5041 3 ia rgoe h 214 anava hvac cooling tower …internet.savannah.chatham.k12.ga.us/district... ·...
TRANSCRIPT
CADD PLOT
mpeavler
11:25
30-JUL-2018
c
Sheet No.Date
Checked
Drawn
Job No.
Sheet Title
Revisions
No. Date Description
109 P
ark of
Co
mm
erc
e Drive, Suite 6
Savannah,
Georgia 3
1405
This dra
win
g a
nd all prints of it are the pro
perty of
for
whic
h they w
ere issued.
Repro
ductions of this dra
win
g without th
e
E:\BOE Savannah High Cooling Towers - 18044.00\CADD\T0_1.dgn1 INCH
Stamp
PH
ON
E (912) 238-2
400 F
AX (912) 238-2
412
Chath
am E
ngin
eering C
om
pany, LLC
Prints are to b
e return
ed to C
hath
am E
ngin
eering C
om
pany, LLC u
pon c
om
pletion of use
written c
onsent of
Chath
am E
ngin
eering C
om
pany, LLC is n
ot permitte
d
18044.00
2018
RELE
ASE
D
FO
R
CO
NSTR
UC
TIO
N
SA
VA
NN
AH,
GE
OR
GIA
SC
CPSS P
ROJE
CT BID C
19-0
6
CO
OLIN
G T
OW
ER R
EP
LA
CE
ME
NT
SA
VA
NN
AH HIG
H S
CH
OO
L
07/30/18
JM
MP
T0.1
TITLE SHEET
DRAWING LIST: CONTACT LIST:
CODE REQUIREMENTS:
2017 Edition
2012 Edition
2009 Edition
2012 Edition
2012 Edition
2012 Edition
2012 Edition
National Electrical Code .............................
International Fire Code ...............................
International Energy Conservation Code ...
International Fuel Gas Code .......................
International Mechanical Code ..................
International Plumbing Code ......................
International Building Code ........................
LOCATION:
(912) 238-2400
SAVANNAH, GA 31405-1396
109 PARK OF COMMERCE DRIVE, SUITE 6
CHATHAM ENGINEERING COMPANY, LLC
SAVANNAH, GA 31404
400 PENNSYLVANIA AVE,
BOARD OF EDUCATION
SCHOOL SYSTEM
FOR SAVANNAH CHATHAM COUNTY PUBLIC
SCCPSS PROJECT BID C19-06
HVAC COOLING TOWER REPLACEMENT
SAVANNAH HIGH SCHOOL
ROOM
MECH
YARD
MECH
AREA
LOADING
KITCHEN
SIDEWALK
STREET
MECH ROOM
2ND FLOOR
CADD PLOT
bmoye
10:43
30-JUL-2018
c
Sheet No.Date
Checked
Drawn
Job No.
Sheet Title
Revisions
No. Date Description
109 P
ark of
Co
mm
erc
e Drive, Suite 6
Savannah,
Georgia 3
1405
This dra
win
g a
nd all prints of it are the pro
perty of
for
whic
h they w
ere issued.
Repro
ductions of this dra
win
g without th
e
E:\BOE Savannah High Cooling Towers - 18044.00\CADD\E1_1.dgn1 INCH
Stamp
PH
ON
E (912) 238-2
400 F
AX (912) 238-2
412
Chath
am E
ngin
eering C
om
pany, LLC
Prints are to b
e return
ed to C
hath
am E
ngin
eering C
om
pany, LLC u
pon c
om
pletion of use
written c
onsent of
Chath
am E
ngin
eering C
om
pany, LLC is n
ot permitte
d
18044.00
2018
RELE
ASE
D
FO
R
CO
NSTR
UC
TIO
N
SA
VA
NN
AH,
GE
OR
GIA
SC
CPSS P
ROJE
CT BID C
19-0
6
CO
OLIN
G T
OW
ER R
EP
LA
CE
ME
NT
SA
VA
NN
AH HIG
H S
CH
OO
L
07/30/18
6
P
5
P
CH
1
CH
2
3
P 4
P
2
P 1
P
CT
1
CT
2
2
B
7
P
8
P
10
P
9
P
1
B
E1.1
LEGEND:
NOTES:
(DEMOLITION)
GENERAL NOTES & SPECIFICATIONS
E1.1
1 SCALE: 1 / 8 " = 1' - 0"
PART PLAN AREA A - ELECTRICAL
FLOOR PLANLINE DIAGRAM AND SCHEDULES, ONE
LEGEND, ELECTRICAL
ONE LINE DIAGRAM - 480/277V SWBD 'B'
E1.1 SCALE: NONE
NOTE D1,G7
ROOM.
