AL RYUM GROUP CURRENT ON-GOING PROJECTS
S.NO.
PROJECT NAME CLIENT CONSULTANT STARTINGDATE
COMPLETIONDATE
CONTRACTVALUE (AED)
1
1Landscape Maintenance Works at
Emirates Palace at Abu Dhabi
EmiratesPalace
Kempenski- 01.04.2014 31.03.2016 8, 480,016.00
2
CW/200A/2011 Supply, Installation,Testing and Commissioning of FibreCement/Glass Reinforced ExpoxyWater Transmission Pipeline and
Associated Works at Various Locationin the Emirate of Dubai
DubaiElectricity &
WaterAuthority(DEWA)
NJSConsultants Co.
Ltd.06.12.2011 31.12.2015 96, 382,378.72
3
CW/200D/2011 Supply, Installation,Testing and Commissioning of Fibre
Cement/Glass Reinforced Epoxy WaterTransmission Pipelines and Associated
Works at Various Locations in theEmirate of Dubai
DubaiElectricity &
WaterAuthority(DEWA)
NJSConsultants Co.
Ltd.06.12.2011 05.12.2015 136,522,781.66
4 Site Wide Irrigation ControlAl Dar
PropertiesPSJC
M/s Maunsell(Aecom)
ConsultancyServices
06.10.2011 30.09.2015 2,765,240.00
5
Iconic Greenhouse: The Constructionand Completion of the Greenhouse
Bldg. and the Associated InfrastructureWorks and Related Facilities for the
Iconic Greenhouse Project, Abu Dhabi UAE
ADS Holdings MZ Architects 29.03.2012 30.09.2015 88,880,000.00
6Annual Maintenance for Landscaping &Irrigation System for Marina Office Park
NationalInvestment
Council- 01.30.2015 28.02.2018 875,000.00
7
Supply, Installation, Testing &Commissioning ( SITC) of Pump Motor
Units & Associated Switchgear withSCADA Integration including one Panel
Mounted Work Station in NajmaPumping Station
DubaiElectricity &
Water
Authority(DEWA)
- 10.02.2013 25.09.2015 5,347,649.20
8
Contract No. CPC-00913-C1 - Design,Construct & Maintenance Landscaping
Work for the Sons of his HighnessSheik Hamdan Bin Zayed
Crown PrinceCourt
- 22.02.2015 30.12.2015 18,000,000.00
-
7/24/2019 651914360On Going Projects
2/5
AL RYUM GROUP CURRENT ON-GOING PROJECTS
S.NO.
PROJECT NAME CLIENT CONSULTANT STARTINGDATE
COMPLETIONDATE
CONTRACTVALUE (AED)
2
9
Upgrading the Engineering NaturalBeautification Value Outside the Islandof Abu Dhabi, Second Phase, Project
No. 407/1
Abu DhabiMunicipality
Dorsch HoldingGmbH
01.10.2013 30.09.2015 10,000,000.00
10
Renovation of the Garden and theInfrastructure in the Main Desert, SixthPhase, Infrastructure, Project No. 209/5
at Abu Dhabi Main Land
Abu DhabiMunicipality
Dorsch HoldingGmbH
01.10.2013 31.12.2015 10,000,000.00
11Mitigation Measures of Water LoggingProblems in Al Sameeh & Al Shahama
Areas
EnvironmentAgency
Parsons IntlLtd.
11.07.2013 30.09.2015 40,871,733.00
12
Operations & Maint of Parks,Landscape, Recreational Facilities &
their related Infrastructure of Asset s forDelma Island, Western Region, Emirate
of Abu Dhabi
WesternRegion
Municipality- 01.01.2014 01.01.2017 31,554,338.39
13 Landscape Works for Crescent ParkLusail RealEstate DevlCo.(LREDC)
Dorsch HoldingGmbH
20.01.2014 16.01.2016 331,097,242.08
14 The Rajmahal Theatre at BollywoodPark
MeraasHolding
Kling Consult 27.03.2014 26.09.2015 107,000,000.00
15Four Seasons Hotel Abu Dhabi
Contract No. CC0044Al Futtaim
Carillion LLCAECOM 01.03.2014 30.10.2015 15,656,977.00
16
In-Parks Primary Infrastructure worksfor Legoland Dubai Park, Bollywood
Park, Hotel 1 and Riverwalk on DubaiParks
MeraasHolding
- 11.05.2014 01.10.2015 145,335,848.00
17
In-Parks Primary Infrastructure works
for Motiongate
Meraas
Holding - 11.05.2014 30.09.2015 105,187,387.00
18
Contract: PRFD/O&M/C4100/1 -Formula 1 Preparation Works of
Landscape and Local Irrigation Assetsfor Yas Island - Zone 2
Abu DhabiMunicipality
Parsons IntlLtd.
