³63(&,$/ 5(32576´ $''(1'80 from ky r 55 south of campbellsville to ky r 70. section 1....
TRANSCRIPT
-
PPRROOJJEECCTTSS TTAARRGGEETTEEDD FFOORR PPOOTTEENNTTIIAALL AADDVVAANNCCEEMMEENNTT ((1100%% LLIISSTT))
As set forth by KRS 176.420 (HB 655), the following is a listing of all projects shown in the 2018 Recommended Highway Plan submitted to the 2018 General Assembly that are targeted for potential advancement. These projects may be advanced from later years to maximize the use of all funds available to the Transportation Cabinet, and to plan for the historical precedent of projects being delayed due to unforeseen circumstances. Submitted herein is a listing of projects from the last four years of the 2018 Recommended Highway Plan, not exceeding ten (10) percent of the expected appropriations for the biennium, which can be advanced if additional money is received or if a project in the biennium is delayed.
-
Funding CategoryFundingAcronym
ExpectedBiennial
Appropriation($ millions)
20% ofExpected
Appropriations($ millions)
10% ofExpected
Appropriations($ millions)
"10% List"Projects
submitted withRecommended Highway
PlanJanuary 2016
Congestion Mitigation CM 31 .5 6 .3 3 .2 0 .0
National Highway NH 652 .6 130 .5 65 .3 64 .9 Safety
(HES, RRP, RRS) SAF 93 .3 18 .7 9 .3 0 .0
STP-Louisville SLO 46 .5 9 .3 4 .7 0 .0
STP-Lexington SLX 16 .2 3 .2 1 .6 0 .0
STP-Northern Kentucky SNK 18 .3 3 .7 1 .8 0 .0
STP-Henderson Kentucky SHN 1 .6 0 .3 0 .2 0 .0
STP-Ashland Kentucky SAH 3 .2 0 .6 0 .3 0 .0
State Construction Dollars Available SPP 304 .0 60 .8 30 .4 27 .7
Statewide Surface Transportation STP 274 .7 54 .9 27 .5 26 .8
Transportation Enhancement TE 26 .0 5 .2 2 .6 0 .0
$1,467 .9 $293 .6 $146 .8 $119 .4
Funding Controls for the Kentucky Transportation Cabinet's"20% List" for FYs 20192020
TOTAL
-
2018 RECOMMENDED HIGHWAY PLAN10% LISTING OF PROJECT PHASES
COUNTY DISTNO ITEMNO PREFIX ROUTENO SUFFIX1 BMP EMP TYPEWORK DESCRIPTION PHASE 2018 REC SYP FUND 2018 REC SYP FY 2018 REC SYP AMOUNTBOONE 6 14 I 75 177.659 178.345 I CHANGE RECONST(O) IMPROVE THE KY 536 (MT. ZION
ROAD) INTERCHANGE.(14CCR)(16CCR)
C NH 2022 5,000,000
BOONE 6 78 I 275 7.2 8.9 NEW INTERCHANGE(O) IMPROVE FREIGHT MOBILITY AT I275 AND GRAVES ROAD(CONTINUATION OF 6 8953:INTERCHANGE JUSTIFICATION STUDYON I 275/GRAVES RD).
C NH 2022 15,000,000
BUTLER 3 2042.3 WN 9007 35.7 36.1 I CHANGE RECONST(O) I 65 SPUR CORRIDOR: IMPROVE THENATCHER PARKWAY/US 231INTERCHANGE (EXIT 36). (2016BOP)
C NH 2021 6,750,000
OHIO 2 2092.2 WN 9007 49.7 50.1 I CHANGE RECONST(O) I 65 SPUR CORRIDOR; RECONSTRUCTTHE EXISTING NATCHERPARKWAY/KY 69 INTERCHANGE(EXIT 50) IN OHIO COUNTY.(2016BOP)
C NH 2021 8,700,000
PULASKI 8 59.25 KY 461 0 3.879 MAJOR WIDENING(O) IMPROVE KY 461 FROM KY 80 TOBUCK CREEK BRIDGE, INCLUDINGINTERCHANGE AT KY 80.
R NH 2021 3,000,000
PULASKI 8 59.25 KY 461 0 3.879 MAJOR WIDENING(O) IMPROVE KY 461 FROM KY 80 TOBUCK CREEK BRIDGE, INCLUDINGINTERCHANGE AT KY 80.
U NH 2021 1,500,000
PULASKI 8 59.26 KY 461 0 3.879 PREFINANCD CONVRSN(O) IMPROVE KY 461 FROM KY 80 TOBUCK CREEK BRIDGE, INCLUDINGINTERCHANGE AT KY 80.
U NH 2022 1,500,000
TAYLOR 4 142.2 KY 555 NEW ROUTE(O) HEARTLAND PARKWAY: IMPROVEMOBILITY AND CONNECTIVITY VIANEW CAMPBELLSVILLE BYPASS FROMKY 55 SOUTH OF CAMPBELLSVILLETO KY 70. SECTION 1.(2010BOP)(14CCR)(16CCR)
C NH 2022 7,600,000
TAYLOR 4 142.21 KY 555 PREFINANCD CONVRSN(O) HEARTLAND PARKWAY: IMPROVEMOBILITY AND CONNECTIVITY VIANEW CAMPBELLSVILLE BYPASS FROMKY 55 SOUTH OF CAMPBELLSVILLETO KY 70. SECTION 1.(2010BOP)(14CCR)(16CCR)
C NH 2023 7,600,000
2018 RECOMMENDED HIGHWAY PLAN BY PHASE FOR 10 PERCENT LIST.xls10 PERCENT LIST 1 OF 3
-
2018 RECOMMENDED HIGHWAY PLAN10% LISTING OF PROJECT PHASES
COUNTY DISTNO ITEMNO PREFIX ROUTENO SUFFIX1 BMP EMP TYPEWORK DESCRIPTION PHASE 2018 REC SYP FUND 2018 REC SYP FY 2018 REC SYP AMOUNTWARREN 3 2042.2 WN 9007 9.4 9.6 I CHANGE RECONST(O) I 65 SPUR CORRIDOR: IMPROVE THE
NATCHER PARKWAY/US 231INTERCHANGE (EXIT 9) ON THE WESTSIDE OF BOWLING GREEN. (SEE ITEMNO. 3 202 FOR DESIGN) (2016BOP)
C NH 2021 8,200,000
TOTAL NH 64,850,000DAVIESS 2 8300 KY 54 2.47 8.003 MAJOR WIDENING(O) IMPROVE KY 54 FROMWEST OF THE
US 60 BYPASS TO CR 1021 (JACKHINTON ROAD).(06CCN)(10CCR)(12CCR)(14CCR)(16CCR)
U SPP 2022 5,750,000
DAVIESS 2 8300.01 KY 54 2.47 8.003 PREFINANCD CONVRSN(O) IMPROVE KY 54 FROMWEST OF THEUS 60 BYPASS TO CR 1021 (JACKHINTON ROAD).(06CCN)(10CCR)(12CCR)(14CCR)(16CCR)
R SPP 2021 4,520,000
DAVIESS 2 8300.01 KY 54 2.47 8.003 PREFINANCD CONVRSN(O) IMPROVE KY 54 FROMWEST OF THEUS 60 BYPASS TO CR 1021 (JACKHINTON ROAD).(06CCN)(10CCR)(12CCR)(14CCR)(16CCR)
U SPP 2023 13,420,000
MADISON 7 235 KY 52 1.17 8.015 RECONSTRUCTION(O) IMPROVE KY 52 FROMWALLACEMILL ROAD TO INTERSTATE 75 ATTHE DUNCANNON ROADINTERCHANGE.(02CCR)(12CCN)(14CCR)(DESIGN/BUILD)(16CCR)
U SPP 2021 4,000,000
TOTAL SPP 27,690,000BOONE 6 444 KY 236 0 1.594 MAJOR WIDENING(O) IMPROVE SAFETY AND REDUCE
CONGESTION ALONG KY 236(DONALDSON ROAD) FROM KY 842(HOUSTON ROAD) TO KY 3076(MINEOLA PIKE).
D STP 2022 5,000,000
BOONE 6 444 KY 236 0 1.594 MAJOR WIDENING(O) IMPROVE SAFETY AND REDUCECONGESTION ALONG KY 236(DONALDSON ROAD) FROM KY 842(HOUSTON ROAD) TO KY 3076(MINEOLA PIKE).
R STP 2023 1,000,000
BOONE 6 445 KY 3076 0 1.05 MAJOR WIDENING(O) IMPROVE FREIGHT MOBILITY ANDREDUCE CONGESTION ON KY 3076(MINEOLA PIKE) FROM KY 236 TO I275.
R STP 2022 4,000,000
2018 RECOMMENDED HIGHWAY PLAN BY PHASE FOR 10 PERCENT LIST.xls10 PERCENT LIST 2 OF 3
-
2018 RECOMMENDED HIGHWAY PLAN10% LISTING OF PROJECT PHASES
COUNTY DISTNO ITEMNO PREFIX ROUTENO SUFFIX1 BMP EMP TYPEWORK DESCRIPTION PHASE 2018 REC SYP FUND 2018 REC SYP FY 2018 REC SYP AMOUNTBOONE 6 445 KY 3076 0 1.05 MAJOR WIDENING(O) IMPROVE FREIGHT MOBILITY AND
REDUCE CONGESTION ON KY 3076(MINEOLA PIKE) FROM KY 236 TO I275.
U STP 2023 750,000
BOURBON 7 8705 US 460 1.394 7.696 RECONSTRUCTION(O) IMPROVE US 460 FROM RUSSELLCAVE ROAD TO US 27 BYPASS INPARIS.(12CCN)(14CCR)(16CCR)
C STP 2021 5,620,000
BOURBON 7 8705.01 US 460 1.394 7.696 PREFINANCD CONVRSN(O) IMPROVE US 460 FROM RUSSELLCAVE ROAD TO US 27 BYPASS INPARIS.(12CCN)(14CCR)(16CCR)
R STP 2021 2,030,000
BOURBON 7 8705.01 US 460 1.394 7.696 PREFINANCD CONVRSN(O) IMPROVE US 460 FROM RUSSELLCAVE ROAD TO US 27 BYPASS INPARIS.(12CCN)(14CCR)(16CCR)
U STP 2021 1,500,000
BOURBON 7 8705.01 US 460 1.394 7.696 PREFINANCD CONVRSN(O) IMPROVE US 460 FROM RUSSELLCAVE ROAD TO US 27 BYPASS INPARIS.(12CCN)(14CCR)(16CCR)
C STP 2023 6,880,000
TOTAL STP 26,780,000
COMBINED TOTAL 119,320,000
2018 RECOMMENDED HIGHWAY PLAN BY PHASE FOR 10 PERCENT LIST.xls10 PERCENT LIST 3 OF 3
-
EEssttiimmaatteedd CCoossttss ttoo CCoommpplleettee PPrroojjeeccttss As set forth by KRS 176.419 (HB 655), the following is a listing of the estimated
costs to complete projects in the 2018 Recommended Highway Plan submitted to the 2018 General Assembly. This listing includes estimated costs, by phase, to complete projects that do not have all phases scheduled to be initiated in the 2018 Recommended Highway Plan. Scoping studies are not included.
