8manullitins002 grand entrance arch installation (rev 2) · packages. add-ons include foam wall...

25
8MANULLITINS002 GRAND ENTRANCE ARCH INSTALLATION 0 Equipment Manual 8MANULLITINS002 GRAND ENTRANCE ARCH INSTALLATION MOTOR CITY WASH WORKS, INC. | 48285 FRANK STREET | WIXOM, MICHIGAN 48393

Upload: others

Post on 24-Jun-2020

12 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 8MANULLITINS002 Grand Entrance Arch Installation (Rev 2) · packages. Add-ons include foam wall assembly and led lights to illuminate and light the foam wall. INSTALLATION TOOLS AND

8MANULLITINS002 GRAND ENTRANCE ARCH INSTALLATION 0

Equipment Manual

8MANULLITINS002 GRAND

ENTRANCE ARCH

INSTALLATION

MOTOR CITY WASH WORKS, INC. | 48285 FRANK STREET | WIXOM, MICHIGAN 48393

Page 2: 8MANULLITINS002 Grand Entrance Arch Installation (Rev 2) · packages. Add-ons include foam wall assembly and led lights to illuminate and light the foam wall. INSTALLATION TOOLS AND

Equipment Manual

3/30/2020

8MANULLITINS002 GRAND ENTRANCE ARCH INSTALLATION 1

TABLE OF CONTENTS

Introduction .................................................................................................................................................. 1

Installation Tools and Materials Needed ..................................................................................................... 1

Notes & Safety Symbols .............................................................................................................................. 2

Equipment Requirements and Specifications ............................................................................................ 2

Electrical Requirements (Back lit sign) + (Light Kit)............................................................................... 2

Equipment Dimensions ................................................................................................................................ 2

Operating Envelope of Equipment ......................................................................................................... 3

Pre-Installation Procedures ......................................................................................................................... 4

Unloading& Uncrating ................................................................................................................................. 4

Installation Procedures ................................................................................................................................ 5

Erection .................................................................................................................................................... 5

Lag & Leveling .......................................................................................................................................... 7

Water manifold Assembly ....................................................................................................................... 8

wall washer Assembly ............................................................................................................................ 11

Warranty and Return Policy ...................................................................................................................... 24

INTRODUCTION

Grand Entrance Arches & Extra. Revenue. Service. arches are white powder coated aluminum beams with a

three-piece design. Fastened to the arch is a front panel sign that showcases the car wash’s name or a featured

product available in the wash tunnel. This sign may also display driver instructions and as well as car wash

packages. Add-ons include foam wall assembly and led lights to illuminate and light the foam wall.

INSTALLATION TOOLS AND MATERIALS NEEDED

€ 1 : Socket set / Wrench

€ 2 : Allen wrench set

€ 3 : Teflon tape

€ 4 : Utility knife

€ 5 : Tape measure

€ 6 : Level

€ 7 : Hammer drill

€ 8 : Concrete drill bit 1/2”

€ 9 : Hammer

€ 10 : Screwdriver set

€ 11 : Wire stripper

€ 12 : Multi-meter

Page 3: 8MANULLITINS002 Grand Entrance Arch Installation (Rev 2) · packages. Add-ons include foam wall assembly and led lights to illuminate and light the foam wall. INSTALLATION TOOLS AND

8MANULLITINS002 GRAND ENTRANCE ARCH INSTALLATION 2

NOTES & SAFETY SYMBOLS

Where necessary, important points will be highlighted in this manual using the following symbols:

NOTE: Provides further information and details.

STOP! Precaution to take to avoid equipment malfunction or error.

WARNING! Dangerous situation which may cause equipment damage, personal injuries or fatalities.

Check Box: Utilize the Check Box to stay organized with completion of important procedures.

Always follow all notes, warnings and instructions. Failure to do so may have serious consequences on the

overall performance of the equipment and/or safety of the people working on the equipment.

EQUIPMENT REQUIREMENTS AND SPECIFICATIONS

ELECTRICAL REQUIREMENTS (BACK LIT SIGN) + (LIGHT KIT)

120VAC, 7AMPS

EQUIPMENT DIMENSIONS

The figures below are typical overall grand entrance arch dimensions with signs affixed to them and it accounts for the

space required for the foam wall assembly and light kit. This would be an expected operating envelope.

