  • 7/24/2019 651914360On Going Projects

    1/5

    AL RYUM GROUP CURRENT ON-GOING PROJECTS

    S.NO.

    PROJECT NAME CLIENT CONSULTANT STARTINGDATE

    COMPLETIONDATE

    CONTRACTVALUE (AED)

    1

    1Landscape Maintenance Works at

    Emirates Palace at Abu Dhabi

    EmiratesPalace

    Kempenski- 01.04.2014 31.03.2016 8, 480,016.00

    2

    CW/200A/2011 Supply, Installation,Testing and Commissioning of FibreCement/Glass Reinforced ExpoxyWater Transmission Pipeline and

    Associated Works at Various Locationin the Emirate of Dubai

    DubaiElectricity &

    WaterAuthority(DEWA)

    NJSConsultants Co.

    Ltd.06.12.2011 31.12.2015 96, 382,378.72

    3

    CW/200D/2011 Supply, Installation,Testing and Commissioning of Fibre

    Cement/Glass Reinforced Epoxy WaterTransmission Pipelines and Associated

    Works at Various Locations in theEmirate of Dubai

    DubaiElectricity &

    WaterAuthority(DEWA)

    NJSConsultants Co.

    Ltd.06.12.2011 05.12.2015 136,522,781.66

    4 Site Wide Irrigation ControlAl Dar

    PropertiesPSJC

    M/s Maunsell(Aecom)

    ConsultancyServices

    06.10.2011 30.09.2015 2,765,240.00

    5

    Iconic Greenhouse: The Constructionand Completion of the Greenhouse

    Bldg. and the Associated InfrastructureWorks and Related Facilities for the

    Iconic Greenhouse Project, Abu Dhabi UAE

    ADS Holdings MZ Architects 29.03.2012 30.09.2015 88,880,000.00

    6Annual Maintenance for Landscaping &Irrigation System for Marina Office Park

    NationalInvestment

    Council- 01.30.2015 28.02.2018 875,000.00

    7

    Supply, Installation, Testing &Commissioning ( SITC) of Pump Motor

    Units & Associated Switchgear withSCADA Integration including one Panel

    Mounted Work Station in NajmaPumping Station

    DubaiElectricity &

    Water

    Authority(DEWA)

    - 10.02.2013 25.09.2015 5,347,649.20

    8

    Contract No. CPC-00913-C1 - Design,Construct & Maintenance Landscaping

    Work for the Sons of his HighnessSheik Hamdan Bin Zayed

    Crown PrinceCourt

    - 22.02.2015 30.12.2015 18,000,000.00

  • 7/24/2019 651914360On Going Projects

    2/5

    AL RYUM GROUP CURRENT ON-GOING PROJECTS

    S.NO.

    PROJECT NAME CLIENT CONSULTANT STARTINGDATE

    COMPLETIONDATE

    CONTRACTVALUE (AED)

    2

    9

    Upgrading the Engineering NaturalBeautification Value Outside the Islandof Abu Dhabi, Second Phase, Project

    No. 407/1

    Abu DhabiMunicipality

    Dorsch HoldingGmbH

    01.10.2013 30.09.2015 10,000,000.00

    10

    Renovation of the Garden and theInfrastructure in the Main Desert, SixthPhase, Infrastructure, Project No. 209/5

    at Abu Dhabi Main Land

    Abu DhabiMunicipality

    Dorsch HoldingGmbH

    01.10.2013 31.12.2015 10,000,000.00

    11Mitigation Measures of Water LoggingProblems in Al Sameeh & Al Shahama

    Areas

    EnvironmentAgency

    Parsons IntlLtd.

