a knowledge based collaborative model for the rapid integration of platforms, people and processes

23
A knowledge based collaborative model for the rapid integration of platforms, people and processes. Feb 19 th 2010 Paul Fenton Montrium Inc.

Upload: paulkfenton

Post on 11-May-2015

601 views

Category:

Documents


6 download

DESCRIPTION

Presentation given at DIA EDM meeting in Washington DC in February 2010. Presentation introduces the notions of BPM and BI for the life sciences industry.

TRANSCRIPT

Page 1: A knowledge based collaborative model for the rapid integration of platforms, people and processes

A knowledge based collaborative model for the rapid integration of platforms, people and processes.Feb 19th 2010

Paul Fenton

Montrium Inc.

Page 2: A knowledge based collaborative model for the rapid integration of platforms, people and processes

The views and opinions expressed in the following PowerPoint slides are those of the individual presenter and should not be attributed to Drug Information Association, Inc. (“DIA”), its directors, officers, employees, volunteers, members, chapters, councils, Special Interest Area Communities or affiliates, or any organization with which the presenter is employed or affiliated.

 

These PowerPoint slides are the intellectual property of the individual presenter and are protected under the copyright laws of the United States of America and other countries. Used by permission. All rights reserved. Drug Information Association, DIA and DIA logo are registered trademarks or trademarks of Drug Information Association Inc. All other trademarks are the property of their respective owners.

2www.diahome.orgDrug Information Association

Page 3: A knowledge based collaborative model for the rapid integration of platforms, people and processes

Introduction

Page 4: A knowledge based collaborative model for the rapid integration of platforms, people and processes

How we work today

Information and procedural silos• In today’s GxP landscape we have:

– Many individuals, groups and organizations working independently

– Many computerized systems working independently– Many different department or organization specific

processes

• All generate data and information which for the most part remains dislocated and underexploited

• This makes our working environment inefficient and costly

Page 5: A knowledge based collaborative model for the rapid integration of platforms, people and processes

Lack of operational knowledge

• In a silo based model, it is difficult to gain cross system, cross functional knowledge

• We spend a lot of time transcribing, reconciling and collating data

• Often we do not have a clear picture of study progress at any one point in time, even less across programs of studies

• We do not fully exploit operational data (generated from automated system processes) and transform it into knowledge

Page 6: A knowledge based collaborative model for the rapid integration of platforms, people and processes

The Challenge

• In todays R&D environment, our challenge is to:– Make better drug development decisions– Accelerate time to market– Increase organizational efficiencies and agility– Improve understanding and management of R&D

processes– Reduce cost– Reduce risk– Improve quality– Improve compliance

Page 7: A knowledge based collaborative model for the rapid integration of platforms, people and processes

Meeting the Challenge..

• To meet the challenge we must break down organizational and procedural silos by:– Leveraging new technologies and work methods– Map out, re-engineer, automate and integrate

processes– Leverage and establish procedural and data

standards– Integrate computerized systems and data sources– Identify clear and measurable metrics and KPIs– Align and integrate the quality system with automated

processes

BPM and BI can help!

Page 8: A knowledge based collaborative model for the rapid integration of platforms, people and processes

Definition of BPM

• Business process management (BPM) is a management approach focused on aligning all aspects of an organization

• It is a holistic management approach that promotes business effectiveness and efficiency while striving for innovation, flexibility, and integration with technology

• Is based on continuous improvement of processes

Source: Wikipedia

Page 9: A knowledge based collaborative model for the rapid integration of platforms, people and processes

BPM technology elements

Page 10: A knowledge based collaborative model for the rapid integration of platforms, people and processes

Definition of Business Intelligence

In 1958 Hans Peter Luhn, a computer scientist at IBM used the term business intelligence for the first time. He defined intelligence as: "the ability to apprehend the interrelationships of presented facts in such a way as to guide action towards a desired goal."

Page 11: A knowledge based collaborative model for the rapid integration of platforms, people and processes

Definition of BI

• BI refers to skills, processes, technologies, applications and practices used to support decision making

• BI technologies provide historical, current, and predictive views of business operations

• BI is composed on reports, dashboards, metrics and analytical models

• BI is capable of transforming operational and business data into information and knowledge

Page 12: A knowledge based collaborative model for the rapid integration of platforms, people and processes

BI Implementation

Top Critical Success Factors are:• Business driven methodology & project

management• Clear vision & planning• Committed management support & sponsorship• Data management & quality issues• Mapping the solutions to the user requirements• Performance considerations of the BI system• Robust & extensible framework

Source: Naveen K Vodapalli, 2009

Page 13: A knowledge based collaborative model for the rapid integration of platforms, people and processes

