01

    H01

    H33

    H34

    EXISTING

    APARTMENT

    EXISTING

    HOUSE

    H33

    EXISTING

    COMMUNITY

    SERVICE

    BUILDING

    H26

    CONSULTANT INFORMATION

    PROJECT INFORMATION

    ISSUED DATE

    SCALE

    DATE

    DRAWN BY

    CHECKED BY

    PROJECT NO.

    DRAWING TITLE

    DRAWING NO.

    This drawing supercedes previous issues. Do not scale these drawings.

    Verify all dimensions, elevations and datums, and report any discrepancies to the Architect prior to construction. Dimensions are taken to face of exterior sheathing, face of concrete block, face of stud for interior partitions, and centreline of demising walls, unless noted otherwise on the drawing.

    The Contract Documents (Drawings and Specifications) are complimentary, what is required by one shall be as binding as required by all.

    All drawings remain the property of the Architect. These drawings are Copyright , S2 Architecture. These drawings may not be reproduced without the permission of the Architect.

    327, 309 W Cordova Street

    Vancouver, BC, Canada V6B 1E5

    T 604.661.8806

    www.s2architecture.com

    PROJECT

    NORTH

    TRUENORTH

    2020

    As indicated

    1/21/2020 9:00:46 PM

    C:\

    Rev

    it P

    roje

    cts\

    2181

    66_A

    -Bas

    e_C

    D_e

    .kla

    tt@s2

    arch

    itect

    ure.

    com

    .rv t

    Nanaimo Fire Station

    #1 Replacement

    618 & 666 FITZWILLIAM

    STREET

    NANAIMO, BRITISHCOLUMBIA

    NH

    GJO/ EK

    218166

    OVERALL SITE PHASING

    PLAN & SITE INFO

    A1.01

    SCALE:1 : 250A1.01

    A0.02

    Site Plan - Phase 11

    Phasing Keynote Legend000 KEYNOTE SYMBOL

    APPLICABLE TO ALL PHASES:

    H01 MAINTAIN PEDESTRIAN ACCESS ALONG FITZWILLAIN STREET AT ALL TIMES, COORDINATE HOARDING DESIGN/INSTALLATION AND ANY OFF-SITE ACCESS REQUIREMENTS WITH CITY OF NANAIMO (AHJ)

    H02 MAINTAIN VEHICLE ACCESS TO ADJACENT PARKING LOT AT ALL TIMES DURING DEMOLITION & CONSTRUCTION. PROVIDE TRAFFIC CONTROL AS REQUIRED DURING CONSTRUCTION, INCLUDING FLAG PERSONNEL TO DIRECT TWO-WAY TRAFFIC THROUGH SINGLE LANE DURING UTILITY CONSTRUCTION & ROADWAY RECONSTRUCTION. WORK IN ROADWAY MUST BE COMPLETE PRIOR TO OCCUPANCY OF NEW BUILDING & TEMPORARY APPARATUS SHELTER

    H03 MAINTAIN PEDESTRIAN ACCESS TO COMMUNITY SERVICE BUILDING AT ALL TIMES, COORDINATE HOARDING DESIGN/INSTALLATION AND ANY OFF-SITE ACCESS REQUIREMENTS WITH CITY OF NANAIMO (AHJ)

    H04 EXISTING OVERHEAD LINES TO REMAIN DURING CONSTRUCTION - REFER TO ELECTRICAL DRAWINGS

    PHASE 1:

    H05 REMOVE GLAZING & DOORS AND INFILL OPENINGS. INSTALL TEMPORARY ACOUSTIC BARRIER MEASURES TO EXISTING BUILDING. ACOUSTIC MEASURES ARE TO BE INSTALLED PRIOR TO COMMENCING OTHER DEMOLITION OR CONSTRUCTION ON SITE COORDINATE SCHEDULE & ACCESS TO EXISTING BUILDING WITH OWNER [PHASE 1]

    H06 PROVIDE TEMPORARY BARRIER-FREE PARKING STALL w/ TEMPORARY PAINTED LINES & SIGNAGE PRIOR TO DEMOLITION OF EXISTING PARKING LOT. MAINTAIN CLEAR PATH OF ACCESS TO FRONT ENTRANCE OF EXISTING BUILDING AT ALL TIMES [PHASE 1]

    H07 REFER TO ELECTRICAL AND MECHANICAL FOR DISCONNECTION AND RECONNECTION OF UTILITIES IN EXISTING BUILDING [PHASE 1]

    H08 DEMOLISH & SALVAGE EXISTING SITE ELEMENTS TO ALLOW FOR RELOCATION OF GENERATOR AND INSTALLATION OF FUEL TANK & SITETRAILER [PHASE 1]

    H09 APPROXIMATE LOCATION OF SITE TRAILER. GENERAL CONTRACTOR TO COORDINATE SIZE AND LOCATION OF SITE TRAILER WITH REMAINDER OF THE WORK AND ALL CITY OF NANAIMO BYLAW AND PERMIT REQUIREMENTS [PHASE 1]

    H10 PROVIDE TEMPORARY DIESEL TANK FOR EXISTING BUILDING BOILER c/w NEW CONCRETE PAD, REFER TO STRUCTURAL & MECHANICAL DRAWINGS [PHASE 1]

    H11 DEMOLISH EXISTING DIESEL TANK & PAD AND CAP EXISTING UTILITIES AFTER TEMPORARY TANK IS INSTALLED & COMMISSIONED - REFER TO MECHANICAL DRAWINGS [PHASE 1]

    H12 RELOCATE EXISTING GENERATOR ON NEW CONCRETE PAD & DEMOLISH EXISTING PAD - REFER TO STRUCTURAL & ELECTRICAL DRAWINGS[PHASE 1]

    H13 DEMOLISH CONCRETE PAD & STORAGE SHED [PHASE 1]

    H14 RELOCATE EXISTING FIBRE OPTIC LINE AS REQUIRE FOR NEW CONSTRUCTION, REFER TO ELECTRICAL AND CIVIL DRAWINGS [PHASE 1]

    H15 RELOCATE EXISTING GARBAGE BINS. COORDINATE RELOCATION w/ WASTE SERVICE PROVIDER [PHASE 1]

    PHASE 2:

    H18 DEMOLISH EXISTING SITE ELEMENTS EAST OF THE EXISTING BUILDING & CONSTRUCT NEW FIRE STATION BUILDING [PHASE 2]

    H19 CONSTRUCT SITE ELEMENTS TO NORTH, EAST & SOUTH OF NEW BUILDING [PHASE 2]

    H20 EXISTING SCBA EQUIPMENT TO BE REMOVED AND RELOCATED TO NEW BUILDING - REFER TO FF&E PLANS FOR LOCATIONS. COORDINATESCHEDULE & ACCESS TO EXISTING BUILDING FOR REMOVAL WITH OWNER [PHASE 2]

    H21 EXISTING COMMERCIAL WASHING MACHINE TO BE REMOVED AND RELOCATED TO NEW BUILDING - REFER TO FF&E PLANS FOR LOCATIONS. COORDINATE SCHEDULE & ACCESS TO EXISTING BUILDING FOR REMOVAL WITH OWNER [PHASE 2]

    H22 PROVIDE TEMPORARY GENERATOR AS REQUIRED TO SUPPORT NEW BUILDING UNTIL INSTALLATION & COMMISSIONING OF PERMANENT GENERATOR IS COMPLETE - REFER TO ELECTRICAL DRAWINGS [PHASE 2]

    PHASES 3 & 4:

    H25 TEMPORARY APPARATUS SHELTER BY OWNER, GC TO PROVIDE TEMPORARY SERVICES TO SHELTER - REFER TO ELECTRICAL DRAWINGS. GC TO PROVIDE 24/7 SECURITY PERSONNEL AT TEMPORARY APPARATUS SHELTER UNTIL COMPLETION OF ALL WORK [PHASES 3 & 4]

    H26 MAINTAIN PEDESTRIAN ACCESS FOR EXIT DOOR AT ALL TIMES[PHASES 3 & 4]

    H27 DEMOLISH EXISTING FIRE STATION BUILDING [PHASE 3]

    H28 DEMOLISH REMAINING EXISTING SITE ELEMENTS TO ALLOW FOR NEW SITE CONSTRUCTION [PHASE 3]

    H29 DEMOLISH & SALVAGE EXISTING TEMPORARY UTILITIES & REMOVE SITE TRAILER. DEMOLISH EXISTING SUPPORT INFRASTRUCTURE FOR TEMPORARY UTILITIES ONCE PERMANENT UTILITIES ARE INSTALLED & COMMISSIONED [PHASE 3]

    H30 PROVIDE TEMPORARY BARRIER-FREE PARKING STALL w/ TEMPORARY PAINTED LINES & SIGNAGE [PHASE 3]

    H33 CONSTRUCT REMAINING SITE ELEMENTS [PHASE 4]

