  • PPRROOJJEECCTTSS TTAARRGGEETTEEDD FFOORR PPOOTTEENNTTIIAALL AADDVVAANNCCEEMMEENNTT ((1100%% LLIISSTT))

    As set forth by KRS 176.420 (HB 655), the following is a listing of all projects shown in the 2018 Recommended Highway Plan submitted to the 2018 General Assembly that are targeted for potential advancement. These projects may be advanced from later years to maximize the use of all funds available to the Transportation Cabinet, and to plan for the historical precedent of projects being delayed due to unforeseen circumstances. Submitted herein is a listing of projects from the last four years of the 2018 Recommended Highway Plan, not exceeding ten (10) percent of the expected appropriations for the biennium, which can be advanced if additional money is received or if a project in the biennium is delayed.

  • Funding CategoryFundingAcronym

    ExpectedBiennial

    Appropriation($ millions)

    20% ofExpected

    Appropriations($ millions)

    10% ofExpected

    Appropriations($ millions)

    "10% List"Projects

    submitted withRecommended Highway

    PlanJanuary 2016

    Congestion Mitigation CM 31 .5 6 .3 3 .2 0 .0

    National Highway NH 652 .6 130 .5 65 .3 64 .9 Safety

    (HES, RRP, RRS) SAF 93 .3 18 .7 9 .3 0 .0

    STP-Louisville SLO 46 .5 9 .3 4 .7 0 .0

    STP-Lexington SLX 16 .2 3 .2 1 .6 0 .0

    STP-Northern Kentucky SNK 18 .3 3 .7 1 .8 0 .0

    STP-Henderson Kentucky SHN 1 .6 0 .3 0 .2 0 .0

    STP-Ashland Kentucky SAH 3 .2 0 .6 0 .3 0 .0

    State Construction Dollars Available SPP 304 .0 60 .8 30 .4 27 .7

    Statewide Surface Transportation STP 274 .7 54 .9 27 .5 26 .8

    Transportation Enhancement TE 26 .0 5 .2 2 .6 0 .0

    $1,467 .9 $293 .6 $146 .8 $119 .4

    Funding Controls for the Kentucky Transportation Cabinet's"20% List" for FYs 20192020

    TOTAL

  • 2018 RECOMMENDED HIGHWAY PLAN10% LISTING OF PROJECT PHASES

    COUNTY DISTNO ITEMNO PREFIX ROUTENO SUFFIX1 BMP EMP TYPEWORK DESCRIPTION PHASE 2018 REC SYP FUND 2018 REC SYP FY 2018 REC SYP AMOUNTBOONE 6 14 I 75 177.659 178.345 I CHANGE RECONST(O) IMPROVE THE KY 536 (MT. ZION

    ROAD) INTERCHANGE.(14CCR)(16CCR)

    C NH 2022 5,000,000

    BOONE 6 78 I 275 7.2 8.9 NEW INTERCHANGE(O) IMPROVE FREIGHT MOBILITY AT I275 AND GRAVES ROAD(CONTINUATION OF 6 8953:INTERCHANGE JUSTIFICATION STUDYON I 275/GRAVES RD).

    C NH 2022 15,000,000

    BUTLER 3 2042.3 WN 9007 35.7 36.1 I CHANGE RECONST(O) I 65 SPUR CORRIDOR: IMPROVE THENATCHER PARKWAY/US 231INTERCHANGE (EXIT 36). (2016BOP)

    C NH 2021 6,750,000

    OHIO 2 2092.2 WN 9007 49.7 50.1 I CHANGE RECONST(O) I 65 SPUR CORRIDOR; RECONSTRUCTTHE EXISTING NATCHERPARKWAY/KY 69 INTERCHANGE(EXIT 50) IN OHIO COUNTY.(2016BOP)

    C NH 2021 8,700,000

    PULASKI 8 59.25 KY 461 0 3.879 MAJOR WIDENING(O) IMPROVE KY 461 FROM KY 80 TOBUCK CREEK BRIDGE, INCLUDINGINTERCHANGE AT KY 80.

    R NH 2021 3,000,000

    PULASKI 8 59.25 KY 461 0 3.879 MAJOR WIDENING(O) IMPROVE KY 461 FROM KY 80 TOBUCK CREEK BRIDGE, INCLUDINGINTERCHANGE AT KY 80.

    U NH 2021 1,500,000

    PULASKI 8 59.26 KY 461 0 3.879 PREFINANCD CONVRSN(O) IMPROVE KY 461 FROM KY 80 TOBUCK CREEK BRIDGE, INCLUDINGINTERCHANGE AT KY 80.

    U NH 2022 1,500,000

    TAYLOR 4 142.2 KY 555 NEW ROUTE(O) HEARTLAND PARKWAY: IMPROVEMOBILITY AND CONNECTIVITY VIANEW CAMPBELLSVILLE BYPASS FROMKY 55 SOUTH OF CAMPBELLSVILLETO KY 70. SECTION 1.(2010BOP)(14CCR)(16CCR)

    C NH 2022 7,600,000

    TAYLOR 4 142.21 KY 555 PREFINANCD CONVRSN(O) HEARTLAND PARKWAY: IMPROVEMOBILITY AND CONNECTIVITY VIANEW CAMPBELLSVILLE BYPASS FROMKY 55 SOUTH OF CAMPBELLSVILLETO KY 70. SECTION 1.(2010BOP)(14CCR)(16CCR)

    C NH 2023 7,600,000

    2018 RECOMMENDED HIGHWAY PLAN BY PHASE FOR 10 PERCENT LIST.xls10 PERCENT LIST 1 OF 3

  • 2018 RECOMMENDED HIGHWAY PLAN10% LISTING OF PROJECT PHASES

    COUNTY DISTNO ITEMNO PREFIX ROUTENO SUFFIX1 BMP EMP TYPEWORK DESCRIPTION PHASE 2018 REC SYP FUND 2018 REC SYP FY 2018 REC SYP AMOUNTWARREN 3 2042.2 WN 9007 9.4 9.6 I CHANGE RECONST(O) I 65 SPUR CORRIDOR: IMPROVE THE

    NATCHER PARKWAY/US 231INTERCHANGE (EXIT 9) ON THE WESTSIDE OF BOWLING GREEN. (SEE ITEMNO. 3 202 FOR DESIGN) (2016BOP)

    C NH 2021 8,200,000

    TOTAL NH 64,850,000DAVIESS 2 8300 KY 54 2.47 8.003 MAJOR WIDENING(O) IMPROVE KY 54 FROMWEST OF THE

    US 60 BYPASS TO CR 1021 (JACKHINTON ROAD).(06CCN)(10CCR)(12CCR)(14CCR)(16CCR)

    U SPP 2022 5,750,000

    DAVIESS 2 8300.01 KY 54 2.47 8.003 PREFINANCD CONVRSN(O) IMPROVE KY 54 FROMWEST OF THEUS 60 BYPASS TO CR 1021 (JACKHINTON ROAD).(06CCN)(10CCR)(12CCR)(14CCR)(16CCR)

    R SPP 2021 4,520,000

    DAVIESS 2 8300.01 KY 54 2.47 8.003 PREFINANCD CONVRSN(O) IMPROVE KY 54 FROMWEST OF THEUS 60 BYPASS TO CR 1021 (JACKHINTON ROAD).(06CCN)(10CCR)(12CCR)(14CCR)(16CCR)

    U SPP 2023 13,420,000

    MADISON 7 235 KY 52 1.17 8.015 RECONSTRUCTION(O) IMPROVE KY 52 FROMWALLACEMILL ROAD TO INTERSTATE 75 ATTHE DUNCANNON ROADINTERCHANGE.(02CCR)(12CCN)(14CCR)(DESIGN/BUILD)(16CCR)

    U SPP 2021 4,000,000

    TOTAL SPP 27,690,000BOONE 6 444 KY 236 0 1.594 MAJOR WIDENING(O) IMPROVE SAFETY AND REDUCE

    CONGESTION ALONG KY 236(DONALDSON ROAD) FROM KY 842(HOUSTON ROAD) TO KY 3076(MINEOLA PIKE).

    D STP 2022 5,000,000

    BOONE 6 444 KY 236 0 1.594 MAJOR WIDENING(O) IMPROVE SAFETY AND REDUCECONGESTION ALONG KY 236(DONALDSON ROAD) FROM KY 842(HOUSTON ROAD) TO KY 3076(MINEOLA PIKE).

    R STP 2023 1,000,000

    BOONE 6 445 KY 3076 0 1.05 MAJOR WIDENING(O) IMPROVE FREIGHT MOBILITY ANDREDUCE CONGESTION ON KY 3076(MINEOLA PIKE) FROM KY 236 TO I275.

    R STP 2022 4,000,000

    2018 RECOMMENDED HIGHWAY PLAN BY PHASE FOR 10 PERCENT LIST.xls10 PERCENT LIST 2 OF 3

  • 2018 RECOMMENDED HIGHWAY PLAN10% LISTING OF PROJECT PHASES

    COUNTY DISTNO ITEMNO PREFIX ROUTENO SUFFIX1 BMP EMP TYPEWORK DESCRIPTION PHASE 2018 REC SYP FUND 2018 REC SYP FY 2018 REC SYP AMOUNTBOONE 6 445 KY 3076 0 1.05 MAJOR WIDENING(O) IMPROVE FREIGHT MOBILITY AND

    REDUCE CONGESTION ON KY 3076(MINEOLA PIKE) FROM KY 236 TO I275.

    U STP 2023 750,000

    BOURBON 7 8705 US 460 1.394 7.696 RECONSTRUCTION(O) IMPROVE US 460 FROM RUSSELLCAVE ROAD TO US 27 BYPASS INPARIS.(12CCN)(14CCR)(16CCR)

    C STP 2021 5,620,000

    BOURBON 7 8705.01 US 460 1.394 7.696 PREFINANCD CONVRSN(O) IMPROVE US 460 FROM RUSSELLCAVE ROAD TO US 27 BYPASS INPARIS.(12CCN)(14CCR)(16CCR)

    R STP 2021 2,030,000

    BOURBON 7 8705.01 US 460 1.394 7.696 PREFINANCD CONVRSN(O) IMPROVE US 460 FROM RUSSELLCAVE ROAD TO US 27 BYPASS INPARIS.(12CCN)(14CCR)(16CCR)

    U STP 2021 1,500,000

    BOURBON 7 8705.01 US 460 1.394 7.696 PREFINANCD CONVRSN(O) IMPROVE US 460 FROM RUSSELLCAVE ROAD TO US 27 BYPASS INPARIS.(12CCN)(14CCR)(16CCR)

    C STP 2023 6,880,000

    TOTAL STP 26,780,000

    COMBINED TOTAL 119,320,000

    2018 RECOMMENDED HIGHWAY PLAN BY PHASE FOR 10 PERCENT LIST.xls10 PERCENT LIST 3 OF 3

  • EEssttiimmaatteedd CCoossttss ttoo CCoommpplleettee PPrroojjeeccttss As set forth by KRS 176.419 (HB 655), the following is a listing of the estimated

    costs to complete projects in the 2018 Recommended Highway Plan submitted to the 2018 General Assembly. This listing includes estimated costs, by phase, to complete projects that do not have all phases scheduled to be initiated in the 2018 Recommended Highway Plan. Scoping studies are not included.

