72 b cast operations at intec2
TRANSCRIPT
72 B Cast Operations at INTEC
Richard S. Leavitt
Backing trailer and cast into building 659 at INTEC
Setting up trailer for removal of impact limiters
Shipping Remote Handled Transuranic Waste
Impact limiters removed and placed in cradle
Hydraulics attached in preparation for up righting of cast
Shipping Remote Handled Transuranic Waste
Cast with Impact limiters removed
Lifting yoke use for removal of 72B cast from trailer
Shipping Remote Handled Transuranic Waste
72B cast in up right position
Cast engaged with lifting yoke and being removed from trailer
Shipping Remote Handled Transuranic Waste
72B cast being moved to work platform
72B cast being installed in work platform
Shipping Remote Handled Transuranic Waste
Work platform center being reinstalled
ICV lid being removed from cast
Shipping Remote Handled Transuranic Waste
Rad-con personnel check cast for contamination ICV lid bolt being removed
Shipping Remote Handled Transuranic Waste
Radcon personnel checking ICV lid for contamination
Radcon personnel checking inside of cast for contamination
Shipping Remote Handled Transuranic Waste
Loading of RLC into castLeak test ICV and OCV lid of cast
Shipping Remote Handled Transuranic Waste
Installing of leak tested cast back onto trailer
Install of impact limiters onto cast
Shipping Remote Handled Transuranic Waste
Loaded 72B castRemoval of 72B cast from building 659 at INTEC
Shipping Remote Handled Transuranic Waste