    H34 REMOVE TEMPORARY ACCESSIBLE PARKING STALLS & CONSTRUCT PERMANENT PARKING AREA ONCE PERMANENT BARRIER-FREE PARKING STALL ADJACENT TO ENTRANCE IS COMPLETED & ACCESSIBLE BY OWNER [PHASE 4]

    SCALE:1 : 250A1.01

    A0.02

    Site Plan - Phase 22

    SCALE:1 : 250A1.01

    A0.02

    Site Plan - Phase 33

    SCALE:1 : 250A1.01

    A0.02

    Site Plan - Phase 44

    50% REVIEW 06.09.2019

    75% REVIEW 18.10.2019

    ISSUED FOR BP 23.10.2019

    PRE-TENDER REVIEW 15.11.2019

    COST ESTIMATE 13.12.2019

    CLIENT REVIEW 06.01.2020

    TENDER 22.01.2020

    BUILDING PERMIT 22.01.2020

  • Site - General Notes1. REFER TO CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND LANDSCAPE

    DRAWINGS FOR ADDITIONAL DISCIPLINE RELATED INFORMATION

    2. ALL DIMENSIONS ARE TO FRONT OF CURB U.N.O.

    3. ALL DIMENSIONS AT BUILDING ARE TO BE FROM FACE OF FOUNDATION U.N.O.

    4. ALL CONCRETE WALKS & CURBS TO BE STANDARD NON-COLOURED CONCRETE W/ CONTROL JOINTS AS PER CITY OF NANAIMO STANDARDS U.N.O.

    5. PAINTED LINES AS PER CITY OF NANAIMO STANDARDS

    6. REFER TO PRELIMINARY SITE INVESTIGATION IN REGARDS TO ENVIRONMENTAL CONTAMINATION.

    Site Plan - Symbol LegendINDICATES EXTENT AND LOCATION OF NEW FIRE STATIONBUILDING

    INDICATES LOCATION OF PROPOSED CATCH BASIN

    INDICATES LOCATION OF EXISTING CATCH BASIN

    INDICATES LOCATION OF PROPOSED MANHOLE

    INDICATES LOCATION OF EXISTING MANHOLE

    INDICATES LOCATION OF PROPOSED FIRE HYDRANT

    INDICATES LOCATION OF BUILDING SIAMESE CONNECTION(FDC)

    INDICATES PROPERTY LINE (SCALED DOWN FOR CLARITY)

    INDICATES LOCATION OF PROPOSED LIGHT STANDARD

    INDICATES LOCATION OF EXISTING LIGHT STANDARD

    INDICATES LOCATION OF EXISTING POWER POLE

    INDICATES LOCATION OF EXISTING POWER POLE ANCHOR

    INDICATES LOCATION OF PROPOSED LIGHT BOLLARD. REFERTO ELECTRICAL DRAWINGS

    INDICATES "BARRIER-FREE PARKING SYMBOL" c/w POLEMOUNTED SIGNAGE

    INDICATES "NO PARKING" POST MOUNTED SIGNAGE

    INDICATES "NO ENTRY" POST MOUNTED SIGNAGE

    INDICATES "NO SMOKING" POST MOUNTED SIGNAGE

    INDICATES "EMERGENCY VEHICLE NO PARKING" POSTMOUNTED SIGNAGE

    INDICATES LOCATION OF PROPOSED CONCRETE WHEEL STOP

    INDICATES LOCATION OF PROPOSED GUARD BOLLARD. REFERTO STRUCTURAL DRAWINGS

    INDICATES HANDICAP PARKING SYMBOL PAINTED ON PAVERS

    INDICATES LOCATION OF PROPOSED CAR PLUG POST. REFERTO ELECTRICAL DRAWINGS

    INDICATES PARKING LINE PAINTED ON ASPHALT / PAVERS

    INDICATES LOCATION OF BIKE RACK

    INDICATES LOCATION OF PROPOSED TRANSFORMER /PEDESTAL C/W BOLLARDS, REFER TO ELECTRICAL DRAWINGS

    INDICATES LINE OF CHAINLINK FENCE

    INDICATES LOCATION OF PROPOSED FLAG POLE

    EV

    OR

    OR

    BF

    NP

    NS

    INDICATES EXTENT AND LOCATION OF CONCRETE SIDEWALK /DRIVEWAY, CONCRETE PAD, REFER TO STRUCTURAL,LANDSCAPE & CIVIL DWGS.

    INDICATES EXTENT AND LOCATION OF SOFT LANDSCAPING,REFER TO LANDSCAPE DWGS.

    INDICATES EXTENT AND LOCATION OF PAVERS (STYLE 2),REFER TO LANDSCAPE DWGS.

    INDICATES EXTENT AND LOCATION OF PAVERS (STYLE 1),REFER TO LANDSCAPE DWGS.

    INDICATES EXTENT AND LOCATION OF EXISTING BUILDINGSOUTSIDE OF SCOPE

    INDICATES EXTENT AND LOCATION OF PAVERS (STYLE 3),REFER TO LANDSCAPE DWGS.

    INDICATES EXTENT AND LOCATION OF ASPHALT PAVINGSURFACE, REFER TO CIVIL DWGS.

    INDICATES "NO PARKING FIRE FIGHTERS ONLY" POSTMOUNTED SIGNAGE

    FF

    NE

    A E

    1

    8

    MIL

    TO

    N S

    TR

    EE

    T

    FITZWILL

    IAM STRE

    ET

    LU

    BB

    OC

    K S

    QU

    AR

    E

    NEW FIRE STATION #1

    ± 5279

    5129

    6710

    6710

    6710

    6710

    22962 300 6915 2480 25325 2335

    2747

    PR

    OP

    ERTY

    LIN

    E

    DISTANCE FROM FDC TO PROPOSED FIRE HYDRANT= 42.8m

    GEODETIC HEIGHT: 44.20mMAIN FLOOR: 100.000

    GEODETIC HEIGHT: 44.10mAPP BAY FLOOR: 99.900

    TRAFFIC SIGNAGE ON LUBBOCK SQUARE TO BE COMPLETED BY CITY OF NANAIMO. COORDINATE REQUIREMENTS & SCHEDULING OF SIGNAGE INSTALLATION w/ CITY

    S04

    S17S18

    S06

    S16

    S03

    2335

    96.5

    °

    FF

    NP

    11620

    S15

    2500

    5800

    1800

    3184 2677 3050 2750 2750 2750 2750 3050

    PROPERTY LINE

    PR

    OP

    ERTY

    LIN

    E

    EV

    S06S27TYP.

    S15

    S10

    S02

    S01

    S12

    PROPERTY LI

    NE

    ENTRYS24

    PR

    OP

    ERTY

    LIN

    E

    EV NPNP

    S04

    5100

    R 4770

    S26

    S26

    S26

    S23

    S14S14

    S27

    S27

    30.5°

    6685

    2335 3050 2750 2750 2750 2750 2750 2750 2750 3730 1435

    S37 TYP.

    11530

    S35

    NP

    FF

    564

    2335

    S32

    S27

    S25

    S25

    S34

    S30

    1800

    S31

    S38

    S41S41

    S41

    S42

    3A1.04

    S37

    TYP.

    3000

    MIN

    .

    MA

    X.

    165

    1070

    6400

    S10

    S10

    S11

    SET OUT POINT

    SET OUT POINT

    S06

    S08

    S09

    S32

    S32

    S05

    S32

    S07

    S29

    NS

    S45S44

    2057

    076

    00

    50261 10055

    2747

    1000

    S25S21

    1500 MIN.

    1000 MIN.

    780 3320 4355

    S43

    1790

    9A5.11

    CLE

    AR

    AN

    CE

    3000

    MIN

    .

    CLEARANCE

    3000 MIN.

    6625

    3050

    2750

    3050

    5800 TYP.

    125

    2455

    S31

    S33

    S46

    TYP.

    1A1.04

    S41

    S20

    S19

    S22

    TYP.

    S28

    TYP.

    S36

    S28

    TYP.

    S39

    S40

    TYP.

    R 2400

    R 1

    200

    R 2150

    R 1

    200

    2050

    S27

    S38

    S26

    S13

    BF

    5800

    6700

    1810

    4

    S25

    1000S21

    1450

    610

    EQ.

    EQ.

    EQ.

    EQ.

    EQ.

    2500

    S26

    S26

    S25

    S06

    TYP.

    S07

    S06

    6675

    2769

    S34

    3107

    2780

    2780

    3184 21017

    S07

    1450

    1450

    2700

    3685 ℄

    EQ.

    EQ.

    750

    EQ. EQ.

    2955

    5800

    2750 TYP.

    S06

    S47

    1200 MIN

    .

    S48

    S48

    NE NE

    3000 MIN.

    S27

    S37

    TYP.