  • 2018 RECOMMENDED HIGHWAY PLAN ESTIMATED COST TO COMPLETELIST OF PROJECTS

    COUNTY DISTRICTITEMNUMBER

    PARENTDISTRICT

    PARENTNUMBER

    PREFIX ROUTENO SUFFIX BMP EMP TYPEWORK 2018 REC SYP DESCRIPTION PHASE ESTIMATED COST

    BALLARD 1 115 1 115 US 60 13.62 16.937 MAJOR WIDENING(O) PADUCAH WICKLIFFE RD: IMPROVEUS 60 FROM STAFFORD ROAD TOBETHEL CHURCH ROAD (INCLUDESKEVIL BYPASS)(TO BE LET WITH 1115.10) (06CCR)(12CCR)(14CCR).

    C 10,130,000

    BALLARD 1 118 1 118 US 60 11.815 13.615 MAJOR WIDENING(O) IMPROVE US 60 FROM PROPOSEDSOUTHERN BYPASS OF LA CENTERTO EAST OF DENIS JONES ROAD.(02CCR)

    C 9,850,000

    BALLARD 1 1140.01 1 1140 US 51 7.327 8.297 AM BRIDGE (P) PE AND ENVIRONMENTAL FORREPLACEMENT OF CAIRO BRIDGE ATOR BESIDE EXISTING LOCATION.(004B00021N)(SD)

    C 100,000,000

    BARREN 3 8821 3 8821 KY 1297 11.085 12.806 MAJOR WIDENING(O) IMPROVE KY 1297 FROM CR 1366(DONNELLY DRIVE) TO US 31E(ROGER WELLS), AND IMPROVE CR1366 (DONNELLY DRIVE) FROM KY1297 TO US 68 IN GLASGOW.(14CCN) (16CCN)

    C 8,430,000

    BOONE 6 444 6 444 KY 236 0 1.594 MAJOR WIDENING(O) IMPROVE SAFETY AND REDUCECONGESTION ALONG KY 236(DONALDSON ROAD) FROM KY 842(HOUSTON ROAD) TO KY 3076(MINEOLA PIKE).

    C 13,000,000

    BOONE 6 445 6 445 KY 3076 0 1.05 MAJOR WIDENING(O) IMPROVE FREIGHT MOBILITY ANDREDUCE CONGESTION ON KY 3076(MINEOLA PIKE) FROM KY 236 TO I275.

    C 9,000,000

    BREATHITT 10 375 10 375 KY 205 7.804 9.954 MINORWIDENING(O) IMPROVE KY 205 FROM NORTH OFKY 1812 TO SOUTH OF PEGGS FORKRD.

    U 1,030,000

    BREATHITT 10 375 10 375 KY 205 7.804 9.954 MINORWIDENING(O) IMPROVE KY 205 FROM NORTH OFKY 1812 TO SOUTH OF PEGGS FORKRD.

    C 7,420,000

    BULLITT 5 150.5 5 150.01 KY 44 22.8 23.25 RECONSTRUCTION(O) SECTION 5 FROM US 31EX TO US31E BYPASS. (2008BOPC).

    C 2,460,000

    2018 RECOMMENDED HIGHWAY PLAN COST TO COMPLETE FOR ADDENDUM JANUARY 17 2018.xls 1 OF 8

  • 2018 RECOMMENDED HIGHWAY PLAN ESTIMATED COST TO COMPLETELIST OF PROJECTS

    COUNTY DISTRICTITEMNUMBER

    PARENTDISTRICT

    PARENTNUMBER

    PREFIX ROUTENO SUFFIX BMP EMP TYPEWORK 2018 REC SYP DESCRIPTION PHASE ESTIMATED COST

    CLINTON 8 8601.3 8 8601.3 US 127 16.135 19.99 RELOCATION(O) RELOCATION OF US 127 FROM EASTOF THE AARON RIDGE RD AND OLDUS 127 INTERSECTION, EXTENDINGNORTHERLY TO NORTH OF THE KY3063 AND OLD US 127INTERSECTION. (SEE 8 108 AND 8115 FOR PE&ENV)(12CCR)

    R 1,680,000

    CLINTON 8 8601.3 8 8601.3 US 127 16.135 19.99 RELOCATION(O) RELOCATION OF US 127 FROM EASTOF THE AARON RIDGE RD AND OLDUS 127 INTERSECTION, EXTENDINGNORTHERLY TO NORTH OF THE KY3063 AND OLD US 127INTERSECTION. (SEE 8 108 AND 8115 FOR PE&ENV)(12CCR)

    U 580,000

    CLINTON 8 8601.3 8 8601.3 US 127 16.135 19.99 RELOCATION(O) RELOCATION OF US 127 FROM EASTOF THE AARON RIDGE RD AND OLDUS 127 INTERSECTION, EXTENDINGNORTHERLY TO NORTH OF THE KY3063 AND OLD US 127INTERSECTION. (SEE 8 108 AND 8115 FOR PE&ENV)(12CCR)

    C 27,000,000

    CUMBERLAND 8 8852 8 8852 KY 90 5.182 10.432 RECONSTRUCTION(O) IMPROVE KY 90 FROM NORRISBRANCH ROAD EXTENDINGWESTERLY TO PA DUERSON ROADNEAR MARROWBONE. (14CCN)

    R 3,200,000

    CUMBERLAND 8 8852 8 8852 KY 90 5.182 10.432 RECONSTRUCTION(O) IMPROVE KY 90 FROM NORRISBRANCH ROAD EXTENDINGWESTERLY TO PA DUERSON ROADNEAR MARROWBONE. (14CCN)

    U 1,800,000

    CUMBERLAND 8 8852 8 8852 KY 90 5.182 10.432 RECONSTRUCTION(O) IMPROVE KY 90 FROM NORRISBRANCH ROAD EXTENDINGWESTERLY TO PA DUERSON ROADNEAR MARROWBONE. (14CCN)

    C 22,000,000

    2018 RECOMMENDED HIGHWAY PLAN COST TO COMPLETE FOR ADDENDUM JANUARY 17 2018.xls 2 OF 8

  • 2018 RECOMMENDED HIGHWAY PLAN ESTIMATED COST TO COMPLETELIST OF PROJECTS

    COUNTY DISTRICTITEMNUMBER

    PARENTDISTRICT

    PARENTNUMBER

    PREFIX ROUTENO SUFFIX BMP EMP TYPEWORK 2018 REC SYP DESCRIPTION PHASE ESTIMATED COST

    DAVIESS 2 8854 2 8854 KY 3143 1.829 2.958 MINOR WIDENING(O) IMPROVE KY 3143 FROM KY 3335 TOKY 54. (14CCN)

    C 7,300,000

    ELLIOTT 9 228 9 228 KY 7 0 6.956 RECONSTRUCTION(O) IMPROVE KY 7 FROM SOUTH CITYLIMITS OF SANDY HOOK TOWARDWRIGLEY. (12CCR)(16CCR)

    R 13,230,000

    ELLIOTT 9 228 9 228 KY 7 0 6.956 RECONSTRUCTION(O) IMPROVE KY 7 FROM SOUTH CITYLIMITS OF SANDY HOOK TOWARDWRIGLEY. (12CCR)(16CCR)

    U 6,490,000

    ELLIOTT 9 228 9 228 KY 7 0 6.956 RECONSTRUCTION(O) IMPROVE KY 7 FROM SOUTH CITYLIMITS OF SANDY HOOK TOWARDWRIGLEY. (12CCR)(16CCR)

    C 61,660,000

    ESTILL 10 206 10 206 KY 2459 0 0.373 SPOT IMPROVEMENTS(O) IMPROVE SAFETY ON KY 2459(CARHARTT AVE.) FROM KY 89 TOTHE RAILROAD BRIDGE.

    C 750,000

    FAYETTE 7 8902 7 8902 KY 1927 0 1.145 MAJOR WIDENING(O) IMPROVE LIBERTY ROAD FROMGRAFTONS MILL LANE TO NEWCIRCLE ROAD AND IMPROVEINTERSECTION WITH NEW CIRCLEROAD. (16CCN)

    C 6,190,000

    FULTON 1 25 1 25 JC 9003 0 1.66 RECONSTRUCTION(O) IMPROVE THE PURCHASE PARKWAYAT THE KENTUCKY/TENNESSEE LINETO SOUTHWEST OF THE US 51INTERCHANGE.(I 69 CORRIDORIMPROVEMENT)(2012BOP)

    U 1,130,000

    FULTON 1 25 1 25 JC 9003 0 1.66 RECONSTRUCTION(O) IMPROVE THE PURCHASE PARKWAYAT THE KENTUCKY/TENNESSEE LINETO SOUTHWEST OF THE US 51INTERCHANGE.(I 69 CORRIDORIMPROVEMENT)(2012BOP)

    C 23,400,000

    2018 RECOMMENDED HIGHWAY PLAN COST TO COMPLETE FOR ADDENDUM JANUARY 17 2018.xls 3 OF 8

  • 2018 RECOMMENDED HIGHWAY PLAN ESTIMATED COST TO COMPLETELIST OF PROJECTS

    COUNTY DISTRICTITEMNUMBER

    PARENTDISTRICT

    PARENTNUMBER

    PREFIX ROUTENO SUFFIX BMP EMP TYPEWORK 2018 REC SYP DESCRIPTION PHASE ESTIMATED COST

    FULTON 1 26 1 26 JC 9003 1.2 3.434 RECONSTRUCTION(O) IMPROVE THE PURCHASE PARKWAYFROM SOUTHWEST OF THE US 51INTERCHANGE TO CARDINAL ROADNEAR MAYFIELD INCLUDING THE KY339 INTERCHANGE IN WINGO, KY. (I69 CORRIDOR IMPROVEMENT)(2012BOP)

    U 500,000

    FULTON 1 26 1 26 JC 9003 1.2 3.434 RECONSTRUCTION(O) IMPROVE THE PURCHASE PARKWAYFROM SOUTHWEST OF THE US 51INTERCHANGE TO CARDINAL ROADNEAR MAYFIELD INCLUDING THE KY339 INTERCHANGE IN WINGO, KY. (I69 CORRIDOR IMPROVEMENT)(2012BOP)

    C 17,550,000

    GALLATIN 6 8910 6 8910 I 71 62.8 64 RECONSTRUCTION(O) IMPROVE GEOMETRICS ON I 71FROM US 127 TO MP 64. (16CCN).

    C 24,000,000

    GARRARD 7 196.3 7 196.01 US 27 5.199 10.331 RELOCATION(O) IMPROVE US 27 FROMWESTLANCASTER BYPASS TO KY 34.(2006BOPC) (16CCN)

    R 14,340,000

    GARRARD 7 196.3 7 196.01 US 27 5.199 10.331 RELOCATION(O) IMPROVE US 27 FROMWESTLANCASTER BYPASS TO KY 34.(2006BOPC) (16CCN)

    U 12,240,000

    GARRARD 7 196.3 7 196.01 US 27 5.199 10.331 RELOCATION(O) IMPROVE US 27 FROMWESTLANCASTER BYPASS TO KY 34.(2006BOPC) (16CCN)

    C 50,290,000

    HART 4 441 4 441 KY 335 1.2 2.545 ECONOMIC DEVEL(O) IMPROVE MOBILITY, CONNECTIVITYAND SAFETY BY ADDRESSINGCOMMERCIAL AND INDUSTRIALTRAFFIC MOVEMENT FROM US 31WSOUTH OF KY 218 TO I 65. (16CCR)

    C 8,400,000

    HOPKINS 2 384 2 384 KY 281 0.996 1.759 MAJORWIDENING(O) IMPROVE KY 281 FROM ISLANDPARK DRIVE TO CARRIAGE LANE (KY2281).

