    6 WEEK INDUSTRIAL TRAINING

    HELD AT

    SWARAJ COMBINE DIVISIONOF

    PUNJAB TRACTOR LIMITED

    SUBMITTED BY:-JASPREET SINGH

    ROLL NO- 6251113276

  • 8/12/2019 6 Week Training

    2/29

    ABOUT SWARAJ

    MEANS FREEDOM FROM BONDAGE. ESTABLISH IN 27 JUNE 1970. FIRST LARGEST TRACTOR PROJECT. FULLY BASED ON P.S.I.D.C WHICH STANDS FOR

    PUJNAB STATE INDUSTRIAL DEVELOPMENTCORPORATION.

    ANNUAL CAPITAL Rs 3.7 CRORES. FIRST PRODUCT SWARAJ -720 TRACTOR A 26.6

    BHP.

  • 8/12/2019 6 Week Training

    3/29

    SWARAJ GROUP SWARAJ TRACTOR

    DIVISION (STD)

    IN PHASE- 4, MOHALI,MANUFACTURING PLANT OFTRACTORS.

    SWARAJ COMBINE

    DIVISION (SCD)

    IN CHAPPER CHERI, Teh. KHARAR,DISTT. MOHALIMANUFACTURING PLANT OFCOMBINE, TRACTORS ANDFORK LIFT.

  • 8/12/2019 6 Week Training

    4/29

    SWARAJ FOUNDRYDIVISION (SFD) IN MAJARI, KURALI.SUPPLIES CASTED CASINGAND DIFFERENT PARTS.

    SWARAJ ENGINE Ltd.

    (SEL) IN PHASE -9, MOHALI, MAKESENGINE OF TRACTORS,COMBINE AND FORK LIFT.

  • 8/12/2019 6 Week Training

    5/29

    SWARAJAUTOMOTIVE Ltd(SAL) IN NABHA , MADE SEATS

    AND SOME AUTOMOTIVEPARTS OF TRACTORS ANDCOMBINE.

    SWARAJ SPAREPARTS / RESEARCHAND DEVELOPMENT(SPD/R&D)

    IN PHASE- 4, MOHALI,MANUFACTURING THE SPAREPARTS OT TRACTORS.

  • 8/12/2019 6 Week Training

    6/29

    VARIOUS SHOPS LIGHT MACHINE SHOP

    HEAVY MACHINE SHOP

    HEAT TREATMENT SHOP

    PAINT SHOP

    ASSEMBLY SHOP

  • 8/12/2019 6 Week Training

    7/29

    LIGHT MACHINE SHOP LIGHT MACHINE SHOP (LMS) IS THE LARGEST SECTIONIN FACTORY. ALL TRANSMISSION COMPONENTS LIKESHAFTS, GEARS ARE MANUFACTURE HERE. IT HAS 127

    MACHINES WHICH PERFORMS THE OPERATION LIKEDRILLING, BORING, SHAPING, CUTTING , SURFACEFINISHING AND MUCH MORE.

    BEVEL GEAR GENERAT0R AND

    GEAR SHAVER ARE IMPORTED FROM GERMANY WHERE ASOTHER MACHINES ARE FROM HMT Ltd.

  • 8/12/2019 6 Week Training

    8/29

    VARIOUS PARTS MADE IN

    LMS INTERNAL GEARS BEVEL WHEEL

    BULL GEARS MAIN SHAFT INPUT SHAFT PINION SHAFTS REVERSED GEARS IDLE CLUSTER GR MAIN DRIVE

  • 8/12/2019 6 Week Training

    9/29

    HEAVY MACHINE SHOP ALL HEAVY PARTS OF TRACTOR MACHINED IN

    THIS SHOP WITH THE HELP OF SPECIALPURPOSE MACHINE (SPM) AND GENERAL PURPOSEMACHINE (GPM).

    ABOUT 20 SPM AND 30 GPM ARE INSTALL IN THELARGE AREA.

    MAINLY TURNING, DRILLING AND DRILINGOPERATIONS ARE PERFORM IN THIS SHOP.

  • 8/12/2019 6 Week Training

    10/29

    COMPONENTS MACHINED GEAR BOX HOUSING

    DIFFRENTIAL HOUSING

    REAR COVER

    TRUMPET HOUSING

  • 8/12/2019 6 Week Training

    11/29

    TYPES OF MACHINE

    LATHE BORING MACHINE

    SPECIAL PURPOSE MACHINE (SPM) SIMPLEX DUPLEX HORIZONTAL MILLING VERTICAL MILLING RADIAL DRILLING MACHINE

  • 8/12/2019 6 Week Training

    12/29

    PAINT SHOP Paint shop is a place where various sheet

    metal components are painted.