08.10.2013 30.09.2015 9,358,037.57
19Construction of 20 Playgrounds in AbuDhabi Main Land-Phase 1 Contract
No. 393-A
Abu DhabiMunicipality
KEOInternational
03.08.2014 22.11.2015 11,190,627.52
-
7/24/2019 651914360On Going Projects
3/5
AL RYUM GROUP CURRENT ON-GOING PROJECTS
S.NO.
PROJECT NAME CLIENT CONSULTANT STARTINGDATE
COMPLETIONDATE
CONTRACTVALUE (AED)
3
20Construction of 20 Children
Playgrounds in Abu Dhabi Main Land-Phase 1 Contract No. 393-B
Abu DhabiMunicipality
KEOInternational
03.08.2014 04.11.2015 10,230,658.88
21Periodic Maintenance Work at Al
Sheikh Saif Bin Zaid, Zacker Palace Al Ain
Crown PrinceCourt
- 02.03.2014 31.12.2015 21,000,000.00
22Landscaping, Swimming Pools & Water
Features Package Works ( 3700) Kempenski Hotel
SunriseProperties Ltd
LINX 13.07.2014 13.09.2015 20,500,000.00
23 Dubai parks plant nursery(DPPN)Meraas
DevelopmentLLC
- 02.09.2014 30.10.2015 20,100,000.00
24 LOUVRE Museum Abu Dhabi
Tourism Dev.& Investment
Co.( TDIC)
- 06.10.2014 21.09.2015 3,377,500.00
25Contract No. 9/467 Removal of
Weeds and Pruning of Trees in AbuDhabi Island South, Abu Dhabi
Abu DhabiMunicipality
Dorsch HoldingGmbH
01.12.2014 30.11.2015 10,000,000.00
26
Contract No. 1/154 Removal of
Weeds and Pruning of Trees inMainland, Abu Dhabi
Abu Dhabi
Municipality Parsons IntlLtd.
10.11.2014 07.05.2016 10,000,000.00
27Contract No. 1/153 Removal of
Weeds and Pruning of Trees in North,Abu Dhabi
Abu DhabiMunicipality
Parsons IntlLtd.
10.11.2014 07.05.2016 10,000,000.00
28
Contract: PRFD/O&M/121/1R Operation and Maintenance of Parks
and Water Features at Area along AbuDhabi Dubai Highway
Abu DhabiMunicipality
Parsons IntlLtd.
31.12.2014 30.12.2016 10,680,000.00
29
Contract: PRFD/O&M/112R Operation
and Maintenance of Landscape andPocket Park Assets on Abu DhabiIsland
Abu DhabiMunicipality Parsons IntlLtd. 31.12.2014 30.12.2016 14,433,333.33
30
Contract: PRFD/O&M/111R Operationand Maintenance of Landscape andPocket Park Assets on Abu Dhabi
Island
Abu DhabiMunicipality
Parsons IntlLtd.
31.12.2014 30.12.2016 13,753,333.33
-
7/24/2019 651914360On Going Projects
4/5
AL RYUM GROUP CURRENT ON-GOING PROJECTS
S.NO.