    C 2,300,000

    2018 RECOMMENDED HIGHWAY PLAN COST TO COMPLETE FOR ADDENDUM JANUARY 17 2018.xls 4 OF 8

  • 2018 RECOMMENDED HIGHWAY PLAN ESTIMATED COST TO COMPLETELIST OF PROJECTS

    COUNTY DISTRICTITEMNUMBER

    PARENTDISTRICT

    PARENTNUMBER

    PREFIX ROUTENO SUFFIX BMP EMP TYPEWORK 2018 REC SYP DESCRIPTION PHASE ESTIMATED COST

    JEFFERSON 5 8810 5 8810 KY 1931 4.561 5.5 MINOR WIDENING(O) THREE LANE WIDENING ALONG KY1931 FROM THE DOSS HIGH SCHOOLENTRANCE TO PALATKA ROAD,INCLUDING INTERSECTIONIMPROVEMENTS WITH PALATKAROAD AND TURN LANES. (14CCN)

    C 4,500,000

    JEFFERSON 5 8952 5 8952 US 60 14.718 15.114 MINOR WIDENING(O) WIDEN US 60 TO THREE LANESFROM EASTWOOD CUTOFF (MP14.7) TO ROCKCREST WAY (MP 15.1).(16CCN)

    R 400,000

    JEFFERSON 5 8952 5 8952 US 60 14.718 15.114 MINOR WIDENING(O) WIDEN US 60 TO THREE LANESFROM EASTWOOD CUTOFF (MP14.7) TO ROCKCREST WAY (MP 15.1).(16CCN)

    U 450,000

    JEFFERSON 5 8952 5 8952 US 60 14.718 15.114 MINOR WIDENING(O) WIDEN US 60 TO THREE LANESFROM EASTWOOD CUTOFF (MP14.7) TO ROCKCREST WAY (MP 15.1).(16CCN)

    C 900,000

    KENTON 6 162.4 6 162.01 KY 536 2.542 4.476 RECONSTRUCTION(O) IMPROVE SAFETY AND REDUCECONGESTION ON KY 536 FROMWILLIAMSWOOD ROAD/CALVARYDRIVE TO KY 17 (PRIORITY SECTION3). DESIGN PHASE UNDER PARENTNO. 6 162.01. (2012BOP)

    C 21,150,000

    KENTON 6 449 6 449 KY 17 18.15 18.65 CONGESTION MITIGTN(O) IMPROVE SAFETY AND REDUCECONGESTION ON KY 17 AT THE I 275INTERCHANGE.

    C 3,500,000

    KENTON 6 450 6 450 KY 1303 5.01 6.248 CONGESTION MITIGTN(O) IMPROVE SAFETY AND REDUCECONGESTION ALONG KY 1303(TURKEYFOOT RD) FROM DUDLEY RDTO US 25 (DIXIE HWY).

    C 10,000,000

    LAUREL 11 8515 11 8515 US 25 0 10.475 DESIGN ENGINEERING(O) IMPROVE CONNECTIVITY BETWEENCORBIN AND LONDON FROM KY1006 TO US 25E. (08CCN)

    R 38,590,000

    LAUREL 11 8515 11 8515 US 25 0 10.475 DESIGN ENGINEERING(O) IMPROVE CONNECTIVITY BETWEENCORBIN AND LONDON FROM KY1006 TO US 25E. (08CCN)

    U 3,090,000

    2018 RECOMMENDED HIGHWAY PLAN COST TO COMPLETE FOR ADDENDUM JANUARY 17 2018.xls 5 OF 8

  • 2018 RECOMMENDED HIGHWAY PLAN ESTIMATED COST TO COMPLETELIST OF PROJECTS

    COUNTY DISTRICTITEMNUMBER

    PARENTDISTRICT

    PARENTNUMBER

    PREFIX ROUTENO SUFFIX BMP EMP TYPEWORK 2018 REC SYP DESCRIPTION PHASE ESTIMATED COST

    LAUREL 11 8515 11 8515 US 25 0 10.475 DESIGN ENGINEERING(O) IMPROVE CONNECTIVITY BETWEENCORBIN AND LONDON FROM KY1006 TO US 25E. (08CCN)

    C 68,150,000

    LAUREL 11 8909 11 8909 HR 9006 7.877 10.593 RECONSTRUCTION(O) IMPROVE THE HAL ROGERSPARKWAY TO INTERSTATESTANDARDS FROM 4.0 MI EAST OFKY 192 TO LAUREL/CLAY CO. LINE. (I75 TO HAZARD) (16CCN).

    R 2,200,000

    LAUREL 11 8909 11 8909 HR 9006 7.877 10.593 RECONSTRUCTION(O) IMPROVE THE HAL ROGERSPARKWAY TO INTERSTATESTANDARDS FROM 4.0 MI EAST OFKY 192 TO LAUREL/CLAY CO. LINE. (I75 TO HAZARD) (16CCN).

    U 1,000,000

    LAUREL 11 8909 11 8909 HR 9006 7.877 10.593 RECONSTRUCTION(O) IMPROVE THE HAL ROGERSPARKWAY TO INTERSTATESTANDARDS FROM 4.0 MI EAST OFKY 192 TO LAUREL/CLAY CO. LINE. (I75 TO HAZARD) (16CCN).

    C 27,000,000

    LIVINGSTON 1 330 1 330 US 60 0.891 4.2 RELOCATION(O) PADUCAH HENDERSON; RELOCATEUS 60 FROM EAST OF THETENNESSEE RIVER BRIDGE TO EASTOF RUDD SPEES ROAD(00CCR)(12CCR)(14CCR)

    C 17,310,000

    MCCRACKEN 1 115.1 1 115.1 US 60 0.4 1.968 MAJOR WIDENING(O) PADUCAH WICKLIFFE RD: IMPROVEUS 60 FROM BETHEL CHURCH ROADTO KY 1154 (MARTIN MARIETTA)(04CCR) (TO BE LET WITH 1115.00).(10CCR)(12CCR)

    C 8,440,000

    NELSON 4 396.1 4 396 US 150 1.952 7.426 RECONSTRUCTION(O) IMPROVE SAFETY, MOBILITY, ANDGEOMETRICS ON US 150 FROM THEBLUEGRASS PARKWAY TO THENELSON/WASHINGTON COUNTYLINE. (2016BOP)

    U 2,500,000

    2018 RECOMMENDED HIGHWAY PLAN COST TO COMPLETE FOR ADDENDUM JANUARY 17 2018.xls 6 OF 8

  • 2018 RECOMMENDED HIGHWAY PLAN ESTIMATED COST TO COMPLETELIST OF PROJECTS

    COUNTY DISTRICTITEMNUMBER

    PARENTDISTRICT

    PARENTNUMBER

    PREFIX ROUTENO SUFFIX BMP EMP TYPEWORK 2018 REC SYP DESCRIPTION PHASE ESTIMATED COST

    NELSON 4 396.1 4 396 US 150 1.952 7.426 RECONSTRUCTION(O) IMPROVE SAFETY, MOBILITY, ANDGEOMETRICS ON US 150 FROM THEBLUEGRASS PARKWAY TO THENELSON/WASHINGTON COUNTYLINE. (2016BOP)

    C 25,000,000

    NICHOLAS 9 205 9 205 KY 36 3.1 3.283 SAFETY(P) IMPROVE THE KY 36/KY 32INTERSECTION NEAR THE NICHOLASCOUNTY SCHOOL PROPERTY.(12CCR)(16CCR)

    C 5,070,000

    ROCKCASTLE 8 8952 8 8952 KY 461 7 9.404 RECONSTRUCTION(O) IMPROVE KY 461 FROM US 150 TOTHE EXISTING FOUR LANEAPPROACH AT US 25.(16CCN)

    C 18,000,000

    SIMPSON 3 8856 3 8856 US 31 W 8.477 10.799 MAJOR WIDENING(O) IMPROVE US 31W FROM KY 1008 TOKY 621. (14CCN)(16CCR)

    U 3,000,000

    SIMPSON 3 8856 3 8856 US 31 W 8.477 10.799 MAJOR WIDENING(O) IMPROVE US 31W FROM KY 1008 TOKY 621. (14CCN)(16CCR)

    C 9,000,000

    SPENCER 5 8955 5 8955 KY 44 0.28 0.44 SAFETY(P) IMPROVE SAFETY AND ADDRESSGEOMETRIC DEFICIENCIES ALONG KY44 NEAR DUTCHMAN CREEK ROAD.(16CCN)

    R 170,000

    SPENCER 5 8955 5 8955 KY 44 0.28 0.44 SAFETY(P) IMPROVE SAFETY AND ADDRESSGEOMETRIC DEFICIENCIES ALONG KY44 NEAR DUTCHMAN CREEK ROAD.(16CCN)

    U 160,000

    SPENCER 5 8955 5 8955 KY 44 0.28 0.44 SAFETY(P) IMPROVE SAFETY AND ADDRESSGEOMETRIC DEFICIENCIES ALONG KY44 NEAR DUTCHMAN CREEK ROAD.(16CCN)

    C 1,000,000

    TAYLOR 4 142.3 4 142.1 KY 555 NEW ROUTE(O) HEARTLAND PARKWAY: IMPROVEMOBILITY AND CONNECTIVITY VIANEW CAMPBELLSVILLE BYPASSFROM KY 70 TO US 68 EAST OFCAMPBELLSVILLE. SECTION 2.(2010BOP)(16CCR)

    C 10,500,000

    2018 RECOMMENDED HIGHWAY PLAN COST TO COMPLETE FOR ADDENDUM JANUARY 17 2018.xls 7 OF 8

  • 2018 RECOMMENDED HIGHWAY PLAN ESTIMATED COST TO COMPLETELIST OF PROJECTS

    COUNTY DISTRICTITEMNUMBER

    PARENTDISTRICT

    PARENTNUMBER

    PREFIX ROUTENO SUFFIX BMP EMP TYPEWORK 2018 REC SYP DESCRIPTION PHASE ESTIMATED COST

    WOODFORD 7 117 7 117 US 60 11.238 12.612 MAJOR WIDENING(O) IMPROVE US 60 (VERSAILLES ROAD)FROM THE BLUEGRASSPARKWAY/HUNTERTOWN PIKE TOPISGAH PIKE.

    R 260,000

    WOODFORD 7 117 7 117 US 60 11.238 12.612 MAJOR WIDENING(O) IMPROVE US 60 (VERSAILLES ROAD)FROM THE BLUEGRASSPARKWAY/HUNTERTOWN PIKE TOPISGAH PIKE.

    U 310,000

    WOODFORD 7 117 7 117 US 60 11.238 12.612 MAJOR WIDENING(O) IMPROVE US 60 (VERSAILLES ROAD)FROM THE BLUEGRASSPARKWAY/HUNTERTOWN PIKE TOPISGAH PIKE.

    C 2,410,000

    2018 RECOMMENDED HIGHWAY PLAN COST TO COMPLETE FOR ADDENDUM JANUARY 17 2018.xls 8 OF 8

  • 22001144 -- 22001166 HHIIGGHHWWAAYY PPLLAANNSS VVSS.. 22001188 RREECCOOMMMMEENNDDEEDD HHIIGGHHWWAAYY PPLLAANN

    As set forth by KRS 176.420 (HB 655), the following is a side-by-side comparison of all projects in the 2018 Recommended Highway Plan submitted to the 2018 General Assembly and those that were in the 2014 and 2016 Highway Plans as enacted by the General Assembly. A justification statement documenting the reason any project in the 2016 Highway Plan was deleted from the 2018 Recommended Highway Plan is also included.

