9715 us highway 64 arlington, tennessee revision date: …

25
NOTE NUMBERS 9 NORTH GENERAL NOTES: NOTE: TO ORDER STANDARD CRITERIA PLANS GO TO WWW.PLANEXPRESS.NET. THE LOGIN AND PASSWORD ARE LLDEV. PLACE ORDER FOR TSC'S STANDARD CRITERIA PLANS - CURRENT PLANS WILL BE Q1 2020. TO ORDER DWG/CAD FILES SEND EMAIL TO [email protected]. INCLUDE PEI ACCOUNT # OR CREDIT CARD # WITH TYPE OF CREDIT CARD, NAME ON CARD, CREDIT CARD #, EXPIRATION DATE AND ZIP CODE OF BILLING ADDRESS. ANY PROBLEMS OR QUESTIONS, YOU MAY CONTACT CINDY PIND @ 901.869.2465. NORTH 1. ALL CONSTRUCTION AND DETAILS SHALL COMPLY WITH ALL APPLICABLE STATE AND LOCAL BUILDING CODES AND ORDINANCES AS OF THE DATE OF THE DRAWINGS. ANY DEVIATIONS FROM BUILDING CODES REQUIRES NOTIFICATION AND APPROVAL FROM TSC PROJECT MANAGER. 2. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS OF THE SITE. DISCREPANCIES SHALL BE REPORTED TO THE ARCHITECT & OWNER PRIOR TO PROCEEDING WITH CONSTRUCTION. 3. REMOVE ALL CONSTRUCTION AND DEMOLITION DEBRIS FROM JOB SITE DAILY. MAKE JOB PREMISES CLEAN AT COMPLETION OF PROJECT. 4. FIRE EXTINGUISHERS SHALL BE INSTALLED IN ACCORDANCE WITH THE LOCAL FIRE DEPARTMENT PRIOR TO COMPLETION OF CONSTRUCTION. 5. ALL DIMENSIONS ARE FACE OF DRYWALL AT NEW WALLS AND TO FINISHED FACE AT MASONRY WALLS UNLESS NOTED OTHERWISE. 6. NOTED DIMENSIONS TAKE PRECEDENCE OVER SCALED DRAWINGS. 7. CONTRACTOR SHALL VERIFY ALL DIMENSIONS. IF DISCREPANCIES ARE FOUND, THE ARCHITECT AND OWNER SHALL BE NOTIFIED IMMEDIATELY. 8. THRESHOLDS SHALL NOT EXCEED 1/2 INCH IN HEIGHT. 9. DRYWALL TO BE HELD UP 1/2" ABOVE CONCRETE FLOOR. 10. SPECIFIC MANUFACTURERS AND PRODUCTS ARE NAMED ON THE DRAWINGS TO INDICATE THE MINIMUM ACCEPTABLE LEVEL OF QUALITY. EQUAL OR BETTER PRODUCTS WILL BE CONSIDERED. SUBSTITUTES MUST BE APPROVED BY TSC PM. 11. CONCEAL ALL PIPING IN WALLS. WHERE PIPING IS TOO LARGE WALLS ARE TO BE FURRED OUT A MINIMUM TO CONCEAL PIPING. 12. PROVIDE WATER RESISTANT GYPSUM BOARD BEHIND ALL PLUMBING FIXTURES. 13. ALL COUNTERTOPS TO BE 2'-0" IN DEPTH UNLESS OTHERWISE NOTED. 14. PROVIDE SOLID BLOCKING FOR WALL HUNG CABINETS, PLUMBING FIXTURES, ACCESSORIES AND MILLWORK. 15. ALL MATERIALS USED BY ALL TRADES SHALL BE LISTED AND LABELED BY AN APPROVED AGENCY AND INSTALLED PER THE MANUFACTURES INSTRUCTIONS. 16. THE MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL ANY DUCT SMOKE DETECTOR FOR NEW WORK ONLY. COORDINATE WITH THE ASSIGNED ALARM COMPANY. 17. THE GENERAL CONTRACTOR SHALL SUBMIT A REPORT, ON A WEEKLY BASIS INDICATING THE PERCENT COMPLETE FOR EACH LINE ITEM ON THE SCHEDULE USING THE TSC WEEKLY PROGRESS REPORT ALONG WITH PHOTOS PER PHOTO LOG ON THE BLANK REPORTS PROVIDED BY TSC. 18. 'J' MOLD TO BE USED AT ALL INTERSECTIONS OF GYPSUM BOARD AND ANY OTHER NON-GYPSUM MATERIAL. 19. CORNER GUARDS TO BE USED AT ALL INTERIOR 'OUTSIDE' CORNER CONDITIONS. 20. FINISHED SPACE SHALL BE PROVIDED IN A MANNER THAT PREVENTS RODENT INTRUSION. SEAL PENETRATIONS THROUGH EXTERIOR WALL SURFACES WITH AN AEROSOL, MOISTURE-CURING POLYURETHANE FOAM SIMILAR TO "PUR BLACK" BY TODOL PRODUCTS, INC. (508.651.3818) OR APPROVED EQUAL. FOUNDATION PLAN S1.0 STRUCTURAL ROOF FRAMING PLAN S2.0 DETAILS S3.0 GENERAL NOTES S4.0 CONTRACTOR RESPONSIBILITIES CONTRACTOR SHALL VERIFY EXISTING CONDITIONS ON SITE. DISCREPANCIES BETWEEN DRAWINGS AND EXISTING CONDITIONS AS WELL AS DISCREPANCIES BETWEEN LANDLORD WORK AND TSC WORK SHALL BE BROUGHT TO THE ATTENTION OF TSC AND ARCHITECT IN WRITING PRIOR TO BID SUBMISSION. MECHANICAL FLOOR PLAN M1.0 MECHANICAL FIRE PROTECTION PLAN FP1.0 FIRE PROTECTION 2 A2.0 2 INTERIOR ELEVATION INDICATOR ROOM LARGE SCALE ROOM NUMBER REVISION DETAIL ROOM NAME 210 BENCH MARK DOOR NUMBER SECTION CUT DRAWING NO. 9 16 DETAIL SCALE: 3/4 " = 1'-0" GRAPHIC SYMBOLS VICINITY MAP TRACTOR SUPPLY COMPANY SHALL NOT BE RESPONSIBLE FOR THE PAYMENT OF ANY WORK PERFORMED OR MATERIAL SUPPLIED BY THE CONTRACTOR OR ANY OF ITS SUB-CONTRACTORS, SUB-SUBCONTRACTORS AND ANYONE CLAIMING BY THROUGH OR UNDER ANY OF THEM WHICH IS NOT IDENTIFIED IN WRITING AND SIGNED BY ONE OF THE FOLLOWING TRACTOR SUPPLY COMPANY PERSONNEL: VICE PRESIDENT REAL ESTATE, VICE PRESIDENT OF CONSTRUCTION, OR A CONSTRUCTION PROJECT MANAGER. NO ACTION, CONDUCT, OMISSION, PRIOR FAILURE, OR COURSE OF DEALING BY TRACTOR SUPPLY COMPANY SHALL ACT TO WAIVE, MODIFY, CHANGE OR ALTER THE REQUIREMENT THAT ALL WORK, WHETHER BY CONTRACT, CHANGE ORDER OR CHANGE DIRECTIVE, MUST BE IN WRITING AND SIGNED BY THE PERSONNEL IDENTIFIED IN THIS PROVISION. ANY WORK PERFORMED OR MATERIAL PROVIDED BY THE CONTRACTOR, ANY OF ITS SUB-CONTRACTORS, SUB-SUBCONTRACTORS CONTRARY TO THIS PROVISION SHALL BE AT ITS OWN RISK AND OWN EXPENSE AND TRACTOR SUPPLY COMPANY SHALL NOT BE OBLIGATED TO REIMBURSE OR PAY THE CONTRACTOR OR ANY OF ITS SUB-CONTRACTORS, SUB-SUBCONTRACTORS FOR SAME. CHANGE ORDER POLICY DRAWING INDEX ISSUED FOR CONSTRUCTION 03.11.2021 REVISION DATE: XX.XX.XXXX REVISION DATE: XX.XX.XXXX REVISION DATE: XX.XX.XXXX REVISION DATE: XX.XX.XXXX REVISION DATE: XX.XX.XXXX REVISION DATE: XX.XX.XXXX TENANT PLUMBING ENGINEER SCHELTON ENGINEERING ELECTRICAL ENGINEER PARSONS ENGINEERING PROJECT MANAGER RODNEY RUNIONS 615.386.9396 [email protected] 4751 TROUSDALE DRIVE SUITE 202 NASHVILLE, TN 37203 1163 W. MAIN STREET FRANKLIN, TN 37064 PROJECT MANAGER GARY W. SCHELTON, P.E., LEED AP 615.730.9111 [email protected] PROJECT ARCHITECT GLEN P. OXFORD, AIA TRACTOR SUPPLY COMPANY 5401 VIRGINIA WAY BRENTWOOD, TENNESSEE POINT OF CONTACT ELIZABETH MORRISETTE 615.256.3455 X 14 [email protected] ARCHITECT 2934 Sidco Drive Suite 120 Nashville, TN 37204 OXFORD ARCHITECTURE PROJECT LOCATION NORTH PROJECT DATA IIB CONSTRUCTION TYPE OCCUPANCY CLASSIFICATION MERCANTILE MERCHNEY STRUCTURE FOUNDATION S1.01 MERCHNEY STRUCTURAL STRUCTURAL S1.02 FLOOR / EQUIPMENT S1.03 ROOF S1.04 ARLINGTON, TENNESSEE 9715 US HIGHWAY 64 THE STUFF YOU NEED OUT HERE www.myTSCstore.com 2000.009 - TSC - ARLINGTON, TN FUSION & SIDE LOT PROJECT ABBREVIATIONS ABV: ABOVE ACT: ACCOUSTICAL CEILING TILE ADA: AMERICANS WITH DISABILITIES ACT ADJ: ADJACENT AFF: ABOVE FINISH FLOOR ALUM: ALUMINUM APPROX: APPROXIMATE BLDG: BUILDING BTM: BOTTOM CL: CENTER LINE CMU: CONCRETE MASONRY UNIT CONC: CONCRETE DIA: DIAMETER DIM: DIMENSION DWG: DRAWING EIFS: EXTERIOR INSULATION & FINISH SYSTEM INSUL: INSULATION MECH: MECHANICAL MFG: MANUFACTURER FFE: FINISH FLOOR ELEVATION FIN: FINISH FLR: FLOOR FRP: FIBERGLASS REINFORCED PANEL FT: FEET GC: GENERAL CONTRACTOR GD: GRADE GYP BD: GYPSUM BOARD HC: ACCESSIBLE HGT: HEIGHT HM: HOLLOW METAL HVAC: HEATING, VENTILATING & AIR CONDITIONING HWY: HIGHWAY MTD: MOUNTED OC: ON CENTER PL: PROPERTY LINE PLYWD: PLYWOOD PP: POWER POLE PR: PAIR PSI: POUNDS PER SQUARE INCH PT: PAINT PTD: PAINTED PVMT: PAVEMENT RCP: REFLECTED CEILING PLAN REQ: REQUIRED SPECS: SPECIFICATIONS SQ: SQUARE STD: STANDARD STRUCT: STRUCTURAL TRANS: TRANSFORMER W/: WITH W/O: WITHOUT WD: WOOD WH: WATER HEATER WWF: WELDED WIRE FABRIC ARLINGTON, TENNESSEE REMODELING SOON 38002 FIRE SUPRESSION SPRINKLERED COVER SHEET GENERAL LIGHTING PLAN E1.0 ELECTRICAL STRUCTURAL ENGINEER WISENGINEERS, INC. 214 OVERLOOK CIRCLE SUITE 201 BRENTWOOD, TN 37027 PROJECT MANAGER JARROD FINGER 615.953.9474 [email protected] 6 4 A4.0 A5.02 2 MERCHNEY ENGINEER ZUENDT ENGINEERING 21B EAST WASHINGTON STREET GREENVILLE, SC 29601 PROJECT DESIGNER ALEXANDER ZUENDT 864.990.2995 [email protected] GENERAL POWER PLAN E2.0 ELECTRICAL SYSTEM / VENDOR DETAILS E3.0 MECHANICAL POWER PLAN E4.0 ELEVATIONS S2.01 DETAILS S3.00 S3.01 S3.02 S3.03 3D ISOMETRIC S4.01 PLUMBING FLOOR PLAN P1.0 PLUMBING PLUMBING SCHEDULES AND DETAILS P2.0 PROJECT MANAGER CHRIS MORAN 615.512.8556 REMODEL BUILDING AREA LIMITS SALES FLOOR EXISTING 18,630 SQ. FT. / 30 22,672 SQ. FT. TOTAL BUILDING AREA EXISTING OCCUPANCY LOAD = 621.0 OR 621 STOCKROOM EXISTING 2,501 SQ. FT. / 300 = 8.3 OR 9 TOTAL OCCUPANT LOAD EXISTING = 653 CORE AREA EXISTING 1,262 SQ. FT. / 100 = 12.6 OR 13 VESTIBULE EXISTING 279 SQ. FT. / 30 = 9.3 OR 10 PROJECT DATA 2015 INTERNATIONAL BUILDING CODE 2015 INTERNATIONAL PLUMBING CODE 2015 INTERNATIONAL MECHANICAL CODE 2014 NATIONAL ELECTRIC CODE 2015 INTERNATIONAL FIRE CODE 2015 INTERNATIONAL FUEL GAS CODE IIB FIRE SUPRESSION CONSTRUCTION TYPE OCCUPANCY CLASSIFICATION SPRINKLERED (EXISTING TO REMAIN) MERCANTILE ALARM SYSTEM ALARMED (EXISTING TO REMAIN) NUMBER OF STORIES 1 (EXISTING TO REMAIN) THIS PROJECT IS BASED ON THE REQUIREMENTS OF THE FOLLOWING: ARCHITECTURAL A1.0 ARCHITECTURAL FLOOR PLAN A5.0 ENLARGED PLAN, ELEVATIONS & DETAILS LS1.0 LIFE SAFETY / FIXTURE PLAN D1.0 DEMOLITION PLAN A0.0 TENANT CRITERIA & VENDOR INFORMATION A2.0 ARCHITECTURAL ELEVATIONS A3.0 REFLECTED CEILING PLAN A4.0 FENCE DETAILS & ELEVATIONS A0.1 DOOR & FINISH SCHEDULES AS1.0 SITE PLAN WALL TYPES GARDEN CENTER NEW 2,378 SQ. FT. / 60 NEW BUILDING AREA LIMITS OCCUPANCY LOAD 6,960 SQ. FT. TOTAL MERCHNEY AREA TOTAL OCCUPANT LOAD = 47 = 39.6 OR 40 FEED STORAGE NEW 1,926 SQ. FT. / 300 = 6.4 OR 7 5/8" TYPE "X" GYP. BD. BOTH SIDES OF 3 5/8" METAL STUDS EXTEND 4" ABOVE CEILING TILE EXISTING WALL EXISTING WALL TO REMAIN PROJECT SUMMARY TRACTOR SUPPLY COMPANY IS REMODELING THIS STORE TO INCLUDE NEW ELECTRICAL UPDATES, TOUCHLESS FIXTURES, AND GENERAL UPKEEP TO THE BUILDING AS A PART OF THEIR NEW FUSION INITIATIVE. THIS STORE WILL ALSO GET A NEW DRESSING ROOM AREA AND A NEW GARDEN CENTER AND FEED STORAGE STRUCTURE IN THEIR OUTDOOR FENCED DISPLAY AREA. ALARM SYSTEM ALARMED GENERAL NOTES S0.01 DETAILS S2.03 FRAMING FOR DH PACE / RAYNOR DOORS S2.04 DETAILS DETAILS DETAILS S3.04 DETAILS S3.05 DETAILS S3.06 DETAILS S3.07 DETAILS MECHANICAL SCHEDULES AND DETAILS M2.0 ELECTRICAL DETAILS AND SPECIFICATIONS E5.0 GREENHOUSE STRUCTURE WALLS, SEE MERCHNEY STRUCTURAL DRAWINGS FOR DETAILS AND ELEVATIONS PRE-ENGINEERED METAL WALLS, SEE MERCHNEY STRUCTURAL DRAWINGS FOR DETAILS AND ELEVATIONS

Upload: others

Post on 30-Dec-2021

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 9715 US HIGHWAY 64 ARLINGTON, TENNESSEE REVISION DATE: …

NOTE NUMBERS 9

NORTH

GENERAL NOTES:

NOTE: TO ORDER STANDARD CRITERIA PLANS GO TO WWW.PLANEXPRESS.NET. THE LOGIN AND PASSWORD ARELLDEV. PLACE ORDER FOR TSC'S STANDARD CRITERIA PLANS - CURRENT PLANS WILL BE Q1 2020. TO ORDERDWG/CAD FILES SEND EMAIL TO [email protected]. INCLUDE PEI ACCOUNT # OR CREDIT CARD# WITH TYPE OF CREDIT CARD, NAME ON CARD, CREDIT CARD #, EXPIRATION DATE AND ZIP CODE OF BILLINGADDRESS. ANY PROBLEMS OR QUESTIONS, YOU MAY CONTACT CINDY PIND @ 901.869.2465.

NORTH1. ALL CONSTRUCTION AND DETAILS SHALL COMPLY WITH ALL APPLICABLE STATE AND LOCAL BUILDING CODES AND ORDINANCES AS OF THE DATE OF

THE DRAWINGS. ANY DEVIATIONS FROM BUILDING CODES REQUIRES NOTIFICATION AND APPROVAL FROM TSC PROJECT MANAGER.2. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS OF THE SITE. DISCREPANCIES SHALL BE REPORTED TO THE ARCHITECT & OWNER PRIOR TO

PROCEEDING WITH CONSTRUCTION.3. REMOVE ALL CONSTRUCTION AND DEMOLITION DEBRIS FROM JOB SITE DAILY. MAKE JOB PREMISES CLEAN AT COMPLETION OF PROJECT.4. FIRE EXTINGUISHERS SHALL BE INSTALLED IN ACCORDANCE WITH THE LOCAL FIRE DEPARTMENT PRIOR TO COMPLETION OF CONSTRUCTION.5. ALL DIMENSIONS ARE FACE OF DRYWALL AT NEW WALLS AND TO FINISHED FACE AT MASONRY WALLS UNLESS NOTED OTHERWISE.6. NOTED DIMENSIONS TAKE PRECEDENCE OVER SCALED DRAWINGS.7. CONTRACTOR SHALL VERIFY ALL DIMENSIONS. IF DISCREPANCIES ARE FOUND, THE ARCHITECT AND OWNER SHALL BE NOTIFIED IMMEDIATELY.8. THRESHOLDS SHALL NOT EXCEED 1/2 INCH IN HEIGHT.9. DRYWALL TO BE HELD UP 1/2" ABOVE CONCRETE FLOOR.10. SPECIFIC MANUFACTURERS AND PRODUCTS ARE NAMED ON THE DRAWINGS TO INDICATE THE MINIMUM ACCEPTABLE LEVEL OF QUALITY. EQUAL OR

BETTER PRODUCTS WILL BE CONSIDERED. SUBSTITUTES MUST BE APPROVED BY TSC PM.11. CONCEAL ALL PIPING IN WALLS. WHERE PIPING IS TOO LARGE WALLS ARE TO BE FURRED OUT A MINIMUM TO CONCEAL PIPING.12. PROVIDE WATER RESISTANT GYPSUM BOARD BEHIND ALL PLUMBING FIXTURES.13. ALL COUNTERTOPS TO BE 2'-0" IN DEPTH UNLESS OTHERWISE NOTED.14. PROVIDE SOLID BLOCKING FOR WALL HUNG CABINETS, PLUMBING FIXTURES, ACCESSORIES AND MILLWORK.15. ALL MATERIALS USED BY ALL TRADES SHALL BE LISTED AND LABELED BY AN APPROVED AGENCY AND INSTALLED PER THE MANUFACTURES

INSTRUCTIONS.16. THE MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL ANY DUCT SMOKE DETECTOR FOR NEW WORK ONLY. COORDINATE WITH THE

ASSIGNED ALARM COMPANY.17. THE GENERAL CONTRACTOR SHALL SUBMIT A REPORT, ON A WEEKLY BASIS INDICATING THE PERCENT COMPLETE FOR EACH LINE ITEM ON THE

SCHEDULE USING THE TSC WEEKLY PROGRESS REPORT ALONG WITH PHOTOS PER PHOTO LOG ON THE BLANK REPORTS PROVIDED BY TSC.18. 'J' MOLD TO BE USED AT ALL INTERSECTIONS OF GYPSUM BOARD AND ANY OTHER NON-GYPSUM MATERIAL.19. CORNER GUARDS TO BE USED AT ALL INTERIOR 'OUTSIDE' CORNER CONDITIONS.20. FINISHED SPACE SHALL BE PROVIDED IN A MANNER THAT PREVENTS RODENT INTRUSION. SEAL PENETRATIONS THROUGH EXTERIOR WALL SURFACES

WITH AN AEROSOL, MOISTURE-CURING POLYURETHANE FOAM SIMILAR TO "PUR BLACK" BY TODOL PRODUCTS, INC. (508.651.3818) OR APPROVEDEQUAL.

FOUNDATION PLANS1.0

STRUCTURAL

ROOF FRAMING PLANS2.0DETAILSS3.0GENERAL NOTESS4.0

CONTRACTOR RESPONSIBILITIESCONTRACTOR SHALL VERIFY EXISTING CONDITIONS ON SITE. DISCREPANCIES BETWEEN DRAWINGS AND EXISTING CONDITIONS AS WELL AS DISCREPANCIESBETWEEN LANDLORD WORK AND TSC WORK SHALL BE BROUGHT TO THE ATTENTION OF TSC AND ARCHITECT IN WRITING PRIOR TO BID SUBMISSION.

MECHANICAL FLOOR PLANM1.0

MECHANICAL

FIRE PROTECTION PLANFP1.0

FIRE PROTECTION

2A2.0

2

INTERIOR ELEVATION

INDICATOR

ROOM

LARGE SCALE

ROOM NUMBER

REVISION

DETAIL

ROOM NAME

210

BENCH MARK

DOOR NUMBER

SECTION CUT

DRAWING NO.

9

16 DETAILSCALE: 3/4 " = 1'-0"

GRAPHIC SYMBOLS VICINITY MAP

TRACTOR SUPPLY COMPANY SHALL NOT BE RESPONSIBLE FOR THE PAYMENT OF ANY WORK PERFORMED OR MATERIAL SUPPLIED BY THE CONTRACTOR OR ANYOF ITS SUB-CONTRACTORS, SUB-SUBCONTRACTORS AND ANYONE CLAIMING BY THROUGH OR UNDER ANY OF THEM WHICH IS NOT IDENTIFIED IN WRITING ANDSIGNED BY ONE OF THE FOLLOWING TRACTOR SUPPLY COMPANY PERSONNEL: VICE PRESIDENT REAL ESTATE, VICE PRESIDENT OF CONSTRUCTION, OR ACONSTRUCTION PROJECT MANAGER. NO ACTION, CONDUCT, OMISSION, PRIOR FAILURE, OR COURSE OF DEALING BY TRACTOR SUPPLY COMPANY SHALL ACT TOWAIVE, MODIFY, CHANGE OR ALTER THE REQUIREMENT THAT ALL WORK, WHETHER BY CONTRACT, CHANGE ORDER OR CHANGE DIRECTIVE, MUST BE IN WRITINGAND SIGNED BY THE PERSONNEL IDENTIFIED IN THIS PROVISION. ANY WORK PERFORMED OR MATERIAL PROVIDED BY THE CONTRACTOR, ANY OF ITSSUB-CONTRACTORS, SUB-SUBCONTRACTORS CONTRARY TO THIS PROVISION SHALL BE AT ITS OWN RISK AND OWN EXPENSE AND TRACTOR SUPPLY COMPANYSHALL NOT BE OBLIGATED TO REIMBURSE OR PAY THE CONTRACTOR OR ANY OF ITS SUB-CONTRACTORS, SUB-SUBCONTRACTORS FOR SAME.

CHANGE ORDER POLICY

DRAWING INDEXISSUED FOR CONSTRUCTION

03.11.2021

REVI

SION

DAT

E: X

X.XX

.XXX

X

REVI

SION

DAT

E: X

X.XX

.XXX

X

REVI

SION

DAT

E: X

X.XX

.XXX

X

REVI

SION

DAT

E: X

X.XX

.XXX

X

REVI

SION

DAT

E: X

X.XX

.XXX

X

REVI

SION

DAT

E: X

X.XX

.XXX

X

TENANT

PLUMBING ENGINEER SCHELTON ENGINEERING

ELECTRICAL ENGINEERPARSONS ENGINEERING

PROJECT MANAGER

RODNEY [email protected]

4751 TROUSDALE DRIVESUITE 202NASHVILLE, TN 37203

1163 W. MAIN STREETFRANKLIN, TN 37064

PROJECT MANAGER

GARY W. SCHELTON, P.E., LEED [email protected]

PROJECT ARCHITECTGLEN P. OXFORD, AIA

TRACTOR SUPPLY COMPANY5401 VIRGINIA WAYBRENTWOOD, TENNESSEE

POINT OF CONTACTELIZABETH MORRISETTE615.256.3455 X [email protected]

ARCHITECT

2934 Sidco DriveSuite 120Nashville, TN 37204

OXFORDARCHITECTURE

PROJECT

LOCATION

NORTH

PROJECT DATA

IIBCONSTRUCTION TYPEOCCUPANCY CLASSIFICATION MERCANTILE

MERCHNEY STRUCTURE

FOUNDATIONS1.01

MERCHNEY STRUCTURAL

STRUCTURALS1.02FLOOR / EQUIPMENTS1.03ROOFS1.04

ARLINGTON, TENNESSEE9715 US HIGHWAY 64

THE STUFF YOU NEED OUT HEREwww.myTSCstore.com

2000

.009

- T

SC -

ARL

ING

TON

, TN

FU

SIO

N &

SID

E LO

T PR

OJE

CTABBREVIATIONS

ABV: ABOVEACT: ACCOUSTICAL CEILING TILEADA: AMERICANS WITH

DISABILITIES ACTADJ: ADJACENTAFF: ABOVE FINISH FLOORALUM: ALUMINUMAPPROX: APPROXIMATEBLDG: BUILDINGBTM: BOTTOMCL: CENTER LINECMU: CONCRETE MASONRY UNITCONC: CONCRETEDIA: DIAMETERDIM: DIMENSIONDWG: DRAWINGEIFS: EXTERIOR INSULATION

& FINISH SYSTEMINSUL: INSULATIONMECH: MECHANICALMFG: MANUFACTURERFFE: FINISH FLOOR ELEVATIONFIN: FINISHFLR: FLOORFRP: FIBERGLASS REINFORCED

PANELFT: FEETGC: GENERAL CONTRACTORGD: GRADE

GYP BD: GYPSUM BOARDHC: ACCESSIBLEHGT: HEIGHTHM: HOLLOW METALHVAC: HEATING, VENTILATING

& AIR CONDITIONINGHWY: HIGHWAYMTD: MOUNTEDOC: ON CENTERPL: PROPERTY LINEPLYWD: PLYWOODPP: POWER POLEPR: PAIRPSI: POUNDS PER SQUARE INCHPT: PAINTPTD: PAINTEDPVMT: PAVEMENTRCP: REFLECTED CEILING PLANREQ: REQUIREDSPECS: SPECIFICATIONSSQ: SQUARESTD: STANDARDSTRUCT: STRUCTURALTRANS: TRANSFORMERW/: WITHW/O: WITHOUTWD: WOODWH: WATER HEATERWWF: WELDED WIRE FABRIC

ARLINGTON, TENNESSEE

REMODELING SOON

38002

FIRE SUPRESSION SPRINKLERED

COVER SHEET

GENERAL LIGHTING PLANE1.0

ELECTRICAL

STRUCTURAL ENGINEER WISENGINEERS, INC.214 OVERLOOK CIRCLESUITE 201BRENTWOOD, TN 37027PROJECT MANAGER

JARROD [email protected]

6

4A4.0

A5.022

MERCHNEY ENGINEER ZUENDT ENGINEERING21B EAST WASHINGTON STREETGREENVILLE, SC 29601

PROJECT DESIGNER

ALEXANDER [email protected]

GENERAL POWER PLANE2.0ELECTRICAL SYSTEM / VENDOR DETAILSE3.0MECHANICAL POWER PLANE4.0

ELEVATIONSS2.01

DETAILSS3.00S3.01S3.02S3.03

3D ISOMETRICS4.01

PLUMBING FLOOR PLANP1.0

PLUMBING

PLUMBING SCHEDULES AND DETAILSP2.0

PROJECT MANAGERCHRIS MORAN615.512.8556

REMODEL BUILDING AREA LIMITS

SALES FLOOR EXISTING 18,630 SQ. FT. / 30

22,672 SQ. FT.TOTAL BUILDING AREA EXISTING

OCCUPANCY LOAD

= 621.0 OR 621STOCKROOM EXISTING 2,501 SQ. FT. / 300 = 8.3 OR 9

TOTAL OCCUPANT LOAD EXISTING = 653

CORE AREA EXISTING 1,262 SQ. FT. / 100 = 12.6 OR 13

VESTIBULE EXISTING 279 SQ. FT. / 30 = 9.3 OR 10

PROJECT DATA

2015 INTERNATIONAL BUILDING CODE2015 INTERNATIONAL PLUMBING CODE2015 INTERNATIONAL MECHANICAL CODE2014 NATIONAL ELECTRIC CODE2015 INTERNATIONAL FIRE CODE2015 INTERNATIONAL FUEL GAS CODE

IIBFIRE SUPRESSIONCONSTRUCTION TYPEOCCUPANCY CLASSIFICATION

SPRINKLERED (EXISTING TO REMAIN)

MERCANTILE

ALARM SYSTEM ALARMED (EXISTING TO REMAIN)

NUMBER OF STORIES 1 (EXISTING TO REMAIN)

THIS PROJECT IS BASED ON THE REQUIREMENTS OF THE FOLLOWING:

ARCHITECTURAL

A1.0 ARCHITECTURAL FLOOR PLAN

A5.0 ENLARGED PLAN, ELEVATIONS & DETAILS

LS1.0 LIFE SAFETY / FIXTURE PLAND1.0 DEMOLITION PLANA0.0 TENANT CRITERIA & VENDOR INFORMATION

A2.0 ARCHITECTURAL ELEVATIONSA3.0 REFLECTED CEILING PLANA4.0 FENCE DETAILS & ELEVATIONS

A0.1 DOOR & FINISH SCHEDULES

AS1.0 SITE PLAN

WALL TYPES

GARDEN CENTER NEW 2,378 SQ. FT. / 60

NEW BUILDING AREA LIMITS OCCUPANCY LOAD

6,960 SQ. FT.TOTAL MERCHNEY AREA

TOTAL OCCUPANT LOAD = 47

= 39.6 OR 40FEED STORAGE NEW 1,926 SQ. FT. / 300 = 6.4 OR 7

5/8" TYPE "X" GYP. BD. BOTH SIDES OF 3 5/8" METAL STUDS EXTEND 4"ABOVE CEILING TILE

EXISTING WALLEXISTING WALL TO REMAIN

PROJECT SUMMARYTRACTOR SUPPLY COMPANY IS REMODELING THIS STORE TO INCLUDE NEW ELECTRICAL UPDATES,TOUCHLESS FIXTURES, AND GENERAL UPKEEP TO THE BUILDING AS A PART OF THEIR NEW FUSION INITIATIVE.THIS STORE WILL ALSO GET A NEW DRESSING ROOM AREA AND A NEW GARDEN CENTER AND FEED STORAGESTRUCTURE IN THEIR OUTDOOR FENCED DISPLAY AREA.