    PR

    OP

    ERTY

    LIN

    E

    PROPERTY LINE

    5/A1.04

    CONSULTANT INFORMATION

    PROJECT INFORMATION

    ISSUED DATE

    SCALE

    DATE

    DRAWN BY

    CHECKED BY

    PROJECT NO.

    DRAWING TITLE

    DRAWING NO.

    This drawing supercedes previous issues. Do not scale these drawings.

    Verify all dimensions, elevations and datums, and report any discrepancies to the Architect prior to construction. Dimensions are taken to face of exterior sheathing, face of concrete block, face of stud for interior partitions, and centreline of demising walls, unless noted otherwise on the drawing.

    The Contract Documents (Drawings and Specifications) are complimentary, what is required by one shall be as binding as required by all.

    All drawings remain the property of the Architect. These drawings are Copyright , S2 Architecture. These drawings may not be reproduced without the permission of the Architect.

    327, 309 W Cordova Street

    Vancouver, BC, Canada V6B 1E5

    T 604.661.8806

    www.s2architecture.com

    PROJECT

    NORTH

    TRUENORTH

    2020

    As indicated

    1/21/2020 9:00:53 PM

    C:\

    Rev

    it P

    roje

    cts\

    2181

    66_A

    -Bas

    e_C

    D_e

    .kla

    tt@s2

    arch

    itect

    ure.

    com

    .rv t

    Nanaimo Fire Station

    #1 Replacement

    618 & 666 FITZWILLIAM

    STREET

    NANAIMO, BRITISHCOLUMBIA

    NH

    GJO / EK

    218166

    NEW SITE

    CONSTRUCTION PLAN

    A1.03SCALE: 1 : 100A1.03A0.02

    Construction Site Plan1

    Site Construction - Keynote Legend

    000 KEYNOTE SYMBOL

    S06 NEW CONCRETE WALKWAY

    S07 CONCRETE WALKWAY LETDOWN

    S08 CONCRETE DRIVEWAY, REFER TO CIVIL DWGS

    S09 CONCRETE APRON, REFER TO STRUCTURAL DWGS

    S10 BENCH TYP, REFER TO LANDSCAPE DWGS

    S11 REMOVE, STORE AND REINSTALL EXISTING BUS STOP BENCH

    S12 PUBLIC ART DISPLAY, TBD

    S13 FLAG POLE, REFER TO SITE DETAILS

    S14 ELECTRIC VEHICLE CHARGER RECEPTACLE - REFER TO ELECTRICAL DWGS

    S15 EXISTING FENCE TO REMAIN AS IS

    S16 FIRE DEPARTMENT CONNECTION (FDC), REFER TO MECHANICAL DWGS

    S17 PROPOSED GAS METER LOCATION, CONFIRM CONCRETE PAD REQUIREMENTSWITH STRUCTURAL AND FORTIS, REFER TO STRUCTURAL AND MECHANICALDWGS

    S18 PROPOSED SEISMIC GAS VALVE, CONFIRM ENCLOSURE REQUIREMENTS WITHFORTIS, REFER TO MECHANICAL DWGS AND DETAIL

    S19 GARBAGE AND RECYCLING AREA

    S20 PARALLEL PARKING PAINTED PARKING STALL LINES AS PER CITY OF NANAIMOSTANDARDS

    S21 INDICATES EXTENT OF CAR OVERHANG INTO LANDSCAPED AREA

    S22 1.8m HIGH SECURE FENCE ENCLOSURE ON 150mm x 150mm CONCRETE CURBc/w MANUAL SWING GATES

    S23 FUEL PUMP, C/W CONCRETE PAD, REFER TO CIVIL AND FUELING SYSTEMDWGS

    S24 4 BICYCLE STALLS, REFER TO LANDSCAPE DWGS

    S25 CONCRETE CURB, REFER TO CIVIL / LANDSCAPE DWGS

    S26 UNIT PAVERS, REFER TO LANDSCAPE DWGS

    S27 LANDSCAPE AREA, REFER TO LANDSCAPE DWGS

    S28 NEW ASPHALT - BLEND INTO EXISTING ASPHALT - REFER TO CIVIL DWGS

    S29 NEW BARRIER FREE CURB CUT - REFER TO CIVIL DRAWINGS

    S30 SEPARATE PRICE: CLEAN EXISTING RETAINING WALL, INSTALL NEW CONCRETEPRE-CAST TOP OF WALL COPING C/W DRIP EDGE, PAINT EXISTING WALL.

    S31 SECURE CHAIN-LINK FENCE ENCLOSURE c/w MANUAL SWING GATES

    S32 LINE OF CANOPY ABOVE

    S33 TRANSFORMER ON CONCRETE PAD c/w BOLLARDS, REFER TO ELECTRICALDWGS

    S34 EXISTING CROSSWALK TO REMAIN - REFER TO CIVIL DRAWINGS

    S35 CITY OF NANAIMO POSSIBLE FUTURE CURB LAYOUT, NOT IN CONTRACT

    S36 EXISTING CONCRETE CURB TO REMAIN AS IS, REFER TO CIVIL DRAWINGS

    S37 CONCRETE FILLED BOLLARD, REFER TO STRUCTURAL DRAWINGS

    S38 EXTERIOR HOSE BIB LOCATION, REFER TO MECHANICAL DWGS

    S39 REFER TO CIVIL DRAWINGS FOR EXTENT OF NEW ASPHALT BEYOND PROPERTYLINES

    S40 PROPOSED PAINTED PARKING STALL LINES ALONG EDGE OF ADJACENTPROPERTY AS PER CITY OF NANAIMO STANDARDS

    S41 EXISTING BUILDING

    S42 EXISTING SHED

    S43 CARDLOCK, REFER TO FUELING SYSTEM DWGS

    S44 GENERATOR C/W BELLY TANK, REFER TO ELECTRICAL DRAWINGS

    S45 FUEL TANK, REFER TO FUELING SYSTEM DRAWINGS

    S46 PAINTED PARKING STALL LINES C/W WHEEL STOPS AS PER CITY OF NANAIMOSTANDARDS

    S47 RELOCATED POLE, REFER TO CIVIL DRAWINGS

    S48 'NO PARKING' WALL MOUNTED SIGNAGE

    Site Construction - Keynote Legend

    000 KEYNOTE SYMBOL

    S01 EXISTING TRAFFIC LIGHT w/ STREET LIGHT

    S02 EXISTING JUNCTION BOX

    S03 EXISTING UTILITY POLE

    S04 EXISTING UTILITY POLE w/ ANCHOR

    S05 UPGRADE FIBER OPTIC UTILITY BOX, REFER TO ELECTRICAL AND CIVILDRAWINGS

    50% REVIEW 06.09.2019

    75% REVIEW 18.10.2019

    ISSUED FOR BP 23.10.2019

    PRE-TENDER REVIEW 15.11.2019

    COST ESTIMATE 13.12.2019

    CLIENT REVIEW 06.01.2020

    TENDER 22.01.2020

    BUILDING PERMIT 22.01.2020

  • EL. 100.000T.O. LEVEL 1 SLAB

    EL. 104.600T.O. LEVEL 2 SLAB

    1 2 3 45

    7 8

    EL. 109.200T.O. LEVEL 3 SLAB

    EL. 113.500U/S ROOF DECK

    EL. 99.900T.O. APPARATUS SLAB

    EL. 114.085T.O ROOF PARAPET

    EL. 109.650T.O ROOF PARAPET

    6

    E04 E05 E02 E07 E02 E02 E02 E05 E02

    E19

    E19

    E19

    E19

    E02 E02

    E02

    E02

    E02

    E10

    E07 E07

    E20

    E20

    E30

    2A4.01

    4A4.01

    5A4.01

    E19

    E19

    E22 E25

    E22E25

    E22

    E27 E28

    E03E09

    E21 E24

    E23 E26

    E23

    E28E27

    E23

    E22

    E29

    E31 E30E31E30

    E29

    E31

    E29 E29

    E13

    E03

    E30

    E04

    4A4.03

    E18

    E11E14

    E01

    E14TYP.

    E22

    E25

    E33

    EL. 100.000T.O. LEVEL 1 SLAB

    EL. 104.600T.O. LEVEL 2 SLAB

    A B C D E

    EL. 109.200T.O. LEVEL 3 SLAB

    EL. 113.500U/S ROOF DECK

    EL. 114.085T.O ROOF PARAPET

    E15 E02 TYP.

    E02

    E19

    E19

    E19 E19 E19

    E19 E19

    E02 E02 E02

    E02 E02 E02

    E02

    E23E26

    E16

    E27 E28

    E23

    E23 E22 E22

    E27

    E23

    E31 E31

    E30

    E32

    E13

    E30

    E14

    3A4.03

    E34

    1350

    E34

    E18

    E21

    E22

    E25

    E09

    E25

    E22

    E24E26

    10

    10

    10

    10

    ALUMINUM WINDOW BOX

    CURTAIN WALL

    FIBRE CEMENT PANEL

    10 10

    10

    ALUMINUM WINDOW BOX

    CURTAIN WALL

    FIBRE CEMENT PANEL

    ALIGN PANEL WITH BOTTOM OF ALUMINUM WINDOW BOX

    ALIGN

    ALUMINUM WINDOW BOX

    CURTAIN WALL

    10 10

    FLASHING MATCH COLOR OF ADJACENT WALL PANEL

    CONSULTANT INFORMATION

    PROJECT INFORMATION

    ISSUED DATE

    SCALE

    DATE

    DRAWN BY

    CHECKED BY

    PROJECT NO.

