WG10 Infrastructure for Georesources
EPOS Working Group 10 INFRASTRUCTURE FOR
GEORESOURCESResponse to induced seismicity studies
needs
Beata Orlecka-SikoraInstitute of Geophysics Polish Academy of Sciences, Warsaw, Poland
A Roadmap for Earth Science in Europe: The next generation of Geophysical Research Infrastructures, Erice 2013
WG10 Infrastructure for Georesources
SCIENCEBUSINESS
and INDUSTRY
PolandFrance
Norway
NetherlandsCzech Republik
Germany
Spain
Sweden
Denmark Switzerland
Coal Company
Niedzica Hydropower Plant
Institute of Innovative Technologies
Song Tranh 2 Hydropower Plant
Finland
Italy
Geothermal Exploration & Exploitationpending
Geothermie Soultzpending
A Roadmap for Earth Science in Europe: The next generation of Geophysical Research Infrastructures, Erice 2013
WG10 Infrastructure for Georesources
Aims of WG10:To facilitate a step-change in the IS research perspective from the present, technology-oriented approach, to one centred on physical problem, without losing touch with technological conditions of IS generation;
To intensify scientific international cooperation;
To Improve research efficiencyby facilitating instantaneous access to data, results, interpretations andmethodologies;
To strengthen cooperationbetween industry and science.
A Roadmap for Earth Science in Europe: The next generation of Geophysical Research Infrastructures, Erice 2013
WG10 Infrastructure for Georesources
Mutually beneficial, bi-directional cooperation between industry and science
IND
U
T
S
RY
SCIE
NCE
Diverse data sets Technical support Posed problems of
practical value Production knowledge
Scientific expertise Methodologies and
ready-to-use solutions to manage seismic hazard
Benefits Solutions to
manage IS hazard at an economically appropriate level and to increase the economic viability of the industrial production
Increased public awareness of real IS risks
Reservoir characterisation
Benefits Perspective of
practicioners Experiments under
different tectonic and technological conditions
Practical feedback. Tests of applicability of solutions in the course of real-time technological activity
A Roadmap for Earth Science in Europe: The next generation of Geophysical Research Infrastructures, Erice 2013
WG10 Infrastructure for Georesources
Dataset diversity
Co mprehe ns ive Ep iso de
A Roadmap for Earth Science in Europe: The next generation of Geophysical Research Infrastructures, Erice 2013
WG10 Infrastructure for Georesources
Dataset diversity
SE
IM
SI
CD
AT
A
Co mprehe ns ive Ep iso de
A Roadmap for Earth Science in Europe: The next generation of Geophysical Research Infrastructures, Erice 2013
WG10 Infrastructure for Georesources
GE
OD
AT
A
Dataset diversity
Co mprehe ns ive Ep iso de
A Roadmap for Earth Science in Europe: The next generation of Geophysical Research Infrastructures, Erice 2013
WG10 Infrastructure for Georesources
P R O T AD U C T I O N D A
Dataset diversity
Co mprehe ns ive Ep iso de
A Roadmap for Earth Science in Europe: The next generation of Geophysical Research Infrastructures, Erice 2013
WG10 Infrastructure for Georesources
Dataset diversity
Mining Induced Seismicity
Reservoir Induced Seismicity
CE
Injection / Extraction Induced Seismicity
Cases In Debate
CE
CE
CE
A Roadmap for Earth Science in Europe: The next generation of Geophysical Research Infrastructures, Erice 2013
WG10 Infrastructure for GeoresourcesMIS - Mining Induced SeismicityIIS - Injection / Extraction Induced
SeismicityRIS - Reservoir Induced Seismicity
MISMIS
IIS
MIS
RIS
RIS
IISIIS
MIS
IIS
RIS
A Roadmap for Earth Science in Europe: The next generation of Geophysical Research Infrastructures, Erice 2013
WG10 Infrastructure for Georesources
Data classification, attributesand data flow
A Roadmap for Earth Science in Europe: The next generation of Geophysical Research Infrastructures, Erice 2013
WG10 Infrastructure for Georesources
A Roadmap for Earth Science in Europe: The next generation of Geophysical Research Infrastructures, Erice 2013
WG10 Infrastructure for Georesources
Induced Seismicity Node
A Roadmap for Earth Science in Europe: The next generation of Geophysical Research Infrastructures, Erice 2013
WG10 Infrastructure for Georesources
IS as a characterization tool for production enhancement
The main outlines of Science Plan for Induced Seismicity Node