HEIGHT WIDTH DEPTH VEHICLE CLEARANCE

139” Max. 168” Max. 22” Max. 90” Max.

Page 4: 8MANULLITINS002 Grand Entrance Arch Installation (Rev 2) · packages. Add-ons include foam wall assembly and led lights to illuminate and light the foam wall. INSTALLATION TOOLS AND

Equipment Manual

3/30/2020

8MANULLITINS002 GRAND ENTRANCE ARCH INSTALLATION 3

OPERATING ENVELOPE OF EQUIPMENT

Picture #01: Arch Bay Width

Picture #02: Arch Bay Width

168” MAX

139” MAX

22” MAX

90” MAX

VEHICLE

CLEARANCE

Page 5: 8MANULLITINS002 Grand Entrance Arch Installation (Rev 2) · packages. Add-ons include foam wall assembly and led lights to illuminate and light the foam wall. INSTALLATION TOOLS AND

Equipment Manual

3/30/2020

8MANULLITINS002 GRAND ENTRANCE ARCH INSTALLATION 4

PRE-INSTALLATION PROCEDURES

Are you ready to install your new equipment? Check these steps beforehand to make sure you are prepared.

Ensure there is space for the equipment by measuring the available area and compare it to the

operating envelope.

Understand the equipment by studying this manual. Take note of the utilities that must be run to the

equipment in order for the equipment to function properly.

Gather all your tools and necessary hardware to complete the installation.

UNLOADING& UNCRATING

Upon receiving your MCWW Equipment, open all boxes and crates; verify that you have all of the required

components and that there is no damage to the equipment. Also, verify that you have all of your installation

materials.

NOTE: Please communicate to your Motor City Wash Works representative for any damage to your equipment.

Remove packaging material covering your equipment and bring into the wash bay where it will be

installed. Verify that the area is sufficiently large enough for the operating envelope.

Be extra cautious not to damage the sign during this step of removing the equipment from the

packaging.

Page 6: 8MANULLITINS002 Grand Entrance Arch Installation (Rev 2) · packages. Add-ons include foam wall assembly and led lights to illuminate and light the foam wall. INSTALLATION TOOLS AND

Equipment Manual

3/30/2020

8MANULLITINS002 GRAND ENTRANCE ARCH INSTALLATION 5

INSTALLATION PROCEDURES

ERECTION

The arch beam consists of two main parts. Those parts consist of the main head sign assembly (see picture

below) and the arch legs.

Picture #03: Assembling the Arch

Positions one leg assembly, sign face down onto wood boards like shown above. Then position the

main head assembly crossbeam (see picture #3) in line with the leg arch.

Slide the main cross beam mount into the leg arch. With the 3/8-16X1” bolts and 3/8” lock washer

(supplied) tighten the arch legs and the cross beam.

Confirm the two sign faces are edges are meeting perfectly. If not, loosen the fasteners holding the

angle brackets mounted in the back of the leg sign light box and adjust the position of the box to meet

with the head assembly

P/S ARCH LEG

MAIN HEAD

WOOD BOARDS

Page 7: 8MANULLITINS002 Grand Entrance Arch Installation (Rev 2) · packages. Add-ons include foam wall assembly and led lights to illuminate and light the foam wall. INSTALLATION TOOLS AND

Equipment Manual

3/30/2020

8MANULLITINS002 GRAND ENTRANCE ARCH INSTALLATION 6

Picture #04: Aligment of the two Light Boxes

Picture #05: Loosen the Mounts Picture #06: Adjust the Mounts

LEG SIGN LIGHT BOX

THE TWO SIGNS

BOXES ARE

MISALIGNED

HEAD ASSEMBLY

LOOSEN THE

ANGLE

BRACKETS

ADJUST THE

SIGN BOX

Page 8: 8MANULLITINS002 Grand Entrance Arch Installation (Rev 2) · packages. Add-ons include foam wall assembly and led lights to illuminate and light the foam wall. INSTALLATION TOOLS AND

Equipment Manual

3/30/2020

8MANULLITINS002 GRAND ENTRANCE ARCH INSTALLATION 7

Repeat with the other leg assembly. When the arch is assembled, raise and position above the

conveyor with the outside edge of the driver side arch leg 45 inches from the inside edge of the

conveyor inside guide rail (see Picture below)

Picture #07: Arch Leg 45” from Inside Guide Rail

LAG & LEVELING

This step requires a hammer drill, 1/2” concrete drill bit, 1/2” lag bolts & a hammer. A leveling tool is

required for squaring the legs to the floor.

