![Page 1: 69KV Project Replacing w/ HTLS Conductors€¦ · 6/21/2019 Power Line Systems, Inc. 1 69KV Project Replacing w/ HTLS Conductors Ryan “Ralphie” Adams . Arizona Public Service](https://reader030.vdocuments.site/reader030/viewer/2022041104/5f03ece97e708231d40b72f0/html5/thumbnails/1.jpg)
1 Power Line Systems, Inc. 6/21/2019
69KV Project Replacing w/ HTLS Conductors
Ryan “Ralphie” Adams Arizona Public Service
2019 PLS‐CADD Advanced Training and User Group
by
IT’S ALL ABOUT YOUR POWER LINES Power Line Systems
IT’S THE SOLUTION
![Page 2: 69KV Project Replacing w/ HTLS Conductors€¦ · 6/21/2019 Power Line Systems, Inc. 1 69KV Project Replacing w/ HTLS Conductors Ryan “Ralphie” Adams . Arizona Public Service](https://reader030.vdocuments.site/reader030/viewer/2022041104/5f03ece97e708231d40b72f0/html5/thumbnails/2.jpg)
69kV Conductor Upgrade Project (AA ACSS ”ish”)
6/21/2019 Power Line Systems, Inc. 2
– 2 miles of double circuit 69kV for upgrade • No structures are to be replaced...??? • Only conductor to be replaced for upgrade • OPGW installation requested also...
![Page 3: 69KV Project Replacing w/ HTLS Conductors€¦ · 6/21/2019 Power Line Systems, Inc. 1 69KV Project Replacing w/ HTLS Conductors Ryan “Ralphie” Adams . Arizona Public Service](https://reader030.vdocuments.site/reader030/viewer/2022041104/5f03ece97e708231d40b72f0/html5/thumbnails/3.jpg)
EAST Section
6/21/2019 Power Line Systems, Inc. 3
![Page 4: 69KV Project Replacing w/ HTLS Conductors€¦ · 6/21/2019 Power Line Systems, Inc. 1 69KV Project Replacing w/ HTLS Conductors Ryan “Ralphie” Adams . Arizona Public Service](https://reader030.vdocuments.site/reader030/viewer/2022041104/5f03ece97e708231d40b72f0/html5/thumbnails/4.jpg)
WEST Section
6/21/2019 Power Line Systems, Inc. 4
![Page 5: 69KV Project Replacing w/ HTLS Conductors€¦ · 6/21/2019 Power Line Systems, Inc. 1 69KV Project Replacing w/ HTLS Conductors Ryan “Ralphie” Adams . Arizona Public Service](https://reader030.vdocuments.site/reader030/viewer/2022041104/5f03ece97e708231d40b72f0/html5/thumbnails/5.jpg)
Structure Modeling
– Towers • 1960’s vintage Generation
Station Towers • 1970’s vintage Tangent
and DE Towers – Tower drawings difficult to
find and limited in model detailing
– PJ Ford • Tower modeling support
– Ongoing engineering support for remediation activities...
6/21/2019 Power Line Systems, Inc. 5
![Page 6: 69KV Project Replacing w/ HTLS Conductors€¦ · 6/21/2019 Power Line Systems, Inc. 1 69KV Project Replacing w/ HTLS Conductors Ryan “Ralphie” Adams . Arizona Public Service](https://reader030.vdocuments.site/reader030/viewer/2022041104/5f03ece97e708231d40b72f0/html5/thumbnails/6.jpg)
Structure Modeling
– Poles • Existing Steel and wood pole structures
6/21/2019 Power Line Systems, Inc. 6
![Page 7: 69KV Project Replacing w/ HTLS Conductors€¦ · 6/21/2019 Power Line Systems, Inc. 1 69KV Project Replacing w/ HTLS Conductors Ryan “Ralphie” Adams . Arizona Public Service](https://reader030.vdocuments.site/reader030/viewer/2022041104/5f03ece97e708231d40b72f0/html5/thumbnails/7.jpg)
Conductor Type Selection
– Normal upgrade conductor = 795 “Tern” ACSS • does not work due to sag / clearance and structure loading issues
– Multiple Manufactures for Specialized Conductor selection • Need to follow specs for Arbutus (existing conductor) but also need to
support 1600 amp ratings (AZ Summer environment) • Need to maintain or reduce loading on existing structures • Need to be installed at same or reduced tension compared to Arbutus
6/21/2019 Power Line Systems, Inc. 7
![Page 8: 69KV Project Replacing w/ HTLS Conductors€¦ · 6/21/2019 Power Line Systems, Inc. 1 69KV Project Replacing w/ HTLS Conductors Ryan “Ralphie” Adams . Arizona Public Service](https://reader030.vdocuments.site/reader030/viewer/2022041104/5f03ece97e708231d40b72f0/html5/thumbnails/8.jpg)
Clearances vs. Tension
• Due to span lengths and existing structures... Graphical Sagging was used for
fitting conductor(s) to the existing terrain.
