5a- resource leveling and allocation (smoothing)
TRANSCRIPT
![Page 1: 5a- Resource Leveling and Allocation (Smoothing)](https://reader034.vdocuments.site/reader034/viewer/2022052406/577cc3531a28aba71195ac0b/html5/thumbnails/1.jpg)
8/10/2019 5a- Resource Leveling and Allocation (Smoothing)
http://slidepdf.com/reader/full/5a-resource-leveling-and-allocation-smoothing 1/15
Tutorial # 5a
Allocate and Level
Resources
(Part A, Level Resources)
(Resource Smoothing)
King Saud University
College of Engineering
GE 404 Engineering Management
![Page 2: 5a- Resource Leveling and Allocation (Smoothing)](https://reader034.vdocuments.site/reader034/viewer/2022052406/577cc3531a28aba71195ac0b/html5/thumbnails/2.jpg)
8/10/2019 5a- Resource Leveling and Allocation (Smoothing)
http://slidepdf.com/reader/full/5a-resource-leveling-and-allocation-smoothing 2/15
It is a technique used to examine unbalanced use of resources (usually
people or equipment) over time: To resolve over-allocations or conflicts and
To allocate resource efficiently by creating schedule in advance to
perform the work in the given time period
Resource leveling and allocation can be done by:
o using all available resources, by which can be completed according toscheduled duration time. (resource smoothing)
o using limited and constraint resources for extended period of time until
the resources required are available (limited resource Allocation)
(Resource smoothing): Mainly done by shifting non critical
tasks over project scheduled duration without resource constrain
(Limited resource Allocation Mainly done by shifting task
with resource constrain and it could result in a later project finish date
if the tasks affected are in the critical path
Resource leveling and Allocation
![Page 3: 5a- Resource Leveling and Allocation (Smoothing)](https://reader034.vdocuments.site/reader034/viewer/2022052406/577cc3531a28aba71195ac0b/html5/thumbnails/3.jpg)
8/10/2019 5a- Resource Leveling and Allocation (Smoothing)
http://slidepdf.com/reader/full/5a-resource-leveling-and-allocation-smoothing 3/15
R period source per
n periods Number of
A sourcs;aliable Maximum Av
Dtionoject dura
R SUMusources;ares of roSum of squ
R rces ; T s of resouTotal unit
where;
D )(DR f eness; Ef - Effectiv
A
DR I ity index;- Critical
;
D
T ement; DRily requir Average da
n j
j
j
n j
j
j
A
AC
A
Re
Re
Pr
3
2
1
max
1
2
1
2
max
Resource leveling and allocation measures
![Page 4: 5a- Resource Leveling and Allocation (Smoothing)](https://reader034.vdocuments.site/reader034/viewer/2022052406/577cc3531a28aba71195ac0b/html5/thumbnails/4.jpg)
8/10/2019 5a- Resource Leveling and Allocation (Smoothing)
http://slidepdf.com/reader/full/5a-resource-leveling-and-allocation-smoothing 4/15
Resource Leveling (Smoothing)
Main
Aspects
Sufficient total resources are available
Project must be completed by a specified due date
It is desirable or necessary to reduce the amount of
variability (peak and valley) in the pattern of resource
usage over the project duration.
The objective is to
level, as much as possible, the demand for
each specific resource during the life of the project.
Project
duration
is
not
allowed
to
increase in this case.
![Page 5: 5a- Resource Leveling and Allocation (Smoothing)](https://reader034.vdocuments.site/reader034/viewer/2022052406/577cc3531a28aba71195ac0b/html5/thumbnails/5.jpg)
8/10/2019 5a- Resource Leveling and Allocation (Smoothing)
http://slidepdf.com/reader/full/5a-resource-leveling-and-allocation-smoothing 5/15
Activity Depends on Time, day Resource, Worker/day
A None 4 2
B A 6 3
C B 7 3
D C, G 3 4
E None 3 3F A, E 4 2
G F 4 2
H None 1 3
I H 5 2
Example1:For a small Engineering project listed below, it is required to do the following:a) Draw the Early Start project schedule using Time- scaled network?
b) Within only two trials, level the project Resource?
c) How many Worker(s)/day you should use in this project?