ALARM SYSTEM ALARMED

GENERAL NOTESS0.01

DETAILSS2.03FRAMING FOR DH PACE / RAYNOR DOORSS2.04

DETAILSDETAILSDETAILS

S3.04 DETAILSS3.05 DETAILSS3.06 DETAILSS3.07 DETAILS

MECHANICAL SCHEDULES AND DETAILSM2.0

ELECTRICAL DETAILS AND SPECIFICATIONSE5.0

GREENHOUSE STRUCTURE WALLS, SEE MERCHNEY STRUCTURALDRAWINGS FOR DETAILS AND ELEVATIONS

PRE-ENGINEERED METAL WALLS, SEE MERCHNEY STRUCTURALDRAWINGS FOR DETAILS AND ELEVATIONS

AutoCAD SHX Text
5
AutoCAD SHX Text
1
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
2
AutoCAD SHX Text
6
Page 2: 9715 US HIGHWAY 64 ARLINGTON, TENNESSEE REVISION DATE: …

PERMANENT TRAILER EQUIPMENT DISPLAY AREA1,600 SQ. FT.

FENCED OUTDOORDISPLAY AREA17,215 SQ. FT.

PERMANENT SIDEWALKDISPLAY AREA

456 SQ. FT.

22,672 SQ. FT.

ACCESSIBLITY SIGNAGE,SEE DETAIL THIS SHEET.

(2) 4' SWING GATES, SEE DETAILON SHEET A4.0.

20' ROLLING CANTILEVEREDGATE WITH AUTOMATIC GATEOPERATOR, SEE A4.0

9

4" PAINTED YELLOW STRIPEINDICATING EXTENT OF DRIVE AISLE

VETERAN'S PARKINGSPACE, SEE DETAILS THISSHEET FOR VERTICALSIGNAGE

BUY ONLINE PAY IN STORESPACE, SEE DETAILS THIS SHEETFOR VERTICAL SIGNAGE

TSC TO PROVIDE ANCHOR BOLTS PERMANUFACTURER'S SPECIFICATIONS ANDANCHOR RACKING AT OUTDOOR DISPLAYAS NECESSARY. TSC TO PROVIDE ANCHORPLATES.

H

E

ELEC

. PAN

EL

TELE

. BO

ARD

ELEC

. PAN

EL

G

ONEWAY

PICKUP

ONEWAY

PICKUP

ONEWAY

PICKUP

ON

EW

AY

ONEW

AY

US HIGHWAY 64

MIS

TY B

AY D

RIVE

FEED STORAGE1,927 SQ. FT.

GARDEN CENTER2,378 SQ. FT.

PERMANENT SIDEWALKDISPLAY AREA

524 SQ. FT.

PERMANENTSIDEWALK DISPLAY

AREA198 SQ. FT.

4

9

8

8

7

7

5

NEW BOPIS SHED

NEW DRIVE THRU CANOPY

20' ROLLING CANTILEVERED GATE WITHAUTOMATIC GATE OPERATOR, SEE A4.0

GROUND MOUNTED AIR CONDITIONINGUNIT TO SERVICE FEED STORAGE

GENERAL SITE NOTES:· VERIFY ALL UTILITY LOCATIONS ON SITE.

N

SITE PLANSCALE: 1" - 30'

ARLINGTON, TENNESSEE

10' 30'20'0 60'

ALUMINUM TUBE FENCE SPECIFICATIONS:1. CONTRACTOR TO SUBMIT CUT SHEET TO ARCHITECT FOR APPROVAL. GENERAL

SPECIFICATIONS ARE AS FOLLOWS:2. PICKETS 1" X 1" X 0.065 WALL3. STRINGERS 1.625" X 1.625" X 1.625" SIDE WALL 0.100 TOP WALL 0.0704. LINE POSTS 2.5" X 2.5" X 0.075 WALLS. LINE POSTS TO BE SET@10'-0" MAX. SPACING. DEPTH

OF POST TO BE MIN. OF 30" IN TRUCK POURED CONCRETE. WHEN PRESET GALVANIZED FENCE SLEEVES ARE USED POSTS ARE TO BE ADHERED WITH EPOXY.

5. TERMINAL AND GATE POSTS 6" X 6" X 0.125 WALL, DEPTH OF TERMINAL AND GATE POSTS TOBE MIN. OF 36" IN TRUCK POURED CONCRETE. WHEN PRESET GALVANIZED FENCE SLEEVESARE USED POSTS ARE TO BE ADHERED WITH EPOXY.

6. PICKET SPACING 4.5" O.C. SPACING BETWEEN PICKETS 3.75"7. HORIZONTAL RAILS: (4) LOCATED 1 @ 6" ABOVE FINISH GRADE (A.F.G.), 2 @ 18" A.F.G., 3 @

6'-6" A.F.G., AND 4 @ 7'-6" A.F.G..8. SWINGING GATES: DESIGN AS PER THE MANUFACTURER'S DESIGN STANDARDS. GATES

SHALL BE MANUALLY OPERATED.9. FASTENERS SHALL BE 302 STAINLESS STEEL WITH SELF-DRILLING HEAD. ALL SCREWS

SHALL BE PAINTED TO MATCH FENCE.10. (6) GATES: (4) 10 FOOT CANTILEVERED GATES AND (2) 4 FOOT SWING GATES, WITH

FRAMEWORK OF 1 5/8" FULL WEIGHT PIPE, 2.27 LBS. PER FOOT (MIN). GATES BRACED ANDTRUSSED AS NECESSARY.

11. GATE LATCHES SHALL ACCEPT PADLOCKS

FENCED OUTDOOR DISPLAY AREA FIXTURE INSTALLATION GUIDELINES:1. CONTRACTOR TO VERIFY WITH THE STORE MANAGER THAT ALL RACKS ARE PROPERLY BUILT

AND POSITIONED.2. DRILL HOLES FOR ANCHORING RACK. GENERALLY THE HOLE IN THE FOOT OF THE RACK IS 1/2"

IN DIAMETER. HOWEVER, THIS MAY VARY. GENERAL CONTRACTOR IS TO DETERMINE IN THEFIELD THE MOST APPROPRIATE SIZE REQUIRED TO ANCHOR RACKS.

3. RACKS ARE TO BE SECURELY ANCHORED W/ ANCHOR BOLTS IN EVERY AVAILABLE HOLE.4. FOLLOWING INSTALLATION, REMOVE ANY RESIDUAL DEBRIS AND CLEAN AREA.

SITE STRIPING GUIDELINES:1. STRIPING ON CONCRETE TO BE YELLOW.2. STRIPING ON ASPHALT TO BE WHITE.

PARKING LOT PAINT SPECIFICATIONS - 15 MIL APPLICATION (0.015 INCH THICKNESS) :1. NEW PAVEMENT SURFACE TO CURE FOR A PERIOD OF NOT LESS THAN 14 DAYS BEFORE

APPLICATION OF MARKING MATERIALS.2. REMOVE ALL DIRT, GRAVEL, DEBRIS, VEGETATION, OR OTHER MISCELLANEOUS OBJECTS

FROM THE SURFACE WITH A BROOM TRUCK OR EQUIVALENT RIGOROUS METHOD. PROVIDE ACLEAN, DUST-FREE AND COMPLETELY DRY SURFACE FOR PAINT APPLICATION. DO NOTAPPLY PAINT OVER EXISTING TAPE MARKINGS.

3. CONFIRM & RECORD PROPER AIR AND SURFACE TEMPERATURES OF 55° AND RISING ANDLESS THAN 95°. IF THE SURFACE TEMPERATURE IS NOT WITH THE TEMPERATURE RANGE OR IFTHE PAINT APPLICATION IS DONE UNDER ADVERSE CONDITIONS (AS DETERMINED BY THECONSTRUCTION PROJECT MANAGER) SUCH AS ABOVE 75% HUMIDITY, NIGHT STRIPING, ETC. INORDER TO MEET TSC OPENING SCHEDULE, CONTRACTOR TO RE-SCHEDULE AND COMPLETESURFACE STRIPING UNDER PROPER CONDITIONS A MINIMUM OF 30 DAYS PRIOR TO THEEXPIRATION OF THE (1) ONE YEAR CONSTRUCTION WARRANTY.

4. PROVIDE A 15 MIL THICK 4" WIDE CONTINUOUS STRIPE WHERE INDICATED. MINIMUM OF (2)TWO COATS.

5. PROVIDE PRIMER AND SEALER TO BE APPLIED PER THE MANUFACTURER'SRECOMMENDATIONS ON ALL CONCRETE SURFACES AND ON ASPHALT SURFACES THAT AREMORE THAN TWO YEARS OLD, OXIDIZED AND/OR HAVE AGGREGATE EXPOSED.

10' 30'20'0 60'

PROPERTY LINE

4"

4"4"

4"4" 4" 4"

4"

4"8"

4'-0

"

22deg12"

16"

NOTE: SIGNAGE SHALL COMPLY WITHAMERICAN'S WITH DISABILITIES ACT(ADA) SIGNAGE REGULATIONS

PAINTED SYMBOL TO BE @ ALL H.CDESIGNATED SPACES

PAINTED H.C. PARKING SYMBOL

6"

12"

4"

2 DETAILSCALE: 1" = 1'-0"

HANDICAP PARKING LOGO

4"

4"4"

4"4" 4" 4"

4"

4"8"

4'-0

"

22deg12"

16"

NOTE: SIGNAGE SHALL COMPLY WITHAMERICAN'S WITH DISABILITIES ACT(ADA) SIGNAGE REGULATIONS

PAINTED SYMBOL TO BE @ ALL H.CDESIGNATED SPACES

PAINTED H.C. PARKING SYMBOL

6"

12"

4"

PAVEMENT

IR KP A NGDRE SR E EV

4'-0

"

12"

1 DETAILSCALE: 3/4" = 1'-0"

VERTICAL SIGNAGE

CENTER SIGN ON HC / TSCPARKING SPACE - TYP.

IR KP A NGDRE SR E EV

4'-0

"12"

18"

EPOXY ANCHORS INTOPAVEMENT PERMANUFACTURER'SSPECIFICATIONS

G.C. TO INSTALL PROPERTSC PROVIDED SIGNAGEAS APPLICABLE

G.C. TO PROVIDE ANDINSTALL MCCUE BS-VSBUMPER SIGN

18"

NOTE:

THIS SITE PLAN IS BASED ON A GOOGLE MAPS SURVEY. ALLDIMENSIONS ARE APPROXIMATE. THE LOCATION OF EXISTINGGRADING AND UTILITIES IS TO BE DETERMINED ON SITE.

FINISH GRADE

BASE TO BE PAINTEDYELLOW

3 DETAILSCALE: 1/2" = 1'-0"

TYPICAL POLE LIGHT BASE

FINISH GRADE

BASE TO BE PAINTEDYELLOWBASE TO BE PAINTEDYELLOW

REPAIR OR REPLACELIGHT FIXTURES THATARE NOT OPERATIONAL

4'-0

"

6" DIA. SCHEDULE40 CONCRETEFILLED PIPEBOLLARD

EXPANSION JOINT

ASPHALT OR CONC.REF. PLANS

16" DIA. CONC.FOUNDATION

4 DETAILSCALE: 1/2" = 1'-0"

TYPICAL BOLLARD

4'-0

"

2" (4

" MAX

.)

FOAM TAPE OVERPIPE BOLLARD

MCCUE CSPC-6-307STANDARD YELLOWCUT TO LENGTH

4'-0

"

6" DIA. SCHEDULE40 CONCRETEFILLED PIPEBOLLARD

EXPANSION JOINT

ASPHALT OR CONC.REF. PLANS

16" DIA. CONC.FOUNDATION

4 DETAILSCALE: 1/2" = 1'-0"

TYPICAL BOLLARD

4'-0

"

2" (4

" MAX

.)

FOAM TAPE OVERPIPE BOLLARD

MCCUE CSPC-6-307STANDARD YELLOWCUT TO LENGTH

TRACTOR SUPPLY COMPANY

2934 Sidco DriveSuite 120Nashville, TN 37204

ARLINGTONTENNESSEE

OXFORDARCHITECTURE

ArchitecturePlanning

Interior Architecture

AS1.0

SITE PLAN

AutoCAD SHX Text
K-2005
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-2005
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
Job Number:
AutoCAD SHX Text
Date:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
Sheet Number:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
2100.009
AutoCAD SHX Text
03.11.2021
AutoCAD SHX Text
This drawing and the design shown is the property of the architect. The reproduction, copying or use of this drawing without their written consent is prohibited and any infringement will be subject to legal action.
AutoCAD SHX Text
All measurements and items portrayed on this sheet are provided to architect by Tractor Supply Company. General Contractors shall field verify any and all discrepancies in field and resolve differences with the Tractor Supply Company Project Manager.
Page 3: 9715 US HIGHWAY 64 ARLINGTON, TENNESSEE REVISION DATE: …

2015 IBC - SECTION 1005.3.2

2015 IBC - TABLE 1004.1.2

2015 IBC - TABLE 1017.2

PROJECT DATA

LIFE SAFETY DATA

EGRESS WIDTH PER OCCUPANT LOAD

WITHSPRINKLER SYSTEM

WITHOUT SPRINKLERSYSTEM

OCCUPANCY

OCCUPANCIES OTHERTHAN THOSE LISTEDBELOW

HAZARDOUS: H-1, H-2,H-3 AND H-4

INSTITUTIONAL: I-2

STAIRWAYS(INCHES PEROCCUPANT)

OTHER EGRESSCOMPONENTS(INCHES PEROCCUPANT)

STAIRWAYS(INCHES PEROCCUPANT)

OTHER EGRESSCOMPONENTS(INCHES PEROCCUPANT)

0.3

0.7

N/A

0.2

0.4

N/A

0.2

0.3

0.3

0.15

0.2

0.2

MAXIMUM FLOOR AREA ALLOWANCES PER OCCUPANT

FLOOR AREA IN SQ. FT. PEROCCUPANT

FUNCTION OF SPACE

BUSINESS AREAS

MERCANTILESTORAGE, STOCK, SHIPPING AREAS

EGRESS ACCESS TRAVEL DISTANCE

WITHSPRINKLER SYSTEM

(FEET)

WITHOUT SPRINKLERSYSTEM(FEET)

OCCUPANCY

250200M

300200B

100 GROSS

60 GROSS300 GROSS

ITEM PROVIDED

EXIT / EGRESS 700 X 0.15 = 105"

REQUIRED

MAX. TRAVEL DISTANCE 250'-0"

NUMBER OF TENANT EXITS 4

MIN. EXIT SEPARATION 74'-4"

230'-0"

5

108'-2"

NUMBER OF SALES EXITS 3 4

276"

PROJECT DATA MERCHNEY STRUCTURE

REMODEL BUILDING AREA LIMITS

SALES FLOOR EXISTING 18,630 SQ. FT. / 30

22,672 SQ. FT.TOTAL BUILDING AREA EXISTING

OCCUPANCY LOAD

= 621.0 OR 621STOCKROOM EXISTING 2,501 SQ. FT. / 300 = 8.3 OR 9

TOTAL OCCUPANT LOAD EXISTING = 653

CORE AREA EXISTING 1,262 SQ. FT. / 100 = 12.6 OR 13

VESTIBULE EXISTING 279 SQ. FT. / 30 = 9.3 OR 10

2015 INTERNATIONAL BUILDING CODE2015 INTERNATIONAL PLUMBING CODE2015 INTERNATIONAL MECHANICAL CODE2014 NATIONAL ELECTRIC CODE2015 INTERNATIONAL FIRE CODE2015 INTERNATIONAL FUEL GAS CODE

IIBFIRE SUPRESSIONCONSTRUCTION TYPEOCCUPANCY CLASSIFICATION

SPRINKLERED (EXISTING TO REMAIN)

MERCANTILE

ALARM SYSTEM ALARMED (EXISTING TO REMAIN)

NUMBER OF STORIES 1 (EXISTING TO REMAIN)

THIS PROJECT IS BASED ON THE REQUIREMENTS OF THE FOLLOWING:

IIBCONSTRUCTION TYPEOCCUPANCY CLASSIFICATION MERCANTILE

FIRE SUPRESSION SPRINKLERED

GARDEN CENTER NEW 2,378 SQ. FT. / 60

NEW BUILDING AREA LIMITS OCCUPANCY LOAD

6,960 SQ. FT.TOTAL MERCHNEY AREA

TOTAL OCCUPANT LOAD = 47

= 39.6 OR 40FEED STORAGE NEW 1,926 SQ. FT. / 300 = 6.4 OR 7

ALARM SYSTEM ALARMED

K-2005KINGSTONC_LAVATORYVITREOUS CHINA

LOADING PLATFORM

STOCKROOM105

WOMEN110

MEN109

EMPLOYEE

108LOUNGE

MANAGER'S

107OFFICE

CORRIDOR106

VESTIBULE101

RETAIL SALES102

GARDEN CENTER113

FEED STORAGE114

DRESSINGROOM104

BOPIS SHED

H

E

ELEC. PAN

EL

TELE. BOARD

ELEC. PAN

EL

G

ONEWAY

PICKUP

ONEWAY

PICKUP

ONEWAY

PICKUP

ONE

WAY

FENCED OUTDOOR DISPLAY AREA

PERMANENT SIDEWALKDISPLAY AREA

PERMANENT SIDEWALKDISPLAY AREA

PERMANENT SIDEWALKDISPLAY AREA

K-2005KINGSTONC_LAVATORYVITREOUS CHINA

C DOOR 'C' UTILIZES DELAYED EGRESS HARDWARE (15 SEC.)EGRESS WIDTH = 68" / 0.15OCCUPANT LOAD PER DOOR = 453

D

EXIT DOOR 'D' SHALL BE USED BYEMPLOYEES ONLY. OCCUPANTSSHALL NOT EGRESS THROUGH THESTOCKROOM.

DOOR 'D' UTILIZES ALARMED DETEXPANIC HARDWAREEGRESS WIDTH = 34" / 0.15OCCUPANT LOAD PER DOOR = 227

B EGRESS WIDTH = 60" / 0.15OCCUPANT LOAD PER DOOR = 400

108'-2" (ACTUAL MINIM

UM EXIT SEPARATION DISTANCE)

223'-0" X 1/3 THE DIAGONAL = 74-4" (MINIM

UM EXIT SEPARATION DISTANCE)

GATE 'F'EGRESS WIDTH = 96" / 0.15OCCUPANT LOAD PER DOOR = 640GATE TO REMAIN UNLOCKED DURING BUSINESS HOURSF

EDOOR 'E' UTILIZES DELAYED EGRESSHARDWARE (15 SEC.)EGRESS WIDTH = 34" / 0.15OCCUPANT LOAD PER DOOR = 227

AEGRESS WIDTH = 80" / 0.15OCCUPANT LOAD PER DOOR = 533

HEGRESS WIDTH = 34" / 0.15OCCUPANT LOAD PER DOOR = 227

G

EGRESS WIDTH =68" / 0.15OCCUPANT LOADPER DOOR = 453

IEGRESS WIDTH = 34" / 0.15OCCUPANT LOAD PER DOOR = 227

TRACTOR SUPPLY COMPANY

2934 Sidco DriveSuite 120Nashville, TN 37204

ARLINGTONTENNESSEE

OXFORDARCHITECTURE

ArchitecturePlanning

Interior Architecture

LS1.0

LIFE SAFETY / FIXTURE PLAN

1 LIFE SAFETY / FIXTURE PLANSCALE: 1/8" = 1'-0"

AutoCAD SHX Text
_
AutoCAD SHX Text
Job Number:
AutoCAD SHX Text
Date:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
Sheet Number:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
2100.009
AutoCAD SHX Text
03.11.2021
AutoCAD SHX Text
This drawing and the design shown is the property of the architect. The reproduction, copying or use of this drawing without their written consent is prohibited and any infringement will be subject to legal action.
AutoCAD SHX Text
All measurements and items portrayed on this sheet are provided to architect by Tractor Supply Company. General Contractors shall field verify any and all discrepancies in field and resolve differences with the Tractor Supply Company Project Manager.
Page 4: 9715 US HIGHWAY 64 ARLINGTON, TENNESSEE REVISION DATE: …

LOADING PLATFORM

STOCKROOM105

WOMEN110

MEN109

EMPLOYEE

108LOUNGE

MANAGER'S

107OFFICE

CORRIDOR106

VESTIBULE101

RETAIL SALES102

H

E

ELEC. PAN

EL

TELE. BOARD

ELEC. PAN

EL

G

SHELTER

FENCED OUTDOOR DISPLAY AREA

PERMANENT SIDEWALKDISPLAY AREA

PERMANENT SIDEWALKDISPLAY AREA

PERMANENT SIDEWALKDISPLAY AREA

CONTRACTOR TO REMOVE LIGHTCOVERS AND CEILING TILE IN OFFICECORE AREA. STORE LIGHTING TO BEREINSTALLED IN SAME LOCATION.

CONTRACTOR TO REMOVE SINK AND COUNTER. PREPAREA TO RECEIVE NEW WORK.

CONTRACTOR TO REMOVE CARPET AND/OR VINYL TILEFLOORING AS NECESSARY. PREP AREA TO RECEIVENEW WORK.

CONTRACTOR TO REMOVE SWING DOORS. PREP AREATO RECEIVE NEW WORK.

CONTRACTOR TO SAW CUT AND REMOVE MASONRYTO CREATE OPENING FOR NEW AUTOMATIC SLIDINGDOORS WHERE INDICATED. SEE A1.0 FOR EXTENTSAND LOCATION.

CONTRACTOR TO CONFIRM WITH TSC PM IFOVERHEAD DOOR IS TO BE REMOVED AND REPLACED.DOOR TO BE PURCHASED, PROVIDED, AND INSTALLEDBY DH PACE AS REQUIRED.

CONTRACTOR TO DEMO AS REQUIRED FOR GREENHOUSEFOOTINGS, SEE MERCHNEY STRUCTURAL DRAWINGS FORADDITIONAL INFORMATION.

CONTRACTOR TO REMOVE CANOPY. PATCH WALLPENETRATIONS AND CONCRETE WHERE NECESSARY.PREP AREA TO RECEIVE NEW WORK.

CONTRACTOR TO REMOVE MAN GATE. PREP AREA TORECEIVE NEW WORK.

CONTRACTOR TO REMOVE PLUMBING FIXTURES ANDTOILET ACCESSORIES. ANY CERAMIC OR VINYL TILEFLOORING TO BE REMOVED. URINAL TO REMAIN, SEEPLUMBING FOR NEW HARDWARE. VERIFY ALL WORKWITH TSC PROVIDED SCOPE OF WORK. PREP AREA TORECEIVE NEW WORK.

CONTRACTOR TO REMOVE DRINKING FOUNTAINS.VERIFY WORK WITH TSC PROVIDED SCOPE OF WORK.PREP AREA TO RECEIVE NEW WORK.

CONTRACTOR TO REMOVE ROOF ACCESS LADDER.RELOCATED WHERE INDICATED ON A1.0. VERIFY EXACTLOCATION WITH TSC PM.

CONTRACTOR TO REMOVE ANY PAINTED STRIPINGWITHIN NEW MERCHNEY STRUCTURE. PREP AREA TORECEIVE NEW WORK.

CONTRACTOR TO REMOVE SHELTER AND ALLASSOCIATED COMPONENTS. PATCH CONCRETE ASNECESSARY TO MATCH ADJACENT SURFACES. PREPAREA TO RECEIVE NEW WORK.

CONTRACTOR TO REMOVE LIGHT COVERS, CEILINGTILE, AND VINYL TILE FLOORING. PREP AREA TORECEIVE NEW WORK.

CONTRACTOR TO REMOVE DRESSING ROOM WALLS,DOOR, AND ACCESSORIES. REUSE ACCESSORIESWHEN POSSIBLE. PREP AREA TO RECEIVE NEW WORK.

CONTRACTOR TO REMOVE WALL PACKS, CONDUIT,ETC. ON SIDE WALL IN MERCHNEY STRUCTURE AREA.PATCH WALL PENETRATIONS AS NECESSARY. PREPAREA TO RECEIVE NEW WORK.

CONTRACTOR TO REMOVE FENCE AS NECESSARY FORNEW DRIVE AISLE. RELOCATE WHERE INDICATED. SEEA1.0 FOR LOCATION.

CONTRACTOR TO REMOVE CANTILEVERED GATES. PREPAREA TO RECEIVE NEW WORK.

CONTRACTOR TO REMOVE CANTILEVERED GATES. PREPAREA TO RECEIVE NEW WORK.

GENERAL NOTES(REFERS TO ALL AREAS WITHIN TSC DEMISED PREMISES)

· DEMOLITION PLAN SHOWS THE APPROXIMATE LAYOUT OF EXISTING BUILDINGSPACE AND IS NOT INTENDED TO REPRESENT "AS BUILT" CONDITIONS.CONTRACTOR MUST FIELD VERIFY EXISTING BUILDING CONDITIONS AS WELL ASVERIFY EXISTING MECHANICAL, PLUMBING, AND ELECTRICAL WORK LOCATED INTHE DEMOLITION SPACE. NOTIFY ARCHITECT IF THERE ARE ANY DISCREPANCIES.

· CONTRACTOR TO PROTECT EXISTING CONSTRUCTION SHOWN TO REMAIN DURINGDEMOLITION. DAMAGE TO EXISTING CONSTRUCTION SHOWN TO REMAIN SHALL BERESTORED TO MATCH PRE-DAMAGED CONDITION.

· CONTRACTOR TO PROTECT ALL EXISTING FINISH WORK TO REMAIN IN PLACEWHICH BECOMES EXPOSED DURING DEMOLITION OPERATIONS FROM DAMAGE.

· CONTRACTOR TO PROVIDE ALL NECESSARY SHORING, BRACING, AND SUPPORT TOPREVENT MOVEMENT, SETTLEMENT, OR COLLAPSE OF STRUCTURE OR ELEMENTTO BE DEMOLISHED, AND ADJACENT STRUCTURE OR ELEMENT SHOWN TOREMAIN. SHORING AND BRACING SHALL BE DESIGNED BY CONTRACTOR'SPROFESSIONAL ENGINEER LICENSED IN THE APPLICABLE JURISDICTION.

· CONTRACTOR TO REFER TO MECHANICAL, PLUMBING, AND ELECTRICALDRAWINGS FOR ADDITIONAL DEMOLITION INFORMATION.

TRACTOR SUPPLY COMPANY

2934 Sidco DriveSuite 120Nashville, TN 37204

ARLINGTONTENNESSEE

OXFORDARCHITECTURE

ArchitecturePlanning

Interior Architecture

D1.0

DEMOLITION PLAN

1 DEMOLITION PLANSCALE: 1/8" = 1'-0"

AutoCAD SHX Text
Job Number:
AutoCAD SHX Text
Date:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
Sheet Number:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
2100.009
AutoCAD SHX Text
03.11.2021
AutoCAD SHX Text
This drawing and the design shown is the property of the architect. The reproduction, copying or use of this drawing without their written consent is prohibited and any infringement will be subject to legal action.
AutoCAD SHX Text
All measurements and items portrayed on this sheet are provided to architect by Tractor Supply Company. General Contractors shall field verify any and all discrepancies in field and resolve differences with the Tractor Supply Company Project Manager.
Page 5: 9715 US HIGHWAY 64 ARLINGTON, TENNESSEE REVISION DATE: …

GENERAL NOTES:

NOTE: GENERAL CONTRACTOR TO ORDER, "CONTACT POSTER", "CONCRETE CHECKLIST", AND "PHONE BOARDPOSTER" FROM PLAN EXPRESS AND POST ON STOREFRONT AT CONSTRUCTION START.

EXHIBIT H-1 - TRAINING CERTIFICATION

INITIAL TSCSTORE MANAGER

INITIALGC

TRAINING HAS BEEN COMPLETED WITH THE STORE MANAGER BY THE GENERAL CONTRACTOR ON HOW TO USE,OPERATE AND MAINTAIN:THE IRRIGATION SYSTEM. ALSO, THE TSC STORE MANAGER HAS BEEN ADVISED THAT THE STORE IS RESPONSIBLE FORMAINTAINING ALL LANDSCAPING STARTING AT EITHER FIXTURE DATE OR COMPLETION DATE, THE LATTER OF THE TWO DATES.THE LIGHT TIMER SYSTEM INCLUDING REVIEW OF THE SCHEDULETHE HVAC SYSTEM OPERATION INCLUDING HOW TO ADJUST THE PROGRAMMABLE THERMOSTATS.THE AUTOMATIC FRONT DOORS OPERATIONS INCLUDING SENSOR ADJUSTMENTS.

THE OVERHEAD DOORS OPERATIONS INCLUDING TIMER, TIMER OVERIDE, AND SAFETY EDGE.

THE DELAY EGRESS DOOR (THE RESET BUTTON IS IN THE CONTROL BOX AND HAS TO BE RESET ANY TIME POWER IS LOST).

STORE #

CITY/STATE

STORE MANAGER

GENERAL CONTRACTOR

COPY OF THIS EXECUTED DOCUMENT TO BEINCLUDED IN THE CLOSE OUT DOCUMENTS PROVIDEDBY THE GENERAL CONTRACTOR (FOR RETROFIT BYTENANT) OR LANDLORD (RETROFIT BY LL) TO TRACTORSUPPLY COMPANY!

PRINTING

RED STRIPINGRICK TOWNEPOP SOLUTIONS GROUP#901.483.5929 (CELL)#901.795.5936 x 19 (OFFICE)[email protected]

CINDY PINDPLAN EXPRESS866.404.2614 x [email protected]

ITEM THE FOLLOWING ITEMS ARE FURNISHED AND INSTALLED BY T.S.C.

THE FOLLOWING ITEMS ARE FURNISHED BY T.S.C. AND INSTALLED BY THE CONTRACTOR.ITEM

QUANTITY

QUANTITY

1. ALL CONSTRUCTION AND DETAILS SHALL COMPLY WITH ALL APPLICABLE STATE AND LOCAL BUILDING CODES AND ORDINANCES AS OFTHE DATE OF THE DRAWINGS. ANY DEVIATIONS FROM BUILDING CODES REQUIRES NOTIFICATION AND APPROVAL FROM TSC PROJECTMANAGER.

2. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS OF THE SITE. DISCREPANCIES SHALL BE REPORTED TO THE ARCHITECT &OWNER PRIOR TO PROCEEDING WITH CONSTRUCTION.

3. REMOVE ALL CONSTRUCTION AND DEMOLITION DEBRIS FROM JOB SITE DAILY. MAKE JOB PREMISES CLEAN AT COMPLETION OFPROJECT.

4. FIRE EXTINGUISHERS SHALL BE INSTALLED IN ACCORDANCE WITH THE LOCAL FIRE DEPARTMENT PRIOR TO COMPLETION OFCONSTRUCTION.

5. ALL DIMENSIONS ARE FACE OF DRYWALL AT NEW WALLS AND TO FINISHED FACE AT MASONRY WALLS UNLESS NOTED OTHERWISE.6. NOTED DIMENSIONS TAKE PRECEDENCE OVER SCALED DRAWINGS.7. CONTRACTOR SHALL VERIFY ALL DIMENSIONS. IF DISCREPANCIES ARE FOUND, THE ARCHITECT AND OWNER SHALL BE NOTIFIED

IMMEDIATELY.8. THRESHOLDS SHALL NOT EXCEED 1/2 INCH IN HEIGHT.9. DRYWALL TO BE HELD UP 1/2" ABOVE CONCRETE FLOOR.

12. SPECIFIC MANUFACTURERS AND PRODUCTS ARE NAMED ON THE DRAWINGS TO INDICATE THE MINIMUM ACCEPTABLE LEVEL OFQUALITY. EQUAL OR BETTER PRODUCTS WILL BE CONSIDERED. SUBSTITUTES MUST BE APPROVED BY TSC PM.