Determine the location of the arch assembly. Using the aforementioned distance of 45 inches, place

the arch in reference to the conveyor. Mark the ground where the lag bolts will be hammered in place.

Take note to align the legs on both sides as to place perpendicular or orthogonal to the trench.

Using the pattern of holes in the base plate, drill into the concrete for the lag bolts to be inserted.

Brush away the aggregate dust after the drilling is complete.

45”

Page 9: 8MANULLITINS002 Grand Entrance Arch Installation (Rev 2) · packages. Add-ons include foam wall assembly and led lights to illuminate and light the foam wall. INSTALLATION TOOLS AND

Equipment Manual

3/30/2020

8MANULLITINS002 GRAND ENTRANCE ARCH INSTALLATION 8

Take the 1/2” lag bolts and use a hammer to insert into the ground. Keep the nut on the stud but loose,

to allow leveling.

Four leveling bolts on each leg totaling eight leveling bolts, per arch are included. Use these to correct

an uneven ground. There are four points of contact to allow flexible leveling with any situation.

Review the diagram below for supplemental instructions.

Picture #08: Level Arch

WATER MANIFOLD ASSEMBLY

Locate the water manifolds mount brackets and secure to the legs like shown in the next picture.

Picture #09: Water Manifold Mounts

WATER MANIFOLD ASSEMBLY

WATER MANIFOLD MOUNTS

STAUFF CLAMPS

Page 10: 8MANULLITINS002 Grand Entrance Arch Installation (Rev 2) · packages. Add-ons include foam wall assembly and led lights to illuminate and light the foam wall. INSTALLATION TOOLS AND

Equipment Manual

3/30/2020

8MANULLITINS002 GRAND ENTRANCE ARCH INSTALLATION 9

Locate one half water manifold assembly and secure to the mounts using the Stauff clamps (see

picture #09 above). Repeat with the other side.

Locate the Wall Washers white mount brackets and secure to the arch like show on picture 10.

Picture #10: Wall Washer Mounts

Secure each water manifolds to the wall washer mounts using the Stauff clamps (see below). Do not

tighten the clamps as you will have to install a manifold feed between the two water manifolds.

Locate the Water Manifold Feed assembly and secure between the two water manifolds. Tighten the

union fittings. Tighten firmly the two Stauff clamps.

Picture #11: Connect the Two Water Manifolds to the Feed Manifold

WALL WASHER MOUNTS

STAUFF CLAMPS

CONNECT TO FEED MANIFOLDS

Page 11: 8MANULLITINS002 Grand Entrance Arch Installation (Rev 2) · packages. Add-ons include foam wall assembly and led lights to illuminate and light the foam wall. INSTALLATION TOOLS AND

Equipment Manual

3/30/2020

8MANULLITINS002 GRAND ENTRANCE ARCH INSTALLATION 10

Picture #12: Arch with Water Manifold Mounted

Page 12: 8MANULLITINS002 Grand Entrance Arch Installation (Rev 2) · packages. Add-ons include foam wall assembly and led lights to illuminate and light the foam wall. INSTALLATION TOOLS AND

Equipment Manual

3/30/2020

8MANULLITINS002 GRAND ENTRANCE ARCH INSTALLATION 11

WALL WASHER ASSEMBLY

Locate the Wall Washer and secure like shown on the picture below.

Picture #13: LED Wall Washer

WATER SUPPLY INSTALLATION

Depending on the chemical feed delivery system, you will require 3/4” hose for the Dosatron system and 1/2”

polytube (SAM) or 3/4” hose (BAM) when utilizing the AccuShot system.

NOTE: Friction loss is common when dealing with flow (GPM) & pressure (psi) in utility lines. Lengthier runs will experience this more prevalently. The suggested sizes are only a guideline and depending on the situation may require larger diameter polytube or hose.