![Page 6: 5a- Resource Leveling and Allocation (Smoothing)](https://reader034.vdocuments.site/reader034/viewer/2022052406/577cc3531a28aba71195ac0b/html5/thumbnails/6.jpg)
8/10/2019 5a- Resource Leveling and Allocation (Smoothing)
http://slidepdf.com/reader/full/5a-resource-leveling-and-allocation-smoothing 6/15
Earlest Start project schedule using Time- scaled network1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
R 8 7 7 4 7 7 5 5 5 5 5 5 3 3 3 3 3 4 4 4
∑R 8 15 22 26 33 40 45 50 55 60 65 70 73 76 79 82 85 89 93 97
R 2 64 49 49 16 49 49 25 25 25 25 25 25 9 9 9 9 9 16 16 16
∑R 2 64 113 162 178 227 276 301 326 351 376 401 426 435 444 453 462 471 487 503 519
A
R2
B
R3
C
R3
D
R4
E
R3
F
R2
G
R2
I
R2
H
R3
A) ES -Time scale network
B) Measure resource requirement
![Page 7: 5a- Resource Leveling and Allocation (Smoothing)](https://reader034.vdocuments.site/reader034/viewer/2022052406/577cc3531a28aba71195ac0b/html5/thumbnails/7.jpg)
8/10/2019 5a- Resource Leveling and Allocation (Smoothing)
http://slidepdf.com/reader/full/5a-resource-leveling-and-allocation-smoothing 7/15
c1) LS -Time scale network
Latest Start project schedule using Time- scaled network1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
R 2 2 2 2 3 3 6 6 6 5 5 5 5 5 8 7 7 6 6 6
∑R 2 4 6 8 11 14 20 26 32 37 42 47 52 57 65 72 79 85 91 97
R 2 4 4 4 4 9 9 36 36 36 25 25 25 25 25 64 49 49 36 36 36
∑R 2 4 8 12 16 25 34 70 106 142 167 192 217 242 267 331 380 429 465 501 537
A
R2
B
R3C
R3
D
R4
E
R3
F
R2
G
R2
I
R2
H
R 3
![Page 8: 5a- Resource Leveling and Allocation (Smoothing)](https://reader034.vdocuments.site/reader034/viewer/2022052406/577cc3531a28aba71195ac0b/html5/thumbnails/8.jpg)
8/10/2019 5a- Resource Leveling and Allocation (Smoothing)
http://slidepdf.com/reader/full/5a-resource-leveling-and-allocation-smoothing 8/15
c2) 1 st trial for leveling
step 1- moving task H to start end of 3rd period
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
R 5 5 5 5 7 7 7 7 7 5 5 5 3 3 3 3 3 4 4 4
∑R 5 10 15 20 27 34 41 48 55 60 65 70 73 76 79 82 85 89 93 97
R 2 25 25 25 25 49 49 49 49 49 25 25 25 9 9 9 9 9 16 16 16
∑R2 25 50 75 100 149 198 247 296 345 370 395 420 429 438 447 456 465 481 497 513
A
R2
B
R3C
R3
D
R4
E
R3
F
R2
G
R2
I
R2
H
R3
![Page 9: 5a- Resource Leveling and Allocation (Smoothing)](https://reader034.vdocuments.site/reader034/viewer/2022052406/577cc3531a28aba71195ac0b/html5/thumbnails/9.jpg)
8/10/2019 5a- Resource Leveling and Allocation (Smoothing)
http://slidepdf.com/reader/full/5a-resource-leveling-and-allocation-smoothing 9/15
c3) 2 nd trial for leveling
step 2- moving task I to start end of 12th period1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
R 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 4 4 4
∑R 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 89 93 97
R 2 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 16 16 16
∑R2
25 50 75 100 125 150 175 200 225 250 275 300 325 350 375 400 425 441 457 473
A
R2
B
R3C
R3
D
R4
E
R3
F
R2
G
R2
I
R2
H
R3
![Page 10: 5a- Resource Leveling and Allocation (Smoothing)](https://reader034.vdocuments.site/reader034/viewer/2022052406/577cc3531a28aba71195ac0b/html5/thumbnails/10.jpg)
8/10/2019 5a- Resource Leveling and Allocation (Smoothing)
http://slidepdf.com/reader/full/5a-resource-leveling-and-allocation-smoothing 10/15
C) Leveling result
0
10
20
30
40
50
60
70
80
90
100
0 5 10 15 20
∑ R ; R = r e s o u r c e
Duration, days
cummulative resource over project periods
ES LS Level
0
1
2
3
4
5
6
7
8
9
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
R e s o
u r c e N u m b e r
Duration, days
Resource Loading over project periods
(ES) (LS) (Level)
The graphs shows the resource is nearly constant over time,
and has been leveled.
![Page 11: 5a- Resource Leveling and Allocation (Smoothing)](https://reader034.vdocuments.site/reader034/viewer/2022052406/577cc3531a28aba71195ac0b/html5/thumbnails/11.jpg)
8/10/2019 5a- Resource Leveling and Allocation (Smoothing)
http://slidepdf.com/reader/full/5a-resource-leveling-and-allocation-smoothing 11/15
Example2:The Activity given in table below
represent a section of work being
undertaken by a subcontractor. The
activities’ predecessor, duration, early
start, total float, free float and laborrequirement are also listed. The labor
profile made up of the preferred limits
chosen by subcontractor is shown in
figure below.
What are the scheduled timings of the
activities that satisfy the preferred profile?