  • KENTUCKY TRANSPORTATION CABINET Page: 1

    COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION SIX YEAR PLAN

    14 JAN 2018COMPARISON OF , , AND EDITIONS

    OF THE SIX YEAR HIGHWAY PLAN PROJECTS

    2014 2016 2018

    2014 SIX YEAR PLAN2016 SIX YEAR PLAN2018

    INTERCHANGE LIGHTING ATLOUIE B. NUNN PARKWAY.(12CCR)(14CCR)

    ADDRESS DEFICIENCIES OFBRIDGE ON KY 704 (11.909) OVERPETTY'S FORK. (001B00078N)(SD)

    ADD PASSING LANES/TRUCKLANES FROM THE COLUMBIABYPASS TO THE CAMPBELLSVILLEBYPASS (HEARTLANDPARKWAY).(14CCN)

    ADDRESS PAVEMENT CONDITIONOF LOUIE B. NUNN CUMBERLANDPARKWAY BOTH DIRECTION(S)FROM MILEPOINT 43.02 TOMILEPOINT 57.79

    IMPROVE THE SAFETY OF KY 98NEAR DURHAM SPRINGS CHURCH(12CCR)

    IMPROVEMENTS TO KY 100:CURVE, BRIDGE, ANDINTERSECTION IMPROVEMENTSFROM NEAR THE STONY POINTROAD INTERSECTION TO EAST OFTHE ALONZO LONG HOLLOWROAD INTERSECTION (12CCR)

    .197

    13.927

    1.100

    1.100

    ADAIR

    ADAIR

    ADAIR

    ADAIR

    ALLEN

    ALLEN

    KY-61

    KY-704

    KY-55

    LN-9008

    KY-98

    KY-100

    $740,000

    $17,770,000

    $4,300,000

    $2,200,000

    Total

    Total

    Total

    Total

    D

    C

    D

    R

    U

    C

    R

    U

    C

    D

    R

    U

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2015

    2016

    2015

    2016

    2017

    2019

    2014

    2015

    2017

    2016

    2018

    2018

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    NH

    NH

    SPP

    SPP

    SPP

    SPP

    SPP

    SPP

    SPP

    SPP

    SPP

    SPP

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $170,000

    $570,000

    $710,000

    $1,425,000

    $1,425,000

    $14,210,000

    $1,050,000

    $750,000

    $2,500,000

    $800,000

    $500,000

    $900,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    08

    08

    08

    08

    03

    03

    170.00

    1068.00

    8851.00

    20000.00

    201.00

    320.00

    -

    -

    -

    -

    -

    -

    TAYLOR

    08

    08

    08

    08

    03

    03

    170.00

    1068.00

    8851.00

    20000.00

    201.00

    320.00

    -

    -

    -

    -

    -

    -

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    2012

    2018

    2014

    2018

    2012

    2012

    2012

    2018

    2014

    2018

    2012

    2012

    10.69

    11.905

    15.101

    43.02

    3.64

    3.1

    10.887

    11.913

    21.305

    48.15

    4.74

    4.2

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    To:

    To:

    To:

    To:

    To:

    To:

    From:

    From:

    From:

    From:

    From:

    From:

    Milepoints: From:0 To: 7.723

    SAFETY(P)

    AM-BRIDGE (P)

    MAJOR WIDENING(O)

    AM-PAVEMENT (PKY)(P)

    SAFETY(P)

    RECONSTRUCTION(O)

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    D

    R

    U

    C

    C

    R

    U

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2020

    2021

    2021

    2022

    2017

    2018

    2018

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    BRX

    BRX

    BRX

    BRX

    SPP

    SPP

    SPP

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $250,000

    $150,000

    $50,000

    $500,000

    $3,680,000

    $500,000

    $900,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    $950,000

    $3,680,000

    $1,400,000

    Total

    Total

    Total

    D

    C

    D

    C

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2019

    2020

    2023

    2023

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    BR

    BR

    PM

    PM

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $175,000

    $490,000

    $400,000

    $4,000,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    $665,000

    $4,400,000

    Total

    Total

    AWARDED

    FUNDS NOT AVAILABLE

  • KENTUCKY TRANSPORTATION CABINET Page: 2

    COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION SIX YEAR PLAN

    14 JAN 2018COMPARISON OF , , AND EDITIONS

    OF THE SIX YEAR HIGHWAY PLAN PROJECTS

    2014 2016 2018

    2014 SIX YEAR PLAN2016 SIX YEAR PLAN2018

    REPLACE BRIDGE ON CR-1372 (MP1.388) OVER LANCASTER BRANCH;1.4 MI SW OF JCT US 231;(STRUCTURALLY DEFICIENT,SR=32.9) 002C00025N

    REPLACE BRIDGE ON KY 2160OVER FLORIDA CREEK SOUTH OFINTERSECTION WITH HUNT LANE(CR 1155) (SR 40.8) 002B00048N

    REPLACE BRIDGE ON HADE BELLRD (CR 1167) OVER BAYS FORK 0.5MILE N OF PARDUE RD (CR1163)(SR 28.7)002C00012N

    ADDRESS DEFICIENCIES OFBRIDGE OVER BAYS FORK ONMITCHELL WEAVER ROAD (CR1328) 2.1 MI W OF KY 1332(002C00063N)(16CCN)

    IMPROVE KY-100 (OLD GALLATINROAD) FROM SOUTH OF KY-2160TO KY-980. (06CCN)

    CONDUCT A SCOPING STUDY ONTHE EASTERN SCOTTSVILLEBYPASS. (08CCN) (10CCR)(16CCN)

    INDUSTRIAL PARK ACCESSROADS. (14CCN)

    .100

    .040

    .040

    .020

    .341

    4.000

    ALLEN

    ALLEN

    ALLEN

    ALLEN

    ALLEN

    ALLEN

    ALLEN

    CR-1372

    KY-2160

    CR-1167

    CR-1328

    KY-100

    KY-98

    -

    $280,000

    $680,000

    $330,000

    $400,000

    $2,710,000

    $500,000

    $300,000

    Total

    Total

    Total

    Total

    Total

    Total

    Total

    C

    R

    U

    C

    R

    U

    C

    D

    R

    U

    C

    P

    C

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2017

    2014

    2014

    2015

    2014

    2014

    2016

    2020

    2014

    2014

    2015

    2014

    2015

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    BRZ

    BRO

    BRO

    BRO

    BRZ

    BRZ

    BRZ

    BRZ

    SPP

    SPP

    SPP

    SP

    SPP

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $280,000

    $80,000

    $30,000

    $570,000

    $70,000

    $85,000

    $175,000

    $400,000

    $250,000

    $960,000

    $1,500,000

    $500,000

    $300,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    03

    03

    03

    03

    03

    03

    03

    1074.00

    1080.00

    1081.00

    1088.00

    8305.00

    8400.00

    8801.00

    -

    -

    -

    -

    -

    -

    -

    03

    03

    03

    03

    03

    03

    03

    1074.00

    1080.00

    1081.00

    1088.00

    8305.00

    8400.00

    8801.00

    -

    -

    -

    -

    -

    -

    -

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    2010

    2012

    2012

    2018

    2006

    2016

    2014

    2010

    2012

    2012

    2018

    2006

    2016

    2014

    1.338

    .626

    1.674

    .35

    14.1

    1.438

    .666

    1.714

    .39

    14.441

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    To:

    To:

    To:

    To:

    To:

    To:

    To:

    From:

    From:

    From:

    From:

    From:

    From:

    From:

    BRIDGE REPLACEMENT(P)

    BRIDGE REPLACEMENT(P)

    BRIDGE REPLACEMENT(P)

    AM-BRIDGE (P)

    RECONSTRUCTION(O)

    SCOPING STUDY(O)

    ECONOMIC DEVEL(O)

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    D

    R

    U

    C

    R

    U

    C

    P

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2020

    2021

    2021

    2021

    2016

    2016

    2017

    2016

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    BRZ

    BRZ

    BRZ

    BRZ

    SPP

    SPP

    SPP

    SP

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $400,000

    $150,000

    $75,000

    $1,655,000

    $370,000

    $960,000

    $1,250,000

    $500,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    $2,280,000

    $2,580,000

    $500,000

    Total

    Total

    Total

    D

    C

    C

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2019

    2020

    2018

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    BR

    BR

    SPP

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $280,000

    $1,316,000

    $1,250,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    $1,596,000

    $1,250,000

    Total

    Total

    FUNDS NOT AVAILABLE

  • KENTUCKY TRANSPORTATION CABINET Page: 3

    COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION SIX YEAR PLAN

    14 JAN 2018COMPARISON OF , , AND EDITIONS

    OF THE SIX YEAR HIGHWAY PLAN PROJECTS

    2014 2016 2018

    2014 SIX YEAR PLAN2016 SIX YEAR PLAN2018

    WIDENING OF KY 100 (FRANKLINROAD) TO 3 LANES WITH URBANSECTION FROM OLIVER STREETTO US 31E TO INCREASECAPACITY/SAFETY. MP 11.800-12.700 (14CCN)

    IMPROVE ACCESS ROAD ON EACHEND OF INDUSTRIAL ACCESSROAD IN SCOTTSVILLE. (16CCN)

    RECONSTRUCT 1.0 MILE EAST OFBRIDGE OVER BARREN RIVERLAKE TO CORRECT VERTICALAND HORIZONTALDEFICIENCIES.(16CCN)

    ADDRESS DEFICIENCIES OF KY-3499 BRIDGE OVER BAYS FORK.(002B00004N)

    ADDRESS DEFICIENCIES OF KY 585BRIDGE OVER MIDDLE FORKDRAKES CREEK. (002B00021N)

    RECONSTRUCT KY 151 FROM US127 AT LAWRENCEBURG TO I-64 INFRANKLIN COUNTY.

    .900

    6.700

    ALLEN

    ALLEN

    ALLEN

    ALLEN

    ALLEN

    ANDERSON

    KY-100

    -

    KY-98

    KY-3499

    KY-585

    KY-151

    $5,330,000Total

    D

    R

    U

    C

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2017

    2018

    2019

    2020

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    SPP

    SP

    SP

    SP

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $480,000

    $380,000

    $670,000

    $3,800,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    03

    03

    03

    03

    03

    05

    8802.00

    8901.00

    8902.00

    10000.00

    10011.00

    806.00

    -

    -

    -

    -

    -

    -

    SIMPSON

    FRANKLIN

    03

    03

    03

    03

    03

    05

    8802.00

    8901.00

    8902.00

    10000.00

    10011.00

    806.00

    -

    -

    -

    -

    -

    -

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    2014

    2016

    2016

    2018

    2018

    2016

    2014

    2016

    2016

    2018

    2018

    2016

    11.8

    10.1

    1.412

    0

    12.7

    10.2

    1.422

    .002

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    To:

    To:

    To:

    To:

    To:

    To:

    From:

    From:

    From:

    From:

    From:

    From:

    Milepoints:

    Milepoints:

    From:

    From:

    8.326 To:

    To:

    8.354

    MAJOR WIDENING(O)

    SAFETY(P)

    RECONSTRUCTION(O)

    AM-BRIDGE (P)

    AM-BRIDGE (P)

    RECONSTRUCTION(O)

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    D

    R

    U

    C

    C

    D

    R

    U

    C

    P

    D

    R

    U

    C

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2017

    2018

    2019

    2020

    2017

    2017

    2018

    2019

    2020

    2017

    2017

    2018

    2020

    2022

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    SPP

    SP

    SP

    SP

    SPP

    SPP

    SPP

    SPP

    SPP

    SPP

    SPP

    SPP

    SPP

    SPP

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $480,000

    $380,000

    $670,000

    $3,800,000

    $300,000

    $400,000

    $400,000

    $300,000

    $1,300,000

    $250,000

    $1,750,000

    $5,000,000

    $5,000,000

    $20,000,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    $5,330,000

    $300,000

    $2,400,000

    $32,000,000

    Total

    Total

    Total

    Total

    D

    C

    D

    C

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2019

    2020

    2019

    2020

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    BR

    BR

    BR

    BR

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $175,000

    $525,000

    $245,000

    $822,500

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    $700,000

    $1,067,500

    Total

    Total

    FUNDS NOT AVAILABLE

    FUNDS NOT AVAILABLE

    FUNDS NOT AVAILABLE

    P PHASE AUTHORIZED

  • KENTUCKY TRANSPORTATION CABINET Page: 4

    COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION SIX YEAR PLAN

    14 JAN 2018COMPARISON OF , , AND EDITIONS

    OF THE SIX YEAR HIGHWAY PLAN PROJECTS

    2014 2016 2018

    2014 SIX YEAR PLAN2016 SIX YEAR PLAN2018

    REPLACE GUARDRAIL ENDTREATMENTS ON VARIOUSROUTES IN ANDERSON, BOURBON,BOYLE, CLARK, FAYETTE,JESSAMINE, MADISON, MERCER,MONTGOMERY, SCOTT, ANDWOODFORD COUNTIES. (2010BOP)

    WIDENING AND IMPROVEMENTSON US-62 FROM 0.103 MILE WESTOF THE NEW SCHOOLENTRANCE/WESTWOOD ESTATESTO 0.095 MILE EAST OF US-127B(LAWRENCEBURG BYPASS).(02CCN)(04CCN)(08CCR)(12CCR)

    ADDRESS PAVEMENT CONDITIONOF MARTHA LAYNE COLLINSBLUEGRASS PARKWAY CARDINALDIRECTION(S) FROM MILEPOINT58.3 TO MILEPOINT 61.84

    PADUCAH-WICKLIFFE RD:IMPROVE US-60 FROM STAFFORDROAD TO BETHEL CHURCH ROAD(INCLUDES KEVIL BYPASS)(TO BELET WITH 1-115.10)(06CCR)(12CCR)(14CCR).

