9. Overall Experiences of ERMC FS ES EIA IEE SI SES- GIS CPD DED BDT SM CA TRN International Projects 1 Program Management and Institutional Strengthening (PMIC) CS/02, Loan No. 2752 ARM (Sustainable Urban Development Investment Program- Project 1), Yarevan Development Project, Yerevan Municipality Yerevan Municipality, Republic of Armenia ADB/SWEROAD April 2012 to July 2015 21 20 2 Road Safety Consultancy Services for TA-8027 REG: South Asia Road Safety Programme (Phase 1: Kingdom of Bhutan and Nepal) (45281-001) Nepal and Bhutan ADB Manila January- December 2013 12 10 National Projects 1 Road Improvement Project Phase III (Ranke-Rabi Bhendetar Road - 90km and Charikot-Tamakoshi-Jiri Road - 55km) Contract No.: RIP-IIII/3371334/CS- 001/71/72) Central and Eastern Development Region of Nepal Department of Roads December 2015 to November 2020 565 28.76 2 Feasibility Study, Detailed Engineering Survey, Design and Preparation of DPR, Environmental and Social Study for Improvement of Double Lane Bituminous Standard, Contract Packaging and Preparation of Bidding Documents of: 1. Kohalpur-Surkhet (Bangesimal) Road (Ratna Highway, H012) and Butwal-Pokhara Road Section (Siddhartha Highway, H10) Nepal Department of Roads, Foreign Cooperation Branch August 2016 to November 2017 88.5 54.06 3 Kathmandu Sustainable Urban Transport Project: Design and Supervision Consultant for various works under KSUTP (DSC-KSUTP) Kathmandu, Nepal KSUTP / ADB June 2016 to July 2017 141 32.78 4 Environmental and Social Study for Kathmandu (Nagdhunga) Naubise Mugling and Kakarbhitta - Pathalaiya Section Road and Bridges Central and Eastern Development Region of Nepal NIRTTP, Foreign Cooperation Branch, DoR / World Bank March 2015 to February 2018 50.5 18.1 5 Detailed Engineering Survey, Design of Road and Report Preparation (DPR) of 6 Roads (Total 112km), Contract No. PMEU/337159/073/74 DPR-33) Bajura and Achhham Districts DoR, Planning Monitoring and Evaluation Unit June 2017 to November 2017 6 6.86 6 Detailed Engineering Survey, Design of Road and Report Preparation (DPR) of 7 Roads (Total 120km), Contract No. PMEU/337159/073/74 DPR-23) Baitadi, Dadeldhura, Bajura, Jhapa, Sindhuli and Ramechhap Districts DoR, Planning Monitoring and Evaluation Unit June 2017 to November 2017 6 6.98 7 National Rural and Renewable Energy Programme (NRREP): Impact Study of Community Electrification RFP # AEPC/NRREP/CESC/2073/74-14: Professional Indemnity Insurance Nepal Alternative Energy Promotion Centre (AEPC) March 2017 to June 2017 4 1.55 8 Monitoring and Evaluation of Road Maintenance Works Executed by Road Agencies Nepal Road Board Nepal, World Bank August 2017- November 2017 3.5 0.1 9 Feasibility Study and Report Preparation of Manang - Mustang - Dolpa - Jumla Road (PMEU/337362/073/74 F-1) Manang, Mustang, Dolpa and Jumla Districts of Nepal Department of Roads July 2017 to November 2017 5 1.74 10 Feasibility Study of Roads: i. Seti Lokmarg (Tikapur Bauniya Khanda), Kailali (18km), ii) Dasharathchanda 3 Sunnakhan Chenejarga Ringroad, Baitadi (15km) (P18-PMEU-070/71) Kailali and Baitadi District Department of Roads April 2014 to May 2014 2 0.39 Location Detail S.N. Project Title Value of Services NRs. (Million) 9.1.1 Highways, Hill Roads, Green Roads, etc. Work Phase 9.1 Transport Sector Client/ Finance Period Professional (Months) ERMC (P.) Ltd. 19

Upload: trandung

Post on 20-Aug-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

9. Overall Experiences of ERMC

FS ES EIA

IEE

SI SES-

GIS

CPD

DED

BDT

SM CA TRN

International Projects1 Program Management and Institutional Strengthening (PMIC) CS/02, Loan

No. 2752 ARM (Sustainable Urban Development Investment Program-Project 1), Yarevan Development Project, Yerevan Municipality

Yerevan Municipality, Republic of Armenia

ADB/SWEROAD April 2012 to July 2015

21 20

2 Road Safety Consultancy Services for TA-8027 REG: South Asia Road Safety Programme (Phase 1: Kingdom of Bhutan and Nepal) (45281-001)

Nepal and Bhutan ADB Manila January-December 2013

12 10

National Projects1 Road Improvement Project Phase III (Ranke-Rabi Bhendetar Road - 90km

and Charikot-Tamakoshi-Jiri Road - 55km) Contract No.: RIP-IIII/3371334/CS-001/71/72)

Central and Eastern Development Region of Nepal

Department of Roads December 2015 to November

2020

565 28.76

2 Feasibility Study, Detailed Engineering Survey, Design and Preparation of DPR, Environmental and Social Study for Improvement of Double Lane Bituminous Standard, Contract Packaging and Preparation of Bidding Documents of: 1. Kohalpur-Surkhet (Bangesimal) Road (Ratna Highway, H012) and Butwal-Pokhara Road Section (Siddhartha Highway, H10)

Nepal Department of Roads, Foreign Cooperation Branch

August 2016 to November 2017

88.5 54.06

3 Kathmandu Sustainable Urban Transport Project: Design and Supervision Consultant for various works under KSUTP (DSC-KSUTP)

Kathmandu, Nepal KSUTP / ADB June 2016 to July 2017

141 32.78

4 Environmental and Social Study for Kathmandu (Nagdhunga) Naubise Mugling and Kakarbhitta - Pathalaiya Section Road and Bridges

Central and Eastern Development Region of Nepal

NIRTTP, Foreign Cooperation Branch, DoR / World Bank

March 2015 to February 2018

50.5 18.1

5 Detailed Engineering Survey, Design of Road and Report Preparation (DPR) of 6 Roads (Total 112km), Contract No. PMEU/337159/073/74 DPR-33)

Bajura and Achhham Districts

DoR, Planning Monitoring and Evaluation Unit

June 2017 to November 2017

6 6.86

6 Detailed Engineering Survey, Design of Road and Report Preparation (DPR) of 7 Roads (Total 120km), Contract No. PMEU/337159/073/74 DPR-23)

Baitadi, Dadeldhura, Bajura, Jhapa, Sindhuli and Ramechhap Districts

DoR, Planning Monitoring and Evaluation Unit

June 2017 to November 2017

6 6.98

7 National Rural and Renewable Energy Programme (NRREP): Impact Study of Community Electrification RFP # AEPC/NRREP/CESC/2073/74-14: Professional Indemnity Insurance

Nepal Alternative Energy Promotion Centre (AEPC)

March 2017 to June 2017

4 1.55

8 Monitoring and Evaluation of Road Maintenance Works Executed by Road Agencies

Nepal Road Board Nepal, World Bank August 2017-November 2017

3.5 0.1

9 Feasibility Study and Report Preparation of Manang - Mustang - Dolpa - Jumla Road (PMEU/337362/073/74 F-1)

Manang, Mustang, Dolpa and Jumla Districts of Nepal

Department of Roads July 2017 to November 2017

5 1.74

10 Feasibility Study of Roads: i. Seti Lokmarg (Tikapur Bauniya Khanda), Kailali (18km), ii) Dasharathchanda 3 Sunnakhan Chenejarga Ringroad, Baitadi (15km) (P18-PMEU-070/71)

Kailali and Baitadi District Department of Roads April 2014 to May 2014

2 0.39

Location DetailS.N. Project TitleValue of

Services NRs. (Million)

9.1.1 Highways, Hill Roads, Green Roads, etc.

Work Phase

9.1 Transport Sector

Client/ Finance Period Professional (Months)

ERMC (P.) Ltd. 19

FS ES EIA

IEE

SI SES-

GIS

CPD

DED

BDT

SM CA TRN

Location DetailS.N. Project TitleValue of

Services NRs. (Million)

Work PhaseClient/ Finance Period Professional

(Months)

11 To Support and Assist Department of Local Development (DoLIDAR) for the Preparation of follow on Project of Rural Reconstruction abd Rehabilitation Sector Development Program (RRRSDP)-2 (Prioritization of Road, Feasibility Study, SIA/IEE and Detailed Design, Cost Estimate, Preparation of Investment Plan and Preparation of Contract Documents and Project appraisal Documents for approx 1100 km roads and 35 bridges.

Kathmandu, Nepal (38 Rural Districts)

RRRSDP-2, DoLIDAR. MoFLD, Nepal

August 2013 to October 2014

76 113

12 Consulting Services for Project Preparatory Consultant 1 for Road Component (PPC1-Road) of Transport Project Preparatory Facility (TPPF), ADB Grant No. 0227 – NEP

Nepal Department of Roads, Project Directorate (ADB)

November 2011-September 2013

363 226

13 Sustainability Study of Infrastructure Sub-Projects Implemented in PAF Assisted Districts

All over the country PAF/World Bank Dec 2011-March 2012 18 1.50

14 Dry Season Road Consultant, Feasibility Study, Detailed Design and Construction Supervision of Road (140 km) (IDA Grant No: H525-NEP& Credit No.: 4664)

Surkhet, Pyuthan, Gulmi, Salyan, Rasuwa, Kaski and Udayapur District

RAIDP/DoLIDAR /World Bank December 2011-December 2013

366 49.3

15 Preparation of Detailed Project Report of North South Highway (Koshi Rajmarga-150km, Khandbari-Kimathanka-40km, Tamakoshi-Lamabager Road, 33 km)(P2)

Sankhuwasawa andDolakha Districts

Asset Management, Contract Management and Quality Control Project, Department of Roads

July-December 2011

9 1.7

16 Consulting Services for Supporting Implementation of Environment Framework in Programme Districts (i) EMF Orientation Training, (ii) Monitoring and Evaluation of Sub-Projects, (iii) Feeding, Maintaining and Organizing Environmental Information in MIS, (iv) IEE of Sub-Projects, (v) Revision/Improvement in EMF and Environmental Guideline, (vi) Special Environmental Studies/Cumulative Environmental Studies

PAF districts of Nepal PAF, Kamalpokhari/World Bank February 2011-March 2012

75 9.55

17 Monitoring and Evaluation of Road Maintenance Works Executed by Road Agencies

Nepal Road Board Nepal, World Bank August 2010-July 2011

5 1.34

18 Environment Impact Assessment (EIA) of Num-Kimanthanka Road (72 km) of North South (Koshi) Highway (GESU/NS (KH)-01/066/067)

Sankhuwasava DOR/GESU Sept 2010-Sept 2011 15 1.10

19 Traffic, surface Distress and Road Roughness Surveys of Strategic Road Network (SRN)

Nepal DOR, HMIS March 2009 to November 2009

14 4

20 Construction Supervision of Upgrading of Dolakha-Singati Section of Road (construction of 35 km Road and 22m span Gamu Khola Motorable Bridge)

Dolakha District Upper Tamakoshi Hydroelectric Project, Uper Tamakoshi Hydropower Limited

January 2009 to January 2011

94 15

21 Detail Survey, Design and Cost Estimate of Mid Hill Highway-36km (Dailekh-Dullu), Package-18

Dailekh District DOR, Mid-Hill Highway May-July 2009 9 1

22 Detail Survey, Design and Cost Estimate of Mid Hill Highway-36km (Dailekh-Dullu), Package-19

Dailekh District DOR, Mid-Hill Highway May-July 2009 9 1

23 Survey, Design, Management and Supervision of Rural Road Construction of Ramghat- Singashen (14.6 km), Desigade-Mahabu (12.5 km) and Chupra-Meheltoli (19 km) Road Project, Dailekh District

Dailekh District Rural Access Program Phase-2/DFID (Contract No-RAP-2008-017-Dailekh)

February 2009-June 2012

346 28.67

24 Survey, Design, Management and Supervision of Rural Road Construction of Myanglung-Sankranti Bazaar (68 km) Road Project, Terathum District

Terathum District Rural Access Program Phase-2/DFID (Contract No-RAP-2008-021-Terathum)

February 2009-May 2012

373 20.23

ERMC (P.) Ltd. 20

FS ES EIA

IEE

SI SES-

GIS

CPD

DED

BDT

SM CA TRN

Location DetailS.N. Project TitleValue of

Services NRs. (Million)

Work PhaseClient/ Finance Period Professional

(Months)

25 Engineering Services for the Implementation of Road Construction Activities in Salyan, Pyuthan and Jajarkot districts for Poverty Allevation Programme in Selected Rural Areas (PASRA). Survey, Design and Construction Supervision and social Mobilisation of Marke-Rampur Road (2.2 km section) Salyan,

Salyan, Pyuthan and Jajarkot Districts

GTZ/PASRA Lalitpur January 2009 to July 2009

93 4.5

26 Central Implementation Support Consultant (CISC) for Rural Reconstruction abd Rehabilitation Sector Development Program (RRRSDP)

Kathmandu, Nepal (38 Rural Districts)

RRRSDP, DoLIDAR ((ADB Grant No: 0093-NEP (SF))

December 08 to December 013

518 129

27 Detailed Engineering Design, IEE and Construction Supervision forUpgrading of Bisnumati Link Road of UEIP Kathmandu Metropolitan City

Kathmandu MetropiltanCity, Kathmandu

Kathmandu Metropolitan City, UEIP/ADB Loan-1966-NEP (SF)

Oct 2007 to February 2009

31 5.62

28 Initial Environmental Examination (IEE) Study of Terai Roads, a) MRM-Birendra Bazar–Yadukuwa– Mahinathpur (42 km) b) Janakpur – Yadukuwa ( 15 km) and c) Janakpur – Jatahi (18 km) in Dhanusha District

Dhanusha District DOR/GESU May 2008 to December 2008

15 0.93

29 Environmental Assessment of Community Group Sub-Projects in Programme District (Darhula, Mugu, Pyuthan, Kapilbastu, Ramechhap and Siraha), (a) Monitoring and Evaluation of Sub-projects, (b) Training Program for Environment and Social Assessment, (c) IEE/ EIA of Sub-projects, (d) Review and Appraisal for Environmental and Social Assessment of Sub-project.