ActivityDepends
onDuration ES TF FF
No. of
Labour
K - 4 0 - - 2
L K 2 4 19 7 3
M K 6 4 9 - 4
N K 9 4 - - 4
O N 10 13 - - 4
P M 3 10 12 - 3
Q M 8 10 9 9 4
R L,P 2 13 12 12 2
S O 4 23 - - 2T Q,R,S 2 27 - - 1
0
1
2
3
4
5
6
7
8
9
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
![Page 12: 5a- Resource Leveling and Allocation (Smoothing)](https://reader034.vdocuments.site/reader034/viewer/2022052406/577cc3531a28aba71195ac0b/html5/thumbnails/12.jpg)
8/10/2019 5a- Resource Leveling and Allocation (Smoothing)
http://slidepdf.com/reader/full/5a-resource-leveling-and-allocation-smoothing 12/15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
L (3)
R(2)
0
1
2
3
4
5
6
7
8
9
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
ActivityDepends
onDuration ES TF FF
No. of
Labor
K - 4 0 - - 2
L K 2 4 19 7 3
M K 6 4 9 - 4
N K 9 4 - - 4
O N 10 13 - - 4
P M 3 10 12 - 3
Q M 8 10 9 9 4
R L,P 2 13 12 12 2
S O 4 23 - - 2
T Q,R,S 2 27 - - 1
K (2) N (4) O (4) S (2) T (1)
M (4)
P (3)
Q (4)
Activities (L, M, P, Q, R are to be moved to satisfy load
profile1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
L (3)
R(2)
K (2) N (4) O (4) S (2) T (1)
M (4)
P (3)
Q (4)
ES – time diagram
![Page 13: 5a- Resource Leveling and Allocation (Smoothing)](https://reader034.vdocuments.site/reader034/viewer/2022052406/577cc3531a28aba71195ac0b/html5/thumbnails/13.jpg)
8/10/2019 5a- Resource Leveling and Allocation (Smoothing)
http://slidepdf.com/reader/full/5a-resource-leveling-and-allocation-smoothing 13/15
0
1
2
3
4
5
6
7
8
9
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
time 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
R 2 2 2 2 4 4 7 7 8 8 8 8 8 8 8 8 8 8 8 8 8 8 7 5 5 4 4 1 1
∑R 2 4 6 8 12 16 23 30 38 46 54 62 70 78 86 94 102 110 118 126 134 142 149 154 159 163 167 168 169
R2
4 4 4 4 16 16 49 49 64 64 64 64 64 64 64 64 64 64 64 64 64 64 49 25 25 16 16 1 1∑R2
4 8 12 16 32 48 97 146 210 274 338 402 466 530 594 658 722 786 850 914 978 1042 1091 1116 1141 1157 1173 11741175
Consider the source profile given above and calculate:
1) Sum of squares of resource profile (∑R2)2) Cumulative usage of resource
3) Average usage and corresponding likely usage of resource
, = (∑)
()=
169
29= .
=
= 2 ∗ = 5.83 2 ∗ 2 9 = .
=
5.83
6 = 0.972 ; ℎ = 6
![Page 14: 5a- Resource Leveling and Allocation (Smoothing)](https://reader034.vdocuments.site/reader034/viewer/2022052406/577cc3531a28aba71195ac0b/html5/thumbnails/14.jpg)
8/10/2019 5a- Resource Leveling and Allocation (Smoothing)
http://slidepdf.com/reader/full/5a-resource-leveling-and-allocation-smoothing 14/15
Example3:Develop load diagram of the resource,
and level the project Resource, then find :
i. average daily requirement;
ii. Critical Index
iii. Effectiveness value
![Page 15: 5a- Resource Leveling and Allocation (Smoothing)](https://reader034.vdocuments.site/reader034/viewer/2022052406/577cc3531a28aba71195ac0b/html5/thumbnails/15.jpg)
8/10/2019 5a- Resource Leveling and Allocation (Smoothing)
http://slidepdf.com/reader/full/5a-resource-leveling-and-allocation-smoothing 15/15
R 6 10 8 8 8 8 8 3 3 3 3 3 3 3 3 4 4 4 3 3 3 3 3 3 3 3
∑R 6 16 24 32 40 48 56 59 62 65 68 71 74 77 80 84 88 92 95 98 101 104 107 110 113 116
R 2 36 100 64 64 64 64 64 9 9 9 9 9 9 9 9 16 16 16 9 9 9 9 9 9 9 9
∑R 2 36 136 200 264 328 392 456 465 474 483 492 501 510 519 528 544 560 576 585 594 603 612 621 630 639 648
Earlest Start project schedule using Time- scaled network
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
A
R2
BR3
DR3
ER4
GR3
F
R5
C
R 1
, = (∑)
()=
116
26= .
=
= 2 ∗ = 4.462 2 ∗ 2 6 = .
=4.462
5= 0.892 ; ℎ = 5