    PADUCAH-WICKLIFFE RD:IMPROVE US-60 FROM STAFFORDROAD TO BETHEL CHURCH ROAD(INCLUDES KEVIL BYPASS)(TO BELET WITH 1-115.10)(06CCR)(12CCR)(14CCR).

    .900

    3.700

    3.700

    ANDERSON

    ANDERSON

    ANDERSON

    BALLARD

    BALLARD

    US-127

    US-62

    BG-9002

    US-60

    US-60

    $907,850

    $7,450,000

    $15,700,000

    Total

    Total

    Total

    C

    R

    C

    R

    U

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2014

    2014

    2015

    2017

    2018

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    SAF

    SP

    SP

    SPP

    SPP

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $907,850

    $3,800,000

    $3,650,000

    $9,980,000

    $5,720,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    07

    07

    07

    01

    01

    918.00

    8100.00

    20001.00

    115.00

    115.01

    -

    -

    -

    -

    -

    BOYLE

    MCCRACKEN

    MCCRACKEN

    99

    07

    07

    01

    01

    911.01

    8100.00

    20001.00

    115.00

    115.00

    -

    -

    -

    -

    -

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    2010

    2002

    2018

    1998

    2006

    2006

    2002

    2018

    1998

    1998

    17.251

    58.3

    13.62

    13.62

    18.371

    61.84

    16.937

    16.937

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    To:

    To:

    To:

    To:

    To:

    From:

    From:

    From:

    From:

    From:

    Milepoints:

    Milepoints:

    Milepoints:

    From:

    From:

    From:

    0

    0

    To:

    To:

    To:

    .385

    .385

    SAFETY-HAZARD ELIM(P)

    SAFETY(P)

    AM-PAVEMENT (PKY)(P)

    MAJOR WIDENING(O)

    MAJOR WIDENING(O)

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    R

    C

    R

    U

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2016

    2018

    2017

    2018

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    SP

    SP

    SPP

    SPP

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $3,800,000

    $3,650,000

    $10,480,000

    $6,190,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    $7,450,000

    $16,670,000

    Total

    Total

    D

    C

    R

    U

    R

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2024

    2024

    2022

    2023

    2024

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    PM

    PM

    NH

    NH

    NH

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $150,000

    $1,500,000

    $2,500,000

    $3,500,000

    $2,500,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    $1,650,000

    $6,000,000

    $2,500,000

    Total

    Total

    Total

    FUNDS NOT AVAILABLE

  • KENTUCKY TRANSPORTATION CABINET Page: 5

    COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION SIX YEAR PLAN

    14 JAN 2018COMPARISON OF , , AND EDITIONS

    OF THE SIX YEAR HIGHWAY PLAN PROJECTS

    2014 2016 2018

    2014 SIX YEAR PLAN2016 SIX YEAR PLAN2018

    IMPROVE US-60 FROM PROPOSEDSOUTHERN BYPASS OF LA CENTERTO EAST OF DENIS JONES ROAD.(02CCR)

    PE AND ENVIRONMENTAL FORREPLACEMENT OF CAIRO BRIDGEAT OR BESIDE EXISTINGLOCATION. (004B00021N)(SD)

    PE AND ENVIRONMENTAL FORREPLACEMENT OF CAIRO BRIDGEAT OR BESIDE EXISTINGLOCATION.(SD)

    PE AND ENVIRONMENTAL FORREPLACEMENT OF CAIRO BRIDGEAT OR BESIDE EXISTINGLOCATION.

    REPLACE BRIDGE ON KY 358 OVERCLAYTON CREEK APPR. 0.5 MILENORTH OF KY 473 (SR 26.5)004B00044N

    STUDY IMPROVEMENTS TOHALLOWAY LANDING ROAD(CR1232) (16CCN).

    ADDRESS PAVEMENT CONDITIONOF AC PAVEMENT

    1.800

    .970

    .970

    .040

    BALLARD

    BALLARD

    BALLARD

    BALLARD

    BALLARD

    BALLARD

    BALLARD

    US-60

    US-51

    US-51

    US-51

    KY-358

    CR-1232

    US-51

    $4,500,000

    $980,000

    Total

    Total

    P

    D

    R

    U

    C

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2017

    2019

    2014

    2014

    2015

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    BRO

    BRO

    BRO

    BRO

    BRO

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $2,000,000

    $2,500,000

    $150,000

    $250,000

    $580,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    01

    01

    01

    01

    01

    01

    01

    118.00

    1140.01

    1140.02

    1140.03

    1143.00

    8953.00

    20000.00

    -

    -

    -

    -

    -

    -

    -

    01

    01

    01

    01

    01

    01

    01

    118.00

    1140.00

    1140.02

    1140.03

    1143.00

    8953.00

    20000.00

    -

    -

    -

    -

    -

    -

    -

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    2000

    2018

    2018

    2018

    2012

    2016

    2018

    2000

    2018

    2018

    2018

    2012

    2016

    2018

    11.815

    7.327

    7.327

    7.327

    14.034

    0

    4.873

    13.615

    8.297

    8.297

    8.297

    14.074

    5.762

    7.3

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    To:

    To:

    To:

    To:

    To:

    To:

    To:

    From:

    From:

    From:

    From:

    From:

    From:

    From:

    MAJOR WIDENING(O)

    AM-BRIDGE (P)

    AM-BRIDGE (P)

    AM-BRIDGE (P)

    BRIDGE REPLACEMENT(P)

    SAFETY(P)

    AM-PAVEMENT (PRI)(P)

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    D

    D

    D

    C

    P

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2019

    2020

    2021

    2016

    2021

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    BRO

    BRO

    BRO

    BRX

    SP

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $3,000,000

    $6,500,000

    $6,500,000

    $500,000

    $200,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    $3,000,000

    $6,500,000

    $6,500,000

    $500,000

    $200,000

    Total

    Total

    Total

    Total

    Total

    R

    U

    D

    R

    U

    C

    D

    C

    D

    D

    C

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2024

    2024

    2019

    2023

    2023

    2023

    2020

    2024

    2021

    2020

    2020

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    NH

    NH

    BR

    BR

    BR

    BR

    BR

    BR

    BR

    PM

    PM

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $2,370,000

    $1,900,000

    $2,500,000

    $1,000,000

    $100,000

    $49,500,000

    $6,500,000

    $49,500,000

    $20,000,000

    $275,000

    $2,750,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    $4,270,000

    $53,100,000

    $56,000,000

    $20,000,000

    $3,025,000

    Total

    Total

    Total

    Total

    Total

    AWARDED

    FUNDS NOT AVAILABLE

  • KENTUCKY TRANSPORTATION CABINET Page: 6

    COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION SIX YEAR PLAN

    14 JAN 2018COMPARISON OF , , AND EDITIONS

    OF THE SIX YEAR HIGHWAY PLAN PROJECTS

    2014 2016 2018

    2014 SIX YEAR PLAN2016 SIX YEAR PLAN2018

    PRIORITY SECTION 3: IMPROVEKY-90 EAST OF GLASGOW FROMBRIDGE OVER FALLEN TIMBERCREEK TO THE METCALFECOUNTY LINE.(2002BOPC)(08CCR)(10CCR)(12CCR)

    PRIORITY SECTION 3: IMPROVEKY-90 EAST OF GLASGOW FROMBRIDGE OVER FALLEN TIMBERCREEK TO THE METCALFECOUNTY LINE.(2002BOPC)(08CCR)(10CCR)(12CCR)

    LOUIE B NUNN PKWY (LN-9008)BRIDGE PAINTING, CLEANING,AND MINOR REPAIRS ON BRIDGEOVER I-65 IN BARREN CO. KY.005B00067R, 005B00067L (2016BOP)

    CONNECT US-31E (MP 12.6) TO OLDCALVARY DRIVE (CS 1196) AT THEEXISTING INTERSECTION OF US-31E AND TROJAN TRAIL.(12CCN)

    MAJOR WIDENING FROM SANDERSSTREET IN CAVE CITY TO US 68(GLASGOW OUTER LOOP) INGLASGOW. (14CCN)(16CCR).

    MAJOR WIDENING OR 2+1 FROMSTATE PARK ROAD TO NUNNPARKWAY. (14CCN)

    4.217

    4.217

    .100

    .300

    8.414

    11.074

    BARREN

    BARREN

    BARREN

    BARREN

    BARREN

    BARREN

    KY-90

    KY-90

    LN-9008

    US-31E

    KY-90

    US-31E

    $10,010,000

    $780,000

    $39,500,000

    $3,500,000

    Total

    Total

    Total

    Total

    C

    R

    U

    C

    D

    R

    U

    C

    D

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2014

    2014

    2014

    2015

    2016

    2017

    2017

    2018

    2017

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    SPP

    SPP

    SPP

    SPP

    STP

    STP

    STP

    SPP

    SPP

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $10,010,000

    $50,000

    $180,000

    $550,000

    $2,500,000

    $6,000,000

    $3,500,000

    $27,500,000

    $3,500,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    03

    03

    03

    03

    03

    03

    108.50

    108.51

    195.00

    8705.00

    8819.00

    8820.00

    -

    -

    -

    -

    -

    -

    03

    03

    03

    03

    03

    03

    108.00

    108.51

    195.00

    8705.00

    8819.00

    8820.00

    -

    -

    -

    -

    -

    -

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    2000

    2018

    2016

    2012

    2014

    2014

    2000

    2018

    2016

    2012

    2014

    2014

    17.758

    17.758

    0

    .16

    1.222

    21.975

    21.975

    .1

    8.574

    12.296

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    To:

    To:

    To:

    To:

    To:

    To:

    From:

    From:

    From:

    From:

    From:

    From:

    RECONSTRUCTION(O)

    PREFINANCD CONVRSN(P)

    AM-BRG PAINTING(P)

    NEW ROUTE(O)

    MAJOR WIDENING(O)

    MAJOR WIDENING(O)