13. ALL OFFICE WALLS TO BE INSULATED.14. CONCEAL ALL PIPING IN WALLS. WHERE PIPING IS TOO LARGE WALLS ARE TO BE FURRED OUT A MINIMUM TO CONCEAL PIPING.15. PROVIDE WATER RESISTANT GYPSUM BOARD BEHIND ALL PLUMBING FIXTURES.16. ALL COUNTERTOPS TO BE 2'-0" IN DEPTH UNLESS OTHERWISE NOTED.17. PROVIDE SOLID BLOCKING FOR WALL HUNG CABINETS, PLUMBING FIXTURES, ACCESSORIES AND MILLWORK.18. ALL MATERIALS USED BY ALL TRADES SHALL BE LISTED AND LABELED BY AN APPROVED AGENCY AND INSTALLED PER THE

MANUFACTURES INSTRUCTIONS.19. TSC RESERVES THE RIGHT TO REVIEW THE BUILDING ON OR BEFORE THE EXPIRATION OF THE LL'S ONE YEAR WARRANTY. IF ANY

WARRANTY OR PUNCH LIST ITEMS ARE FOUND THE LL SHALL IMMEDIATELY CORRECT THE CONDITION AT ITS' EXPENSE.20. WHEN SOS TRUCK COMES AS SCHEDULED 20 DAYS PRIOR TO FIXTURE DATE, GENERAL CONTRACTOR TO ASSIST TSC STORE MANAGER

WITH THE UNLOADING AND STORAGE OF ALL SOS TRUCK CONTENTS. IF GENERAL CONTRACTOR REQUESTS SOS TRUCK EARLY,GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL LABOR AND EQUIPMENT REQUIRED TO UNLOAD AND PROPER PLACEMENT ANDSTORAGE OF CONTENTS ONCE OFF SOS TRUCK.

21. GENERAL CONTRACTOR TO PROVIDE 2 COPIES OF SITE PLAN AND ELEVATIONS TO SIGN COMPANY ASSIGNED TO THIS PROJECT.VERIFY SIGN COMPANY W/ TSC. 1 COPY OF ELEVATIONS TO POP SOLUTIONS, RICK TOWNE (901.795.5936) -- ARCHITECT TO E-MAIL CADBASE OF FLOOR PLAN TO KEN MARSH, KMARSH@TRACTOR SUPPLY.COM), NO LATER THAN TWO WEEKS OF STARTING CONSTRUCTION.

22. GENERAL CONTRACTOR SHALL COORDINATE ENTIRE PROJECT AND SCHEDULE THE ALARM COMPANY FOR ALL ROUGH-IN AND FINALCONNECTIONS AND INSPECTIONS. CONTACT TSC, RICH WOOD 615.440.4721 FOR THE ALARM COMPANY ASSIGNED TO THIS LOCATIONNO LATER THAN TWO WEEKS AFTER CONSTRUCTION START. REFER TO THE SECURITY VENDOR PRE-CONSTRUCTION AND INSPECTIONS.CONTACT TSC, RICH WOOD @ 615.440.4721 FOR THE ALARM COMPANY ASSIGNED TO THIS LOCATION NO LATER THAN TWO WEEKSAFTER CONSTRUCTION START. REFER TO THE SECURITY VENDOR PRE-CONSTRUCTION AND PRE-INSTALLATION CHECKLIST.

23. CLOSE-OUT REQUIREMENTS, REFER TO LEASE / CONTRACT. FOR QUESTIONS, CONTACT GAYLE BASS @ 615.440.4795.24. THE MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL ANY DUCT SMOKE DETECTOR FOR NEW WORK ONLY. COORDINATE

WITH THE ASSIGNED ALARM COMPANY.25. THE GENERAL CONTRACTOR SHALL PAY FOR ALL UTILITY COST DURING CONSTRUCTION AND CONTACT DEEANA GHOLSON AT ECOVA,

INC. @ 509.329.7516 TWO WEEKS PRIOR TO FIXTURE DATE FOR TRANSFER TO TSC.26. DOCK ACCESS FROM ROAD MUST BE ACHIEVED 3 WEEKS PRIOR TO FIXTURE DATE.27. THE GENERAL CONTRACTOR OR LANDLORD SHALL SUBMIT A REPORT, ON A WEEKLY BASIS INDICATING THE PERCENT COMPLETE FOR

EACH LINE ITEM ON THE SCHEDULE USING THE TSC WEEKLY PROGRESS REPORT ALONG WITH PHOTOS PER PHOTO LOG ON THE BLANKREPORTS PROVIDED BY TSC.

28. THE GENERAL CONTRACTOR SHALL PROVIDE FOR INDEPENDENT INSPECTION AND CERTIFICATION FOR FOOTING COMPACTION, ANDCONCRETE QUALITY AND STRENGTH. THE RESULTS ARE TO BE SUBMITTED TO THE OWNER THE G.C. SHALL LIKEWISE PROVIDE ANINDEPENDENT INSPECTOR TO CERTIFY PROPER INSTALLATION OF THE STRUCTURAL STEEL OR PRE-ENGINEERED METAL BUILDINGSYSTEM.

29. FOR RED STRIPING, CONTACT POP SOLUTIONS @ 901.795.5936, ACCOUNT REP: RICK TOWNE.30. LANDLORD/LANDLORD GENERAL CONTRACTOR TO VERIFY WITH LOCAL POSTMASTER IF A MAILBOX IS REQUIRED. IF SO, GENERAL

CONTRACTOR TO INSTALL MAILBOX TYPE AND LOCATION PER THE POSTMASTER RECOMMENDATION AND PER USPS STANDARDS.31. 'J' MOLD TO BE USED AT ALL INTERSECTIONS OF GYPSUM BOARD AND ANY OTHER NON-GYPSUM MATERIAL.32. CORNER GUARDS TO BE USED AT ALL INTERIOR 'OUTSIDE' CORNER CONDITIONS.33. DURING CONSTRUCTION, ANY PARTIALLY COMPLETED MASONRY WALLS (CMU, BRICK, ETC.) SHALL BE COVERED WITH STRONG

WEATHER RESISTIVE MATERIAL DURING ALL TIMES WHEN CONSTRUCTION IS NOT IN PROGRESS AND ESPECIALLY AT THE END OF EACHWORK DAY. THE COVER SHALL BE DRAPED OVER THE WALL AND EXTEND A MINIMUM OF (2) TWO FEET DOWN FROM BOTH SIDES ANDSECURELY HELD IN PLACE.

34. FOR SOS TRUCK DELIVERIES ON RELO STORES, COORDINATE WITH TSC STORE SERVICES SPECIALIST BRAD COOPER([email protected]) FOR RENTAL TOW-MOTOR DROP. RENTAL TOW-MOTOR SHOULD ARRIVE NO LATER THAN THEWEDNESDAY PRIOR TO FIXTURE DATE. THE RENTAL TOW-MOTOR WILL BE PICKED-UP THE MONDAY FOLLOWING THE STORE'S SOFTOPENING DATE.

35. FINISHED SPACE SHALL BE PROVIDED IN A MANNER THAT PREVENTS RODENT INTRUSION. SEAL PENETRATIONS THROUGH EXTERIORWALL SURFACES WITH AN AEROSOL, MOISTURE-CURING POLYURETHANE FOAM SIMILAR TO "PUR BLACK" BY TODOL PRODUCTS, INC.(508.651.3818) OR APPROVED EQUAL.

36. CONCRETE MASONRY UNITS AND EXTERIOR CONCRETE MOISTURE CONTENT CRITERIA. GENERAL CONTRACTOR, OR, THE OWNERSTESTING COMPANY SHALL PROVIDE MOISTURE TESTING OF ALL CMU AND CONCRETE EXTERIOR WALL PER ASTM D4263 PRIOR TOAPPLICATION OF PAINT.

37. TSC PROJECT MANAGER MUST APPROVE THE APPLICATION OF PAINT IN WRITING, IF THE MOISTURE CONTENT IS ABOVE 15%.38. GENERAL CONTRACTOR TO HAVE A LOCAL CONTACT WITHIN 2-HOURS FOR ALL (NON)WARRANTY ELECTRICAL AND/OR PLUMBING CALL

BACK REPAIRS.39. ADD STEEL WOOL AT ALL CONDUIT/PIPE PENETRATIONS AT EXTERIOR WALLS AND ADD ESCUTCHEON PLATE AND PROVIDE SEALANT AT

ALL ESCUTCHEON EDGES TO PREVENT RODENT INTRUSION.40. AT EXISTING HVAC CURBS, CONTRACTOR TO INSTALL STEEL WOOL AND CLOSED-CELL SPRAY FOAM AT ALL CURB PENETRATIONS TO

PREVENT RODENT INTRUSION. CONTRACTOR TO VERIFY ALL WARRANTIES REMAIN INTACT AND APPROVED BY LANDLORD.

1 SET RESTROOM ACCESSORIES (NOT INCLUDING MIRRORS)FIRE EXTINGUISHERSBRAILLE SIGNAGE

1 "OPEN" SIGN1 "CUB CADET" SIGN1 T.S.C. ROAD SIGN, GENERAL CONTRACTOR TO PROVIDE POWER TO SIGN BASE.

COORDINATE WITH SIGN COMPANY ASSIGNED TO THIS LOCATION1 SECURITY VENDOR WORK (NOT INCLUDING LVW) PAID BY TSC

10.

11.

HAND DRYERS

LIGHTING PROVIDER

TSC AND VENDOR CONTACT INFORMATIONTRACTOR SUPPLY FIXTURE PLANS

VINYL PLANK FLOORING

UTILITY TRANSFER INFORMATIONKEN MARSH#[email protected]

VICKY DERON#[email protected]

PROPANE COORDINATION

BRYAN BIRDWELLVILLA LIGHTING SUPPLY, INC. #[email protected] TIME:

3-5 DAYS - INT/EXT LIGHTING3-4 WEEKS - SITE POLE LIGHTING

ADAM CARRIER, NATIONAL ACCOUNTS MANAGERVILLA LIGHTING SUPPLY, INC.#[email protected] TIME:

3-5 DAYS - INT/EXT LIGHTING3-4 WEEKS - SITE POLE LIGHTING

ANNE VOELKER, PRICING CONTACTVILLA LIGHTING SUPPLY, INC.#[email protected] TIME:

3-5 DAYS - INT/EXT LIGHTING3-4 WEEKS - SITE POLE LIGHTING

GAGE PERRYPHILIPS TELETROL#[email protected]

SECURITY SYSTEMS

HVAC PROVIDERLOW VOLTAGE PROVIDERTERRY L CORPENINGMERCURY TECH PARTNERS, INC.#828.465.7348 x [email protected]

ELECTRIC PANELERIC LINE, NATIONAL ACCOUNTS MANAGERCAROLINA PRODUCTS, INC. (CPI)#800.736.4455 OFFICE#704.778.2327 [email protected] TIME: 6 WEEKS

STOREFRONT DOORS

METAL RAMP DISTRIBUTORTONY HAMILTONQ.S.I. ENVIRONMENTAL & INDUSTRIALSTEEL FABRICATORS#[email protected] TIME: 3 WEEKS

ANDREW STREUTKERDURA-RAMP, INC.#[email protected] TIME: 3-5 WEEKS

PROTOTYPESACTION BY WHO WHEN SPECIAL NOTES

PLEASE BE SURE TO VERIFY HVAC SYSTEMS(GROUND MOUNT VS. ROOF MOUNT, ETC...)SECURITY SYSTEMS CONTRACTOR TO IDENTIFYEXIST. HVAC UNITS BY LL PER THE CHECKLIST

STORE ADDED TO SOSCODES AND BUILDING TYPE (CONTACT TSC PM AS NECESSARY) RESEARCHED,BA AND FA PLANS COMPLETED

SECURITY SYSTEMS CONTRACTOR COMPLETES PLANS SENDS TO RICH WOODAND TSC PM

PLANS FORWARDED TO LL AND/OR HIS ARCHITECT IF KNOWN

LL TO COMPLETE ALL LVW SOW PER PLANS USING TSC VENDOR

SECURITY SYSTEMS CONTRACTOR TO INSTALL THEIR EQUIPMENT AND MAKETERMINATIONS

INSTALLATION OF PA SYSTEM, PHONE SYSTEM, SPEAKERS, OUTSIDE HORNS,PHONES, PATCH PANEL, AP'S W/ ANTENNAS

INSTALLATION OF POS SYSTEMS AT ALL LOCATIONS AND TESTING OF AP SYSTEM

TSC REAL ESTATE

JCI/ADT

TSC PM

MERCURY TECH

RAY CLEMENT / MERCURY TECH

RAY CLEMENT / AGILYSIS

1ST MONDAY OF EACH MONTH

WITHIN 30 DAYS AFTER ADDED TO THE SOS

ON 30TH DAY AFTER ADDED TO SOS

31 DAYS

WHEN SENT BY LL PRIOR TO CONSTRUCTION STARTNO LESS THAN 2 WEEKS PRIOR TO FD FROM 2 WEEKS

MONDAY AND TUESDAY BEFORE FD

TUESDAY BEFORE FD

TSC TO REVIEW LL PLANS FOR ACCURACY TSC PM

ON DEVELOPER OWNED PROJECTS, DEVELOPER IS RESPONSIBLE FOR 100 % OF COST OF LVW VENDOR AND WIRING.

JCI/ADT

JCI/ADT STARTING APPROXIMATELY 3 WEEKS FROM FD TO BEDONE LAST AS LVW VENDOR COMPLETES NO LATERTHAN 2 WEEKS PRIOR TO FD.

LVW RESPONSIBILITY AND TIMING PLAN

GAVIN ELLIS, SYSTEMS APPLICATIONS ENGINEERJCI120 W. PARK DRIVE, BIRMINGHAM, AL 35211#[email protected]

JESSICA JONES, TEAM MANAGERINSTALLATION COORDINATOR / JCI10405 CROSSPOINT BLVD., INDIANAPOLIS, IN [email protected]@jci.com

DUANE MULLINSMERCURY TECH PARTNERS, INC.#828.465.7348 x [email protected]

BUMPER SIGNS / BOLLARD COVERSKEVIN O'NEILLMCCUE#[email protected]

EMS

JEREMY BLACK, STORE PROJECT SPECIALIST /STORE OPERATIONSTSC CONTACT FOR BULK PROPANE#615.440.4533#615.484.4486 (FAX)[email protected]

FELICIA MINGSTSC CONTACT FOR BULK PROPANE#615.440.4217#615.484.4486 (FAX)[email protected]

CLOSE-OUT BINDER REQUIREMENTS

PRO

TO

RETR

O

X = REQUIREDCONTRACTOR SHALL PROVIDE OWNER WITH ONE ELECTRONIC CLOSE-OUT BINDER ON A CD. ALL INFORMATION BELOW MUST BE INCLUDED. THE CLOSE-OUT BINDER SHALL BESENT ATTN TO THE CONSTRUCTION COORDINATOR AT THE OWNER'S ADDRESS: 5401 VIRGINIA WAY, BRENTWOOD, TN 37027.

NAME, ADDRESS AND TELEPHONE NUMBER OF THE CONTRACTOR AND ALL SUBCONTRACTORS.1.XX

PM STORE # CITY/STATE ______________________________________________________________________________ SO __________________________

THE FINAL CERTIFICATE OF OCCUPANCY OR THE EQUIVALENT THEREOF DESCRIBED IN ARTICLE 15.5.2(b)XX 2.AN ASSIGNMENT BY THE CONTRACTOR OF ALL GUARANTEES AND WARRANTIES FROM ALL SUBCONTRACTORS, VENDORS, SUPPLIERS, AND MANUFACTURERS, TOGETHERWITH ORIGINALS OF ALL SUCH GUARANTEES, WARRANTIES, AND OPERATING MANUALS (E.G. HVAC, ROOF, DOORS, WATER HEATER, ETC. AS APPLICABLE).

XX 3.

COMPLETE LIST OF EQUIPMENT - COMPLETE TEMPLATE.XX 4.CONFIRMATION IN WRITING FROM THE INSTALLER OF THE HVAC SYSTEM OR COMPONENTS THEREOF CONFIRMING THAT THE PROPERSTART-UP PROCEDURES WERE FOLLOWED.

XX 5.

COMPLETE RETROFIT HVAC BREAKDOWN OF COSTS - COMPLETE TEMPLATE.XN/A 6.COMPLETE PROTOTYPE HVAC INFORMATION - COMPLETE TEMPLATE.N/AX 7.CERTIFICATE OF SEWER CLEAN-OUT BY THE PERSON WHO PERFORMED THE SAME.8.XN/ADISABILITY ACCESSIBILITY INSPECTION REPORTS SENT TO THE TEXAS DEPARTMENT OF LICENSING AND REGULATION (FOR TEXAS STORES ONLY).9.XXA COPY OF THE PUNCH LIST ITEMS SIGNED BY THE OWNER (OR STORE MANAGER, IF SO AUTHORIZED BY OWNER) CONFIRMING ALL PUNCH LIST ITEMS ARE COMPLETED.10.XX(1) PDF CONTAINING WORKING DRAWINGS AND PLANS AND SPECIFICATIONS REFLECTING 'AS-BUILT' CONDITIONS, WITH A SUMMARY LIST OF CHANGES, INCLUDING IN .PDF FORMAT.11.XXA COMPLETE SET OF FIRE SPRINKLER SHOP DRAWINGS, IF APPLICABLE.12.XXA CERTIFICATE EVIDENCING THAT INSURANCE REQUIRED UNDER THE CONTRACT DOCUMENTS SHALL REMAIN IN FORCE AFTER FINAL PAYMENT AND SHALL NOT BE CANCELED,REDUCED, OR ALLOWED TO EXPIRE UNTIL AT LEAST 30 DAYS PRIOR WRITTEN NOTICE HAS BEEN GIVEN TO THE OWNERS.

13.XN/A

CERTIFICATION OF WATER WELLS AN/OR SEPTIC SYSTEMS THAT DEMONSTRATE INSPECTION AND ACCEPTANCE BY THE MUNICIPALITY. THIS SHOULD INCLUDE ANY ONGOINGTESTING AND/OR INSPECTIONS THAT ARE REQUIRED AS WELL AS THE INTERVAL AT WHICH TESTING AND/OR INSPECTION MUST BE COMPLETED.

14.XX

DIGITAL PHOTOGRAPHS OF THE 'BEFORE' AND 'AFTER' OF THE FRONT VIEW OF THE STORE.15.XN/ACOPY OF COLOR SCHEDULE.16.XXROOFING INSPECTION REPORT FROM THE ROOFING MANUFACTURER (SHOULD REFLECT ROOF PROPERLY INSTALLED AND AS SUCH WARRANTY 100% IN TACT).17.XX

TSC PM - SIGNATURE DATE

CERTIFICATION FROM THE PROJECT CIVIL ENGINEER THAT THE STORM WATER DRAINAGE SYSTEM HAS BEEN CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH THEAPPROVED PLANS AND ALL APPLICABLE LAWS (SEE LEASE EXHIBIT).

18.N/AX

DOORS, FRAMES, & DOOR HARDWARE

SECTIONAL DOORSADAM POSLOSKYDH PACE#[email protected]@dhpace.comLEAD TIME:

2-3 WEEKS - SECTIONAL & COILING DOORS*USE COILING DOORS IN HIGH IMPACT REGIONS

TRAVIS SMITHDH PACE#[email protected]@dhpace.comLEAD TIME:

2-3 WEEKS - SECTIONAL & COILING DOORS*USE COILING DOORS IN HIGH IMPACT REGIONS

CHARLES GIRTMANNATIONAL ACCOUNT SALES EXECUTIVEDH PACE#[email protected]

SAMI TOTTENDH PACE#[email protected]@dhpace.comLEAD TIME:

2 WEEKS - HOLLOW METAL FRAMES3 WEEKS - PRE-PAINTED & HPI DOORS3-4 WEEKS - WIND RATED ASSEMBLIES & COASTAL /

CA PROJECTS

MATT MATTHEWS, NATIONAL ACCOUNT MANAGERSTANLEY#[email protected] TIME: 6 WEEKS

CARLA MESSINA, NATIONAL ACCOUNT PMSTANLEY#[email protected] TIME: 6 WEEKS

LISA JUMP, NATIONAL ACCOUNT SALES MANAGERYORK / JOHNSON CONTROLS#800.481.9738 x 6531 TOLL FREE#405.419.6527 [email protected]@jci.comLEAD TIME: 3-4 WEEKS

ASHLEY MAYWORLD DRYERS DISTRIBUTOR#[email protected]

JOE RAY, SALES APPLICATION ENGINEERYORK / JOHNSON CONTROLS#405.419.6631 DIRECT#1.800.481.9738 QUOTE [email protected]@jci.comLEAD TIME: 3-4 WEEKS

JAMES MASTERS, TSC ENERGY MANAGERENGIE#[email protected]@engie.com(FOR LP ACCOUNTS FOR BUILDING HEAT CALL AMERIGAS)

AMY SADLEREARTHWERKS/ SWIFF-TRAIN#[email protected]

BOPIS SHED PROVIDERRICK WELLERL.J.S. SOLUTIONS#[email protected]

KEITH GREEENTELAID#[email protected]

RONALD BRUSSPOMEROY#[email protected]

WASTE AND RECYCLING VENDORDIANE HUEFFMEIER, PROGRAM MANAGERROCKTENN COMPANY#[email protected]

(RECOMMENDED ONLY)

TRACTOR SUPPLY COMPANY

2934 Sidco DriveSuite 120Nashville, TN 37204

ARLINGTONTENNESSEE

OXFORDARCHITECTURE

ArchitecturePlanning

Interior Architecture

A0.0

TENANT CRITERIA & VENDOR INFORMATION

AutoCAD SHX Text
Job Number:
AutoCAD SHX Text
Date:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
Sheet Number:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
2100.009
AutoCAD SHX Text
03.11.2021
AutoCAD SHX Text
This drawing and the design shown is the property of the architect. The reproduction, copying or use of this drawing without their written consent is prohibited and any infringement will be subject to legal action.
AutoCAD SHX Text
All measurements and items portrayed on this sheet are provided to architect by Tractor Supply Company. General Contractors shall field verify any and all discrepancies in field and resolve differences with the Tractor Supply Company Project Manager.
Page 6: 9715 US HIGHWAY 64 ARLINGTON, TENNESSEE REVISION DATE: …

MATERIAL SCHEDULEHARDWARE SETSIZE

DOOR SCHEDULE

10'-0" X 10'-0"

PR 3'-0"X8'-0"

13

MARK

6*

E MTL.

MATERIALSTORE FRONT

ALUM. / GLASS

TYPE

D

FRAME

MTL.

SEE NOTES 1 & 122

REMARKS

2

INSUL MTL.

NOTE: TRACTOR SUPPLY COMPANY HAS A NATIONAL ACCOUNT WITH DH PACE FOR DOOR HARDWARE.CONTACT: CHARLES GIRTMAN @ [email protected] OR #816.221.0543

18

NOT USED

4

NOT USED

NOT USED

SEE NOTE 18

STORE FRONT

9" MIN. TO CENTER OF SIGN

18" MAX. FAR EDGE OF SIGN

MEN'SRESTROOM

INSTALL RAISED CHARACTER, BRAILLESIGNS COMPLYING WITH ANSI A117.1INDICATING, 'EXIT', AT LATCH SIDE OFEACH EXIT DOOR. SEE PLAN FOR EXITSIGN LOCATIONS. 60" MAX. TO BOTTOM

OF TOP ROW OF TEXT

48" MAX. TO BOTTOM OF BRAILLECELLS / BOTTOM ROW OF TEXT

JOHNSONITE VINYL #40 BLACK IN ALL SPACES W/ PREFORMED INSIDE AND OUTSIDE CORNERSVINYL BASE

CLEAR ANODIZED ALUMINUM

HIGH GLOSS FINISH - COLOR TO MATCH SW4081 SAFETY RED FROM 10'-0" A.F.F. TO 10'-8" A.F.F., FRONT, LEFT, AND RIGHT SIDES 2 COATS: S-W ACROLON 100, B65R720 PART A SAFETY RED/ B65V720 PART B HARDENER - APPLY AS NEEDED FOR COMPLETE COVERAGE)

INTERIOR FINISHES:

STOREFRONT FINISH

EXTERIOR BUILDING FINISHES:

(CONCRETE MASONRY UNITS)RED ACCENT STRIPE

GLOSS FINISH - COLOR TO MATCH SW1012 POWER GREY 1ST COAT: S-W KEM KROMIK UNIVERSAL METAL PRIMER, B50Z

SERIES - OMIT FOR H.M. DOOR FRAMES (6.0 - 8.0 MLS WET / 3.0 -4.0 MLS DRY PER COAT) 2ND COAT: S-W INDUSTRIAL ENAMEL HS, B54Z400 SERIES 3RD COAT: S-W INDUSTRIAL ENAMEL HS, B54Z400 SERIES (2.0 - 4.0 MILS DRY PER COAT) (APPLY AS NEEDED FOR COMPLETE COVERAGE)

VINYL PLANK FLOORING

APPLY TO EXTERIOR RED STRIPE ONLY - CLEAR COAT GLOSS FINISH - DIAMOND-CLAD WB 3 COMPONENT, LOW VOC WATERBASED ACRYLIC POLYURETHANE CLEAR COAT DIAMOND-CLAD CLEAR COAT URETHANE GLOSS CLEAR PART A (B65T175) DIAMOND-CLAD CLEAR COAT URETHANE HARDNER PART B (B65V175) DIAMOND-CLAD CLEAR COAT URETHANE CATALYST PART C (B65C175)MIX COMPONENTS PER MANUFACTURERS SPECIFICATIONS COAT ACROLON WITHIN 48 HOURS RECOMMENDED SPREAD RATE (WET MILS: 2.4-4.8 AND DRY MILS: 1.0-2.0)

RED STRIPE (AROUND VESTIBULE BUMP OUT) - BY POP SOLUTIONS TO MATCH RED STRIPE SW 4081 SAFETY RED

NOTE: APPLICATIONS MAYUTILIZE BRUSH, ROLLEROR AIRLESS SPRAYER;HOWEVER, ALL COATSMUST BE BACK-ROLLED.SEE SHERWIN WILLIAMSDATA SHEET APPLICATIONRECOMMENDATIONS

NOTE: APPLICATIONS MAY UTILIZEBRUSH, ROLLER OR AIRLESSSPRAYER; HOWEVER, ALL COATSMUST BE BACK-ROLLED. SEESHERWIN WILLIAMS DATA SHEETAPPLICATION RECOMMENDATIONS

CONCRETE MASONRY UNITS AND EXTERIOR CONCRETE MOISTURE CONTENT CRITERIA.GENERAL CONTRACTOR, OR, THE OWNERS TESTING COMPANY SHALL PROVIDE MOISTURE TESTING OF ALL CMU AND CONCRETE EXTERIORWALL PER ASTM D4263 PRIOR TO APPLICATION OF PAINT. TSC PROJECT MANAGER MUST APPROVE THE APPLICATION OF PAINT IN WRITING,IF THE MOISTURE CONTENT IS ABOVE 15%.

SWIFF-TRAIN COMPANY EARTHWERKS "WOOD CLASSIC" GWT-C 9812

LOADING DOCK GUARDRAILS AND HOLLOW METAL DOOR FRAMES

STOREFRONT GLAZING VESTIBULE EXTERIOR 1" TEMP. INSULATED GREY TINTED GLASSSTOREFRONT GLAZING VESTIBULE INTERIOR 1/4" TEMP. CLEAR GLASS

(DOOR 12 ONLY)

6* FRAME SUPPLIED BY TSC, INSTALLED BY CONTRACTOR

ADA SIGNAGE

DOOR TYPES

DOOR NOTES

HOLLOW METAL DOORSFACTORY FINISHED SHER-CRYL HPA SW1012 POWER GRAY

H.M. AND WOOD DOORS FACTORY FINISHED SHER-CRYL HPA SW1012 POWER GRAY

DOORS

HARDWARE SCHEDULE

5

8

7

5B

6

SET #

1 C

1 A

1 B

3

4

QUANTITY ITEM MANUFACTURER

2

MORTISE CYLINDER 28107-2-26DCYLINDER - THUMB TURN 7201-2-6261CC7A2 (BEST GREEN CONSTRUCTION CORE)BALANCE OF HARDWARE BY DOOR SUPPLIER

CYLINDER, DUMMY 7160DC-26DBALANCE OF HARDWARE BY DOOR SUPPLIER

MORTISE CYLINDER 28107-1-26DCYLINDER - THUMB TURN 7201-2-6261CC7A2 (BEST GREEN CONSTRUCTION CORE)DRIP CAP 16A X 76 - ABALANCE OF HARDWARE BY DOOR SUPPLIER

ALL HARDWARE BY DOOR SUPPLIER

HINGES MPB79 4 1/2 X 4 1/2 NRP- 26DCYLINDRICAL LOCK T581BD X D X 23981145 X 5164 X 1 3/41CC7A2 (BEST GREEN CONSTRUCTION CORE)CLOSER, PARALLEL ARM SC81A X SS S SLIMSILENCER SR64-GRYCONTINUOUS HINGE MCK-22HD 66-CLEARPRIVACY SET T301S X D X 23981137 X 5164 X 1 3/4- 626WALL STOP WS407- CCV-US32DSILENCER SR64- GRY

HINGE MPB79 4 1/2 X 4 1/2 NRP- 26DDELAYED RIM EXIT DEVICE V40 X EEPT5-TSS - 711MORTISE CYLINDER 28107-1-26D1CC7A2 (BEST GREEN CONSTRUCTION CORE)CLOSER, PARALLEL ARM SC81A X DS X SLIM - 689WEATHER STRIPING 160V X 36 X 84 - MILLTHRESHOLD 896V X 36 - MILLDRIP CAP 16A X 40 - A

HINGE MPB79 4 1/2 X 4 1/2 NRP - 26DPUSH PLATE 8200 X 4 X 16 - US32DPULL PLATE 8302-0 X 4 X 16 - US 32DCLOSER, REGULAR ARM SC81A X RW/PA X SLIM - 689WALL STOP WS407-CCV - US32DSILENCER SR64 - GRYLITE KIT L-FRA 100 5 W X 35 H (TEMPERED GLS) - GPZ

HINGE MPB79 4 1/2 X 4 1/2 NRP - 26DCYLINDRICAL LOCK T511BD X D X 23981145 X 5164 X 1 3/4-6261CC7A2 (BEST GREEN CONSTRUCTION CORE)WALL STOP WS407-CCV - US32D (DOOR 11 ONLY)O.H. STOP 6016 X SURFACE MOUNT X 2 - US32D (DOOR 14 ONLY)SILENCER SR64 - GRY

HINGE MPB79 4 1/2 X 4 1/2 NRP- 26DPRIVACY SET T301S X D 23981137 X 5164 X 1 3/4 - 626CLOSER, REGULAR ARM SC81A X RW/PA X SLIM - 689WALL STOP WS407-CCV - US32DSILENCER SR64-GRY

ILCILCBEST

ILC

ILCILCBESTNAT

MCKFALBESTFALIVE

MCKFALIVEIVE

MCKDETILCBESTFALNATNATNAT

MCKIVEIVEFALIVEIVENAT

MCKFALBESTIVEHAGIVE

MCKFALFALIVEIVE

1 EA.1 EA.1 EA.

2 EA.

1 EA.1 EA.1 EA.1 EA.

3 EA.1 EA.1 EA.1 EA.3 EA.

1 EA.1 EA.1 EA.2 EA.

3 EA.1 EA.1 EA.1 EA.1 EA.1 EA.1 EA.1 EA.

3 EA.1 EA.1 EA.1 EA.1 EA.3 EA.1 EA.

3 EA.1 EA.1 EA.1 EA.1 EA.3 EA.

3 EA.1 EA.1 EA.1 EA.3 EA.

3 EA.1 EA.2 EA.1 EA.1 EA.1 EA.1 EA.1 EA.1 EA.1 EA.2 EA.1 EA.

HINGE MPB79 4 1/2 X 4 1/2 NRP- 26DEXIT ALARM ECL-230D X GRAY X (OUTSIDE KEY CONTROL)1CC7A2 (BEST GREEN CONSTRUCTION CORE)PULL 8N-US28CLOSER, PARALLEL ARM SC81A X DS X SLIM-689WEATHERSTRIP 160V X 36 X 84 - MILLDOOR BOTTOM 95WH X 36 - MILLTHRESHOLD 896V X 36 - MILLDRIP CAP 16A X 40 - ACYLINDER COLLAR ECL-1595RIM CYLINDER R28207-9DOOR VIEWER U698 - B26D (MOUNT 60" CL/A.F.F.)

