6 sigma green belt test review
TRANSCRIPT
1. ________ survey questions allow forquantitative analysis
closedended
2. ___________data yields the most reliableinformation
continuous
3. "The team leader is responsible forinitiating the charter process.
false
4. A ____________ poka yoke, such as analarm or flashing light, discovers a defectbut does not reduce or prevent the defectfrom occurring
warning
5. A baseline analysis establishes a controlmethod for a problem
FALSE
6. A baseline is: all of theabove
7. A control plan should include both aresponse plan that defines the actionsrequired to control the process andactions that define the responsibility of thepeople closest to the process
TRUE
8. A corrective action in a control planidentifies and permanently corrects thecause of variation in a process
FALSE
9. A data collection plan defines all of theabove
10. A Failure Mode and Effects Analysis(FMEA) should be undertaken only after aprocess is in place and stable and allfailure modes have already beenexperienced
FALSE
11. A failure mode can have multiple causes TRUE
12. A judgmental sample strategy is based on___________ knowledge
experiential
13. A standing team charter focuses on broad,ongoing business issues
TRUE
14. A statistical sample is ___________selected from the population to makeinferences about the entire population
random
15. A team charter is created in the ________phase of the Define, Measure, Analyze,Improve, and Control (DMAIC) cycle
define
16. A Tree Diagram is useful for BOTH
17. A value stream map will help identify inputvariables (X's) that could be influencingthe outputs (Y's) of a process
TRUE
18. Ad hoc teams typically do not have aspecific time frame to complete theirmission
FALSE
19. After the forming and storming stages,an effective team understands all ofthese except
root cause
20. All of the following are steps to create aFishbone diagram except
measure allcauses
21. All of the questions below are key to askwhen starting a Measurement SystemsAnalysis (MSA) except
all are keyquestions toask
22. All projects and initiatives need to bechartered, whether it's a short cyclequick hit or a complex, multi-layeredimprovement
TRUE
23. An example of a control poka yoke isbuilding a spreadsheet that will notcalculate totals until all data has beenentered
TRUE
24. An example of qualitative data is a, b, c
25. Another name for a Fishbone diagramis:
cause andeffect diagram
26. Baselines are established during the_______ phase of the Define, Measure,Analyze, Improve, and Control (DMAIC)cycle
measure
27. Benchmarking is conducted in order toachieve incremental improvements
FALSE
28. Benchmarking is not a one-time event.How do you determine when torecalibrate a process
all of theabove
29. Benchmarks can be used to set goals forimprovement
TRUE
30. Control plan effectiveness is measuredagainst a set of questions that can becharacterized as: Check all that apply
SOPs,measurement,audit
31. Creating a visual workplace whereeverything has a place and is in its placerefers to which element of 6s
store
32. Creating consistent repeatable processesis the goal for which Lean tool
standardwork
33. Customer Needs Mapping is also knownas
VOC
34. Customer Needs Mapping, surveys, andQuality Function Deployment (QFD) aretools used in the _____ phase of theDefine, Measure, Analyze, Improve, andControl (DMAIC) cycle
define
35. Data for a Pareto chart usually starts outin a
check sheet
6 Sigma Green Belt Test Review!Study online at quizlet.com/_514j9
36. Failure Mode and Effects Analysis (FMEA)focuses on the______of potentialproblems
prevention
37. Fishbone diagrams are best used at the______ of a problem solving process
Beginningand End
38. Fishbone diagrams organize and visualizepossible relationships between factors thataffect a problem
TRUE
39. House of quality is another name for QFD
40. If you were trying to identify world-classcustomer service processes, you woulddeploy
strategic
41. In a Management by Fact (MBF), anti-y'sare also known as secondary metrics thatcan be adversely affected by the primarymetric. These are tracked in the datagraphs section of an MBF