    DRAWING TITLE

    DRAWING NO.

    This drawing supercedes previous issues. Do not scale these drawings.

    Verify all dimensions, elevations and datums, and report any discrepancies to the Architect prior to construction. Dimensions are taken to face of exterior sheathing, face of concrete block, face of stud for interior partitions, and centreline of demising walls, unless noted otherwise on the drawing.

    The Contract Documents (Drawings and Specifications) are complimentary, what is required by one shall be as binding as required by all.

    All drawings remain the property of the Architect. These drawings are Copyright , S2 Architecture. These drawings may not be reproduced without the permission of the Architect.

    327, 309 W Cordova Street

    Vancouver, BC, Canada V6B 1E5

    T 604.661.8806

    www.s2architecture.com

    2020

    As indicated

    1/21/2020 9:01:42 PM

    C:\

    Rev

    it P

    roje

    cts\

    2181

    66_A

    -Bas

    e_C

    D_e

    .kla

    tt@s2

    arch

    itect

    ure.

    com

    .rv t

    Nanaimo Fire Station

    #1 Replacement

    618 & 666 FITZWILLIAM

    STREET

    NANAIMO, BRITISHCOLUMBIA

    NH / MT

    GJO / EK

    218166

    EXTERIOR ELEVATIONS

    A4.01SCALE: 1 : 50A4.01

    A2.00

    West Elevation3

    Exterior Elevations Keynote Legend

    000 KEYNOTE SYMBOL

    E01 EXTERIOR STAIR & GUARD/HANDRAIL, PRIME & PAINT ALL METAL - P7G4FINISH

    E02 ALUMINUM CURTAIN WALL SYSTEM, REFER TO GLAZING SCHEDULE

    E03 MECHANICAL EQUIPMENT. REFER TO MECHANICAL DRAWINGS

    E04 HOLLOW METAL INSULATED DOORS, REFER TO DOOR SCHEDULE

    E05 GLASS DOOR IN ALUMINUM CURTAIN WALL FRAMING - REFER TO DOORSCHEDULE

    E06 ALUMINUM DOOR IN ALUMINUM CURTAIN WALL FRAMING - REFER TO DOORSCHEDULE

    E07 PREFINISHED BI-FOLD DOORS - REFER TO DOOR SCHEDULE

    E08 OVERHEAD SECTION DOOR - REFER TO DOOR SCHEDULE

    E09 GLASS FIBRE REINFORCED CEMENT COMPOSITE PANEL MECHANICAL ROOFSCREEN SYSTEM - CCP1 FINISH

    E10 1070mm HIGH ROOF TERRACE GUARD RAIL

    E11 PREFINISHED METAL LOUVRE TO MATCH EXTERIOR PANEL WIDTH- P9G4 FINISHWHERE LOCATED ADJACENT TO CCP1 FINISH, P7G4 FINISH WHERE LOCATEDADJACENT TO CCP2 FINISH

    E12 GAS METER c/w CHAIN-LINK ENCLOSURE, REFER SITE DWGS & TOMECHANICAL

    E13 MECHANICAL COVERS. FINISH TO MATCH ADJACENT MATERIAL FINISHCOLOUR. REFER TO MECHANICAL.

    E14 CONCRETE FILLED BOLLARD. REFER TO STRUCTURAL DRAWINGS

    E15 FIRE DEPARTMENT CONNECTION. REFER TO MECHANICAL

    E16 BACK LIT EXTERIOR SIGNAGE. COLOUR:FROSTED WHITE.

    E17 ROOF SCUPPER. REFER TO DETAIL 9/A6.14 - P9G4 FINISH WHERE LOCATEDADJACENT TO CCP1 FINISH, P7G4 FINISH WHERE LOCATED ADJACENT TO CCP2FINISH, P8G4 FINISH WHERE LOCATED ADJACENT TO SPP1 FINISH

    E18 COMMUNICATION TOWER

    E19 PREFABRICATED ALUMINUM WINDOW BOXES - P8G4 FINISH

    E20 ROOF LADDER SECURED TO WALL - P9G4 FINISH WHERE LOCATED ADJACENTTO CCP1 FINISH, P7G4 FINISH WHERE LOCATED ADJACENT TO CCP2 FINISH

    E21 GLASS FIBRE REINFORCED CEMENT COMPOSITE PANEL - CCP1 FINISH

    E22 GLASS FIBRE REINFORCED CEMENT COMPOSITE PANEL - CCP2 FINISH

    E23 SOLID PHENOLIC WALL PANEL - SPP1 FINISH

    E24 PREFINISHED METAL FLASHING - P9G4 FINISH

    E25 PREFINISHED METAL FLASHING - P7G4 FINISH

    E26 PREFINISHED METAL FLASHING - P8G4 FINISH

    E27 METAL CLADDING PANEL - MCP1 FINISH

    E28 PREFINISHED METAL FLASHING - TO MATCH MCP1 FINISH

    E29 ELECTRONIC CARD READER. REFER TO ELECTRICAL

    E30 EXTERIOR LIGHT FIXTURE. REFER TO ELECTRICAL

    E31 CCTV CAMERA. REFER TO ELECTRICAL

    E32 FRONT ENTRY INTERCOM. REFER TO ELECTRICAL

    E33 EXTERIOR SIGNAGE. COLOR:RED

    E34 LOCATION OF POWER DOOR OPERATOR, CONTROLS EAST DOOR LEAF, REFERTO ELECTRICAL DRAWINGS

    E35 LOCATION OF TEMPORARY GENERATOR CONNECTION PANEL, REFER TOELECTRICAL DRAWINGS

    E36 PROVIDE SPACE BETWEEN CROSS-BRACING OF COMMUNICATION TOWER TOALLOW FOR LADDER ACCESS TO ROOF

    E37 COMMUNICATION CABLE TRAY, REFER TO ELECTRICAL DRAWINGS

    SCALE: 1 : 50A4.01

    A2.00

    South Elevation1

    SCALE: 1 : 5A4.01

    A4.01

    PANEL 12

    SCALE: 1 : 5A4.01

    A4.01

    PANEL 24

    SCALE: 1 : 5A4.01

    A4.01

    PANEL 35

    50% REVIEW 06.09.2019

    75% REVIEW 18.10.2019

    ISSUED FOR BP 23.10.2019

    PRE-TENDER REVIEW 15.11.2019

    COST ESTIMATE 13.12.2019

    CLIENT REVIEW 06.01.2020

    TENDER 22.01.2020

    BUILDING PERMIT 22.01.2020

  • EL. 100.000T.O. LEVEL 1 SLAB

    EL. 104.600T.O. LEVEL 2 SLAB

    12345

    78

    EL. 109.200T.O. LEVEL 3 SLAB

    EL. 113.500U/S ROOF DECK

    EL. 99.900T.O. APPARATUS SLAB

    EL. 114.085T.O ROOF PARAPET

    EL. 109.650T.O ROOF PARAPET

    6

    E20

    E17

    E10

    E19

    E17

    E19E19

    E19

    E20

    E14E04E04E04E04E02

    E02

    E02E02

    E08E15

    E02

    E30

    E26E23

    E26E23E21 E24

    E23

    E09

    E24E21

    E03

    E24E21

    E25E22

    E30

    E11 E11

    E30

    E30

    E30

    E11

    E11

    E22

    E30E31

    E32

    E31

    E29 E29

    E29

    E13

    E35

    E11

    E18

    E28 E27

    E22

    E12E01

    E03

    E36

    T.O

    LO

    UV

    ER

    3440

    T.O

    LO

    UV

    ER

    8320

    E13

    E13

    E37

    EL. 104.600T.O. LEVEL 2 SLAB

    ABCDE

    EL. 109.200T.O. LEVEL 3 SLAB

    EL. 113.500U/S ROOF DECK

    EL. 99.900T.O. APPARATUS SLAB

    EL. 114.085T.O ROOF PARAPET

    EL. 109.650T.O ROOF PARAPET

    E20 E17

    E17

    E04

    E14

    E12

    E30

    E24E21

    E31E31

    E29

    E22 E25

    E22

    E27

    E13

    E31

    E11

    E11

    E18

    E35

    E14

    E11

    E28

    E22

    E11

    TYP.