Darhula, Mugu, Pyuthan, Kapilbastu, Ramechhap and Siraha

PAF, Chakupat/World Bank July 2005 to September 2009

100 12.00

30 Pre-Feasibility Study of Mid Hill Road, Musikot-Chaurjhari-Jajarkot-Meheltoli-Dailekh Road (215 Km)

Jajarkot and Dailekh District

DoR, Planning Branch June-July 2008 10 0.68

31 Detailed Survey, Design and Cost Estimate of Sundarijal 8-Mahankal-Mulkharka Okhreni-Chisapani Road (10 km)

DDC, Kathmandu DDC February-April 2008 5 0.15

32 Detailed Survey, Design and Cost Estimate of Patan-Pancheswor Road (3+050 - 6+100), Baitadi

DRILP, Baitadi DRILP-DDC Baitadi January- Feb 2008 5 0.20

33 Environmental Impact Assessment and Social Impact Assessment (EIA/SIA)of Outer Ring Road Project (72km) in Kathmandu Valley

Kathmandu Valley(Kathmandu, Lalitpur &Bhaktapur District)

ORRDP/DUDBC March 2007 to March 2008

50 3.8

34 Implementation of DRILP at Lamjung District, Survey, Design, IEE, Social Mobilisation and Construction Supervision of Paudhi - Sundarbazar - Sotipasal - Duipapal (23.5 Km)

Lamjung District DOLIDAR / DDC / (ADB Loan No. 2092 Nep (SF))

January 2007 to August 2011

1200 33.4

35 Implementation of DRILP at Kalikot , Survey, Design, IEE, Social Mobilisation and Construction Supervision of Khulalu - Laiphu (38 Km), Phalulu - Kotbadha (30 Km)

Kalikot District DOLIDAR / DDC / (ADB Loan No. 2092 Nep (SF))

January 2007 to August 2011

1200 33.3

36 Implementation of DRILP at Jumla, Survey, Design, IEE, Social Mobilisation and Construction Supervision of Nagma - Sinja - Choutha (55 Km)

Jumla District DOLIDAR / DDC / (ADB Loan No. 2092 Nep (SF))

January 2007 to August 2011

1200 33.25

37 Implementation of DRILP at Humla, Survey, Design, IEE, Social Mobilisation and Construction Supervision of Hilsa - Simikot Rural Road, Salli Khola - Tumkot Section (25 Km)

Humla District DOLIDAR / DDC / (ADB Loan No. 2092 Nep (SF))

March 2007 to August 2011

1200 33

38 Implementation of DRILP at Gorkha, Survey, Design, IEE, Social Mobilisation and Construction Supervision of Gorkha - Arughat (15 Km), Gorkha - Ghalyachowk (47 Km), Aruwa - Barpa (45 Km)

Gorkha District DOLIDAR / DDC / (ADB Loan No. 2092 Nep (SF))

March 2007 to August 2011

1200 33.4

39 Environmental Impact Assessment of Saljhundi-Juthepauwa-Sundharedhunga (37km) Road

Palpa and RupandehiDistrict

DoR/GEU July 2004 to Dec 2007

7 0.36

ERMC (P.) Ltd. 21

FS ES EIA

IEE

SI SES-

GIS

CPD

DED

BDT

SM CA TRN

Location DetailS.N. Project TitleValue of

Services NRs. (Million)

Work PhaseClient/ Finance Period Professional

(Months)

40 Detail Survey, Design and Cost Estimate of Kaligandaki Corridor (Mirmi) (27km)

Baglung, Gulmi DOR, Traffic Unit May to July 2007 3 0.7434

41 Detailed Survey, Design and Cost Estimate of Rural Road (10 km), Bhaktapur District

Bhaktapur District DDC Bhaktapur April to July 2007 5 0.20

42 Detailed Survey, Design and Cost Estimate of Bana Khola-Taxar-Dulegauda Rural Road (10 km), Naudanda-Karkineta Rural Road (10 km), Waling-Huwas Rural Road (10 km), Syangja District

Syangja District DDC Syangja, RAIDP-World Bank April to July 200720 1.00

43 Detailed Survey, Design and Cost Estimate of Jhadeni-Gothadi-Matha Jagat-Khairini Motorable Road (14 km) Palpa District

Palpa District DDC Palpa April to July 20079 0.50

44 Survey, Design and Construction Supervision of Ramghat-Thatikhand-Singasain Rural Road (23 Km), Dailekh District.

Dailekh District GTZ/RPN June 2006 to May 2008

125 4.7

45 Survey, Design & Construction Supervision of Dailekh – Mahavu (16 km) and Chupra – Meheltoli (25 km) District Road Project

Dailekh District GTZ/RPN April 2006 to June 2008

115 3.5

46 Survey, Design and Construction Supervision of Tallo Dungeshwor to Mathilo dungreswor Road (9 Km)

Dailekh District GTZ/RPN April 2006 to March 2008

15 1

47 Detailed Survey, Design and Cost Estimate of Dachhinkali - Chaimale Road (7 Km) and Pharping - Humane Bhanjyang (11 Km) in Kathmandu

Kathmandu District DDC Kathmandu April to June 2006 3 0.20

48 Detailed Survey, Design and Cost Estimate of Ringroad Corridor, Ring Road Track, Sinamangal Bagmati Bridge, Bagmati Bridge to Jorpati, Bagmati Bridge to Gyoseri and Bishnumati Road Corridor (24 Km) in Kathmandu Valley

Kathmandu Metropolitan City

DOR, Division Road Office, Kathmandu

April to June 2006 3 0.60

49 Detail Survey, Design and Cost Estimate of Nagdhunga to Kalanki Road(9.11 Km)-8 lane highway with Kalanki Intersection .

Kathmandu DOR, Division Road Office, Kathmandu

April to July 2007 3 0.35

50 Detailed Survey and Design of Hilsa – Simakot Road, Okhren Kagru Khola (9 Km), Pani Taluwan – Bummuchhe (Tumkot) Road (7 Km), Kagru Khola – Salli Khola Road (16 Km), Humla

Humla District DDC Humla June 2007 to Sept 2007

30 1.7

51 Consultancy Survey on the Implementation of RCIW activities in Pyuthan District: Survey, Design and Construction Supervision of Sarebangphedi-Machhi-Gaumukhi Rural Road (45km), Damti-Bahane-Syaulibang Rural Road (20 km), Khalanga Jogitari Rural Road (20 km)

Pyuthan District GTZ/RPN. Lalitpur March 2005- June 2008

272 6.78

52 Survey, Design and Construction Supervision of Dipayal-Mallek-Patihalne (Dipayal-Daud Section) Rural Road (40 Km), Doti District.

Doti District DDC Doti and RAP/DFID November 2004- November 2005

36 1.8

ERMC (P.) Ltd. 22

FS ES EIA

IEE

SI SES-

GIS

CPD

DED

BDT

SM CA TRN

Location DetailS.N. Project TitleValue of

Services NRs. (Million)

Work PhaseClient/ Finance Period Professional

(Months)

53 Survey, Design & Construction Supervision of Dailekh – Mahavu (16 km) and Chupra – Meheltoli (25 km) District Road Project

Dailekh District DDC Dailekh and RAP/DFID November 2004 - March 2006

115 3.5

54 Survey, Design and Construction Supervision of Ramghat-Thatikhand-Singasain Rural Road (40 Km), Dailekh District.

Dailekh District DDC Dailekh and RAP/DFID May 2004 - March 2006

125 4.7

55 Survey, Design, IEE and Construction Supervision of Hile Dingla Rural Road(49.4 Km), Bhojpur District.

Bhojpur District DDC Bhojpur and RAP Dec 2003 to May 2006

288 5.45

56 Survey, Design and IEE of Chupra Meheltoli (16 km), Dailekh-Mahavu (25 km) and Ramghat-Thatikhand-Singasain (15 km), Dailekh District.

Dailekh District DDC Dailekh and RAP/DFID 2003-2005 12 0.7

57 Feasibility Study (150 Km), Detailed Survey, Planning and Detailed Engineering Design (100 Km) of Road (7.5m, 9m, 12m) Kamerotar Land Pooling Project

Madhyapur Thimi Municipality, Bhaktapur District

KVTDC 20038 0.80

58 Detailed Survey, Design and IEE of Gopetar- Phagune-Charibhanjyang Rural Road (5 Km).

Panchthar District DDC Panchthar June-July 2003 2 0.11

59 Detailed Survey & Design and IEE of Gupha Sangu Tamor Dobhan Rural Road (20 Km)

Taplejung District DDC Taplejung June-Aug. 2003 5 0.30

60 Detailed Survey, Design and Construction Supervision of Madan Kundari-Gunsi Rural Road, 7 Km

Ramechhap District DoR Bhaktapur / DDC Ramechhap

Dec 2002-July 2003 8 0.70

61 Detailed Survey, Design and IEE of Mallaj-Lekhphat-Salija Road 15km. Parbat District DoR, Kaski May-July 2001 3 0.10

62 Detailed Feasibility Study of Channabhatti Gosaikunda Road Sindhupalanchok, 27km.

Sindhupalchowk District DoR, Planning Branch May-July 2001 2 0.11

63 Detailed Feasibility Study of Chitwan - Khurkure-Badhara- Thakur Bhyanjyang Chitwan-39km.

Chitwan District DoR, Planning Branch May-July 20012 0.11

64 Detailed Survey and Design of Saridobhan-Khanigaon (12 Km) Road,Access Road of Khare Khola Hydropower Project

Dolkha District BPC May-June 2005 3 0.15

65 Detailed Survey, Design, IEE and Construction Supervision of Chauri Khola to Galpa Vhanjyang Rural Road in Ramechhap District, 20 Km

Ramechhap District User's Group/DDC Ramechhap / Helvetas

Feb-Sept, 2003 30 1.20

66 Detailed Engineering Survey and Design of Chatra, Beltar, Gaighat Road in Udayapur District, 12 Km.

Udayapur District District Office Udayapur, (DOR) Jan-March, 1992 2 0.08

67 Detailed Engineering Survey and Design of Himali Chiya Bagan Setumadi Road, 9 Km.

Udayapur District Department of Road, Design Section

Jan-Feb, 1991 2 0.08

68 Detailed Engineering Survey and design of Gaighat Katari Road in Udayapur District 8 Km.

Udayapur District District Office Udayapur, (Department of Road)

Feb-July, 1990 2 0.09

69 Feasibility Study “Thori – Galchhi Road Project (182.40KM)” Parsa, Chitwan and Dhading Districts : Department of Roads (DoR), ACQ

14 Feb 2016 to07 June 2016 6 0.03

70 Feasibility Study of Deurali Vhanjyang Kavre to Galpa Vhanjyang Ramechhap in Kavre/Ramechhap District, 25 Km.

Ramechap District User's Group / DDC Ramechhap Jan 1997 2 0.09

Detailed Engineering Survey, DCP Test, Design of Road and Preparation of Detailed Project Report (DPR) of Roads with Dedicated Two Lane Standards of following Strategic Roads:1. Galchhi-Trishuli-Betrawati Road Section (35.516 Km).2. Betrawati-Mailung-Syaphrubesi Road Section (31.134 Km).

Dhading, Nuwakot and Rasuwa Districts PMEU/DOR

12/2/2015 to 27 June 2016

6 0.19

ERMC (P.) Ltd. 23

FS ES EIA

IEE

SI SES-

GIS

CPD

DED

BDT

SM CA TRN

Location DetailS.N. Project TitleValue of

Services NRs. (Million)

Work PhaseClient/ Finance Period Professional

(Months)

70 Feasibility Study and Detail Design for Construction of New Bridges and Maintenance of Existing Bridges

Nepal Road Sector Debvelopment Project (RSDP), DoR, Nepal

Feb 2015 to Aug 2015

150 100

71 Construction Supervision of Koshi Bridge-270 m (Chatara), Emergency FloodDamage Rehabilitation Project. (ADB Grant No 0150-NEP (SF).

Eastern Region of Nepal DOR, Project Directorate (ADB) Nov 2011 to Dec 2014

155 67.8

72 Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Package-34 (BP-661-DSD-34-068/69) (10 bridges), Patuwako Kulo Bridge, Rapti Khola Bridge, Daduwa Khola Bridge, Orahi Khola Bridge, Aurahi Khola Bridge, Pehari Khiola Bridge, Kusumbaghat Bridge, kiran Nala Bridge in Banke District.

Banke District DoR, Bridge Project May 2013 to July 2014

40 5.99

73 Construction Supervision, Quality Control and other Technical Support forMotorable Bridge over Man Nadi at Gaughat (96m long with RCC Deck Slaband Well Foundation)

Banke District DoLIDAR, Rural Road/Bridge Programme

July 2010 to December 2012

46 4.4

74 Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Package-6 (10 bridges), Krinsha Bridge, Pokli Khola Bridge and Likhu Khola Bridge in Okhaldhunga district; Mainabaathi Khola Bridge, Jharana Khola Bridge, Sorban Khola Bridge and Kataniya Nadi Bridge in Siraha District; Damari Khola Bridge, Thulo Baluwa Khola Bridge and Sano Baluwa Khola Bridge in Dhanusha District

Okhaldhunga, Siraha and Dhanusha District

DoR, Bridge Unit June 2009 to December 2009

40 4.53

75 Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Package-25 (9 bridges), Patharaiya Nadi Bridge and Dhangadi Campus Chatakpur Bridge Kailali; Mahakali Bridge Darchula; Kapadi Nadi Bridge, Kumreli Gad Bridge in Doti; Bhyagute Khola Bridge Bajhang; Barjugad Bridge, Thadokhola Bridge and Guigad Bridge in Bajura District

Kailali, Darchula, Doti, Bajhang and Bajura District

DoR, Bridge Unit June 2009 to December 2009

42 6.19

76 Detailed Survey, Design and Geotechnical Investigation of Bhadali Nala, Daulatpur, Bardiya District

Bardiya District DOLIDAR, Trail Bridge Section May-July 2010 4 0.504

77 Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Majhuwa Khola Bridge, Jhapa

Jhapa District DoR, Bridge Unit May-July 20104 0.44

78 Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Mariya Khola Bridge along Jalpapur-Bhutaha Road Sunsari (SMBCP-ES-01)

Sunsari District Sunsari Morang Bridge Construction Project, DOR

May-July 20095 0.27

79 Detailed Survey, Design and Geotechnical Investigation of Man Khola RCC Bridge (175 m), Bardiya District

Bardiya District DOLIDAR, Trail Bridge Section May-July 2009 4 0.517

80 Detailed Survey, Design and Geotechnical Investigation of Kampughat (120 m) in Khotang and Thaple-Bahune Danda (200 m) in Okhaldhunga District

