  • Tpm.training

    Sa

    fety

    , H

    ea

    lth

    &

    en

    vir

    on

    me

    nt

    Ed

    uca

    tio

    n &

    Tra

    inin

    g

    Init

    ial

    flo

    w C

    on

    tro

    l

    To

    ol

    Ma

    inte

    na

    nce

    Off

    ice

    TP

    M

    Qu

    ali

    ty M

    ain

    ten

    an

    ce

    Pla

    nn

    ed

    Ma

    inte

    na

    nce

    Fo

    cu

    sse

    d I

    mp

    rove

    me

    nt

    Au

    ton

    om

    ou

    s M

    ain

    ten

    an

    ce

    1 2 4 3 5 9 8 7 6

  • Tpm.training

    Jishu Hozen autonomous Maintenance

    Purpose : 1. Training of operators to be proficient in equipment 2. Protecting ones own equipment

    Members: 1. Operators 2. Line leaders 3. supervisors

  • Tpm.training

    JISHU HOZEN

    Jishu Hozen is the activities which

    each operator performs -daily inspection ,

    lubrication, parts replacement, repair,

    trouble-shooting, accuracy checks and

    so forth on his own equipment, aiming at

    achieving the goal of keeping ones own

    equipment in good condition by one self

  • Tpm.training

    Jishu Hozen 7 Steps

    1. Initial Clean up

    2. Counter Measures

    3. Tentative standards

    4. General Inspection

    5. Autonomous Inspection

    6. standardisation

    7. Autonomous

    Management

  • Tpm.training

    Jishu - Hozen Steps for developing

    1. Initial

    Cleaning

    (inspection)

    All- around clean-up of

    dust and dirt on equipment.

    Oiling and re-tightening of

    bolts and nuts

    Finding and restoration of

    Fuguai (abnormalities)

  • Tpm.training

  • Tpm.training

  • Tpm.training

    So Cleaning isESSENTIAL Purpose of cleaning

  • Tpm.training

    DIS COVER ---- DISCOVER -

  • Tpm.training

    WHAT TO CHECK ? Loose bolts & nuts.

    Loose wires.

    Missing parts.

    Rusted parts.

    Broken parts.

    Cracked parts.

    Air leaks

    Oil leaks

    Coolant leaks.

    Dirt, dust and cobwebs.

    Oil on the floor.

    Scrap around the machine.

    Burr and swarf around the machine.

    Abnormal heat.

    Abnormal sound.

    Abnormal vibration.

  • Tpm.training

    Jishu Hozen 7 Steps

    Step 1: Initial Clean up

    a. Formation of JH circles b. division of machine pars to operators c. Training on abnormality identification d. Preparation of red & white tags

    a. White tags for abnormality that can be corrected by unskilled person b. Red tags for abnormality that can be corrected by skilled person

    e. Keeping cleaning tools ready f. fixing time for JH Activity g. Cleaning all parts of the machine even opening of parts are necessary h. Inspection of parts during cleaning activity i. Identification and tagging of abnormality and recording j. Identify difficult to access areas around the machine-In-Accessible(IA) k. Identify the SOC source of contamination after cleaning l. Record in the matrix red & white tags,IA,SOC

  • Tpm.training

    Baniyan waste

    To clean small burr & coolant

    Nylon brush

    To clean small burr & coolant

    Tools used for cleaning

  • Tpm.training

    Wire brush

    To clean small burr & coolant

    Spanners

    To tighten loose bolts & nuts

    Tools used for cleaning

  • Tpm.training

    Showel

    To clean big burr & swarf

    Screw drivers

    To tighten loose screws

    Tools used for cleaning

  • Tpm.training

    Allen Keys

    To remove screws

    Tools used for cleaning

    Allen Keys

    To remove hard/ solidified burr & dust

  • Tpm.training

    Jishu Hozen 7 Steps

    Step 1: Initial Clean up

    a. Formation of JH circles b. division of machine pars to operators

    Machine no:

    Circle No:

    Circle Leader:

    Circle Members:

    1

    2

    3

    4

    Machine Parts: Responsibility:

    1

    2

    3

    4

    5

    6

  • Tpm.training

    Jishu Hozen 7 Steps

    Step 1: Initial Clean up Record in the matrix red & white tags,IA,SOC

    Tag MatrixMachine No:

    Circle No:

    Slno M/c Parts dust Leak Loose Missing vibration noise Broken Wornout nonStd others total

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    P = Tags put R= Tags RemovedPR

  • Tpm.training

    Jishu Hozen 7 Steps

    Step 1: Initial Clean up Record in the matrix red & white tags,IA,SOC

    Source of Contaminantion

    slno contaminant source Why Why why Why countermeasure

    1

    2

    3

    4

    5

    6

    7

    InAccessible /difficult to Clean,Lubricate,Inspect,Re-tighten - CLIR

    slno Area CLIR Why Why why Why countermeasure

    1

    2

    3

    4

    5

    6

    7

  • Tpm.training

    Jishu Hozen 7 Steps

    Step 1: Initial Clean up

    Countermeasure Plan for Red/white/IA/SOC

    slno abnormality Tgt Dt Resp

    1

    2

    3

    4

    5

    6

    7

    8

    Action Plan

    0

    5

    10

    15

    20

    25

    No of tags

    Failure Setup Yield Defect Motion

    Tags linked to losses

  • Tpm.training

    Jishu - Hozen Steps for developing

    2.

    Countermeasure

    s for sources of

    problems and

    difficult places

    Eliminate causes for dirt

    and dust.