-
2018 RECOMMENDED HIGHWAY PLAN ESTIMATED COST TO COMPLETELIST OF PROJECTS
COUNTY DISTRICTITEMNUMBER
PARENTDISTRICT
PARENTNUMBER
PREFIX ROUTENO SUFFIX BMP EMP TYPEWORK 2018 REC SYP DESCRIPTION PHASE ESTIMATED COST
BALLARD 1 115 1 115 US 60 13.62 16.937 MAJOR WIDENING(O) PADUCAH WICKLIFFE RD: IMPROVEUS 60 FROM STAFFORD ROAD TOBETHEL CHURCH ROAD (INCLUDESKEVIL BYPASS)(TO BE LET WITH 1115.10) (06CCR)(12CCR)(14CCR).
C 10,130,000
BALLARD 1 118 1 118 US 60 11.815 13.615 MAJOR WIDENING(O) IMPROVE US 60 FROM PROPOSEDSOUTHERN BYPASS OF LA CENTERTO EAST OF DENIS JONES ROAD.(02CCR)
C 9,850,000
BALLARD 1 1140.01 1 1140 US 51 7.327 8.297 AM BRIDGE (P) PE AND ENVIRONMENTAL FORREPLACEMENT OF CAIRO BRIDGE ATOR BESIDE EXISTING LOCATION.(004B00021N)(SD)
C 100,000,000
BARREN 3 8821 3 8821 KY 1297 11.085 12.806 MAJOR WIDENING(O) IMPROVE KY 1297 FROM CR 1366(DONNELLY DRIVE) TO US 31E(ROGER WELLS), AND IMPROVE CR1366 (DONNELLY DRIVE) FROM KY1297 TO US 68 IN GLASGOW.(14CCN) (16CCN)
C 8,430,000
BOONE 6 444 6 444 KY 236 0 1.594 MAJOR WIDENING(O) IMPROVE SAFETY AND REDUCECONGESTION ALONG KY 236(DONALDSON ROAD) FROM KY 842(HOUSTON ROAD) TO KY 3076(MINEOLA PIKE).
C 13,000,000
BOONE 6 445 6 445 KY 3076 0 1.05 MAJOR WIDENING(O) IMPROVE FREIGHT MOBILITY ANDREDUCE CONGESTION ON KY 3076(MINEOLA PIKE) FROM KY 236 TO I275.
C 9,000,000
BREATHITT 10 375 10 375 KY 205 7.804 9.954 MINORWIDENING(O) IMPROVE KY 205 FROM NORTH OFKY 1812 TO SOUTH OF PEGGS FORKRD.
U 1,030,000
BREATHITT 10 375 10 375 KY 205 7.804 9.954 MINORWIDENING(O) IMPROVE KY 205 FROM NORTH OFKY 1812 TO SOUTH OF PEGGS FORKRD.
C 7,420,000
BULLITT 5 150.5 5 150.01 KY 44 22.8 23.25 RECONSTRUCTION(O) SECTION 5 FROM US 31EX TO US31E BYPASS. (2008BOPC).
C 2,460,000
2018 RECOMMENDED HIGHWAY PLAN COST TO COMPLETE FOR ADDENDUM JANUARY 17 2018.xls 1 OF 8
-
2018 RECOMMENDED HIGHWAY PLAN ESTIMATED COST TO COMPLETELIST OF PROJECTS
COUNTY DISTRICTITEMNUMBER
PARENTDISTRICT
PARENTNUMBER
PREFIX ROUTENO SUFFIX BMP EMP TYPEWORK 2018 REC SYP DESCRIPTION PHASE ESTIMATED COST
CLINTON 8 8601.3 8 8601.3 US 127 16.135 19.99 RELOCATION(O) RELOCATION OF US 127 FROM EASTOF THE AARON RIDGE RD AND OLDUS 127 INTERSECTION, EXTENDINGNORTHERLY TO NORTH OF THE KY3063 AND OLD US 127INTERSECTION. (SEE 8 108 AND 8115 FOR PE&ENV)(12CCR)
R 1,680,000
CLINTON 8 8601.3 8 8601.3 US 127 16.135 19.99 RELOCATION(O) RELOCATION OF US 127 FROM EASTOF THE AARON RIDGE RD AND OLDUS 127 INTERSECTION, EXTENDINGNORTHERLY TO NORTH OF THE KY3063 AND OLD US 127INTERSECTION. (SEE 8 108 AND 8115 FOR PE&ENV)(12CCR)
U 580,000
CLINTON 8 8601.3 8 8601.3 US 127 16.135 19.99 RELOCATION(O) RELOCATION OF US 127 FROM EASTOF THE AARON RIDGE RD AND OLDUS 127 INTERSECTION, EXTENDINGNORTHERLY TO NORTH OF THE KY3063 AND OLD US 127INTERSECTION. (SEE 8 108 AND 8115 FOR PE&ENV)(12CCR)
C 27,000,000
CUMBERLAND 8 8852 8 8852 KY 90 5.182 10.432 RECONSTRUCTION(O) IMPROVE KY 90 FROM NORRISBRANCH ROAD EXTENDINGWESTERLY TO PA DUERSON ROADNEAR MARROWBONE. (14CCN)
R 3,200,000
CUMBERLAND 8 8852 8 8852 KY 90 5.182 10.432 RECONSTRUCTION(O) IMPROVE KY 90 FROM NORRISBRANCH ROAD EXTENDINGWESTERLY TO PA DUERSON ROADNEAR MARROWBONE. (14CCN)
U 1,800,000
CUMBERLAND 8 8852 8 8852 KY 90 5.182 10.432 RECONSTRUCTION(O) IMPROVE KY 90 FROM NORRISBRANCH ROAD EXTENDINGWESTERLY TO PA DUERSON ROADNEAR MARROWBONE. (14CCN)
C 22,000,000
2018 RECOMMENDED HIGHWAY PLAN COST TO COMPLETE FOR ADDENDUM JANUARY 17 2018.xls 2 OF 8
-
2018 RECOMMENDED HIGHWAY PLAN ESTIMATED COST TO COMPLETELIST OF PROJECTS
COUNTY DISTRICTITEMNUMBER
PARENTDISTRICT
PARENTNUMBER
PREFIX ROUTENO SUFFIX BMP EMP TYPEWORK 2018 REC SYP DESCRIPTION PHASE ESTIMATED COST
DAVIESS 2 8854 2 8854 KY 3143 1.829 2.958 MINOR WIDENING(O) IMPROVE KY 3143 FROM KY 3335 TOKY 54. (14CCN)
C 7,300,000
ELLIOTT 9 228 9 228 KY 7 0 6.956 RECONSTRUCTION(O) IMPROVE KY 7 FROM SOUTH CITYLIMITS OF SANDY HOOK TOWARDWRIGLEY. (12CCR)(16CCR)
R 13,230,000
ELLIOTT 9 228 9 228 KY 7 0 6.956 RECONSTRUCTION(O) IMPROVE KY 7 FROM SOUTH CITYLIMITS OF SANDY HOOK TOWARDWRIGLEY. (12CCR)(16CCR)
U 6,490,000
ELLIOTT 9 228 9 228 KY 7 0 6.956 RECONSTRUCTION(O) IMPROVE KY 7 FROM SOUTH CITYLIMITS OF SANDY HOOK TOWARDWRIGLEY. (12CCR)(16CCR)
C 61,660,000
ESTILL 10 206 10 206 KY 2459 0 0.373 SPOT IMPROVEMENTS(O) IMPROVE SAFETY ON KY 2459(CARHARTT AVE.) FROM KY 89 TOTHE RAILROAD BRIDGE.
C 750,000
FAYETTE 7 8902 7 8902 KY 1927 0 1.145 MAJOR WIDENING(O) IMPROVE LIBERTY ROAD FROMGRAFTONS MILL LANE TO NEWCIRCLE ROAD AND IMPROVEINTERSECTION WITH NEW CIRCLEROAD. (16CCN)
C 6,190,000
FULTON 1 25 1 25 JC 9003 0 1.66 RECONSTRUCTION(O) IMPROVE THE PURCHASE PARKWAYAT THE KENTUCKY/TENNESSEE LINETO SOUTHWEST OF THE US 51INTERCHANGE.(I 69 CORRIDORIMPROVEMENT)(2012BOP)
U 1,130,000
FULTON 1 25 1 25 JC 9003 0 1.66 RECONSTRUCTION(O) IMPROVE THE PURCHASE PARKWAYAT THE KENTUCKY/TENNESSEE LINETO SOUTHWEST OF THE US 51INTERCHANGE.(I 69 CORRIDORIMPROVEMENT)(2012BOP)
C 23,400,000
2018 RECOMMENDED HIGHWAY PLAN COST TO COMPLETE FOR ADDENDUM JANUARY 17 2018.xls 3 OF 8
-
2018 RECOMMENDED HIGHWAY PLAN ESTIMATED COST TO COMPLETELIST OF PROJECTS
COUNTY DISTRICTITEMNUMBER
PARENTDISTRICT
PARENTNUMBER
PREFIX ROUTENO SUFFIX BMP EMP TYPEWORK 2018 REC SYP DESCRIPTION PHASE ESTIMATED COST
FULTON 1 26 1 26 JC 9003 1.2 3.434 RECONSTRUCTION(O) IMPROVE THE PURCHASE PARKWAYFROM SOUTHWEST OF THE US 51INTERCHANGE TO CARDINAL ROADNEAR MAYFIELD INCLUDING THE KY339 INTERCHANGE IN WINGO, KY. (I69 CORRIDOR IMPROVEMENT)(2012BOP)
U 500,000
FULTON 1 26 1 26 JC 9003 1.2 3.434 RECONSTRUCTION(O) IMPROVE THE PURCHASE PARKWAYFROM SOUTHWEST OF THE US 51INTERCHANGE TO CARDINAL ROADNEAR MAYFIELD INCLUDING THE KY339 INTERCHANGE IN WINGO, KY. (I69 CORRIDOR IMPROVEMENT)(2012BOP)
C 17,550,000
GALLATIN 6 8910 6 8910 I 71 62.8 64 RECONSTRUCTION(O) IMPROVE GEOMETRICS ON I 71FROM US 127 TO MP 64. (16CCN).