Eastern Development Region

Suspension Bridge Division, Local Trail Bridge Programme, Pulchowk

March-July 0092 0.15

81 Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of (Thoppal Khola Bridge, Dhading

Dhading district DoR, Bridge Unit June-July 20082 0.15

9.1.2 Bridge (RCC, Truss & Supension)

ERMC (P.) Ltd. 24

FS ES EIA

IEE

SI SES-

GIS

CPD

DED

BDT

SM CA TRN

Location DetailS.N. Project TitleValue of

Services NRs. (Million)

Work PhaseClient/ Finance Period Professional

(Months)

82 Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of (8 bridges), Budhi Kulo along Badalpur – Rajapur Road – Bardiya, Budhi Kulo along Bhimapur Gohiwala Road – Bardiya, Khakraula Bridge Tikapur - Kailali, Thulighad Bridge along Sahajpur Deepayal Road, Banganga Bridge along Gorusinghe Thaulihawa Road at Ramghat, Kapilvastu, Kanchaniya Bridge along Hulaki Sadak, Bahadurganj – Kapilvastu, Bahuligadh Khola Bridge Khodpe – Bajhang and Mahawa Khola Bridgem, Brindaban Badgo Nawalparasi Road

Bardiya, Kailali, Kapilvastu, Bajhang and Nawalparasi District

DoR, Bridge Unit July 2007 to May 2008

25 3.82

83 Environmental Impact Assessment (EIA) of Aurahi Bridge and Gumnah Bridge in Mahendra Rajmarga, Bardiya

Bardiya District DOR/GESU Sept 2007 to Aug 2007 9 0.55

84 Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Tinau Motorable Bridge and Dui Muhan, Rupandehi

Rupandehi District DDC, Rupandehi May 2007 to July 2007 4 0.46

85 Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Benighat Bridge over Trishuli River, Dhading, Gorkha Distict

Dhading and Gorkha District

DRO, Bharatpur May 2007 to July 2007 4 0.46

86 Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Khageri Bridge over Khageri River Chitwan Distict

Chitwan District DRO, Bharatpur May 2007 to July 2007 4 0.44

87 Construction Supervision of Kharjyang Khola RCC Bridge in ArgakhanchiDistrict.

Argakhanchi District DOLIDAR, Trail Bridge Section June 2007 to Sept 2008

10 0.6

88 Hydrological Study and Study on Bed Aggradations of Lothar River Chitwan District DRO, Bharatpur March to July 2006 10 0.50

89 Feasibility Study, Detailed Survey, Design and Geotechnical Investigation of Kali Gandaki Motorable Suspension Bridge (40 m), Mustang

Mustang District DoR, Bridge Unit July to Dec 2006 5 0.50

90 Detailed Survey, Design and Geotechnical Investigation of Ghatte Khola RCC Bridge (30 m), Kaski

Kaski District DoR, Bridge Unit July 2006 to January 2007 3 0.30

91 Detailed Survey, Design and Cost Estimate of Budhi Shera Moterable RCC Bridge (40 m)

Nuwakot District DDC, Nuwakot June-Augst 20075 0.45

92 Detailed Engineering Survey, Soil Investigation and Detail Design Estimate of Chepeghat Dhumilikuwa Moterable Bridge

Lamjung District DDC, Lamjung June-Augst 2007 5 0.35

93 Detailed Survey, Design and Geotechnical Investigation of Sange Khola RCC Bridge (40 m), Tanahun

Tanahun District DOLIDAR, Trail Bridge Section April 2006 to August 2006

4 0.3

94 Detailed Survey, Design and Geotechnical Investigation of Kharjyang Khola RCC Bridge (40 m), Argakhanchi District

Argakhanchi District DOLIDAR, Trail Bridge Section April 2006 to August 2006

4 0.35

95 Detailed Engineering Survey, Soil Investigation and Detailed Design and CostEstimate of Kharibot Khola Bridge along Sarebangphedi - Machhi - Gaumukhi Road(18 m), Narikot Khola Bridge along Machhi - Gaumukhi Road (16 m), Balle KholaBridge along Damti - Bahane Road (18m), Phhelo Khola river Crossing along Marke -Rampur Road (16.5 m), Pani Khola River Crossing along Marke - Rampur Road (8.7m), Perchhetta Khola River Crossing along Bagbazar - Bagarkot Road (17.10 m),Ruwa Khola River Crossing along Bhatkanda - Rel Road (14.3 m)

Dadeldhura, Salyan and Pyuthan District

GTZ/RPN. Lalitpur March 2005-September 2005

5 0.5

96 Construction Supervision of Balle Khola Bridge-18m and Narikot Khola Bridge 16m, Kharibot Khola Vented Causeway-18m) in Pyuthan district

Pyuthan District GTZ/RPN-kfw May to Dec 2006 8 1.0

ERMC (P.) Ltd. 25

FS ES EIA

IEE

SI SES-

GIS

CPD

DED

BDT

SM CA TRN

Location DetailS.N. Project TitleValue of

Services NRs. (Million)

Work PhaseClient/ Finance Period Professional

(Months)

97 Survey, Design and Construction Supervision of Pilot Community Steel TrussBridge over Godawari Khola along Thaib - Godamchaur Road in Lalitpur(Package No: 3/con/Rural/062/063)

Lalitpur District DOLIDAR, Trail Bridge Section April 2006 to February 2009

10 0.726

98 Detailed Survey, Design and Investigation of Dwari Khola Bridge (23.5 m). Sunsari District DoR, Bridge Unit June to Dec 05 2 0.32

99 Feasibility Study of Timai Bridge (RCC) in Jhapa District Jhapa DoR, Bridge Unit July-Sep 2004 2 0.1

100 Survey Design and Soil Investigation of Local Trail Bridge EP-11-Siddhi Khola, Mayum (Gorkhe), Mayum in Ilam & Ragighat, Magmaya, Hatikharkha, Laguwa in Dhankuta

Ilam and Dhankuta District SBD/ LTBP 20034 0.27

101 Feasibility Study, Survey, Design and Soil Investigation of Local Trail Bridge in Ilam and Dhankuta District (EP-3).

Ilam and Dhankuta District SBD/ Helvetas 20034 0.22

102 Detailed Survey & Design of Nawa Khola Bridge (120m span). Panchthar District DDC Panchthar June-July 2003 1 0.07

103 Feasibility Study of Chabdi Khola RCC Bridge in Tanahun District and Banarawa RCC Bridge in Rupandehi District

Tanahu and Rupendehi District

DoR, Planning Branch, Babarmahal

June-July 2002 3 0.10

104 Detailed Survey, Design and Geotechnical Investigation of Bhuthaha Khola RCC Bridge. (75 m Span).

Sunsari District DoR, Biratnagar May-July 2001 2 0.20

105 Detailed Survey, Design and Geotechnical Investigation of Bhuthaha Khola RCC Bridge in Sunsari VDC. (75m Span).

Sunsari District DoR, Biratnagar May-July 2001 2 0.20

106 Detailed Feasibility Study of Modi Khola Bridges (30m), Fuser Khola Bridge (35m), Kali Bandai Bridge (150m) and Madi Nadi Bridge (65m)

Kaski, Syangja and Parbat District

DoR, Planning Branch May-July 2001 2 0.17

107 Detailed Survey, Design and Geotechnical Investigation of Sital Pati (120m span) and Jagat Suspension Bridge in Ramechhap District.

Ramechhap District Suspension Bridge Division, Local Trail Bridge Programme, Pulchowk

20022 0.19

108 Detailed Survey, Design and Geotechnical Investigation of Hoste Dovan-Kavre (240 m span), Tawa Khola (46m), Ranajor Khola (90m) Bridge and Hulaki Sangu in Ilam (35m) and Kawa Khola 35m and Charangawati Bridge

Ramechhap, Ilam, Bhojpur and Dolakha District.

Suspension Bridge Division, Local Trail Bridge Programme, Pulchowk

20006 0.40

109 Detailed Survey, Design and Geotechnical Investigation of Kali Gandaki bridges (120m span), Sunkoshi River at Khahareghat (90m), Naya Sangu in Gorkha (55m), Landrang at Lamjung

Tanahun and Myagdi District

Suspension Bridge Division, Local Trail Bridge Programme, Pulchok

Jan -June 20006 0.40

110 Detailed Survey and Design of Himganga (120m span), Chandikhola (46m), Betaulikhola (55m), Pumdung (35m) and Melamchi Khoa (70m) Bridge

Ramechhap, Sindhupalchowk and Kavre

Suspension Bridge Division, Local Trail Bridge Programme, Pulchok /

Feb-Sept, 20016 0.40

111 Construction Supervision Consultant for Pavement Improvement of Runway and Taxiway of TIA Project

Kathmandu, Nepal Civil Aviation Authority of Nepal/TIA

August 2016 to November 2020 210 72.80

112 Capacity Development of CAAN, Air Transport Capacity Enhancement Project [ADB Loan No 2581 and Grant No: 0181 Nepal (SF)]

Kathmandu, Nepal Civil Aviation Authority of Nepal/ADB

March 2012-December 2014 242 364.00

113Design and Construction Supervision Consultancy Services for Gautam Buddha Airport Upgrading Component (Loan no 2579 Grant No 0179 NEP (SF): South Asia Tourism Infrastructure Development Project-STAIDP)

Butawal Civil Aviation Authority of Nepal (CAAN)/ADB

September 2011-August 2015

129 114.5

114Detailed Engineering Survey and Design of Railway Line Butwal-Lamahi Section (115km) of Mechi-Mahakali Railway

Western Development Region of Nepal

Department of Railway, Rail, Metrorail and Monorail Development Projectt

July 2017 - September 2018

87 164.95

9.1.3 Airports

9.1.4 Railways and Metro

ERMC (P.) Ltd. 26

FS ES EIA

IEE

SI SES-

GIS

CPD

DED

BDT

SM CA TRN

Location DetailS.N. Project TitleValue of

Services NRs. (Million)

Work PhaseClient/ Finance Period Professional

(Months)

115Detailed Engineering Survey and Design of Electrified Railway Line for Sukhkhad-Gaddachowki Section (94km) of Mechi Mahakali Railway

Far Western Development Region

Department of Railway, Rail, Metrorail and Monorail Development Projectt

July 2017 - September 2018

134 134

116 Detail Survey and Design of Electrified Railway Line for Inaruwa Kakarbhitta Sector of Mechi-Mahakali Railway and Itahari-Biratnagar Link

Eastern Development Region of Nepal

Department of Railway, Rail, Metrorail and Monorail

August 2016 to November 2016 229 191

117 Feasibility Study of Mass Rapid Transit (Underground and Elevated Railway) System in Kathmandu Valley

Kathmandu, Nepal Department of Railway, Railway and Metro Development Project

February-December 2012

72 69.5

International Projects1 Environmental and Social Impact of the Isimba Hydropower Project on the

Kalagala Off Set AreaUganda Ministry of Energy and Mineral

Development/World BankMay 2016 tp December 2017 20 40.61

2 TA-8630 BHU: Promoting Clean Energy Development in Bhutan-F-002 Renewable/Master Plan (47275-001)

Bhutan Asian Development Bank June 2014-June 2016 66 131.28

3 Independent Engineer (Firm) for the Feasibility Study Phase of the ORIO Mini Hydro Power Project (10- Mini Hydro Power Sites)

Uganda Uganda Energy Credit Capitalisation Company

July 2015-July 2016 30.5 53.5

National Projects1 Feasibility and Environmental Study of Seti River - 6 (SR-6) Storage Project Nepal DoED May 2017 to

November 2019380

178.89

2 Feasibility and Environmental Impact Assessment Study of Sunkoshi 2 and 3 Hydropower Project

Nepal DoED May 2017 to November 2019

1103376.55

3 Feasibility Study and EIA Study of Karnali Stage-1 Hydropower Project Nepal DoED May 2016 to November 2018

828117.23

4 Feasibility Study and Environmental Impact Assessment of Naumure Multipurpose Project

Nepal DoED July 2016 to November 2018

80239.17

5 Detail Engineering Design and Environmental Impact Assessment including Social Impact Assessment of Budhi Ganga Hydropower Project (20MW)

Achham District, Nepal DoED / Kuwait Fund for Arab Economic Development (KFAED)

June 2015 to August 2016

76.5138.37

6 Feasibility and Initial Environmental Examination (IEE) Study of Lower Chameliya Hydropower Project (20 MW)

Nepal DoED April 2016 to September 2016

57 18.20

7 Pre-feasibility Study of Upper Jhimruk Storage Project Nepal DoED March 2015 to February 2017

6618.50

8 Environmental and Social Impact Assessment (ESIA) of Karnali (Chisapani) Multipurpose Project (10,000 MW);

Nepal DoED October 2015 to July 2016

5719.87

9 Feasibility Study and Initial Environmental Examination (IEE) Study of Pikhuwa Khola Hydropower Project (10 MW);

Nepal DoED July 2016 to January 2018

13919.63

10 Feasibility and Initial Environment Examination Study of Kawadi Khola Hydropower Project (10 MW

Nepal DoED July 2016 to March 2018 61.50 25.25

11 Feasibility Study and Initial Environmental Examination (IEE) Study of Chyadu Khola Hydropower Project (10 MW),

Nepal DoED July 2016 to November 2018

44.519.86

12 Feasibility and Initial Environment Examination Study of Nyaurigad Hydropower Project (10 MW

Nepal DoED July 2016 to March 2018

61.525.97

9.2 Hydropower and Energy

Note: FS : Feasibility Study, ES : Environmental Study, EIA : Environmental Impact Assessment, SI : Survey & Investigation, SES : Socioeconomic Study, CPD : Conceptual & Preliminary Design, DED : Detailed Engineering Design, BDT : Contract Packaging, Preparation of Bidding, Contract Document & Tendering, CA : Contract Administration & Construction Supervision, GIS: GIS Mapping, T: Trainings

ERMC (P.) Ltd. 27

FS ES EIA

IEE

SI SES-

GIS

CPD

DED

BDT

SM CA TRN

Location DetailS.N. Project TitleValue of

Services NRs. (Million)

Work PhaseClient/ Finance Period Professional

(Months)