    11.07.2013 30.09.2015 40,871,733.00

    12

    Operations & Maint of Parks,Landscape, Recreational Facilities &

    their related Infrastructure of Asset s forDelma Island, Western Region, Emirate

    of Abu Dhabi

    WesternRegion

    Municipality- 01.01.2014 01.01.2017 31,554,338.39

    13 Landscape Works for Crescent ParkLusail RealEstate DevlCo.(LREDC)

    Dorsch HoldingGmbH

    20.01.2014 16.01.2016 331,097,242.08

    14 The Rajmahal Theatre at BollywoodPark

    MeraasHolding

    Kling Consult 27.03.2014 26.09.2015 107,000,000.00

    15Four Seasons Hotel Abu Dhabi

    Contract No. CC0044Al Futtaim

    Carillion LLCAECOM 01.03.2014 30.10.2015 15,656,977.00

    16

    In-Parks Primary Infrastructure worksfor Legoland Dubai Park, Bollywood

    Park, Hotel 1 and Riverwalk on DubaiParks

    MeraasHolding

    - 11.05.2014 01.10.2015 145,335,848.00

    17

    In-Parks Primary Infrastructure works

    for Motiongate

    Meraas

    Holding - 11.05.2014 30.09.2015 105,187,387.00

    18

    Contract: PRFD/O&M/C4100/1 -Formula 1 Preparation Works of

    Landscape and Local Irrigation Assetsfor Yas Island - Zone 2

    Abu DhabiMunicipality

    Parsons IntlLtd.

    08.10.2013 30.09.2015 9,358,037.57

    19Construction of 20 Playgrounds in AbuDhabi Main Land-Phase 1 Contract

    No. 393-A

    Abu DhabiMunicipality

    KEOInternational

    03.08.2014 22.11.2015 11,190,627.52

  • 7/24/2019 651914360On Going Projects

    3/5

    AL RYUM GROUP CURRENT ON-GOING PROJECTS

    S.NO.

    PROJECT NAME CLIENT CONSULTANT STARTINGDATE

    COMPLETIONDATE

    CONTRACTVALUE (AED)

    3

    20Construction of 20 Children

    Playgrounds in Abu Dhabi Main Land-Phase 1 Contract No. 393-B

    Abu DhabiMunicipality

    KEOInternational

    03.08.2014 04.11.2015 10,230,658.88

    21Periodic Maintenance Work at Al

    Sheikh Saif Bin Zaid, Zacker Palace Al Ain

    Crown PrinceCourt

    - 02.03.2014 31.12.2015 21,000,000.00

    22Landscaping, Swimming Pools & Water

    Features Package Works ( 3700) Kempenski Hotel

    SunriseProperties Ltd

    LINX 13.07.2014 13.09.2015 20,500,000.00

    23 Dubai parks plant nursery(DPPN)Meraas

    DevelopmentLLC

    - 02.09.2014 30.10.2015 20,100,000.00

    24 LOUVRE Museum Abu Dhabi

    Tourism Dev.& Investment

    Co.( TDIC)

    - 06.10.2014 21.09.2015 3,377,500.00

    25Contract No. 9/467 Removal of

    Weeds and Pruning of Trees in AbuDhabi Island South, Abu Dhabi

    Abu DhabiMunicipality

    Dorsch HoldingGmbH

    01.12.2014 30.11.2015 10,000,000.00

    26

    Contract No. 1/154 Removal of

    Weeds and Pruning of Trees inMainland, Abu Dhabi

    Abu Dhabi

    Municipality Parsons IntlLtd.

    10.11.2014 07.05.2016 10,000,000.00

    27Contract No. 1/153 Removal of

    Weeds and Pruning of Trees in North,Abu Dhabi

    Abu DhabiMunicipality

    Parsons IntlLtd.

    10.11.2014 07.05.2016 10,000,000.00

    28

    Contract: PRFD/O&M/121/1R Operation and Maintenance of Parks

    and Water Features at Area along AbuDhabi Dubai Highway

    Abu DhabiMunicipality

    Parsons IntlLtd.

    31.12.2014 30.12.2016 10,680,000.00

    29

    Contract: PRFD/O&M/112R Operation

    and Maintenance of Landscape andPocket Park Assets on Abu DhabiIsland

    Abu DhabiMunicipality Parsons IntlLtd. 31.12.2014 30.12.2016 14,433,333.33

    30

    Contract: PRFD/O&M/111R Operationand Maintenance of Landscape andPocket Park Assets on Abu Dhabi

    Island

    Abu DhabiMunicipality

    Parsons IntlLtd.

    31.12.2014 30.12.2016 13,753,333.33

  • 7/24/2019 651914360On Going Projects

    4/5

    AL RYUM GROUP CURRENT ON-GOING PROJECTS

    S.NO.