C 24,000,000
GARRARD 7 196.3 7 196.01 US 27 5.199 10.331 RELOCATION(O) IMPROVE US 27 FROMWESTLANCASTER BYPASS TO KY 34.(2006BOPC) (16CCN)
R 14,340,000
GARRARD 7 196.3 7 196.01 US 27 5.199 10.331 RELOCATION(O) IMPROVE US 27 FROMWESTLANCASTER BYPASS TO KY 34.(2006BOPC) (16CCN)
U 12,240,000
GARRARD 7 196.3 7 196.01 US 27 5.199 10.331 RELOCATION(O) IMPROVE US 27 FROMWESTLANCASTER BYPASS TO KY 34.(2006BOPC) (16CCN)
C 50,290,000
HART 4 441 4 441 KY 335 1.2 2.545 ECONOMIC DEVEL(O) IMPROVE MOBILITY, CONNECTIVITYAND SAFETY BY ADDRESSINGCOMMERCIAL AND INDUSTRIALTRAFFIC MOVEMENT FROM US 31WSOUTH OF KY 218 TO I 65. (16CCR)
C 8,400,000
HOPKINS 2 384 2 384 KY 281 0.996 1.759 MAJORWIDENING(O) IMPROVE KY 281 FROM ISLANDPARK DRIVE TO CARRIAGE LANE (KY2281).
C 2,300,000
2018 RECOMMENDED HIGHWAY PLAN COST TO COMPLETE FOR ADDENDUM JANUARY 17 2018.xls 4 OF 8
-
2018 RECOMMENDED HIGHWAY PLAN ESTIMATED COST TO COMPLETELIST OF PROJECTS
COUNTY DISTRICTITEMNUMBER
PARENTDISTRICT
PARENTNUMBER
PREFIX ROUTENO SUFFIX BMP EMP TYPEWORK 2018 REC SYP DESCRIPTION PHASE ESTIMATED COST
JEFFERSON 5 8810 5 8810 KY 1931 4.561 5.5 MINOR WIDENING(O) THREE LANE WIDENING ALONG KY1931 FROM THE DOSS HIGH SCHOOLENTRANCE TO PALATKA ROAD,INCLUDING INTERSECTIONIMPROVEMENTS WITH PALATKAROAD AND TURN LANES. (14CCN)
C 4,500,000
JEFFERSON 5 8952 5 8952 US 60 14.718 15.114 MINOR WIDENING(O) WIDEN US 60 TO THREE LANESFROM EASTWOOD CUTOFF (MP14.7) TO ROCKCREST WAY (MP 15.1).(16CCN)
R 400,000
JEFFERSON 5 8952 5 8952 US 60 14.718 15.114 MINOR WIDENING(O) WIDEN US 60 TO THREE LANESFROM EASTWOOD CUTOFF (MP14.7) TO ROCKCREST WAY (MP 15.1).(16CCN)
U 450,000
JEFFERSON 5 8952 5 8952 US 60 14.718 15.114 MINOR WIDENING(O) WIDEN US 60 TO THREE LANESFROM EASTWOOD CUTOFF (MP14.7) TO ROCKCREST WAY (MP 15.1).(16CCN)
C 900,000
KENTON 6 162.4 6 162.01 KY 536 2.542 4.476 RECONSTRUCTION(O) IMPROVE SAFETY AND REDUCECONGESTION ON KY 536 FROMWILLIAMSWOOD ROAD/CALVARYDRIVE TO KY 17 (PRIORITY SECTION3). DESIGN PHASE UNDER PARENTNO. 6 162.01. (2012BOP)
C 21,150,000
KENTON 6 449 6 449 KY 17 18.15 18.65 CONGESTION MITIGTN(O) IMPROVE SAFETY AND REDUCECONGESTION ON KY 17 AT THE I 275INTERCHANGE.
C 3,500,000
KENTON 6 450 6 450 KY 1303 5.01 6.248 CONGESTION MITIGTN(O) IMPROVE SAFETY AND REDUCECONGESTION ALONG KY 1303(TURKEYFOOT RD) FROM DUDLEY RDTO US 25 (DIXIE HWY).
C 10,000,000
LAUREL 11 8515 11 8515 US 25 0 10.475 DESIGN ENGINEERING(O) IMPROVE CONNECTIVITY BETWEENCORBIN AND LONDON FROM KY1006 TO US 25E. (08CCN)
R 38,590,000
LAUREL 11 8515 11 8515 US 25 0 10.475 DESIGN ENGINEERING(O) IMPROVE CONNECTIVITY BETWEENCORBIN AND LONDON FROM KY1006 TO US 25E. (08CCN)
U 3,090,000
2018 RECOMMENDED HIGHWAY PLAN COST TO COMPLETE FOR ADDENDUM JANUARY 17 2018.xls 5 OF 8
-
2018 RECOMMENDED HIGHWAY PLAN ESTIMATED COST TO COMPLETELIST OF PROJECTS
COUNTY DISTRICTITEMNUMBER
PARENTDISTRICT
PARENTNUMBER
PREFIX ROUTENO SUFFIX BMP EMP TYPEWORK 2018 REC SYP DESCRIPTION PHASE ESTIMATED COST
LAUREL 11 8515 11 8515 US 25 0 10.475 DESIGN ENGINEERING(O) IMPROVE CONNECTIVITY BETWEENCORBIN AND LONDON FROM KY1006 TO US 25E. (08CCN)
C 68,150,000
LAUREL 11 8909 11 8909 HR 9006 7.877 10.593 RECONSTRUCTION(O) IMPROVE THE HAL ROGERSPARKWAY TO INTERSTATESTANDARDS FROM 4.0 MI EAST OFKY 192 TO LAUREL/CLAY CO. LINE. (I75 TO HAZARD) (16CCN).
R 2,200,000
LAUREL 11 8909 11 8909 HR 9006 7.877 10.593 RECONSTRUCTION(O) IMPROVE THE HAL ROGERSPARKWAY TO INTERSTATESTANDARDS FROM 4.0 MI EAST OFKY 192 TO LAUREL/CLAY CO. LINE. (I75 TO HAZARD) (16CCN).
U 1,000,000
LAUREL 11 8909 11 8909 HR 9006 7.877 10.593 RECONSTRUCTION(O) IMPROVE THE HAL ROGERSPARKWAY TO INTERSTATESTANDARDS FROM 4.0 MI EAST OFKY 192 TO LAUREL/CLAY CO. LINE. (I75 TO HAZARD) (16CCN).
C 27,000,000
LIVINGSTON 1 330 1 330 US 60 0.891 4.2 RELOCATION(O) PADUCAH HENDERSON; RELOCATEUS 60 FROM EAST OF THETENNESSEE RIVER BRIDGE TO EASTOF RUDD SPEES ROAD(00CCR)(12CCR)(14CCR)
C 17,310,000
MCCRACKEN 1 115.1 1 115.1 US 60 0.4 1.968 MAJOR WIDENING(O) PADUCAH WICKLIFFE RD: IMPROVEUS 60 FROM BETHEL CHURCH ROADTO KY 1154 (MARTIN MARIETTA)(04CCR) (TO BE LET WITH 1115.00).(10CCR)(12CCR)
C 8,440,000
NELSON 4 396.1 4 396 US 150 1.952 7.426 RECONSTRUCTION(O) IMPROVE SAFETY, MOBILITY, ANDGEOMETRICS ON US 150 FROM THEBLUEGRASS PARKWAY TO THENELSON/WASHINGTON COUNTYLINE. (2016BOP)
U 2,500,000
2018 RECOMMENDED HIGHWAY PLAN COST TO COMPLETE FOR ADDENDUM JANUARY 17 2018.xls 6 OF 8
-
2018 RECOMMENDED HIGHWAY PLAN ESTIMATED COST TO COMPLETELIST OF PROJECTS
COUNTY DISTRICTITEMNUMBER
PARENTDISTRICT
PARENTNUMBER
PREFIX ROUTENO SUFFIX BMP EMP TYPEWORK 2018 REC SYP DESCRIPTION PHASE ESTIMATED COST
NELSON 4 396.1 4 396 US 150 1.952 7.426 RECONSTRUCTION(O) IMPROVE SAFETY, MOBILITY, ANDGEOMETRICS ON US 150 FROM THEBLUEGRASS PARKWAY TO THENELSON/WASHINGTON COUNTYLINE. (2016BOP)
C 25,000,000
NICHOLAS 9 205 9 205 KY 36 3.1 3.283 SAFETY(P) IMPROVE THE KY 36/KY 32INTERSECTION NEAR THE NICHOLASCOUNTY SCHOOL PROPERTY.(12CCR)(16CCR)
C 5,070,000
ROCKCASTLE 8 8952 8 8952 KY 461 7 9.404 RECONSTRUCTION(O) IMPROVE KY 461 FROM US 150 TOTHE EXISTING FOUR LANEAPPROACH AT US 25.(16CCN)
C 18,000,000
SIMPSON 3 8856 3 8856 US 31 W 8.477 10.799 MAJOR WIDENING(O) IMPROVE US 31W FROM KY 1008 TOKY 621. (14CCN)(16CCR)
U 3,000,000
SIMPSON 3 8856 3 8856 US 31 W 8.477 10.799 MAJOR WIDENING(O) IMPROVE US 31W FROM KY 1008 TOKY 621. (14CCN)(16CCR)
C 9,000,000
SPENCER 5 8955 5 8955 KY 44 0.28 0.44 SAFETY(P) IMPROVE SAFETY AND ADDRESSGEOMETRIC DEFICIENCIES ALONG KY44 NEAR DUTCHMAN CREEK ROAD.(16CCN)
R 170,000
SPENCER 5 8955 5 8955 KY 44 0.28 0.44 SAFETY(P) IMPROVE SAFETY AND ADDRESSGEOMETRIC DEFICIENCIES ALONG KY44 NEAR DUTCHMAN CREEK ROAD.(16CCN)
U 160,000
SPENCER 5 8955 5 8955 KY 44 0.28 0.44 SAFETY(P) IMPROVE SAFETY AND ADDRESSGEOMETRIC DEFICIENCIES ALONG KY44 NEAR DUTCHMAN CREEK ROAD.(16CCN)
C 1,000,000
TAYLOR 4 142.3 4 142.1 KY 555 NEW ROUTE(O) HEARTLAND PARKWAY: IMPROVEMOBILITY AND CONNECTIVITY VIANEW CAMPBELLSVILLE BYPASSFROM KY 70 TO US 68 EAST OFCAMPBELLSVILLE. SECTION 2.(2010BOP)(16CCR)
C 10,500,000
2018 RECOMMENDED HIGHWAY PLAN COST TO COMPLETE FOR ADDENDUM JANUARY 17 2018.xls 7 OF 8
-
2018 RECOMMENDED HIGHWAY PLAN ESTIMATED COST TO COMPLETELIST OF PROJECTS
COUNTY DISTRICTITEMNUMBER
PARENTDISTRICT
PARENTNUMBER
PREFIX ROUTENO SUFFIX BMP EMP TYPEWORK 2018 REC SYP DESCRIPTION PHASE ESTIMATED COST
WOODFORD 7 117 7 117 US 60 11.238 12.612 MAJOR WIDENING(O) IMPROVE US 60 (VERSAILLES ROAD)FROM THE BLUEGRASSPARKWAY/HUNTERTOWN PIKE TOPISGAH PIKE.