13 Feasibility and Initial Environment Examination Study of Bheri Khola Hydropower Project (10 MW

Nepal DoED July 2016 to December 2018

43.7524.91

14 Detailed Engineering Design of SiwaKhola Small Hydropower Project (15 MW)

Taplejung District, Nepal DoED July 2015-July 2017

90 23.00

15 Detailed Engineering Design of Lower HonguKhola Small Hydropower Project (23.5 MW)

Solukhumbu District, Nepal DoED July 2015-July 2018

9023.00

16 Detailed Engineering Design of InkhuKhola Small Hydropower Project (20 MW)

Solukhumbu District, Nepal DoED July 2015-July 2019

90 23.00

17 Detailed Engineering Design of Budhi Ganga Khola Small Hydrpower (6.2 MW)

Bajura District, Nepal DoED July 2015-July 2017

79 21.61

18 Feasibility and IEE Study of Lungri Khola Hydropower Project (10MW) Rolpa District, Nepal DoED May 2015-November 2017

130 18.19

19 Feasibility Study and EIA of Simbuwa Khola Hydropower Project (53 MW) Taplejung District, Nepal DoED May 2015-November 2017

130 20.18

20 Preparation of Inspection Guidelines for Hydropower Plants, Substations & Transmission Lines

Nepal DoED April 2015-October 2015

51.75 10.91

21 Preparation of Powerhouse Design Guidelines of Hydropower Projects Nepal DoED April 2015-April 2017

62.6 11.65

22 Feasibility Study and Initial Environment Examination (IEE) Study of Myagdi Khola Hydropower Project, Myagdi District (32 MW)

Myagdi District DoED Oct 2014-April 2017

84.518.78

23 Feasibility Study and Environmental Impact Assessment (EIA) Study of Beni-Kaligandaki Hydropower Project (50MW)

Baglung, Parbat and Myagdi districts

DoED May 2014-Nov 2016

15419.87

24 Feasibility Study and Environment Impact Assessment (EIA) Study of Sankhuwa Khola-1 Hydropower Project (30 MW)

Sankhuwasawa District DoED Oct 2014-April 2017

6119.81

25 Feasibility Study and Environment Impact Assessment (EIA) Study of Sankhuwa Khola Hydropower Project (25 MW)

Sankhuwasawa and Bhojpur District

DoED Oct 2014-April 2017

69 19.94

26 Detail Survey of Sindabesi-Leknath 33 KV Transmission line form Mijuredanda to Lekhnath Substation, Kaski

Lekhnath, Kaski NEA Nov 2013-Jan 2013 0.57

27 Consulting Services on Design and Supervision of Rashuwagadi Hydroelectric Project (111 MW)

Rashuwagadi Rashuwagadi Hydropower Company Limited

Dec 2012-Dec 2016 454 600.00

28 Consulting Services on Design and Supervision of Sanjen (upper) (14.5 MW) and Sanjen Hydroelectric Projects (42.5)

Rasuwa Sanjen Jalvidhyut Company Limited

February 2013-Dec 2016 1190 430.00

29 Feasibility Study and Initial environmental Examination (IEE) Study of Iower Chepe Hydorpower Project, Lamjung & Gorkha Dictricts (15 MW)

Lamjung and Gorkha Districts

DoED July 2012 - Dec 2013 73 15.75

30 Detail Engineering Study of Maiwa Khola Hydropower Project (16 MW) Rolpa District DoED July 2012-Jan 2014 96 17.16

31 Feasibility Study and Initial environmental Examination (IEE) Study of Ikhuwa Khola Hydropower Project (30 MW)

Sankhuwasawa District DoED March 2012-Feb 2014 109 17.00

32 Preparation of Guidelines for Power System Optimization of Hydropower Projects

Nepal DoED April 2012- Feb 2014 56 8.90

33 National Survey of Energy Consumption and Supply Situation of Nepal Nepal WECS, Singa Durbar May 2012-July 2013 82 9.01

ERMC (P.) Ltd. 28

FS ES EIA

IEE

SI SES-

GIS

CPD

DED

BDT

SM CA TRN

Location DetailS.N. Project TitleValue of

Services NRs. (Million)

Work PhaseClient/ Finance Period Professional

(Months)

34 Land and Property Inventory Survey including Socio-economic Baseline Survey and SIA of Nalsing Gad Hydropower Storage Project – 410 MW, Jajarkot District

Nepal Nalsing Gad Hydropower Project Development Committee, Ministry of Energy

February-July 2013

160.45

35 ADB TA 7666-NEP, Energy Access and Efficiency Improvement Project II Nepal ADB, Manila June-Dec 2011 32 32.12

36 Detailed Design of Bheri-Babai Diversion Hydropower Project (48 MW) Banke District DOI May 2010 to July 2011 94 17.50

37 Initial Environment Examination (IEE) Study of Nepal Portion for 400 KV D/C Transmission System for Evacuation of Power from Arun-3 HEP Dhalkebar in Nepal

Nepal SJVN Ltd, India Jan 2011- July 2011 10 2.00

38 Detailed survey of Marshyangdi 132 Kv Transmission Line Corridor Project (75 km)

Lamjung and Manang District

NEA, Engineering Services, Project Development Department

Jan to June 2010 27 6.00

39 Detailed survey of Kaligandaki 132 Kv Transmission Line Corridor Project (170km)

Lamjung and Manang District

NEA, Engineering Services, Project Development Department

Jan to June 2010 9 2.05

40 Detail Survey & Design of Pathan Khola MHP Bhanbhave - 2, Badachaur Gulmi and Khurpa Khola MHP, Hadhade - 1 Dhanmyda.

Gulmi District User's Group/ AEPC Jan 2002 - March 2003 3 0.08

41 Feasibility Study, Detailed Survey and Design and Construction Supervision of the Chauri Khola Bokse Micro Hydropower (30 KW) project.

Kavrepalanchok District. User's Group/Local NGO's/ ADB Bokse, Kavre

200212 0.25

42 Feasibility Study & Detail Survey and Design of the Chauri Khola-Gunsi Micro-Hydropower & Project (40 KW).

Ramechhap District. VDC Gunsi Bhadaure, Ramechhap/ADB

2001 12 0.38

43 122 KV Transmission Line Topographical Survey from Hetauda to Barda Ghhat.

Makawanpur and Chitwan District

NEA soil Lab, Swayambhu Jan-March, 1998 6 0.39

44 Feasibility Study & Detail Survey and Design of the Rajamtar Micro hydro Project.

Ramechhap District. User's Group /ADB Nov - Dec, 2000 4 0.07

45 Inspection, Maintenance and Monitoring of the Built Structures of Tsho Rolpa GLOF Risk Reduction Project Area Site and Monitoring of MHP Power Plant.

Tsho Rolpa, Dolakha District.

DHM, Babarmahal Norvegien Fund

Nov 2004-July 2005 0.63

Note: FS : Feasibility Study, ES : Environmental Study, EIA : Environmental Impact Assessment, SI : Survey & Investigation, SES : Socioeconomic Study, CPD : Conceptual & Preliminary Design, DED : Detailed Engineering Design, BDT : Contract Packaging, Preparation of Bidding, Contract Document & Tendering, CA : Contract Administration & Construction Supervision, GIS: GIS Mapping, TRN: Trainings

ERMC (P.) Ltd. 29

FS ES EIA

IEE

SI SES-

GIS

CPD

DED

BDT

SM CA TRN

Location DetailS.N. Project TitleValue of

Services NRs. (Million)

Work PhaseClient/ Finance Period Professional

(Months)

1ADB TA-9171 NEP: Second Kathmandu Valley Water Supply Improvement Project Kathmandu, Nepal ADB

June 2017 to November 2017 15 4.60

2Design and Supervision Consultant (DSC-05): Kathmandu Valley Water Supply Improvement Project (Additional Financing) Loan No. 3255 Kathmandu, Nepal ADB Manila, EA-KUKL

January 2017 - August 2020 517

105.11

3Grant 0157-NEP, Second Small Towns Water Supply and Sanitation Sector Project (SSTWSSSP) Nepal DWSS, Panipokhari

July 2017 to November 2017 154

6.63

4Monitoring and Evaluation (M&E) for Batch X and XI Schemes, Central Region - Package 1 Central Region of Nepal RWSSFDB / World Bank / DFID

March 2017 to December 2018 126

19.35

5Monitoring and Evaluation (M&E) for Batch X and XI Schemes, Central Region - Package 2 Central Region of Nepal RWSSFDB / World Bank / DFID

March 2017 to December 2018 123

18.97

6CDA Baseline Study including Audio Visual Survey in sample basis of Batch X Schemes (RWSSIP/S/QCBS-020) Nepal RWSSFDB / World Bank

December 2016 to March 2017 18

3.81

7Monitoring and Evaluation of Batch IX Schemes, Central Region - Package 1

Central Region of Nepal RWSSFDB / World Bank / DFIDJune 2013 to

December 2014 32 2.80

8Monitoring and Evaluation of Batch IX Schemes, Central Region - Package 2

Central Region of Nepal RWSSFDB / World Bank / DFIDJune 2013 to

December 2014 37 3.10

9Resettlement Action Plan Survey (Part 2) for Preparatory Survey on Pokhara Water Supply Improvement Project in Nepal Kaski, Nepal NJS Consultants Co. Ltd.

August 2015 to December 2015 30 2.84

10TA 35173-012 NEP: Third Small Towns Water Supply and Sanitation Sector Project Nepal Asian Development Bank

September 2013-December 2014 79

17.00

11

Design and Supervision Consultant (DSC) for Feasibility Study and Planning, Detailed Design, Construction Management, Implementation Monitoring and Evaluation of Sukhad, Kailali, Musikot (Khalanga, Rukum and Sitalpati Salyan Town Water supply and Sanitation Project (Batch-II, Package 1), DWSS/ADBSecond Small Town Water Supply and Sanitation Project

Mid and Far Western Dev Regional

SSTWSSSP/ADB, Department of Water Supply and Sewerage, Panipokhari

Oct 2011 to December 2015

305 39.40

12

Project Management Consulting Services. Sewerage Construction, Road Improvement and Sewage and Treatment Plant Construction for Bagmati River

Kathmandu Valley High Power Committee for IDBC, Intigrated Development for Bagmati Civilization

January 2013 to December 2014 228 26.86

13

Feasibility Study, Detailed Engineering Survey, Detailed Design and Construction Supervision of Greater Ramechhap Drinking Water Supply Project

Ramechhap District SDC/ITECO Swiss February 2011-December 2012 31.25 16.35

14

Design and Supervision Consultant (DSC) for Feasibility Study and Planning, Detailed Design or Design Review, Construction Management, Implementation Monitoring and Evaluation of Narayan Municipality-Dailekh, Shiva Nagar-Kailali, Ghasi- Kanchanpur and Dashrath Nagar Municipality-Baitadi, DWSS/ADBSecond Small Town Water Supply and Sanitation Project

Far Western Dev Regional SSTWSSSP/ADB, Department of Water Supply and Sewerage, Panipokhari

May 2010 to March 2014

160 36.15

9.3 Water Supply, Sanitation and Urban Development9.3.1 Water Supply and Sanitation

ERMC (P.) Ltd. 30

FS ES EIA

IEE

SI SES-

GIS

CPD

DED

BDT

SM CA TRN

Location DetailS.N. Project TitleValue of

Services NRs. (Million)

Work PhaseClient/ Finance Period Professional

(Months)

15ADB TA-7936 NEP: Preparing the Kathmandu Valley Urban Environemnt Improvement Project

Kathmandu, Nepal ADB Manila, EA-KUKL March 2012 -Oct 2012 35 50.00

16

Project Management Consulting Services (Package-I). Sewerage Construction, Road Improvement and Sewage Treatment Plant Construction for Bagmati River

Kathmandu High Power Committee for IDBC, Intigrated Development for Bagmati Civilization

July 2010 to July 2012 100 23.05

17

Third Party Monitoring and Beneficiary Satisfacyion Survey of EPSP (Contract ID No: EPSP/S/CQS/33)

Eastern Nepal Ministry of Peace and Reconstruction, Emergency Peace support Project/World Bank

Spetember 2013-May 2014 9 3.90

18

Impact Evaluation of Employement/Self-Employement Services (ESES) EPSP (Contract ID No: EPSP/S/CQS/35)

Eastern Nepal Ministry of Peace and Reconstruction, Emergency Peace support Project/World Bank

Spetember 2013-May 2014 8 1.50

19 Technical, Operational and Environmental Audit of Batch-VII Schemes All over the country RWSSFDB/World Bank May-July 2012 10 4.70

20Long-Term Sustainability Study of Batch-III Schemes All over the country RWSSFDB/World Bank Nov 2011-Feb

2012 5 2.50

21

Consulting Services for Designing M&E/MIS System for RWSS sector in Ministry of Physical Planning and Works (MPPW) of the GON. (RFP 126, ICB.

Nepal MPPW/RWSSFDB/World Bank June to Dec 2009 50 49.42

22

Feasibility Study, Detailed Engineering Survey and Design of Small Town Water Supply and Sanitation Sector Project (Package-2, Mahendranagar Water Supply- Sunsari, Makarahar-Karaiya Water Supply-Rupandehi, Tamgas Water Supply-Gulmi and Sandikharka Water Supply in Argakhanchi District)

Eastern and Mid-Western Development Region of Nepal

STWSSSP/ADB, Department of Water Supply and Sewerage, Panipokhari

Jan 2008 to December 2008

65 8.00

23

Community Based Water Supply and Sanitation Project, Regional and District Level Monitoring Consultancy Services (Package 4) (ADB Loan No. 2008 NEP(SF)

Dailekh, Darchula, Dolpa and Salyan

CBWSSP, DWSS/ADB August 2006 to December 2010 163 17.00

24

Community Based Water Supply and Sanitation Project, Regional and District Level Monitoring Consultancy Services (Package 5) (ADB Loadn No. 2008 NEP(SF)

Dang, Gulmi, Kalikot, Mugu and Jumla

CBWSSP, DWSS/ADB August 2006 to December 2010 214 23.10

25

Monitoring and Evaluation of Batch V, VI and VII Schemes consisting of Compliance and Process Monitoring and Evaluation of Development and Implementation Phase Batch – VII and VIII Schemes, Development and Implementation Phases of Batch – VI Schemes & Development Phase of Batch – VII Schemes, Pre Feasibility Site Appraisal of Batch – VIII and IX Schemes Cycle, Finalization of Design Estimate as part of Implementation Phase Proposal of Batch – VIII Schemes (Package-III, Central)

Central Development Region

RWSSFDB/World Bank/ DFID Panipokhari

May 2009 to December 2010

100 6.00

ERMC (P.) Ltd. 31

FS ES EIA

IEE

SI SES-

GIS

CPD

DED

BDT

SM CA TRN

Location DetailS.N. Project TitleValue of

Services NRs. (Million)

Work PhaseClient/ Finance Period Professional

(Months)