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    C

    C

    D

    R

    U

    C

    D

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2016

    2016

    2016

    2017

    2017

    2019

    2017

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    SPP

    SPP

    STP

    STP

    STP

    SPP

    SPP

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $12,070,000

    $550,000

    $2,200,000

    $6,000,000

    $3,500,000

    $27,500,000

    $3,500,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    $12,070,000

    $550,000

    $39,200,000

    $3,500,000

    Total

    Total

    Total

    Total

    C

    C

    C

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2022

    2023

    2018

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    STP

    STP

    NH

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $3,950,000

    $9,210,000

    $500,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    $3,950,000

    $9,210,000

    $500,000

    Total

    Total

    Total

    AWARDED

    SEE 03-8819.20

    FUNDS NOT AVAILABLE

  • KENTUCKY TRANSPORTATION CABINET Page: 7

    COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION SIX YEAR PLAN

    14 JAN 2018COMPARISON OF , , AND EDITIONS

    OF THE SIX YEAR HIGHWAY PLAN PROJECTS

    2014 2016 2018

    2014 SIX YEAR PLAN2016 SIX YEAR PLAN2018

    IMPROVE KY-1297 FROM CR-1366(DONNELLY DRIVE) TO US-31E(ROGER WELLS), AND IMPROVECR-1366 (DONNELLY DRIVE) FROMKY-1297 TO US-68 IN GLASGOW.(14CCN) (16CCN)

    IMPROVE KY-1297 FROM CR-1366(DONNELLY DRIVE) TO US-31E(ROGER WELLS), AND IMPROVECR-1366 (DONNELLY DRIVE) FROMKY-1297 TO US-68 IN GLASGOW.(14CCN) (16CCN)

    WIDEN KY-70 AT THE CAVE CITYINDUSTRIAL PARK. (16CCN)

    CONSTRUCT AN ACCESS DRIVE ATTHE CAVE CITY INDUSTRIALPARK.(16CCN)

    CONSTRUCT AN INDUSTRIALACCESS ROAD TO CONNECT TOKY 70 NEAR MP 5.9, INCLUDING ALEFT TURNING LANE ON KY 70.(16CCN)

    INTERSECTION REALIGNMENT ONUS 68 AT KY 255 IN BARRENCOUNTY AT M.P. 3.971.(2012BOP)(AR/W)

    ADDRESS DEFICIENCIES OF US31EX BRIDGE OVER WATERSTREET. (005B00058N)

    1.721

    1.721

    .063

    BARREN

    BARREN

    BARREN

    BARREN

    BARREN

    BARREN

    BARREN

    KY-1297

    KY-1297

    KY-70

    -

    -

    US-68

    US-31EX

    $1,200,000

    $250,000

    Total

    Total

    D

    C

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2016

    2014

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    SPP

    SAF

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $1,200,000

    $250,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    03

    03

    03

    03

    03

    03

    03

    8821.00

    8821.01

    8906.00

    8907.00

    8953.00

    9005.00

    10001.00

    -

    -

    -

    -

    -

    -

    -

    03

    03

    03

    03

    03

    99

    03

    8821.00

    8821.00

    8906.00

    8907.00

    8953.00

    911.01

    10001.00

    -

    -

    -

    -

    -

    -

    -

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    2016

    2018

    2016

    2016

    2016

    2012

    2018

    2016

    2016

    2016

    2016

    2016

    2006

    2018

    11.085

    11.085

    5.878

    3.929

    1.582

    12.806

    12.806

    6.016

    3.992

    1.586

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    To:

    To:

    To:

    To:

    To:

    To:

    To:

    From:

    From:

    From:

    From:

    From:

    From:

    From:

    MAJOR WIDENING(O)

    PREFINANCD CONVRSN(O)

    MINOR WIDENING(O)

    NEW ROUTE(O)

    NEW ROUTE(O)

    SAFETY-HAZARD ELIM(P)

    AM-BRIDGE (P)

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    R

    U

    C

    C

    C

    C

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2017

    2019

    2021

    2018

    2018

    2018

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    STP

    STP

    STP

    SP

    SP

    SPP

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $3,860,000

    $4,100,000

    $7,150,000

    $220,000

    $415,000

    $600,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    $15,110,000

    $220,000

    $415,000

    $600,000

    Total

    Total

    Total

    Total

    R

    U

    R

    U

    D

    C

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2022

    2022

    2023

    2023

    2019

    2020

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    STP

    STP

    STP

    STP

    BR

    BR

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $2,250,000

    $2,000,000

    $2,250,000

    $2,000,000

    $245,000

    $945,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    $4,250,000

    $4,250,000

    $1,190,000

    Total

    Total

    Total

    SEE 03-8953.00

    SEE 03-8953.00

    AUTHORIZED

  • KENTUCKY TRANSPORTATION CABINET Page: 8

    COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION SIX YEAR PLAN

    14 JAN 2018COMPARISON OF , , AND EDITIONS

    OF THE SIX YEAR HIGHWAY PLAN PROJECTS

    2014 2016 2018

    2014 SIX YEAR PLAN2016 SIX YEAR PLAN2018

    ADDRESS PAVEMENT CONDITIONOF I-065 BOTH DIRECTION(S)FROM MILEPOINT 42.89 TOMILEPOINT 43.307

    ADDRESS PAVEMENT CONDITIONOF I-065 NON-CARDINALDIRECTION(S) FROM MILEPOINT45.935 TO MILEPOINT 46.881

    ADDRESS PAVEMENT CONDITIONOF LOUIE B. NUNN CUMBERLANDPARKWAY BOTH DIRECTION(S)FROM MILEPOINT 16.117 TOMILEPOINT 20.1

    ADDRESS PAVEMENT CONDITIONOF LOUIE B. NUNN CUMBERLANDPARKWAY BOTH DIRECTION(S)FROM MILEPOINT 20.1 TOMILEPOINT 22.357

    ADDRESS PAVEMENT CONDITIONOF LOUIE B. NUNN CUMBERLANDPARKWAY BOTH DIRECTION(S)FROM MILEPOINT 9.375 TOMILEPOINT 14.85

    ADDRESS PAVEMENT CONDITIONOF AC PAVEMENT

    BARREN

    BARREN

    BARREN

    BARREN

    BARREN

    BARREN

    I-65

    I-65

    LN-9008

    LN-9008

    LN-9008

    US-68X

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    03

    03

    03

    03

    03

    03

    20000.00

    20001.00

    20003.00

    20004.00

    20005.00

    20006.00

    -

    -

    -

    -

    -

    -

    03

    03

    03

    03

    03

    03

    20000.00

    20001.00

    20003.00

    20004.00

    20005.00

    20006.00

    -

    -

    -

    -

    -

    -

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    2018

    2018

    2018

    2018

    2018

    2018

    2018

    2018

    2018

    2018

    2018

    2018

    42.89

    45.935

    16.117

    20.1

    9.375

    1.692

    43.307

    46.881

    20.1

    22.357

    14.85

    2.523

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    To:

    To:

    To:

    To:

    To:

    To:

    From:

    From:

    From:

    From:

    From:

    From:

    AM-PAVEMENT (INT)(P)

    AM-PAVEMENT (INT)(P)

    AM-PAVEMENT (PKY)(P)

    AM-PAVEMENT (PKY)(P)

    AM-PAVEMENT (PKY)(P)

    AM-PAVEMENT (PRI)(P)

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    D

    C

    D

    C

    D

    C

    D

    C

    D

    C

    D

    C

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2019

    2019

    2024

    2024

    2019

    2019

    2021

    2021

    2021

    2021

    2021

    2021

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    PM

    PM

    PM

    PM

    PM

    PM

    PM

    PM

    PM

    PM

    PM

    PM

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $50,000

    $500,000

    $50,000

    $500,000

    $320,000

    $3,200,000

    $180,000

    $1,800,000

    $440,000

    $4,400,000

    $400,000

    $4,000,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    $550,000

    $550,000

    $3,520,000

    $1,980,000

    $4,840,000

    $4,400,000

    Total

    Total

    Total

    Total

    Total

    Total

  • KENTUCKY TRANSPORTATION CABINET Page: 9

    COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION SIX YEAR PLAN

    14 JAN 2018COMPARISON OF , , AND EDITIONS

    OF THE SIX YEAR HIGHWAY PLAN PROJECTS

    2014 2016 2018

    2014 SIX YEAR PLAN2016 SIX YEAR PLAN2018

    ADDRESS PAVEMENT CONDITIONON US-68 FROM MILEPOINT 0.00 TOMILEPOINT 9.70

    ADDRESS PAVEMENT CONDITIONON US-68 FROM MILEPOINT 16.95TO MILEPOINT 23.16

    RECONSTRUCT KY-111 IN THEVICINITY OF THE "S-CURVE" EASTOF OWINGSVILLE.(14CCR)

    IMPROVE INTERSECTION OF KY 36AND KENDALL SPRINGS ROAD TOACCOMODATE INDUSTRIALTRUCK TRAFFIC. (14CCR)

    RECONSTRUCTION FROM US-60 INOWINGSVILLE NORTH TOPRICKLY ASH ROAD. (SEE 9-193)(08CCN) (10CCN) (16CCN)

    NEW CONSTRUCTION FROMKENDALL SPRINGS ROAD TO BATHCOUNTY HIGH SCHOOL INOWINGSVILLE. (08CCN)

    RECONSTRUCT CURVE AT .8 MILESOUTH OF KY-36. (08CCN)(12CCR)

    9.700

    6.210

    .500

    .100

    1.900

    .100

    BARREN

    BARREN

    BATH

    BATH

    BATH

    BATH

    BATH

    US-68

    US-68

    KY-111

    KY-36

    KY-111

    -

    KY-965

    $8,140,000

    $1,500,000

    $8,100,000

    $1,440,000

    $1,150,000

    Total

    Total

    Total

    Total

    Total

    R

    U

    C

    D

    R

    U

    C

    R

    U

    C

    P

    D

    R

    U

    C

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2015

    2015

    2016

    2014

    2014

    2014

    2015

    2014

    2014

    2015

    2014

    2014

    2014

    2014

    2015

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    SPP

    SPP

    SPP

    SPP

    SPP

    SPP

    SPP

    SP

    SP

    SP

    SP

    SP

    SPP

    SPP

    SPP

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $1,580,000

    $1,040,000

    $5,520,000

    $250,000

    $300,000

    $200,000

    $750,000

    $1,600,000

    $1,000,000

    $5,500,000

    $240,000

    $1,200,000

    $350,000

    $50,000

    $750,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    03

    03

    09

    09

    09

    09

    09

    20020.00

    20021.00

    193.00

    394.00

    8402.00

    8403.00

    8404.00

    -

    -

    -

    -

    -

    -

    -

    03

    03

    09

    09

    09

    09

    09

    20020.00

    20021.00

    193.00

    394.00

    8402.00

    8403.00

    8404.00

    -

    -

    -

    -

    -

    -

    -

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    2018

    2018

    2006

    2014

    2016

    2008

    2008

    2018

    2018

    2006

    2014

    2016

    2008

    2008

    0

    16.95

    1

    12.65

    0

    7.147

    9.7

    23.16

    1.5

    12.75

    1.909

    7.247

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    To:

    To:

    To:

    To:

    To:

    To:

    To:

    From:

    From:

    From:

    From:

    From:

    From:

    From:

    AM-PAVEMENT (PRI)(P)

    AM-PAVEMENT (PRI)(P)

    RECONSTRUCTION(O)

    SAFETY(P)

    RECONSTRUCTION(O)

    NEW ROUTE(O)

    RECONSTRUCTION(O)

