    PLANNING AND DEVELOPMENT SERVICES STAFF REPORT

    For Planning Commission Meeting of June 5, 2012

    SUBJECT: DTE Buck ler Substation Site Plan for Planning Commission Approval

    (984 Broadway)

    File No. SP12-006

    PROPOSED CITY PLANNING COMMISSION MOTION

    The Ann Arbor City Planning Commission hereby approves the DTEBuckler Site Plan for Planning Commission Approval, subject to:

    1) Obtaining variances from the Zoning Board of Appeals from the conflictingland use buffer and storm water detention requirements;2) Obtaining a Michigan Department of Environmental Quality (MDEQ) permitfor work within the floodplain, prior to issuance of building permits;

    3) Relocating the fire hydrant and construction of associated water main, priorto the issuance of building permits;4) Completion of required footing drain disconnects, prior to final inspectionapproval; and5) Execution of water main easements, prior to final inspection approval.

  • 8/14/2019 984 Broadway DTE Buckler Substation Staff Report with Attachments, June 2012

    2/11

    DTE Buckler SubstationPage 2

    Planning Bicycle parking spaces are now shown on the plan. The off-site floodplain mitigationwas approved on May 15 when the Michcon site plan for Planning Commission was approved.The Michcon project included floodplain capacity being created on the Michcon site, upstreamfrom the DTE Buckler site to mitigate the construction of the transformer pads in the floodplain.

    Public Services The footing drains must be disconnected in accordance with Cityspecifications prior to final inspection; this information must be included on the site plan. A note

    must be added to the plan indicating that the water main easement will be provided. Details ofthe final relocation of the fire hydrant must be approved by City staff. The hydrant relocationshall be shown on the utility sheet.

    Fire Marshall The fire hydrant will be relocated to meet fire protection standards. The entirebuilding must fall within the 250 foot hydrant radius or combination of hydrant radii. The entireexternal portions of the building must be reached by a hose lay, along an approved fire route,that does not exceed 400 feet from a hydrant or combination of hydrants.

    Floodplain Staff supports the motion to approve off-site floodplain mitigation because it isconsistent with the conditions described in Chapter 57 (Subdivision and Land Use Control)Section 5:127(5). DTE Buckler proposes to add 363 cubic yards of fill to accommodate thetransformer pads and create 1,210 cubic yards of floodplain capacity on the Michcon sitelocated upstream and across the Huron River at 841 Broadway.

  • 8/14/2019 984 Broadway DTE Buckler Substation Staff Report with Attachments, June 2012

    3/11

    PLANNING AND DEVELOPMENT SERVICES STAFF REPORT

    For Planning Commission Meeting of May 15, 2012

    SUBJECT: DTE Buck ler Substation Site Plan for Planning Commission Approval

    (984 Broadway)

    File No. SP12-006

    PROPOSED CITY PLANNING COMMISSION MOTION

    The Ann Arbor City Planning Commission hereby approves the DTEBuckler Site Plan for Planning Commission Approval, subject to obtainingvariances from the Zoning Board of Appeals for a conflicting land use bufferand storm water detention and subject to obtaining a Michigan Department ofEnvironmental Quality (MDEQ) permit for work within the floodplain.

    STAFF RECOMMENDATION

    Staff recommends that this petition bepostponedto give the petitioner an opportunity torespond to staff comments.

  • 8/14/2019 984 Broadway DTE Buckler Substation Staff Report with Attachments, June 2012

    4/11

    DTE Buckler SubstationPage 2

    No change is proposed to the main access to the site. A vehicular access door will be relocatedfrom the east wall to the south wall to accommodate the new transformers.

    The petitioner indicates DTE is unable to provide on-site the conflicting land use buffer requiredalong the east side property line abutting Riverside Park. The petitioner is requesting avariance from this requirement to allow 33 trees and 38 shrubs to be planted along the far

    western side of Riverside Park instead.

    The petitioner is able to accommodate first flush and bankfull storm water storage on the southside of the site by modifying the outlet structure in the existing basin. The previous site planreceived a variance to allow this detention basin in a 100 year floodplain. It appears that thevariance was intended to waive the requirement to provide detention for the 100-year event.However, that variance was not specifically requested or provided and the variance languagewas somewhat vague. As a result, staff has recommended that the petitioner go to the Zoning

    Board of Appeals to specifically request a variance from the 100-year detention requirement.

    COMPARISON CHART

    EXISTING PROPOSED REQUIREMENTS

  • 8/14/2019 984 Broadway DTE Buckler Substation Staff Report with Attachments, June 2012

    5/11

    DTE Buckler SubstationPage 3

    SURROUNDING LAND USES AND ZONING

    LAND USE ZONING

    NORTH Medical, Residential R4C (Multiple-Family Dwelling)C1 (Local Business)

    R5 (Hotel)

    EAST Park PL (Public Land)

    SOUTH Huron River PL (Public Land)

    WEST River, Broadway Bridge PL (Public Land)

    HISTORY

    The brick building on the western edge of the site was constructed around 1905 and is notproposed to be affected by this project. A site plan was approved in 1999 to construct a 39,192square foot truck shelter. The large steel garage/storage shed was completed in 2000.