    E11

    E04

    E31

    T.O

    LO

    UV

    ER

    8340

    T.O

    LO

    UV

    ER

    3870

    E11

    E01

    CONSULTANT INFORMATION

    PROJECT INFORMATION

    ISSUED DATE

    SCALE

    DATE

    DRAWN BY

    CHECKED BY

    PROJECT NO.

    DRAWING TITLE

    DRAWING NO.

    This drawing supercedes previous issues. Do not scale these drawings.

    Verify all dimensions, elevations and datums, and report any discrepancies to the Architect prior to construction. Dimensions are taken to face of exterior sheathing, face of concrete block, face of stud for interior partitions, and centreline of demising walls, unless noted otherwise on the drawing.

    The Contract Documents (Drawings and Specifications) are complimentary, what is required by one shall be as binding as required by all.

    All drawings remain the property of the Architect. These drawings are Copyright , S2 Architecture. These drawings may not be reproduced without the permission of the Architect.

    327, 309 W Cordova Street

    Vancouver, BC, Canada V6B 1E5

    T 604.661.8806

    www.s2architecture.com

    2020

    1 : 50

    1/21/2020 9:01:47 PM

    C:\

    Rev

    it P

    roje

    cts\

    2181

    66_A

    -Bas

    e_C

    D_e

    .kla

    tt@s2

    arch

    itect

    ure.

    com

    .rv t

    Nanaimo Fire Station

    #1 Replacement

    618 & 666 FITZWILLIAM

    STREET

    NANAIMO, BRITISHCOLUMBIA

    NH / MT

    GJO / EK

    218166

    EXTERIOR ELEVATIONS

    A4.02SCALE: 1 : 50A4.02

    A2.00

    East Elevation2

    SCALE: 1 : 50A4.02

    A2.00

    North Elevation1

    Exterior Elevations Keynote Legend

    000 KEYNOTE SYMBOL

    E01 EXTERIOR STAIR & GUARD/HANDRAIL, PRIME & PAINT ALL METAL - P7G4FINISH

    E02 ALUMINUM CURTAIN WALL SYSTEM, REFER TO GLAZING SCHEDULE

    E03 MECHANICAL EQUIPMENT. REFER TO MECHANICAL DRAWINGS

    E04 HOLLOW METAL INSULATED DOORS, REFER TO DOOR SCHEDULE

    E05 GLASS DOOR IN ALUMINUM CURTAIN WALL FRAMING - REFER TO DOORSCHEDULE

    E06 ALUMINUM DOOR IN ALUMINUM CURTAIN WALL FRAMING - REFER TO DOORSCHEDULE

    E07 PREFINISHED BI-FOLD DOORS - REFER TO DOOR SCHEDULE

    E08 OVERHEAD SECTION DOOR - REFER TO DOOR SCHEDULE

    E09 GLASS FIBRE REINFORCED CEMENT COMPOSITE PANEL MECHANICAL ROOFSCREEN SYSTEM - CCP1 FINISH

    E10 1070mm HIGH ROOF TERRACE GUARD RAIL

    E11 PREFINISHED METAL LOUVRE TO MATCH EXTERIOR PANEL WIDTH- P9G4 FINISHWHERE LOCATED ADJACENT TO CCP1 FINISH, P7G4 FINISH WHERE LOCATEDADJACENT TO CCP2 FINISH

    E12 GAS METER c/w CHAIN-LINK ENCLOSURE, REFER SITE DWGS & TOMECHANICAL

    E13 MECHANICAL COVERS. FINISH TO MATCH ADJACENT MATERIAL FINISHCOLOUR. REFER TO MECHANICAL.

    E14 CONCRETE FILLED BOLLARD. REFER TO STRUCTURAL DRAWINGS

    E15 FIRE DEPARTMENT CONNECTION. REFER TO MECHANICAL

    E16 BACK LIT EXTERIOR SIGNAGE. COLOUR:FROSTED WHITE.

    E17 ROOF SCUPPER. REFER TO DETAIL 9/A6.14 - P9G4 FINISH WHERE LOCATEDADJACENT TO CCP1 FINISH, P7G4 FINISH WHERE LOCATED ADJACENT TO CCP2FINISH, P8G4 FINISH WHERE LOCATED ADJACENT TO SPP1 FINISH

    E18 COMMUNICATION TOWER

    E19 PREFABRICATED ALUMINUM WINDOW BOXES - P8G4 FINISH

    E20 ROOF LADDER SECURED TO WALL - P9G4 FINISH WHERE LOCATED ADJACENTTO CCP1 FINISH, P7G4 FINISH WHERE LOCATED ADJACENT TO CCP2 FINISH

    E21 GLASS FIBRE REINFORCED CEMENT COMPOSITE PANEL - CCP1 FINISH

    E22 GLASS FIBRE REINFORCED CEMENT COMPOSITE PANEL - CCP2 FINISH

    E23 SOLID PHENOLIC WALL PANEL - SPP1 FINISH

    E24 PREFINISHED METAL FLASHING - P9G4 FINISH

    E25 PREFINISHED METAL FLASHING - P7G4 FINISH

    E26 PREFINISHED METAL FLASHING - P8G4 FINISH

    E27 METAL CLADDING PANEL - MCP1 FINISH

    E28 PREFINISHED METAL FLASHING - TO MATCH MCP1 FINISH

    E29 ELECTRONIC CARD READER. REFER TO ELECTRICAL

    E30 EXTERIOR LIGHT FIXTURE. REFER TO ELECTRICAL

    E31 CCTV CAMERA. REFER TO ELECTRICAL

    E32 FRONT ENTRY INTERCOM. REFER TO ELECTRICAL

    E33 EXTERIOR SIGNAGE. COLOR:RED

    E34 LOCATION OF POWER DOOR OPERATOR, CONTROLS EAST DOOR LEAF, REFERTO ELECTRICAL DRAWINGS

    E35 LOCATION OF TEMPORARY GENERATOR CONNECTION PANEL, REFER TOELECTRICAL DRAWINGS

    E36 PROVIDE SPACE BETWEEN CROSS-BRACING OF COMMUNICATION TOWER TOALLOW FOR LADDER ACCESS TO ROOF

    E37 COMMUNICATION CABLE TRAY, REFER TO ELECTRICAL DRAWINGS

    50% REVIEW 06.09.2019

    75% REVIEW 18.10.2019

    ISSUED FOR BP 23.10.2019

    PRE-TENDER REVIEW 15.11.2019

    COST ESTIMATE 13.12.2019

    CLIENT REVIEW 06.01.2020

    TENDER 22.01.2020

    BUILDING PERMIT 22.01.2020

  • ABCDE

    EL. 109.200T.O. LEVEL 3 SLAB

    EL. 113.500U/S ROOF DECK

    EL. 114.085T.O ROOF PARAPET

    EL. 109.650T.O ROOF PARAPET

    E17

    E19

    E02

    E19

    E20

    E02

    E02

    E06

    E06

    E02

    E19

    E19

    E21

    E30

    E30

    E24

    E09 E03

    E30

    E21 E24

    E23 E26

    E11E11

    E10

    SIM.SIM.

    A

    EL. 109.200T.O. LEVEL 3 SLAB

    EL. 113.500U/S ROOF DECK

    EL. 114.085T.O ROOF PARAPET

    EL. 109.650T.O ROOF PARAPET

    E20

    E04

    E30

    E29

    E30

    E18

    E11

    E22

    E25

    EL. 104.600T.O. LEVEL 2 SLAB

    A

    EL. 109.200T.O. LEVEL 3 SLAB

    EL. 113.500U/S ROOF DECK

    6315

    2000

    3D LED SIDE-LIT ACRYLIC SIGN w/ 150mm CLEAR ACRYLIC RETURNS c/w OPAQUE FRONT AND BACK PANEL, COLOUR FROSTED WHITE. FLUSH MOUNT TO FACE OF FINISH

    EQ.EQ.

    EL. 104.600T.O. LEVEL 2 SLAB

    2 3 4

    EL. 109.200T.O. LEVEL 3 SLAB

    4000 11800

    3D POWDER COATED ALUMINUM SIGN w/ 50mm RETURNS, COLOUR RED. PROJECTED MOUNT 100mm FROM FACE OF FINISH2

    000

    590

    EL. 113.500U/S ROOF DECK

    OPENING

    1415

    MIN

    .

    610

    ** VERTICAL INTERMEDIATE HSS NOT SHOWN FOR CLARITY

    E21

    EL. 113.500U/S ROOF DECK

    1415

    MIN

    .

    610

    OPENING

    ** VERTICAL INTERMEDIATE HSS NOT SHOWN FOR CLARITY

    E21

    1415

    MIN

    .

    610

    ** VERTICAL INTERMEDIATE HSS NOT SHOWN FOR CLARITY

    E21

    1415

    MIN

    .

    610

    ** VERTICAL INTERMEDIATE HSS NOT SHOWN FOR CLARITY

    E21

    CONSULTANT INFORMATION

    PROJECT INFORMATION

    ISSUED DATE

    SCALE

    DATE

    DRAWN BY

    CHECKED BY

    PROJECT NO.