PROJECT NAME CLIENT CONSULTANT STARTINGDATE
COMPLETIONDATE
CONTRACTVALUE (AED)
4
31
Operation & Maintenance of the Seedsof Beautification Plants and the LocalIrrigation Networks at Khalifa City
Contract No.1R/113
Abu DhabiMunicipality
Dorsch HoldingGmbH
31.12.2014 30.12.2016 12,176,666.67
32
Operation & Maintenance ofBeautification Plants and Irrigation
Networks at the Area of Abu Dhabi AlAin Road from Mussafah BridgeIntersection to Al Nahda Area
Contract No. 1R/112
Abu DhabiMunicipality
Dorsch HoldingGmbH
31.12.2014 30.12.2016 29,869,282.48
33 Contract No. CPC-14048-MICrown Prince
Court- 1.11.2014 30.10.2015 1,575,303.00
34
Contract No. 73/2014 LandscapingMaintenance for Crown Prince CourtBuildings and the Villa of Strategic
Affairs, Abu Dhabi
Crown PrinceCourt
- 21.10.2014 20.10.2015 1,490,000.00
35Palm Jumeirah Azure Residence
Building(Contract DMS135862)
NakheelMs. Dal AlHandasha
20.11.2014 19.11.2015 6,100,000.00
36Church Compound for Armenian
Community of Abu Dhabi School
ArmenianCommunity ofAbu Dhabi
KojakianEngineeringConsultants
01.06.2015 31.12.2015 3,703,534.00
37DPDP 4005 LEGOLAND Area
Development Package 4
LL DubaiTheme Park
LLC- 14.06.2015 29.02.2016 66,150,000.00
38
Contract No. 51/2013 Commissioning,Developing & Maintaining Public
Gardens, Landscape & Blight/PestControl Works and on the Palm and
Fruit Trees in the Residence of Al AinCity and Eastern Region District of theEmirates Contract No: 1 Al MarkhaniaArea Sector and the Related Area, Al
Markhania Al Ain, UAE
Al AinMunicipality
- 11.07.2015 10.07.2017 22,575,139.58
39
Contract No. 52/2014 OutsourcingWork of Operation, Development &Maintenance of Public Parks andLandscapes in Al Ain and Eastern
Region of the Emirates Contract (12)for the Operation, Water Management,
Devl. , Maintenance & Repair ofIrrigation Water Supply and Distribution
City in Al Ain Region, Al Ain UAE
Al AinMunicipality
- 01.07.2015 30.06.2017 28,204,566.72
-
7/24/2019 651914360On Going Projects
5/5
AL RYUM GROUP CURRENT ON-GOING PROJECTS
S.NO.
PROJECT NAME CLIENT CONSULTANT STARTINGDATE
COMPLETIONDATE
CONTRACTVALUE (AED)
5
40
Construction of Downtown Jebel AliZone 1 4 Infrastructure RemainingWorks LML-DJA-15005, Downtown
Jebel Ali Zone 1-4
Limitless LLC - 08.06.2015 26.07.2017 285,512,503.68
41
The Complete Construction andCommissioning of the CommunityFacility Buildings ( Civil Defense,
Ambulance Post & Police Station Dubai UAE
Dubai Parks &Resorts PJSC
- 24.06.2015 22.06.2016 31,900,000.00
42
Infrastructure Works for Package 8 andPackage 2A Contract No. DMS
140563, Jumeirah Park Development,Dubai
Jumeirah Park - 25.06.2015 24.06.2016 18,393,406.25
43The Complete Construction and
Commissioning of the Data CentreBuilding
Dubai Parks &Resorts PJSC
- 12.07.2015 12.05.2016 21,091,962.00
44Contract No. 67W/2014 1MIG RCC
Water Tank at Gizemri - Fujairah
FederalElectricity &
Water
Authority
- 16.08.2015 15.08.2016 6,972,134.40
45Design & Build of LEGOLAND Water
Park
LL DubaiTheme Park
LLC- 01.07.2015 31.05.2016 106,262,203.00
46DPDP 4005 LEGOLAND(Ride Specialist Installation)
LL DubaiTheme Park
LLC- 02.08.2015 24.04.2016 4,400,876.00
47DPDP 4001 Motiongate(Ride Specialist Installation)
MotiongateLLC
- 02.08.2015 07.08.2016 8,676,338.00
48DPDP 4003 Bollywood Park
(Ride Specialist Installation)BollywoodParks LLC
- 02.08.2015 18.06.2016 2,595,206.00
49CPC-15054-M1
Periodic Maintenance Work for DifferentAreas
Crown PrinceCourt
- 01.05.2015 30.04.2016 3,900,000.00