  • 8/11/2019 7 Wastes at Construction

    1/15

  • 8/11/2019 7 Wastes at Construction

    2/15

    The meaning of waste is:Bad utilization of something, so this not only refers inmaterial could also is referring to the time or the people.In the construction can be say 7 big wastes:

    MaterialTimeQualityCostDeforestationLegal ProblemsTransportation

  • 8/11/2019 7 Wastes at Construction

    3/15

    The 7 wastes at construction

  • 8/11/2019 7 Wastes at Construction

    4/15

    In the constructions many times presents wastes,between it can be mention wood, steel, concrete, etc. A lot of material is usually wasted by the lack of

    prefessionalism of the staff and not being trainedproperly, but at the same time can also happen that thepeople could steal the material in the work.

  • 8/11/2019 7 Wastes at Construction

    5/15

  • 8/11/2019 7 Wastes at Construction

    6/15

    The time in every type of project also constructions is a very important factor because some times this impactmost.

    Every construction depends of the capital butsometimes when something its not concluded in theright period it becomes a problem because the moneyshould come from the pocket of the engineer.

  • 8/11/2019 7 Wastes at Construction

    7/15

    A huge problem with the time in works haverepercussionsbecause this makesthe people dont work but it doesn'tmatter if they dothe job or not, theyalso have to receive

    the pay in time.

  • 8/11/2019 7 Wastes at Construction

    8/15

    Talking about constructionsthis migth be the mostimportant factor, and the worst waste.

    In every construction ever isneed a high or acceptable

    quality, but not always thiscan occur and is the impactof the inexperience of thepersonnel; however its theeffect of the time, havingsometimes incentives if theybuild faster they recievemore money.

    Quality

  • 8/11/2019 7 Wastes at Construction

    9/15

    Here in Guatemala this is the most importat thing inthe head, of every engineer so for this reason cost is a waste, because the cost is everywhere doing any work,passing time, buying o using materials, also the moneyitself .This can be take as a waste because this have an actionin everything for example if someone dont have theenough money to carry out a project cant be done, theright materials cant be used, so this characteristicmakes imposible to work so makes a waste in anyaspect.

  • 8/11/2019 7 Wastes at Construction

    10/15

  • 8/11/2019 7 Wastes at Construction

    11/15

    Deforestation is driven by several causes, most of whichoriginate outside the forestry sector. Deforestation is theproduct of the interaction of many ecological, social,economic, cultural and political forces in a given region.

    Many forest has been cleared for the construction of roads,settlements, utilities, electricity transmission networks,pipelines, hydroelectric dams and other infrastructure. Forindirect effects, building roads is the largest contributor todeforestation, has an immediate (deforestation) and

    delayed impact (erosion, landslides). Productiveinfrastructure such as hydroelectric dams, tourist andindustrial complexes, and the expansion of urban areascause the total elimination of forest cover.

  • 8/11/2019 7 Wastes at Construction

    12/15

    So for conlussion deforestation isnt adirect waste of construction but is a waste of the Earths surface, and thismakes it important to attend.

  • 8/11/2019 7 Wastes at Construction

    13/15

    Between the legal documents,include governmental regulationson the use of property, andobligations that are created in theconstruction process.

    Some legal requirements come fromconsiderations in itself, or the desireto prevent things that areindisputably bad (contracts). Aconstruction project is a complexnet of contracts and other legalobligations, each of which must becarefully considered.

    In contracts clear expectationsand clear paths for establishingcompliance is much more likelythat the project flowingsmoothly, whereas poorlydrafted contracts can lead toconfusion and collapse.This type of confusion makesimpossible to continue with aproject so makes it difficult tocontinue making it lose a lot oftime waiting for a resolution(waste of time).

  • 8/11/2019 7 Wastes at Construction

    14/15

    The distance has become abig problem of waste, thetowns are well hidden which only makes thearrival a labor, but this inturn may affect theequipment or machinerycant reach the place work

    that makes it all come tomiss more time of theproject to reach the placeand to get out, than whatthey really works.