MCKDETBESTHAGFALNATNATNATNATDETILCIVE

MORTISE CYLINDER 28107-2-26DCYLINDER, DUMMY 7160DC-26D1CC7A2 (BEST GREEN CONSTRUCTION CORE)BALANCE OF HARDWARE BY DOOR SUPPLIER

ILCILCBEST

1 EA.1 EA.1 EA.

1 D

10

9

11

HINGES MPB79 4 1/2 X 4 1/2 NRP- 26DCLASS LOCKSET T561BD X D X23981145 X 5164 X 1 3/4 -26DCLOSER SC81A X RW/PA X SLIM-689WALL STOP WS407-CCV-US32DSILENCER SR64- GRY

HINGES MPB79 4 1/2 X 4 1/2 NRP- 26DFIRE-RATED EXIT DEVICE FV40 X LD- 628CLOSER, PARALLEL ARM SC81A X DS X SLIM- 689THRESHOLD 896V- MILLDOOR BOTTOM 95WH - MILLWEATHER STRIPPING 160V- MILLDRIP CAP 16A-A

HINGES MPB79 4 1/2 X 4 1/2 NRP- 26DRIM EXIT DEVICE V40 X DC X EE X TSC-711POWER TRANSFER PT5REMOVABLE MULLION F90KR-7CLOSER, PARALLEL ARM SC81A X DS X SLIM - 689THRESHOLD 896V- MILLDOOR BOTTOM 95WH - MILLWEATHER STRIPPING 160V - MILLDRIP CAP 16A - A

MCKFALFALIVEIVE

MCKDETFALNATNATNATNAT

MCKDETDETDETFALNATNATNATNAT

3 EA.1 EA.1 EA.1 EA.3 EA.

3 EA.1 EA.1 EA.1 EA.1 EA.1 EA.1 EA.

3 EA.2 EA.2 EA.1 EA.2 EA.1 EA.1 EA.1 EA.1 EA.

NOT USED

44 3'-0" X 5'-8" H H. MTL. 4

'A' 'D' 'E'

1'-0

" 3'-6

"

10"

'H'

8"5'

-8"

8"

S.C. WOOD

1ST COAT: FACTORY PRIMED REMAINING COATS: FACTORY FINISHED

(COLOR TO MATCH SW1012, POWER GREY)EXTERIOR METAL AND INTERIOR WOOD DOORS:

PROVIDED BY DH PACETOUCH-UP PAINT

(COLOR TO MATCH SW7513, SANDERLING@ DRESSING ROOM DOOR ONLY)

PIPE BOLLARDS AND COVERS 6" SCHEDULE 40 CONCRETE FILLED PIPE BOLLARD WITH MCCUE POST COVER CSPC-6-307(SEE MANUFACTURER FOR BOLLARD SIZES OTHER THAN 6" DIA.) COLOR TO BE STANDARD YELLOW

NOTE: CONTRACTOR TO ACCESSA0.0_ASD1.PDF ON PLAN EXPRESSFOR ALTERNATE PAINTSPECIFICATION BY PPG.

NOT USED

(DOOR 16 ONLY)

1 EA.1 EA.1 EA.

SEMI-GLOSS FINISH - SW 4081 SAFETY RED 1ST COAT: S-W PROMAR 200 ZERO VOC INTERIOR LATEX PRIMER, B28W02600 (4 MILS. WET, 1.2 MILS DRY) 2ND COAT: S-W PROMAR 200 ZERO VOC INTERIOR LATEX SEMI-GLOSS, B31R02658 3RD COAT: S-W PROMAR 200 ZERO VOC INTERIOR LATEX SEMI-GLOSS, B31R02658

RED ACCENT STRIPE (IN RETAIL SALES AREA - 10'-3" TO BOTTOM OF STRIPE, 12" STRIPE)

GLOSS FINISH - COLOR TO MATCH SW1012, POWER GREY 1ST COAT: S-W KEM KROMIK UNIVERSAL METAL PRIMER, B50Z SERIES (6.0 - 8.0 MILS WET / 3.0 - 4.0 MILS DRY PER COAT) 2ND COAT: S-W PROMAR 400 ZERO VOC INTERIOR LATEX

SEMI-GLOSS, B31W04651 SERIES 3RD COAT: S-W PROMAR 400 ZERO VOC INTERIOR LATEX

SEMI-GLOSS, B31W04651 SERIES (4 MILS WET, 1.3 MILS DRY PER COAT)

GLOSS FINISH - COLOR TO MATCH SW1012, POWER GREY COLOR TO MATCH SW7513, SANDERLING - @ DRESSING ROOM DOOR ONLY

1ST COAT: FACTORY PRIMED 2ND COAT: S-W PROMAR 400 ZERO VOC INTERIOR LATEX SEMI-GLOSS,

B31W04651 SERIES 3RD COAT: S-W PROMAR 400 ZERO VOC INTERIOR LATEX SEMI-GLOSS,

B31W04651 SERIES (4 MILS WET, 1.3 MILS DRY PER COAT)

METAL DOOR FRAMES

INTERIOR COLUMNS (METAL)

SEMI-GLOSS FINISH - COLOR TO MATCH SW7005 PURE WHITE 1ST COAT: S-W PREPRITE BLOCK FILLER B25W25 (75-125 SQ. FT./GAL @ 16 MILS WET; 8 MILS DRY) 2ND COAT: S-W PROMAR 400 ZERO VOC INTERIOR LATEX SEMI-GLOSS, B31W04651 SERIES 3RD COAT: S-W PROMAR 400 ZERO VOC INTERIOR LATEX SEMI-GLOSS, B31W04651 SERIES (4 MILS WET, 1.3 MILS DRY PER COAT)

MASONRY (CONCRETE, SCORED, SMOOTH, HIGH/LOW DENSITY)

CONCRETE MASONRY UNITS FOR CONVENTIONAL BUILDINGS.ELASTOMERIC SYSTEM

LIGHTING POLE BASES

SEMI-GLOSS FINISH - (COLOR TO MATCH SW7036 ACCESSIBLE BEIGE.) 1ST COAT: S-W PROMAR 200 ZERO VOC INTERIOR LATEX PRIMER,

B28W02600 (4 MILS WET, 1.3 MILS DRY PER COAT) 2ND COAT: S-W PROMAR 400 ZERO VOC INTERIOR LATEX SEMI-GLOSS,

B31W04651 SERIES 3RD COAT: S-W PROMAR 400 ZERO VOC INTERIOR LATEX SEMI-GLOSS,

B31W04651 SERIES (4 MILS WET, 1.3 MILS DRY PER COAT)

OUTER CORE AREAS

INNER CORE AREAS

SEMI-GLOSS FINISH - (COLOR TO MATCH SW7005 PURE WHITE.) 1ST COAT: S-W PROMAR 200 ZERO VOC INTERIOR LATEX PRIMER,

B28W02600 (4 MILS WET, 1.3 MILS DRY PER COAT) 2ND COAT: S-W PROMAR 400 ZERO VOC INTERIOR LATEX SEMI-GLOSS,

B31W04651 SERIES 3RD COAT: S-W PROMAR 400 ZERO VOC INTERIOR LATEX SEMI-GLOSS,

B31W04651 SERIES (4 MILS WET, 1.3 MILS DRY PER COAT)

FLAT FINISH - FRONT FACADE COLOR TO MATCH SW7513 SANDERLING TO 4'-0" A.F.F., SW7532URBAN PUTTY FROM 4'-0" A.F.F. TO TOP OF C.M.U. , ALL SIDES. 1ST COAT: S-W LOXON ACRYLIC BLOCK SURFACER, LX01W0200 (50-100 SQ FT/ GAL @ 16 MILS

WET; 8 MILS DRY) 2ND COAT: S-W CONFLEX XL SMOOTH HIGH BUILD ACRYLIC COATING, CF11 SERIES 3RD COAT: S-W CONFLEX XL SMOOTH HIGH BUILD ACRYLIC COATING, CF11 SERIES (16 MILS WET, 7.5 MILS PER DRY COAT) (ACCEPTABLE TOLERANCE IS 9-10 PINHOLES PER SQ. FT.)

1ST COAT: S-W PREPRITE 200 ZERO VOC INTERIOR LATEX PRIMER, B28W02600

(4 MILS WET, 1.3 MILS DRY PER COAT) TSC TO PROVIDE AND INSTALL WALLPAPER

OUTER DRESSING ROOM WALLS

GLOSS FINISH - COLOR TO MATCH SW1012, POWER GREYCOLOR TO MATCH SW7513, SANDERLING -@ DRESSING ROOM DOOR ONLY

1ST COAT: FACTORY PRIMED 2ND COAT: S-W PRO INDUSTRIAL WATERBASED ALKYD

URETHANE ENAMEL B53W01051 SERIES 3RD COAT: S-W PRO INDUSTRIAL WATERBASED ALKYD

URETHANE ENAMEL B53W01051 SERIES (4 MILS WET, 1.6 MILS DRY PER COAT)

METAL DOOR FRAMES - OPTION (HARDER FINISH AND BETTERCOLOR/GLOSS RETENTION)

EXPOSED DECK & JOISTS (PRE-PRIMED GREY) PREFERED OR AS APPROVED BY TSC

PLASTIC LAMINATE - WILSONART 4857-60 SHADOW ZEPHYR AT EMPLOYEE LOUNGE COUNTERTOP PROVIDED BY TSC

RETAIL SALES TO BE PAINTED DOWN TO 7' A.F.F. BEHIND FIXTURES, AND 12' AROUND OPENINGS

LAYIN CEILINGS & GRID (OFFICE CORE) ARMSTRONG DUNE 1776 2X4, WHITE, SQUARE LAYIN, OR EQUAL

LAYIN CEILINGS & GRID (VESTIBULE) GRID STONE GYPSUM CEILING PANELS 1/2" X 2' X 4'

FIBERGLASS REINFORCED PANEL (FRP) - BY GLASTEEL, GLASLINER FRP,COLOR: XA WHITE, FINISH: TEXTURED. INSTALL AS WAINSCOT TO 4'A.F.F. ON ALL WALLS ADJACENT TO THE WATER COOLER AND ON ALL NON-MASONRY WALLS IN RESTROOMS. SEE DETAILS A5.0 FOR MOPSINK CONDITION. SEE DETAILS A5.1 FOR PET WASH WALL CONDITION.

DOOR NOTES:1. 10' WIDE X 10' HIGH SECTIONAL INSULATED METAL DOOR W/ ELECTRIC OPERATOR, (2) RADIO REMOTES, TIMER, CHAIN KEEPER AND REVERSING SAFETY EDGE.

OVERRIDE BUTTON TO BE SUPPLIED BY OVERHEAD DOOR VENDOR AND INSTALLED BY GENERAL CONTRACTOR'S ELECTRICIAN. COLOR TO BE FACTORYFINISHED WHITE.

2. NOT USED.3. NOT USED.4. NOT USED.5. NOT USED.6. NOT USED.7. NOT USED.8. NOT USED.9. NOT USED.10. DOOR #18 KEYED ALIKE.11. NOT USED.12. CONTRACTOR TO INSTALL PLASTIC AIR CURTAIN WITH 50% PANEL OVERLAP @ INSIDE NEW DOOR. AIR CURTAIN INCLUDED WITH OVERHEAD DOOR VENDOR

PACKAGE.13. CONTRACTOR TO PROVIDE AND INSTALL DOOR SWEEPS.14. DOORS TO HAVE FLAT THRESHOLD PROVIDED BY DOOR MANUFACTURER.15. NOT USED.16. NOT USED.17. NOT USED.18. 72" X 96", 72" X 84" OR 36" X 96" OPENINGS TO BE PROVIDED AS: P11PLUS, WITH 10" X 30" ADA COMPLIANT WINDOWS, 18" TALL BUMPERS, COLOR: RED. (OR)

OPENINGS 96" X 120" TO BE: DURULITE STANDARD DOORS WITH 20" X 30" ADA COMPLIANT WINDOWS, 36" TALL BUMPERS, COLOR: RED.19. NOT USED.20. NOT USED.21. NOT USED.22. NOT USED.23. SEE MERCHNEY DRAWINGS FOR DOOR SPECIFICATIONS.

FLOOR IN VESTIBULE,SALES, STOCKROOM,RESTROOMS, CORRIDOR,MANAGER'S OFFICE,EMPLOYEE LOUNGE

CONCRETE FLOORING SPECIFICATIONS, PROVIDE THE FOLLOWING:

· ANY FLOOR AREAS OVER 3" ROUND WILL BE PREPPED BY THE "GC".· MECHANICALLY GROUND AND POLISHED FLOOR SURFACE TO A 400 GRIT RESIN

DIAMOND FOLLOWED BY 800 GRIT DIAMOND PAD BURNISH FOR A MID LEVELGLOSS. INCLUDED IN THIS PROCESS IS CONCRETE DENSIFICATION,JOINT/CRACK FILLING UP TO 1150 LF AND PATCHING OF HOLES SMALLER THAN3" THAT POSE A TRIP HAZARD. PROCESS TO BE INSTALLED BY FLOORINGCONTRACTOR. NO SUBSTITUTIONS.

MANAGER'S OFFICE

EMPLOYEE LOUNGE

SPRINKLER ROOM

DRESSING ROOM

FINISH SCHEDULE

110

109

WOMEN

MEN

CORRIDOR106

108

107

105

104

STOCKROOM

VESTIBULE101

103

102 RETAIL SALES

ROOM NO. ROOM

A.C.T. @ 8'-0"

A.C.T. @ 8'-0"

GYP. BD. CEILING PANELS @ 10'-0" A.F.F.

PTD. GYP. / C.M.U. / PLYWOOD

PTD. GYP./ FRP

PTD. GYP.

PTD. GYP.

(SEMI-GLOSS, WHITE)A.C.T. @ 8'-0"

A.C.T. @ 8'-0"

A.C.T. @ 8'-0"

PTD. GYP. / C.M.U.PTD. C.M.U. / STOREFRONT

(SEMI-GLOSS, WHITE)

WALLS

EXP. STRUCTURE FACTORY PRIMED (GRAY)

CEILING

VINYL

VINYL

VINYL

-

FLOOR-

VINYL

BASE

1, 4, 5, 9

1, 4, 7, 9

1, 4, 9

9

6, 9

2, 3, 9

REMARKS

PTD. GYP./C.M.U./ FRP

PTD. GYP./C.M.U./ FRP

EXP. STRUCTURE FACTORY PRIMED (GRAY)

VINYL

VINYL

1. CEILING TILE: 2' x 4' X 3/4" MINERAL BOARD, NON-DIRECTIONAL FISSURED, MEDIUM TEXTURE, FLAME RESISTANCE CLASS A, FLAME SPREADCLASS I

2. VINYL PLANK: EARTHWERKS "WOOD CLASSIC" GWC 9812. DELIVERED BY TSC, SUPPLIED, PURCHASED AND INSTALLED BY CONTRACTOR.BEVELED EDGE VINYL PLANK TO BE USED AT EXPOSED TRANSITION OF VINYL PLANK FLOORING TO CONCRETE.

3. RED ACCENT STRIPE @ 10'-3" FROM FINISH FLOOR TO BOTTOM OF STRIPE -1'-0" STRIPE4. WALL COLOR TO BE (SW7036 ACCESSIBLE BEIGE). TRIM AND DOORS TO BE (SW1012 POWER GRAY).5. FRP WAINSCOT TO BE INSTALLED ON ALL NON-MASONRY WALLS 4'-0" A.F.F. COLOR: XA WHITE, FINISH: TEXTURED.6. GRID STONE GYPSUM CEILING PANELS 1/2" X 2' X 4'7. FRP WAINSCOT TO BE INSTALLED BEHIND AND ON ALL SIDES OF THE WATER COOLER ALCOVE TO 4'-0" A.F.F. COLOR: XA WHITE, FINISH:

TEXTURED.8. INTERIOR DRESSING ROOM WALLS TO BE PURE WHITE. EXTERIOR WALL EXTENDING ABOVE 9'-0" A.F.F. TO BE PAINTED PURE WHITE W/ RED

STRIPE TO MATCH RETAIL SALES WALLS. EXTERIOR DRESSING ROOM WALLS TO BE WALLPAPER PROVIDED AND INSTALLED BY TSC.9. SEE CONCRETE FINISHING REQUIREMENTS THIS SHEET.10. VINYL TILE TO MATCH AZROCK V-862 CLOUD WHITE OR ARMSTRONG 51899 COOL WHITE.

1, 4, 5, 9

1, 4, 9

PTD. GYP. / C.M.U. 2, 8OPEN TO DECK ABOVE VINYL

PTD. GYP. / C.M.U.(SEMI-GLOSS, WHITE) EXP. STRUCTURE FACTORY PRIMED (GRAY) - 9

DRYWALL AND INTERIOR DRESSING ROOM WALLS(WALLS, GYPSUM BOARD, PLASTER BOARD, ETC.)

GLOSS FINISH - COLOR TO BE SW4084 SAFETY YELLOW 1ST COAT: S-W LOXON ACRYLIC BLOCK SURFACER,

LX01W0200 (50-100 SQ FT/ GAL @ 16 MILS WET;8 MILS DRY)

2ND COAT: S-W CONFLEX XL SMOOTH HIGH BUILD ACRYLICCOATING, CF11 SERIES

3RD COAT: S-W CONFLEX XL SMOOTH HIGH BUILD ACRYLICCOATING, CF11 SERIES

(APPLY AS NEEDED FOR COMPLETE COVERAGE) PRODUCT IS PACKAGE SAFETY YELLOW; COLOR

ACCEPTANCE SHOULD BE APPROVED BY TRACTOR SUPPLY.

CONDUIT IN CLOTHING AREA CONDUIT ON EXTERIOR WALLS IN CLOTHING AREA RUST-OLEUM UNIVERSALHAMMERED ALL SURFACE PAINT + PRIMER COLOR: BROWN

6, 13

GC TO PAINT EXPOSED CONDUIT IN RETAIL SALESAREA TO MATCH INTERIOR WALL FINISH

EXPOSED CONDUIT IN RETAIL SALES AREA

VINYL PLANKCONCRETE /

VINYL PLANK

CONCRETEGRIND & POLISH

CONCRETEGRIND & POLISH

CONCRETEGRIND & POLISH

CONCRETE

CONCRETEGRIND & POLISH

CONCRETE

CONCRETEGRIND & POLISH

CONCRETEGRIND & POLISH

PR 3'-0"X7'-0"

3'-0" X 7'-0"

19

18 GLASSA ALUM. SEE NOTES 10, 13 & 141A

20

3'-0" X 7'-0"

3'-0" X 7'-0"

21

22

23

24

10'-0" X 10'-0" SEE NOTE 23

SEE NOTE 23

SEE NOTE 23

25

SEE NOTE 23

10'-0" X 10'-0"

10'-0" X 10'-0"

3'-0" X 7'-0"

SEE NOTE 23

SEE NOTE 23

SEE NOTE 23

NOT USED

NOT USED

NOT USED

NOT USED

NOT USED

NOT USED

NOT USEDTRACTOR SUPPLY COMPANY

2934 Sidco DriveSuite 120Nashville, TN 37204

ARLINGTONTENNESSEE

OXFORDARCHITECTURE

ArchitecturePlanning

Interior Architecture

A0.1

DOOR & FINISH SCHEDULES

AutoCAD SHX Text
Job Number:
AutoCAD SHX Text
Date:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
Sheet Number:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
2100.009
AutoCAD SHX Text
03.11.2021
AutoCAD SHX Text
This drawing and the design shown is the property of the architect. The reproduction, copying or use of this drawing without their written consent is prohibited and any infringement will be subject to legal action.
AutoCAD SHX Text
All measurements and items portrayed on this sheet are provided to architect by Tractor Supply Company. General Contractors shall field verify any and all discrepancies in field and resolve differences with the Tractor Supply Company Project Manager.
Page 7: 9715 US HIGHWAY 64 ARLINGTON, TENNESSEE REVISION DATE: …

STOCKROOM105

WOMEN110

MEN109

EMPLOYEE

108LOUNGE

MANAGER'S

107OFFICE

CORRIDOR106

VESTIBULE101

RETAIL SALES102

GARDEN CENTER113

FEED STORAGE114

DRESSINGROOM104

BOPIS SHED

H

E

ELEC. PAN

EL

TELE. BOARD

ELEC. PAN

EL

G

ONEWAY

PICKUP

ONEWAY

PICKUP

ONEWAY

PICKUP

ON

EW

AY

ONE

WAY

FENCED OUTDOOR DISPLAY AREA

PERMANENT SIDEWALKDISPLAY AREA

PERMANENT SIDEWALKDISPLAY AREA

PERMANENT SIDEWALKDISPLAY AREA

NOTE:FINAL FIXTURE PLAN TO BE DEVELOPEDBY TSC. SERVICE DESK, FIXTURES ANDCOUNTERS TO BE SUPPLIED BY TSCAND INSTALLED BY CONTRACTOR.

9A5.0

6

7A5.0

19

VERI

FY E

XTEN

T O

F PL

ANK

FLO

ORI

NG

W/ F

INAL

FIX

TURE

PLA

N

VERIFY EXTENT OF PLANK FLOORING W/ FINAL FIXTURE PLAN

2A1.0

4

13

5'-6"8'-0"

12'-0

"15

'-4"

2'-4

"(2) 4' SWING GATES TO REMAINUNLOCKED AND OPEN WHEN THEBUILDING IS OCCUPIED. INSTALL SIGNSIN 1" LETTERS STATING "THIS GATE TOREMAIN UNLOCKED WHEN THIS SPACEIS OCCUPIED" ON EACH GATE

DURULITE DOOR AND CUSTOM FRAME BYTSC, INSTALLED BY CONTRACTOR.CONTRACTOR TO PROPERLY SECURE ALLANCHOR POINTS WHEN ANCHORING INPLACE. VERIFY LOCATION W/ FIXTUREPLAN & INSTALL AFTER FIXTURES HAVEBEEN INSTALLED.

AT EACH BOPIS AND VETERAN PARKING SPACE,CONTRACTOR TO PROVIDE AND INSTALLVERTICAL SIGNAGE, SEE DETAILS ON AS1.0

RELOCATED ROOF ACCESS LADDER.CONFIRM EXACT LOCATION WITH TSCPM. LADDER TO BE PRIMED ANDPAINTED GRAY TO MATCH EXTERIORMAN DOOR PAINT SPECIFICATION. SEEDETAILS ON SHEET A4.0.

TSC TO PROVIDE ANCHOR BOLTS PERMANUFACTURER'S SPECIFICATIONS ANDANCHOR RACKS TO CONCRETE. TSC TOPROVIDE ANCHOR PLATES.

PROVIDE AND INSTALL KNOX LOCKSFOR GATES, COORDINATE LOCATIONWITH FIRE DEPARTMENT

DRESSING ROOM TO BE CLEAR OF CONDUITAND JUNCTION BOXES BELOW 96" A.F.F.

(2) 4" PAINTED YELLOW LINESINDICATING EXTENT OF DRIVE AISLE

NOTE: SLOPE OF SIDE LOT SURFACE SHALL BE 3%MAX IN ANY DIRECTION. CONTRACTOR TO CONFIRMWITH GRADE SURVEY BEFORE ANY WORK ISSTARTED IN SIDE LOT.

SIGN FOR GATE OPERATOR: "GATE WILLOPEN AUTOMATICALLY. PLEASE PULLFORWARD."

PAINTED STOP BAR. COORDINATE WITHTSC PM.

CONCRETE FLOOR TO BE CLEANED ANDBURNISHED.

20' ROLLING CANTILEVERED GATE WITHAUTOMATIC GATE OPERATOR, SEE A4.0

NOTE: VARIATIONS IN THE FINISH FLOORELEVATIONS BETWEEN THE BUILDINGSLAB AND SIDE LOT MAY OCCUR WHICHREQUIRE ADDITIONAL SLOPING OFCONCRETE AT NEW SLIDING DOORS.COORDINATE SLOPES WITH TSC PM ANDSTORE PLANNING AS THIS MAY AFFECTFIXTURING.

1A5.0

GROUND MOUNTED AIR CONDITIONINGUNIT TO SERVICE FEED STORAGEENCLOSED BY CHAIN LINK FENCE, SEEMECHANICAL.

4" PAINTED YELLOW LINES INDICATINGEXTENT OF SIDEWALK DISPLAY

TSC TO PROVIDE ANCHOR BOLTS PERMANUFACTURER'S SPECIFICATIONS ANDANCHOR RACKS TO CONCRETE. TSC TOPROVIDE ANCHOR PLATES.

CONCRETE FLOOR TO BE SEALED WITHEUCOSIL LIQUID DENSIFIER ASMANUFACTURED BY EUCLID CHEMICALCOMPANY INC.

20' ROLLING CANTILEVERED GATE WITHAUTOMATIC GATE OPERATOR, SEE A4.0

CONTRACTOR TO VERIFY THAT VINYL PLANK FLOORING ISINSTALLED THROUGHOUT CLOTHING AREA. REMOVE ANDINSTALL ADDITIONAL FLOORING AS NECESSARY.

MITER VINYL PLANK AT OUTSIDECORNER OF EXTENT OF CLOTHINGAREA. RETURN VINYL PLANK TOCOVER ALL EXPOSED SHORTEDGES UNTIL FIXTURES COVERFLOORING. COORDINATE W/FINAL FIXTURE PLAN.

TRACTOR SUPPLY COMPANY

2934 Sidco DriveSuite 120Nashville, TN 37204

ARLINGTONTENNESSEE

OXFORDARCHITECTURE

ArchitecturePlanning

Interior Architecture

A1.0

ARCHITECTURAL FLOOR PLAN

2 DETAILSCALE: 1/4" = 1'-0"

VINYL PLANK RETURN 1 ARCHITECTURAL FLOOR PLANSCALE: 1/8" = 1'-0"

AutoCAD SHX Text
K-2005
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-2005
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
Job Number:
AutoCAD SHX Text
Date:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
Sheet Number:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
2100.009
AutoCAD SHX Text
03.11.2021
AutoCAD SHX Text
This drawing and the design shown is the property of the architect. The reproduction, copying or use of this drawing without their written consent is prohibited and any infringement will be subject to legal action.
AutoCAD SHX Text
All measurements and items portrayed on this sheet are provided to architect by Tractor Supply Company. General Contractors shall field verify any and all discrepancies in field and resolve differences with the Tractor Supply Company Project Manager.
Page 8: 9715 US HIGHWAY 64 ARLINGTON, TENNESSEE REVISION DATE: …

FIN. FLR.0'-0" A.F.F.

PAINTED SAFETY RED

GENERAL CONTRACTOR, OR, THEOWNERS TESTING COMPANY SHALLPROVIDE MOISTURE TESTING OF ALLCMU AND CONCRETE EXTERIORWALLS PER ASTM D4263 PRIOR TOAPPLICATION OF PAINT. TSC PROJECTMANAGER MUST APPROVE IF THEMOISTURE CONTENT IS ABOVE 15%.

PAINTED SW7532 URBAN PUTTY ABOVE4'-0" A.F.F.

PAINTED SW7513 SANDERLING TO 4'-0" A.F.F.(2) 4' MAN GATES20' ROLLING CANTILEVERED GATE WITHAUTOMATIC GATE OPERATOR, SEE A4.0 FORDETAILS

JOIST BEARING

RELOCATED ROOF LADDER

FIN. FLR.0'-0" A.F.F.

OVERHEAD DOOR, SEE MERCHNEYDRAWINGS FOR SPECIFICATIONS

HVAC UNIT BEYOND

TRACTOR SUPPLY COMPANY

2934 Sidco DriveSuite 120Nashville, TN 37204

ARLINGTONTENNESSEE

OXFORDARCHITECTURE

ArchitecturePlanning

Interior Architecture

ELEVATION1 SCALE: 1/8"=1'-0"

FRONT

ELEVATION2 SCALE: 1/8"=1'-0"

LEFT SIDE

ELEVATION3 SCALE: 1/8"=1'-0"

REAR

A2.0

ARCHITECTURAL ELEVATIONS

AutoCAD SHX Text
Job Number:
AutoCAD SHX Text
Date:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
Sheet Number:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
2100.009
AutoCAD SHX Text
03.11.2021
AutoCAD SHX Text
This drawing and the design shown is the property of the architect. The reproduction, copying or use of this drawing without their written consent is prohibited and any infringement will be subject to legal action.
AutoCAD SHX Text
All measurements and items portrayed on this sheet are provided to architect by Tractor Supply Company. General Contractors shall field verify any and all discrepancies in field and resolve differences with the Tractor Supply Company Project Manager.
Page 9: 9715 US HIGHWAY 64 ARLINGTON, TENNESSEE REVISION DATE: …

STOCKROOM105

WOMEN110

MEN109

EMPLOYEE

108LOUNGE

MANAGER'S

107OFFICE

CORRIDOR106

VESTIBULE101

RETAIL SALES102

GARDEN CENTER113

FEED STORAGE114

DRESSINGROOM104

BOPIS SHED

H

E

ELEC. PAN

EL

TELE. BOARD

ELEC. PAN

EL

G

ONEWAY

PICKUP

ONEWAY

PICKUP

ONEWAY

PICKUP

ON

EW

AY

ONE

WAY

FENCED OUTDOOR DISPLAY AREA

PERMANENT SIDEWALKDISPLAY AREA

PERMANENT SIDEWALKDISPLAY AREA

PERMANENT SIDEWALKDISPLAY AREA

EXIT

INSTALL NEW LIGHT COVERS ANDCEILING TILE IN EXISTING CEILINGGRID. STORE LIGHTING TO BEREINSTALLED IN SAME LOCATION.VERIFY ALL WORK WITH TSCPROVIDED SCOPE OF WORK.

10'-0" A.F.F.

E

AT CHICK DAY POWERLOCATION, GC TO PROVIDE &INSTALL STEEL CORD REEL PERMANUFACTURER'SINSTRUCTIONS, COORDINATE W/ELECTRICAL FOR CHICK DAYPOWER LOCATION. REEL TO BEHUBBELL #HBLC40123TT

8'-0" A.F.F.8'-0" A.F.F.

8'-0" A.F.F. 8'-0" A.F.F.

EQ EQ

EXIT

CENTERED AT PEAK, MOUNTAS HIGH AS POSSIBLE

CENTERED IN SHED, MOUNTEDAS TIGHT TO SHED STRUCTUREAS POSSIBLE

CENTERED BETWEEN COLUMNSON MAIN FRAME LINE, TYP.

EQ EQ

EQ EQ

EQ EQ

EQ EQ

EQ EQ

EQ EQ

EQ EQ

EQ EQ

EQ EQ

EQ EQ

INSTALL NEW LIGHT COVERS ANDCEILING TILE IN EXISTING CEILINGGRID. STORE LIGHTING TO BEREINSTALLED IN SAME LOCATION.VERIFY ALL WORK WITH SCOPE OFWORK.

EXPOSED CEILING

EXPOSED CEILING

EXIT SIGNEXIT

CEILING PLAN LEGEND

EMERGENCY LIGHTS (2 LIGHTS)E

8' LED LIGHT FIXTURESEE PLAN FOR MOUNTING HEIGHTS

GENERAL NOTES(REFERS TO ALL AREAS WITHIN TSC DEMISED PREMISES)

· TSC GENERAL CONTRACTOR RESPONSIBLE FOR COORDINATION OF ALL WORK.

· FIELD VERIFY QUANTITY AND LOCATION OF EXISTING LIGHT FIXTURES, ALL FIXTURES SHOWN AREASSUMED. DO NOT ADD ADDITIONAL FIXTURES IF LAYOUT SHOWN IS INCORRECT. COORDINATE WITHARCHITECT.

· CONTRACTOR RESPONSIBLE FOR ADDING NEW LIGHTING FIXTURES PER TSC GUIDELINES ANDENSURE ALL EXISTING LIGHTING IS IN PROPER WORKING ORDER.

· CONTRACTOR TO RELOCATE EXISTING LIGHT FIXTURES OR INSTALL NEW FIXTURES AS INDICATED INAREAS OF DEMOLITION. VERIFY EXISTING CONDITIONS ON SITE. COORDINATE WITH SHEET D1.0 FOREXTENT OF DEMOLITION.