LOCATED IN MECHINCAL
SWITCHBOARD 'B'.
EXISTING 480/277V
100A/3P
NEW
100A/3P
NEW
1 NO. 8(G)
3 NO.1,
1•"C W/
NEW
30A/3P
EXIST.
30A/3P
EXIST.
NOTE D2,G7
MECHINCAL ROOM.
LOCATED IN
PANEL H1M
EXISTING
NOTE D2
7.5HP,480V,3PH
P-3
NEW
NOTE D2
7.5HP,480V,3PH
P-4
NEW
50A/3P
EXIST.
NOTE D2
15HP,480V,3PH
P-5
NEW
50A/3P
EXIST.
NOTE D2
15HP,480V,3PH
P-6
NEW
E1.1 SCALE: NONE
ONE LINE DIAGRAM - PANEL H1M
80A/3P
EXIST.
80A/3P
EXIST.
PUMP#5
PUMP#6
NOTE D1
SWBD 'B'
480/277V
EXISTING
NOTE D2
PANEL H1M
EXISTING
PUMP#4
PUMP#3 PUMP#1
CW
PUMP#2
CW
CT-2 CT-1
BPM
PM
PUMP#8 PUMP#7
PUMP#9
PUMP#10
30A/3P
EXIST.
E1.1 SCALE: NONE
5
30A/3P
EXIST.
ONE LINE DIAGRAM - PANEL H2M
NOTE D3,G7
MECHINCAL ROOM.
2ND FLOOR
LOCATED IN
PANEL H2M
EXISTING
E1.1 SCALE: NONE
6
20A/1P
EXIST.
ONE LINE DIAGRAM - PANEL P2D
NOTE D4,G7
MECHINCAL ROOM.
2ND FLOOR
LOCATED IN
PANEL P2D
EXISTING
20A/1P
EXIST.
NOTE D3
10HP,480V,3PH
P-7
NEW
NOTE D3
10HP,480V,3PH
P-8
NEW
NOTE P3
VFD.
PUMP#2
CW
NOTE P3
VFD
PUMP#1
CW
4
BOILER #1
EXISTING
BOILER #2
EXISTING
NOTE D4,P4
• HP,120V,1PH
P-10
NEW
NOTE D4,P4
• HP,120V,1PH
P-9
NEW
ON DRAWING. VERIFY EXACT STARTED NEEDED IN FIELD.
P5. CONTRACTOR TO PROVIDE NEW STARTERS FOR PUMPS AS NOTED
IN PANEL P2D. VERIFY EXACT BREAKERS IN FIELD.
P4. RECONNECT NEW P-9 & P-10 TO EXISTING BOILER BRANCH CIRCUITS
CONTRACTOR TO VERIFY EXACT LOCATION.
P3. VFD PROVIDED BY DIVISION 23. COORDINATE WITH MECHANICAL
PROVIDE NEW 100A/3P BREAKER FOR NEW CHILL WATER PUMP #2.
P2. REMOVE EXISTING 125A/3P BREAKER IN EXISTING SWITCHBOARD 'B'.
PROVIDE NEW 100A/3P BREAKER FOR NEW CHILL WATER PUMP #1.
P1. REMOVE EXISTING 125A/3P BREAKER IN EXISTING SWITCHBOARD 'B'.
NEMA 1
NEMA 1
NEMA 2
NEMA 2
W/ UNIT
PROVIDED
PANEL
CONTROL
NOTE P3
VFD
PUMP#8
NOTE P3
VFD.
PUMP#7
LIQUIDTIGHT FLEX CONNECTIONS, MAX. LENGTH 18" AT MOTOR
MOTOR STARTER, NEMA SIZE INDICATED ON DRAWING
MOTOR, HORSEPOWER INDICATED ON DRAWING
EQUIPMENT AS NOTED ON DRAWING
AND RECONNECT TO NEW P-9 & P10.
D4. DISCONNECT EXISTING BRANCH CIRCUITS FROM EXISTING P-9 & P-10
AND RECONNECT TO NEW P-7 & P-8.