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    R

    U

    C

    C

    R

    U

    C

    P

    D

    U

    C

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2016

    2016

    2018

    2016

    2016

    2017

    2018

    2016

    2017

    2016

    2016

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    SPP

    SPP

    SPP

    SPP

    SP

    SP

    SP

    SP

    SP

    SPP

    SPP

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $1,580,000

    $1,040,000

    $5,520,000

    $750,000

    $1,600,000

    $1,000,000

    $5,500,000

    $240,000

    $1,200,000

    $50,000

    $750,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    $8,140,000

    $750,000

    $8,100,000

    $1,440,000

    $800,000

    Total

    Total

    Total

    Total

    Total

    C

    C

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2022

    2022

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    PM

    PM

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $1,180,000

    $920,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    $1,180,000

    $920,000

    Total

    Total

    FUNDS NOT AVAILABLE

    AWARDED

    FUNDS NOT AVAILABLE

    FUNDS NOT AVAILABLE

    FUNDS NOT AVAILABLE

  • KENTUCKY TRANSPORTATION CABINET Page: 10

    COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION SIX YEAR PLAN

    14 JAN 2018COMPARISON OF , , AND EDITIONS

    OF THE SIX YEAR HIGHWAY PLAN PROJECTS

    2014 2016 2018

    2014 SIX YEAR PLAN2016 SIX YEAR PLAN2018

    IMPROVE SAFETY ANDEFFICIENCY AT THE KY-211 ANDUS-60 INTERSECTION IN SALTLICK. (14CCN)

    CORRECT HORIZONTAL ANDWIDTH DEFICIENCIES ON KY 36FROM "OLD KY 11" MP 1.004 TO KY1325 (MP 6.97) TO IMPROVE SAFETYAND OPERATIONAL EFFICIENCYOF ROADWAY. (14CCN)

    ADDRESS DEFICIENCIES OF KY-1106 BRIDGE OVER FLAT CREEK.(006B00069N)

    ADDRESS DEFICIENCIES OF KY-1944 BRIDGE OVER WHITE OAKCREEK. (006B00076N)

    ADDRESS DEFICIENCIES OF KY 211BRIDGE OVER COW CREEK.(006B00043N)

    ADDRESS PAVEMENT CONDITIONOF AC PAVEMENT

    CONSTRUCT NEW ROUTE FROMKY 441 TO US 25E INMIDDLESBORO. (08CCR)

    .200

    5.966

    .800

    BATH

    BATH

    BATH

    BATH

    BATH

    BATH

    BELL

    US-60

    KY-36

    KY-1106

    KY-1944

    KY-211

    US-60

    KY-441

    $1,975,000

    $6,400,000

    $7,910,000

    Total

    Total

    Total

    D

    R

    U

    C

    P

    D

    R

    U

    D

    R

    U

    C

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2015

    2015

    2015

    2016

    2015

    2016

    2017

    2018

    2014

    2015

    2015

    2016

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    STP

    STP

    STP

    STP

    SPP

    SPP

    SPP

    SPP

    SP

    SP

    SP

    SP

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $325,000

    $350,000

    $300,000

    $1,000,000

    $400,000

    $2,100,000

    $2,700,000

    $1,200,000

    $400,000

    $620,000

    $490,000

    $6,400,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    09

    09

    09

    09

    09

    09

    11

    8813.00

    8814.00

    10000.00

    10001.00

    10017.00

    20001.00

    110.00

    -

    -

    -

    -

    -

    -

    -

    09

    09

    09

    09

    09

    09

    11

    8813.00

    8814.00

    10000.00

    10001.00

    10017.00

    20001.00

    110.00

    -

    -

    -

    -

    -

    -

    -

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    2014

    2014

    2018

    2018

    2018

    2018

    2000

    2014

    2014

    2018

    2018

    2018

    2018

    2000

    16.3

    1.004

    3.291

    2.701

    8.166

    6.35

    16.5

    6.97

    3.327

    2.715

    8.178

    7.724

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    To:

    To:

    To:

    To:

    To:

    To:

    To:

    From:

    From:

    From:

    From:

    From:

    From:

    From:

    SAFETY(P)

    RECONSTRUCTION(O)

    AM-BRIDGE (P)

    AM-BRIDGE (P)

    AM-BRIDGE (P)

    AM-PAVEMENT (PRI)(P)

    NEW ROUTE(O)

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    R

    U

    C

    P

    D

    R

    U

    D

    R

    U

    C

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2017

    2017

    2018

    2016

    2017

    2017

    2018

    2016

    2017

    2017

    2019

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    STP

    STP

    STP

    SPP

    SPP

    SPP

    SPP

    SP

    SP

    SP

    SP

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $560,000

    $300,000

    $1,000,000

    $400,000

    $2,100,000

    $2,700,000

    $1,200,000

    $400,000

    $620,000

    $490,000

    $6,400,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    $1,860,000

    $6,400,000

    $7,910,000

    Total

    Total

    Total

    C

    D

    C

    D

    C

    D

    C

    D

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2020

    2019

    2020

    2019

    2020

    2019

    2020

    2019

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    STP

    BR

    BR

    BR

    BR

    BR

    BR

    PM

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $1,000,000

    $595,000

    $2,258,000

    $473,000

    $1,015,000

    $315,000

    $717,500

    $410,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    $1,000,000

    $2,853,000

    $1,488,000

    $1,032,500

    $410,000

    Total

    Total

    Total

    Total

    Total

    FUNDS NOT AVAILABLE

    FUNDS NOT AVAILABLE

  • KENTUCKY TRANSPORTATION CABINET Page: 11

    COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION SIX YEAR PLAN

    14 JAN 2018COMPARISON OF , , AND EDITIONS

    OF THE SIX YEAR HIGHWAY PLAN PROJECTS

    2014 2016 2018

    2014 SIX YEAR PLAN2016 SIX YEAR PLAN2018

    IMPROVE CONGESTION ANDFREIGHT MOVEMENT BYCONSTRUCTING A TWO WAY LEFTTURN LANE. (LET W/ 11-8701)(12CCR)

    RECONSTRUCT KY-66 FROM 500' SOF NCL PINEVILLE TO KY-221

    REPLACE BRIDGE ON KY-2011 (MP8.498) OVER RED BIRD CREEK; .55MI SOUTH OF JCT KY 66; (SR=3.5)007B00074N

    REPLACE BRIDGE ON CR-1327 (MP0.014) OVER LEFT FORK STRAIGHTCREEK; .10 MI W OF JCT KY 66;(STRUCTURALLY DEFICIENT, SR=2)007C00048N

    REPLACE BRIDGE ON DAVISOXENDINE RD (CR 1184) OVERHANCES CREEK AT JCT WITH KY1344(SR 12.9) 007C00061N

    PAGE SCHOOL TURN LANE. (LETW/ 11-189)(12CCN)

    .800

    .900

    .100

    .100

    .100

    BELL

    BELL

    BELL

    BELL

    BELL

    BELL

    US-119

    KY-66

    KY-2011

    CR-1327

    CR-1184

    US-119

    $2,624,500

    $11,030,000

    $950,000

    $800,000

    $450,000

    $1,074,555

    Total

    Total

    Total

    Total

    Total

    Total

    U

    C

    R

    U

    C

    R

    U

    C

    C

    U

    C

    U

    C

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2014

    2015

    2014

    2014

    2015

    2014

    2014

    2016

    2016

    2014

    2015

    2014

    2014

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    SPP

    SPP

    SP

    SP

    SP

    BRX

    BRX

    BRX

    BRZ

    BRZ

    BRZ

    SPP

    SPP

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $200,000

    $2,424,500

    $2,220,000

    $830,000

    $7,980,000

    $250,000

    $150,000

    $550,000

    $800,000

    $50,000

    $400,000

    $94,555

    $980,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    11

    11

    11

    11

    11

    11

    189.00

    217.00

    1079.00

    1083.00

    1093.00

    8701.00

    -

    -

    -

    -

    -

    -

    11

    11

    11

    11

    11

    11

    189.00

    217.00

    1079.00

    1083.00

    1093.00

    8701.00

    -

    -

    -

    -

    -

    -

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    2012

    1996

    2010

    2010

    2012

    2012

    2012

    1996

    2010

    2010

    2012

    2012

    .37

    .41

    8.35

    0

    .01

    3.45

    1.17

    1.557

    8.65

    .1

    .05

    3.55

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    To:

    To:

    To:

    To:

    To:

    To:

    From:

    From:

    From:

    From:

    From:

    From:

    SAFETY(P)

    RECONSTRUCTION(O)

    BRIDGE REPLACEMENT(P)

    BRIDGE REPLACEMENT(P)

    BRIDGE REPLACEMENT(P)

    SAFETY(P)

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    C

    R

    U

    C

    C

    C

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2016

    2016

    2016

    2018

    2016

    2016

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    SPP

    SP

    SP

    SP

    BRX

    SPP

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $2,424,500

    $2,220,000

    $830,000

    $7,980,000

    $550,000

    $980,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    $2,424,500

    $11,030,000

    $550,000

    $980,000

    Total

    Total

    Total

    Total

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AWARDED

    FUNDS NOT AVAILABLE

    AWARDED

    FUNDS NOT AVAILABLE

  • KENTUCKY TRANSPORTATION CABINET Page: 12

    COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION SIX YEAR PLAN

    14 JAN 2018COMPARISON OF , , AND EDITIONS

    OF THE SIX YEAR HIGHWAY PLAN PROJECTS

    2014 2016 2018

    2014 SIX YEAR PLAN2016 SIX YEAR PLAN2018

    PROVIDE PASSINGOPPORTUNITIES ON US 119 IN THEVICINITY OF MP 4.5 IN BELLCOUNTY. (12CCN)(14CCR)(16CCR)

    CONSTRUCT LEFT AND RIGHTTURN LANES ONTO THE BELLCOUNTY GARAGE/VETERANSPARK ENTRANCE FROM US 119.(14CCN)

    RECONSTRUCT TO CORRECTSAFETY ISSUES AND IMPROVESTABILIZATION OF ROADWAY ONKY 188 AND YELLOW CREEK ONTHE SOUTHSIDE OF ROADWAY.(16CCN)

    RECONSTRUCT KY 1534 ANDYELLOW CREEK ALONG THEEASTSIDE OF ROADWAY FROM MP1.3 TO MP 3.5 TO IMPROVE SAFETY.(16CCN)

    IMPROVE SAFETY ALONG KY 221WHILE PROVIDING SAFERTURNING LANES FOR SCHOOLTRAFFIC. (16CCN)

    IMPROVE CURB AND GUTTER ONKY 74 FROM 10TH STREET TO 30THSTREET. (16CCN)

    1.500BELL

    BELL

    BELL

    BELL

    BELL

    BELL

    US-119

    US-119

    KY-188

    KY-1534

    KY-221

    KY-74

    $3,900,000

    $1,275,000

    Total

    Total

    D

    R

    U

    C

    D

    R

    U

    C

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2015

    2017

    2017

    2018

    2017

    2018

    2018

    2019

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    SPP

    SPP

    SPP

    SPP

    SPP

    SPP

    SPP

    SPP

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $400,000

    $500,000

    $500,000

    $2,500,000

    $100,000

    $25,000

    $50,000

    $1,100,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    11

    11

    11

    11

    11

    11

    8702.00

    8805.00

    8901.00

    8902.00

    8903.00

    8904.00

    -

    -

    -

    -

    -

    -

    11

    11

    11

    11

    11

    11

    8702.00

    8805.00

    8901.00

    8902.00

    8903.00

    8904.00

    -

    -

    -

    -

    -

    -

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    2012

    2014

    2016

    2016

    2016

    2016

    2012

    2014

    2016

    2016

    2016

    2016

    3.7

    0

    1.3

    15.19

    5.2

    2.55

    3.5

    16.753

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    To:

    To:

    To:

    To:

    To:

    To:

    From:

    From:

    From:

    From:

    From:

    From:

    MINOR WIDENING(O)

    SAFETY(P)

    RECONSTRUCTION(O)

    RECONSTRUCTION(O)

    SAFETY(P)

    SAFETY(P)

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    R

    U

    C

    D

    R

    U

    C

    D

    R

    U

    C

    D

    R

    U

    C

    D

    R

    U

    C

    D

    R

    U

    C

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2017

    2018

    2019

    2017

    2018

    2018

    2019

    2017

    2018

    2019

    2020

    2017

    2018

    2019

    2020

    2017

    2018

    2019

    2020

    2018

    2019

    2019

    2020

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    SPP

    SPP

    SPP

    SPP

    SPP

    SPP

    SPP

    SPP

    SPP

    SPP

    SPP

    SPP

    SPP

    SPP

    SPP

    SP

    SP

    SP

    SP

    SP

    SP

    SP

    SP

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $1,450,000

    $4,100,000

    $21,000,000

    $100,000

    $25,000

    $50,000

    $1,100,000

    $250,000

    $200,000

    $350,000

    $2,500,000

    $250,000

    $300,000

    $250,000

    $2,250,000

    $200,000

    $200,000

    $75,000

    $625,000

    $50,000

    $75,000

    $75,000

    $250,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    $26,550,000

    $1,275,000

    $3,300,000

    $3,050,000

    $1,100,000

    $450,000

    Total

    Total

    Total

    Total

    Total

    Total

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    FUNDS NOT AVAILABLE

    FUNDS NOT AVAILABLE

    FUNDS NOT AVAILABLE

    FUNDS NOT AVAILABLE

    FUNDS NOT AVAILABLE

    FUNDS NOT AVAILABLE

  • KENTUCKY TRANSPORTATION CABINET Page: 13

    COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION SIX YEAR PLAN

    14 JAN 2018COMPARISON OF , , AND EDITIONS

    OF THE SIX YEAR HIGHWAY PLAN PROJECTS

    2014 2016 2018

    2014 SIX YEAR PLAN2016 SIX YEAR PLAN2018

    ADDRESS DEFICIENCIES OF KY-2011 BRIDGE OVER RED BIRDCREEK. (007B00071N)

    ADDRESS DEFICIENCIES OF KY-2011 BRIDGE OVER RED BIRDCREEK. (007B00072N)

    ADDRESS DEFICIENCIES OF CR-1041 BRIDGE OVER YORK BRANCH.(007C00003N)

    ADDRESS DEFICIENCIES OF KY 92BRIDGE OVER GREASY CREEK.(007B00040N)

    ADDRESS PAVEMENT CONDITIONOF AC PAVEMENT

    ADDRESS PAVEMENT CONDITIONON US-25E FROM MILEPOINT 0.90TO MILEPOINT 2.86

    I-275 BRIDGE OVER THE OHIORIVER NEAR LAWRENCEBURG,INDIANA (B52); JOINT PROJECTWITH INDIANA TO PERFORMFRACTURE CRITICAL INSPECTION.(008B00052N)

    1.960

    .600

    BELL

    BELL

    BELL

    BELL

    BELL

    BELL

    BOONE

    KY-2011

    KY-2011

    CR-1041

    KY-92

    KY-2012

    US-25E

    I-275

    $20,000Total

    C

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2014

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    IM

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $20,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    11

    11

    11

    11

    11

    11

    06

    10000.00

    10001.00

    10002.00

    10038.00

    20000.00

    20021.00

    9.00

    -

    -

    -

    -

    -

    -

    -

    11

    11

    11

    11

    11

    11

    06

    10000.00

    10001.00

    10002.00

    10038.00

    20000.00

    20021.00

    9.00

    -

    -

    -

    -

    -

    -

    -

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    2018

    2018

    2018

    2018

    2018

    2018

    2000

    2018

    2018

    2018

    2018

    2018

    2018

    2000

    6.395

    7.534

    .091

    3.142

    0

    .9

    13.275

    6.399

    7.54

    .097

    3.148

    1.95

    2.86

    13.892

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    To:

    To:

    To:

    To:

    To:

    To:

    To:

    From:

    From:

    From:

    From:

    From:

    From:

    From:

    AM-BRIDGE (P)

    AM-BRIDGE (P)

    AM-BRIDGE (P)

    AM-BRIDGE (P)

    AM-PAVEMENT (PRI)(P)

    AM-PAVEMENT (PRI)(P)

    BRIDGE INSPECTION(P)

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    D

    C

    D

    C

    D

    C

    D

    C

    D

    C

    C

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2019

    2020

    2019

    2020

    2019

    2020

    2019

    2020

    2021

    2021

    2022

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    BR

    BR

    BR

    BR

    BR

    BR

    BR

    BR

    PM

    PM

    PM

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $175,000

    $441,000

    $175,000

    $791,000

    $193,000

    $595,000

    $175,000

    $490,000

    $61,000

    $610,000

    $1,391,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    $616,000

    $966,000

    $788,000

    $665,000

    $671,000

    $1,391,000

    Total

    Total

    Total

    Total

    Total

    Total

  • KENTUCKY TRANSPORTATION CABINET Page: 14

    COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION SIX YEAR PLAN

    14 JAN 2018COMPARISON OF , , AND EDITIONS

    OF THE SIX YEAR HIGHWAY PLAN PROJECTS

    2014 2016 2018

    2014 SIX YEAR PLAN2016 SIX YEAR PLAN2018

    IMPROVE THE KY-536 (MT. ZIONROAD) INTERCHANGE.(14CCR)(16CCR)

    IMPROVE THE KY-536 (MT. ZIONROAD) INTERCHANGE.(14CCR)(16CCR)

    ADD AUXILIARY LANES ON I-71/75FROM KY-536 TO US-42 (NB & SB)AS PER THE INTERCHANGEJUSTIFICATION STUDY(IJS).(10CCR)(12CCR)

    RECONSTRUCT THE KY-338(RICHWOOD ROAD)INTERCHANGE. (FUNDING FORIMR SHOWN UNDER 6-14.01)(10CCR)(12CCR)(14CCR)(16CCR)

    RECONSTRUCT THE KY-338(RICHWOOD ROAD)INTERCHANGE. (ADDITIONAL C-FUNDS FOR 6-18.00)

    RECONSTRUCT THE KY-338(RICHWOOD ROAD)INTERCHANGE. (ADDITIONAL C-FUNDS FOR 6-18.00)

    IMPROVE FREIGHT MOBILITY ATI-275 AND GRAVES ROAD(CONTINUATION OF 6-8953:INTERCHANGE JUSTIFICATIONSTUDY ON I-275/GRAVES RD).

    .686

    .686

    2.067

    .100

    .100

    BOONE

    BOONE

    BOONE

    BOONE

    BOONE

    BOONE

    BOONE

    I-75

    I-75

    I-75

    I-75

    I-75

    I-75

    I-275

    $33,870,000

    $24,700,000

    $63,900,000

    Total

    Total

    Total

    R

    U

    C

    R

    U

    C

    D

    R

    U

    C

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2016

    2017

    2018

    2016

    2017

    2018

    2015

    2016

    2017

    2018

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    IM

    IM

    IM

    IM

    IM

    IM

    IM

    IM

    IM

    IM

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $8,930,000

    $5,200,000

    $19,740,000

    $6,300,000

    $800,000

    $17,600,000

    $5,000,000

    $20,950,000

    $6,240,000

    $31,710,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    06

    06

    06

    06

    06

    06

    06

    14.00

    14.02

    14.50

    18.00

    18.10

    18.11

    78.00

    -

    -

    -

    -

    -

    -

    -

    06

    06

    06

    06

    06

    06

    06

    14.00

    14.02

    14.01

    18.00

    18.00

    18.11

    78.00

    -

    -

    -

    -

    -

    -

    -

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    Parent No.:

    2004

    2008

    2008

    2004

    2016

    2016

    2018

    2004

    2008

    2006

    2004

    2004

    2016

    2018

    177.659

    178.033

    178.039

    175.217

    175.217

    175.217

    7.2

    178.345

    178.133

    180.106

    175.622

    175.622

    175.622

    8.9

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    Milepoints:

    To:

    To:

    To:

    To:

    To:

    To:

    To:

    From:

    From:

    From:

    From:

    From:

    From:

    From:

    I-CHANGE RECONST(O)

    PREFINANCD CONVRSN(O)

    MINOR WIDENING(O)

    I-CHANGE RECONST(O)

    PREFINANCD CONVRSN(O)

    PREFINANCD CONVRSN(P)

    NEW INTERCHANGE(O)

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    Scope:

    R

    U

    C

    U

    C

    R

    U

    C

    C

    C

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2017

    2019

    2019

    2018

    2020

    2019

    2020

    2021

    2021

    2022

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    IM

    IM

    IM

    IM

    IM

    IM

    IM

    IM

    IM

    IM

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $14,700,000

    $7,280,000

    $22,080,000

    $800,000

    $19,800,000

    $26,250,000

    $12,480,000

    $15,000,000

    $15,000,000

    $27,000,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    $44,060,000

    $20,600,000

    $53,730,000

    $15,000,000

    $27,000,000

    Total

    Total

    Total

    Total

    Total

    U

    C

    C

    U

    C

    D

    R

    U

    C

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    PHASE

    2018

    2022

    2023

    2018

    2024

    2019

    2020

    2020

    2022

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    YEAR

    NH

    NH

    NH

    NH

    NH

    NH

    NH

    NH

    NH

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    FUNDING

    $5,430,000

    $5,000,000

    $17,080,000

    $1,060,000

    $10,000,000

    $4,000,000

    $8,000,000

    $3,000,000

    $15,000,000

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    AMOUNT

    $10,430,000

    $17,080,000

    $11,060,000

    $30,000,000

    Total

    Total

    Total

    Total

    FUNDS NOT AVAILABLE

    FUNDS NOT AVAILABLE

    FUNDS NOT AVAILABLE

  • KENTUCKY TRANSPORTATION CABINET Page: 15

    COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION SIX YEAR PLAN

    14 JAN 2018COMPARISON OF , , AND EDITIONS

    OF THE SIX YEAR HIGHWAY PLAN PROJECTS

    2014 2016 2018

    2014 SIX YEAR PLAN2016 SIX YEAR PLAN2018

    IMPROVE FREIGHT MOBILITY ATI-275 AND GRAVES ROAD(CONTINUATION OF 6-8953:INTERCHANGE JUSTIFICATIONSTUDY ON I-275/GRAVES RD).

    IMPROVE SAFETY, MOBILITY,OPERATIONS, AND GEOMETRICSAT THE JUNCTION OF I-75 AND I-275 AND THE SYSTEM-TO-SYSTEMRAMPS.

    REDUCE CONGESTION ANDIMPROVE TRAFFIC MOBILITY ATTHE INTERCHANGE OF I-75 ANDKY-14 IN WALTON.

    RECONSTRUCT KY-536 TO A 5-LANE URBAN SECTION FROM 1500'WEST OF US-42 TO I-75 (MP 10.3 TOMP 13.24). (DOES NOT INCLUDEINTERCHANGERECONSTRUCTION) (00CCR)(10CCR)(12CCR)(14CCR)(16CCR)

    RECONSTRUCT KY-536 TO A 5-LANE URBAN SECTION FROM 1500'WEST OF US-42 TO I-75 (MP 10.4 TOMP 13.4). (ADDITIONAL FUNDINGFOR C PHASE) (16CCR)

    LIMABURG ACCESS ROAD ANDSIDEWALK FROM THEINTERSECTION OF GATEWAYBLVD AND KY-237