Similarities and particularities of seismic processes induced by different technological activitiesOptimization of IS monitoring strategiesDiscrimination between the induced and natural seismicityIS response to technological activity in a long and short time-scaleFrom time-dependent seismic hazard assessment to hazard management. Optimizing production for hazard control. THAIS initiative
Testing procedures and benchmark tests
IS and public concern
A Roadmap for Earth Science in Europe: The next generation of Geophysical Research Infrastructures, Erice 2013
WG10 Infrastructure for Georesources
General technical architecture of IS NodeScience Gateway: processing and presentation Data Accuisition and Integration
On-line data loading
Off-line data loading
Data preparation and QoS
Publishing services
New sources integration
Data and Metadata Repositories
Scientific and Technical Coordination
Data Management
Services
Scientific Analysis
And Visualisation
Tools
Open Access
Data Repository
Authentication and Authorization Services
User Registration
& Access Management
Data Backups
Metadata Repository
A Roadmap for Earth Science in Europe: The next generation of Geophysical Research Infrastructures, Erice 2013
WG10 Infrastructure for Georesources
Implementation Plan Timeline with Milestones
Phase 1: ImplementationMilestone ISN1-1: Coordination structure and essential staff in placeMilestone ISN1-2: Data repositories are operational Milestone ISN1-3: Process for integration of off-line sources in place, integration activity established Milestone ISN1-4: Process for integration of on-line sources in place Milestone ISN1-5: Science gateway in place with data management module and at least 2 scientific pipelines integratedMilestone ISN1-6: All IS Node services are operational, user registration open, pilot sources integrated
Phase 2: Integration
Milestone ISN2-1: At least 15 on-line stations are integrated
Milestone ISN2-2: Integration of 10 off-line data sources completed
Milestone ISN2-3: At least 30 on-line stations are integrated
Phase 3: Maintainance and
evolution Milestone ISN3-1: Sustainability and development plan
A Roadmap for Earth Science in Europe: The next generation of Geophysical Research Infrastructures, Erice 2013
WG10 Infrastructure for Georesources
Parameterization of IS node impact factor and measures of success of WG10 plan realization
Science Industry
Public
1 2
3
A Roadmap for Earth Science in Europe: The next generation of Geophysical Research Infrastructures, Erice 2013
WG10 Infrastructure for Georesources
To serve the scientific sector and advance research in IS field is a major task. Quality of research based on the IS NODE is important, and will be evaluated by other stakeholders.
Possible parameters: No. of comprehensive case studies No. of data/software/reports/services provided No. of downloads of data/software No. of peer reviewed papers acknowledging the IS Node No. of conference sessions, workshops, etc. on IS subject No. of cooperation links based on IS Node (industry, universities,
research assoc.) No. of expertises based on IS Node
1. SCIENCE
A Roadmap for Earth Science in Europe: The next generation of Geophysical Research Infrastructures, Erice 2013
WG10 Infrastructure for Georesources
2. INDUSTRYThe industry sector is of strategic relevance. IS may influence the operation plan. Therefore managing seismic hazard at an economically appropriate level is crucial.
Possible parameters: Total economic value of integrated RI provided by industry Total economic value of industrial stakeholders Number of industrial data providers Readiness of industrial partners to disseminate data, measured
by a level of comprehensiveness of the uploaded data cases; Number of disseminated solutions for the use by industrial
stakeholders Total economic value of science-industry collaborative projects; Total economic value of expertise provided
A Roadmap for Earth Science in Europe: The next generation of Geophysical Research Infrastructures, Erice 2013
WG10 Infrastructure for Georesources
3. PUBLICISN aims to increase public understanding and realistic evaluation of hazards due to IS by providing expert knowledge and background information.
Possible parameters: Number of public users of ISN; Quality of the information portal increasing awareness, graded by
users; Number of inquiries on anthropogenic seismic hazards and risks; Number of downloads of instructive materials on anthropogenic
seismicity.
A Roadmap for Earth Science in Europe: The next generation of Geophysical Research Infrastructures, Erice 2013
WG10 Infrastructure for Georesources
THANK YOU FOR ATTENTION