    DRAWING TITLE

    DRAWING NO.

    This drawing supercedes previous issues. Do not scale these drawings.

    Verify all dimensions, elevations and datums, and report any discrepancies to the Architect prior to construction. Dimensions are taken to face of exterior sheathing, face of concrete block, face of stud for interior partitions, and centreline of demising walls, unless noted otherwise on the drawing.

    The Contract Documents (Drawings and Specifications) are complimentary, what is required by one shall be as binding as required by all.

    All drawings remain the property of the Architect. These drawings are Copyright , S2 Architecture. These drawings may not be reproduced without the permission of the Architect.

    327, 309 W Cordova Street

    Vancouver, BC, Canada V6B 1E5

    T 604.661.8806

    www.s2architecture.com

    2020

    1 : 50

    1/21/2020 9:01:52 PM

    C:\

    Rev

    it P

    roje

    cts\

    2181

    66_A

    -Bas

    e_C

    D_e

    .kla

    tt@s2

    arch

    itect

    ure.

    com

    .rv t

    Nanaimo Fire Station

    #1 Replacement

    618 & 666 FITZWILLIAM

    STREET

    NANAIMO, BRITISHCOLUMBIA

    MT

    GJO / EK

    218166

    EXTERIOR ELEVATIONS

    A4.03

    SCALE: 1 : 50A4.03

    A2.00

    North Third Floor Elevation1SCALE: 1 : 50A4.03

    A2.00

    Third Floor Tower Elevation2

    Exterior Elevations Keynote Legend

    000 KEYNOTE SYMBOL

    E01 EXTERIOR STAIR & GUARD/HANDRAIL, PRIME & PAINT ALL METAL - P7G4FINISH

    E02 ALUMINUM CURTAIN WALL SYSTEM, REFER TO GLAZING SCHEDULE

    E03 MECHANICAL EQUIPMENT. REFER TO MECHANICAL DRAWINGS

    E04 HOLLOW METAL INSULATED DOORS, REFER TO DOOR SCHEDULE

    E05 GLASS DOOR IN ALUMINUM CURTAIN WALL FRAMING - REFER TO DOORSCHEDULE

    E06 ALUMINUM DOOR IN ALUMINUM CURTAIN WALL FRAMING - REFER TO DOORSCHEDULE

    E07 PREFINISHED BI-FOLD DOORS - REFER TO DOOR SCHEDULE

    E08 OVERHEAD SECTION DOOR - REFER TO DOOR SCHEDULE

    E09 GLASS FIBRE REINFORCED CEMENT COMPOSITE PANEL MECHANICAL ROOFSCREEN SYSTEM - CCP1 FINISH

    E10 1070mm HIGH ROOF TERRACE GUARD RAIL

    E11 PREFINISHED METAL LOUVRE TO MATCH EXTERIOR PANEL WIDTH- P9G4 FINISHWHERE LOCATED ADJACENT TO CCP1 FINISH, P7G4 FINISH WHERE LOCATEDADJACENT TO CCP2 FINISH

    E12 GAS METER c/w CHAIN-LINK ENCLOSURE, REFER SITE DWGS & TOMECHANICAL

    E13 MECHANICAL COVERS. FINISH TO MATCH ADJACENT MATERIAL FINISHCOLOUR. REFER TO MECHANICAL.

    E14 CONCRETE FILLED BOLLARD. REFER TO STRUCTURAL DRAWINGS

    E15 FIRE DEPARTMENT CONNECTION. REFER TO MECHANICAL

    E16 BACK LIT EXTERIOR SIGNAGE. COLOUR:FROSTED WHITE.

    E17 ROOF SCUPPER. REFER TO DETAIL 9/A6.14 - P9G4 FINISH WHERE LOCATEDADJACENT TO CCP1 FINISH, P7G4 FINISH WHERE LOCATED ADJACENT TO CCP2FINISH, P8G4 FINISH WHERE LOCATED ADJACENT TO SPP1 FINISH

    E18 COMMUNICATION TOWER

    E19 PREFABRICATED ALUMINUM WINDOW BOXES - P8G4 FINISH

    E20 ROOF LADDER SECURED TO WALL - P9G4 FINISH WHERE LOCATED ADJACENTTO CCP1 FINISH, P7G4 FINISH WHERE LOCATED ADJACENT TO CCP2 FINISH

    E21 GLASS FIBRE REINFORCED CEMENT COMPOSITE PANEL - CCP1 FINISH

    E22 GLASS FIBRE REINFORCED CEMENT COMPOSITE PANEL - CCP2 FINISH

    E23 SOLID PHENOLIC WALL PANEL - SPP1 FINISH

    E24 PREFINISHED METAL FLASHING - P9G4 FINISH

    E25 PREFINISHED METAL FLASHING - P7G4 FINISH

    E26 PREFINISHED METAL FLASHING - P8G4 FINISH

    E27 METAL CLADDING PANEL - MCP1 FINISH

    E28 PREFINISHED METAL FLASHING - TO MATCH MCP1 FINISH

    E29 ELECTRONIC CARD READER. REFER TO ELECTRICAL

    E30 EXTERIOR LIGHT FIXTURE. REFER TO ELECTRICAL

    E31 CCTV CAMERA. REFER TO ELECTRICAL

    E32 FRONT ENTRY INTERCOM. REFER TO ELECTRICAL

    E33 EXTERIOR SIGNAGE. COLOR:RED

    E34 LOCATION OF POWER DOOR OPERATOR, CONTROLS EAST DOOR LEAF, REFERTO ELECTRICAL DRAWINGS

    E35 LOCATION OF TEMPORARY GENERATOR CONNECTION PANEL, REFER TOELECTRICAL DRAWINGS

    E36 PROVIDE SPACE BETWEEN CROSS-BRACING OF COMMUNICATION TOWER TOALLOW FOR LADDER ACCESS TO ROOF

    E37 COMMUNICATION CABLE TRAY, REFER TO ELECTRICAL DRAWINGS

    SCALE: 1 : 50A4.03

    A2.00

    South Elevation Signage3SCALE: 1 : 50A4.03

    A2.00

    West Elevation Signage4SCALE: 1 : 50A4.03

    Roof Screen North Elevation5

    SCALE: 1 : 50A4.03

    Roof Screen South Elevation6SCALE: 1 : 50A4.03

    Roof Screen East Elevation7SCALE: 1 : 50A4.03

    Roof Screen West Elevation8

    50% REVIEW 06.09.2019

    75% REVIEW 18.10.2019

    ISSUED FOR BP 23.10.2019

    PRE-TENDER REVIEW 15.11.2019

    COST ESTIMATE 13.12.2019

    CLIENT REVIEW 06.01.2020

    TENDER 22.01.2020

    BUILDING PERMIT 22.01.2020

  • 7 7 7 78 78 85 56

    21 21 21 2118 1820 20 19 20 20

    7 8 8 8 8 8 87 7 76

    18 2121 181818191918212121

    30 303030303031323031

    2222222222222225 25 25 25 25 25 232424242424242424

    ± 1250± 12501730

    2290

    29 29 29 29 282626 26 26 26 26 2628282828

    734

    C

    C

    C

    C

    C C C

    C

    C

    C

    C

    C C

    C

    C C

    C

    C

    C

    C

    C C C C C C C C

    540 1850 1820 1820 1940 438

    822

    C

    OPENING

    ± 2007

    28 28 29 2926 26 26

    4 1 3 3 33 3 3 34 4 4

    21 21 21 21 21 2120 20 20 18 18

    88888888888887 7 7 7 7 7 7 7 7 77 7 7 7 7875 5 5 5 7 5

    21 2020 1918

    4344

    2020202020202020202020202020202020 21 21 191818181821212121212121 1818 19 21 21 21

    24 24 24 24 24252525252523 232222

    12 12 3230 30 30 3031 31

    16 16 1615

    12 11 CCCC

    C

    C C

    C

    C

    C

    C

    C

    C

    C

    C

    C

    CC

    C C

    CC

    C

    C

    C

    C

    C

    ± 569

    SLOPE BOTTOM EDGE OF PANELS

    SIM SIM

    Exterior Elevation - Panel Sizes

    5

    6

    7

    8

    9

    10

    11

    12

    600mm x 2130mm

    800mm x 2130mm

    900mm x 2130mm

    1220mm x 2130mm

    600mm x 2385mm

    800mm x 2385mm

    900mm x 2385mm

    1220mm x 2385mm

    13

    14

    15

    16

    600mm x 2495mm

    800mm x 2495mm

    900mm x 2495mm

    1220mm x 2495mm

    18

    19

    20

    21

    600mm x 2535mm

    800mm x 2535mm

    900mm x 2535mm

    1220mm x 2535mm

    1

    2

    3

    4

    600mm x 1880mm

    800mm x 1880mm

    900mm x 1880mm

    1220mm x 1880mm

    17 400mm x 2535mm

    22

    23

    24

    25

    600mm x 1730mm

    800mm x 1730mm

    900mm x 1730mm

    1220mm x 1730mm

    26

    27

    28

    29

    600mm x 1415mm

    NOT USED

    900mm x 1415mm

    1220mm x 1415mm

    NOTE: REFER TO EXTERIOR ELEVATIONS FOR FINISH

    C CUSTOM SIZE / CUT PANEL

    30 600mm x 2290mm

    31 900mm x 2290mm

    32 1220mm x 2290mm

    CONSULTANT INFORMATION

    PROJECT INFORMATION

    ISSUED DATE

    SCALE

    DATE

    DRAWN BY

    CHECKED BY

    PROJECT NO.

