a 1 globalink vhf digital link mode 2 progress report to icao amcp wg-m/2 prepared by: dan...

13
A 1 GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2 Prepared by: Dan Pendergast [email protected] 410-266-2267 Presented by: Bassam Farroha [email protected] 410-266-2160

Upload: lucas-gallegos

Post on 27-Mar-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: A 1 GLOBALink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2 Prepared by: Dan Pendergast dpenderg@arinc.com 410-266-2267 Presented by: Bassam

A1

GLOBALink

VHF Digital Link Mode 2 Progress Report

toICAO AMCP WG-M/2

Prepared by:Dan Pendergast

[email protected]

Presented by:Bassam Farroha

[email protected]

Page 2: A 1 GLOBALink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2 Prepared by: Dan Pendergast dpenderg@arinc.com 410-266-2267 Presented by: Bassam

A2

Overview

VDL Mode 2 Accomplishments to Date

VDL Mode 2 Development Activities

VDL Mode 2 Deployment Activities

Page 3: A 1 GLOBALink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2 Prepared by: Dan Pendergast dpenderg@arinc.com 410-266-2267 Presented by: Bassam

A3

GLOBALink

VDL Mode 2 Progress Summary

Page 4: A 1 GLOBALink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2 Prepared by: Dan Pendergast dpenderg@arinc.com 410-266-2267 Presented by: Bassam

A4

ARINC’s Overall VDL Mode 2 Progress Summary

Initial VDL AOA Operational Capability Deployed and Operational

VDL AOA AQP Capability Established

First Flight Successfully Accomplished

Boeing Black Label Certification Underway

Deployment Activities for VDL Coverage Expansion Underway

ATN Development Meeting Milestones

Page 5: A 1 GLOBALink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2 Prepared by: Dan Pendergast dpenderg@arinc.com 410-266-2267 Presented by: Bassam

A5

GLOBALink

ARINC VDL Mode 2 Development Activities

for 2001

Page 6: A 1 GLOBALink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2 Prepared by: Dan Pendergast dpenderg@arinc.com 410-266-2267 Presented by: Bassam

A6

VDL Mode 2 Program 2001 Development Activities

AOA• Develop and deploy first maintenance release in June• Enhance AQP capability• Deployment RF test/analysis accomplished

Avionics Interoperability Testing for AOA and ATN• Collins underway (AOA and ATN)• Airbus/Aerospatiale underway for AOA• Boeing type certification underway• FAA interoperability tests underway (ATN)• EuroControl PETAL tests underway (ATN ground/ground)• Honeywell imminent (AOA)• Teledyne imminent (AOA)

Page 7: A 1 GLOBALink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2 Prepared by: Dan Pendergast dpenderg@arinc.com 410-266-2267 Presented by: Bassam

A7

VDL Mode 2 Program 2001 Development Activities

ATN• PETAL

Software test near completion and fielded within the next 30 days

– end-to-end CPDLC message delivery proven over the RF– AA 767 w/Collins CMU/ARINC ATN network/Maastricht

5 of 6 Ground stations deployed in Europe 2 AGRMs deployed in Europe ATN routers deployed Engineering network operations center established PETAL aircraft certification

– Two AGTS’s deployed and operational at Dallas-Fort Worth and Tulsa

– Aircraft certification underway

PETAL operational from May through October ‘01

Page 8: A 1 GLOBALink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2 Prepared by: Dan Pendergast dpenderg@arinc.com 410-266-2267 Presented by: Bassam

A8

VDL Mode 2 Program 2001 Development Activities

ATN

• Deployment Activities for Miami Airspace Coverage requirements defined with FAA and

American Airlines Ground Stations fielded as part of AOA deployment in

2001 and early 2002– additional Florida and Caribbean sites required

• ATN Service Operational in December ‘01 Will support CPDLC Build I and AOC needs ATN initially cut-over to limited geographical area Expansion to operational service cloud in Florida in

early ‘02

Page 9: A 1 GLOBALink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2 Prepared by: Dan Pendergast dpenderg@arinc.com 410-266-2267 Presented by: Bassam

A9

GLOBALink

ARINC VDL Mode 2 2001 Deployment Activities

Page 10: A 1 GLOBALink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2 Prepared by: Dan Pendergast dpenderg@arinc.com 410-266-2267 Presented by: Bassam

A10

VDL Mode 2 Service and Ground Station Roll-Out

Initial Operational Capability Established

2001 Deployment Activities Encompasses:• Installing over 80 VDL retrofit kits for currently deployed VDL-

capable ground stations• Beginning deployment of over 90 new ACARS/VDL operational

ground stations Over 20 retrofit kits fabricated to date

• Deploying Air/Ground Routers/Regional Managers (AGRMs)• Establishing VDL Mode 2 ATN IOC capability

2001 Deployment Coverage• Continental US focus is en-route cloud and CPDLC coverage• Europe focus is cloud to support Airbus VDL production

certification

Page 11: A 1 GLOBALink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2 Prepared by: Dan Pendergast dpenderg@arinc.com 410-266-2267 Presented by: Bassam

A11

VDL Mode 2Service and Ground Station Roll-Out

VDL Ground Station Deployment Approach• Long lead parts ordered and fabrication underway• Operational testing underway to ensure smooth

implementation (especially at high volume “critical” airports)

• Begin deployment at @ 20 ground stations per month in 2Q01 with the following focus:

VDL kits for already deployed VDL-upgradeable ground stations

New VDL ground stations for Miami airspace and to fill in holes in en-route VDL coverage

Page 12: A 1 GLOBALink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2 Prepared by: Dan Pendergast dpenderg@arinc.com 410-266-2267 Presented by: Bassam

A12

Representative Planned Operational CoverageCurrently Deployed VDL-Capable Ground Stations

Page 13: A 1 GLOBALink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2 Prepared by: Dan Pendergast dpenderg@arinc.com 410-266-2267 Presented by: Bassam

A13

Summary

One Big Milestone Accomplished and Several To Go in 2001• VDL Mode 2 Is Reality Now

The Focus of 2001 is:• PETAL• Deploying VDL Mode 2 ATN capability for AOC and

CPDLC• Expanding VDL Mode 2 Coverage• Continuing to Work with Industry for VDL Mode 2

Air/Ground Interoperability