· VERIFY CONDITION OF EXISTING INTERIOR LIGHT FIXTURES THROUGHOUT. RETROFIT AS REQUIRED TOLED. FIXTURES THAT ARE REMOVED IN AREAS OF DEMO MAY BE RELOCATED IN LIEU OF INSTALLINGNEW.

· ALL NEW/RELOCATED LIGHTING TO BE SUPPORTED VIA METAL THREADED ROD OR AIRCRAFT CABLE(NO CHAIN).

· TURN CEILING TILE AND GRID UP TO DECK AT EDGE OF LAY-IN CEILING AT ALL EXPOSED PLENUMAREAS. PROVIDE HOLD DOWN CLIPS.

LED LIGHT FIXTURESEE ELECTRICAL

Z-STRIP SPRING HANGER

FLAT WASHER

LOCK WASHER

HEX NUT

1 Z-STRIP SPRING HANGERSCALE: 1-1/2"=1'-0"

THREADED ROD

FLAT WASHER

LOCK WASHER

HEX NUT

ENLARGED ISOMETRIC Z-STRIP SPRING HANGERINSTALL PER MANUFACTURER'SRECOMMENDATIONS

LIGHTS IN MERCHNEY STRUCTURE 2 ALTERNATE ATTACHMENT DTL.SCALE: 3/4"=1'-0"

NOTE: SECURE PER LIGHTMANUFACTURER'S INSTALLATIONGUIDELINES. FOR CONTINUOUSROW MOUNTING, UTILIZE ENDPLATE COUPLER PER LIGHTMANUFACTURER'S INSTALLATIONGUIDELINES.

AIRCRAFT CABLE, TYP.

CABLE COMPRESSIONSLEEVE, INSTALL PERMANUFACTURER'SINSTALLATIONGUIDELINES

CABLE COMPRESSION SLEEVEINSTALL PER MANUFACTURER'SINSTALLATION GUIDELINES

LED LIGHT FIXTURESEE ELECTRICAL

LED LIGHT FIXTURESEE ELECTRICAL

AIRCRAFT CABLE, TYP.

LIGHTS IN MERCHNEY STRUCTURE

TRACTOR SUPPLY COMPANY

2934 Sidco DriveSuite 120Nashville, TN 37204

ARLINGTONTENNESSEE

OXFORDARCHITECTURE

ArchitecturePlanning

Interior Architecture

A3.0

REFLECTED CEILING PLAN1 REFLECTED CEILING PLAN

SCALE: 1/8" = 1'-0"

AutoCAD SHX Text
Job Number:
AutoCAD SHX Text
Date:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
Sheet Number:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
2100.009
AutoCAD SHX Text
03.11.2021
AutoCAD SHX Text
This drawing and the design shown is the property of the architect. The reproduction, copying or use of this drawing without their written consent is prohibited and any infringement will be subject to legal action.
AutoCAD SHX Text
All measurements and items portrayed on this sheet are provided to architect by Tractor Supply Company. General Contractors shall field verify any and all discrepancies in field and resolve differences with the Tractor Supply Company Project Manager.
Page 10: 9715 US HIGHWAY 64 ARLINGTON, TENNESSEE REVISION DATE: …

7A4.0

1'-0

" TYP

.

7'-1

0" (9

4")

4"

6"

7'-6

" (90

")

6"6'

-6" (

78")

5"

F.F.

TO

TO

P O

F PA

RAPE

TVE

RIFY

IN F

IELD

12" M

AX.

5"4"

CLE

AR

9"

COORDINATE DIMENSION WITHGUTTER ABOVE

1'-0

" TYP

.

CONTRACTOR TO INSTALL NEWRUNGS AT APPROPRIATE HEIGHTWITH CORRECT FASTENERSWHERE LADDER DOES NOT MEETGRADE

12" M

AXIM

UM

4"C

LEAR

7"VERIFY

ALUM. OR STEELTUBULAR LADDER

3/16" ALUM. OR STEELALTERNATE BRACKET

20'-0" GATE OPENING 10'-0" COUNTER SUPPORT

GATE STOPSGATE STOPS

CAST ALUM. CARRIAGE W/ (2)HEAVY DUTY RUBBER TIRES

8'-0"4'-0"20'-0"

18"

HEAVY DUTY NYLONROLLERS MOUNTED TOGATE POSTS

CAST ALUM. CARRIAGE W/ (2)HEAVY DUTY RUBBER TIRES

*NOTE: GATE INSTALLER TO DESIGN GATES FORAN END RESULT OF NO MORE THAN 8" OF SPACEFROM BOTTOM OF GATE TO FINISH SURFACE.

8" M

AX.

NOTE: CONTRACTOR TO INSTALL AUTOMATICGATE OPERATOR, LIFTMASTER SL 585. SEEELECTRICAL.

HEAVY DUTYNYLON ROLLERSMOUNTED TOGATE POSTS

18"

PRESSED STEEL CHAIN-LINKFENCE POST HINGES, 3 EACH SIDE

*NOTE: GATE INSTALLER TO DESIGN GATES FOR AN END RESULT OF NOMORE THAN 8" OF SPACE FROM BOTTOM OF GATE TO FINISH SURFACE.

8'-0"

TRACTOR SUPPLY COMPANY

2934 Sidco DriveSuite 120Nashville, TN 37204

ARLINGTONTENNESSEE

OXFORDARCHITECTURE

ArchitecturePlanning

Interior Architecture

A4.0

FENCE DETAILS & ELEVATIONS

4 ELEVATIONSCALE = 3/4" = 1'-0"

@ ROOF ACCESS LADDER FRONT

5 ELEVATIONSCALE = 3/4" = 1'-0"

@ ROOF ACCESS LADDER SIDE

7 DETAILSCALE = 3/4" = 1'-0"

PLATFORM PLAN

6 DETAILSCALE = 3" = 1'-0"

ALTERNATE BOTTOM SUPPORT

2 DETAILSCALE = 1/4" = 1'-0"

20' ROLLING CANTILEVERED GATE

1 DETAILSCALE = 1/4" = 1'-0"

20' ROLLING CANTILEVERED GATE

3 DETAILSCALE = 1/4" = 1'-0"

PAIR OF SWING GATES

AutoCAD SHX Text
Job Number:
AutoCAD SHX Text
Date:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
Sheet Number:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
2100.009
AutoCAD SHX Text
03.11.2021
AutoCAD SHX Text
This drawing and the design shown is the property of the architect. The reproduction, copying or use of this drawing without their written consent is prohibited and any infringement will be subject to legal action.
AutoCAD SHX Text
All measurements and items portrayed on this sheet are provided to architect by Tractor Supply Company. General Contractors shall field verify any and all discrepancies in field and resolve differences with the Tractor Supply Company Project Manager.
Page 11: 9715 US HIGHWAY 64 ARLINGTON, TENNESSEE REVISION DATE: …

C

E

D

A

B

F

G

MIRROR (1/4" POLISHED PLATE GLASS) 1 PIECE, 18 x 36

TOILET ACCESSORIES SCHEDULE

TOILET PAPER DISPENSER

SOAP DISPENSER

GRAB BAR

TYPE MODEL #

F.B.O., I.B.C.

MANUF.F.B.O., I.B.C.

BRADLEY8320-001-368320-001-42

40" MAX. TO CONTROL

REFLECTIVE SURFACE

MOUNTING HT.

33" - 36" TO TOP, MAX.

8320-001-18 39" - 41" TO BOTTOM33" - 36" TO TOP, MAX.

40" TO BOTTOM OF

NOT USED

NOTE:1. ALL HAND DRYERS, MIRRORS, AND GRAB BARS TO BE PROVIDED AND INSTALLED BY GC. TSC

IS NOT RESPONSIBLE.2. F.B.O., I.B.C. (FURNISHED BY OWNER; INSTALLED BY CONTRACTOR)3. FLUSH CONTROL SHALL BE LOCATED ON THE OPEN SIDE OF THE WATER CLOSET PER

ICC/ANSI 117.1 SECTION 604.6.4. FRP TO 4'-0" A.F.F. ON ALL WALLS EXCEPT CMU UNLESS NOTED OTHERWISE.5. ALL PLUMBING FIXTURES TO BE ANCHORED PER ALL ANCHOR POINTS.6. PROVIDE CEILING BATT INSULATION FOR RESTROOMS.7. NO ITEMS SHALL BE LOCATED FROM FLOOR TO CEILING WITHIN 18" OF THE EDGE OF THE

PULL-SIDE OF THE BATHROOM DOORS.

PAPER TOWEL DISPENSER 40" MAX. TO CONTROLF.B.O., I.B.C.

SMARTDRI PLUS WORLD DRYER UNIT40" TO BOTTOM OFK-974P2

CONTRACTOR TO UTILIZE TOILET ACCESSORIES SCHEDULE AS NECESSARY.

A5.0

4

2

3

A5.0

5

MEN'S109

WOMEN'S110

MANAGER'SOFFICE107

EMPLOYEELOUNGE108

CORRIDOR106

COUNTER, SEEDETAIL 6/A5.0

NOTE: IF A STAND ALONE FIRE ALARMSYSTEM IS BEING PROVIDED FORMONITORING OF GARDEN CENTER,PROVIDE ADDITIONAL PLYWOOD ANDPOWER REQUIREMENTS FOR FIREALARM EQUIPMENT. COORDINATEREQUIEMENTS WITH FIRE ALARMVENDOR.

VITREOUS CHINATOILETHIGHLINEK-3519

15" M

IN. 39

" TO

41"

33" -

36"

TO

TO

PO

F G

RAB

BAR

7" TO 9"

17" M

IN. T

O19

" MAX

.

39" TO 41"

B

18" M

IN.

11 2"M

IN.

42" MIN.

A

VINYL BASE

SW7036 ACCESSIBLE BEIGE

12" MAX.

B

FRP WAINSCOT TO 4'-0" A.F.F

LC

VINYL BASE

FRP WAINSCOT TO 4'-0" A.F.F

E

1'-6"

SW7036 ACCESSIBLE BEIGE

C

34" M

AX.

27" M

IN.

29" M

IN.

G

40" M

AX.

TO R

EFLE

CTI

VE S

URF

ACE

A

B

15" M

IN.

33" -

36"

TO

TO

PO

F G

RAB

BAR

36" MAX.

1'-6" MAX.1'-4" MIN.

LCTOILET

12" MIN.

BOTTOM OF REFLECTIVE SURFACE@ MIRROR & SOAP DISPENSER

ELECTRIC HAND DRYER

16" X 36" STAINLESS STEELPANEL UNDER HANDDRYER PROVIDED ANDINSTALLED BY G.C.

CLEAR SEALANT AROUND ALL 4SIDES OF MIRROR @ WALL TOCREATE WATER TIGHT SEAL

5'-0" MIN.CLEAR FLOOR SPACE

27" M

IN.

29" M

IN.

34" M

AX.

74" M

IN.

40" M

AX.

EBOTTOM OF REFLECTIVE SURFACE@ MIRROR & SOAP DISPENSER

SW7036 ACCESSIBLE BEIGE

ELECTRIC HAND DRYER

FRP WAINSCOT TO 4'-0" A.F.F

VINYL BASE

G

C

EXISTING OPENING

SEALANT @DISSIMILAR MATERIALS

STEEL CHANNEL PAINTED,WIDTH TO MATCH WALLTHICKNESS. PROVIDE 1/2"ANCHOR TO BLOCK @ 48"O.C. VERT. GROUT FILL

DOOR TRACK, SEE MANUF.

3'-0

"

40" M

AX.

1'-5"

4" VINYL BASE

PAPER TOWEL DISPENSERMTD. OVER COUNTER

TSC PROVIDED SINK,SEE PLUMBING

TSC PROVIDED CABINETS

TSC PROVIDED ADACOMPLIANT CABINET

WATER & WASTE LINEWRAP 102G BYTRUEBRO, INC.

TSC PROVIDEDCABINET

1'-8

"

5'-0

"

TSC PROVIDED SHELF ANDBRACKETS

GC TO COORDINATE ALLIN-WALL BLOCKINGREQUIREMENTS

GFI

SW7036ACCESSIBLE BEIGE

9" M

IN.

FRP WAINSCOT TO 4'-0"A.F.F. ADD CLEARSEALANT @ ALL SEAMSAND CORNERS

27" M

IN.

36" M

AX.

9" M

IN.

8" MIN. 6" MAX.

11" MIN.

4" MAX.

VINYL BASE

15" MIN.

15" MIN.

CL

CL

CORNER GUARDS @OUTSIDE CORNERS

5/8" GYP. BD. ON 3-5/8" METAL STUDS @16" O.C. FILL VOID WITH INSULATION

NOTE: CONTRACTOR TO BUILD DRESSING ROOM @ FRONT OF BUILDING ON RIGHT SIDE. G.C. TO BUILDADA COMPLIANT BENCH COVERED WITH LVT TO MATCH NEW CLOTHING DEPARTMENT FLOORING.

PROVIDE (4) FOUR HOOKS ON DRESSINGROOM WALL.

PROVIDE (2) TWO 24" x 60"MIRRORS, ONE ON THEEXTERIOR SIDE OF ROOM ANDONE ON THE INTERIOR WALLPARALLEL TO THE FRONT WALL.

DRESSINGROOM104

4

NOTE: PERIMETER WALLS OFDRESSING ROOM TO EXTEND TO9'-0" A.F.F. CAP AND FINISH TOPOF WALL WITH GYP. BD.

8A5.0

R2'-6"

3'-4

"2'

-8"

4'-3"2'-8"

1'-8"

3'-6

"2'

-6"

4"

4'-0"

3'-0"

4'-0"

ROOM SIGNAGE LOCATION

FIRE EXTINGUISHER, MOUNTPER AHJ

4"

20"

3/4" FINISH GRADEPLYWOOD

17"

2' X 2"

FLOOR

WALL

SECURE FRAMINGTO WALL

2 x 4 BLOCKING

1x6 APPLIED WOODTRIM W/ 0.25" RADIUSAT TOP EDGE

3/4" FINISH GRADEPLYWOOD

INSTALL LVT OVERPLYWOOD

TRACTOR SUPPLY COMPANY

2934 Sidco DriveSuite 120Nashville, TN 37204

ARLINGTONTENNESSEE

OXFORDARCHITECTURE

ArchitecturePlanning

Interior Architecture

1 ENLARGED CORE PLANSCALE: 3/8" = 1'-0"

3 ELEVATIONSCALE: 1/2" = 1'-0"

@ WOMEN'S RESTROOM

2 ELEVATIONSCALE: 1/2" = 1'-0"

@ WOMEN'S RESTROOM4 ELEVATIONSCALE: 1/2" = 1'-0"

@ WOMEN'S RESTROOM

A5.0

INTERIOR PLANS, ELEVATIONS, & DETAILS

9 DETAILSCALE: 1 1/2" = 1'-0"

@ EXISTING OVERHEAD DOOR JAMB

6 ELEVATIONSCALE: 1/2" = 1'-0"

@ BREAK ROOM COUNTER

5 ELEVATIONSCALE: 1/2" = 1'-0"

@ DRINKING FOUNTAIN

7 ENLARGED DRESSING ROOM PLANSCALE: 1/4" = 1'-0"

8 SECTIONSCALE: 1 1/2" = 1'-0"

DRESSING ROOM BENCH

AutoCAD SHX Text
K-2005
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-2005
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
Job Number:
AutoCAD SHX Text
Date:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
Sheet Number:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
2100.009
AutoCAD SHX Text
03.11.2021
AutoCAD SHX Text
This drawing and the design shown is the property of the architect. The reproduction, copying or use of this drawing without their written consent is prohibited and any infringement will be subject to legal action.
AutoCAD SHX Text
All measurements and items portrayed on this sheet are provided to architect by Tractor Supply Company. General Contractors shall field verify any and all discrepancies in field and resolve differences with the Tractor Supply Company Project Manager.
Page 12: 9715 US HIGHWAY 64 ARLINGTON, TENNESSEE REVISION DATE: …

H

G

CLR.,

MAX

12'-

0"

NEW OPENING IN EXIST. MASONRY WALL, SEE ARCH. FOR SIZE & LOCATION

ADD 3- #6's EA. JAMB, TYP.

GARDEN CENTER STRUCTURE & FOUNDATION, BY OTHERS

S3.0

1

TYP.

2S3.0

3

S3.0

EXIST. CONC. SLAB ON GRADE

CLR., MAX.

10'-0"

MODIFIED OPENING IN EXIST. MASONRY WALL, SEE ARCH. FOR SIZE & LOCATION

ADD 3- #6's EA. JAMB, TYP.

S3.01

TYP.

3S3.0

2S3.0

CONC. PAD w/ MECH. SYSTEM, SEE MECH.

NOTES:

1. VERIFY EXISTING CONSTRUCTION AND DIMENSIONS PRIOR TO COMMENCING CONSTRUCTION. IMMEDIATELY NOTIFY ARCHITECT IN WRITING IF CONDITIONS DEVIATE FROM THOSE NOTED.

2. REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND ELEVATIONS NOT SHOWN.

3. ASSUMED EXTERIOR WALL CONSTRUCTION IS 8" THICK CMU., TYP. G.C. SHALL FIELD VERIFY EXISTING CONDITIONS AND MASONRY SIZE.

4. SHORE EXISTING WORK TO REMAIN ADJACENT TO NEW WORK BEFORE COMMENCING DEMO.

TRACTOR SUPPLY COMPANY

Job Number:

Date:

Revisions:

Sheet Number:

Revisions:

Revisions:

This drawing and the design shown isthe property of the architect. The reproduction, copying or use of this drawing without their written consent is prohibited and any infringement will be subject to legal action

All measurements and items portrayedon this sheet are deemed to beaccurate by architect, however all bidding General Contractors should field verify the actual conditions. Anychanges to the scope of work, and thus potential change orders, should be identified and communicated in your bid submittal to TSC.

2934 Sidco Drive

Suite 120

Nashville, TN 37204

OXFORD

ARCHITECTURE

Architecture

Planning

Interior Architecture

ARLINGTON

TENNESSEE

2100.009

03.11.2021

FOUNDATION PLAN

S1.0WE-21047

STRUCTURAL SHEET INDEXSHEET NO. SHEET NAME

S1.0 FOUNDATION PLAN

S2.0 ROOF FRAMING PLAN

S3.0 DETAILS

S4.0 GENERAL NOTES

SCALE: 1/8" = 1'-0"1FOUNDATION PLAN

Page 13: 9715 US HIGHWAY 64 ARLINGTON, TENNESSEE REVISION DATE: …

H

RTUEXIST.

RTUEXIST.

RTUEXIST.

RTUEXIST.

RTUEXIST.

LINTEL - CAST-CRETE 8F24-1B/1T

4

S3.0

5S3.0

TYP.

EXIS

T.

STEEL J

OIS

TS

EXIS

T.

STEEL J

OIS

TS

EXIS

T.

STEEL J

OIS

TS

4

S3.0

5

S3.0TYP.

LINTEL - CAST-CRETE 8F24-1B/1T

GARDEN CENTER STRUCTURE & FOUNDATION, BY OTHERS

NOTES:

1. VERIFY EXISTING CONSTRUCTION AND DIMENSIONS PRIOR TO COMMENCING CONSTRUCTION. IMMEDIATELY NOTIFY ARCHITECT IN WRITING IF CONDITIONS DEVIATE FROM THOSE NOTED.

2. REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND ELEVATIONS NOT SHOWN.

3. ASSUMED EXTERIOR WALL CONSTRUCTION IS 8" THICK CMU., TYP. G.C. SHALL FIELD VERIFY EXISTING CONDITIONS AND MASONRY SIZE.

4. SHORE EXISTING WORK TO REMAIN ADJACENT TO NEW WORK BEFORE COMMENCING DEMO.

5. ROOF TOP MECHANICAL UNITS SHOWN ARE UNDERSTOOD TO BE EXISTING UNITS IN EXISTING LOCATIONS, U.N.O. IF NEW UNIT WEIGHTS ARE TO BE PROVIDED, NOTIFY ARCHITECT AND ENGINEER OF RECORD IN WRITING PRIOR TO COMMENCING NEW WORK. ADDITIONAL ANALYSIS MAY BE REQUIRED TO DETERMINE ADJUSTMENT/ STRENGTHING, UPON RECEIPT OF FINAL LOCATIONS AND WEIGHTS, OF EXISTING JOISTS TO ACCOMODATE NEW WORK.

6. G.C. SHALL FIELD VERIFY LOCATIONS OF EXISTING CONTROL JOINTS ADJACENT TO NEW AND MODIFIED OPENINGS. JOINTS SHALL BE 24" MINIMUM FROM BOUNDARY OF OPENING.

TRACTOR SUPPLY COMPANY

Job Number:

Date:

Revisions:

Sheet Number:

Revisions:

Revisions:

This drawing and the design shown isthe property of the architect. The reproduction, copying or use of this drawing without their written consent is prohibited and any infringement will be subject to legal action

All measurements and items portrayedon this sheet are deemed to beaccurate by architect, however all bidding General Contractors should field verify the actual conditions. Anychanges to the scope of work, and thus potential change orders, should be identified and communicated in your bid submittal to TSC.

2934 Sidco Drive

Suite 120

Nashville, TN 37204

OXFORD

ARCHITECTURE

Architecture

Planning

Interior Architecture

ARLINGTON

TENNESSEE

2100.009

03.11.2021

ROOF FRAMING PLAN

S2.0WE-21047

SCALE: 1/8" = 1'-0"1ROOF FRAMING PLAN

Page 14: 9715 US HIGHWAY 64 ARLINGTON, TENNESSEE REVISION DATE: …

NEW REINF., SEE PLAN FOR SIZE AND QUANTITY, SEE FOR GROUTING

GROUT SOLID TO LINTEL BEARING ELEVATION

. .

SAW CUT AS REQ'D TO ALLOW PLACEMENT OF NEW VERT. REINFORCEMENT

PROVIDE FORMWORK AS REQ'D TO ALLOW SOLID GROUTING OF REINFORCED CELLS

.

PROVIDE MIN. 8" BEARING FOR LINTELS

NEW OPENING

NOTE:1. SEE PLAN FOR NUMBER OF BARS

4 / S3.0

EXIST. CONC. SLAB

DRILL & EPOXY GROUT 6" INTO EXISTING FOUNDATION

EXIST. CMU, SEE PLAN

SEE PLAN FOR VERT. REINF.

EXIST. FOUNDATION

EXIST. CONC. SLAB

EXIST. GRANULAR FILL

EXIST. CONC. SLAB

EXIST. STEM WALL

CONC. SLAB, SEE PLAN

#5's @ 12" o.c., 12" EMBED, SET-XP EPOXY

NOTE:1. G.C. SHALL VERIFY

EXIST. CELLS ARE GROUTED @ NEW OPENINGS.

#5's @ 16" o.c., EMBED INTO GROUTED CELLS, 8" MIN.

EXIST. CMU

GROUT SOLID TO LINTEL BEARING

LINTEL, SEE PLAN

8" , MIN.

GROUT REINF. CELLS SOLID, EXTEND REINF. TO ROOF, U.N.O.

NOTE:1. SEE PLAN FOR NUMBER OF REINF. BARS.

EXIST. CMU, SEE PLAN

LINTEL, SEE PLANSEE P

LAN

HEIG

HT

SEE PLAN

WIDTH

TRACTOR SUPPLY COMPANY

Job Number:

Date:

Revisions:

Sheet Number:

Revisions:

Revisions:

This drawing and the design shown isthe property of the architect. The reproduction, copying or use of this drawing without their written consent is prohibited and any infringement will be subject to legal action

All measurements and items portrayedon this sheet are deemed to beaccurate by architect, however all bidding General Contractors should field verify the actual conditions. Anychanges to the scope of work, and thus potential change orders, should be identified and communicated in your bid submittal to TSC.

2934 Sidco Drive

Suite 120

Nashville, TN 37204

OXFORD

ARCHITECTURE

Architecture

Planning

Interior Architecture

ARLINGTON

TENNESSEE

2100.009

03.11.2021

DETAILS

S3.0WE-21047

SCALE: NONE1PLAN DETAIL @ DOOR JAMB

SCALE: NONE2SECTION @ EXIST. STEM WALL

SCALE: NONE3SECTION @ NEW/EXIST. SLAB

SCALE: NONE4SECTION @ NEW LINTEL @ EXIST.

SCALE: NONE5SECTION @ NEW LINTEL

Page 15: 9715 US HIGHWAY 64 ARLINGTON, TENNESSEE REVISION DATE: …

ABBREVIATIONS

&

PL

SHT

SPC

U.N.O.

RTU

C

FDN

FFE

INFO

REINF

FTG

JST

CONC

DIA

DWGS

CONT

EL

FINISHED FLOOR ELEVATION

FOUNDATION

INFORMATION

ROOF TOP UNIT

REINFORCING

UNLESS NOTED OTHERWISE

SHEET

SPACING

CENTERLINE

AND

PLATE

CONCRETE

DIAMETER

DRAWINGS

ELEVATION

CONTINUOUS

JOIST

FOOTING

ARCH

BRG

CMU CONCRETE MASONRY UNIT

ARCHITECT, ARCHITECTURAL

BEARING

L

FV FIELD VERIFY

CFS COLD FORMED STEEL

T.O.M. TOP OF MASONRY

PEMB PRE-ENGINEERED METAL BUILDING

DESIGN AND CODE INFORMATION

1. ALL CONSTRUCTION SHALL CONFORM TO THE INTERNATIONAL BUILDING CODE, 2015 EDITION.

2. VERIFY EXISTING CONDITIONS AND ALL DIMENSIONS AND NOTIFY ARCHITECT OF ANY CONDITIONS THAT CONFLICT WITH OTHER PLANS AND SPECIFICATIONS. STRUCTURAL DRAWINGS MUST BE COORDINATED WITH ARCHITECTURAL DRAWINGS. STRUCTURAL DRAWINGS ARE NOT INTENDED FOR BUILDING LAYOUT.

3. SHOP DRAWINGS WILL NOT BE REVIEWED BY THE DESIGNER UNTIL AFTER THE GENERAL CONTRACTOR HAS THOROUGHLY REVIEWED THE SHOP DRAWINGS, VERIFIED EXISTING CONDITIONS, AND COORDINATED THE SHOP DRAWINGS WITH OTHER AFFECTED TRADES. REPRODUCTION OF STRUCTURAL DRAWINGS FOR SHOP DRAWINGS IS NOT PERMITTED.

4. THE STRUCTURE IS UNSTABLE UNTIL ALL STRUCTURAL MEMBERS ARE ERECTED AND CONNECTED, ALL CONNECTIONS ARE COMPLETELY MADE AND INSPECTED, THE DECK IS ATTACHED TO THE FRAMING, THE ROOF SHEATHING IS ATTACHED, AND THE CONCRETE FLOORS ARE PLACED AND ATTAIN 75% OF 28-DAY STRENGTH. UNTIL SUCH TIME, TEMPORARY BRACING IS REQUIRED. THE DESIGN ADEQUACY OF TEMPORARY BRACING AND SHORING IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.

5. DO NOT SCALE STRUCTURAL DRAWINGS. FOR LOCATION OF MISCELLANEOUS ITEMS (OPENINGS, BENT PLATES, INSERTS, ETC.) AFFECTING STRUCTURAL WORK, SEE ARCHITECTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS.

6. LIVE LOADS (EXISTING STRUCTURE - LOADS NOT INDEPENDENTLY VERIFIED)A. FLOORS: 100 PSF

7. SNOW LOADS (EXISTING STRUCTURE - LOADS NOT INDEPENDENTLY VERIFIED)A. GROUND SNOW LOAD, Pg: 10 PSFB. SNOW EXPOSURE, Ce: 1.0C. THERMAL FACTOR, Ct: 1.0D. SNOW IMPORTANCE FACTOR, Is: 1.0E. FLAT ROOF SNOW LOAD, Pf: 11.5 PSF

8. WIND LOADS (EXISTING STRUCTURE - LOADS NOT INDEPENDENTLY VERIFIED)A. BASIC WIND SPEED, V: 115 MPH (3-SEC GUST)B. WIND IMPORTANCE FACTOR, Iw: 1.0C. WIND DIRECTIONALITY FACTOR, Kd: 0.85D. EXPOSURE CATEGORY: CE. TOPOGRAPHIC FACTOR, Kzt: 1.0F. GUST EFFECT FACTOR, G: 0.85G. INTERNAL PRESSURE COEFFICIENT, GCpi: 0.18

REINFORCED CONCRETE

1. ALL CONCRETE WORK SHALL CONFORM TO ACI 318-14, "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE."

2. REINFORCING STEEL SHALL BE DEFORMED BARS ASTM A615, GRADE 60.

3. THE COMPRESSIVE STRENGTH AT 28 DAYS OF ALL CAST IN PLACE CONCRETE SHALL BE 4,000 PSI USING TYPE II PORTLAND CEMEMNT. SEE CIVIL DRAWINGS FOR SITE CONCRETE. FOUNDATION CONCRETE SHALL HAVE A 28-DAY COMPRESSIVE STRENGTH OF 4,000 PSI.

4. LAP SPLICES FOR REINFORCING BARS SHALL BE CLASS B IN ACCORDANCE WITH ACI 318-14, UNLESS NOTED OTHERWISE.

5. CLEAR CONCRETE COVER FOR REINFORCING STEEL:A. MASONRY WALLS LOCATE IN CENTER OF WALL (U.N.O.)B. SLAB-ON-GRADE 3/4" TOP STEEL

1 1/2" BOTTOM STEELC. FOOTINGS 2” FORMED EDGES

3” CAST AGAINST GROUND

6. THE LONGITUDINAL REINFORCING STEEL IN BOND BEAMS, WALLS, AND FOOTINGS SHALL BE CONTINUOUS AROUND CORNERS. SEE TYPICAL DETAILS.

7. MECHANICAL VIBRATORS SHALL VIBRATE ALL CONCRETE.

CONCRETE MASONRY

1. CONCRETE MASONRY SHALL CONFORM TO ACI 530-11, “BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES,” AND ACI 530.1-11, “SPECIFICATIONS FOR MASONRY STRUCTURES,” AND SHALL HAVE A MINIMUM PRISM STRENGTH (F'M) OF 1500 PSI.

2. MASONRY UNITS SHALL CONFORM WITH ASTM C90 "STANDARD SPECIFICATIONS FOR LOADBEARING CONCRETE MASONRY UNITS" AND HAVE MINIMUM AVERAGE NET-AREA COMPRESSIVE STRENGTH OF 2150 PSI.

3. GROUT FOR FILLING CONCRETE MASONRY CELLS SHALL CONFORM TO ASTM C476-09, “STANDARD SPECIFICATION FOR GROUT FOR MASONRY,” AND SHALL HAVE A COMPRESSIVE PRISM STRENGTH (F'M) OF 3000 PSI AT 28 DAYS. THE SLUMP SHALL BE BETWEEN 9 INCHES AND 11 INCHES. WHERE THE MINIMUM DIMENSION OF ANY CONTINUOUS VERTICAL CELL IS 3 INCHES OR LESS, USE FINE GROUT. OTHERWISE, USE COARSE (PEA GRAVEL) GROUT.

4. MORTAR FOR CONCRETE MASONRY SHALL BE TYPE "S" AND SHALL CONFORM TO ASTM C270-08, “SPECIFICATION FOR MORTAR FOR UNIT MASONRY” AND HAVE A MINIMUM COMPRESSIVE STRENGTH OF 1800 PSI.

5. ALL REINFORCING BARS IN FILLED CELLS SHALL BE DOWELED INTO FOOTINGS WITH STANDARD 90-DEGREE HOOKS AND DOWELED 7 INCHES INTO BOND BEAMS AT TOP OF WALLS.