26

Monitoring and Evaluation of Batch V, VI and VII Schemes consisting of Compliance and Process Monitoring and Evaluation of Development and Implementation Phase Batch – VII and VIII Schemes, Development and Implementation Phases of Batch – VI Schemes & Development Phase of Batch – VII Schemes, Pre Feasibility Site Appraisal of Batch – VIII and IX Schemes Cycle, Finalization of Design Estimate as part of Implementation Phase Proposal of Batch – VIII Schemes (Package-IV, Central)

Central Development Region

RWSSFDB/World Bank/ DFID Panipokhari

May 2009 to December 2010

95 5.80

27

Monitoring and Evaluation of Batch VII, VIII and IX Schemes consisting of Compliance and Process Monitoring and Evaluation of Implementation Phase Batch – V Schemes, Development and Implementation Phases of Batch – VI Schemes & Development Phase of Batch – VII Schemes, Pre Feasibility Site Appraisal of Batch – VII Schemes Cycle, Finalization of Design Estimate as part of Implementation Phase Proposal of Batch – VI Schemes and Construction Material Quality Spot Checking of Batch – VI Schemes (Package 2, Eastern Development Region)

Eastern Dev. Region RWSSFDB/World Bank/ DFID Panipokhari

November 2006 to May 2010

115 5.00

28

Monitoring and Evaluation of Batch V, VI and VII Schemes consisting of Compliance and Process Monitoring and Evaluation of Implementation Phase Batch – V Schemes, Development and Implementation Phases of Batch – VI Schemes & Development Phase of Batch – VII Schemes, Pre Feasibility Site Appraisal of Batch – VII Schemes Cycle, Finalization of Design Estimate as part of Implementation Phase Proposal of Batch – VI Schemes and Construction Material Quality Spot Checking of Batch – VI Schemes (Package 3, Central Development Region)

Central Dev. Region RWSSFDB/World Bank/ DFID Panipokhari

November 2006 to May 2010

170 9.00

29

Community Based Water Supply and Sanitation Project, Regional and District Level Monitoring Consultancy Services (Package 1) (ADB Loan No. 2008 NEP(SF)

Pyuthan, Kapilbastu, Dadeldhura and Baitadi District

CBWSSP, DWSS/ADB August 2006 to May 2010 163 20.00

30Technical, Operational and Environmental Audit of Batch-IV Schemes (103 schemes)

All over the country RWSSFDB/World Bank Feb-June 2007 40 2.00

31Training Need Assessment and Preparation of Trainings Material for Health worker Working in district Level.

All over the country NHTC/ MOPH May to August 2006 8 3.00

32 Health KAP Study of Batch-IV Schemes All over the country RWSSFDB/World Bank Feb-June 2006 4 0.70

33 Immediate Impact Study of Batch IV Schemes All over the country RWSSFDB/World Bank Feb-June 2006 4 0.80

34Design Estimate and Drawing Preparation of Water Supply and Sanitation Project and Micro-Irrigation Project in Jumla, Surkhet and Dailekh districts

Jumla, Surkhet and Dailekh districts

CECI, Nepal July 2005 to Sept 2006 2 0.14

35Preparation of National Guidelines for Rain Water Harvesting System of Nepal and Evaluation study of 24 RWHS schemes in 18 districts of Nepal.

All over the country Department of Water Supply and Sewerage, Panipokhari

March 2004-December 2004 30 0.70

36

Detailed Engineering Design and Construction Supervision of Small Town Water Supply and sanitation Sector Project (Package-3, Fikkal-Ilam and Trijuga-Udayapur)

Eastern Dev Region, Ilam & Udayapur District

Small Town Water Supply and Sanitation Sector Project, DWSS, Panipokhari / ADB

2001 - 200672 8.00

37

Detailed Engineering Survey Design and Construction Supervision of Small Town Water Supply and sanitation Sector Project (Package-11, Surunga-Jhapa, Bardibas-Mahottari and Kamalamai-Sindhuli)

Eastern Dev Regional, Jhapa, Mahottari & Sindhuli District.

STWSSSP/ADB, Department of Water Supply and Sewerage, Panipokhari

2002 - 2006192 19.00

ERMC (P.) Ltd. 32

FS ES EIA

IEE

SI SES-

GIS

CPD

DED

BDT

SM CA TRN

Location DetailS.N. Project TitleValue of

Services NRs. (Million)

Work PhaseClient/ Finance Period Professional

(Months)

38

Monitoring & Evaluation Consisting of Compliance and Process Monitoring and Evaluation of Batch IV and V Development and Implementation Phase Schemes and Finalisation of Design Estimate as a Part of Implementation Phase Proposalof Batch IV and V, Pre-feasibility Site Appraisal with Water Quality Testing of Batch – V and VI Schemes, Monitoring & Evaluation and Design Finalisation of Rehabilitation Schemes of Batch I, II and III of RWSSFDB, New (Support Organization) SO Assessment of Batch – V Schemes, Material Quality Spot Check of Batch – IV & V Schemes (Package 5)

Central, Eastern, Western, Mid and Far Western Development Regions of Nepal

RWSSFDB/World Bank/ DFID Panipokhari

January 2002 to September 2006

150 5.50

39

Compliance and Process and Performance Monitoring Study of Batch-III Development Phase Phase Water Supply Schemes (4 schemes of MCDC) in Khotang District

Eastern Dev. Region RWSSFDB/World Bank/ DFID Panipokhari

Sep-030.5 0.10

40

New SO Assessment (NGO Selection) for Batch-V (25 SOs and 50 Scheme) in Mid Western and Far Western Development Region (Humla, Jumla, Mugu, Baitadi, Darchula, Surkhet, Jajarkot, Kailali, Bardiya and Dang Districts)

Mid and Far Western Development Region

RWSSFDB/World Bank/ DFID Panipokhari

Dec 2003-March 2004 4 0.25

41 Material Quality Spot Check for approx. 58 SOs and 58 w/s schemes RWSSFDB Panipokhari Jan-Dec 2003 6 0.45

42Detailed Feasibility Study & Project Preparation Study of Rain Water Harvesting System in Nepal.

Eastern Central & Western Dev Region

DWSS, Panipokhari Jan - Dec, 20007 0.39

43

Detailed Engineering Survey, Design and Implementation of the Bhimsen Damar w/s Scheme, Phaparbari w/s Scheme, Bhairab danda w/s Schemes.

Central Development Region, Makawanpur District

RWSSFDB, PPUK Kavre / World Bank

Jan 2000 - June 2001 9 0.28

44

Detailed Engineering Survey, Design and Implementation of the Serabensi w/s scheme in Baluwa VDC, Tamaghat w/s Schemes in Panchkhal VDC and Madan Kundari w/s Scheme in Madan Kundari VDC.

Central Dev Region, Kavrepalanchowk District

RWSSFDB & Paropokar Prathamic Upchar Kendra (PPUK) Kavre / World Bank

Jan 2000 - June 2001 18 0.45

45

Detail Engineering Survey, Design and Implementation for Chhatiwan w/s Scheme and Hatti Sunde w/s scheme in Makawanpur District

Central Development Region, Kavrepalanckowk District

RWSSFDB/ PPUK Kavre Jan 2000 - June 2001 14 0.38

46Detail Engineering Survey, Design and Implementation for Lekh Nath w/s Seceme in Armala w/s Schemes and Kisti-Ekhate w/s Scheme.

Western Development Region, Kaski District.

RWSSFDB/ NWEEHA Kathmandu Jan 1998 - June 2000 14 0.35

47Prefeasibility Study of 5 w/s Scheme in Ramechhap District, 15 w/s Scheme in Kavreplanchok District & 5 w/s scheme.

Makawanpur District RWSS/ PPUK/RSDAN 2000 18 0.35

48Prefeasibility Study of 5 w/s Scheme in Ramechhap District, 15 w/s Scheme in Kavreplanchok District & 5 w/s scheme.

Makawanpur District RWSS/ PPUK/RSDAN 2000 3 0.23

49

Detail Engineering Survey, Design and Implementation for the Chukha Bensi w/s Scheme in Sarsyun Kharka VDC Salyani w/s scheme in Thulo Parsel VDC Dhulkhu-8 w/s scheme in Dhulkhu VDC.

Central Development Region in Kavrepalanchowk District

RWSSBFD/ RSDAN Jan 1998 - Dec. 1999 18 0.50

50Detail Engineering Survey, Design and Implementation for Kumal w/s Scheme and Pakuwal w/s Schemes.

Kavrepalanchowk District RWSSBFD/ RSDAN Jan 1998 - Aug 1999 9 0.15

51

Detail Engineering Survey, Design and Implementation for Saping w/s Scheme in Saping VDC, Dud Gaun w/s Scheme in Chaubas VDC, Kavre w/s Scheme in Chaubas VDC, Dhusini w/s Scheme in Sivalaya VDC, Sano Banthali w/s and Scheme in Simthali w/s Scheme.

Central Development Region in Kavrepalanchowk District

RWSSFDB/ PPUK Dec 1997 - Jan 2000 18 0.58

ERMC (P.) Ltd. 33

FS ES EIA

IEE

SI SES-

GIS

CPD

DED

BDT

SM CA TRN

Location DetailS.N. Project TitleValue of

Services NRs. (Million)

Work PhaseClient/ Finance Period Professional

(Months)

52

Detail Engineering Survey, Design and Implementation for Nepta w/s Scheme in Vekhsimle VDC, Godam Chauur w/s Scheme in Sanu Bnthali VDC, Jogitar w/s Scheme in Goth Pani VDC, Kodka w/s Scheme in Chaubas VDC.

Central Development Region in Kavrepalanchowk District

RWSSFDB/ PPUK Dec 1996 - Jan 1998

18 0.58

53

Detail engineering survey, design and implementation for the following w/s scheme in Kavreplanchok district Kuwal w/s scheme in Sarmthli VDC Bokse w/s scheme in Kattike Deurali VDC Upallo Kattike w/s scheme in Kattike Deurali VDC Gothpani w/s scheme

Central Development Region in Kavrepalanchowk District

Janatako Khane Pani Ra Sarasphai Karyakram (JJAKPASS), PPUK

Jan 1995 - Feb 1997 18 0.58

54

Preparation of Detailed Design and Cost Estimate and Constuction Supervision of Tharu Tole, Chamare Tole and Musari Tole Ground Water Supply and Sanitation Schemes

Chandraniyapur, Rautahad District

OMNI Development Society 1994 - 19973 0.21

55Preparation of Detailed Design and Cost Estimate and Constuction Supervision of Daman - Palung Water Supply and Sanitation Project

Daman VDC, Makawanpur OMNI Development Society 1999 - 20013 2.35

56Preparation of Detailed Design and Cost Estimate and Constuction Supervision of Tahali and Bishnu Tole Water Supply and Sanitation Scheme

Bhimeswor Municipality, Dolkha

OMNI Development Society 1999 - 20013 2.65

57Preparation of Detailed Design and Cost Estimate and Constuction Supervision of Ratanput Water Supply and Sanitation Scheme

Ratnapur VDC, Bara OMNI Development Society 2003 - 2005 3 2.75

58

Preparation of Detailed Design and Cost Estimate and Constuction Supervision of Dhanewa Ground Water Supply Scheme in Jahaba VDC Nawalparasi District

Nawalparasi District Ecology Service Center, Chitwan July 2004 to Feb 2005 2 0.20

59Detailed Feasibility Study of Sewerage Project in Ramgram Municipality Kapilbastu District TDF/Ramgram Municipality Sept 2007-June

2008 8 0.50

60Detailed Study & Design and Implementation of Low Cost Storm Water Drainage in Sirsiya VDC.

Central Development Region, Parsa District.

SAFE Nepal/IDA Jan 2002 - July 2003 9 0.65

61

Detailed Feasibility Study of Sewerage Project in Bayarghari Bazar Sewerage Project Bazar area, Darsing Daharhum, Syangja; Bensi Sahar Sewerage Project Ward No. 1, 2, 3, 4 and 9, Bensi Sahar, Lamjung; Janakpur Sewerage Project Municipality Area, Janakpur;

Syangja, Dhanusha, Lamjung, siraha and Nuwakot

DWSS, Panipokhari November 2006 to August 2007 10 0.90

62Detailed Feasibility Study of Sewerage Project in Kamalamai Sindhuli, Manthali Ramechhap and Balkot Bhaktapur

Sindhuli, Ramechap and Bhaktapur

DWSS, Panipokhari March 2004-July 2004 25 0.50

63Kathmandu Valley Waste Water Management Project Loan No. 3000, Contract No. CASSC02 Kathmandu, Nepal KUKL, PID / ADB

May 2017 - May 2020 716 100.24

64 Design and Supervision Consultant (DSC-04): Kathmandu Valley Wastewater Management Project; ADB Loan 3000 NP Kathmandu, Nepal ADB Manila, EA-KUKL

February 2014-Sptember 2018 660 320

65ADB TA 7597-NEP: Capacity Development for Waste Management Nepal ADB Manila, EA-SWMRMC June 2011 to

September 2012 36 40.00

66 Environmental Impact Assessment of Tobudole Landfill Site at Bhaktapur Municipality

Bhaktapur Municipality, Bhaktapur District

Bhaktapur Municipality 2004 to 2005 4 0.20

67Preparation of National Environmental Impact Assessment (EIA) Guideline for Solid Waste Management of Municipilities of Nepal

Nepal SWM&RMC Jan 2003-Dec 2004 6 0.60

Note: FS : Feasibility Study, ES : Environmental Study, EIA : Environmental Impact Assessment, SI : Survey & Investigation, SES : Socioeconomic Study, CPD : Conceptual & Preliminary Design, DED : Detailed Engineering Design, BDT : Contract Packaging, Preparation of Bidding, Contract Document & Tendering, CA : Contract Administration & Construction Supervision, GIS: GIS Mapping, TRN: Trainings

9.3.2 Waste Water and Solid Waste Management

ERMC (P.) Ltd. 34

FS ES EIA

IEE

SI SES-

GIS

CPD

DED

BDT

SM CA TRN

Location DetailS.N. Project TitleValue of

Services NRs. (Million)

Work PhaseClient/ Finance Period Professional

(Months)

68Construction Supervision of Birendranagar Bus Park in Birendranagar Municipality

Birendranagar Municipality, Surkhet

Birendranagar Municipality / TDF April 2016 to December 2016

161.7

69Construction Supervision of Tulsipur Bus Park and Shopping Stalls (K3SL-022-CS/K3G-010-CS) Tulsipur Municipality, Dang

Tulsipur Municipality, Dang / TDF June 2017 - December 2018 16 1.7

70Project Support Consultant: Pro-Poor Urban Regeneration Pilot Project (PURPP)

Kathmandu, Nepal Lalitpur Sub-Metroplitan City/World Bank

March 2016 to October 2017 126 21.97

71Project Management, Detailed Design and Supervision of Lumbini Clean Public Transport Project

Lumbini, Kapilbastu Ministry of Culture, Tourism and Civil Aviation, Lumbini

April 2015 to September 2016 11 15.7

72Project Management Support Consultants of Integrated Urban Development Project (IUDP), ADB Loan No. 2851 / Grant: 0284-NEP

Janakpur, Dharan and Nepalgunj Municipality, DUDBC, IUDP, PCO / ADB

March 2013 to June 2017 316 91.20

73

Project Management Consulting Services for Secondary Towns Integrated Urban Environment Improvement Project, ADB Loan: 2650 NEP (SF)/STIUEIP

Kathmandu, Kavre Valley, Butwal, Biratnagar and Birgunj Municipalities

STIUEIP, PCO/DUDBC, ADB June 2011 to December 2015 316 82.31

74South Asia Tourism Infrastructure Development Project, Lumbini Development Trust Component

Lumbini, Kapilbastu ADB Loan No 2579- NEP Feburary 2012 to June 20 15 119.5 42.99

75Infrastructure Development in Palpa and Dharan, Town Development Fund (TDF)

Palpa and Dharan World Bank January 2012 to June 2013 17 19.40

76Preparation of Long Term Development Plan of Panchkhal Valley Kavre, Panchkhal

MunicipalityDUDBC February 2011-

July 2011 15 2.99

77

Study of Urban System Comprising of Municipilities/Small Towns/Market Centers in the five Development Regions of Nepal for the establishment of "One City One Identity".

