9/10 sat 8:30 | envisioning a shared future; brick by brick

31
ENVISIONING A SHARED FUTURE BRICK BY BRICK

Upload: apa-florida

Post on 19-Jan-2015

323 views

Category:

Entertainment & Humor


4 download

DESCRIPTION

Tom Wodrich Erin Tilghman Jennifer Stults The opening of the newest major theme park in Florida, LEGOLAND Florida, has provided unique challenges for community planners, business owners, and residents in the existing communities. In anticipation of the tremendous opportunities yet potential threats to the way of life here, planners from multiple jurisdictions gathered community leaders together to discuss the key issues such as infrastructure, traffic, signage/wayfinding, and improved pedestrian/transit accommodation in order to create a vision for the future of a community influenced by an anticipated 1.5-2 million visitors per year.

TRANSCRIPT

Page 1: 9/10 SAT 8:30 | Envisioning a Shared Future; Brick by Brick

ENVISIONING A SHARED FUTURE BRICK BY BRICK

Page 2: 9/10 SAT 8:30 | Envisioning a Shared Future; Brick by Brick

Location, Location, Location…

Page 3: 9/10 SAT 8:30 | Envisioning a Shared Future; Brick by Brick

History

1936 – Cypress Gardens opens Florida’s 1st commercial tourist theme park Became water ski capital of the world US 27 was major North/South artery through the state

1959 - I-4 construction begins (completed in the late 1960s)

1971 - Disney World opens (shifting tourist focus away from US 27)

2003 – Cypress Gardens closes after prolonged tourism decline Within 3 ½ months, a grass-roots effort from all 50 states and 27 countries raised USD 13,500,000 and saved the park

2009 – Cypress Gardens closes for good 2010 – LEGOLAND announces

Winter Haven location (park opens October 15)

Page 4: 9/10 SAT 8:30 | Envisioning a Shared Future; Brick by Brick

How is LEGOLAND different? Park open 10 a.m. – 5 p.m. Closed Tuesday &Wednesday Primary Target:

Families with kids ages 2-12 only Single day park usage 2 hour drive (overnight?)

Incentives $5,000,000 over 10 years Expedited permits/review

Page 5: 9/10 SAT 8:30 | Envisioning a Shared Future; Brick by Brick

The LEGOLAND Location Challenge 22 miles from I-4 57 miles from the Florida Turnpike Mainline Visitors travel through multiple jurisdictions along

US 27 Studies show unattractive road corridors

(visual/signage clutter, lack of pedestrian amenities, strip development, etc.) impede new investment.

What impressions will our visitors return home to share?

Page 6: 9/10 SAT 8:30 | Envisioning a Shared Future; Brick by Brick

Corridor Planning for

LEGOLAND

• Previous Planning Efforts

• Selected Area Plans1. US 272. Ronald Reagan3. North Ridge4. Gateway

• Community Redevelopment Areas

• Ongoing Corridor Planning & Collaboration

• Working with cities along US 27 to develop a gateway plan

1 2

3

4

CRA

Page 7: 9/10 SAT 8:30 | Envisioning a Shared Future; Brick by Brick

East Polk County Planning Studies

Cypress Gardens Boulevard Corridor Plan

North Ridge CRA US 27 Corridor Study

US 27 & SR 60 Corridor Studies

North Ridge CRA

US 27 Corridor Study

Potential Applicability

CypressGardensBlvd CorridorStudy

Page 8: 9/10 SAT 8:30 | Envisioning a Shared Future; Brick by Brick

Common Issues and Concerns

Page 9: 9/10 SAT 8:30 | Envisioning a Shared Future; Brick by Brick

"Legoland is the magic word in Winter Haven," said Bob Gernert, executive director of the Greater Winter Haven Chamber of Commerce.

Polk County's tourism industry received a major jolt in January with the announcement that Legoland Florida would replace Cypress Gardens.

Legoland to Begin Hiring 1,000 Workers Soon

Businesses Urged to Prepare for Legoland Visitors

Cynthia Cross, 62 and a retired teacher, said Legoland will be good for Winter Haven, especially for motels, gas stations and restaurants. "But I just don't see how it's going to trickle down to the rest of us," she said.