    DRAWING TITLE

    DRAWING NO.

    This drawing supercedes previous issues. Do not scale these drawings.

    Verify all dimensions, elevations and datums, and report any discrepancies to the Architect prior to construction. Dimensions are taken to face of exterior sheathing, face of concrete block, face of stud for interior partitions, and centreline of demising walls, unless noted otherwise on the drawing.

    The Contract Documents (Drawings and Specifications) are complimentary, what is required by one shall be as binding as required by all.

    All drawings remain the property of the Architect. These drawings are Copyright , S2 Architecture. These drawings may not be reproduced without the permission of the Architect.

    327, 309 W Cordova Street

    Vancouver, BC, Canada V6B 1E5

    T 604.661.8806

    www.s2architecture.com

    2020

    As indicated

    1/21/2020 9:01:57 PM

    C:\

    Rev

    it P

    roje

    cts\

    2181

    66_A

    -Bas

    e_C

    D_e

    .kla

    tt@s2

    arch

    itect

    ure.

    com

    .rv t

    Nanaimo Fire Station

    #1 Replacement

    618 & 666 FITZWILLIAM

    STREET

    NANAIMO, BRITISHCOLUMBIA

    ML

    GJO / EK

    218166

    EXTERIOR PANEL LAYOUT

    A4.04

    SCALE: 1 : 50A4.04

    TEMP

    South Elevation Panel Layout1

    SCALE: 1 : 50A4.04

    A2.12

    West Elevation Panel Layout2

    PRE-TENDER REVIEW 15.11.2019

    COST ESTIMATE 13.12.2019

    CLIENT REVIEW 06.01.2020

    TENDER 22.01.2020

    BUILDING PERMIT 22.01.2020

  • 5 7 7 7 8 8 8 8 7 7 7 5 5 7 7 7 8 8 8 8 6 7 8 88

    3 4 34

    21 18 20 21

    21 21 21 21 21 20 20 18 18 20 20 20 21 21 20 20 20 21 21 21 21 20 20 2117

    161616151516151316131315

    C

    C1616161615141415151616

    12C 12 12 12 12 12 12 12 11

    C

    C 11 11 11 9 9 12 12 12 10

    C

    C

    C

    C

    C

    C

    C

    C

    C129

    3 4 4 4

    21 21 21 20

    888888877555557788775557788775557576

    182020202121212020201818202021212120202020212020202020202121211821

    18212020181818

    1113241

    2018

    1133

    18

    7

    20

    15151515 1513 13 13 13 13 13 13 13 1314 14 14 14 14 14 14 161616161616161616161616

    12999999930303030 32 32 12 12 1212 12 12 12 11111111313131 9

    26 28 28 26 29 29 26

    969 1220 1220 969

    712

    24232323 2524

    C

    C

    C

    C

    C

    CCCC

    CCCC

    CCC

    CC

    CC

    C

    C C

    CC

    C

    C

    SLOPE BOTTOM EDGE OF PANELS

    SIM SIMSIM

    ± 569

    31

    Exterior Elevation - Panel Sizes

    5

    6

    7

    8

    9

    10

    11

    12

    600mm x 2130mm

    800mm x 2130mm

    900mm x 2130mm

    1220mm x 2130mm

    600mm x 2385mm

    800mm x 2385mm

    900mm x 2385mm

    1220mm x 2385mm

    13

    14

    15

    16

    600mm x 2495mm

    800mm x 2495mm

    900mm x 2495mm

    1220mm x 2495mm

    18

    19

    20

    21

    600mm x 2535mm

    800mm x 2535mm

    900mm x 2535mm

    1220mm x 2535mm

    1

    2

    3

    4

    600mm x 1880mm

    800mm x 1880mm

    900mm x 1880mm

    1220mm x 1880mm

    17 400mm x 2535mm

    22

    23

    24

    25

    600mm x 1730mm

    800mm x 1730mm

    900mm x 1730mm

    1220mm x 1730mm

    26

    27

    28

    29

    600mm x 1415mm

    NOT USED

    900mm x 1415mm

    1220mm x 1415mm

    NOTE: REFER TO EXTERIOR ELEVATIONS FOR FINISH

    C CUSTOM SIZE / CUT PANEL

    30 600mm x 2290mm

    31 900mm x 2290mm

    32 1220mm x 2290mm

    CONSULTANT INFORMATION

    PROJECT INFORMATION

    ISSUED DATE

    SCALE

    DATE

    DRAWN BY

    CHECKED BY

    PROJECT NO.

    DRAWING TITLE

    DRAWING NO.

    This drawing supercedes previous issues. Do not scale these drawings.

    Verify all dimensions, elevations and datums, and report any discrepancies to the Architect prior to construction. Dimensions are taken to face of exterior sheathing, face of concrete block, face of stud for interior partitions, and centreline of demising walls, unless noted otherwise on the drawing.

    The Contract Documents (Drawings and Specifications) are complimentary, what is required by one shall be as binding as required by all.

    All drawings remain the property of the Architect. These drawings are Copyright , S2 Architecture. These drawings may not be reproduced without the permission of the Architect.

    327, 309 W Cordova Street

    Vancouver, BC, Canada V6B 1E5

    T 604.661.8806

    www.s2architecture.com

    2020

    As indicated

    1/21/2020 9:02:02 PM

    C:\

    Rev

    it P

    roje

    cts\

    2181

    66_A

    -Bas

    e_C

    D_e

    .kla

    tt@s2

    arch

    itect

    ure.

    com

    .rv t

    Nanaimo Fire Station

    #1 Replacement

    618 & 666 FITZWILLIAM

    STREET

    NANAIMO, BRITISHCOLUMBIA

    ML

    GJO / EK

    218166

    EXTERIOR PANEL LAYOUT

    A4.05

    SCALE: 1 : 50A4.05

    TEMP

    North Elevation Panel Layout1

    SCALE: 1 : 50A4.05

    A2.11

    East Elevation Panel Layout2

    PRE-TENDER REVIEW 15.11.2019

    COST ESTIMATE 13.12.2019

    CLIENT REVIEW 06.01.2020

    TENDER 22.01.2020

    BUILDING PERMIT 22.01.2020

  • 66688 7 7 7 7 7 7 8885555 5 7

    4 4 4 4 4 4

    292929 29

    3 3 3 3 3 3 3

    2828282828282626 26 26 26

    1 1 1 44C

    C C C C C C

    CCCC

    OPENING

    ± 1137

    4 1 2 3 3

    4656C

    C

    Exterior Elevation - Panel Sizes

    5

    6

    7

    8

    9

    10

    11

    12

    600mm x 2130mm

    800mm x 2130mm

    900mm x 2130mm

    1220mm x 2130mm

    600mm x 2385mm

    800mm x 2385mm

    900mm x 2385mm

    1220mm x 2385mm

    13

    14

    15

    16

    600mm x 2495mm

    800mm x 2495mm

    900mm x 2495mm

    1220mm x 2495mm

    18

    19

    20

    21

    600mm x 2535mm

    800mm x 2535mm

    900mm x 2535mm

    1220mm x 2535mm

    1

    2

    3

    4

    600mm x 1880mm

    800mm x 1880mm

    900mm x 1880mm

    1220mm x 1880mm

    17 400mm x 2535mm

    22

    23

    24

    25

    600mm x 1730mm

    800mm x 1730mm

    900mm x 1730mm

    1220mm x 1730mm

    26

    27

    28

    29

    600mm x 1415mm

    NOT USED

    900mm x 1415mm

    1220mm x 1415mm

    NOTE: REFER TO EXTERIOR ELEVATIONS FOR FINISH

    C CUSTOM SIZE / CUT PANEL

    30 600mm x 2290mm

    31 900mm x 2290mm

    32 1220mm x 2290mm

    CONSULTANT INFORMATION

    PROJECT INFORMATION

    ISSUED DATE

    SCALE

    DATE

    DRAWN BY

    CHECKED BY

    PROJECT NO.

    DRAWING TITLE

    DRAWING NO.

    This drawing supercedes previous issues. Do not scale these drawings.