All five Regions of Nepal DUDBC May 2011 to August 2011 4 0.53

78ADB TA 77727-NEP: Preparing the Integrated Urban Developmetn Project Nepal ADB Manila, EA-DUDBC February 2011-

July 2011 21.5 50.00

79

Implementation and Supervision Work for Land Pooling and Service Track in Chovar-Satungal Sector of Outer Ring Road

Kirtipur Area, Kathmandu DoUDBC, Outer Ring Road Development Project

February 2009-February 2010 55 6.00

80

Land Development, Land Pooling and Planning of Outer Ring Road (10500 ropani), Package-1 (Bhatedhikuro to Thali/Danchi, Bhaktapur)

Kathmandu, Lalitpur and Bhaktapur

DoUDBC, Outer Ring Road Development Project

April 2007 to October 2007 62 10.00

81Urban Land Development-Land Pooling at Ratmate Area (100ha) Kamalamai Municapility,

SindhuliDoUDBC, UEIP/ADB Jan 2007 to

March 2009 25 2.60

82Kamerotar Landpooling Project (1500 ha.) Madhyapur Thimi Mun.

Bhaktapur DistrictKVTDC, Anam Nagar Jan. 2003 - Feb.

2004 6 0.50

83Land Development, Land Pooling and Planning of Outer Ring Road (1000 ropani), Package-1

Lalitpur District DoUDBC, Outer Ring Road Development Project

April -Dec 2006 6 0.60

84Land Development, Land Pooling and Planning of Outer Ring Road (1000 ropani), Package-2

Lalitpur District DoUDBC, Outer Ring Road Development Project

April -Dec 20066 0.60

85Land Development, Land Pooling and Planning of Outer Ring Road (1000 ropani), Package-3

Lalitpur District DoUDBC, Outer Ring Road Development Project

April -Dec 20066 0.60

86Land Development, Land Pooling and Planning of Outer Ring Road (1000 ropani), Package-4

Lalitpur District DoUDBC, Outer Ring Road Development Project

April -Dec 20066 0.60

9.3.3 Urban Planning and Urban Infrastructure Development

ERMC (P.) Ltd. 35

FS ES EIA

IEE

SI SES-

GIS

CPD

DED

BDT

SM CA TRN

Location DetailS.N. Project TitleValue of

Services NRs. (Million)

Work PhaseClient/ Finance Period Professional

(Months)

87Land Development, Land Pooling and Planning of Outer Ring Road (1000 ropani), Package-5

Lalitpur District DoUDBC, Outer Ring Road Development Project

April -Dec 20066 0.60

88Architecture Designing, Planning, Structural Designing and Estimating of Manohara Khola Wholesale Market Area

Bhaktapur/ Kathmandu Agri Business Propmotion Centre, MoA

March-April 20062 0.15

89 Master Plan of Muktinath Area of Mustang District Mustang district DDC, Mustang 2006 5 0.50

90Preparation of Physical Development Plan of Bishnu Budhanilkantha, Imadol and Katunje VDC in Kathmandu Valley

Kathmandu, Lalitpur and Bhaktapur

DoUDBC, KVTDC May-July 2010 6 0.51

91Integrated Local Development Project Preparation of 4 VDCs (Gothatar, Imadole, Ichangu Narayan and Goldhunga VDC)

Kathmandu, Lalitpur and Bhaktapur

DoUDBC, KVTDC April 2006 to July 2006 6 0.30

92 Pre-feasibility Study of Industrial Infrastructure or SEZ in Jumla Jumla District SEZ Project, MOI July-Oct 009 8 0.85

93Detailed Engineering Design, IEE and Construction Supervision of UEIP of Kamalamai Municipality

Kamalamai Municapilities, Sindhuli

DoUDBC, UEIP/ADB Jan 2007 to September 2010 25 2.60

94Architecture Designing, Planning, Structural Designing and Estimating of Manohara Khola Wholesale Market Area

Bhaktapur/ Kathmandu Agri Business Propmotion Centre, MoA

March-April 2006 2 0.15

95

Consulting Services for (RBB-CS-03-073/74) A/E Design and Supervision of Thapathali and Basantpur Branch Office Buildings of Rastriya Banijya Bank Ltd.

Kathmandu, Nepal Rastriya Banijya Bank Ltd. July 2017 to September 2019

147 1.48

96

Consulting Services for (RBB-CS-01-073/74) A/E Design and Supervision of Pokhara and Lahan Branch Office Buildings of Rastriya Banijya Bank Ltd.

Pokhara and Siraha Districts of Nepal

Rastriya Banijya Bank Ltd. July 2017 to September 2019

147 1.52

97Urban Governance and Infrastructure Improvement Project II (UGIIP-II) Contract No. UGIIP/DUDBC/S/QCBS-3

5 Municipalities of Mid Terai of Nepal

DUDBC, UGIIP-II August 2017 to March 2018 347 52.87

98Urban Governance and Infrastructure Improvement Project II (UGIIP-II) Contract No. UGIIP/DUDBC/S/QCBS-4

4 Municipalities of Western Nepal

DUDBC, UGIIP-II August 2017 to March 2018 341 51.41

99Preparation of Master Plan of Seven Selected Destinations in Each of 7 Federal State Including Preparation of DPR of Cultural Museum in each state

All Federal States of Nepal Ministry of Culture, Tourism and Civil Aviation

May 2017 to October 2017 36.5 4.80

100Design and Construction Supervision of School Reconstruction (EEAP / MOE / PIU / DSC - 1)

All over Nepal EEAP, CLPIU - MOUD / ADB November 2016 - December 2018 1172 232.09

101

Nepal India Regional Trade and Transportation Project (NIRTTP)Rehabilitation of Bhairahawa Pavement Works and Construction of SteelTruss Shed at Birgunj ICD; Contract No: NIRTTP/PCO/NITDB/S/QCBS-16

Birgunj, Nepal Government of Nepal (GoN), Ministry of Infrastructure & Transport, Department of Roads, Nepal

July 2014 to December 2015

144 21.25

102Rehabilitation of Bhairahawa Pavement Works and Construction of Steel Truss Shed at Birgunj ICD; Contract No: NIRTTP/PCO/NITDB/S/QCBS-16

Tanahu District Project Dev Department, NEA Feb- July 20105 0.97

103Architecture Designing, Planning, Structural Designing and Estimating of National Trading Building Complex at Pokhara

Pokhara, Kaski District NTL Kathmandu Dec. 2003 - May -2004 2 0.50

104Detailed Design and Construction Supervision of Jaya Santosi Ma chalachitra Mandir

Sankhusawa District Jaya Santosi Ma Chalachitra Mandir, Argakhanchi

200015 0.38

105Detailed Design and Construction Supervision of Prativa Primary School Kavrepalanchowk District Love Green Nepal ( LGN), Kavre

Branch1999 9 0.12

9.3.4 Building and Architect

ERMC (P.) Ltd. 36

FS ES EIA

IEE

SI SES-

GIS

CPD

DED

BDT

SM CA TRN

Location DetailS.N. Project TitleValue of

Services NRs. (Million)

Work PhaseClient/ Finance Period Professional

(Months)

106Detailed Design and Construction Supervision of Jhigana Devi Primary School

Kavrepalanchowk District Jhigana Devi Primary School, Panchkhal/LGN Kavre

1999 9 0.13

107Detailed Design and Construction Supervision of Golden Future Primary School

Kavrepalanchowk District Golden Future Primary School, Panchkhal/ & LGN Kavre

1999 9 0.12

108

Detailed Design and Construction Supervision of Jagannath Santi Kunja, Deu Ghat

Tanahu District Jagganath Santi Kunja, Deu Ghat Tanahu, Head Office: Tangal, Kathandu

199918 1.50

109Detailed Design and Construction Supervision of Jorpati Lower Secondary School

Kavrepalanchowk District Jorpati Lower Secondary School, Panchkhal VDC & LGN Kavre.

19987 0.12

110

Detailed Design and Construction Supervision of Samundra Mana Education Trust (now Kathmandu Medica College, K. U. ) Gahana Pokhari

Kathmandu District Samundra Mana Education Trust Gahana Pokhari, Kathmandu

19947 0.12

111Detailed Design and Construction Supervision of Radha Krishna Devsthan Byabasta Samitee in Tangal, Kathmandu

Kathmandu District Radha Krishna Devsthan Byabasta Samitee, Tangal

19942 0.18

112Detailed Design and Construction Supervision of Dhuskun Primary School Sindhupalachowk District Dhuskun Primary School,

Sindhupalchok1994

7 0.13

113Detailed Design and Construction Supervision of Ganesh Lower Secondary School

Kavrepalanchowk District Ganesh Lower Secondary School, Panchkhal

19936 0.09

114Various (at least 300) private residential buildings in Kathamndu, Vhaktapur and Lalitpur Municipalites at least more than 50 building

Kathmandu Many private Clients in various parts of the city

1998-2004 0.80

Note: FS : Feasibility Study, ES : Environmental Study, EIA : Environmental Impact Assessment, SI : Survey & Investigation, SES : Socioeconomic Study, CPD : Conceptual & Preliminary Design, DED : Detailed Engineering Design, BDT : Contract Packaging, Preparation of Bidding, Contract Document & Tendering, CA : Contract Administration & Construction Supervision, GIS: GIS Mapping, TRN: Trainings

ERMC (P.) Ltd. 37

FS ES EIA

IEE

SI SES-

GIS

CPD

DED

BDT

SM CA TRN

Location DetailS.N. Project TitleValue of

Services NRs. (Million)

Work PhaseClient/ Finance Period Professional

(Months)

1

Detailed Engineering Survey, Design and Cost Estimate for the Rehabilitation of Banganga Irrigation System (6350 ha) (Package Number: BIMD/072-73/CS-1)

Kapilbastu, Nepal Department of Irrigation June 2016 to May 2017 15 2.77

2Detailed Planning, Engineering Design of Branch Canals and Command Area Development of Dunduwa Irrigation System

Nepalgunj, Banke District DOI, Sikta Irrigation Project September 2016 to February 2018 283 20.45

3Design and Supervision of Hydromechanical Works of Headworks of Sikta Irrigation Project

Banke district DOI, Sikta Irrigation Project November 2013 to October 2017 202 20.46

4

Construction Supervision, Quality control and Contract Management of Civil Works in Main Canal Ch 15+00 to Ch 35+000 km of Sikta Irrigation Project

Banke district DOI, Sikta Irrigation Project May 2012 to January 2015 128 19.98

5Bheri-Babai Irrigation Project (Lidar Survey, Preparation of Ortho-Photo- 85000 ha and Detailed Engineering Design of Irrigation Project-46000 ha)

Banke district DOIMWRID August 2010-Nov 2011 107.4 51.20

6Irrigation Infrastructure Development and Improvement, IWRMP Nepal DOI, IWRMP/World Bank 2010-2014

526 100.00

7Construction Supervision of Main Canal Ch 0+614 to Ch 15+000 km of Sikta Irrigation Project

Banke district DOI, Sikta Irrigation Project Dec 2009 to March 2013 96 19.92

8Project Preparation Study, TA No. 7229-NEP Community Irrigation Project Nepal ADB Manila, EA-DOI August 2009 to

June 2010 41.4 50.78

9Initial Environmental Examination (IEE) Study of Rani Jamara Kulariya Irrigation Project, Kailali

Kailali District FWRID, DOI July 2009 to December 2009

15 1

10Preparation of Approach Manual and Implementation Guidelines for Small Irrigation Project

Nepal DoLIDAR July-December 2009 15 1.10

11

Remaining Command Area Development Works, i. Supervision and Quality Control of Construction Works, ii. Detailed System Planning, Design, Drawing, Verification and Estimate of Command Area (6300 ha) Development, Protection and Other Related Works and Review of the Completed Detailed Design of CAD, 10302 ha. iii. Detailed Planning, Design, Drawings and Estimate of Silt Ejectors and other related Works iv. Preparation of Parcellary Maps of Irrigated Areas for 24600 ha v. Project Management in Project Related Activities.

Rautahat and Sarlahi District

DOI, Bagmati Irrigation Project/Saudi for Development (SFD) Loan No 5/465

2008-2013

303 26.42

12

Community – Managed Irrigated Agriculture Sector Project (Package No. B), Feasibility Study and Subproject Implementation Plan of � Kali Koshi No. 1 Paini (203 ha), Sunsari District� Lohandra Dataram Paini Irrigation Sub Projects (200 ha), Morang District � Sapta Kohi Irrigation Sub Project (300 a), Sunsari District� Bhulke Irrigation Sub Projects (212 ha), Sunsari District

Morang and Sunsari District

CMAISP / Regional Irrigation Directorate (RPSU), Biratnagar

November 2007 to May 2008

15 1.33

13Detailed Survey and Design of Basti Khola and Bet Khola Irrigation Project in Dang, 300 ha.