R 260,000
WOODFORD 7 117 7 117 US 60 11.238 12.612 MAJOR WIDENING(O) IMPROVE US 60 (VERSAILLES ROAD)FROM THE BLUEGRASSPARKWAY/HUNTERTOWN PIKE TOPISGAH PIKE.
U 310,000
WOODFORD 7 117 7 117 US 60 11.238 12.612 MAJOR WIDENING(O) IMPROVE US 60 (VERSAILLES ROAD)FROM THE BLUEGRASSPARKWAY/HUNTERTOWN PIKE TOPISGAH PIKE.
C 2,410,000
2018 RECOMMENDED HIGHWAY PLAN COST TO COMPLETE FOR ADDENDUM JANUARY 17 2018.xls 8 OF 8
-
22001144 -- 22001166 HHIIGGHHWWAAYY PPLLAANNSS VVSS.. 22001188 RREECCOOMMMMEENNDDEEDD HHIIGGHHWWAAYY PPLLAANN
As set forth by KRS 176.420 (HB 655), the following is a side-by-side comparison of all projects in the 2018 Recommended Highway Plan submitted to the 2018 General Assembly and those that were in the 2014 and 2016 Highway Plans as enacted by the General Assembly. A justification statement documenting the reason any project in the 2016 Highway Plan was deleted from the 2018 Recommended Highway Plan is also included.
-
KENTUCKY TRANSPORTATION CABINET Page: 1
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION SIX YEAR PLAN
14 JAN 2018COMPARISON OF , , AND EDITIONS
OF THE SIX YEAR HIGHWAY PLAN PROJECTS
2014 2016 2018
2014 SIX YEAR PLAN2016 SIX YEAR PLAN2018
INTERCHANGE LIGHTING ATLOUIE B. NUNN PARKWAY.(12CCR)(14CCR)
ADDRESS DEFICIENCIES OFBRIDGE ON KY 704 (11.909) OVERPETTY'S FORK. (001B00078N)(SD)
ADD PASSING LANES/TRUCKLANES FROM THE COLUMBIABYPASS TO THE CAMPBELLSVILLEBYPASS (HEARTLANDPARKWAY).(14CCN)
ADDRESS PAVEMENT CONDITIONOF LOUIE B. NUNN CUMBERLANDPARKWAY BOTH DIRECTION(S)FROM MILEPOINT 43.02 TOMILEPOINT 57.79
IMPROVE THE SAFETY OF KY 98NEAR DURHAM SPRINGS CHURCH(12CCR)
IMPROVEMENTS TO KY 100:CURVE, BRIDGE, ANDINTERSECTION IMPROVEMENTSFROM NEAR THE STONY POINTROAD INTERSECTION TO EAST OFTHE ALONZO LONG HOLLOWROAD INTERSECTION (12CCR)
.197
13.927
1.100
1.100
ADAIR
ADAIR
ADAIR
ADAIR
ALLEN
ALLEN
KY-61
KY-704
KY-55
LN-9008
KY-98
KY-100
$740,000
$17,770,000
$4,300,000
$2,200,000
Total
Total
Total
Total
D
C
D
R
U
C
R
U
C
D
R
U
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2015
2016
2015
2016
2017
2019
2014
2015
2017
2016
2018
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
NH
NH
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$170,000
$570,000
$710,000
$1,425,000
$1,425,000
$14,210,000
$1,050,000
$750,000
$2,500,000
$800,000
$500,000
$900,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
08
08
08
08
03
03
170.00
1068.00
8851.00
20000.00
201.00
320.00
-
-
-
-
-
-
TAYLOR
08
08
08
08
03
03
170.00
1068.00
8851.00
20000.00
201.00
320.00
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2018
2014
2018
2012
2012
2012
2018
2014
2018
2012
2012
10.69
11.905
15.101
43.02
3.64
3.1
10.887
11.913
21.305
48.15
4.74
4.2
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
Milepoints: From:0 To: 7.723
SAFETY(P)
AM-BRIDGE (P)
MAJOR WIDENING(O)
AM-PAVEMENT (PKY)(P)
SAFETY(P)
RECONSTRUCTION(O)
Scope:
Scope:
Scope:
Scope:
Scope:
Scope:
D
R
U
C
C
R
U
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2020
2021
2021
2022
2017
2018
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BRX
BRX
BRX
BRX
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$250,000
$150,000
$50,000
$500,000
$3,680,000
$500,000
$900,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
$950,000
$3,680,000
$1,400,000
Total
Total
Total
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2023
2023
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$175,000
$490,000
$400,000
$4,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
$665,000
$4,400,000
Total
Total
AWARDED
FUNDS NOT AVAILABLE
-
KENTUCKY TRANSPORTATION CABINET Page: 2
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION SIX YEAR PLAN
14 JAN 2018COMPARISON OF , , AND EDITIONS
OF THE SIX YEAR HIGHWAY PLAN PROJECTS
2014 2016 2018
2014 SIX YEAR PLAN2016 SIX YEAR PLAN2018
REPLACE BRIDGE ON CR-1372 (MP1.388) OVER LANCASTER BRANCH;1.4 MI SW OF JCT US 231;(STRUCTURALLY DEFICIENT,SR=32.9) 002C00025N
REPLACE BRIDGE ON KY 2160OVER FLORIDA CREEK SOUTH OFINTERSECTION WITH HUNT LANE(CR 1155) (SR 40.8) 002B00048N
REPLACE BRIDGE ON HADE BELLRD (CR 1167) OVER BAYS FORK 0.5MILE N OF PARDUE RD (CR1163)(SR 28.7)002C00012N
ADDRESS DEFICIENCIES OFBRIDGE OVER BAYS FORK ONMITCHELL WEAVER ROAD (CR1328) 2.1 MI W OF KY 1332(002C00063N)(16CCN)
IMPROVE KY-100 (OLD GALLATINROAD) FROM SOUTH OF KY-2160TO KY-980. (06CCN)
CONDUCT A SCOPING STUDY ONTHE EASTERN SCOTTSVILLEBYPASS. (08CCN) (10CCR)(16CCN)
INDUSTRIAL PARK ACCESSROADS. (14CCN)
.100
.040
.040
.020
.341
4.000
ALLEN
ALLEN
ALLEN
ALLEN
ALLEN
ALLEN
ALLEN
CR-1372
KY-2160
CR-1167
CR-1328
KY-100
KY-98
-
$280,000
$680,000
$330,000
$400,000
$2,710,000
$500,000
$300,000
Total
Total
Total
Total
Total
Total
Total
C
R
U
C
R
U
C
D
R
U
C
P
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2014
2014
2015
2014
2014
2016
2020
2014
2014
2015
2014
2015
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BRZ
BRO
BRO
BRO
BRZ
BRZ
BRZ
BRZ
SPP
SPP
SPP
SP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$280,000
$80,000
$30,000
$570,000
$70,000
$85,000
$175,000
$400,000
$250,000
$960,000
$1,500,000
$500,000
$300,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
03
03
03
03
03
03
03
1074.00
1080.00
1081.00
1088.00
8305.00
8400.00
8801.00
-
-
-
-
-
-
-
03
03
03
03
03
03
03
1074.00
1080.00
1081.00
1088.00
8305.00
8400.00
8801.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2010
2012
2012
2018
2006
2016
2014
2010
2012
2012
2018
2006
2016
2014
1.338
.626
1.674
.35
14.1
1.438
.666
1.714
.39
14.441
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
BRIDGE REPLACEMENT(P)
BRIDGE REPLACEMENT(P)
BRIDGE REPLACEMENT(P)
AM-BRIDGE (P)
RECONSTRUCTION(O)
SCOPING STUDY(O)
ECONOMIC DEVEL(O)
Scope:
Scope:
Scope:
Scope:
Scope:
Scope:
Scope:
D
R
U
C
R
U
C
P
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2020
2021
2021
2021
2016
2016
2017
2016
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BRZ
BRZ
BRZ
BRZ
SPP
SPP
SPP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$400,000
$150,000
$75,000
$1,655,000
$370,000
$960,000
$1,250,000
$500,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
$2,280,000
$2,580,000
$500,000
Total
Total
Total
D
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$280,000
$1,316,000
$1,250,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
$1,596,000
$1,250,000
Total
Total
FUNDS NOT AVAILABLE
-
KENTUCKY TRANSPORTATION CABINET Page: 3
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION SIX YEAR PLAN
14 JAN 2018COMPARISON OF , , AND EDITIONS
OF THE SIX YEAR HIGHWAY PLAN PROJECTS
2014 2016 2018
2014 SIX YEAR PLAN2016 SIX YEAR PLAN2018
WIDENING OF KY 100 (FRANKLINROAD) TO 3 LANES WITH URBANSECTION FROM OLIVER STREETTO US 31E TO INCREASECAPACITY/SAFETY. MP 11.800-12.700 (14CCN)
IMPROVE ACCESS ROAD ON EACHEND OF INDUSTRIAL ACCESSROAD IN SCOTTSVILLE. (16CCN)
RECONSTRUCT 1.0 MILE EAST OFBRIDGE OVER BARREN RIVERLAKE TO CORRECT VERTICALAND HORIZONTALDEFICIENCIES.(16CCN)
ADDRESS DEFICIENCIES OF KY-3499 BRIDGE OVER BAYS FORK.(002B00004N)
ADDRESS DEFICIENCIES OF KY 585BRIDGE OVER MIDDLE FORKDRAKES CREEK. (002B00021N)
RECONSTRUCT KY 151 FROM US127 AT LAWRENCEBURG TO I-64 INFRANKLIN COUNTY.