WALL WASHER MOUNTS

WALL WASHER

Page 13: 8MANULLITINS002 Grand Entrance Arch Installation (Rev 2) · packages. Add-ons include foam wall assembly and led lights to illuminate and light the foam wall. INSTALLATION TOOLS AND

Equipment Manual

3/30/2020

8MANULLITINS002 GRAND ENTRANCE ARCH INSTALLATION 12

ELECTRICAL INSTALLATION

. The LED lights are 24 VDC, powered by led drivers or a light controller.

Use the diagrams below as reference to installing the light kit.

Picture #14-15: LED LIGHTS CONTROL BOX

Allow a certified electrician to connect the control wiring using the following connection diagrams.

Picture #16: SIGN PANEL CONNECTIONS

14

12

11

A2

A1

A1

A2

11

1214

EL

KO

1412

11

A2A1

A1A211

121

4

EL

KO

CR

1C

R2

8ELECTNLBLK0009

8ELECTNLBLK0009

8EL

EC

RL

YT

MR

00

11

NO

NC

C

NO

CNC

~~ V

12

10 9 8 7

65

43210.1

TR1

IoAD J.

VoADJ.

8ELECPWRTFR0023INPUT 120-240VAC\7-3.3AOUPUT 24VDC/25A/600W OUT

CR1-A1

TR-A1

DIAMOND

WALL

BACK

**O

UT

TO

SIG

N**

OU

T TO

SIG

N***

*FRO

M C

AR

WA

SH

CO

NTR

OLLE

R**

**IN

PU

T S

IGN

AL 24

-240

V A

C/D

C**

**2

4VDC

ONL

Y!**

24VD

C O

NLY

!**

CR2-A1

+24V

+24V

0V-24V

0V-24V

COM

COM

7ELECTFRFLSH013

150

W LE

D

CO

NTR

OLLE

R

6 F

UN

CTIO

NS

ON

E

OR

M

OR

E

LI

VE CIRCUITS

Dis

conn

ect

ALL

powe

r to

this

equ

ipme

nt b

efor

e se

rvic

ing.

Ele

ctri

cal

shoc

k wi

ll r

esul

t in

death

or

seri

ous

inju

ry.

CI

RC

UI

TO

S

EN

ERGIZADOS

Des

cone

cte

la a

lime

ntac

ión al

equ

ipo

ante

s de

dar

le s

ervicio.

Des

carg

as e

léct

rica

s po

drán

cau

sar

la m

uert

e o

lesi

ones

ser

ias.

PL

US

D

'U

N

CI

RCUITS SOUS

TE

NS

ION

Cou

pez

tout

es a

lime

ntat

ion

a cet

app

arei

l av

ant

de p

rocé

der à

l'e

ntre

tien.

Une

éle

ctro

cuti

on p

eux

entr

ainer

la

mort

ou

des

bles

sure

s gr

aves.

8D

CA

LE

LC

WRN0002

App

ly a

ppro

priate

per

sona

l pr

otec

tivee

quip

ment

(pp

e) a

nd

fol

low

safe

ele

ctrical

wor

k pr

acti

ces.

Se

e

NF

PA 70E

HA

ZA

RD OF

EL

EC

TR

ICAL

SH

OCK,

EX

PL

OS

ION,

OR

A

RC

FLASH

Thi

s eq

uipm

ent

must

be

inst

alle

d and

ser

viced

onl

y by

qua

lified

ele

ctri

cal

pers

onnel.

Tur

n of

f al

l power

sup

plyi

ng t

his

equ

ipme

nt b

efore

wor

king

on

or i

nside

equ

ipme

nt.

Alw

ays

use

a pr

operly

rat

ed v

olta

ge s

ensing

dev

ice

to c

onfirm

pow

er i

s off.

Rep

lace

all

dev

ices,

doo

rs,

and

covers

bef

ore

turn

ing on

pow

er t

o this

equ

ipme

nt.

Fai

lure

to

f

ollow

the

se

ins

truc

tions

ma

y

res

ult

in

dea

th

or

seri

ous

inj

ury.

8D

CA

LE

LC

WR

N0

003-C/UL

RI

SQ

UE DE

SH

OCK

EL

EC

TR

IQUE,

D'

EX

PL

OSION,

AR

CS

E

LE

CTRIC!