6. REINFORCEMENT IN WALLS SHALL BE PLACED IN THE CENTER OF THE WALL UNLESS NOTED OTHERWISE. SEE PLANS FOR REINFORCING.

7. MASONRY LAP SPLICES: SEE TABLE BELOW.

9. SEISMIC LOADS (EXISTING STRUCTURE - LOADS NOT INDEPENDENTLY VERIFIED)A. SEISMIC IMPORTANCE FACTOR, Ie: 1.0B. 0.2 SEC RESPONSE PARAMETER, Ss: 0.88C. 1.0 SEC RESPONSE PARAMETER, S1: 0.308D. SITE CLASS: D (ASSUMED)E. 0.2 SEC DESIGN RESP. PARAMETER, SDS: 0.674F. 1.0 SEC DESIGN RESP. PARAMETER, SD1: 0.367G. SEISMIC DESIGN CATEGORY: D

CONCRETE MASONRY REINFORCING LAP LENGTH SCHEDULE

BAR SIZE 8" WALL

#3

#5

#7

#6

#4

16"

21"

26"

43"

60"

12" WALL

16"

21"

26"

40"

46"

MINIMUM BEND

DIAMETERS

NOTE:1. d= BAR DIAMETER. BARS

REQUIRED TO BE FIELD BENT SHALL BE BENT COLD TO THE MINIMUM DIAMETER SPECIFIED. FIELD BENDING IN EXCESS OF A 90 DEGREE BEND IS PROHIBITED.

MIN. DIA. 6d

PRECAST CONCRETE LINTELS

1. PRECAST CONCRETE LINTELS ARE HIGH STRENGTH PRECAST AND PRESTRESSED CONCRETE LINTELS DESIGNED TO BE USED UNFILLED OR FILLED WITH GROUT TO FORM A COMPOSITE REINFORCED BEAM USING CONCRETE MASONRY UNITS AND SHALL BE SUPPLIED BY CAST-CRETE, OR EQUAL.

2. LINTELS SHALL HAVE EQUAL OR GREATER CAPACITY AND DEFLECTION PROPERTIES AS SHOWN IN THE PUBLISHED TABLES OF CAST-CRETE, JUNE 2003.

3. MATERIALSA. CONCRETE FOR LINTELS SHALL BE AS FOLLOWS:

1. 8" PRECAST LINTELS CONCRETE STRENGTH F’c = 3500 PSI 2. 8" PRESTRESSED, 6" AND 12" PRECAST LINTELS CONCRETE STRENGTH F’c =

6000 PSI 3. F'c 4" PRECAST LINTELS = 3000 PSI

B. CONCRETE MASONRY UNITS (CMU) THAT ARE PART OF THE DESIGNATED LINTEL SHALL BE ASTM C90 WITH MINIMUM NET AREA COMPRESSIVE STRENGTH = 1900 PSI

C. GROUT PER ASTM C476 THAT IS PART OF THE DESIGNATED LINTEL SHALL BE F’g = 3000 PSI W/MAXIMUM 3/8-INCH AGGREGATE AND 8 TO 11-INCH SLUMP.

D. REINFORCING STEEL SHALL COMPLY WITH ASTM A615 GRADE 60E. PRESTRESSING STRAND SHALL COMPLY WITH ASTM A416 GRADE 270 LOW

RELAXATION F. WIRE SHALL BE 7/32-INCH DIAMETER, ASTM A510G. MORTAR COMPLY WITH ASTM C270 TYPE S

4. LINTELS SHALL HAVE A MINIMUM BEARING AT BOTH ENDS OF 8 INCHES, NOMINAL.

5. PROVIDE FULL MORTAR HEAD AND BED JOINTS.

6. U-LINTELS ARE MANUFACTURED WITH 5-1/2-INCH-LONG NOTCHES AT ENDS TO ACCOMMODATE VERTICAL CELL REINFORCING AND GROUTING. ALL JAMBS SHALL HAVE A REINFORCED GROUTED CELL AS INDICATED ON THE DRAWINGS.

7. BOTTOM FIELD ADDED REINFORCING STEEL TO BE LOCATED AT THE BOTTOM OF LINTEL CAVITY. TOP FIELD ADDED BARS SHALL BE PLACED WITH 1-1/2 CLEAR TO THE TOP OF THE BLOCK.

16"

NO

MIN

AL H

EIG

HT

1'-

3 5

/8"

AC

TU

AL

8" NOMINAL WIDTH

7 5/8" ACTUAL

GROUT

#5 FIELD ADDED REBAR AT BTM OF LINTEL CAVITY

BOTTOM REINFORCING PROVIDED IN LINTEL (SEE CAST - CRETE REINF. SCHED.)

FIELD PLACED CMU

#5 FIELD ADDED REBAR AT TOP MIN. (1) REQ'D

CLR

.

1 1

/2"

CAST - CRETE TYPE DESIGNATION

8F16-1B/1T

NOMINAL WIDTH

NORMINAL HEIGHT

GUANTITY OF #5 FIELD ADDED REBAR AT TOP

QUANTITY OF #5 FIELD ADDED REBAR AT BOTTOM OF LINTEL CAVITY

F = FILLED WITH GROUT

U = UNFILLED

S = SOLID

TRACTOR SUPPLY COMPANY

Job Number:

Date:

Revisions:

Sheet Number:

Revisions:

Revisions:

This drawing and the design shown isthe property of the architect. The reproduction, copying or use of this drawing without their written consent is prohibited and any infringement will be subject to legal action

All measurements and items portrayedon this sheet are deemed to beaccurate by architect, however all bidding General Contractors should field verify the actual conditions. Anychanges to the scope of work, and thus potential change orders, should be identified and communicated in your bid submittal to TSC.

2934 Sidco Drive

Suite 120

Nashville, TN 37204

OXFORD

ARCHITECTURE

Architecture

Planning

Interior Architecture

ARLINGTON

TENNESSEE

2100.009

03.11.2021

GENERAL NOTES

S4.0WE-21047

GENERAL NOTES

Page 16: 9715 US HIGHWAY 64 ARLINGTON, TENNESSEE REVISION DATE: …

STOCKROOM105

WOMEN110

MEN109

EMPLOYEE

108LOUNGE

MANAGER'S

107OFFICE

CORRIDOR106

VESTIBULE101

RETAIL SALES102

GARDEN CENTER113

FEED STORAGE114

DRESSINGROOM104

BOPIS SHED

H

E

ELEC. PAN

EL

TELE. BOARD

ELEC. PAN

EL

G

ONEWAY

PICKUP

ONEWAY

PICKUP

ONEWAY

PICKUP

PERMANENT SIDEWALKDISPLAY AREA

PERMANENT SIDEWALKDISPLAY AREA

PERMANENT SIDEWALKDISPLAY AREA

EXIT

EXIT

FIRE PROTECTION PLAN

FP1.0

FIRE PROTECTION PLAN

2934 Sidco Drive

Suite 120

Nashville, TN 37204

OXFORD

ARCHITECTURE

Architecture

Planning

Interior Architecture

1163 West Main St.Franklin, TN 37064Tel: 615.730.9111 / Fax: [email protected] #21-025

TRACTOR SUPPLY COMPANY

ARLINGTONTENNESSEE

G

A

R

Y

W

. S

C

H

E

L

T

O

N

S

T

A

T

E

O

F

TE

N

N

E

S

S

E

E

R

E

G

I

S

T

E

R

E

D E

N

G

I

N

E

E

R

N

o

.

1 0

8

0

8

1

MOUNTING HEIGHT

FIRE EXTINGUISHER

DRY PIPE SPRINKLER RISER SCHEMATIC

SPRINKLER LEGEND

SPRINKLER INTENT INFORMATION

FIRE PROTECTION SPECIFICATIONS

GENERAL NOTES

AutoCAD SHX Text
NEW DRY SYSTEM RISER
AutoCAD SHX Text
EXISTING WET SYSTEM FIRE RISER TO REMAIN - FIELD VERIFY EXACT LOCATION
AutoCAD SHX Text
FE
AutoCAD SHX Text
FE
AutoCAD SHX Text
FE
AutoCAD SHX Text
FE
AutoCAD SHX Text
COLUMN MOUNTED
AutoCAD SHX Text
COLUMN MOUNTED
AutoCAD SHX Text
COLUMN MOUNTED
AutoCAD SHX Text
COLUMN MOUNTED
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
1/8" = 1'-0"
AutoCAD SHX Text
Job Number:
AutoCAD SHX Text
Date:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
Sheet Number:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
This drawing and the design shown is the property of the architect. The reproduction, copying or use of this drawing without their written consent is prohibited and any infringement will be subject to legal action.
AutoCAD SHX Text
All measurements and items portrayed on this sheet are deemed to be accurate by architect, however all bidding General Contractors should field verify the actual conditions. Any changes to the scope of work, and thus potential change orders, should be identified and communicated in your bid submittal to TSC.
AutoCAD SHX Text
Tractor Supply Company shall not be responsible for the payment of any work performed or material supplied by the Contractor or any of its sub-contractors, sub-subcontractors and anyone claiming by through or under any of them which is not identified in writing and signed by one of the following Tractor Supply Company personnel: Vice President Real Estate, Director of Construction, or a Construction Project Manager. No action, conduct, omission, prior failure, or course of dealing by Tractor Supply Company shall act to waive, modify, change or alter the requirement that all work, whether by contract, change order or change directive, must be in writing and signed by the personnel identified in this provision. Any work performed or material provided by the Contractor, any of its sub-contractors, sub-subcontractors contrary to this provision shall be at its own risk and own expense and Tractor Supply Company shall not be obligated to reimburse or pay the Contractor or any of its sub-contractors, sub-subcontractors for same.
AutoCAD SHX Text
2100-009
AutoCAD SHX Text
03.11.2021
AutoCAD SHX Text
AGRICULTURE
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
M
AutoCAD SHX Text
M
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
ABC, BC. WALL HUNG
AutoCAD SHX Text
FIRE EXTINGUISHER
AutoCAD SHX Text
ABC FIRE EXTINGUISHER
AutoCAD SHX Text
IN SEMI-RECESSED CABINET
AutoCAD SHX Text
FIN. FLR.
AutoCAD SHX Text
46" AFF
AutoCAD SHX Text
FIN. FLR.
AutoCAD SHX Text
46" AFF
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
NONE
AutoCAD SHX Text
EXTERIOR WALL
AutoCAD SHX Text
AIR COMPRESSOR
AutoCAD SHX Text
FIN. FLOOR
AutoCAD SHX Text
FROM EXISTING WET PIPE FIRE SPRINKLER SYSTEM
AutoCAD SHX Text
WATERFLOW PRESSURE SWITCH
AutoCAD SHX Text
O.S. & Y. VALVE
AutoCAD SHX Text
LOW AIR PRESSURE SWITCH
AutoCAD SHX Text
NOTE: ELECT. CONTRACTOR TO INTERLOCK FLOW SWITCHES AND AIR PRESSURE SWITCHES WITH WITH FIRE ALARM PANEL.
AutoCAD SHX Text
BVL BLEED VALVE
AutoCAD SHX Text
SHUT-OFF VALVE
AutoCAD SHX Text
CHECK VALVE
AutoCAD SHX Text
RBVS
AutoCAD SHX Text
THREADED OUTLET
AutoCAD SHX Text
1" 45 ELBOW
AutoCAD SHX Text
DRY PIPE VALVE W/ STANDARD TRIM
AutoCAD SHX Text
CHECK VALVE
AutoCAD SHX Text
BALL VALVE W/ RBVS
AutoCAD SHX Text
AUXILLIARY DRAIN TO BUILDING EXTERIOR
AutoCAD SHX Text
MAIN DRAIN VALVE
AutoCAD SHX Text
AIRFLOW
AutoCAD SHX Text
DRY SPRINKLER PIPE TO BELOW CANOPY AT BUILDING EXTERIOR
AutoCAD SHX Text
WATER PRESSURE GAUGE
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
NONE
AutoCAD SHX Text
ALARM TEST VALVE
AutoCAD SHX Text
FIRE EXTINGUISHER
AutoCAD SHX Text
SPRINKLER RISER
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
UPRIGHT HEAD (165%%D)
AutoCAD SHX Text
FE
AutoCAD SHX Text
CHROME PENDANT HEAD (165%%D)
AutoCAD SHX Text
COVERAGE PER SPRINKLER
AutoCAD SHX Text
COVERAGE AREA
AutoCAD SHX Text
DENSITY
AutoCAD SHX Text
ZONE CLASSIFICATION **
AutoCAD SHX Text
COMMENTS:
AutoCAD SHX Text
HOSE STREAM ALLOWANCE
AutoCAD SHX Text
MAXIMUM HEAD SPACING
AutoCAD SHX Text
DISCHARGE TEMPERATURE
AutoCAD SHX Text
.20 GPM/ SQ. FT.
AutoCAD SHX Text
2535 SQ. FT.***
AutoCAD SHX Text
130 SQ. FT.
AutoCAD SHX Text
165%%DF
AutoCAD SHX Text
15 FT.
AutoCAD SHX Text
250 GPM
AutoCAD SHX Text
ORDINARY HAZARD GROUP 2
AutoCAD SHX Text
GARDEN CENTER
AutoCAD SHX Text
EXTRA HAZARD
AutoCAD SHX Text
BY PIPE SCHEDULE
AutoCAD SHX Text
BY PIPE SCHEDULE
AutoCAD SHX Text
100 SQ. FT.
AutoCAD SHX Text
165%%DF
AutoCAD SHX Text
10 FT.
AutoCAD SHX Text
BY PIPE SCHEDULE
AutoCAD SHX Text
PROPANE SHED
AutoCAD SHX Text
* COMMODITY CLASS REDUCED TO CLASS III BASED ON STORAGE OF LESS THAN 10 PALLET OF CLASS IV COMMODITIES. ** ZONE CLASSIFICATION SUBJECT TO AUTHORITY HAVING JURISDICTION. *** NFPA 13, SECTION 11.2.3.2.7.1 WHERE MULTIPLE ADJUSTMENTS TO THE AREA OF OPERATION ARE REQUIRED TO BE MADE IN ACCORDANCE WITH 11.2.3.2.3, 11.2.3.2.4, 11.2.3.2.5, OR 11.2.3.2.6, THESE ADJUSTMENTS SHALL BE COMPOUNDED BASED ON THE AREA OF OPERATION ORIGINALLY SELECTED FROM FIGURE 11.2.3.1.1.
AutoCAD SHX Text
1. THE SPRINKLER SYSTEM SHALL CONFORM TO NATIONAL FIRE PROTECTION ASSOCIATION AND ALL APPLICABLE REGULATORY REQUIREMENTS AND BUILDING CODES AS INTERPRETED BY THE AUTHORITY HAVING JURISDICTION IN THE LOCALE OF THE PROJECT. WHERE CONFLICTS EXIST BETWEEN SUCH REGULATORY OR CODE REQUIREMENTS, SUCH CONFLICT SHALL BE IDENTIFIED FOR THE REVIEW OF THE ARCHITECT AND ENGINEER. 2. CONTRACTOR SHALL FURNISH AND INSTALL A COMPLETE AND HYDRAULICALLY CALCULATED SPRINKLER SYSTEM AS INDICATED ON FLOOR PLANS. MINIMUM SCOPE OF WORK SHALL INCLUDE PROVIDING NEW PENDANT SPRINKLER HEADS AND/OR RELOCATING EXISTING SPRINKLER HEADS AS REQUIRED IN THE PET WASH AREA, GARDEN CENTER, AND FEED STORAGE. RELOCATE EXISTING UPRIGHT SPRINKLER HEADS OR PROVIDE NEW SPRINKLER HEADS AS REQUIRED IN THE STOCK ROOM. PROVIDE BRANCH PIPING FOR ALL NEW SPRINKLER HEADS AND ROUTE PIPING TO NEAREST BRANCH MAIN OR CROSS MAIN. PROVIDE SUPPORTS AS REQUIRED By NFPA 13. FIELD VERIFY EXISTING CONDITIONS. 3. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DEFECTS, REPAIRS AND REPLACEMENTS IN MATERIAL AND WORKMANSHIP FOR A PERIOD OF ONE (1) YEAR AFTER FINAL PAYMENT IS APPROVED. 4. SUBMIT FOR APPROVAL THE NUMBER OF SHOP DRAWINGS AND MANUFACTURERS LITERATURE ON ALL MATERIALS AS REQUIRED TO THE ARCHITECT OR OWNER'S REPRESENTATIVE. 5. SUBMIT DRAWINGS AND CALCULATIONS TO THE DEPARTMENT OF FIRE PREVENTION OF THE STATE AND LOCAL AUTHORITIES HAVING JURISDICTION. 6. CONTRACTOR SHALL VISIT THE SITE AS WELL AS ADJACENT SPACES AND FULLY INFORM HIMSELF CONCERNING ALL CONDITIONS AFFECTING SCOPE OF WORK. VERIFY PIPE SIZES, LOCATION OF EXISTING COMPONENTS, AND SUITABILITY OF THE EXISTING SYSTEMS TO MEET THE HYDRAULIC CALCULATIONS PRIOR TO BID. 7. DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO SHOW APPROXIMATE LOCATIONS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL ARCHITECTURAL, CIVIL, STRUCTURAL, ELECTRICAL, AND MECHANICAL DRAWINGS AND COORDINATE WITH OTHER TRADES FOR PIPE ROUTING AND EQUIPMENT PLACEMENT. INSTALL ALL WORK WITHOUT CONFLICT WITH OTHER TRADES AND MAKE MINOR ALTERATIONS AS REQUIRED WITHOUT ADDITIONAL COST TO OWNER. 8. THE SPRINKLER SYSTEM SHALL BE INSTALLED BY A FIRE PROTECTION SPRINKLER SYSTEM CONTRACTOR WITH A VALID CERTIFICATE OF REGISTRATION ISSUED BY THE AUTHORITY HAVING JURISDICTION. 9. CONTRACTOR SHALL COORDINATE WITH ELECTRICAL CONTRACTOR ALL VOLTAGES, ELECTRICAL LOADS, ETC. OF ELECTRICALLY OPERATED EQUIPMENT PRIOR TO PURCHASING EQUIPMENT. ALL EQUIPMENT SHALL BE U.L. AND NEMA APPROVED. 10. MAINTAIN A MINIMUM CLEARANCE OF 3'-0" IN FRONT OF ALL ELECTRICAL PANELS AND 1'-0" ON EITHER SIDE OF ELECTRICAL PANEL TO STRUCTURE. 11. ALL HORIZONTAL AND VERTICAL PIPING SHALL BE SUPPORTED IN ACCORDANCE WITH NFPA 13 AND STATE AND LOCAL REQUIREMENTS. SUPPORTS HALL SECURELY HOLD PIPING, PREVENT VIBRATION, COMPENSATE FOR STATIC AND OPERATIONAL CONDITIONS OF THE VARIOUS SYSTEMS, AND SHALL NOT BE SUBJECT TO ELECTROLYTIC ACTION. 12. ALL SPRINKLER SYSTEM MATERIALS INSTALLED SHALL BE U.L. LISTED AND FACTORY MUTUAL APPROVED FOR FIRE PROTECTION USE. 13. CONTROL VALVES SHALL BE SLOW CLOSING INDICATING VALVES LISTED FOR FIRE PROTECTION USE. EACH CONTROL SHALL HAVE A SUPERVISORY SWITCH. 14. SPRINKLER PIPING PENETRATING ONE-HOUR OR GREATER RATED FIRE WALLS SHALL BE SLEEVED AND CAULKED TO MEET U.L. LISTED ASSEMBLY FOR RATING OF WALL. 15. CONTRACTOR SHALL FLUSH WATER SYSTEM AFTER INSTALLATION PER REQUIREMENTS OF NFPA 24. 16. SPRINKLER HEADS SHALL BE TYCO, RELIABLE, CENTRAL, VIKING OR EQUAL. 17. ALL SPRINKLER HEADS IN AREAS WITHOUT FINISHED CEILINGS SHALL BE BRASS UPRIGHT HEADS WITH TEMPERATURE RATING AS CONDITIONS DICTATE. ASSOCIATED SPRINKLER PIPING SHALL BE RUN EXPOSED. DO NOT PAINT HEADS. 18. THE SPRINKLER CONTRACTOR SHALL COORDINATE THE LOCATION OF PIPING AND HEADS WITH LIGHT FIXTURES, DIFFUSERS, DUCTWORK, PLUMBING LINES, ETC. AND MAKE MINOR ADJUSTMENTS IN THE SPRINKLER LAYOUT WHERE REQUIRED OR DEEMED NECESSARY BY THE ARCHITECT. 19. MODIFICATIONS TO THE SPRINKLER SYSTEM SHALL BE IN ACCORDANCE WITH NFPA 13.
AutoCAD SHX Text
1. TSC TO FURNISH AND CONTRACTOR TO INSTALL MINIMUM OF 5 PORTABLE FIRE EXTINGUISHERS. LOCATIONS SHALL BE DETERMINED BY STORE FIXTURES AND SHELVING TO MAINTAIN A MAXIMUM TRAVEL DISTANCE OF 75'-0". 2. SPRINKLER LINES, MAINS, AND BRANCHES SHALL BE AS HIGH AS POSSIBLE IN STOCKROOM. 3. TSC IS TO APPROVE ALL SPRINKLER DRAWINGS PRIOR TO INSTALLATION. 4. FIRE SPRINKLER CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING FORMAL "DESIGN INTENT" DRAWINGS INCLUDING FULL HYDRAULIC CALCULATIONS, SEALED BY A PROFESSIONAL ENGINEER MEETING ALL STATE AND LOCAL CODE REQUIREMENTS. 5. FIRE EXTINGUISHERS SHALL BE UL & ULC RATED AT 2A:10B:C OR BETTER. 6. ACTUAL SPRINKLER HEAD LAYOUT MAY VARY BASED ON ROOF SLOPE AND ORIENTATION. COORDINATE WITH GARDEN CENTER AND FEED STORAGE BUILDING MANUFACTURER PRIOR TO FINAL SPRINKLER DRAWING LAYOUT.
Page 17: 9715 US HIGHWAY 64 ARLINGTON, TENNESSEE REVISION DATE: …

STOCKROOM105

WOMEN110

MEN109

EMPLOYEE

108LOUNGE

MANAGER'S

107OFFICE

CORRIDOR106

VESTIBULE101

RETAIL SALES102

GARDEN CENTER113

FEED STORAGE114

DRESSINGROOM104

BOPIS SHED

H

E

ELEC. PAN

EL

TELE. BOARD

ELEC. PAN

EL

G

ONEWAY

PICKUP

ONEWAY

PICKUP

ONEWAY

PICKUP

PERMANENT SIDEWALKDISPLAY AREA

PERMANENT SIDEWALKDISPLAY AREA

PERMANENT SIDEWALKDISPLAY AREA

EXIT

EXIT

MECHANICAL FLOOR PLAN

M1.0

MECHANICAL FLOOR PLAN

MECHANICAL LEGEND

2934 Sidco Drive

Suite 120

Nashville, TN 37204

OXFORD

ARCHITECTURE

Architecture

Planning

Interior Architecture

1163 West Main St.Franklin, TN 37064Tel: 615.730.9111 / Fax: [email protected] #21-025

TRACTOR SUPPLY COMPANY

ARLINGTONTENNESSEE

G

A

R

Y

W

. S

C

H

E

L

T

O

N

S

T

A

T

E

O

F

TE

N

N

E

S

S

E

E

R

E

G

I

S

T

E

R

E

D E

N

G

I

N

E

E

R

N

o

.

1 0

8

0

8

1

CONSTRUCTION NOTES

AutoCAD SHX Text
3
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
GFUH-2
AutoCAD SHX Text
GFUH-1
AutoCAD SHX Text
EF-2
AutoCAD SHX Text
(EXISTING)
AutoCAD SHX Text
1
AutoCAD SHX Text
EF-1
AutoCAD SHX Text
(EXISTING)
AutoCAD SHX Text
1
AutoCAD SHX Text
20"x18"
AutoCAD SHX Text
16"x16"
AutoCAD SHX Text
12"x12"
AutoCAD SHX Text
CFM
AutoCAD SHX Text
670
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
MOUNT THERMOSTAT 90" A.F.F.
AutoCAD SHX Text
CFM
AutoCAD SHX Text
665
AutoCAD SHX Text
A
AutoCAD SHX Text
CFM
AutoCAD SHX Text
665
AutoCAD SHX Text
A
AutoCAD SHX Text
SD
AutoCAD SHX Text
CFM
AutoCAD SHX Text
2000
AutoCAD SHX Text
R
AutoCAD SHX Text
A/C-1
AutoCAD SHX Text
20"x18" SUPPLY AND RETURN DUCTS UP AS HIGH AS POSSIBLE
AutoCAD SHX Text
MOUNT GRILLE AS HIGH AS POSSIBLE
AutoCAD SHX Text
MOUNT DUCT AS HIGH AS POSSIBLE.
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
1/8" = 1'-0"
AutoCAD SHX Text
T
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
EF-1
AutoCAD SHX Text
CFM
AutoCAD SHX Text
200
AutoCAD SHX Text
B
AutoCAD SHX Text
NEW SUPPLY AIR DUCTWORK
AutoCAD SHX Text
NEW RETURN AIR DUCTWORK
AutoCAD SHX Text
CEILING MOUNTED EXHAUST FAN
AutoCAD SHX Text
SUPPLY CFM
AutoCAD SHX Text
EQUIPMENT LABEL (SEE MECH. SCHEDULE FOR INFO.)
AutoCAD SHX Text
THERMOSTAT
AutoCAD SHX Text
AIR FLOW
AutoCAD SHX Text
SD
AutoCAD SHX Text
DUCT MOUNTED SMOKE DETECTOR
AutoCAD SHX Text
ABOVE FINISHED FLOOR
AutoCAD SHX Text
A.F.F.
AutoCAD SHX Text
Job Number:
AutoCAD SHX Text
Date:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
Sheet Number:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
This drawing and the design shown is the property of the architect. The reproduction, copying or use of this drawing without their written consent is prohibited and any infringement will be subject to legal action.
AutoCAD SHX Text
All measurements and items portrayed on this sheet are deemed to be accurate by architect, however all bidding General Contractors should field verify the actual conditions. Any changes to the scope of work, and thus potential change orders, should be identified and communicated in your bid submittal to TSC.
AutoCAD SHX Text
Tractor Supply Company shall not be responsible for the payment of any work performed or material supplied by the Contractor or any of its sub-contractors, sub-subcontractors and anyone claiming by through or under any of them which is not identified in writing and signed by one of the following Tractor Supply Company personnel: Vice President Real Estate, Director of Construction, or a Construction Project Manager. No action, conduct, omission, prior failure, or course of dealing by Tractor Supply Company shall act to waive, modify, change or alter the requirement that all work, whether by contract, change order or change directive, must be in writing and signed by the personnel identified in this provision. Any work performed or material provided by the Contractor, any of its sub-contractors, sub-subcontractors contrary to this provision shall be at its own risk and own expense and Tractor Supply Company shall not be obligated to reimburse or pay the Contractor or any of its sub-contractors, sub-subcontractors for same.
AutoCAD SHX Text
2100-009
AutoCAD SHX Text
03.11.2021
AutoCAD SHX Text
AGRICULTURE
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
M
AutoCAD SHX Text
M
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
EXISTING CEILING MOUNTED EXHAUST FAN AND ALL ASSOCIATED DUCTWORK TO REMAIN. CONTRACTOR SHALL FIELD VERIFY EXISTING EXHAUST FAN IS IN GOOD WORKING CONDITION. CONTRACTOR SHALL PROVIDE ALTERNATE BID TO REPLACE EXHAUST FAN PER FAN SCHEDULE. FURNISH AND INSTALL NEW DUCTWORK, CONTROL WIRING, ETC. FOR A COMPLETE AND OPERABLE SYSTEM. FURNISH AND INSTALL 5" CLASS "B" VENT THRU ROOF TO VENT CAP. PROVIDE FLASHING CONE, STORM COLLAR AND FLASH ROOF PENETRATION WEATHER TIGHT. MAINTAIN RECOMMENDED CLEARANCES FROM COMBUSTIBLES. REFER TO "FLUE THROUGH ROOF DETAIL." COORDINATE EXACT LOCATION OF UNIT HEATER WITH TSC FINAL "FIXTURE PLAN." REFER TO UNIT HEATER DETAIL.
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
Page 18: 9715 US HIGHWAY 64 ARLINGTON, TENNESSEE REVISION DATE: …

2934 Sidco Drive

Suite 120

Nashville, TN 37204

OXFORD

ARCHITECTURE

Architecture

Planning

Interior Architecture

1163 West Main St.Franklin, TN 37064Tel: 615.730.9111 / Fax: [email protected] #21-025

TRACTOR SUPPLY COMPANY

ARLINGTONTENNESSEE

G

A

R

Y

W

. S

C

H

E

L

T

O

N

S

T

A

T

E

O

F

TE

N

N

E

S

S

E

E

R

E

G

I

S

T

E

R

E

D E

N

G

I

N

E

E

R

N

o

.

1 0

8

0

8

1

MUST BE COMPATIBLE WITH TSCFURNISHED EMS. MUST BE EQUAL TO OR BETTER THAN YORKPREDATOR/SUNLINE SERIES INCLUDING HINGED DOORS, HIGHEFFICIENCY, WARRANTY, AND MAINTENANCE REQUIREMENTS.

12. MECHANICAL CONTRACTOR SHALL PROVIDE A START UP CHECKLISTCONFIRMING ALL UNITS HAVE BEEN PROPERLY STARTED ANDCONFIRMED RUNNING PROPERLY. CHECKLIST MUST BE PROVIDEDTO TSC VIA CLOSE-OUT BINDER.

