7 boiler fuel oil commissioning procedure-töàtéëtçⵦ¦t¦+t+ƒf¦âf»òµÄ¬µû+

57
锅锅 Boiler Fuel Oil Commissioning Procedure Compiled by: Reviewed by: 锅锅 Approved by: 锅锅锅锅锅锅锅锅锅锅锅锅锅锅锅锅锅锅 2014 年 Qingdao Huachen Weiye Electric Power Technology Engineering Co., Ltd. Date:

Upload: kvsagar

Post on 11-Nov-2015

13 views

Category:

Documents


1 download

DESCRIPTION

detail about fueoil commiosioning

TRANSCRIPT

Boiler Fuel Oil Commissioning Procedure

Compiled by:

Reviewed by:

Approved by:

2014

Qingdao Huachen Weiye Electric Power Technology Engineering Co., Ltd.

Date:

Catalogue

31. overview

32. main equipment technique specification

73.commissioning basis and standard

84.commissioning purpose

85.commissioning range

86.commissioning condition and checking content

117.commissioning process and method

118. commissioning quality and assessment standard

129.Environment, occupational health and safety control procedure

1210. organization and division

1511.Appendix

Boiler Fuel Oil Commissioning Procedure1.Overview ZMTP 2150MW2510t/h

The project is Zambia ZMTP 2150MW coal fired power plant, located at Maamba coal mine, Sinazongwe, Southern Province. The boiler is produced by Dongfang Boiler Company, which is 2*510t/h high temperature, super high pressure circulating CFB boiler. Here the procedure is for the boiler fuel oil system commissioning.41.35t/h,3.0MPaThe boiler adopts high energy igniter to fire light oil, and then fire coal. Combined firing mode is adopted above bed and under bed, where four mechanical atomization oil guns are set, with output of 1.35t/h and inlet pressure of 3.0MPa. 2.

Main equipment technique specification2.1

Boiler specification

Zambia MCL 2150MW Coal Fired Power Plant2510t/h150MW

Zambia MCL 2150MW Coal Fired Power Plant is provided with two sets of 510t/h super high pressure, natural circulating CFB steam drum boilers, which is single furnace, single medium reheating, thermal isolation cyclone separator, tube-type air preheater, balanced draft, end part double flue, suspension structure, half-unsheltered layout, solid state deslagging, complete steel structure, matched with 150MW condense turbine-generator. The boiler adopts CFB combustion and limestone desulfurization technique that is low pollution and high efficiency.

Boiler main parameter sheetItem Unit BMCRBECR

Main steam flowT/H510485.73

Main steam pressure MPa14.3214.32

Main steam temp. 540540

LP RH inlet pressure MPa2.852.85

LP RH inlet temp.334334

HP RH inlet pressureMPa2.72.7

HP RH inlet temp.540540

RH flowT/H420.42400.4

Feed water temp. 248248

Feed water temp. exclusive all HP171

#1Feed water temp. exclusive #1 HP228.6

#2Feed water temp. exclusive #2 HP207.3

(LHV)

Boiler guaranteed efficiency (LHV)90

Boiler desulfurization efficiency 92.3

2.2Fuel oil system regulation and main equipment technique parameter 500m33100%21350%,222The project is provided with light oil tank with effective volume of 500m3. Oil supplying system owns 3*100% capacity oil pumps, two in operation and one in standby. 3*50% capacity oil discharge pumps are installed to meet tank truck unloading requirement, in which two oil discharge pumps can fill two oil tanks in two hours. And one contaminated-oil pump and sewage pump are installed. Oil contaminated-oil basin shall accept and purify the waste oil from light oil tank, various oil pumps and filters, which the purified oil shall be sent to oil tank by contaminated-oil pump, and the left waste water shall be sent to sewage disposal plant by sewage pump. Stationary foam firefighting facilities and spray water system shall be installed on fuel oil tanks to extinguish fire or reduce oil tank temperature in hot weather. Oil pump recirculation pipe is installed at outlet of light diesel oil pump; a tube shall be set between oil supply pipe and oil return pipe in front of the furnace to be used when blowing pipe or oil circulation. Air blowing system shall be necessary for light diesel oil system, and the blowing adopts relay and fixed-direction mode. The fuel oil system shall be cleaned up by blowing, as well as fire cutting on oil pipes. The connection between blowing pipe and oil pump back the pump shall be fixed, where the cut-off valve and non-return valve shall be set to prevent compressed air system polluted by fuel oil contamination. Light diesel oil quality: Sl.No. ParametersUnits Value

1Viscosity at 40 Cst 1.6/5.3

2Density at 15 (Approximate) kg/lt 0.820/0.869

3Flash point, Min Min 60

4Pour point, Max. Max 5.0

5Water content, Max. Mass% Max 0.01

6Sediment, Max. Mass% Max 0.01

7Sulphur, Max. Mass% Max0. 55

8Ash content, Max. Mass%