Dang District DIO, Surkhet 2000 5 0.25

14Design Estimate and Drawing Preparation of Micro-Irrigation Project in Jumla, Surkhet and Dailekh Districts

Jumla, Surkhet and Dailekh districts

CECI, Nepal July 2005 to Sept 2005 2 0.14

9.4.1 Irrigation9.4 Water Resource, Irrigation and Natural Resources Management

ERMC (P.) Ltd. 38

FS ES EIA

IEE

SI SES-

GIS

CPD

DED

BDT

SM CA TRN

Location DetailS.N. Project TitleValue of

Services NRs. (Million)

Work PhaseClient/ Finance Period Professional

(Months)

15

Detailed Survey and Design of the following Irrigation Project Jogimara Irrigation Project in Dhading District, 90 ha parabetar Irrigation project in Dhading, 70 ha Majhitar Irrigation Project in Dhanding, 1340 Ha Pathahan Irrigation Project in Chitwan

Dhading & Chitwan District Irrigation Sector Project. 1992

6 0.75

16

Assessment Study of the following different Project in Bara, Chitawan and Dhading District Bhagawanpur Irrigation Project Gumdi Irrigation Project Jutpani Irrigation Project, Thalahi Irrigation Project, Kirkichauraha Irrigation Project, Umajan Irrigation

Bara, Chitwan and Dhading District

Irrigation Sector Project 1991

5 0.84

17Feasibility Study of Banlekh Irrigation Project, Lana Kedareshwor Irrigation Project and Lada Gad Irrigation Project.

Kapilbastu District Feasibility Study Project, DOI, Maharajganj

1990 1 0.07

18 Socio-economic Bench Mark Survey of Rajapur Island Rehabilitation Project. Bardiya District DOI/ADB 1990 3 0.56

19Detail Survey and Design of Bhumahi Irrigation Project in Nawalparasi District, 1000 ha

Nawalparasi District Feasibility Study Project, DOI 1990 2 0.13

20Detailed Survey and Design of Baragadahi Kawasoti Irrigation Project in Nawalparasi District, 700 ha

Nawalparasi District Feasibility Study Project, DOI Maharajang

1990 2 0.11

21Detailed Survey and Design of Janakpur Pipar Irrigation Project in Nawalparasi District, 400 ha

Nawalparasi District District Irrigation Office, Nawalparasi

1990 2 0.17

22

Consultancy Services for Technical Assistance for Project for Agriculture Commercialization and Trade (RFP No.: PACT-39-SBC-CF-PACT-AF/S/QCBS/40/2013)

All over Nepal Project for Agricultural Commercialization and Trade (PACT) Credit / Grant No: 5180-NEP/H813-NP

November 2016 - July 2018 958 201.31

23Baseline Survey of PACT districts (Contract ID PACT/12/2010) Central and Western

Region of NepalPSCT/World Bank July-Oct 2011 8 7.27

24 Updating and Upgrading Water Resources Information System and Assessment of Basin/Sub-Basin Water Availibiliyy (IWRMP/World Bank)

Mid and Far Western Development Region

WECS, Singa Durbar March 2012-Feb 2013 94 9.70

25 Master Plan Study for Tinau Integrated Development Works Rupandehi District WIDP, Division No. 5, Bhairahawa, Rupandehi

March to Dec 2009 18 2.26

26 Detailed Studies for the Preparation of River Training Master Plan of Riu River

Chitwan DWIDP, Pulchowk June-Dec 2008 10 1.30

27 Water Use Master Plan (WUMP) Preparation of Humla District Humla District, Karnali RVWRMP, Helvetas/Finnida April to Nov 2008 9 2.60

28 Preparation of Station Inventory with Cross-Section Survey of Narayani Basin Narayani Basin DHM Babarmahal March-July 2008 7 0.50

29 Environmental Impact Assessment (EIA) on Extraction of Gravel, Sand andBoulder from Rapti River, Musot Khola, Gwar Khola and Patu Khola in DangDistrict

Dang District DDC Dang Nov 2007 to June 2008

7 0.3

30 Multi Dimensional Study of the Bagmati River Basin Bagmati Basin Area WECS, Singa Durbar July 06 to Dec 08 82 4.30

31 Preparation of Water Induced Hazard Map of Rangoon River Mahakali River Basin DWIDP, Pulchowk April to July 2006 10 0.60

32 Preparation of Water Induced Hazard Map of Tinau River Basin Tinau River Basin DWIDP, Pulchowk March to July 10 0.64

33 Preparation of Water Induced Hazard Map of Kankai River Basin Kankai River Basin DWIDP, Pulchowk March to July 2006

9 0.54

9.4.3 River Basin Planning and Development

9.4.2 Agriculture

ERMC (P.) Ltd. 39

FS ES EIA

IEE

SI SES-

GIS

CPD

DED

BDT

SM CA TRN

Location DetailS.N. Project TitleValue of

Services NRs. (Million)

Work PhaseClient/ Finance Period Professional

(Months)

34 Evaluation Study of the Effectiveness of Model River Training and Sabo Works carried out by DWIDP in Girubari Khola, Nawalparasi

Nawalparasi District DWIDP, Pulchowk April to July 2006 7 0.40

35 Study and Investigation Survey of Lothar Khola River Basin and Adjoining Rivulets for Water Induced Disaster

Chitwan and Nawalparasi district

DWIDP, Pulchowk April to July 200610 0.60

36 Development of GIS Database from Existing District Water Use Inventory Studies

Nepal WECS, Singa Durbar April 2006 to July 2006 7 0.60

37 GIS Based Study of River System in Terai from Bara to Chitwan Districts Bara, Parsa and Chitwan districts

DWIDP, Pulchowk June 2005 -January 2006 12 0.32

38 GIS Based Study of River System in Terai from Dhanusa to Rautahat Districts Dhanusha to Rautahat District

DWIDP, Pulchowk June 2005 -January 2006 12 0.36

39 Digitization Radiosonde Data of Kathmandu 1977 - 1979 Kathmandu DHM, Babarmahal Nov 2004-July 2005 3 0.1

40 Digitization Synoptic Report of Kathmandu Airport 1973 - 1977 Kathmandu DHM, Babarmahal November 2004-July 2005 3 0.1

41 Extraction and Digitization of Autographic Chart of Kathmandu Airport 1988-1992

Kathmandu DHM, Babarmahal Nov 2003-July 2004 2 0.25

42 Fog Epedic Study of Kathmandu Valley Kathmandu DHM, Babarmahal July, 2003 1 0.25

43 Extraction and Digitization of Autographic Chart of Kathmandu Airport 1993-1999

Kathmandu DHM, Babarmahal Nov 03-July 04 1 0.25

44 Preparation of Water Induced Hazard Map of Bagmati River Bagmati River Basin DWIDP, Pulchowk June 2005 - January 2006 24 1.30

45 Preparation of Water Induced Hazard Map of Kamala River Kamala River Basin DWIDP, Pulchowk June 2005 - January 2006 24 1.20

46 Legal, Policy and Institutional Structure for Integrated Water Resources Management in River Basin Context

Nepal WECS, singa Durbar March-July 2005 12 0.60

47 Preliminary Study of Boarders Rivers in Nepal, (Package-4)-Dhedu Nadi, Amuwa Nadi, Thute Nadi, Odar Nadi, Shakharibas Nadi, Dhuthaha Nadi, Gad Nadi, Tilawe Nadi and Sirsiya Nadi in Parsa district.

Central Development Region, Parsa District.

DWIDP, Pulchowk Feb-June, 20025 0.16

48 Preliminary Study of Boarders Rivers in Nepal, (Package-3)- Singha Nadi, Bhutiya Nadi, Kadiya Nadi, Aruwa River, Jamune River and Bangi River.

Central Development Region, Bara District.

DWIDP, Pulchowk Feb-June, 20025 0.16

49 Preliminary Study of Boarders Rivers in Nepal, (Package-5)- Arra Nadi, Surkhi River, chakrihawa Nadi, Surang Khola, Sotwa Nala, Jamuhar River, Muse Nala and Sisawa Nala.

Central Development Region, Nawalparasi District.

DWIDP, Pulchowk Feb-June, 20025 0.16

50 Detailed Topographical Survey and Landscaping and River Training of Jagganath Santi Kunja, Deu Ghat.

Tanahu District Jagganath Santi Kunja, Deu Ghat Tanahu

1997 6 0.45

51 Determination of Flood Warning and Danger Level of Seti River in Flood Forecasting Stations

Kaski, Pokhara Practical Action South Asia November 2013 -February 2014 5 1.00

52 Conducting Kosi River Cross- Section Survey, Hazard Map Preparation, Embankment Breach Analysis, soil Sampling and Analysis (Package 1), (Emergency flood Damage Rehabilitation Project (EFDRP), Part E Institutional Strengthening of DWIDP for disaster risk Reduction)

Eastern Development Region

DWIDP, EFDRP/ Asian Development Bank

Feb -May 2012

16 7.60

9.4.4 Flood Forecasting and Early Warning and Management

ERMC (P.) Ltd. 40

FS ES EIA

IEE

SI SES-

GIS

CPD

DED

BDT

SM CA TRN

Location DetailS.N. Project TitleValue of

Services NRs. (Million)

Work PhaseClient/ Finance Period Professional

(Months)

53 Conducting Koshi River Flood Forecasting and Early Warning System(Package 2), Emergency Flood Damage Rehabitation Project (EFDRP), Part E Institutional Strengthening of DWIDP for disaster risk reduction

Eastern Development Region

DWIDP, EFDRP/ Asian Development Bank

Feb-May 2012

6.5 1.56

54 Discharge Measurement at all Gauging Station of FFP Major River Basin of Nepal DHM Babarmahal February 2011- June 2011 3 0.47

56 Discharge Measurement at all Gauging Station of FFP Major River Basin of Nepal DHM Babarmahal Jan to June 2010 3 0.50

55 Determination of Flood Danger Level in Flood Forecasting Stations in Karnali riverat Chisapani and Rapti River at Rajaiya

Karnali and Rapti river Basin

DHM Babarmahal February 2011- June 2011 9 0.78

57 Determination of Flood Danger Level in Flood Forecasting Stations in of Koshi River

Eastern River DHM Babarmahal Jan to June 20109 0.88

58 Preparation of Water Induced Hazard Map of East Rapti River Basin Chitwan and Makawanpur DWIDP, Pulchowk Oct 09 to Jun 2010 10 0.80

59 Development of Flood Forecasting Model for Narayani Basin Western Nepal DHM Babarmahal May-July 2009 3 0.27

61 Determination of Flood Danger Level in Flood Forecasting Stations in Narayani and Rapti Basin

Western Nepal DHM Babarmahal March to July 2009 9 0.85

60 Discharge Measurement at all Gauging Station of FFP Nepal DHM Babarmahal March to July 2009 3 0.65

62 Updating Hydrometer Station Calibratio under FFP. Nepal DHM Babarmahal March-July 2008 2 0.10

63 Detailed Studies for the Preparation of River Training Master Plan of Narayani River

Narayani Basin, Chitwan DWIDP, Pulchowk July 06 - March 07 25 2.00

64 Discharge Measurement at all Gauging Station of FFP Nepal DHM Babarmahal Nov 2005-April 2006 3 0.30

66 Discharge Measurement at all Gauging Station of FFP Nepal DHM Babarmahal Jan-May 2006 3 0.14

65 Preparation of Flood Hazard Map of Nepal Nepal DHM Babarmahal Jan-May 2006 3 0.42

67 Preparation of Flood Mitigation Plan for Rangoon Khola, Deldhura Dadeldhura District RTP, DOI, Jawalakhel 2001 5 0.16

68 Image Processing for Glacier of Nepal Himalayan Region DHM Babarmahal June-July 2009 3 0.30

69 Initial Environmental Examination of Rupataal Dam Construction Project Lekhnath Municipality, Pokhara, Kaski

Lekhnath Municipality July 2008 to January 2009 4 0.30

70 Water Resources Study of Rupatal, Pokhara Lekhnath Municipality, Pokhara, Kaski

Lekhnath Municipality July 2008 to January 2009 5 0.50

71 Inspection, Maintenance and Monitoring of the Built Structures of Tsho Rolpa GLOF Risk Reduction Project Area Site and Monitoring of MHP Power Plant.

Tsho Rolpa, Dolakha District.

DHM, Babarmahal Norvegien Fund

November 2004-July 2005 0.63

72 Topographical and Byathematic Survey of Bhairabkunda and Gosaikunda Lakes in Sindhupalchowk districts

Sindhupalchowk District DHM, Babarmahal May-July 2004 3 0.30

73 Glacier Out-burst Study, Topographical and Byathematic Survey of Surrounding Area of Tsho-Rolpa Glacier Lakes.

Tsho Rolpa, Dolakha District.

DHM, Babarmahal Norvegien Fund

April-July, 2003 3 0.40

9.4.5 Natural Resources Management

ERMC (P.) Ltd. 41

FS ES EIA

IEE

SI SES-

GIS

CPD

DED

BDT

SM CA TRN

Location DetailS.N. Project TitleValue of

Services NRs. (Million)

Work PhaseClient/ Finance Period Professional

(Months)

74 Building Resilience of Watersheds in Mountain Eco-Regions Project (ADB Grant 0357-NEP)

Far Western Development Region of Nepal

Department of Soil Conservation and Watershed Management (DSCWM)/ADB

August 2014-July 2019 679 266.00

75 PPCR-Building Resilience to Climate Related Hazards (Loan/Credit/Grant No. TF013557/TF013665) Contract No. PPCR/DHM/S/FBS-11

Nepal Department of Hydrology and Metereology, Kathmandu, Nepal/World Bank

June 2014-May 2018 27.99 210.00

1 Preparation of VDC Level land resources maps (Present Land Use Map, Soil Map, Land Capability Map, Detail Land Use Zoning Map, VDC Profile for Land Use Zoning and Superimpose of Cadastral Layers), database and reports for six VDCs of Kailali District, (Package : 19)

Kailali District, Nepal National Land Use Project, Ministry of Land Reform and Management

December 2015 to March 2016

8.70

2 Preparation of VDC Level land resources maps (Present Land Use Map, Soil Map, Land Capability Map, Detail Land Use Zoning Map, VDC Profile for Land Use Zoning and Superimpose of Cadastral Layers), database and reports for six VDCs of Palpa District, National Land Use Project

Palpa District, Nepal National Land Use Project, Ministry of Land Reform and Management

April 2015-July 2015

7.40

3 Digitization and Preparation of Geodatabase of Cadastral Maps of Kapilbastu, Dang, Surkhet and Kanchanpur Districts (Khanda Gha).