Mapping out processes – High level to detailed

• We typically think of clinical trial organization as hierarchical

• Processes usually align to a particular level of hierarchy

• Processes can be high level and then drill down

Pgm

Molecule

StudyS

ite

Investigator

Page 14: A knowledge based collaborative model for the rapid integration of platforms, people and processes

Process MapsD

isco

very

Pre-C

linic

alStu

dies IN

D

Phase

I

Phase

II

Phase

III

ND

A

Laun

ch

Mol

ecul

e

Devel

opm

ent

Proto

col

Dev

elop

men

t

eCTD

Subm

issi

on

Site

Selec

tion

Publis

hing

MOLECULE

PROGRAM

STUDY

Reg

ulat

ory

Appro

val

ICF

Dev

elop

men

teC

RF

Dev

elop

men

t

Mon

itorin

gP

lan

SITESQ

V

CTA

CTM

Ship

. SIV

Bio-

Equiva

lenc

e

API/DP

CD

A

Page 15: A knowledge based collaborative model for the rapid integration of platforms, people and processes

Identifying milestones and KPI

• Milestones are predefined events within a process or processes

• Milestones are calculated or non-calculated values based on one or many datapoints

• Milestones correspond to predefined key events or values within the various levels of the process maps

• Examples of Milestones would be:– IND Submission (Molecule Level)– Protocol Approval (Study Level)– FPFV (Site Level)

Page 16: A knowledge based collaborative model for the rapid integration of platforms, people and processes

Identifying milestones and KPIs with process maps

• KPIs are key operational indicators which are calculated using information from processes, data and documents

• KPIs are calculated or non-calculated values based on one or many datapoints

• KPIs can be drilled in to to see underlying KPIs and data or rolled-up to see higher level KPIs

• Examples of KPIs would be:– Time between FPFV and DB Lock (study level)– Time between last query and DB lock (study level)– Time to query resolution (study, site level)– Number of queries by status (study / site) – Average protocol IRB approval time (site)

Page 17: A knowledge based collaborative model for the rapid integration of platforms, people and processes

Identifying milestones and KPIs with process maps

eCTD

Subm

issi

onIND

Starte

d

MOL101 – IND Preparation Time = 4mths

Doc

umen

t

Autho

ring

eCTD

Com

pila

tion

Doc

umen

t

Rev

iew

& A

ppro

val

Doc

umen

t

Publis

hing

Phase

I In

itiat

ion

FPFV

SQV

CTA

CTM

Ship

. SIVCD

A

IRB

Appro

val FP

Scree

ned

FP F

V

Time to FPFV = 6mths

Time to FPFV = 1mth

Page 18: A knowledge based collaborative model for the rapid integration of platforms, people and processes

Identify data sources and integration points

• Data sources for KPIs and Milestones can come from:– Documents and document metadata– Procedures and procedural data (workflows)– Databases (EDC, CTMS, Safety etc.)– Project plans and manual metrics

• When thinking about data for KPIs and Milestones, it is important to identify unique data sources

• Establishment and use of standards is key to be able to integrate data sources and procedures

Page 19: A knowledge based collaborative model for the rapid integration of platforms, people and processes

Integrating Processes through BPM

Page 20: A knowledge based collaborative model for the rapid integration of platforms, people and processes

Building an operational knowledge model

Dashboards -

roll-up, drill-down, drill-in• By identifying key metrics, milestones and indicators at all

levels we are able to develop multi-dimensional dashboards

• These dashboards allow up to move up and down in our operational knowledge

• By adding a third dimension we are able to drill in both in terms of data but also time

• This model enables us to pin point key factors which have positive/negative impacts on our operations

Page 21: A knowledge based collaborative model for the rapid integration of platforms, people and processes

Aligning with the QMS

• Implementing this approach often requires changes to components of the QMS

• When re-engineering processes try and break them down into clear steps, tasks, responsabilities and delvierable elements

• Clearly identify all interconnections on process maps• Re-engineer manual processes into automated

processes• Finally align these elements to your BPM and

collaborative environment

Page 22: A knowledge based collaborative model for the rapid integration of platforms, people and processes

Recommended approach

1. Map out R&D process maps; remember high to low

2. Identify processes (SOPs) and interactions for each level and step

3. Identify people and organizations who intervene in each process and step

4. Identify data sources

5. Identify key metrics, milestones and KPIs

6. Identify technology elements

7. Define a scope for pilot project

8. Implement and improve

Page 23: A knowledge based collaborative model for the rapid integration of platforms, people and processes

The light is at the end of the tunnel

Drug Information Association www.diahome.org 23