6/21/2019 Power Line Systems, Inc. 8
![Page 9: 69KV Project Replacing w/ HTLS Conductors€¦ · 6/21/2019 Power Line Systems, Inc. 1 69KV Project Replacing w/ HTLS Conductors Ryan “Ralphie” Adams . Arizona Public Service](https://reader030.vdocuments.site/reader030/viewer/2022041104/5f03ece97e708231d40b72f0/html5/thumbnails/9.jpg)
Clearances vs. Tension with Graphical Sagging
6/21/2019 Power Line Systems, Inc. 9
• All specialized conductors
were “fit” to the terrain allowing a 2 ft buffer for additional clearance.
• 4” vertical deviation
![Page 10: 69KV Project Replacing w/ HTLS Conductors€¦ · 6/21/2019 Power Line Systems, Inc. 1 69KV Project Replacing w/ HTLS Conductors Ryan “Ralphie” Adams . Arizona Public Service](https://reader030.vdocuments.site/reader030/viewer/2022041104/5f03ece97e708231d40b72f0/html5/thumbnails/10.jpg)
Structure Remediation – per Conductor Type
– Tower member over-stress based on Conductor Selection
6/21/2019 Power Line Systems, Inc. 10
![Page 11: 69KV Project Replacing w/ HTLS Conductors€¦ · 6/21/2019 Power Line Systems, Inc. 1 69KV Project Replacing w/ HTLS Conductors Ryan “Ralphie” Adams . Arizona Public Service](https://reader030.vdocuments.site/reader030/viewer/2022041104/5f03ece97e708231d40b72f0/html5/thumbnails/11.jpg)
Conclusion • Model Towers – don’t take short cuts
– Modeling the towers shows that the as-built conditions produce overloaded members, not expected...
– Also allows the user to identify unknown capacities that may be used if needed
• Conductor Manufacturers – Using multiple WIR files from various manufacturers was helpful to better
refine the potential installation solutions (alternate tensions, etc.)
• Specialized Conductors vs. Traditional Upgrade Methods – Evaluating a range of specialized conductor options could and some times
will be less expensive than doing a full rebuild
6/21/2019 Power Line Systems, Inc. 11
![Page 12: 69KV Project Replacing w/ HTLS Conductors€¦ · 6/21/2019 Power Line Systems, Inc. 1 69KV Project Replacing w/ HTLS Conductors Ryan “Ralphie” Adams . Arizona Public Service](https://reader030.vdocuments.site/reader030/viewer/2022041104/5f03ece97e708231d40b72f0/html5/thumbnails/12.jpg)
PLS‐CADD ® FAC 008/009
Drafting
FAC 003
NERC Ratings
Structural Analysis
PLS‐POLE Joint Use
Advanced Sag & Tension LiDAR Modeling
Line Ratings TOWER
Pole Analysis
Vegetation Management
Materials Management
Line Optimization
1000+ Users in 100+ Countries Storm Hardening
Project Estimating
ASCE
CENELEC
NESC
IEEE
IEC
CSA Distribution
Transmission
12 Power Line Systems, Inc. 6/21/2019
IT’S ALL ABOUT YOUR POWER LINES Power Line Systems
IT’S THE SOLUTION
GO95
Questions...