Mid and Far Western Nepal

Department of Land Information and Archiv

Jan-Nov 2012 40 9.00

4 Preparation of VDC Level Present Land Use Map, Soil Map, Land Capability Map, Detail Land Use Zoning Map, VDC Profile for Land Use Zoning and Superimpose of Cadastral Layers for Jutpani, Piple and Shaktikhor VDCs of Chitwan Districts, National Land Use Project

Chitwan, Nepal National Land Use Project, DOS December-April 2012

100

9.99

5 Preparation of Existing digital Land Use Map of 12 VDCs of Kathmandu Valley

Kathmandu Valley KVTDC, Anam Nagar May-July 2011 6 0.63

6 Preparation of VDC Level Present Land Use Map, Soil Map, Land Capability Map, Detail Land Use Zoning Map, VDC Profile for Land Use Zoning and Superimpose of Cadastral Layers for Chainpur, Khairahani, Kathar, Birendranagar and Bhandara VDC of Chitawan District, National Land Use Project

Chitwan, Nepal Land Use Zoning, DOS May-July 2011 100

9.99

7 Digitization and Preparation of Geodatabase of Cadastral Maps of Banke, Surkhet, Kailali-Tikapur and Dhangadi and Bardia Districts

Mid and Far Western Nepal

Department of Land Information and Record

April-July 2011 15 6.47

8 District Level Land Use Map Updating, Preparation of District Level Land Use Zoning Maps, Preparation of GIS Database and Preparation of District Profile for Land Use Zoning (25 Districts)

Nepal Land Use Zoning, DOS January-July 2010

12017.50

9 Digitization and Preparation of Geodatabase of Cadastral Maps of Chabahil and Kaski Napi Office

Nepal Department of Land Information and Record

January-June 2010

15 4.60

10 Preparation of Proposed GLD Road on Cadastral Map in Ten Urbanizing VDC's of Kathmandu

Kathmandu KVTDC May-July 2010 6 0.63

11 District Level Land Use Map Updating, Preparation of District Level Land Use Zoning Maps, Preparation of GIS Database and Preparation of District Profile for Land Use Zoning (7 Districts)

Nepal Land Use Zoning, DOS May-July 2009 304.80

12 Preparation of Digital Base Map of Trijuga Municipality (3300 ha) Trijuga Municipality, Udayapur

DUDBC April to July 2008 6 0.80

13 Updating Industrial Schemes and Preparation of Software Kathmandu Ministry of Industry June-July 2008 4 0.20

9.5 Mapping

9.4.6 Climate Change Adaptation

ERMC (P.) Ltd. 42

FS ES EIA

IEE

SI SES-

GIS

CPD

DED

BDT

SM CA TRN

Location DetailS.N. Project TitleValue of

Services NRs. (Million)

Work PhaseClient/ Finance Period Professional

(Months)

14 GIS based Poverty and Social Mapping of in CLDP Districts (Package 1) Banke, Bardiya, Kailali, Kanchanpur, Doti, Dadeldhura, Baitadi, Achham, Darchula and Bajang Districts

Mid and Far Western Development Region

MOA, CLDP-ADB Loa n No. 2071-NEP (SF)

April 2006 to July 2006 3 0.60

15 GIS based Poverty and Social Mapping of in CLDP Districts (Package 2) Surkhet, Dailekh, Jajarkot, Rukum, Salyan, Pyuthan, Rolpa, Humla, Jumla and Mugu Districts

Mid and Far Western Development Region

MOA, CLDP-ADB Loa n No. 2071-NEP (SF)

April 2006 to July 2006 3 0.60

16 GIS based Poverty and Social Mapping of in CLDP Districts (Package 3) Nawalparasi, Tanahun, Lamjung, Palpa, Arghakhanchhi, Gulmi and Baglung Districts

Mid and Far Western Development Region

MOA, CLDP-ADB Loa n No. 2071-NEP (SF)

April 2006 to July 2006 3 0.60

17 GIS Mapping of Agricultural Resources and Potential Pocket areas in CDP Districts

Far Western Development Region

MOA, CDP-ADB Loa n No. 1778-NEP (SF)

April 2006 to July 2006 3 0.40

18 Development of GIS Database from Existing District Water Use Inventory Studies

Eastern Nepal WECS, Singa Durbar April 2006 to July 2006 7 0.60

19 Preparation and Supply of Urban Map for Kamalamai Municipality, Sindhuli Kamalamai Municapility, Sindhuli

UEIP/DUDBC/ADB Jan 2007 to July 2008

18 1.37

20 Preparation and Supply of Urban Map for Dhulikhel Municipality, Kavre Dhulikhel Municapility, Kavre

UEIP/DUDBC/ADB March 2007 to July 2008

12 0.77

21 Preparation and Supply of Urban Map for Bidur Municipality, Nuwakot Bidur Municapility, Nuwakot

UEIP/DUDBC/ADB May 2007 to July 2008

14 0.96

22 Mapping and Planning Services for Zone - II for Leasehold Forestry and Livestock Programme including Sindhupalchowk, Lamjung, Pyuthan, Salyan, Baitadi, Dadeldhura, Doti and Achham Districts

Sindhupalchowk, Lamjung, Pyuthan, Salyan, Baitadi, Dadeldhura, Doti and Achham Districts

Leasehold Forestry and Livestock Programme

May 2007 to February 2008

66

3.30

23 Preparation of District Environment Brief (DEB) of Dailekh District. Dailekh District RAP/RCIW (DFID/GTZ) and DDC Dailekh

2003-2004 3 0.20

24 Preparation of District Environment (DEB) of Achham District. Achham District RAP/RCIW (DFID/GTZ) and DDC Achham

2003-2004 3 0.30

Note: FS : Feasibility Study, ES : Environmental Study, EIA : Environmental Impact Assessment, SI : Survey & Investigation, SES : Socioeconomic Study, CPD : Conceptual & Preliminary Design, DED : Detailed Engineering Design, BDT : Contract Packaging, Preparation of Bidding, Contract Document & Tendering, CA : Contract Administration & Construction Supervision, GIS: GIS Mapping, TRN: Trainings

ERMC (P.) Ltd. 43

FS ES EIA

IEE

SI SES-

GIS

CPD

DED

BDT

SM CA TRN

Location DetailS.N. Project TitleValue of

Services NRs. (Million)

Work PhaseClient/ Finance Period Professional

(Months)

1 Feasibility Study for Poverty Alleviation Projects in Provinces 6 & 7 Province 6 and 7 of Nepal Poverty Alleviation Fund, GoN October 2016 to February 2017 71 5.90

2 Skills Development Project Grant 0345-NEP: Third Party Monitoring Firm for Package Number No: SDP/CS/08-070/71

Nepal Council for Technical Education & Vocational Training (CTEVT)

May 2015 to April 2018 201 16.33

3 Training on Community Action Planning / Health, Hygine and Sanitation including Conflict Management Training to CWs and CTs of Batch-IX New Sos(Package 2)

Dhulikhel (Central Development Region)

RWSSFDB/ IDA/ WB July 2012 to August 2012 6 2.20

4 Training on Water and Sanitation Scheme Design and construction supervision for Technical Supervisor (Ten Days)

Butwal, Nepal RWSSFDB/World Bank/ DFID Panipokhari

April-May 2012 5 1.00

5 Training on CAP/HHS including Conflict Management for Community Workers (CW) and Community Technician (CT), Batch-IX, 17 days (4 Groups), Package3.

Hetauda and Dhulikhel RWSSFDB/World Bank/ DFID Panipokhari

November-December 2011 8 3.50

6 Basic Foreman Plumbing Training for Batch VIII-Package-3 (RFP 139) Western Development Region

RWSSFDB/World Bank/ DFID Panipokhari

March-May 2011 12 1.90

7 Ferrocement Tank Training to CT for Batch VIII-Package-2 (RFP 140) Central Development Region

RWSSFDB/World Bank/ DFID Panipokhari

March-May 2011 12 1.30

8 Training on CAP/HHS including Conflict Management for Community Workers (CW) and Community Technician (CT), Batch-VIII, 17 days (4 Groups).

Bardibas and Pathalaiya RWSSFDB/World Bank/ DFID Panipokhari

September to October 2009 8 3.10

9 Training on CAP/HHS including Conflict Management for Community Workers (CW) and Community Technician (CT), Batch-VII, 17 days (4 Groups).

Nepalgunj RWSSFDB/World Bank/ DFID Panipokhari

Septemberto October 2007 8 1.80

10 Basic Foreman Plumbing Training for Batch VII-Package-2 (RFP 128) Central Development Region

RWSSFDB/World Bank/ DFID Panipokhari

June-July 2009 12 1.90

11 Conduction of GIS Trainings to Municipal Staff (7 days) Dhulikhel Municaplity, Kavre Dhulikhel Municipality, UEIP/ADB Jul-08 2 0.20

12 Conduction of GIS Trainings to Municipal Staff (7 days) Bidhur Municaplity, Nuwakot Dhulikhel Municipality, UEIP/ADB Jul-08 2 0.20

13 Conduction of GIS Trainings to Municipal Staff (7 days) Kamalamai Municaplity, Kavre Kamalamai Municaplity, UEIP/ADB Jul-08 2 0.20

14 Conduction of GIS Trainings to Municipal Staff (7 days) Trijuga Municaplity, Udayapur Trijuga Municipality, UEIP/ADB Jul-08 2 0.15

15 Basic Marketing Development Training to Project Partners, [ADB Grant No. 0063- NEP (SF)] (7 days training, 4 groups with 25 participants each)

Eastern Development Region

MOA, CADP-[ADB Grant No. 0063-NEP (SF)]

June-July 20083 3.60

16 Land Development and GPS Survey Trainings ( 7 days Trainings for 17 Participants)

Kathmandu DoUDBC, Outer Ring Road Development Project

March-June 2008 3 0.10

17 Basic Induction Training on Implementation of Small Scale Irrigation Schemes for JT/JTA (2 groups of 25 participants-35 days)

Far Western Development Region

MOA, CDP-ADB Loa n No. 1778-NEP (SF)

Dec 2005 to May 2006 3 0.80

18 JT/JTA Level Skill Development Trainings (1 groups of 25 participants-90 days)

Far Western Development Region

MOA, CDP-ADB Loa n No. 1778-NEP (SF)

April 2006 to July 2006 3 1.00

19 Farmers Level Skill Development Trainings (2 groups, 25 participants-30 days)

Far Western Development Region

MOA, CDP-ADB Loa n No. 1778-NEP (SF)

April 2006 to July 2006 3 1.40

20 Trainings on GIS based Poverty and Social Mapping of in CLDP Districts Mid and Far Western Development Region

MOA, CLDP-ADB Loa n No. 2071-NEP (SF)

April 2006 to July 2006 3 0.60

21 Trainings on GIS Mapping of Agricultural Resources and Potential Pocket Areas in CDP Districts

Far Western Development Region

MOA, CDP-ADB Loa n No. 1778-NEP (SF)

April 2006 to July 2006 3 0.40

9.6 Human Resource Management and Capacity Building

ERMC (P.) Ltd. 44

FS ES EIA

IEE

SI SES-

GIS

CPD

DED

BDT

SM CA TRN

Location DetailS.N. Project TitleValue of

Services NRs. (Million)

Work PhaseClient/ Finance Period Professional

(Months)

22 (a) Training Program on CAP/HHS including Conflict Management for TL, SS and Field Coordinator (FC), Batch VI, (7 days), 1 Groups (b) Training on CAP/HHS including Conflict Management for Community Workers (CW) and Community Technician (CT), Batch-VI, 17 days (4 Groups).

Nepalgunj RWSSFDB/World Bank/ DFID Panipokhari

September to December 2006 4 1.80

23 (a) Training Program on CAP/HHS including Conflict Management for TL, SS and Field Coordinator (FC), Batch V, (7 days), 2 Groups (b) CAP/HHS Refresher Training Program on CAP/HHS including Conflict Management for TL, FC/SS Batch-V (3 days for old staff), 2 Groups. (c) Training on CAP/HHS including Conflict Management for Community Workers (CW) and Community Technician (CT), Batch-V, 17 days (2 Groups).

Pokhara and Kathmandu RWSSFDB/World Bank/ DFID Panipokhari

July -August 2004

4 1.5

24 CAP, Health, Hygiene and Sanitation Including Conflict Management Training to CWs and CTs of SOs Staff for Batch – VII (2 Groups)

Nepalgunj RWSSFDB/World Bank/DFID Panipokhari

Sept - Nov 2007 3 1.09

25 Training Need Assessment and Preparation of Trainings Material for Health Worker Working in district Level.

All over the country NHTC/ MOPH May to August 2006 8 3.00

26 Ferrocement Tank Construction Trainings on Community Technician of Batch-V SOS, RWSSFDB.

Mid and Far Western Development Region

RWSSFDB/World Bank/ DFID Panipokhari

Dec 2005 to March 2006 3 0.72

27 Training Program on Rural Water Supply Scheme Design and Supervision for TS Batch-V, (10 days)

Kathmandu RWSSFDB/World Bank/ DFID Panipokhari

Sep-04 2 0.50

28 Refresher Training Program on Basic Health and Sanitation Education and CAP for Community Workers, Batch IV- 3 days (2 Groups)

Itahari and Nepalgunj RWSSFDB/World Bank/ DFID Panipokhari

Dec-04 1 0.50

29 SA Orientation on PF Site Appraisal, Batch V- 3 days (3 Groups) Kathmandu and Nepalgunj RWSSFDB/World Bank June-Aug 2005 1 0.50

30 Training Program on General Municipal Institutional Strengthening and Support for Revenue Mobilization for 8 UEIP Municipalities (Construction Management Trainings-1, Human Resources Management Training-16, Financial Management Training-16, Municipal Urban Development Training-8, Total 41 Trainings)

Bharatpur, Ratnanagar, Dhulikhel, Sindhuli, Kathmandu, Banepa, Panauti, Bidur and Nuwakot

DoUDBC, UEIP/ADB Jan 2007 to September 2008

16 6.60

31 Land Development Trainings in UEIP towns (5 days at Kathmandu and 2 days in each Municipality)

Kathmandu, Banepa, Panauti, Bidur and Nuwakot

DoUDBC, UEIP/ADB March 2006 to Sept 2007 6 0.80

Note: FS : Feasibility Study, ES : Environmental Study, EIA : Environmental Impact Assessment, SI : Survey & Investigation, SES : Socioeconomic Study, CPD : Conceptual & Preliminary Design, DED : Detailed Engineering Design, BDT : Contract Packaging, Preparation of Bidding, Contract Document & Tendering, CA : Contract Administration & Construction Supervision, GIS: GIS Mapping, TRN: Trainings