    Verify all dimensions, elevations and datums, and report any discrepancies to the Architect prior to construction. Dimensions are taken to face of exterior sheathing, face of concrete block, face of stud for interior partitions, and centreline of demising walls, unless noted otherwise on the drawing.

    The Contract Documents (Drawings and Specifications) are complimentary, what is required by one shall be as binding as required by all.

    All drawings remain the property of the Architect. These drawings are Copyright , S2 Architecture. These drawings may not be reproduced without the permission of the Architect.

    327, 309 W Cordova Street

    Vancouver, BC, Canada V6B 1E5

    T 604.661.8806

    www.s2architecture.com

    2020

    As indicated

    1/21/2020 9:02:04 PM

    C:\

    Rev

    it P

    roje

    cts\

    2181

    66_A

    -Bas

    e_C

    D_e

    .kla

    tt@s2

    arch

    itect

    ure.

    com

    .rv t

    Nanaimo Fire Station

    #1 Replacement

    618 & 666 FITZWILLIAM

    STREET

    NANAIMO, BRITISHCOLUMBIA

    ML

    GJO / EK

    218166

    EXTERIOR PANEL LAYOUT

    A4.06

    SCALE: 1 : 50A4.06

    THIRD FLOOR NORTH ELEVATION PANEL LAYOUT1

    SCALE: 1 : 50A4.06

    Hose Tower Panel Layout2

    PRE-TENDER REVIEW 15.11.2019

    COST ESTIMATE 13.12.2019

    CLIENT REVIEW 06.01.2020

    TENDER 22.01.2020

    BUILDING PERMIT 22.01.2020

    A-218166_Nanaimo_Tender_2020-01-22A0.02 - GLAZING SCHEDULESA0.03 - BUILDING CODE ANALYSISA0.04 - BUILDING CODE ANALYSISA1.00 - SITE SURVEYA1.01 - OVERALL SITE PHASING PLAN & SITE INFOA1.02 - SITE DEMOLITION PLANA1.03 - NEW SITE CONSTRUCTION PLANA1.04 - SITE DETAILS, GENSET AND TEMPORARY ACOUSTIC BARRIERSA2.00 - OVERALL FLOOR PLANSA2.11 - MAIN FLOOR CONSTRUCTION PLANA2.12 - SECOND FLOOR CONSTRUCTION PLANA2.13 - THIRD FLOOR CONSTRUCTION PLANA2.14 - MAIN FLOOR SLAB PLAN & ROOF PLANA2.15 - CANOPY AND SOFFIT PLANA2.21 - ENLARGED WASHROOM PLANSA3.00 - OVERALL REFLECTED CEILING PLANSA3.01 - ENLARGED MAIN FLOOR REFLECTED CEILING PLANA3.02 - ENLARGED APP BAY REFLECTED CEILING PLANA3.03 - ENLARGED SECOND & THIRD FLOOR REFLECTED CEILING PLANSA4.01 - EXTERIOR ELEVATIONSA4.02 - EXTERIOR ELEVATIONSA4.03 - EXTERIOR ELEVATIONSA4.04 - EXTERIOR PANEL LAYOUTA4.05 - EXTERIOR PANEL LAYOUTA4.06 - EXTERIOR PANEL LAYOUTA5.01 - BUILDING SECTIONSA5.02 - WALL SECTIONSA5.11 - STAIR PLANSA5.12 - STAIR SECTIONSA5.13 - HOSE TOWER AND SECTIONSA5.14 - STAIR DETAILSA6.01 - PLAN DETAILSA6.02 - PLAN DETAILSA6.11 - SECTION DETAILSA6.12 - SECTION DETAILSA6.13 - SECTION DETAILSA6.14 - SECTION DETAILSA6.15 - CANOPY DETAILSA6.20 - CEILING DETAILSA7.01 - FINISHES PLAN MAIN FLOOR, NORTHA7.02 - FINISHES PLAN MAIN FLOOR, SOUTHA7.03 - FINISHES PLAN SECOND FLOORA7.04 - FINISHES PLAN THIRD FLOORA8.01 - OVERALL FF&E PLANSA8.02 - ENLARGED MAIN FLOOR FF&E PLANSA8.03 - ENLARGED SECOND FLOOR FF&E PLANSA8.04 - ENLARGED THIRD FLOOR FF&E PLANSA9.01 - INTERIOR ELEVATIONS - MAIN LEVELA9.02 - INTERIOR ELEVATIONS - MAIN LEVELA9.03 - INTERIOR ELEVATIONS - SECOND & THIRD LEVELSA10.01 - MILLWORK TYPICAL SECTION DETAILSA10.02 - MILLWORK TYPICAL SECTION DETAILSA10.03 - MILLWORK & FINISH DETAILS

    S-218166_Nanaimo_Tender_2020-01-22S-001 - GENERAL NOTES AND TYPICAL DETAILSS-002 - GENERAL NOTES AND TYPICAL DETAILSS-003 - GENERAL NOTES AND TYPICAL DETAILSS-004 - GENERAL NOTES AND TYPICAL DETAILSS-005 - GENERAL NOTES AND TYPICAL DETAILSS-101 - FOUNDATION PLANS-102 - SECOND AND THIRD FLOOR FRAMING PLANSS-103 - ROOF FRAMING PLANS-301 - FRAMING ELEVATIONSS-302 - FRAMING ELEVATIONSS-401 - FOUNDATION SECTIONS AND DETAILSS-501 - SECTIONS AND DETAILSS-502 - SECTIONS AND DETAILS

    M-218166_Nanaimo_Tender_2020-01-22Sheets and ViewsM0.00

    Sheets and ViewsM0.01

    SheetsM1.00 - Plumbing Plan Below GradeM1.01 - Plumbing Plan Level 1M1.02 - Plumbing Plan Level 2M1.03 - Plumbing Plan Level 3M1.04 - Plumbing and HVAC Roof PlanM2.00 - HVAC Plan Level 1M2.01 - HVAC Plan Level 2M2.02 - HVAC Plan Level 3M3.00 - HVAC Piping Plan Level 1M3.01 - HVAC Piping Plan Level 2M3.02 - HVAC Piping Plan Level 3M4.00 - Fire Protection Plan Level 1M4.01 - Fire Protection Plan Level 2M4.02 - Fire Protection Plan Level 3

    Sheets and ViewsM5.01 Schematics 2 of 2-M5.00

    Sheets and ViewsM5.01 Schematics 2 of 2-M5.01

    Sheets and ViewsM6.01 Details 2 of 2-M6.00

    Sheets and ViewsM6.01 Details 2 of 2-M6.01

    Sheets and ViewsM7.00

    Sheets and ViewsSheets and ViewsSheetsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheetsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheetsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheetsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheetsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheetsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheetsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheetsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheetsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheetsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheetsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheetsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheetsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheetsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheetsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheetsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheetsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheetsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheetsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheetsSheets and ViewsSheets and ViewsSheets and ViewsSheets and ViewsSheets and Views

    E-218166_Nanaimo_Tender_2020-01-22C-218166_Nanaimo_Tender_2020-01-22C1.00 Cover SheetC1.01 General NotesC1.02 Phasing PlanC2.01 Key PlanC2.02 Grading PlanC2.03 Onsite Storm and WaterworksC2.04 DetailsC2.05 Onsite Stormwater Management PlanC3.01 Roadworks Lubbock SquareC3.02 Offsite Storm and Sanitary SewerC3.03 Offsite WaterworksC3.04 Lubbock Square Cross SectionsC3.05 Offsite Stormwater Control Plan - Pre DevelopmentC3.06 Offsite Stormwater Control Plan - Post DevelopmentC3.07 Erosion and Sediment Control DetailsC3.08 Erosion and Sediment Control Plan - Stage 1C3.09 Erosion and Sediment Control Plan - Stage 2C3.10 Erosion and Sediment Control Plan - Stage 3C3.11 Erosion and Sediment Control Plan - Stage 4 & 5

    L-218166_Nanaimo_Tender_2020-01-22L1.01-Landscape PlanViewport-20Viewport-24

    L2.01-Grading and IrrigationViewport-28Viewport-26

    L2.02-Landscape DetailsViewport-33Viewport-21CIP Concrete Paving-2Viewport-25Viewport-194/L2.02Gravel Maintenance Edge-2Concrete Edge Restraint8/L2.0217/L2.05Viewport-30

    L2.03-Landscape SectionsRain garden adjacent to concrete edge-2Section through Rain Garden at Prop line

    L3.01 -Planting PlanViewport-35Viewport-36

    F-218166_Nanaimo_Tender_2020-01-22Sheets and Views49-198-F1.0049-198-F2.0049-198-F3.00

    Sheets and ViewsSheets and Views

    SF-218166_Nanaimo_Tender_2020-01-143349E1.pdfSheets and Views3349E-E1

    Sheets and ViewsSheets and ViewsSheets and ViewsSheets and Views

    3349E1.pdf3349E1.pdf3349E1.pdf3349E1.pdf