PACKAGED ALL ELECTRIC UNIT SCHEDULE

FLUE THRU ROOF DETAIL

FAN SCHEDULE

CONNECTION DETAIL

DUCT MOUNTED REGISTER

GAS-FIRED UNIT HEATER SCHEDULE

GENERAL MECHANICAL SPECIFICATIONS

M2.0

MECHANICAL SCHEDULES, DETAILS, AND

SPECIFICATIONS

AIR DISTRIBUTION SCHEDULE

CONDENSATE DRAIN PIPING

A/C UNIT

A/C UNIT DETAIL

AutoCAD SHX Text
Job Number:
AutoCAD SHX Text
Date:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
Sheet Number:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
This drawing and the design shown is the property of the architect. The reproduction, copying or use of this drawing without their written consent is prohibited and any infringement will be subject to legal action.
AutoCAD SHX Text
All measurements and items portrayed on this sheet are deemed to be accurate by architect, however all bidding General Contractors should field verify the actual conditions. Any changes to the scope of work, and thus potential change orders, should be identified and communicated in your bid submittal to TSC.
AutoCAD SHX Text
Tractor Supply Company shall not be responsible for the payment of any work performed or material supplied by the Contractor or any of its sub-contractors, sub-subcontractors and anyone claiming by through or under any of them which is not identified in writing and signed by one of the following Tractor Supply Company personnel: Vice President Real Estate, Director of Construction, or a Construction Project Manager. No action, conduct, omission, prior failure, or course of dealing by Tractor Supply Company shall act to waive, modify, change or alter the requirement that all work, whether by contract, change order or change directive, must be in writing and signed by the personnel identified in this provision. Any work performed or material provided by the Contractor, any of its sub-contractors, sub-subcontractors contrary to this provision shall be at its own risk and own expense and Tractor Supply Company shall not be obligated to reimburse or pay the Contractor or any of its sub-contractors, sub-subcontractors for same.
AutoCAD SHX Text
2100-009
AutoCAD SHX Text
03.11.2021
AutoCAD SHX Text
AGRICULTURE
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
M
AutoCAD SHX Text
M
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
UNIT M.O.C.P.
AutoCAD SHX Text
VOLTAGE
AutoCAD SHX Text
STAGES
AutoCAD SHX Text
HEATING KW:
AutoCAD SHX Text
TOTAL COOLING CAP. (MBH)
AutoCAD SHX Text
SENSIBLE COOLING CAP. (MBH)
AutoCAD SHX Text
FAN SECTION:
AutoCAD SHX Text
CFM SUPPLY
AutoCAD SHX Text
CFM O.A. MIN./MAX
AutoCAD SHX Text
ESP-IN WG.
AutoCAD SHX Text
EVAP. FAN H.P.
AutoCAD SHX Text
FILTER SIZE
AutoCAD SHX Text
OPERATING WT. (LBS.)
AutoCAD SHX Text
NOMINAL TONS
AutoCAD SHX Text
IDENTIFICATION
AutoCAD SHX Text
MANUFACTURER
AutoCAD SHX Text
MODEL NUMBER
AutoCAD SHX Text
VOLTAGE
AutoCAD SHX Text
UNIT M.C.A.
AutoCAD SHX Text
SEER
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
NOTES
AutoCAD SHX Text
EER
AutoCAD SHX Text
SEMI EXCLUSIVE WITH YORK AND LENNOX
AutoCAD SHX Text
1. TRACTOR SUPPLY COMPANY HAS NATIONAL ACCOUNTS WITH YORK/JOHNSON TRACTOR SUPPLY COMPANY HAS NATIONAL ACCOUNTS WITH YORK/JOHNSON CONTROLS & LENNOX. FOR YORK PLEASE EMAIL [email protected] OR CALL 1-405-419-6613 FOR YORK/JOHNSON CONTROLS QUOTATIONS AND TECHNICAL SUPPORT. FOR LENNOX PLEASE EMAIL [email protected] OR CALL 1-800-367-6285 FOR LENNOX QUOTATIONS AND TECHNICAL SUPPORT. ACCEPTABLE ALTERNATE MANUFACTURER: LENNOX 'L' SERIES. MUST BE COMPATIBLE WITH TSC 2. COOLING CAPACITIES BASED ON 80°F DB / 67°F WB ENTERING COIL, 95°F COOLING CAPACITIES BASED ON 80°F DB / 67°F WB ENTERING COIL, 95°F DB ENTERING CONDENSER. 3. PROVIDE FACTORY FURNISHED 14" HIGH ROOF CURB. PROVIDE FACTORY FURNISHED 14" HIGH ROOF CURB. 4. THERMOSTAT BY LOW VOLTAGE VENDOR. 5. PROVIDE FACTORY INSTALLED DIRTY FILTER SWITCH AND BLOWER PROVING PROVIDE FACTORY INSTALLED DIRTY FILTER SWITCH AND BLOWER PROVING SWITCH. 6. PROVIDE 1 YEAR LABOR AND 3 YEARS PARTS WARRANTY. PROVIDE 1 YEAR LABOR AND 3 YEARS PARTS WARRANTY. 7. PROVIDE 5 YEAR PARTS WARRANTY ON COMPRESSORS. PROVIDE 5 YEAR PARTS WARRANTY ON COMPRESSORS. 8. PROVIDE FACTORY INSTALLED SMOKE DETECTORS ON THE RETURN DUCT PROVIDE FACTORY INSTALLED SMOKE DETECTORS ON THE RETURN DUCT DISCHARGES. 9. PROVIDE FACTORY INSTALLED DIFFERENTIAL ENTHALPY ECONOMIZER AND PROVIDE FACTORY INSTALLED DIFFERENTIAL ENTHALPY ECONOMIZER AND BAROMETRIC RELIEF. O.A. DAMPER SHALL CLOSE DURING UNOCCUPIED HOURS. 10. MECHANICAL CONTRACTOR SHALL PROVIDE A SECOND SET OF FILTERS TO MECHANICAL CONTRACTOR SHALL PROVIDE A SECOND SET OF FILTERS TO BE INSTALLED PRIOR TO STORE OPENING. 11. UNIT SHALL USE R-410A REFRIGERANT (NO EXCEPTIONS). UNIT SHALL USE R-410A REFRIGERANT (NO EXCEPTIONS). 13. NON-POWERED CONVENIENCE OUTLET. NON-POWERED CONVENIENCE OUTLET. 14. GENERAL CONTRACTOR TO PROVIDE AND INSTALL CONDUITS AND GANG GENERAL CONTRACTOR TO PROVIDE AND INSTALL CONDUITS AND GANG BOXES FOR FUTURE EMS. SEE DRAWING E4.0 FOR DETAILS 15. LOW VOLTAGE VENDOR TO PROVIDE AND INSTALL LOW VOLTAGE PRE-WIRE LOW VOLTAGE VENDOR TO PROVIDE AND INSTALL LOW VOLTAGE PRE-WIRE FOR FUTURE EMS. SEE DRAWING E4.0 FOR DETAILS. 16. PROVIDE COIL (HAIL) GUARDS. PROVIDE COIL (HAIL) GUARDS.
AutoCAD SHX Text
5.0
AutoCAD SHX Text
A/C-1
AutoCAD SHX Text
YORK
AutoCAD SHX Text
12.2
AutoCAD SHX Text
14.5
AutoCAD SHX Text
ZJ061E20
AutoCAD SHX Text
60.0
AutoCAD SHX Text
208/3%%C
AutoCAD SHX Text
2
AutoCAD SHX Text
20
AutoCAD SHX Text
63.2
AutoCAD SHX Text
54.2
AutoCAD SHX Text
2,000
AutoCAD SHX Text
N/A
AutoCAD SHX Text
.8
AutoCAD SHX Text
1.5
AutoCAD SHX Text
2"
AutoCAD SHX Text
1,044
AutoCAD SHX Text
208/3%%C
AutoCAD SHX Text
58.5
AutoCAD SHX Text
1-16
AutoCAD SHX Text
SLEEVE THRU ROOF
AutoCAD SHX Text
AT ROOF
AutoCAD SHX Text
W/ AIR SPACE
AutoCAD SHX Text
36"
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
COUNTERFLASH TO
AutoCAD SHX Text
FLASHING COLLAR
AutoCAD SHX Text
STORM COLLAR
AutoCAD SHX Text
SOLDER
AutoCAD SHX Text
"BELMONT CAP" BY MITCHELL METAL PRODUCTS OR APPROVED EQUAL
AutoCAD SHX Text
TO GAS FIRED EQUIPMENT
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
NONE
AutoCAD SHX Text
MANUFACTURER
AutoCAD SHX Text
FAN IDENTIFICATION
AutoCAD SHX Text
SERVICE AREA
AutoCAD SHX Text
CFM
AutoCAD SHX Text
FAN TYPE
AutoCAD SHX Text
SONES
AutoCAD SHX Text
WEIGHT
AutoCAD SHX Text
VOLTAGE/PHASE
AutoCAD SHX Text
ESP
AutoCAD SHX Text
MODEL NUMBER
AutoCAD SHX Text
ACCESSORIES:
AutoCAD SHX Text
ACCESSORIES REQUIRED
AutoCAD SHX Text
MOTOR POWER
AutoCAD SHX Text
REMARKS:
AutoCAD SHX Text
A: BACKDRAFT DAMPER
AutoCAD SHX Text
B: VARIABLE SPEED CONTROLLER
AutoCAD SHX Text
- EF-1 & 2 SHALL BE INTERLOCKED WITH LIGHTSWITCH SERVING THEIR RESPECTIVE SPACES.
AutoCAD SHX Text
GREENHECK
AutoCAD SHX Text
EF-1
AutoCAD SHX Text
MEN'S RR
AutoCAD SHX Text
150
AutoCAD SHX Text
CABINET CENT.
AutoCAD SHX Text
1.5
AutoCAD SHX Text
17 LBS
AutoCAD SHX Text
115/60/1%%C
AutoCAD SHX Text
0.35
AutoCAD SHX Text
SP-A190
AutoCAD SHX Text
A,B
AutoCAD SHX Text
46 WATTS
AutoCAD SHX Text
EF-2
AutoCAD SHX Text
WOMEN'S RR
AutoCAD SHX Text
A,B
AutoCAD SHX Text
GREENHECK
AutoCAD SHX Text
150
AutoCAD SHX Text
CABINET CENT.
AutoCAD SHX Text
1.5
AutoCAD SHX Text
17 LBS
AutoCAD SHX Text
115/60/1%%C
AutoCAD SHX Text
0.35
AutoCAD SHX Text
SP-A190
AutoCAD SHX Text
46 WATTS
AutoCAD SHX Text
6" MAX.
AutoCAD SHX Text
DUCT SIZE VARIES
AutoCAD SHX Text
OPPOSED BLADE DAMPER
AutoCAD SHX Text
FELT
AutoCAD SHX Text
SHEET METAL SCREW
AutoCAD SHX Text
INTERNALLY LINED DUCT
AutoCAD SHX Text
SUPPLY REGISTER
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
NONE
AutoCAD SHX Text
HORIZONTAL OR VERTICAL BLADES AS SPECIFIED
AutoCAD SHX Text
AIR FLOW
AutoCAD SHX Text
MANUFACTURER
AutoCAD SHX Text
UNIT IDENTIFICATION
AutoCAD SHX Text
GAS MBH INPUT
AutoCAD SHX Text
HORSE POWER
AutoCAD SHX Text
FAN CFM
AutoCAD SHX Text
FLUE CONNECTION SIZE:
AutoCAD SHX Text
UNIT WEIGHT (APPROX.)
AutoCAD SHX Text
VOLTAGE/PHASE
AutoCAD SHX Text
MODEL NUMBER
AutoCAD SHX Text
ADP
AutoCAD SHX Text
GFUH-1, 2
AutoCAD SHX Text
300
AutoCAD SHX Text
1/8
AutoCAD SHX Text
4,400
AutoCAD SHX Text
5"
AutoCAD SHX Text
280 LBS.
AutoCAD SHX Text
115/1%%C
AutoCAD SHX Text
SEP-300
AutoCAD SHX Text
GAS MBH OUTPUT
AutoCAD SHX Text
241.5
AutoCAD SHX Text
ACCESSORIES:
AutoCAD SHX Text
A,B,C,D,E,F,G
AutoCAD SHX Text
F: CONTROL TRANSFORMER
AutoCAD SHX Text
E: INERMITTENT PILOT L
AutoCAD SHX Text
B: SAFETY CONTROLS
AutoCAD SHX Text
A: PRESSURE REGULATOR
AutoCAD SHX Text
G: UNIT MOUNTED THERMOSTAT
AutoCAD SHX Text
C: GAS TRAIN
AutoCAD SHX Text
D: ELECTRONIC IGNITION
AutoCAD SHX Text
REMARKS:
AutoCAD SHX Text
- UNIT SHALL BE A.G.A. CERTIFIED AND U.L. LISTED. - PROVIDE ALL REQUIRED MOUNTING HARDWARE FOR MOUNTING TO STRUCTURE. MOUNT UNIT AS HIGH AS POSSIBLE. - PROVIDE THE MANUFACTURES' REQUIRED MINIMUM CLEARANCES. - ACCEPTABLE EQUALS SHALL BE MODINE, REZNOR, LENNOX, OR STERLING. - LOW VOLTAGE VENDOR TO PROVIDE, INSTALL AND PRE-WIRE FOR EMS. SEE DRAWING E-5.1 FOR DETAILS.
AutoCAD SHX Text
(CONTRACTOR TO VERIFY GFUH SUPPLIED BY GREENHOUSE VENDOR) (SCHEDULE PROVIDED FOR COORDINATION PURPOSE ONLY)
AutoCAD SHX Text
6. GAS FIRED EQUIPMENT A. ALL GAS FIRED EQUIPMENT SHALL BE AGA CERTIFIED. B. BURNERS SHALL BE EQUIPPED WITH CONTROLS AND SAFETIES REQUIRED FOR COMPLETE AND FULLY OPERATIONAL SYSTEM. PILOT SHALL BE INTERMITTENT ELECTRIC IGNITION TYPE. 7. FLUES AND VENTS A. CONTRACTOR SHALL FURNISH AND INSTALL ALL FLUES AND VENTS. FLUES AND VENTS SHALL BE U.L. LISTED DOUBLE WALL TYPE WITH SIZES AS INDICATED ON DRAWINGS. B. CONSTRUCTION AND HEIGHT OF FLUE ABOVE ROOF SHALL CONFORM TO REQUIREMENTS OF NFPA 54 AND LOCAL CODES. 8. SLEEVES A. PROVIDE 18 GAGE SLEEVING AT MASONRY WALLS, ETC. B. SEAL ALL PENETRATIONS OF RATED PARTITIONS WITH U.L. LISTED FIRE BARRIER MATERIAL. 9. CONTROLS A. LOW VOLTAGE VENDOR SHALL FURNISH, ROUTE, AND INSTALL CONTROL WIRING & THERMOSTATS FOR HVAC SYSTEMS INCLUDING GAS FURNACE UNIT HEATER, AND PACKAGED UNITS. CONTROL WIRING CONNECTIONS TO BE MADE BY MECHANICAL CONTRACTOR. GC SHALL FURNISH AND INSTALL TEMPORARY THERMOSTATS. B. INSTALL THERMOSTATS AT 90" A.F.F. UNLESS NOTED OTHERWISE. THERMOSTAT LOCATIONS SHALL BE COORDINATED WITH FINAL LOCATIONS OF WALL-MOUNTED ARCHITECTURAL AND ELECTRICAL EQUIPMENT. FINAL LOCATIONS MUST BE APPROVED BY THE ARCHITECT AND OWNER. THERMOSTATS SHALL NOT BE INSTALLED ON EXTERIOR WALLS IF INTERIOR WALLS ARE AVAILABLE WITHIN SPACE SERVED BY THERMOSTAT. SHOULD THE THERMOSTAT REQUIRE INSTALLATION ON AN EXTERIOR WALL AN INSULATED BACKING PLATE MUST BE PROVIDED TO PREVENT FALSE READINGS BY THE THERMOSTAT. PART 3 EXECUTION 1. FURNISH AND INSTALL SYSTEM IN ACCORDANCE WITH REFERENCED STANDARDS, APPLICABLE CODES, MANUFACTURERS RECOMMENDATIONS AND AS INDICATED ON DRAWINGS. 2. CONTRACTOR SHALL TEST AND BALANCE MECHANICAL SYSTEM. CONTRACTOR SHALL PROVIDE ALTERNATE PRICE FOR 3RD PARTY AABC CERITFIED TEST & BALANCE TO ASSURE CONFORMANCE WITH DESIGN. CONTRACTOR SHALL SUBMIT WRITTEN TEST AND BALANCE REPORT TO LOCAL CODE OFFICIALS AS REQUIRED. 3. CONTRACTOR SHALL INSTRUCT THE OWNER'S REPRESENTATIVE IN ALL MATTERS PERTAINING TO THE PROPER MAINTENANCE OF EQUIPMENT FURNISHED UNDER THIS CONTRACT. 4. CONTRACTOR SHALL PROGRAM ALL THERMOSTATS FOR OCCUPIED/UNOCCUPIED HOURS OF OPERATION. HOURS OF OPERATION AND TEMPERATURE SET POINTS PER OWNERS REQUEST. FAN SHALL RUN CONTINUOUSLY DURING OCCUPIED HOURS.
AutoCAD SHX Text
PART 1 GENERAL 1. FURNISH ALL MATERIALS, LABOR, TOOLS, TRANSPORTATION AND INCIDENTALS TO COMPLETE IN EVERY DETAIL, AND LEAVE IN WORKING ORDER ALL ITEMS CALLED FOR HEREIN OR SHOWN ON THE ACCOMPANYING DRAWINGS. 2. IT IS THE RESPONSIBILITY OF CONTRACTOR TO READ ALL SPECIFICATIONS AND CONSULT ALL DRAWINGS WHICH MAY AFFECT THE INSTALLATION AND COORDINATION OF HIS WORK WITH OTHER TRADES. CONTRACTOR SHALL COORDINATE AND MAKE MINOR ADJUSTMENTS IN LOCATION OF EQUIPMENT AND MATERIALS AS NECESSARY TO SECURE COORDINATION. 3. LAYOUT SHOWN IN DRAWINGS IS BASED ON A PARTICULAR MAKE OF EQUIPMENT. CONTRACTOR SHALL PROVIDE SIX SUBMITTAL SETS OF SHOP DRAWINGS TO ENGINEER FOR APPROVAL PRIOR TO STARTING WORK. IF ANOTHER MAKE OF EQUIPMENT IS DESIRED, THESE SUBMITTALS SHALL ALSO SHOW ALL REQUIRED MODIFICATIONS AND CHANGES, INCLUDING THOSE INVOLVING OTHER TRADES, AND COST THEREOF SHALL BE INCLUDED IN HIS BID. REQUESTS FOR SUBSTITUTION OF PRODUCTS NOT SPECIFICALLY NAMED SHALL BE SUBMITTED IN WRITING A MINIMUM OF TEN (10) CALENDAR DAYS PRIOR TO THE BID DATE. REQUESTS SHALL INCLUDE DESCRIPTION OF ITEM(S), NAME OF MANUFACTURER TO BE SUBSTITUTED AND CATALOG DATA. REQUESTS SHALL BE REVIEWED ONLY TO APPROVE OR REJECT SUBMISSION OF PRODUCT. DETAILED SUBMITTALS SHALL BE SUBMITTED AS NOTED IN OTHER PORTIONS OF THIS SPECIFICATION. DO NOT SUBSTITUTE MATERIALS, EQUIPMENT OR METHODS UNLESS SUCH SUBSTITUTION HAS BEEN APPROVED IN WRITING. DO NOT ASSUME THAT MATERIALS, EQUIPMENT OR METHODS WILL BE APPROVED UNTIL SPECIFIC WRITTEN APPROVAL HAS BEEN GIVEN. THE BURDEN OF PROOF FOR REQUESTED SUBSTITUTIONS RESTS WITH THE CONTRACTOR. CONTRACTOR MUST RECEIVE APPROVED SUBMITTAL COPY, SIGNED BY ENGINEER BEFORE PROCEEDING WITH ANY MODIFICATIONS. WORK INSTALLED USING UNAPPROVED SUBSTITUTIONS SHALL BE REPLACED AT NO ADDITIONAL COST TO THE OWNER. 4. CONTRACTOR SHALL VISIT THE SITE AND FULLY INFORM HIMSELF CONCERNING ALL CONDITIONS AFFECTING SCOPE OF WORK. FAILURE TO DO SO SHALL NOT RELIEVE CONTRACTOR OF ANY RESPONSIBILITY IN THE PERFORMANCE OF HIS WORK. ALL WORKMANSHIP SHALL BE OF THE HIGHEST QUALITY IN ACCORDANCE WITH THE BEST PRACTICES OF THE TRADE BY CRAFTSMEN SKILLED IN THIS PARTICULAR WORK. CONTRACTOR SHALL FILE ALL DRAWINGS, PAY ALL FEES AND OBTAIN ALL PERMITS AND CERTIFICATES OF INSPECTION RELATIVE TO THIS WORK. 5. COMPLETED INSTALLATION SHALL CONFORM TO ALL APPLICABLE FEDERAL, STATE AND LOCAL CODES AND ORDINANCES, INCLUDING BUT NOT LIMITED TO THE LATEST APPROVED EDITIONS OF THE FOLLOWING: STATE BUILDING CODE, INTERNATIONAL BUILDING CODE, INTERNATIONAL MECHANICAL CODE, INTERNATIONAL ENERGY CONSERVATION CODE NFPA-90A, NFPA-101, NFPA-54. ALL EQUIPMENT SHALL BE ARI CERTIFIED AND U.L. LISTED. 6. SYSTEM LAYOUT IS SCHEMATIC AND EXACT LOCATIONS SHALL BE DETERMINED BY STRUCTURAL CONDITIONS, COORDINATION WITH OTHER TRADES, COORDINATION WITH FINISHES AND OTHER CONDITIONS. STRUCTURAL SUPPORTS SHALL NOT BE CUT OR ALTERED TO ASSURE FIT OF HVAC SYSTEM. 7. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DEFECTS, REPAIRS AND REPLACEMENTS IN MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE (1) YEAR AFTER FINAL PAYMENT IS APPROVED. CONTRACTOR SHALL HONOR FACTORY WARRANTIES ON ALL EQUIPMENT PROVIDED AS PART OF THIS SYSTEM. COMPRESSORS SHALL BE PROVIDED WITH A MINIMUM OF FIVE (5) YEAR (PARTS ONLY) WARRANTY. 8. UPON COMPLETION OF PROJECT, ALL SYSTEM EQUIPMENT AND MATERIALS SHALL BE IN NEW, CLEAN CONDITION WITH ALL DAMAGE RESTORED TO ACCEPTABLE CONDITION. ALL EQUIPMENT, COMPONENTS AND DUCTWORK SHALL BE INSPECTED AND THOROUGHLY CLEANED, READY FOR USE. AT COMPLETION OF JOB, ALL MISCELLANEOUS TOOLS, SCAFFOLDING, SURPLUS MATERIALS, RUBBISH AND DEBRIS SHALL BE REMOVED BY CONTRACTOR. 9. IF HVAC EQUIPMENT IS USED FOR TEMPORARY HEATING, ETC., THE CONTRACTOR SHALL ASSUME THE RESPONSIBILITY FOR CLEANING FILTERS, COILS, ETC. FINAL PERMANENT CONNECTIONS OF SERVICES TO UNITS SHALL BE COMPLETE PRIOR TO ANY START-UP OF EQUIPMENT. 10. WHERE PIPES, DUCTS, ETC., ARE TO PASS THROUGH WALLS, FLOORS, ETC. SLEEVES SHALL BE PROVIDED PRIOR TO WALL CONSTRUCTION. SLEEVES SHALL BE OF EQUAL OR GREATER GAUGE METAL THAN PIPES OR DUCTS PASSING THROUGH. WHERE SLEEVES PENETRATE EXTERIOR SURFACES, VOIDS SHALL BE SEALED WATER TIGHT. WHERE SLEEVES PASS THROUGH RATED PARTITIONS, SLEEVE PACKING SHALL BE OF U.L. LISTED FIRE SAFE TYPE. 11. CONTRACTOR SHALL SUBMIT THREE SETS (3) OF INSTRUCTION BOOKS, INCLUDING INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS, PAMPHLETS OR BROCHURES AND ALL EQUIPMENT WARRANTIES OBTAINED FROM EACH MANUFACTURER OF EQUIPMENT. PART 2 PRODUCTS 1. HEATING AND COOLING EQUIPMENT A. NEW ROOFTOP UNITS SHALL BE THE YORK PREDATOR/SUNLINE SERIES OR LENNOX "L SERIES" ROOFTOP UNITS WITH ELECTRIC COOLING AND HEATING. THE MECHANICAL CONTRACTOR SHALL CONTACT YORK AT 405-419-6531 OR LENNOX AT 404-403-7083 TO REQUEST PRICING AND TECHNICAL SUPPORT ON THE TRACTOR SUPPLY COMPANY NATIONAL ACCOUNT. B. UNIT SHALL BE FACTORY ASSEMBLED, TESTED AND HAVE COMPLETE REFRIGERANT - 410A CHARGE, READY TO OPERATE. ALL TUBING JOINTS SHALL BE BRAZED. COIL SHALL BE MINIMUM OF 3-ROWS DEEP. C. FAN SHALL BE STATICALLY AND DYNAMICALLY BALANCED, DOUBLE INLET, FORWARD CURVED BLOWER CAPABLE OF DELIVERING DESIGN CFM. FAN SHALL BE QUIET IN OPERATION AND INTERNALLY VIBRATION ISOLATED. D. EQUIPMENT SHALL BE COMPLETELY FACTORY WIRED WITH ALL CONTROL AND PROTECTIVE DEVICES. ALL ROOFTOP EQUIPMENT 2000 CFM OR OVER SHALL HAVE SMOKE DETECTOR AND CONTROLS FOR SMOKE DETECTORS SHUTDOWN. E. FURNISH AND INSTALL CONDENSATE DRAIN PAN FLOAT SWITCH IN PRIMARY DRAIN PAN, DIVERSITECH MODEL CC-1 OR APPROVED EQUAL. INTERLOCK WITH DEDICATED UNIT FOR UNIT SHUTDOWN.
AutoCAD SHX Text
2. FANS A. FANS SHALL BE EQUAL TO THE MAKE AND MODEL(S) INDICATED AND SHALL BE LOCATED AS SHOWN ON DRAWINGS. FANS SHALL BE PENN, ACME, LOREN COOK OR GREENHECK. B. FANS SHALL BE FURNISHED COMPLETE WITH VIBRATION ISOLATION, PLUG TYPE DISCONNECT, NON-YELLOWING PLASTIC GRILLE, THERMAL OVER LOAD PROTECTION, AND INSULATED HOUSING. 3. ROOF CURBS A. CONTRACTOR SHALL PROVIDE ALL ROOF CURBS. PREFAB ROOF CURB ASSEMBLIES SHALL BE GALVANIZED STEEL WITH WOOD NAILER STRIP. PITCHES SHALL MATCH SLOPE OF ROOF TO PROVIDE LEVEL EQUIPMENT MOUNTING. 4. DUCTWORK AND INSULATION A. ALL DUCTWORK SHALL BE SHEETMETAL EXCEPT AS NOTED. CONSTRUCTION STANDARDS AND RECOMMENDATIONS OF SMACNA SHALL BE FOLLOWED WITH RESPECT TO CONSTRUCTION, INSTALLATION AND SUPPORTING OF ALL DUCTWORK. ALL JOINTS LONGITUDINAL AND TRANSVERSE SEAMS SHALL BE SEALED WITH GASKETS, MASTICS (ADHESIVES), TAPES, ETC. ALL SEALANT MATERIAL SHALL BE LISTED IN ACCORDANCE WITH UL 181A OR 181B. B. DIMENSIONS FOR SHEETMETAL WORK ON DRAWINGS ARE INSIDE CLEAR UNLESS OTHERWISE NOTED. C. EXPOSED SUPPLY AND RETURN DUCTS WITHIN CONDITIONED SPACE SHALL HAVE 1" THICK INTERNAL INSULATION AT 1.5 LB DENSITY, GLUED AND PINNED. WHERE INTERNAL LINER AND EXTERNAL WRAP MEET, THEY SHALL OVERLAP BY MINIMUM OF 6". INSULATION SHALL BE BY MANVILLE CORPORATION, CERTAINTEED OR KNAUF. PAINT PER ARCHITECT. D. TRUNK DUCTS SHALL BE ISOLATED FROM UNIT VIBRATION WITH THE USE OF NFPA AND U.L. APPROVED FLEXIBLE CONNECTORS IN BOTH SUPPLY AND RETURN. E. RADIUS DUCTWORK ELBOWS SHALL HAVE A CENTERLINE RADIUS OF 1.5 TIMES THE DUCT WIDTH (OR DIAMETER) UNLESS NOTED OTHERWISE. F. ALL MITERED ELBOWS (RECTANGULAR AND ROUND) SHALL HAVE TURNING VANES INSTALLED UNLESS NOTED OTHERWISE ON DRAWINGS. 5. AIR DEVICES A. AIR DEVICES SHALL BE PRICE, TITUS OR METALAIRE.
AutoCAD SHX Text
%%uNOTES:
AutoCAD SHX Text
A
AutoCAD SHX Text
1. ALL AIR DEVICES TO HAVE COLOR PER ARCHITECT
AutoCAD SHX Text
REMARKS
AutoCAD SHX Text
COLLAR SIZE
AutoCAD SHX Text
VOLUME CONTROL
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
FACE
AutoCAD SHX Text
DEVICE
AutoCAD SHX Text
MFGR. & MODEL #
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
DOUBLE DEFLECTION
AutoCAD SHX Text
SUPPLY REGISTER
AutoCAD SHX Text
TITUS MOD. 300 FS
AutoCAD SHX Text
18" x 10"
AutoCAD SHX Text
DUCT MOUNTED
AutoCAD SHX Text
R
AutoCAD SHX Text
LOUVERED
AutoCAD SHX Text
RETURN REGISTER
AutoCAD SHX Text
TITUS MOD. 350 FL
AutoCAD SHX Text
22" x 22"
AutoCAD SHX Text
DUCT MOUNTED
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
NONE
AutoCAD SHX Text
PAD
AutoCAD SHX Text
PRESSURE RATING OF UNIT
AutoCAD SHX Text
UNION
AutoCAD SHX Text
A.C. UNIT
AutoCAD SHX Text
EQUAL TO MAXIMUM STATIC
AutoCAD SHX Text
FULL SIZE VENT x 6"
AutoCAD SHX Text
EQUAL TO MAXIMUM STATIC
AutoCAD SHX Text
PRESSURE RATING OF UNIT
AutoCAD SHX Text
+ 2" (MINIMUM 6")
AutoCAD SHX Text
UNIT CURB
AutoCAD SHX Text
P-TRAP
AutoCAD SHX Text
+ 2" (MINIMUM 6")
AutoCAD SHX Text
TERMINATE 12" PAST UNIT IN DIRECTION OF PAD SLOPE
AutoCAD SHX Text
SEAL DUCTWORK TO UNIT PER NOTES
AutoCAD SHX Text
FLEXIBLE CONNECTION
AutoCAD SHX Text
DUCT TRANSITION
AutoCAD SHX Text
OUTDOOR INSULATION WITH ALUMINUM JACKET
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
NONE
AutoCAD SHX Text
14" HIGH CURB
AutoCAD SHX Text
CONCRETE PAD
AutoCAD SHX Text
SEAL INSULATION AT JOINTS
AutoCAD SHX Text
FLASH AND SEAL AROUND DUCTWORK AT PENETRATIONS WITH SILICON WATER TIGHT
Page 19: 9715 US HIGHWAY 64 ARLINGTON, TENNESSEE REVISION DATE: …

STOCKROOM105

WOMEN110

MEN109

EMPLOYEE

108LOUNGE

MANAGER'S

107OFFICE

CORRIDOR106

VESTIBULE101

RETAIL SALES102

GARDEN CENTER113

FEED STORAGE114

DRESSINGROOM104

BOPIS SHED

H

E

ELEC. PAN

EL

TELE. BOARD

ELEC. PAN

EL

G

ONEWAY

PICKUP

ONEWAY

PICKUP

ONEWAY

PICKUP

PERMANENT SIDEWALKDISPLAY AREA

PERMANENT SIDEWALKDISPLAY AREA

PERMANENT SIDEWALKDISPLAY AREA

P1.0

PLUMBING FLOOR PLAN

PLUMBING FLOOR PLAN

2934 Sidco Drive

Suite 120

Nashville, TN 37204

OXFORD

ARCHITECTURE

Architecture

Planning

Interior Architecture

1163 West Main St.Franklin, TN 37064Tel: 615.730.9111 / Fax: [email protected] #21-025

TRACTOR SUPPLY COMPANY

ARLINGTONTENNESSEE

G

A

R

Y

W

. S

C

H

E

L

T

O

N

S

T

A

T

E

O

F

TE

N

N

E

S

S

E

E

R

E

G

I

S

T

E

R

E

D E

N

G

I

N

E

E

R

N

o

.

