6993 e14 pi - d14557 0214 pi - hzv 350 b4 - 2nd and 3rd fans - balancing report
TRANSCRIPT
![Page 1: 6993 E14 PI - D14557 0214 PI - HZV 350 B4 - 2nd and 3rd Fans - Balancing Report](https://reader034.vdocuments.site/reader034/viewer/2022042610/58a6ae5f1a28ab0a7a8b69b1/html5/thumbnails/1.jpg)
CUSTOMER: TOTAL E&P NIGERIA OUR REFERENCE N°: 6993 E14 PI
INTERVENTION REPORT BALANCING OF 2 ND AND 3TH
HZV 350 B4 FAN
08/2014
Redactor Controller Corrector
Name J.FROGER M.TOGNI D.INGLES
Function Mechanic Chief Mechanic Method Assistant
Signature
2 - - - 1 - - - 0 Creation 23/08/2014 JFR
Rev. Motif Date Author
![Page 2: 6993 E14 PI - D14557 0214 PI - HZV 350 B4 - 2nd and 3rd Fans - Balancing Report](https://reader034.vdocuments.site/reader034/viewer/2022042610/58a6ae5f1a28ab0a7a8b69b1/html5/thumbnails/2.jpg)
INTERVENTION REPORT
Document Origine : Eurofiliales
Indice : A
TOTAL E&P NIGERIA Mise en application: 15/05/14
Affaire : 6693 E14 PI
Page 2 sur 14
SUMMARY I. PARTICIPANTS LIST ..................................................................................................................... 3
II. RECEPTION ................................................................................................................................... 4
III. BALANCING ................................................................................................................................ 6
2nd Fan: ............................................................................................................................................. 7
3rd Fan: ............................................................................................................................................. 9
IV. CERTIFICATS ............................................................................................................................ 10
FC021 - Balancing Sheet - 2nd Fan. ........................................................................................... 11
Balancing Certificate - 2nd Fan. .................................................................................................. 12
FC021 - Balancing Sheet - 3rd Fan. ............................................................................................ 13
Balancing Certificate - 3rd Fan. .................................................................................................. 14
![Page 3: 6993 E14 PI - D14557 0214 PI - HZV 350 B4 - 2nd and 3rd Fans - Balancing Report](https://reader034.vdocuments.site/reader034/viewer/2022042610/58a6ae5f1a28ab0a7a8b69b1/html5/thumbnails/3.jpg)
INTERVENTION REPORT
Document Origine : Eurofiliales
Indice : A
TOTAL E&P NIGERIA Mise en application: 15/05/14
Affaire : 6693 E14 PI
Page 3 sur 14
I. PARTICIPANTS LIST
CUSTOMER:
TOTAL E&P NIGERIA
BORRELL Serge
EUROFILIALES:
FROGER Julien
BENKLINE:
IZIYON Harrison OSSAI Terry
![Page 4: 6993 E14 PI - D14557 0214 PI - HZV 350 B4 - 2nd and 3rd Fans - Balancing Report](https://reader034.vdocuments.site/reader034/viewer/2022042610/58a6ae5f1a28ab0a7a8b69b1/html5/thumbnails/4.jpg)
INTERVENTION REPORT
Document Origine : Eurofiliales
Indice : A
TOTAL E&P NIGERIA Mise en application: 15/05/14
Affaire : 6693 E14 PI
Page 4 sur 14
II. RECEPTION
![Page 5: 6993 E14 PI - D14557 0214 PI - HZV 350 B4 - 2nd and 3rd Fans - Balancing Report](https://reader034.vdocuments.site/reader034/viewer/2022042610/58a6ae5f1a28ab0a7a8b69b1/html5/thumbnails/5.jpg)
INTERVENTION REPORT
Document Origine : Eurofiliales
Indice : A
TOTAL E&P NIGERIA Mise en application: 15/05/14
Affaire : 6693 E14 PI
Page 5 sur 14
We received two fans and one shaft (the one to use for balance the first Fan on 05/2014) without keys in our Port Harcourt workshop. One new fan the 25th June and one old fan the 1st July to be balance. The shaft has a several seizing marks on the shaft contact area (see picture below).
Fan n°2 (new fan) Fan n°3 (old fan)
Pump shaft showing seizing marks.