    Automatic painting machines mainly paintspraying machine are used. Had to pass through various chemical

    processes .

  • 8/12/2019 6 Week Training

    13/29

    NEED OF PAINTING

    LONG LIFE RUST RESISTANCE BETTER LOOK

  • 8/12/2019 6 Week Training

    14/29

    HEAT TREATMENT

    MAJOR ROLE IN FACTORY TO IMPROVE THE STRENGTH TO MAKE LONG LIFE OF COMPONENT TO IMPROVE ITS HARDNESS. ALL SHAFTS AND GEARS PRODUCE

    IN LMS IS MAINLY HEAT TREATED .

  • 8/12/2019 6 Week Training

    15/29

    ASSEMBLY SHOP

    The assembly of Swaraj Tractor Division dealswith the assembly of tractor models 724, 744,733, 735, 855.

    And various sub assemblies are carried out in themain line.

  • 8/12/2019 6 Week Training

    16/29

    DIFFERENTIAL LOOP Differential casting mounted

    on trolley after washing. Bull pinion Shaft left and

    right fitted. Cage assembly fitted. It

    consists of: Crown wheel. Tail pinion assembly. Roller bearing. Bevel wheels.

    PTO shaft fitted.

    Rear axle/trumpet is fitted. Gearbox assembly is lifted. Rear cover assembly fitted. Brakes are fitted. Footboard is fitted.

  • 8/12/2019 6 Week Training

    17/29

    GEARBOX LOOP

    Gearbox housing mounted on trolley. Drive shaft & input shaft assembly.

    Output shaft assembly. Lay shaft and connecting shaftassembly.

    Shifter rod assembly. Steering assembly.

  • 8/12/2019 6 Week Training

    18/29

    REAR COVER LOOP

    Rear cover mountedon trolley. Control valve and

    response valveassembly.

    Ram assembly. (Thisconsists of cylinder,

    piston and pistonrods.) Testing of hydraulic

    lift.

  • 8/12/2019 6 Week Training

    19/29

    ENGINE ASSEMBLY LOOP

    Engine mounted ontrolley

    Dynamo is fitted. Self-motor is fitted. Oil pump is fitted. Front axle beam and

    bracket is fitted. Clutch plate isfitted .

  • 8/12/2019 6 Week Training

    20/29

    LAYEOUT OF ASSEMBLY SHOPS

  • 8/12/2019 6 Week Training

    21/29

    LAYOUT OF GEAR ASSEMBLY

  • 8/12/2019 6 Week Training

    22/29

    LAYOUT OF REAR COVER

    ASSEMBLY

  • 8/12/2019 6 Week Training

    23/29

    DIMOUNTING STAGE Removal of complete

    tractor from conveyor. It is a long rail type

    carriage system, whichcarries whole chassisand engine while movingfrom the different

    assembly. Then it is carried intackle .

  • 8/12/2019 6 Week Training

    24/29

    This dismounting stage is further divided intodifferent small stages.

    Each stage, 2 persons works at a time, on anassembled piece of chassis & engine. The dismounting stage is divided into 5

    different stages in which the parts of thetractor are fitted on the assembled piece ofchassis & engine.

    Every 12 minutes, we got a complete tractor,

    which is removed from the conveyor of thedismounting stage.

  • 8/12/2019 6 Week Training

    25/29

    Stage 1 Alternator connection Horn

    Brake rod Brake switch connection Fan belt

    STAGE 2

    Speedometer wire Rear frame Fuel tank Overflow pipes

  • 8/12/2019 6 Week Training

    26/29

    Stage 3 Fan Radiator Hose pipes Dash board (engine oil meter,

    fuel gauge, ampere meter,temperature gauge,speedometer)

    Dash board cover

    Number plate

    STAGE 4: Battery Steering wheel

    Head lights Clutch connection Hooks and side panel Knobs and covers Sealing

  • 8/12/2019 6 Week Training

    27/29

    Stage 5 Seat Sheet metal covers (side panel covers,

    side shield, bonnet, front grill) Tyres fixing Battery cover

    Torque checking

    Engine oil pouring and greasing Charts and stickers

  • 8/12/2019 6 Week Training

    28/29

    After these stages a completetractor is assembled

  • 8/12/2019 6 Week Training

    29/29