    Improve places which are

    difficult to clean,

    lubricate, and re-

    tightening of bolts and

    nuts.

    Reduce time for clean-up

    and oiling.

  • Tpm.training

  • Tpm.training

    Jishu Hozen 7 Steps

    Step 2: Countermeasures for SOC/IA/others

    a. Taking actions on all abnormalities b. eliminating difficult to access areas c. Eliminating SOC d. Machine CLEAN Without Cleaning status e. Various kaizens implemented f. Machine ready for tentative standard preparation g. Step2 audit passed

    Tags Put Vs Removed - cumulative for HSL9

    0

    50

    100

    150

    200

    250

    Aug-04 Sep-04 Oct-04 Nov-04 Dec-04 Jan-05

    No of tags

    Tags put Tags removed

  • Tpm.training

    Before After

    JH 2nd step

    Easy to clean / Hard to access area

  • Tpm.training

    Before After

    JH 2nd Step

    Easy to lubricate

  • Tpm.training

    Before After

    JH 2nd step

    Easy to inspect and adjust

  • Tpm.training

    Jishu - Hozen Steps for developing

    3. Establishing

    Tentative

    Standards for

    Jishu-Hozen

    Make temporary

    procedures or manual of

    Autonomous Maintenance

    for cleanup, lubrication, re-

    tightening, checkups.

    (Specify the time

    allocation for various

    maintenance daily or

    regularly held.)

  • Tpm.training

  • Tpm.training

    Jishu Hozen 7 Steps

    Step 3: Preparation of Tentative standards

    a. Making a list of Cleaning, Lubrication,Inspection & Re-tigthening points b. arriving at method and frequency of CLIR c. dividing the CLIR into mahine zones d. Preparation of standards chart with visual aids e. Education of operators on standards f. Practising the standards for minimum 1 month g. Update new check points h. Have step 3 audit Passes

  • Tpm.training

    Jishu Hozen 7 Steps

    Step 3: Preparation of Tentative standards

    JH Tentative Checksheets

    MONTH : M/C NO :

    SL

    NO

    1 2 3 4 5 6 7 8 9 10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    31

    RUNNINGSTOPPED

    1 CLEANING RUNNING STOPPED

    1.1Clean front side of machine

    Dy 60 Oper

    1.2 Clean burrs in bed

    Wk 300 Oper

    1.5.Clean coolant tank

    Dy 60 oper

    2 INSPECTION2.1 Hyd.oil level (should be in

    green band) Dy 10 Oper Top up oil

    2.3 Lub.oil level

    Dy 10 Oper Top up oil

    Lub oil pressure(Within

    green band ) Dy 10 Oper

    Inform

    supervisor

    2.4 Hyd.system pressure

    (green band) Dy 10 Oper

    Inform

    supervisor

    2.6 Abnormal noise ,heat in

    hydraulic motors Daily 30 Oper

    Inform

    supervisor

    2.6 Abnormal noise ,heat in

    coolant motors Daily 30 Oper Inform

    supervisor

    2.6 Abnormal noise ,heat in

    lub motors Daily 30 Oper Inform

    supervisor

    Check lub oil pressure(within

    green band) Daily 10 Oper Inform

    supervisor

    2.1 Cutting oil level (should

    be in green band) Daily 10 Oper Inform

    supervisor

    RE

    SP ACTION IF

    ABNORMA

    L

    M/C

    STATUS

    DATE

    ACTIVITY HOW

    FR

    EQ

    TIM

    E

    (SE

    C)

  • Tpm.training

    Jishu - Hozen Steps for developing

    4. Overall

    Inspection

    Training in check-up skills

    through checkup manuals.

    Find and restore slight

    defects through general

    inspection.

  • Tpm.training

    Jishu Hozen 7 Steps

    Step 4: Preparation of General Inspection

    Bolts & Nuts Pneumatics Hydraulics Electrical DrivesFits/toler

    ancesSafety

    Process

    condition

    2

    TopicsSl

    No.Emp. No. Name M/c No

    11

    3

    4

    5

    6

    7

    8

    9

    10

    JH Step 4 Training

    1

  • Tpm.training TVS-SUZUKI

  • Tpm.training

  • Tpm.training

  • Tpm.training

    Jishu - Hozen Steps for developing

    5. Autonomous

    Inspection

    Formulation and

    implementation of clean-

    up and oiling lubricate

    criteria and autonomous

    inspection check sheet

    which can be performed

    efficiently and positively.

  • Tpm.training

    Jishu - Hozen Steps for developing

    6. Standardization Standardize various types of

    field management items.

    Establish the system to

    thoroughly maintain and

    control them.

    Establish logistics standard

    Standardization of data records

    Standardization of die, tool and

    jig management

    Process quality assurance

    standard, etc.

  • Tpm.training

    Jishu - Hozen Steps for developing

    7. Autonomous

    Management

    Continue to develop

    corporate policy and

    commitment target and

    conduct Kaizen activities

    regularly, and record the

    data analyzed through

    MTBF to improve the

    equipment.

  • Tpm.training

    TPM Vs initiatives at Wada

    sixsigma comm.

    eff

    scrap

    redn d/t redn

    Meas.Pri

    nt

    cust.Co

    mpl.

    Vendor

    Dev. RTY Imp COQ HMP GMP Tool.Imp M/c Imp

    Spares.

    Mgmt Projects

    1 KK

    2 JH

    3 QM

    4 PM

    5 Otpm

    6 E&T

    7 SHE

    8 Ifc

    9 Ttpm

    TPM

    Double E initiatives Quality Initiatives Projects