1 0

8

0

8

1

PLUMBING FIXTURE LEGEND

PLUMBING DRAWINGS NOTES

AutoCAD SHX Text
GFUH-2
AutoCAD SHX Text
GFUH-1
AutoCAD SHX Text
MODELNUMBER
AutoCAD SHX Text
TRADENAME
AutoCAD SHX Text
PRODUCT
AutoCAD SHX Text
MATERIAL
AutoCAD SHX Text
MODELNUMBER
AutoCAD SHX Text
TRADENAME
AutoCAD SHX Text
PRODUCT
AutoCAD SHX Text
MATERIAL
AutoCAD SHX Text
2
AutoCAD SHX Text
MS
AutoCAD SHX Text
1
AutoCAD SHX Text
BS
AutoCAD SHX Text
1
AutoCAD SHX Text
LAV
AutoCAD SHX Text
1
AutoCAD SHX Text
LAV
AutoCAD SHX Text
1
AutoCAD SHX Text
EWC
AutoCAD SHX Text
1
AutoCAD SHX Text
WC
AutoCAD SHX Text
1
AutoCAD SHX Text
WC
AutoCAD SHX Text
1" GAS DOWN TO BELOW ROOF
AutoCAD SHX Text
34"
AutoCAD SHX Text
1"(ON ROOF)
AutoCAD SHX Text
1"
AutoCAD SHX Text
34"
AutoCAD SHX Text
ROUTE NEW 1" NATURAL GAS PIPING FROM OUTLET OF METER, UPSTREAM OF ALL BRANCH CONNECTIONS - CONTRACTOR SHALL VERIFY EXISTING GAS PIPING FROM METER SUPPLIED AT 2 PSI OUTLET PRESSURE AND EXISTING NATURAL GAS METER IS ADEQUATELY SIZED TO HANDLE ADDITIONAL 600 CFH LOAD.
AutoCAD SHX Text
HB
AutoCAD SHX Text
HR
AutoCAD SHX Text
HR
AutoCAD SHX Text
34"
AutoCAD SHX Text
34"
AutoCAD SHX Text
PROPOSED HOSE BIBB LOCATION. ROUTE NEW 34" CW DOWN TIGHT TO INSIDE FACE OF WALL WITHIN 8" OF DOOR-JAM TO HB. HB. . WATER PIPING CANNOT INTERFERE WITH WALL FIXTURES ON FINAL FIXTURE PLAN. COORDINATE WITH LATEST FINAL FIXTURE PLANS.
AutoCAD SHX Text
34"
AutoCAD SHX Text
CONNECT " CW SERVICE AT NEAREST 34" CW SERVICE AT NEAREST CONVENIENT LOCATION - ROUTE ALL PIPING TIGHT TO EXTERIOR WALL AND AS HIGH AS POSSIBLE. PROVIDE SHUT-OFF VALVE FOR WINTERIZATION OF GARDEN CENTER HOSE REELS. SLOPE WATER LINE WITH LOW POINT AT HOSE BIBB.
AutoCAD SHX Text
EXISTING " CW, FIELD VERIFY EXACT LOCATION.34" CW, FIELD VERIFY EXACT LOCATION.
AutoCAD SHX Text
3
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
1/8" = 1'-0"
AutoCAD SHX Text
Job Number:
AutoCAD SHX Text
Date:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
Sheet Number:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
This drawing and the design shown is the property of the architect. The reproduction, copying or use of this drawing without their written consent is prohibited and any infringement will be subject to legal action.
AutoCAD SHX Text
All measurements and items portrayed on this sheet are deemed to be accurate by architect, however all bidding General Contractors should field verify the actual conditions. Any changes to the scope of work, and thus potential change orders, should be identified and communicated in your bid submittal to TSC.
AutoCAD SHX Text
Tractor Supply Company shall not be responsible for the payment of any work performed or material supplied by the Contractor or any of its sub-contractors, sub-subcontractors and anyone claiming by through or under any of them which is not identified in writing and signed by one of the following Tractor Supply Company personnel: Vice President Real Estate, Director of Construction, or a Construction Project Manager. No action, conduct, omission, prior failure, or course of dealing by Tractor Supply Company shall act to waive, modify, change or alter the requirement that all work, whether by contract, change order or change directive, must be in writing and signed by the personnel identified in this provision. Any work performed or material provided by the Contractor, any of its sub-contractors, sub-subcontractors contrary to this provision shall be at its own risk and own expense and Tractor Supply Company shall not be obligated to reimburse or pay the Contractor or any of its sub-contractors, sub-subcontractors for same.
AutoCAD SHX Text
2100-009
AutoCAD SHX Text
03.11.2021
AutoCAD SHX Text
AGRICULTURE
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
M
AutoCAD SHX Text
M
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
COLD WATER ABOVE SLAB
AutoCAD SHX Text
HOT WATER ABOVE SLAB
AutoCAD SHX Text
COLD WATER BELOW SLAB OR GRADE
AutoCAD SHX Text
WASTE LINE BELOW SLAB OR GRADE
AutoCAD SHX Text
VENT LINE ABOVE OR BELOW SLAB
AutoCAD SHX Text
GAS LINE ABOVE SLAB OR GRADE
AutoCAD SHX Text
EXTERIOR CLEANOUT UP FROM BELOW SLAB OR GRADE
AutoCAD SHX Text
CLEANOUT UP FROM BELOW FLOOR OR SLAB
AutoCAD SHX Text
PIPE TURNED DOWN
AutoCAD SHX Text
PIPE TURNED UP
AutoCAD SHX Text
V
AutoCAD SHX Text
BALL VALVE
AutoCAD SHX Text
HOSE BIBB
AutoCAD SHX Text
NEW FIXTURES
AutoCAD SHX Text
FIXTURE IDENTIFICATIONS
AutoCAD SHX Text
COLD WATER
AutoCAD SHX Text
HOT WATER
AutoCAD SHX Text
VENT THRU ROOF
AutoCAD SHX Text
EXTERIOR CLEANOUT
AutoCAD SHX Text
INTERIOR CLEANOUT
AutoCAD SHX Text
ABOVE FINISHED FLOOR
AutoCAD SHX Text
AFF
AutoCAD SHX Text
ICO
AutoCAD SHX Text
ECO
AutoCAD SHX Text
VTR
AutoCAD SHX Text
HW
AutoCAD SHX Text
CW
AutoCAD SHX Text
WC1, ETC.
AutoCAD SHX Text
PRESSURE REGULATING VALVE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
EXISTING PLUMBING FIXTURE TO BE REPLACED PER "PLUMBING FIXTURE SCHEDULE". USE EXISTING UTILITIES WITHIN WALLS AND FLOOR TO RE-CONNECT AT MODIFIED LOCATIONS. CONTRACTOR TO FIELD VERIFY EXACT LOCATIONS OF EXISTING UTILITY CONNECTIONS BEFORE CONSTRUCTION. CAPACITY TEST EXISTING MOP SINK. BID AS ALTERNATE IF BASIN AND FAUCET ARE FOUND LEAKING. EXISTING URINAL TO BE REUSED. ENSURE CAULK IS CLEAN/SMOOTH TRANSITION FROM URINAL WALL. IF HARDWARE WILL NOT COME CLEAN PER TSC PM, FURNISH AND INSTALL NEW HARDWARE INCLUDING ESCUTCHEON TRIM RING, VALVE, AND SUPPLY LINE. RETROFIT EXISTING FLUSHVALVE WITH ZURN MODEL ZERK-CPM MOTION SENSOR.
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
CONNECT NEW TO EXISTING
Page 20: 9715 US HIGHWAY 64 ARLINGTON, TENNESSEE REVISION DATE: …

P2.0

PLUMBING SCHEDULES AND DETAILS

2934 Sidco Drive

Suite 120

Nashville, TN 37204

OXFORD

ARCHITECTURE

Architecture

Planning

Interior Architecture

1163 West Main St.Franklin, TN 37064Tel: 615.730.9111 / Fax: [email protected] #21-025

TRACTOR SUPPLY COMPANY

ARLINGTONTENNESSEE

G

A

R

Y

W

. S

C

H

E

L

T

O

N

S

T

A

T

E

O

F

TE

N

N

E

S

S

E

E

R

E

G

I

S

T

E

R

E

D E

N

G

I

N

E

E

R

N

o

.

1 0

8

0

8

1

PIPE HANGER - BAR JOIST

NON-FREEZE WALL HYDRANT

PIPE INSULATION - BAR JOIST

PLUMBING FIXTURE SCHEDULE

GAS CONNECTION SCHEDULE

GAS LINE SIZED AT 2.0 PSI INLET PRESSURE

GENERAL PLUMBING SPECIFICATIONS

TYPICAL GAS CONNECTION DETAIL

PIPE SUPPORT DETAIL

GAS PIPING ROOF PENETRATION

AutoCAD SHX Text
Job Number:
AutoCAD SHX Text
Date:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
Sheet Number:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
Revisions:
AutoCAD SHX Text
This drawing and the design shown is the property of the architect. The reproduction, copying or use of this drawing without their written consent is prohibited and any infringement will be subject to legal action.
AutoCAD SHX Text
All measurements and items portrayed on this sheet are deemed to be accurate by architect, however all bidding General Contractors should field verify the actual conditions. Any changes to the scope of work, and thus potential change orders, should be identified and communicated in your bid submittal to TSC.
AutoCAD SHX Text
Tractor Supply Company shall not be responsible for the payment of any work performed or material supplied by the Contractor or any of its sub-contractors, sub-subcontractors and anyone claiming by through or under any of them which is not identified in writing and signed by one of the following Tractor Supply Company personnel: Vice President Real Estate, Director of Construction, or a Construction Project Manager. No action, conduct, omission, prior failure, or course of dealing by Tractor Supply Company shall act to waive, modify, change or alter the requirement that all work, whether by contract, change order or change directive, must be in writing and signed by the personnel identified in this provision. Any work performed or material provided by the Contractor, any of its sub-contractors, sub-subcontractors contrary to this provision shall be at its own risk and own expense and Tractor Supply Company shall not be obligated to reimburse or pay the Contractor or any of its sub-contractors, sub-subcontractors for same.
AutoCAD SHX Text
2100-009
AutoCAD SHX Text
03.11.2021
AutoCAD SHX Text
AGRICULTURE
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
M
AutoCAD SHX Text
M
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
WATER HAMMER ARRESTER PDI SIZE "B"
AutoCAD SHX Text
SHUT-OFF VALVE LOCATED ABOVE CEILING IN ACCESSIBLE AREA
AutoCAD SHX Text
34" COLD WATER PIPE INSULATED
AutoCAD SHX Text
CEILING
AutoCAD SHX Text
INSTALL RISER INSIDE PARTITION WHERE AVAILABLE: REFER TO PLANS. IF RISER IS EXPOSED, ANCHOR TIGHT TO WALL, INTERIOR TO WALL INSULATION
AutoCAD SHX Text
ELBOWS AS REQUIRED
AutoCAD SHX Text
VALVE INTERIOR TO WALL
AutoCAD SHX Text
WALL CLAMP
AutoCAD SHX Text
INTERIOR FLOOR
AutoCAD SHX Text
INSTALL +/- 24" ABOVE GRADE. ADJUST HEIGHT IF/AS REQ'D TO SUIT MASONRY SEAMS.
AutoCAD SHX Text
EXTERIOR BUILDING WALL
AutoCAD SHX Text
LENGTH OF SHAFT TO SUIT THICKNESS OF WALL.
AutoCAD SHX Text
CUT WALL AS REQUIRED. INSTALL WALL HYDRANT, GROUT OR OTHERWISE REPAIR WALL NEATLY AROUND FACE OF WALL HYDRANT, TO SEAL WATERTIGHT
AutoCAD SHX Text
NON-FREEZE WALL HYDRANT WITH INTEGRAL VACUUM BREAKER AND NICKEL-PLATED FACE, EXPOSED TYPE WITH LOOSE TEE KEY, " HOSE 34" HOSE CONNECTION.
AutoCAD SHX Text
EXTERIOR GRADE, PAVEMENT, OR SIDEWALK.
AutoCAD SHX Text
STEEL DECK
AutoCAD SHX Text
C-CLAMP, CONNECT TO TOP OF BEAM OR STEEL BAR JOIST
AutoCAD SHX Text
ADJUSTABLE BAND HANGER FOR PIPE 3-1/2" AND SMALLER AND CAST IRON PIPE 2" AND SMALLER
AutoCAD SHX Text
ROUTE PIPING WITHIN JOISTS / GIRDER
AutoCAD SHX Text
HANG PIPE LARGER THAN 4" FROM TOP OF JOISTS ONLY AT PANEL POINT
AutoCAD SHX Text
ALL-THREAD ROD
AutoCAD SHX Text
PROVIDE COPPER COATED HANGERS WHERE HANGERS CONTACT BARE COPPER PIPE
AutoCAD SHX Text
PROVIDE UPPER ATTACHMENT AS REQUIRED FOR CASES NOT SHOWN HERE. DO NOT INSTALL HANGER INSIDE INSULATION OR OTHERWISE PENETRATE VAPOR BARRIER. DO NOT HANG ONE PIPE FROM ANOTHER EXCEPT IN CHASES. SLOPE ALL WATER PIPING SLIGHTLY TOWARD DRAINABLE LOCATIONS. HANGER SPACING FOR PIPE SIZE: AS INDICATED ON TABLE. CAST IRON:: 10' AND WITHIN 1'-0" OF ALL JOINTS. ROD SIZES FOR PIPE SIZE: 2" AND SMALLER = ", 2 " TO 3" = ", 4= ", 38", 2 " TO 3" = ", 4= ", 12" TO 3" = ", 4= ", 12", 4= ", 58", 6"= ", 8" AND LARGER = ". LOCATE HANGERS WITHIN 1'-0" OF 34", 8" AND LARGER = ". LOCATE HANGERS WITHIN 1'-0" OF 78". LOCATE HANGERS WITHIN 1'-0" OF VALVES AND FITTINGS. PROVIDE SUPPLEMENTARY STEEL STRUTS BETWEEN JOISTS IF REQUIRED. LOCATE HANGERS WITHIN 1'-0" OR EQUIPMENT CONNECTIONS. ANCHOR WATER PIPE AGAINST SWAYING DUE TO CHANGES IN WATER VELOCITY. CHAINS AND PERFORATED STRAP IRON AND STEEL ARE NOT ACCEPTABLE. DO NOT SUSPEND PIPE FROM JOIST BRACING MEMBERS. REFER TO CODE AND SPECIFICATIONS FOR FUTHER INFORMATION. PROVIDE SEISMIC BRACING IF/AS REQUIRED BY LOCAL AUTHORITIES. TRAPEZE HANGERS MAY BE USED FOR MULTIPLE PARALLEL PIPES, SEE "TRAPEZE PIPE HANGER DETAIL"
AutoCAD SHX Text
12"
AutoCAD SHX Text
34"
AutoCAD SHX Text
1"
AutoCAD SHX Text
1 "14"
AutoCAD SHX Text
1 "12"
AutoCAD SHX Text
2"
AutoCAD SHX Text
2 "12"
AutoCAD SHX Text
4"
AutoCAD SHX Text
3"
AutoCAD SHX Text
5'
AutoCAD SHX Text
5'
AutoCAD SHX Text
6'
AutoCAD SHX Text
7'
AutoCAD SHX Text
8'
AutoCAD SHX Text
8'
AutoCAD SHX Text
10'
AutoCAD SHX Text
12'
AutoCAD SHX Text
11'
AutoCAD SHX Text
7'
AutoCAD SHX Text
7'
AutoCAD SHX Text
7'
AutoCAD SHX Text
8'
AutoCAD SHX Text
9'
AutoCAD SHX Text
10'
AutoCAD SHX Text
11'
AutoCAD SHX Text
12'
AutoCAD SHX Text
12'
AutoCAD SHX Text
PIPE SIZE
AutoCAD SHX Text
COPPER PIPE HANGER SPACING
AutoCAD SHX Text
STEEL PIPE HANGER SPACING
AutoCAD SHX Text
32"
AutoCAD SHX Text
32"
AutoCAD SHX Text
32"
AutoCAD SHX Text
32"
AutoCAD SHX Text
32"
AutoCAD SHX Text
32"
AutoCAD SHX Text
32"
AutoCAD SHX Text
32"
AutoCAD SHX Text
32"
AutoCAD SHX Text
PEX PIPE HANGER SPACING
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
NONE
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
NONE
AutoCAD SHX Text
PROVIDE GALVANIZED STEEL SHEILD FOR ALL INSULATED PIPE. VERIFY INSULATION THICKNESS WHEN SIZING HANGERS AND SHIELDS.
AutoCAD SHX Text
PROVIDE A 1'-0" LENGTH OF NOCOMPRESSIBLE INSULATION AT ALL PIPE HANGERS FOR PIPES 2 " 12" AND LARGER
AutoCAD SHX Text
ONE-PIECE PREMOULDED PVC FITTING COVERS. SEE PLUMBING SPECIFICATIONS
AutoCAD SHX Text
COVER VALVE BODIES WITH INSULATION BUT NOT UNIONS
AutoCAD SHX Text
TAPE ALL JOINTS OF FIBERGLASS INSULATION
AutoCAD SHX Text
PROVIDE ELASTOMERIC OR FIBERGLASS INSULATION ON DOMESTIC COLD & HOT WATER PIPES IN WALLS & CHASES. SEAL ALL JOINTS WITH ADHESIVE. PER SPECS.
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
NONE
AutoCAD SHX Text
COPPER PIPE ONLY AFTER DROP TO HOSE BIBB.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
CW
AutoCAD SHX Text
UTILITIES
AutoCAD SHX Text
HW
AutoCAD SHX Text
DR
AutoCAD SHX Text
VENT
AutoCAD SHX Text
MARK
AutoCAD SHX Text
BS
AutoCAD SHX Text
12"
AutoCAD SHX Text
1 "12"
AutoCAD SHX Text
1 "14"
AutoCAD SHX Text
12"
AutoCAD SHX Text
BREAKROOM SINK: (SINGLE BOWL, S.S., GOOSENECK): PROVIDED BY TRACTOR SUPPLY COMPANY & INSTALLED BY CONTRACTOR.
AutoCAD SHX Text
WC
AutoCAD SHX Text
12"
AutoCAD SHX Text
4"
AutoCAD SHX Text
X
AutoCAD SHX Text
2"
AutoCAD SHX Text
MS
AutoCAD SHX Text
12"
AutoCAD SHX Text
3"
AutoCAD SHX Text
1 "12"
AutoCAD SHX Text
12"
AutoCAD SHX Text
HB
AutoCAD SHX Text
34"
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
HOSE BIBB (NON-FREEZE, KEYED HANDLE): WOODFORD MODEL 65, ", AUTOMATIC DRAINING BRASS FINISH, NIDEL MODEL 34HA VACUUM BREAKER. PROVIDE LOOSE TEE 34", AUTOMATIC DRAINING BRASS FINISH, NIDEL MODEL 34HA VACUUM BREAKER. PROVIDE LOOSE TEE KEY FOR EACH HYDRANT.
AutoCAD SHX Text
EWC
AutoCAD SHX Text
12"
AutoCAD SHX Text
1 "14"
AutoCAD SHX Text
1 "14"
AutoCAD SHX Text
X
AutoCAD SHX Text
HR
AutoCAD SHX Text
34"
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
HOSE REEL: REEL CRAFT MODEL SWA3850. MOUNT FROM STRUCTURE. COORDINATE EXACT LOCATION WITH LATEST TSC FIXTURE PLAN AND TSC PM.
AutoCAD SHX Text
ELECTRIC WATER COOLER (ACCESSIBLE, SINGLE STATION, MOTION ACTIVATED): ELKAY MODEL EZ08S WITH INFRARED SENSOR CONTROLS AND WALL MOUNTING BRACKET. 8 GPH, 115/1/60. MOUNT RIM AT 32" ABOVE FLOOR. MAINTAIN 27" CLEAR BENEATH COOLER. PROVIDE MCGUIRE 8872 P-TRAP AND MCGUIRE 165-CC SUPPLY WITH STOP. COORDINATE WITH ELECTRICAL CONTRACTOR TO LOCATE RECEPTACLE BEHIND WATER COOLER CABINET.
AutoCAD SHX Text
MOP SINK : MUSTEE MODEL 63M 24"x24" FIBERGLASS MOP SERVICE BASIN. COMPLETE WITH MODEL 63.401 EXTRUDED BUMPER GUARD, CHICAGO MODEL 897-RCF CHROME PLATED SPOUT WITH VACUUM BREAKER, " HOSE THREAD OUTLET, PAIL HOOK. WALL 34" HOSE THREAD OUTLET, PAIL HOOK. WALL SUPPORT, INTEGRAL STOPS, MODEL 369 2 " METAL LEVER HANDLES AND 36" LENGTH OF THREADED HOSE. IF CHEMICAL 12" METAL LEVER HANDLES AND 36" LENGTH OF THREADED HOSE. IF CHEMICAL DISPENSER IS INCLUDED WITHIN S.O.W., FURNISH AND INSTALL T&S MODEL B-0977 THREADED CONTINUOUS PRESSURE VACUUM BREAKER AND DEMA MODEL 68-6 PRESSURE INDICATING TEE ON FAUCET OUTLET FOR HOSE CONNECTION TO BETCO DISPENSER. VACUUM BREAKER TO BE INSTALLED UPSTREAM OF PRESSURE INDICATING TEE.
AutoCAD SHX Text
LOAD
AutoCAD SHX Text
EQUIPMENT
AutoCAD SHX Text
TOTAL NEW CONNECTED LOAD:
AutoCAD SHX Text
WITH 1.0 PSI PRESSURE LOSS FOR 350'-0" FURNISH AND INSTALL PRV AT EQUIPMENT CONNECTION AS REQUIRED. CONTRACTOR SHALL VERIFY GAS AVAILABILITY @ 2 PSI WITH LOCAL PROVIDER PRIOR TO CONSTRUCTION.
AutoCAD SHX Text
ALL NATURAL GAS PIPING IS SIZED FOR SCHEDULE 40 METALLIC PIPE.
AutoCAD SHX Text
GFUH-1
AutoCAD SHX Text
300,000 BTUH
AutoCAD SHX Text
600,000 BTUH
AutoCAD SHX Text
GFUH-1
AutoCAD SHX Text
300,000 BTUH
AutoCAD SHX Text
FURNISH, INSTALL, PROVIDE AND MAKE OPERATIVE ALL EQUIPMENT MATERIALS, SUPERVISION, LABOR AND ANY AND ALL ITEMS NECESSARY FOR THE PROPER INSTALLATION OF THE CORRECTLY FUNCTIONING PLUMBING SYSTEM AS SHOWN ON THE DRAWINGS AND SPECIFIED HEREIN. EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. EQUALS MAY BE SUBSTITUTED ONLY IF PRIOR APPROVAL IS OBTAINED FROM OWNER ORDINANCES, PERMITS AND CODES: THE WORKMANSHIP AND MATERIALS COVERED BY THESE SPECIFICATIONS SHALL CONFORM TO ALL REGULATIONS OF ALL THE AUTHORITIES HAVING JURISDICTION. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, CONNECTION AND INSPECTION FEES AS REQUIRED FOR THE COMPLETE INSTALLATION OF THE PLUMBING SYSTEM. THE LOCATION OF PIPING AND EQUIPMENT, AS SHOWN ON THE DRAWINGS, IS DIAGRAMMATIC AND SCHEMATIC AND IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO MAKE HIS OWN WORKING LAYOUT TO ELIMINATE ALL STRUCTURAL AND ARCHITECTURAL CONFLICTS IN THE BUILDING. VERIFY ALL MEASUREMENTS AT THE SITE AND COORDINATE ALL WORK SO THAT IT DOES NOT INTERFERE WITH THE WORK OF THE OTHER TRADES. DOMESTIC WATER PIPES SHALL BE TYPE "L" COPPER ABOVE GROUND / SLAB AND TYPE "K" COPPER BELOW GRADE / SLAB. INSTALL DIELECTRIC UNIONS AT CONNECTION TO DISSIMILAR METALS. ALTERNATIVE WATER PIPING MATERIAL SHALL BE WIRSBO TYPE "A" "PEX" POLYETHYLENE CROSS-BRACED PIPING WITH BRASS / COPPER FITTINGS. SANITARY WASTE AND VENT PIPE SHALL BE CAST IRON WITH NO-HUB FITTINGS OR SCHEDULE 40 PVC. IT IS THE INTENT OF THESE DRAWINGS TO COVER ALL WORK FOR A COMPLETE FIRST CLASS PLUMBING INSTALLATION - ANY EQUIPMENT, TRIM HARDWARE AND/OR DEVICES USUALLY UTILIZED IN THIS CLASS OF WORK, THOUGH NOT SPECIFICALLY MENTIONED OR SHOWN ON THE DRAWINGS, BUT WHICH MAY BE NECESSARY FOR THE SATISFACTORY COMPLETION OF THE WORK (AS DETERMINED BY THE CONSTRUCTION MANAGER) SHALL BE FURNISHED AND INSTALLED BY THE PLUMBING CONTRACTOR AS PART OF HIS TOTAL WORK. JET ALL WASTE LINES AND CAMERA. VIDEO TO BE SENT TO TSC PM. INCLUDE PRICE FOR POTENTIAL REPAIRS. PROVIDE AND INSTALL A CUT-OFF VALVE, UNION AND FULL SIZE DIRT LEG AT CONNECTION TO EACH GAS-FIRED PIECE OF EQUIPMENT. ALL GAS PIPING SHALL BE SCHEDULE 40 BLACK STEEL WITH SCREWED OR WELDED FITTINGS AND GASKET TYPE UNIONS AND FLANGES. ALL GAS PIPING INSTALLED OUTDOORS SHALL BE COATED WITH A CORROSION RESISTANT PAINT. PAINT COLOR SHALL BE ORANGE OR YELLOW. NATURAL GAS REGULATORS SHALL BE MAXITROL 325 SERIES OR EQUAL.
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
NONE
AutoCAD SHX Text
8" DIRT LEG WITH REMOVABLE END PLUG IN DIRECTION OF FLOW
AutoCAD SHX Text
CONNECTION TO EQUIPMENT
AutoCAD SHX Text
GAS LINE FROM MAIN
AutoCAD SHX Text
GAS VALVE
AutoCAD SHX Text
UNION
AutoCAD SHX Text
PRESSURE REDUCING VALVE (REQUIRED IF DELIVER PRESSURE OVER 10.5" W.C. OR MAX EQUIPMENT DELIVERY PRESSURE.) NOTE: ALL VENTED TYPE REGULATORS/REDUCERS SHALL HAVE GAS VENT PIPED TO THE BUILDING EXTERIOR.
AutoCAD SHX Text
NONE
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
FRAMING CHANNEL
AutoCAD SHX Text
KEYCURB MODEL RKCSE1
AutoCAD SHX Text
2 THREADED RODS, EACH BLOCK
AutoCAD SHX Text
GALVANIZED STEEL CLAMP, LOOSE FIT FOR PIPE EXTENSION
AutoCAD SHX Text
12" - 1 "12"
AutoCAD SHX Text
2" - 2 "12"
AutoCAD SHX Text
3" - 4"
AutoCAD SHX Text
6'
AutoCAD SHX Text
10'
AutoCAD SHX Text
12'
AutoCAD SHX Text
PIPE SIZE
AutoCAD SHX Text
MAX SPACING
AutoCAD SHX Text
* BLOCK SPACING FOR PLASTIC PIPE (ALL SIZES) SHALL BE 4' MAX
AutoCAD SHX Text
BLOCK SPACING CHART (METAL PIPE)
AutoCAD SHX Text
NOTE: NO WOOD ALLOWED FOR SUPPORTS.
AutoCAD SHX Text
CORE DRILL ROOF OR PROVIDE SLEEVE IF REQ'D. BY TYPE OF ROOF DECK. FIRE STOP BETWEEN PIPE & SLEEVE
AutoCAD SHX Text
ANCHOR PIPE TO ROOF DECK/JOISTS
AutoCAD SHX Text
GROUND JOINT PIPE UNION
AutoCAD SHX Text
PIPE SUPPORT (SEE GAS PIPE SUPPORT DETAIL)
AutoCAD SHX Text
FLASHING & COUNTERFLASHING OF ROOF PENETRATION AS BY ROOFING CONTRACTOR. PLUMBING CONTRACTOR TO COORDINATE INSTALLATION.
AutoCAD SHX Text
ELBOW TO COMPENSATE FOR PIPE EXPANSION (TYPICAL)
AutoCAD SHX Text
ROOF INSULATION
AutoCAD SHX Text
ROOF DECK
AutoCAD SHX Text
REFER TO PLANS FOR GAS PIPE SIZES AND LOCATIONS. USE WELDED OR SCREWED FITTINGS AS SPECIFIED FOR PIPE SIZE. LOCATE PENETRATION MINIMUM 18" FROM ADJACENT WALLS, EQUIPMENT CURBS, PARAPETS, EXPANSION JOINTS, ETC.
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
NONE
AutoCAD SHX Text
WATER CLOSET (FLOOR MTD., PRESSURE ASSISTED FLUSH TANK, MOTION ACTIVATED): KOHLER HIGHLINE K-3519, 12" ROUGH-IN, 1.0 GPF, WITH SLOAN FLUSHMATE PRESSURE ASSIST, LOW CONSUMPTION, VITREOUS CHINA, 17-1/8" HIGH, ELONGATED BOWL FLUSH TANK WATER CLOSET WITH LEFT HAND TRIP LEVER. PROVIDE KOHLER K-5588 ELONGATED TOILET SEAT, K-5420 BOLT CAPS. FOR RIGHT HAND TRIP LEVER PROVIDE WITH ALTERNATE TANK CONFIGURATION MODEL K-3519-RH. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING CORRECT TANK SELECTION WITH LATEST ARCHITECTURAL DRAWINGS TO ACCOMMODATE ADA ACCESSIBILITY PRIOR TO ORDERING. RETROFIT WITH INTELLI-FLUSH K-100101 WALL SENSOR, POWERED BY FOUR(4) AA BATTERIES, CHROME FINISH. INTELLI-FLUSH SYSTEM MUST BE ORDERED SEPARATELY FROM FLUSHMATE. CONTACT KELECHI AKALAONU AT FLUSHMATE FOR ORDERING INFORMATION. PH:(248)513-7715 EMAIL: [email protected]
AutoCAD SHX Text
LAVATORY (ACCESSIBLE, WALL HUNG, MOTION ACTIVATED): KOHLER KINGSTON WALL-MOUNT K-2005, VITREOUS CHINA LAVATORY WITH A ZURN AQUASENSE BATTERY POWERED Z6915-XL FAUCET, POLISHED CHROME FINISH, KOHLER K-23726 DRAIN, KOHLER K-8998 P-TRAP AND KOHLER K-23725 CAST IRON CLEANER. MOUNT FIXTURE WITH FLOOD RIM 34" AFF. FURNISH AND INSTALL WITH ZURN MODEL ZW3870XLT THERMAL MIXING VALVE FOR MAX. 110°F HOT WATER.
AutoCAD SHX Text
LAV
AutoCAD SHX Text
12"
AutoCAD SHX Text
1 "14"
AutoCAD SHX Text
1 "14"
AutoCAD SHX Text
12"
Page 21: 9715 US HIGHWAY 64 ARLINGTON, TENNESSEE REVISION DATE: …

PARSONSENGINEERING.COMPARSONSENGINEERING.COM

TRACTOR SUPPLY COMPANY

ARLINGTONTENNESSEE

E1.0GENERAL LIGHTING PLAN

STOCKROOM105

WOMEN110

MEN109

EMPLOYEE

108LOUNGE

MANAGER'S

107OFFICE

CORRIDOR106

VESTIBULE101

RETAIL SALES102

GARDEN CENTER113

FEED STORAGE114

BOPIS SHED

H

E

ELEC. PAN

EL

TELE. BOARD

ELEC. PAN

EL

G

Page 22: 9715 US HIGHWAY 64 ARLINGTON, TENNESSEE REVISION DATE: …

PARSONSENGINEERING.COMPARSONSENGINEERING.COM

TRACTOR SUPPLY COMPANY

ARLINGTONTENNESSEE

STOCKROOM105

WOMEN110

MEN109

EMPLOYEE

108LOUNGE

MANAGER'S

107OFFICE

CORRIDOR106

VESTIBULE101

RETAIL SALES102

GARDEN CENTER113

FEED STORAGE114

BOPIS SHED

H

E

ELEC. PAN

EL

TELE. BOARD

ELEC. PAN

EL

G

E2.0GENERAL POWER PLAN

Page 23: 9715 US HIGHWAY 64 ARLINGTON, TENNESSEE REVISION DATE: …

PARSONSENGINEERING.COMPARSONSENGINEERING.COM

TRACTOR SUPPLY COMPANY

ARLINGTONTENNESSEE

E3.0ELEC SYSTEM/VENDOR DETAILS

Page 24: 9715 US HIGHWAY 64 ARLINGTON, TENNESSEE REVISION DATE: …

PARSONSENGINEERING.COMPARSONSENGINEERING.COM

TRACTOR SUPPLY COMPANY

ARLINGTONTENNESSEE

STOCKROOM105

WOMEN110

MEN109

EMPLOYEE

108LOUNGE

MANAGER'S

107OFFICE

CORRIDOR106

VESTIBULE101

RETAIL SALES102

GARDEN CENTER113

FEED STORAGE114

BOPIS SHED

H

E

ELEC. PAN

EL

TELE. BOARD

ELEC. PAN

EL

G

E4.0MECHANICAL POWER PLAN

Page 25: 9715 US HIGHWAY 64 ARLINGTON, TENNESSEE REVISION DATE: …

PARSONSENGINEERING.COMPARSONSENGINEERING.COM

TRACTOR SUPPLY COMPANY

ARLINGTONTENNESSEE

E5.0ELECRICAL DETAILS & SPECS