D3. DISCONNECT EXISTING BRANCH CIRCUITS FROM EXISTING P-7 & P-8
P-5 AND P-6 AND RECONNECT TO NEW P-3,P-4,P-5 & P-6.
D2. DISCONNECT EXISTING BRANCH CIRCUIT FROM EXISTING P-3, P-4,
WATER PUMP #1 & #2.
D1. REMOVE EXISTING BRANCH CIRCUIT AND BREAKER FOR EXISTING CHILL
REQUIRED. VERIFY EXACT BREAKER IN FIELD.
TO MATCH AND BE COMPATIBLE TO EXISTING. MAKE ALL MODIFICATIONS
G7. WHERE BREAKERS ARE ADDED TO EXISTING SWITCHBOARD. BREAKERS
G6. PROVIDE GREEN EQUIPMENT GROUNDING CONDUCTOR IN ALL CONDUITS.
480/277V BROWN ORANGE YELLOW GREY
PH A PH B PHC NEUTRAL
FOLLOWS:
G5. ALL CONDUCTORS TO BE STRANDED COPPER TYPE THWN. COLOR CODE AS
G4. LABEL ALL OUTLET AND JUNCTION BOXES SHOWING CIRCUIT NUMBER.
CONDUITS OUTSIDE TO BE IMC.
ELBOWS. CONDUITS INSIDE TO BE EMT WITH COMPRESSION FITTINGS.
G3. PROVIDE STANDARD THREADED COUPLINGS, LOCKNUTS, BUSHINGS AND
G2. COORDINATE ALL WORK WITH EXISTING CONDITIONS AND OTHER TRADES.
BOE STANDARDS.
G1. ALL WORK TO COMPLY WITH 2017 NEC, ALL STATE ORDINANCES AND
18" MAX
NOTE D1,P1
40HP,480V,3PH
NEW CHILL WATER PUMP#2
NOTE D1,P1
40HP,480V,3PH
NEW CHILL WATER PUMP#1
NOTE P3
VFD
NEW
NOTE P1
NOTE P2
NOTE D2
15HP W/12KW HTR,480V,3PH
CT-1
NEW
NOTE D2
15HP W/12KW HTR,480V,3PH
CT-1
NEW
NOTE P5
NOTE P5
E1.1
2 SCALE: 1 / 8 " = 1' - 0"
PART PLAN AREA A - ELECTRICAL
3
NOTE P5
NOTE P5
SEE 5/E1.1
NOTE D3
PANEL H2M
EXISTING
SEE 6/E1.1
NOTE D4
PANEL P2D
EXISTING
NOTE P3
VFD
NEW
NOTES:(POWER)
ROOM
MECH
YARD
MECH
AREA
LOADING
KITCHEN
SIDEWALK
STREET
MECH ROOM
2ND FLOOR
CADD PLOT
jmitchell
10:56
30-JUL-2018
c
Sheet No.Date
Checked
Drawn
Job No.
Sheet Title
Revisions
No. Date Description
109 P
ark of
Co
mm
erc
e Drive, Suite 6
Savannah,
Georgia 3
1405
This dra
win
g a
nd all prints of it are the pro
perty of
for
whic
h they w
ere issued.
Repro
ductions of this dra
win
g without th
e
E:\BOE Savannah High Cooling Towers - 18044.00\CADD\M1_1.dgn1 INCH
Stamp
PH
ON
E (912) 238-2
400 F
AX (912) 238-2
412
Chath
am E
ngin
eering C
om
pany, LLC
Prints are to b
e return
ed to C
hath
am E
ngin
eering C
om
pany, LLC u
pon c
om
pletion of use
written c
onsent of
Chath
am E
ngin
eering C
om
pany, LLC is n
ot permitte
d
18044.00
2018
RELE
ASE
D
FO
R
CO
NSTR
UC
TIO
N
SA
VA
NN
AH,
GE
OR
GIA
SC
CPSS P
ROJE
CT BID C
19-0
6
CO
OLIN
G T
OW
ER R
EP
LA
CE
ME
NT
SA
VA
NN
AH HIG
H S
CH
OO
L
07/30/18
6
P
5
P
CH
1
CH
2
3
P 4
P
2
P 1
P
CT
1
CT
2
JM
MP
TRANSCLOSURE
PAD MOUNTED
TRANSFORMER
PAD MOUNTED
CH
AIN
LIN
K
FE
NC
EC
HAIN
LIN
K
FE
NC
EC
HAIN
LIN
K
FE
NC
E
GAS METER
EL
EC
TRIC
AL
EQ
UIP
ME
NT
RO
LL
UP
DO
OR
FIR
E
SU
PP
RE
SSIO
N
EQ
UIP
ME
NT
1
2
3
4
5
6
7
8
9
10
1
VARIABLE SPEED PUMP. PROVIDE AND INSTALL NEW VFD.