    PLANNING BACKGROUND

  • 8/14/2019 984 Broadway DTE Buckler Substation Staff Report with Attachments, June 2012

    6/11

    DTE Buckler SubstationPage 4

    Prepared by Jeff KahanReviewed by Wendy Rampsonmg/5/11/12

    Attachments: Zoning/Parcel MapsAerial PhotoSite PlanSite Plan DetailElevation

    c: Petitioner/Owner: Detroit Edison CompanyOne Energy PlazaDetroit, MI 48226-1279

    Petitioner's Representative: Mark Fairless, DTEOne Energy Plaza, 560 S. B.Detroit, MI 48226-1279

  • 8/14/2019 984 Broadway DTE Buckler Substation Staff Report with Attachments, June 2012

    7/11

    Broa

    dway

    StWallSt

    MaidenLn

    Tra

    verSt

    WrightSt

    BowenSt

    Fre

    esia

    Ct

    P

    onti

    acSt

    Free

    sia

    Ct

    Moore

    St

    LongShoreDr

    Sw

    iftSt

    JonesD

    r

    Alley

    Plymouth

    Rd

    Broa

    dwaySt

    WrightSt

    Nie

    lsenCt

    Howle

    yCt

    LongShoreDr

    R2A

    R2A

    PL

    R4A

    O

    R4A

    C1

    R4C

    R4C

    M1

    R5

    PUD

    C3

    C3

    M1

    PL

    984 Broadway St

    -Zoning Map-

  • 8/14/2019 984 Broadway DTE Buckler Substation Staff Report with Attachments, June 2012

    8/11

    Broa

    dway

    St

    WallSt

    MaidenLn

    Trav

    erSt

    WrightSt

    BowenSt

    Fre

    esia C

    Ponti

    acSt

    Free

    sia

    Ct

    MooreSt

    LongShoreDr

    SwiftSt

    JonesD

    r

    All

    ey

    Plym

    outh

    Rd

    Broad

    way

    St

    WrightSt

    Nielse

    nCtH

    owle

    yCt

    CanalSt

    LongShoreDr

    984 Broadway St

    -Aerial Map-

  • 8/14/2019 984 Broadway DTE Buckler Substation Staff Report with Attachments, June 2012

    9/11

    7

    C N L STREET

    PARKRIVERS

    E Y E UM K

    U

    N

    XTN

    U

    N

    X NG RV N RG RG

    SERVICE CENTER NN RBOR

    DETROIT EDISON

    PDC

    E XIS T ING P AR KING

    E XIS T ING P AR KING

    PARKINGEXISTING

    SILT B SIN

    O

    TY

    OO

    N

    G

    PICNIC TABLEBENCH AND

    EXISING

    TOWERCELL

    E X I S T

    P R OP OS ED LANDS C AP ING

    RO

    Y ST R

    T

    SUBSTATIONU KLER

    PROPOSED

  • 8/14/2019 984 Broadway DTE Buckler Substation Staff Report with Attachments, June 2012

    10/11

    7

    CANAL STREET

    PA RKRIVERSIDE

    GR GEENTERSERVI EEXISTING

    BANKSCAPACITOR

    1TRANSFORMER

    2TRANSFORMER

    ERVERVE

    PICNIC TABLEBENCH AND

    EXISING

    SUB STATIONB UC KLER

    P R O P O S E D

    POWER DELIVERY ENTER(PDC)

    O

    O

    N

    NGOWERCELLEXIST.

    PROPOSED LANDSCAPING

    N

    F E N C E A N D G A T E

    EYE CENTERUM KELLOGG

  • 8/14/2019 984 Broadway DTE Buckler Substation Staff Report with Attachments, June 2012

    11/11

    163-2 (BUCKLER SUBSTATION)

    SUBSTATION YARD ELEVATION 768.00

    CELL TOWER CUSTOMER

    165 H. CELL TOWER

    WALL SYSTEMCONCRETE RETAINING

    WIRE ON V -ARMSSTRANDS OF BARBEDLINK FENCE W/ 66-0 HIGH CHAIN

    15.5 H.TRANSFORMER

    16.0 H.SECONDARY TOWER

    8.5 H.CAPACITORS

    12.5 H .TERMINATIONU.G. CABLE

    ORTY

    CANAL STREET1-0

    LIGHT (SWITCHED)100W INCADESCENT

    (SWITCHED)100W H.P.S. LIGHT

    DRAWINGSNSA ARCHITECTSFIREWALL-SEE2 HOUR RATED

    18.0 H.CIRCUIT SWITCHER

    WALL SYSTEMCONCRETE RETAINING

    FIN. GRADE EL. 76T/C WALL EL. 768

    PROPOSED GRADE

    PARK BENCHEXISTING

    E A S T E L E V A T I O N A - A - L O O K I N G W E S T F R O M R I V E R S I D E P A R K

    AT PROPERTY LINEEXISTING GRADE

    FIN. EL. 768.00BUCKLER SUBSTATION

    (ELEVATION VARIES)AT PROPERTY LINEEXISTING GRADE

    (ELEVATION VARIES)AT PROPERTY LINEEXISTING GRADE

    CENTER (PDC) 12.5 H.POWER DELIVERYGARAGESERVICE CENTERANN ARBOR

    EL. 766.50GARAGE FIN. FLOORSERVICE CENTER