Uti

lise

z eq

uipm

ent

app

ropr

ie p

our

l'us

age.S

uivr

e les

re

co

ma

ndations

sec

urit

aire

rel

evan

t des

met

hode

the

tra

vail

pour

cir

cuit

ele

ctric.

Cet

equ

ipme

nt d

oit

etre

ins

tall

e, s

ervie et

mai

nten

ue p

ar p

erso

nel

qua

lifi

e se

ulem

ent.

Ouv

rir

tout

cir

cuit sous

ten

sion

ava

nt d

'ouv

rir ce

cab

inet.

Tou

jour

s ut

ilizer

vol

tmet

re e

t ve

rifiez la

mis

e so

us t

ensi

on a

vant

de

serv

ir c

et a

ppareil.

Fre

mer

et/o

u in

stal

ler les

por

tes,

cou

verc

les et

aut

re p

rote

ctio

n av

ant de

ret

abli

r la

tension.

Ome

tre

de s

uivr

e les

re

co

me

nd

at

ions ci-haut

peu

t en

trai

ner

des

co

nc

eq

ue

nc

es grave,

des

ble

ssur

es,

et a

ussi

la

mort.

8DC

AL

LIT

PNL

0003

7ELECTFRFLSH020

600

W LE

D S

IGN

RELAY

BOX

3 C

HA

NNELS

IoADJ.

VoADJ.

8ELECPWRTFR0023INPUT 120-240VAC\7-3.3AOUPUT 24VDC/25A/600W OUT

Page 14: 8MANULLITINS002 Grand Entrance Arch Installation (Rev 2) · packages. Add-ons include foam wall assembly and led lights to illuminate and light the foam wall. INSTALLATION TOOLS AND

Equipment Manual

3/30/2020

8MANULLITINS002 GRAND ENTRANCE ARCH INSTALLATION 13

Picture #17: CONTROL BOX PICTORAL CONNECTION DRAWING

Page 15: 8MANULLITINS002 Grand Entrance Arch Installation (Rev 2) · packages. Add-ons include foam wall assembly and led lights to illuminate and light the foam wall. INSTALLATION TOOLS AND

Equipment Manual

3/30/2020

8MANULLITINS002 GRAND ENTRANCE ARCH INSTALLATION 14

Picture #18: LED LIGHTS CONTROL BOX ELECTRICAL DIAGRAM

TR

1

CR

1A

2A

1

CR

2A

2A

1

A2

A1

FR

OM

CW

CO

NT

RO

LLE

R(2

4-2

40

V A

C/D

C)

11

14

12

CR

1

+ -L

1 N G

11

14

12

CR

2

18

9

CR

1-A

1

600

W

DR

IVE

RL

ED

JUMPER

++ -

OU

T T

O S

IGN

CO

NN

EC

T T

O

NE

GA

TIV

E W

IRE

24V

DC

ON

LY

!

BA

CK

(LIG

HT

)

OU

T T

O S

IGN

.C

ON

NE

CT

TO

P

OS

ITIV

E W

IRE

CO

MM

ON

WIR

E

CO

NN

EC

T T

O

NE

GA

TIV

E W

IRE

FO

R S

IGN

ALW

AY

S O

N

OU

T T

O S

IGN

CO

NN

EC

T T

O

NE

GA

TIV

E W

IRE

24V

DC

ON

LY

!

WA

LL (L

IGH

T)

OU

T T

O S

IGN

CO

NN

EC

T T

O

NE

GA

TIV

E W

IRE

24V

DC

ON

LY

!

DIA

MO

ND

S

12

0-2

40

VA

C5

0-6

0H

Z

FLSH 0V

0V

CR

1

0V

CR

2

0V

TR

1

#14 B

LK

#14 B

LK

CO

NN

EC

T T

O

NE

GA

TIV

E W

IRE

FO

R S

IGN

ALW

AY

S O

N

FLSH 0V

FLSH 0V

SIG

N L

ED

LIG

HT

SG

RA

ND

EN

TR

AN

CE

CR

1-A

1

BLU

E L

ED

WA

LL W

AS

HE

R

TR

1-A

1

DIA

MO

ND

LE

D L

IGH

TS

GR

AN

D E

NT

RA

NC

E

CO

MM

ON

GR

OU

ND

Page 16: 8MANULLITINS002 Grand Entrance Arch Installation (Rev 2) · packages. Add-ons include foam wall assembly and led lights to illuminate and light the foam wall. INSTALLATION TOOLS AND