    PROJECT NAME CLIENT CONSULTANT STARTINGDATE

    COMPLETIONDATE

    CONTRACTVALUE (AED)

    4

    31

    Operation & Maintenance of the Seedsof Beautification Plants and the LocalIrrigation Networks at Khalifa City

    Contract No.1R/113

    Abu DhabiMunicipality

    Dorsch HoldingGmbH

    31.12.2014 30.12.2016 12,176,666.67

    32

    Operation & Maintenance ofBeautification Plants and Irrigation

    Networks at the Area of Abu Dhabi AlAin Road from Mussafah BridgeIntersection to Al Nahda Area

    Contract No. 1R/112

    Abu DhabiMunicipality

    Dorsch HoldingGmbH

    31.12.2014 30.12.2016 29,869,282.48

    33 Contract No. CPC-14048-MICrown Prince

    Court- 1.11.2014 30.10.2015 1,575,303.00

    34

    Contract No. 73/2014 LandscapingMaintenance for Crown Prince CourtBuildings and the Villa of Strategic

    Affairs, Abu Dhabi

    Crown PrinceCourt

    - 21.10.2014 20.10.2015 1,490,000.00

    35Palm Jumeirah Azure Residence

    Building(Contract DMS135862)

    NakheelMs. Dal AlHandasha

    20.11.2014 19.11.2015 6,100,000.00

    36Church Compound for Armenian

    Community of Abu Dhabi School

    ArmenianCommunity ofAbu Dhabi

    KojakianEngineeringConsultants

    01.06.2015 31.12.2015 3,703,534.00

    37DPDP 4005 LEGOLAND Area

    Development Package 4

    LL DubaiTheme Park

    LLC- 14.06.2015 29.02.2016 66,150,000.00

    38

    Contract No. 51/2013 Commissioning,Developing & Maintaining Public

    Gardens, Landscape & Blight/PestControl Works and on the Palm and

    Fruit Trees in the Residence of Al AinCity and Eastern Region District of theEmirates Contract No: 1 Al MarkhaniaArea Sector and the Related Area, Al

    Markhania Al Ain, UAE

    Al AinMunicipality

    - 11.07.2015 10.07.2017 22,575,139.58

    39

    Contract No. 52/2014 OutsourcingWork of Operation, Development &Maintenance of Public Parks andLandscapes in Al Ain and Eastern

    Region of the Emirates Contract (12)for the Operation, Water Management,

    Devl. , Maintenance & Repair ofIrrigation Water Supply and Distribution

    City in Al Ain Region, Al Ain UAE

    Al AinMunicipality

    - 01.07.2015 30.06.2017 28,204,566.72

  • 7/24/2019 651914360On Going Projects

    5/5

    AL RYUM GROUP CURRENT ON-GOING PROJECTS

    S.NO.

    PROJECT NAME CLIENT CONSULTANT STARTINGDATE

    COMPLETIONDATE

    CONTRACTVALUE (AED)

    5

    40

    Construction of Downtown Jebel AliZone 1 4 Infrastructure RemainingWorks LML-DJA-15005, Downtown

    Jebel Ali Zone 1-4

    Limitless LLC - 08.06.2015 26.07.2017 285,512,503.68

    41

    The Complete Construction andCommissioning of the CommunityFacility Buildings ( Civil Defense,

    Ambulance Post & Police Station Dubai UAE

    Dubai Parks &Resorts PJSC

    - 24.06.2015 22.06.2016 31,900,000.00

    42

    Infrastructure Works for Package 8 andPackage 2A Contract No. DMS

    140563, Jumeirah Park Development,Dubai

    Jumeirah Park - 25.06.2015 24.06.2016 18,393,406.25

    43The Complete Construction and

    Commissioning of the Data CentreBuilding

    Dubai Parks &Resorts PJSC

    - 12.07.2015 12.05.2016 21,091,962.00

    44Contract No. 67W/2014 1MIG RCC

    Water Tank at Gizemri - Fujairah

    FederalElectricity &

    Water

    Authority

    - 16.08.2015 15.08.2016 6,972,134.40

    45Design & Build of LEGOLAND Water

    Park

    LL DubaiTheme Park

    LLC- 01.07.2015 31.05.2016 106,262,203.00

    46DPDP 4005 LEGOLAND(Ride Specialist Installation)

    LL DubaiTheme Park

    LLC- 02.08.2015 24.04.2016 4,400,876.00

    47DPDP 4001 Motiongate(Ride Specialist Installation)

    MotiongateLLC

    - 02.08.2015 07.08.2016 8,676,338.00

    48DPDP 4003 Bollywood Park

    (Ride Specialist Installation)BollywoodParks LLC

    - 02.08.2015 18.06.2016 2,595,206.00

    49CPC-15054-M1

    Periodic Maintenance Work for DifferentAreas

    Crown PrinceCourt

    - 01.05.2015 30.04.2016 3,900,000.00