.900
6.700
ALLEN
ALLEN
ALLEN
ALLEN
ALLEN
ANDERSON
KY-100
-
KY-98
KY-3499
KY-585
KY-151
$5,330,000Total
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2018
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SP
SP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$480,000
$380,000
$670,000
$3,800,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
03
03
03
03
03
05
8802.00
8901.00
8902.00
10000.00
10011.00
806.00
-
-
-
-
-
-
SIMPSON
FRANKLIN
03
03
03
03
03
05
8802.00
8901.00
8902.00
10000.00
10011.00
806.00
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2016
2016
2018
2018
2016
2014
2016
2016
2018
2018
2016
11.8
10.1
1.412
0
12.7
10.2
1.422
.002
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
Milepoints:
Milepoints:
From:
From:
8.326 To:
To:
8.354
MAJOR WIDENING(O)
SAFETY(P)
RECONSTRUCTION(O)
AM-BRIDGE (P)
AM-BRIDGE (P)
RECONSTRUCTION(O)
Scope:
Scope:
Scope:
Scope:
Scope:
Scope:
D
R
U
C
C
D
R
U
C
P
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2018
2019
2020
2017
2017
2018
2019
2020
2017
2017
2018
2020
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SP
SP
SP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$480,000
$380,000
$670,000
$3,800,000
$300,000
$400,000
$400,000
$300,000
$1,300,000
$250,000
$1,750,000
$5,000,000
$5,000,000
$20,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
$5,330,000
$300,000
$2,400,000
$32,000,000
Total
Total
Total
Total
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$175,000
$525,000
$245,000
$822,500
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
$700,000
$1,067,500
Total
Total
FUNDS NOT AVAILABLE
FUNDS NOT AVAILABLE
FUNDS NOT AVAILABLE
P PHASE AUTHORIZED
-
KENTUCKY TRANSPORTATION CABINET Page: 4
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION SIX YEAR PLAN
14 JAN 2018COMPARISON OF , , AND EDITIONS
OF THE SIX YEAR HIGHWAY PLAN PROJECTS
2014 2016 2018
2014 SIX YEAR PLAN2016 SIX YEAR PLAN2018
REPLACE GUARDRAIL ENDTREATMENTS ON VARIOUSROUTES IN ANDERSON, BOURBON,BOYLE, CLARK, FAYETTE,JESSAMINE, MADISON, MERCER,MONTGOMERY, SCOTT, ANDWOODFORD COUNTIES. (2010BOP)
WIDENING AND IMPROVEMENTSON US-62 FROM 0.103 MILE WESTOF THE NEW SCHOOLENTRANCE/WESTWOOD ESTATESTO 0.095 MILE EAST OF US-127B(LAWRENCEBURG BYPASS).(02CCN)(04CCN)(08CCR)(12CCR)
ADDRESS PAVEMENT CONDITIONOF MARTHA LAYNE COLLINSBLUEGRASS PARKWAY CARDINALDIRECTION(S) FROM MILEPOINT58.3 TO MILEPOINT 61.84
PADUCAH-WICKLIFFE RD:IMPROVE US-60 FROM STAFFORDROAD TO BETHEL CHURCH ROAD(INCLUDES KEVIL BYPASS)(TO BELET WITH 1-115.10)(06CCR)(12CCR)(14CCR).
PADUCAH-WICKLIFFE RD:IMPROVE US-60 FROM STAFFORDROAD TO BETHEL CHURCH ROAD(INCLUDES KEVIL BYPASS)(TO BELET WITH 1-115.10)(06CCR)(12CCR)(14CCR).
.900
3.700
3.700
ANDERSON
ANDERSON
ANDERSON
BALLARD
BALLARD
US-127
US-62
BG-9002
US-60
US-60
$907,850
$7,450,000
$15,700,000
Total
Total
Total
C
R
C
R
U
PHASE
PHASE
PHASE
PHASE
PHASE
2014
2014
2015
2017
2018
YEAR
YEAR
YEAR
YEAR
YEAR
SAF
SP
SP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$907,850
$3,800,000
$3,650,000
$9,980,000
$5,720,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
07
07
07
01
01
918.00
8100.00
20001.00
115.00
115.01
-
-
-
-
-
BOYLE
MCCRACKEN
MCCRACKEN
99
07
07
01
01
911.01
8100.00
20001.00
115.00
115.00
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2010
2002
2018
1998
2006
2006
2002
2018
1998
1998
17.251
58.3
13.62
13.62
18.371
61.84
16.937
16.937
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
Milepoints:
Milepoints:
Milepoints:
From:
From:
From:
0
0
To:
To:
To:
.385
.385
SAFETY-HAZARD ELIM(P)
SAFETY(P)
AM-PAVEMENT (PKY)(P)
MAJOR WIDENING(O)
MAJOR WIDENING(O)
Scope:
Scope:
Scope:
Scope:
Scope:
R
C
R
U
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2018
2017
2018
YEAR
YEAR
YEAR
YEAR
YEAR
SP
SP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$3,800,000
$3,650,000
$10,480,000
$6,190,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
$7,450,000
$16,670,000
Total
Total
D
C
R
U
R
PHASE
PHASE
PHASE
PHASE
PHASE
2024
2024
2022
2023
2024
YEAR
YEAR
YEAR
YEAR
YEAR
PM
PM
NH
NH
NH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$150,000
$1,500,000
$2,500,000
$3,500,000
$2,500,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
$1,650,000
$6,000,000
$2,500,000
Total
Total
Total
FUNDS NOT AVAILABLE
-
KENTUCKY TRANSPORTATION CABINET Page: 5
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION SIX YEAR PLAN
14 JAN 2018COMPARISON OF , , AND EDITIONS
OF THE SIX YEAR HIGHWAY PLAN PROJECTS
2014 2016 2018
2014 SIX YEAR PLAN2016 SIX YEAR PLAN2018
IMPROVE US-60 FROM PROPOSEDSOUTHERN BYPASS OF LA CENTERTO EAST OF DENIS JONES ROAD.(02CCR)
PE AND ENVIRONMENTAL FORREPLACEMENT OF CAIRO BRIDGEAT OR BESIDE EXISTINGLOCATION. (004B00021N)(SD)
PE AND ENVIRONMENTAL FORREPLACEMENT OF CAIRO BRIDGEAT OR BESIDE EXISTINGLOCATION.(SD)
PE AND ENVIRONMENTAL FORREPLACEMENT OF CAIRO BRIDGEAT OR BESIDE EXISTINGLOCATION.
REPLACE BRIDGE ON KY 358 OVERCLAYTON CREEK APPR. 0.5 MILENORTH OF KY 473 (SR 26.5)004B00044N
STUDY IMPROVEMENTS TOHALLOWAY LANDING ROAD(CR1232) (16CCN).
ADDRESS PAVEMENT CONDITIONOF AC PAVEMENT
1.800
.970
.970
.040
BALLARD
BALLARD
BALLARD
BALLARD
BALLARD
BALLARD
BALLARD
US-60
US-51
US-51
US-51
KY-358
CR-1232
US-51
$4,500,000
$980,000
Total
Total
P
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2019
2014
2014
2015
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BRO
BRO
BRO
BRO
BRO
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$2,000,000
$2,500,000
$150,000
$250,000
$580,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
01
01
01
01
01
01
01
118.00
1140.01
1140.02
1140.03
1143.00
8953.00
20000.00
-
-
-
-
-
-
-
01
01
01
01
01
01
01
118.00
1140.00
1140.02
1140.03
1143.00
8953.00
20000.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2000
2018
2018
2018
2012
2016
2018
2000
2018
2018
2018
2012
2016
2018
11.815
7.327
7.327
7.327
14.034
0
4.873
13.615
8.297
8.297
8.297
14.074
5.762
7.3
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
MAJOR WIDENING(O)
AM-BRIDGE (P)
AM-BRIDGE (P)
AM-BRIDGE (P)
BRIDGE REPLACEMENT(P)
SAFETY(P)
AM-PAVEMENT (PRI)(P)
Scope:
Scope:
Scope:
Scope:
Scope:
Scope:
Scope:
D
D
D
C
P
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2021
2016
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BRO
BRO
BRO
BRX
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$3,000,000
$6,500,000
$6,500,000
$500,000
$200,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
$3,000,000
$6,500,000
$6,500,000
$500,000
$200,000
Total
Total
Total
Total
Total
R
U
D
R
U
C
D
C
D
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2024
2024
2019
2023
2023
2023
2020
2024
2021
2020
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
NH
NH
BR
BR
BR
BR
BR
BR
BR
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$2,370,000
$1,900,000
$2,500,000
$1,000,000
$100,000
$49,500,000
$6,500,000
$49,500,000
$20,000,000
$275,000
$2,750,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
$4,270,000
$53,100,000
$56,000,000
$20,000,000
$3,025,000
Total
Total
Total
Total
Total
AWARDED
FUNDS NOT AVAILABLE
-
KENTUCKY TRANSPORTATION CABINET Page: 6
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION SIX YEAR PLAN
14 JAN 2018COMPARISON OF , , AND EDITIONS
OF THE SIX YEAR HIGHWAY PLAN PROJECTS
2014 2016 2018
2014 SIX YEAR PLAN2016 SIX YEAR PLAN2018
PRIORITY SECTION 3: IMPROVEKY-90 EAST OF GLASGOW FROMBRIDGE OVER FALLEN TIMBERCREEK TO THE METCALFECOUNTY LINE.(2002BOPC)(08CCR)(10CCR)(12CCR)
PRIORITY SECTION 3: IMPROVEKY-90 EAST OF GLASGOW FROMBRIDGE OVER FALLEN TIMBERCREEK TO THE METCALFECOUNTY LINE.(2002BOPC)(08CCR)(10CCR)(12CCR)
LOUIE B NUNN PKWY (LN-9008)BRIDGE PAINTING, CLEANING,AND MINOR REPAIRS ON BRIDGEOVER I-65 IN BARREN CO. KY.005B00067R, 005B00067L (2016BOP)
CONNECT US-31E (MP 12.6) TO OLDCALVARY DRIVE (CS 1196) AT THEEXISTING INTERSECTION OF US-31E AND TROJAN TRAIL.(12CCN)
MAJOR WIDENING FROM SANDERSSTREET IN CAVE CITY TO US 68(GLASGOW OUTER LOOP) INGLASGOW. (14CCN)(16CCR).