Page 10: 9/10 SAT 8:30 | Envisioning a Shared Future; Brick by Brick

Eagle Lake can lure tourists, a county official told city commissioners. "We've got plans coming out the wazoo," he said. "When we get businesses to locate here, then we can do some serious planning.“

Croes said building those extra services is "the chicken and the egg:" Winter Haven won't be able to become its own destination until investment is made in a cluster of family-friendly attractions that keep people in Winter Haven after the park closes. But he said investors are not going to make that kind of investment in Winter Haven until Legoland proves it can bring the people. Robertico Croes, associate professor of tourism, events and attractions at the University of Central Florida

Page 11: 9/10 SAT 8:30 | Envisioning a Shared Future; Brick by Brick
Page 12: 9/10 SAT 8:30 | Envisioning a Shared Future; Brick by Brick

What Would You Buy?

Page 13: 9/10 SAT 8:30 | Envisioning a Shared Future; Brick by Brick
Page 14: 9/10 SAT 8:30 | Envisioning a Shared Future; Brick by Brick

Why Plan?

LEGOLAND = Golden Opportunity Planning = Investment Strategy Infrastructure Promotes Growth Minimize the Tax Burden Doing More With Less = Partnering is

Vital City Participation Involve Key Stakeholders Public-Private-Partnerships

Page 15: 9/10 SAT 8:30 | Envisioning a Shared Future; Brick by Brick

Goals of Study

Identify strategies to ensure that US 27 serves as a premiere corridor within Polk County.

Enhance property values and cultivate economic development.

Identify visual blight as well as access management, connectivity, and wayfinding deficiencies.

Improve transit and pedestrian/bicycle access and usage.

Work with municipalities to create a coordinated approach to land use and quality development standards.

Page 16: 9/10 SAT 8:30 | Envisioning a Shared Future; Brick by Brick
Page 17: 9/10 SAT 8:30 | Envisioning a Shared Future; Brick by Brick

Vision Statement

Fully leverage the opportunities associated with the development of LEGOLAND Florida;

Support sustainable use of limited land and public resources by encouraging higher densities, multi-modal transportation access, mixed use developments, and housing options;

Protect, preserve, and enhance natural resources; Coordinate planning efforts between Polk County, the City of

Winter Haven, the FDOT, significant property owners, and other interested parties/agencies;

Provide safe and convenient access to shopping, housing, and essential services;

Support the development of a positive visual character for the City by promoting a high degree of compatibility between land uses and by maintaining a standard for quality development; and

Elevate the level of economic development through repositioning the corridor to accommodate new growth, changes in demographics, and the adaptation of the local economy.

Page 18: 9/10 SAT 8:30 | Envisioning a Shared Future; Brick by Brick

Existing Conditions - Development

Page 19: 9/10 SAT 8:30 | Envisioning a Shared Future; Brick by Brick

Existing Conditions – Land Use

Page 20: 9/10 SAT 8:30 | Envisioning a Shared Future; Brick by Brick

Existing Conditions - Landscaping

Page 21: 9/10 SAT 8:30 | Envisioning a Shared Future; Brick by Brick

Existing Conditions - Signs

Page 22: 9/10 SAT 8:30 | Envisioning a Shared Future; Brick by Brick

Existing Conditions - Design

Page 23: 9/10 SAT 8:30 | Envisioning a Shared Future; Brick by Brick

Existing Conditions - Transportation

Page 24: 9/10 SAT 8:30 | Envisioning a Shared Future; Brick by Brick

Regional Wayfinding Signs

Page 25: 9/10 SAT 8:30 | Envisioning a Shared Future; Brick by Brick

Local Signs

Page 26: 9/10 SAT 8:30 | Envisioning a Shared Future; Brick by Brick

Access Management

Page 27: 9/10 SAT 8:30 | Envisioning a Shared Future; Brick by Brick

Multi-modal Transportation

Pedestrian/Bicycle FacilitiesTransit Parking Access Management

Page 28: 9/10 SAT 8:30 | Envisioning a Shared Future; Brick by Brick

Pre-Construction

Page 29: 9/10 SAT 8:30 | Envisioning a Shared Future; Brick by Brick

Construction

Photos

Page 30: 9/10 SAT 8:30 | Envisioning a Shared Future; Brick by Brick

To Be Continued….

Page 31: 9/10 SAT 8:30 | Envisioning a Shared Future; Brick by Brick

Contact Information

Erin Tilghman, AICP

City of Winter Haven

863-298-5353

[email protected]

Jennifer Stults, AICP

Florida Department of Transportation

District One

863-519-2656

[email protected]

Tom Wodrich, AICP

Polk County Office of Planning & Development

863-534-6792

[email protected]