TRUE
42. In order to do effective benchmarking, youmust visit each company to look at eachprocess in person.
FALSE
43. Management by Fact (MBF) is a one-timeevent that is completed as the start of aproductivity improvement project
FALSE
44. Management by Fact (MBF) is part of the__________ phase of the Define, Measure,Analyze, Improve, and Control (DMAIC)cycle
define
45. Measurement bias is dif b/tobservedavg and ref
46. Measurement System Analysis (MSA) ispart of the _______ phase of the Define,Measure, Analyze, Improve, and Control(DMAIC) cycle
measure
47. Multivoting is another name for NGT
48. No improvement work should be initiateduntil a baseline is established
TRUE
49. Order the steps to construct a Fishbonediagram. Drag each number to its correctstep description
createtemp,createprob, idcause, idand place,analyze
50. Pareto charts allow teams to focus on the"vital many" versus the "useful few"problems
FALSE
51. Pareto charts are always bar
52. Pareto charts are part of the _______phase in the Define, Measure, Analyze,Improve, and Control (DMAIC) cycle
Analyze
53. Pareto charts are used to___________:
all of the above
54. Pareto charts most often rank causesrelated to a problem in order fromleast frequent to most frequent
FALSE
55. Primary research can be collected via a, b, d
56. Put the five steps of a value streammap in the proper order
id stream, createcurrent, idimprove, createfuture,implementchanges
57. Put the following customer input toolsin order of quickest/easiest to longercycle time/more complex to use
1,2,3
58. Quality Function Deployment (QFD)is a system for translating customerrequirements into the appropriateinternal requirements
TRUE
59. Reliable data is needed to a & b
60. Root cause analysis is qualitative
61. Root cause analysis is part of the________ phase of the Define,Measure, Analyze, Improve, andControl (DMAIC) cycle
analyze
62. Secondary research refers toinformation available in the publicdomain/on the internet
TRUE
63. team charter question - MissionStatement (1), Objective (2),Performance metrics (3), boundaries(4)
****
64. The ________________ element ofstandard work refers to the effectivesequencing of work tasks and thework content assigned to each task
work seq
65. The 5 Whys process ______: 1st 3
66. The 5 Whys tool is useful for bothsimple and complex problems
FALSE
67. The Fishbone diagram is part of the________ phase of the Define,Measure, Analyze, Improve, andControl (DMAIC) cycle.
analyze
68. The horizontal axis of a Pareto chartreflects
categories
69. The most effective ways to assesscontrol plan effectiveness are:
a & b
70. The Pareto chart is based upon thePareto principle or 80:20 rule. The rulestates that 80% of the results come from20% of the process issues
TRUE
71. The problem statement in aManagement by Fact (MBF) answerswhich of the following questions
all of theabove
72. The rating scale used in a Failure Modeand Effects Analysis (FMEA) assigns ahigh number to correspond to higherlevels of
RISK
73. The team leader is responsible forinitiating the charter process
FALSE
74. The word "value" in value streammapping is defined as the activitiesrequired to provide a customer with aquality product or service
FALSE
75. To establish a baseline, you can all of theabove
76. Tree Diagrams are used in the__________ phases of the Define,Measure, Analyze, Improve, and Control(DMAIC) cycle
D & A
77. Tree Diagrams have a limit on the levelof detail that can be analyzed.
FALSE
78. Types of actions in a control planinclude
compensating,preventive,corrective
79. Value stream maps help identify all ofthe following except
financialforecasts
80. What are the components of a RiskPriority Number
SEV, OCC,DET
81. When calculating a Risk PriorityNumber, a high rating on thedetectability rating scale means thecurrent process controls are not likely todetect the potential cause or failuremode
TRUE
82. When collecting data for a MeasurementSystems Analysis (MSA), it is importantthat the data is collected independentlyand in _______ order
random
83. When creating a control plan, youshould consider which of the followingitems?
all of theabove
84. When creating a value stream map, it isbest to write down all the process stepsfrom memory before reviewing with ateam
FALSE
85. When establishing a baseline, it is goodto look at data at least several years old
FALSE
86. When establishingcountermeasures, you do notidentify the forecasted impact foreach countermeasure as part of theManagement by Fact (MBF).
FALSE
87. When you move to lower levels (finerdetails) of a Tree Diagram, thequestion being asked is "How?" aprocess operates
TRUE
88. Where do the process steps comefrom on a Failure Mode and EffectsAnalysis (FMEA) form?
control plan
89. Which acronym best describes whatis included in an effective teammeeting?
SPACER
90. Which acronym helps you rememberthe wastes easily
TIM WOOD
91. Which item listed is not part of ateam charter
analysis tools
92. Which measurement process aspectis not assessed by MeasurementSystem Analysis (MSA)?
viability
93. Which of the following is not ameeting role?
auditor
94. Which of the following tools is partof root cause analysis
all
95. Which one of the items below doesnot represent good team dynamics
low risk
96. Which one of the items listed belowis not a phase of Management by Fact(MBF)?
all are MBF
97. Which one of these is not a decision-making tool?
MORE
98. Which one of these is not part of thefive stages of team development
conforming
99. Which three questions determine ifa process step adds value? Check allthat apply
does customercare, does stepchange product,can we do the stepright everytime