MAJOR WIDENING OR 2+1 FROMSTATE PARK ROAD TO NUNNPARKWAY. (14CCN)
4.217
4.217
.100
.300
8.414
11.074
BARREN
BARREN
BARREN
BARREN
BARREN
BARREN
KY-90
KY-90
LN-9008
US-31E
KY-90
US-31E
$10,010,000
$780,000
$39,500,000
$3,500,000
Total
Total
Total
Total
C
R
U
C
D
R
U
C
D
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2014
2014
2014
2015
2016
2017
2017
2018
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
STP
STP
STP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$10,010,000
$50,000
$180,000
$550,000
$2,500,000
$6,000,000
$3,500,000
$27,500,000
$3,500,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
03
03
03
03
03
03
108.50
108.51
195.00
8705.00
8819.00
8820.00
-
-
-
-
-
-
03
03
03
03
03
03
108.00
108.51
195.00
8705.00
8819.00
8820.00
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2000
2018
2016
2012
2014
2014
2000
2018
2016
2012
2014
2014
17.758
17.758
0
.16
1.222
21.975
21.975
.1
8.574
12.296
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
RECONSTRUCTION(O)
PREFINANCD CONVRSN(P)
AM-BRG PAINTING(P)
NEW ROUTE(O)
MAJOR WIDENING(O)
MAJOR WIDENING(O)
Scope:
Scope:
Scope:
Scope:
Scope:
Scope:
C
C
D
R
U
C
D
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2016
2017
2017
2019
2017
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
STP
STP
STP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$12,070,000
$550,000
$2,200,000
$6,000,000
$3,500,000
$27,500,000
$3,500,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
$12,070,000
$550,000
$39,200,000
$3,500,000
Total
Total
Total
Total
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2022
2023
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
STP
STP
NH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$3,950,000
$9,210,000
$500,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
$3,950,000
$9,210,000
$500,000
Total
Total
Total
AWARDED
SEE 03-8819.20
FUNDS NOT AVAILABLE
-
KENTUCKY TRANSPORTATION CABINET Page: 7
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION SIX YEAR PLAN
14 JAN 2018COMPARISON OF , , AND EDITIONS
OF THE SIX YEAR HIGHWAY PLAN PROJECTS
2014 2016 2018
2014 SIX YEAR PLAN2016 SIX YEAR PLAN2018
IMPROVE KY-1297 FROM CR-1366(DONNELLY DRIVE) TO US-31E(ROGER WELLS), AND IMPROVECR-1366 (DONNELLY DRIVE) FROMKY-1297 TO US-68 IN GLASGOW.(14CCN) (16CCN)
IMPROVE KY-1297 FROM CR-1366(DONNELLY DRIVE) TO US-31E(ROGER WELLS), AND IMPROVECR-1366 (DONNELLY DRIVE) FROMKY-1297 TO US-68 IN GLASGOW.(14CCN) (16CCN)
WIDEN KY-70 AT THE CAVE CITYINDUSTRIAL PARK. (16CCN)
CONSTRUCT AN ACCESS DRIVE ATTHE CAVE CITY INDUSTRIALPARK.(16CCN)
CONSTRUCT AN INDUSTRIALACCESS ROAD TO CONNECT TOKY 70 NEAR MP 5.9, INCLUDING ALEFT TURNING LANE ON KY 70.(16CCN)
INTERSECTION REALIGNMENT ONUS 68 AT KY 255 IN BARRENCOUNTY AT M.P. 3.971.(2012BOP)(AR/W)
ADDRESS DEFICIENCIES OF US31EX BRIDGE OVER WATERSTREET. (005B00058N)
1.721
1.721
.063
BARREN
BARREN
BARREN
BARREN
BARREN
BARREN
BARREN
KY-1297
KY-1297
KY-70
-
-
US-68
US-31EX
$1,200,000
$250,000
Total
Total
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2014
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SAF
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,200,000
$250,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
03
03
03
03
03
03
03
8821.00
8821.01
8906.00
8907.00
8953.00
9005.00
10001.00
-
-
-
-
-
-
-
03
03
03
03
03
99
03
8821.00
8821.00
8906.00
8907.00
8953.00
911.01
10001.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2016
2018
2016
2016
2016
2012
2018
2016
2016
2016
2016
2016
2006
2018
11.085
11.085
5.878
3.929
1.582
12.806
12.806
6.016
3.992
1.586
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
MAJOR WIDENING(O)
PREFINANCD CONVRSN(O)
MINOR WIDENING(O)
NEW ROUTE(O)
NEW ROUTE(O)
SAFETY-HAZARD ELIM(P)
AM-BRIDGE (P)
Scope:
Scope:
Scope:
Scope:
Scope:
Scope:
Scope:
R
U
C
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2019
2021
2018
2018
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
STP
STP
STP
SP
SP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$3,860,000
$4,100,000
$7,150,000
$220,000
$415,000
$600,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
$15,110,000
$220,000
$415,000
$600,000
Total
Total
Total
Total
R
U
R
U
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2022
2022
2023
2023
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
STP
STP
STP
STP
BR
BR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$2,250,000
$2,000,000
$2,250,000
$2,000,000
$245,000
$945,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
$4,250,000
$4,250,000
$1,190,000
Total
Total
Total
SEE 03-8953.00
SEE 03-8953.00
AUTHORIZED
-
KENTUCKY TRANSPORTATION CABINET Page: 8
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION SIX YEAR PLAN
14 JAN 2018COMPARISON OF , , AND EDITIONS
OF THE SIX YEAR HIGHWAY PLAN PROJECTS
2014 2016 2018
2014 SIX YEAR PLAN2016 SIX YEAR PLAN2018
ADDRESS PAVEMENT CONDITIONOF I-065 BOTH DIRECTION(S)FROM MILEPOINT 42.89 TOMILEPOINT 43.307
ADDRESS PAVEMENT CONDITIONOF I-065 NON-CARDINALDIRECTION(S) FROM MILEPOINT45.935 TO MILEPOINT 46.881
ADDRESS PAVEMENT CONDITIONOF LOUIE B. NUNN CUMBERLANDPARKWAY BOTH DIRECTION(S)FROM MILEPOINT 16.117 TOMILEPOINT 20.1
ADDRESS PAVEMENT CONDITIONOF LOUIE B. NUNN CUMBERLANDPARKWAY BOTH DIRECTION(S)FROM MILEPOINT 20.1 TOMILEPOINT 22.357
ADDRESS PAVEMENT CONDITIONOF LOUIE B. NUNN CUMBERLANDPARKWAY BOTH DIRECTION(S)FROM MILEPOINT 9.375 TOMILEPOINT 14.85
ADDRESS PAVEMENT CONDITIONOF AC PAVEMENT
BARREN
BARREN
BARREN
BARREN
BARREN
BARREN
I-65
I-65
LN-9008
LN-9008
LN-9008
US-68X
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
03
03
03
03
03
03
20000.00
20001.00
20003.00
20004.00
20005.00
20006.00
-
-
-
-
-
-
03
03
03
03
03
03
20000.00
20001.00
20003.00
20004.00
20005.00
20006.00
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
42.89
45.935
16.117
20.1
9.375
1.692
43.307
46.881
20.1
22.357
14.85
2.523
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
AM-PAVEMENT (INT)(P)
AM-PAVEMENT (INT)(P)
AM-PAVEMENT (PKY)(P)
AM-PAVEMENT (PKY)(P)
AM-PAVEMENT (PKY)(P)
AM-PAVEMENT (PRI)(P)
Scope:
Scope:
Scope:
Scope:
Scope:
Scope:
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
D
C
D
C
D
C
D
C
D
C
D
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2019
2024
2024
2019
2019
2021
2021
2021
2021
2021
2021
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$50,000
$500,000
$50,000
$500,000
$320,000
$3,200,000
$180,000
$1,800,000
$440,000
$4,400,000
$400,000
$4,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
$550,000
$550,000
$3,520,000
$1,980,000
$4,840,000
$4,400,000
Total
Total
Total
Total
Total
Total
-
KENTUCKY TRANSPORTATION CABINET Page: 9
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION SIX YEAR PLAN
14 JAN 2018COMPARISON OF , , AND EDITIONS
OF THE SIX YEAR HIGHWAY PLAN PROJECTS
2014 2016 2018
2014 SIX YEAR PLAN2016 SIX YEAR PLAN2018
ADDRESS PAVEMENT CONDITIONON US-68 FROM MILEPOINT 0.00 TOMILEPOINT 9.70
ADDRESS PAVEMENT CONDITIONON US-68 FROM MILEPOINT 16.95TO MILEPOINT 23.16
RECONSTRUCT KY-111 IN THEVICINITY OF THE "S-CURVE" EASTOF OWINGSVILLE.(14CCR)
IMPROVE INTERSECTION OF KY 36AND KENDALL SPRINGS ROAD TOACCOMODATE INDUSTRIALTRUCK TRAFFIC. (14CCR)
RECONSTRUCTION FROM US-60 INOWINGSVILLE NORTH TOPRICKLY ASH ROAD. (SEE 9-193)(08CCN) (10CCN) (16CCN)
NEW CONSTRUCTION FROMKENDALL SPRINGS ROAD TO BATHCOUNTY HIGH SCHOOL INOWINGSVILLE. (08CCN)
RECONSTRUCT CURVE AT .8 MILESOUTH OF KY-36. (08CCN)(12CCR)
9.700
6.210
.500
.100
1.900
.100
BARREN
BARREN
BATH
BATH
BATH
BATH
BATH
US-68
US-68
KY-111
KY-36
KY-111
-
KY-965
$8,140,000
$1,500,000
$8,100,000
$1,440,000
$1,150,000
Total
Total
Total
Total
Total
R
U
C
D
R
U
C
R
U
C
P
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2015
2015
2016
2014
2014
2014
2015
2014
2014
2015
2014
2014
2014
2014
2015
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SP
SP
SP
SP
SP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,580,000
$1,040,000
$5,520,000
$250,000
$300,000
$200,000
$750,000
$1,600,000
$1,000,000