Equipment Manual

3/30/2020

8MANULLITINS002 GRAND ENTRANCE ARCH INSTALLATION 15

Page 17: 8MANULLITINS002 Grand Entrance Arch Installation (Rev 2) · packages. Add-ons include foam wall assembly and led lights to illuminate and light the foam wall. INSTALLATION TOOLS AND

Equipment Manual

3/30/2020

8MANULLITINS002 GRAND ENTRANCE ARCH INSTALLATION 16

Page 18: 8MANULLITINS002 Grand Entrance Arch Installation (Rev 2) · packages. Add-ons include foam wall assembly and led lights to illuminate and light the foam wall. INSTALLATION TOOLS AND

Equipment Manual

3/30/2020

8MANULLITINS002 GRAND ENTRANCE ARCH INSTALLATION 17

Page 19: 8MANULLITINS002 Grand Entrance Arch Installation (Rev 2) · packages. Add-ons include foam wall assembly and led lights to illuminate and light the foam wall. INSTALLATION TOOLS AND

Equipment Manual

3/30/2020

8MANULLITINS002 GRAND ENTRANCE ARCH INSTALLATION 18

Page 20: 8MANULLITINS002 Grand Entrance Arch Installation (Rev 2) · packages. Add-ons include foam wall assembly and led lights to illuminate and light the foam wall. INSTALLATION TOOLS AND

Equipment Manual

3/30/2020

8MANULLITINS002 GRAND ENTRANCE ARCH INSTALLATION 19

Page 21: 8MANULLITINS002 Grand Entrance Arch Installation (Rev 2) · packages. Add-ons include foam wall assembly and led lights to illuminate and light the foam wall. INSTALLATION TOOLS AND

Equipment Manual

3/30/2020

8MANULLITINS002 GRAND ENTRANCE ARCH INSTALLATION 20

Page 22: 8MANULLITINS002 Grand Entrance Arch Installation (Rev 2) · packages. Add-ons include foam wall assembly and led lights to illuminate and light the foam wall. INSTALLATION TOOLS AND

Equipment Manual

3/30/2020

8MANULLITINS002 GRAND ENTRANCE ARCH INSTALLATION 21

Page 23: 8MANULLITINS002 Grand Entrance Arch Installation (Rev 2) · packages. Add-ons include foam wall assembly and led lights to illuminate and light the foam wall. INSTALLATION TOOLS AND

Equipment Manual

3/30/2020

8MANULLITINS002 GRAND ENTRANCE ARCH INSTALLATION 22

Page 24: 8MANULLITINS002 Grand Entrance Arch Installation (Rev 2) · packages. Add-ons include foam wall assembly and led lights to illuminate and light the foam wall. INSTALLATION TOOLS AND

Equipment Manual

3/30/2020

8MANULLITINS002 GRAND ENTRANCE ARCH INSTALLATION 23

Page 25: 8MANULLITINS002 Grand Entrance Arch Installation (Rev 2) · packages. Add-ons include foam wall assembly and led lights to illuminate and light the foam wall. INSTALLATION TOOLS AND

Equipment Manual

3/30/2020

8MANULLITINS002 GRAND ENTRANCE ARCH INSTALLATION 24

WARRANTY AND RETURN POLICY

Motor City Wash Works warrants this product to be free of defects in material and/or workmanship for a period

of one year. During the warranty period MCWW will at its discretion, at no charge to the customer, repair or

replace this product if found defective, with a new or refurbished unit, not to include costs of removal or

installation. Any product returned to MCWW for warranty has to have a Return Material Authorization Number.

All shipping costs to MCWW are assumed by the customer. This is only a summary of MCWW’s Limited Warranty.

Please, communicate with MCWW for our complete warranty.

Prior to returning any product to MCWW, the customer must call in for a Return Material Authorization

Number and a copy of our Return Material Authorization Form must be completed. The RMA number must be

written clearly on the outside of the shipping package and a copy of the form must be included in the package.