![Page 6: 6993 E14 PI - D14557 0214 PI - HZV 350 B4 - 2nd and 3rd Fans - Balancing Report](https://reader034.vdocuments.site/reader034/viewer/2022042610/58a6ae5f1a28ab0a7a8b69b1/html5/thumbnails/6.jpg)
INTERVENTION REPORT
Document Origine : Eurofiliales
Indice : A
TOTAL E&P NIGERIA Mise en application: 15/05/14
Affaire : 6693 E14 PI
Page 6 sur 14
III. BALANCING
![Page 7: 6993 E14 PI - D14557 0214 PI - HZV 350 B4 - 2nd and 3rd Fans - Balancing Report](https://reader034.vdocuments.site/reader034/viewer/2022042610/58a6ae5f1a28ab0a7a8b69b1/html5/thumbnails/7.jpg)
INTERVENTION REPORT
Document Origine : Eurofiliales
Indice : A
TOTAL E&P NIGERIA Mise en application: 15/05/14
Affaire : 6693 E14 PI
Page 7 sur 14
For both fans we used:
- The same shaft - An entire standard sized key for fan side type: “parallel key, form C, 18x11x100” - Half key DE side is: “parallel key, form C, 18x5.5x80, NF E 27-656”
The balancing was made in cantilever, at a rotation speed of 600 rpm by adding of material.
2nd Fan: Rotor assembling and balancing.
![Page 8: 6993 E14 PI - D14557 0214 PI - HZV 350 B4 - 2nd and 3rd Fans - Balancing Report](https://reader034.vdocuments.site/reader034/viewer/2022042610/58a6ae5f1a28ab0a7a8b69b1/html5/thumbnails/8.jpg)
INTERVENTION REPORT
Document Origine : Eurofiliales
Indice : A
TOTAL E&P NIGERIA Mise en application: 15/05/14
Affaire : 6693 E14 PI
Page 8 sur 14
Before After
After verification, the values of balancing are not in tolerance. We thus proceed to a new balancing.
Fan is ready to be sent.
![Page 9: 6993 E14 PI - D14557 0214 PI - HZV 350 B4 - 2nd and 3rd Fans - Balancing Report](https://reader034.vdocuments.site/reader034/viewer/2022042610/58a6ae5f1a28ab0a7a8b69b1/html5/thumbnails/9.jpg)
INTERVENTION REPORT
Document Origine : Eurofiliales
Indice : A
TOTAL E&P NIGERIA Mise en application: 15/05/14
Affaire : 6693 E14 PI
Page 9 sur 14
Fan and shaft were assembly and ready to be balance.
3rd Fan:
After verification, the values were out of tolerance. We proceed to a new balancing. The fan has ready to be sent.
Before After
![Page 10: 6993 E14 PI - D14557 0214 PI - HZV 350 B4 - 2nd and 3rd Fans - Balancing Report](https://reader034.vdocuments.site/reader034/viewer/2022042610/58a6ae5f1a28ab0a7a8b69b1/html5/thumbnails/10.jpg)
INTERVENTION REPORT
Document Origine : Eurofiliales
Indice : A
TOTAL E&P NIGERIA Mise en application: 15/05/14
Affaire : 6693 E14 PI
Page 10 sur 14
IV. CERTIFICATS
![Page 11: 6993 E14 PI - D14557 0214 PI - HZV 350 B4 - 2nd and 3rd Fans - Balancing Report](https://reader034.vdocuments.site/reader034/viewer/2022042610/58a6ae5f1a28ab0a7a8b69b1/html5/thumbnails/11.jpg)
INTERVENTION REPORT
Document Origine : Eurofiliales
Indice : A
TOTAL E&P NIGERIA Mise en application: 15/05/14
Affaire : 6693 E14 PI
Page 11 sur 14
FC021 - Balancing Sheet - 2nd Fan.
![Page 12: 6993 E14 PI - D14557 0214 PI - HZV 350 B4 - 2nd and 3rd Fans - Balancing Report](https://reader034.vdocuments.site/reader034/viewer/2022042610/58a6ae5f1a28ab0a7a8b69b1/html5/thumbnails/12.jpg)
INTERVENTION REPORT
Document Origine : Eurofiliales
Indice : A
TOTAL E&P NIGERIA Mise en application: 15/05/14
Affaire : 6693 E14 PI
Page 12 sur 14
Balancing Certificate - 2nd Fan.
![Page 13: 6993 E14 PI - D14557 0214 PI - HZV 350 B4 - 2nd and 3rd Fans - Balancing Report](https://reader034.vdocuments.site/reader034/viewer/2022042610/58a6ae5f1a28ab0a7a8b69b1/html5/thumbnails/13.jpg)
INTERVENTION REPORT
Document Origine : Eurofiliales
Indice : A
TOTAL E&P NIGERIA Mise en application: 15/05/14
Affaire : 6693 E14 PI
Page 13 sur 14
FC021 - Balancing Sheet - 3rd Fan.
![Page 14: 6993 E14 PI - D14557 0214 PI - HZV 350 B4 - 2nd and 3rd Fans - Balancing Report](https://reader034.vdocuments.site/reader034/viewer/2022042610/58a6ae5f1a28ab0a7a8b69b1/html5/thumbnails/14.jpg)
INTERVENTION REPORT
Document Origine : Eurofiliales
Indice : A
TOTAL E&P NIGERIA Mise en application: 15/05/14
Affaire : 6693 E14 PI
Page 14 sur 14
Balancing Certificate - 3rd Fan.