$5,500,000
$240,000
$1,200,000
$350,000
$50,000
$750,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
03
03
09
09
09
09
09
20020.00
20021.00
193.00
394.00
8402.00
8403.00
8404.00
-
-
-
-
-
-
-
03
03
09
09
09
09
09
20020.00
20021.00
193.00
394.00
8402.00
8403.00
8404.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2006
2014
2016
2008
2008
2018
2018
2006
2014
2016
2008
2008
0
16.95
1
12.65
0
7.147
9.7
23.16
1.5
12.75
1.909
7.247
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
AM-PAVEMENT (PRI)(P)
AM-PAVEMENT (PRI)(P)
RECONSTRUCTION(O)
SAFETY(P)
RECONSTRUCTION(O)
NEW ROUTE(O)
RECONSTRUCTION(O)
Scope:
Scope:
Scope:
Scope:
Scope:
Scope:
Scope:
R
U
C
C
R
U
C
P
D
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2018
2016
2016
2017
2018
2016
2017
2016
2016
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SP
SP
SP
SP
SP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,580,000
$1,040,000
$5,520,000
$750,000
$1,600,000
$1,000,000
$5,500,000
$240,000
$1,200,000
$50,000
$750,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
$8,140,000
$750,000
$8,100,000
$1,440,000
$800,000
Total
Total
Total
Total
Total
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2022
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,180,000
$920,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
$1,180,000
$920,000
Total
Total
FUNDS NOT AVAILABLE
AWARDED
FUNDS NOT AVAILABLE
FUNDS NOT AVAILABLE
FUNDS NOT AVAILABLE
-
KENTUCKY TRANSPORTATION CABINET Page: 10
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION SIX YEAR PLAN
14 JAN 2018COMPARISON OF , , AND EDITIONS
OF THE SIX YEAR HIGHWAY PLAN PROJECTS
2014 2016 2018
2014 SIX YEAR PLAN2016 SIX YEAR PLAN2018
IMPROVE SAFETY ANDEFFICIENCY AT THE KY-211 ANDUS-60 INTERSECTION IN SALTLICK. (14CCN)
CORRECT HORIZONTAL ANDWIDTH DEFICIENCIES ON KY 36FROM "OLD KY 11" MP 1.004 TO KY1325 (MP 6.97) TO IMPROVE SAFETYAND OPERATIONAL EFFICIENCYOF ROADWAY. (14CCN)
ADDRESS DEFICIENCIES OF KY-1106 BRIDGE OVER FLAT CREEK.(006B00069N)
ADDRESS DEFICIENCIES OF KY-1944 BRIDGE OVER WHITE OAKCREEK. (006B00076N)
ADDRESS DEFICIENCIES OF KY 211BRIDGE OVER COW CREEK.(006B00043N)
ADDRESS PAVEMENT CONDITIONOF AC PAVEMENT
CONSTRUCT NEW ROUTE FROMKY 441 TO US 25E INMIDDLESBORO. (08CCR)
.200
5.966
.800
BATH
BATH
BATH
BATH
BATH
BATH
BELL
US-60
KY-36
KY-1106
KY-1944
KY-211
US-60
KY-441
$1,975,000
$6,400,000
$7,910,000
Total
Total
Total
D
R
U
C
P
D
R
U
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2015
2015
2015
2016
2015
2016
2017
2018
2014
2015
2015
2016
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
STP
STP
STP
STP
SPP
SPP
SPP
SPP
SP
SP
SP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$325,000
$350,000
$300,000
$1,000,000
$400,000
$2,100,000
$2,700,000
$1,200,000
$400,000
$620,000
$490,000
$6,400,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
09
09
09
09
09
09
11
8813.00
8814.00
10000.00
10001.00
10017.00
20001.00
110.00
-
-
-
-
-
-
-
09
09
09
09
09
09
11
8813.00
8814.00
10000.00
10001.00
10017.00
20001.00
110.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2014
2014
2018
2018
2018
2018
2000
2014
2014
2018
2018
2018
2018
2000
16.3
1.004
3.291
2.701
8.166
6.35
16.5
6.97
3.327
2.715
8.178
7.724
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
SAFETY(P)
RECONSTRUCTION(O)
AM-BRIDGE (P)
AM-BRIDGE (P)
AM-BRIDGE (P)
AM-PAVEMENT (PRI)(P)
NEW ROUTE(O)
Scope:
Scope:
Scope:
Scope:
Scope:
Scope:
Scope:
R
U
C
P
D
R
U
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2017
2018
2016
2017
2017
2018
2016
2017
2017
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
STP
STP
STP
SPP
SPP
SPP
SPP
SP
SP
SP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$560,000
$300,000
$1,000,000
$400,000
$2,100,000
$2,700,000
$1,200,000
$400,000
$620,000
$490,000
$6,400,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
$1,860,000
$6,400,000
$7,910,000
Total
Total
Total
C
D
C
D
C
D
C
D
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2020
2019
2020
2019
2020
2019
2020
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
STP
BR
BR
BR
BR
BR
BR
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,000,000
$595,000
$2,258,000
$473,000
$1,015,000
$315,000
$717,500
$410,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
$1,000,000
$2,853,000
$1,488,000
$1,032,500
$410,000
Total
Total
Total
Total
Total
FUNDS NOT AVAILABLE
FUNDS NOT AVAILABLE
-
KENTUCKY TRANSPORTATION CABINET Page: 11
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION SIX YEAR PLAN
14 JAN 2018COMPARISON OF , , AND EDITIONS
OF THE SIX YEAR HIGHWAY PLAN PROJECTS
2014 2016 2018
2014 SIX YEAR PLAN2016 SIX YEAR PLAN2018
IMPROVE CONGESTION ANDFREIGHT MOVEMENT BYCONSTRUCTING A TWO WAY LEFTTURN LANE. (LET W/ 11-8701)(12CCR)
RECONSTRUCT KY-66 FROM 500' SOF NCL PINEVILLE TO KY-221
REPLACE BRIDGE ON KY-2011 (MP8.498) OVER RED BIRD CREEK; .55MI SOUTH OF JCT KY 66; (SR=3.5)007B00074N
REPLACE BRIDGE ON CR-1327 (MP0.014) OVER LEFT FORK STRAIGHTCREEK; .10 MI W OF JCT KY 66;(STRUCTURALLY DEFICIENT, SR=2)007C00048N
REPLACE BRIDGE ON DAVISOXENDINE RD (CR 1184) OVERHANCES CREEK AT JCT WITH KY1344(SR 12.9) 007C00061N
PAGE SCHOOL TURN LANE. (LETW/ 11-189)(12CCN)
.800
.900
.100
.100
.100
BELL
BELL
BELL
BELL
BELL
BELL
US-119
KY-66
KY-2011
CR-1327
CR-1184
US-119
$2,624,500
$11,030,000
$950,000
$800,000
$450,000
$1,074,555
Total
Total
Total
Total
Total
Total
U
C
R
U
C
R
U
C
C
U
C
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2014
2015
2014
2014
2015
2014
2014
2016
2016
2014
2015
2014
2014
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SP
SP
SP
BRX
BRX
BRX
BRZ
BRZ
BRZ
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$200,000
$2,424,500
$2,220,000
$830,000
$7,980,000
$250,000
$150,000
$550,000
$800,000
$50,000
$400,000
$94,555
$980,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
11
11
11
11
11
189.00
217.00
1079.00
1083.00
1093.00
8701.00
-
-
-
-
-
-
11
11
11
11
11
11
189.00
217.00
1079.00
1083.00
1093.00
8701.00
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
1996
2010
2010
2012
2012
2012
1996
2010
2010
2012
2012
.37
.41
8.35
0
.01
3.45
1.17
1.557
8.65
.1
.05
3.55
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
SAFETY(P)
RECONSTRUCTION(O)
BRIDGE REPLACEMENT(P)
BRIDGE REPLACEMENT(P)
BRIDGE REPLACEMENT(P)
SAFETY(P)
Scope:
Scope:
Scope:
Scope:
Scope:
Scope:
C
R
U
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2016
2016
2018
2016
2016
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SP
SP
SP
BRX
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$2,424,500
$2,220,000
$830,000
$7,980,000
$550,000
$980,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
$2,424,500
$11,030,000
$550,000
$980,000
Total
Total
Total
Total
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AWARDED
FUNDS NOT AVAILABLE
AWARDED
FUNDS NOT AVAILABLE
-
KENTUCKY TRANSPORTATION CABINET Page: 12
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION SIX YEAR PLAN
14 JAN 2018COMPARISON OF , , AND EDITIONS
OF THE SIX YEAR HIGHWAY PLAN PROJECTS
2014 2016 2018
2014 SIX YEAR PLAN2016 SIX YEAR PLAN2018
PROVIDE PASSINGOPPORTUNITIES ON US 119 IN THEVICINITY OF MP 4.5 IN BELLCOUNTY. (12CCN)(14CCR)(16CCR)
CONSTRUCT LEFT AND RIGHTTURN LANES ONTO THE BELLCOUNTY GARAGE/VETERANSPARK ENTRANCE FROM US 119.(14CCN)
RECONSTRUCT TO CORRECTSAFETY ISSUES AND IMPROVESTABILIZATION OF ROADWAY ONKY 188 AND YELLOW CREEK ONTHE SOUTHSIDE OF ROADWAY.(16CCN)
RECONSTRUCT KY 1534 ANDYELLOW CREEK ALONG THEEASTSIDE OF ROADWAY FROM MP1.3 TO MP 3.5 TO IMPROVE SAFETY.(16CCN)
IMPROVE SAFETY ALONG KY 221WHILE PROVIDING SAFERTURNING LANES FOR SCHOOLTRAFFIC. (16CCN)
IMPROVE CURB AND GUTTER ONKY 74 FROM 10TH STREET TO 30THSTREET. (16CCN)
1.500BELL
BELL
BELL
BELL
BELL
BELL
US-119
US-119
KY-188
KY-1534
KY-221
KY-74
$3,900,000
$1,275,000
Total
Total
D
R
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2015
2017
2017
2018
2017
2018
2018
2019
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$400,000
$500,000
$500,000
$2,500,000
$100,000
$25,000
$50,000
$1,100,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
11
11
11
11
11
8702.00
8805.00
8901.00
8902.00
8903.00
8904.00
-
-
-
-
-
-
11
11
11
11
11
11
8702.00
8805.00
8901.00
8902.00
8903.00
8904.00
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2012
2014
2016
2016
2016
2016
2012
2014
2016
2016
2016
2016
3.7
0
1.3
15.19
5.2
2.55
3.5
16.753
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
MINOR WIDENING(O)
SAFETY(P)
RECONSTRUCTION(O)
RECONSTRUCTION(O)
SAFETY(P)
SAFETY(P)
Scope:
Scope:
Scope:
Scope:
Scope:
Scope:
R
U
C
D
R
U
C
D
R
U
C
D
R
U
C
D
R
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2018
2019
2017
2018
2018
2019
2017
2018
2019
2020
2017
2018
2019
2020
2017
2018
2019
2020
2018
2019
2019
2020
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SPP
SP
SP
SP
SP
SP
SP
SP
SP
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$1,450,000
$4,100,000
$21,000,000
$100,000
$25,000
$50,000
$1,100,000
$250,000
$200,000
$350,000
$2,500,000
$250,000
$300,000
$250,000
$2,250,000
$200,000
$200,000
$75,000
$625,000
$50,000
$75,000
$75,000
$250,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
$26,550,000
$1,275,000
$3,300,000
$3,050,000
$1,100,000
$450,000
Total
Total
Total
Total
Total
Total
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
FUNDS NOT AVAILABLE
FUNDS NOT AVAILABLE
FUNDS NOT AVAILABLE
FUNDS NOT AVAILABLE
FUNDS NOT AVAILABLE
FUNDS NOT AVAILABLE
-
KENTUCKY TRANSPORTATION CABINET Page: 13
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION SIX YEAR PLAN
14 JAN 2018COMPARISON OF , , AND EDITIONS
OF THE SIX YEAR HIGHWAY PLAN PROJECTS
2014 2016 2018
2014 SIX YEAR PLAN2016 SIX YEAR PLAN2018
ADDRESS DEFICIENCIES OF KY-2011 BRIDGE OVER RED BIRDCREEK. (007B00071N)
ADDRESS DEFICIENCIES OF KY-2011 BRIDGE OVER RED BIRDCREEK. (007B00072N)
ADDRESS DEFICIENCIES OF CR-1041 BRIDGE OVER YORK BRANCH.(007C00003N)
ADDRESS DEFICIENCIES OF KY 92BRIDGE OVER GREASY CREEK.(007B00040N)
ADDRESS PAVEMENT CONDITIONOF AC PAVEMENT
ADDRESS PAVEMENT CONDITIONON US-25E FROM MILEPOINT 0.90TO MILEPOINT 2.86
I-275 BRIDGE OVER THE OHIORIVER NEAR LAWRENCEBURG,INDIANA (B52); JOINT PROJECTWITH INDIANA TO PERFORMFRACTURE CRITICAL INSPECTION.(008B00052N)
1.960
.600
BELL
BELL
BELL
BELL
BELL
BELL
BOONE
KY-2011
KY-2011
CR-1041
KY-92
KY-2012
US-25E
I-275
$20,000Total
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2014
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
IM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$20,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
11
11
11
11
11
11
06
10000.00
10001.00
10002.00
10038.00
20000.00
20021.00
9.00
-
-
-
-
-
-
-
11
11
11
11
11
11
06
10000.00
10001.00
10002.00
10038.00
20000.00
20021.00
9.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2018
2018
2018
2018
2018
2018
2000
2018
2018
2018
2018
2018
2018
2000
6.395
7.534
.091
3.142
0
.9
13.275
6.399
7.54
.097
3.148
1.95
2.86
13.892
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
AM-BRIDGE (P)
AM-BRIDGE (P)
AM-BRIDGE (P)
AM-BRIDGE (P)
AM-PAVEMENT (PRI)(P)
AM-PAVEMENT (PRI)(P)
BRIDGE INSPECTION(P)
Scope:
Scope:
Scope:
Scope:
Scope:
Scope:
Scope:
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
D
C
D
C
D
C
D
C
D
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2019
2020
2019
2020
2019
2020
2019
2020
2021
2021
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
BR
BR
BR
BR
BR
BR
BR
BR
PM
PM
PM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$175,000
$441,000
$175,000
$791,000
$193,000
$595,000
$175,000
$490,000
$61,000
$610,000
$1,391,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
$616,000
$966,000
$788,000
$665,000
$671,000
$1,391,000
Total
Total
Total
Total
Total
Total
-
KENTUCKY TRANSPORTATION CABINET Page: 14
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION SIX YEAR PLAN
14 JAN 2018COMPARISON OF , , AND EDITIONS
OF THE SIX YEAR HIGHWAY PLAN PROJECTS
2014 2016 2018
2014 SIX YEAR PLAN2016 SIX YEAR PLAN2018
IMPROVE THE KY-536 (MT. ZIONROAD) INTERCHANGE.(14CCR)(16CCR)
IMPROVE THE KY-536 (MT. ZIONROAD) INTERCHANGE.(14CCR)(16CCR)
ADD AUXILIARY LANES ON I-71/75FROM KY-536 TO US-42 (NB & SB)AS PER THE INTERCHANGEJUSTIFICATION STUDY(IJS).(10CCR)(12CCR)
RECONSTRUCT THE KY-338(RICHWOOD ROAD)INTERCHANGE. (FUNDING FORIMR SHOWN UNDER 6-14.01)(10CCR)(12CCR)(14CCR)(16CCR)
RECONSTRUCT THE KY-338(RICHWOOD ROAD)INTERCHANGE. (ADDITIONAL C-FUNDS FOR 6-18.00)
RECONSTRUCT THE KY-338(RICHWOOD ROAD)INTERCHANGE. (ADDITIONAL C-FUNDS FOR 6-18.00)
IMPROVE FREIGHT MOBILITY ATI-275 AND GRAVES ROAD(CONTINUATION OF 6-8953:INTERCHANGE JUSTIFICATIONSTUDY ON I-275/GRAVES RD).
.686
.686
2.067
.100
.100
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
BOONE
I-75
I-75
I-75
I-75
I-75
I-75
I-275
$33,870,000
$24,700,000
$63,900,000
Total
Total
Total
R
U
C
R
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2016
2017
2018
2016
2017
2018
2015
2016
2017
2018
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
IM
IM
IM
IM
IM
IM
IM
IM
IM
IM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$8,930,000
$5,200,000
$19,740,000
$6,300,000
$800,000
$17,600,000
$5,000,000
$20,950,000
$6,240,000
$31,710,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
06
06
06
06
06
06
06
14.00
14.02
14.50
18.00
18.10
18.11
78.00
-
-
-
-
-
-
-
06
06
06
06
06
06
06
14.00
14.02
14.01
18.00
18.00
18.11
78.00
-
-
-
-
-
-
-
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
Parent No.:
2004
2008
2008
2004
2016
2016
2018
2004
2008
2006
2004
2004
2016
2018
177.659
178.033
178.039
175.217
175.217
175.217
7.2
178.345
178.133
180.106
175.622
175.622
175.622
8.9
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
Milepoints:
To:
To:
To:
To:
To:
To:
To:
From:
From:
From:
From:
From:
From:
From:
I-CHANGE RECONST(O)
PREFINANCD CONVRSN(O)
MINOR WIDENING(O)
I-CHANGE RECONST(O)
PREFINANCD CONVRSN(O)
PREFINANCD CONVRSN(P)
NEW INTERCHANGE(O)
Scope:
Scope:
Scope:
Scope:
Scope:
Scope:
Scope:
R
U
C
U
C
R
U
C
C
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2017
2019
2019
2018
2020
2019
2020
2021
2021
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
IM
IM
IM
IM
IM
IM
IM
IM
IM
IM
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$14,700,000
$7,280,000
$22,080,000
$800,000
$19,800,000
$26,250,000
$12,480,000
$15,000,000
$15,000,000
$27,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
$44,060,000
$20,600,000
$53,730,000
$15,000,000
$27,000,000
Total
Total
Total
Total
Total
U
C
C
U
C
D
R
U
C
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
PHASE
2018
2022
2023
2018
2024
2019
2020
2020
2022
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
YEAR
NH
NH
NH
NH
NH
NH
NH
NH
NH
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
FUNDING
$5,430,000
$5,000,000
$17,080,000
$1,060,000
$10,000,000
$4,000,000
$8,000,000
$3,000,000
$15,000,000
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
$10,430,000
$17,080,000
$11,060,000
$30,000,000
Total
Total
Total
Total
FUNDS NOT AVAILABLE
FUNDS NOT AVAILABLE
FUNDS NOT AVAILABLE
-
KENTUCKY TRANSPORTATION CABINET Page: 15
COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION SIX YEAR PLAN
14 JAN 2018COMPARISON OF , , AND EDITIONS
OF THE SIX YEAR HIGHWAY PLAN PROJECTS
2014 2016 2018
2014 SIX YEAR PLAN2016 SIX YEAR PLAN2018
IMPROVE FREIGHT MOBILITY ATI-275 AND GRAVES ROAD(CONTINUATION OF 6-8953:INTERCHANGE JUSTIFICATIONSTUDY ON I-275/GRAVES RD).
IMPROVE SAFETY, MOBILITY,OPERATIONS, AND GEOMETRICSAT THE JUNCTION OF I-75 AND I-275 AND THE SYSTEM-TO-SYSTEMRAMPS.
REDUCE CONGESTION ANDIMPROVE TRAFFIC MOBILITY ATTHE INTERCHANGE OF I-75 ANDKY-14 IN WALTON.
RECONSTRUCT KY-536 TO A 5-LANE URBAN SECTION FROM 1500'WEST OF US-42 TO I-75 (MP 10.3 TOMP 13.24). (DOES NOT INCLUDEINTERCHANGERECONSTRUCTION) (00CCR)(10CCR)(12CCR)(14CCR)(16CCR)
RECONSTRUCT KY-536 TO A 5-LANE URBAN SECTION FROM 1500'WEST OF US-42 TO I-75 (MP 10.4 TOMP 13.4). (ADDITIONAL FUNDINGFOR C PHASE) (16CCR)
LIMABURG ACCESS ROAD ANDSIDEWALK FROM THEINTERSECTION OF GATEWAYBLVD AND KY-237