CONSTANT SPEED PUMP. PROVIDE AND INSTALL NEW STARTER.
PUMP SHALL HAVE LEAD-LAG OPERATION.
2
3
1
2FOR ACCESS TO TOP.COOLING TOWER SHALL HAVE SIDE LADDER
236500 FOR LIST OF FULL REQUIREMENTS.WAY, AND GUIDE RAILS. SEE SPECIFICATION FAN WITH SINGLE WINDING, INTERNAL WALK COOLING TOWER SHALL HAVE TWO SPEED
DUCTWORK OR ORDERING OF PIPE.
IN MECHANICAL ROOMS PRIOR TO FABRICATION OF
SHALL ALSO VERIFY SPACE ABOVE CEILINGS AND
MODIFICATIONS MAY BE REQUIRED. CONTRACTOR
SHALL NOTIFY THE ENGINEER IMMEDIATELY AS
ON THE DESIGN DOCUMENTS, THE CONTRACTOR
ACTUAL CONDITIONS AND THE CONDITIONS SHOWN
ANY DEVIATIONS ARE DISCOVERED BETWEEN THE
CONTRACTOR SHALL FIELD VERIFY CONDITIONS. IF
PLANS WHERE AVAILABLE. AS SUCH, THE
BASIC FIELD INVESTIGATIONS AND EXISTING
EXISTING CONDITIONS: THE DESIGN IS BASED ON
ABBREVIATION DESCRIPTIONSYMBOL ABBREVIATION DESCRIPTION
MLD/MD
A/C
MANUAL DAMPER
ABOVE CEILING
AHU AIR HANDLING UNIT
T'STAT
BTUH BRITISH THERMAL UNITS PER HOUR
CLG CEILING
DWGS DRAWINGS
METERED BALANCING VALVE MBV
GATE VALVE GV
ELEC ELECTRIC
CHECK VALVE CV
EXIST EXISTING
MOTOR OPERATED (2-WAY) VALVE MOV
GPM GALLONS PER MINUTE
HVAC HEATING VENTILATING & AIR CONDITIONING
STRAINER
UNION
FIRE DAMPER FD
MAX MAXIMUM
MIN MINIMUM
SINGLE LINE DUCT
FLEXIBLE DUCT
DUCT TRANSITION
ROUND
PIPE UP
PIPE OR DUCT DOWN
TYP TYPICAL
AFF ABOVE FINISHED FLOOR
LEGEND & ABBREVIATIONS
DIRECTION OF FLOW
TT
OR
DN DOWN
COOLING TOWER
DUCT SMOKE DETECTOR SKD
UH
SKD
ELECTRIC UNIT HEATER
AIR CONDITIONER AC
SHUT-OFF VALVE
P PUMP
GENERAL NOTES:
1. COORDINATE ALL WORK WITH OTHER TRADES PRIOR TO INSTALLATION.
TRIPLE DUTY VALVE TDV
P PRESSURE GAUGE
DUCT MOUNTED SENSORS
MUW
G G
MUW MAKE-UP WATER
GAS
CW
S
CW
SC
WS
CW
SC
WS
CWS
CWS
CW
S
CW
S
CWR
CW
R
CW
R
CW
R
CW
R
CHWS
CHWS
CH
WS
CH
WS
CH
WS
CHWS
CHWR
CH
WR
CH
WR
CH
WR
CH
WR
CHWR
1
11
1
2
2
2
3 4
5
6
7
7
89
9
1010
CWS
CWR
CWS
CWR
CONDENSING WATER SUPPLY
CONDENSING WATER RETURN
CHWS
CHWR
CHWS
CHWR
CHILLED WATER SUPPLY
CHILLED WATER RETURN
THERMOSTAT
CH CHILLER
CT
ET EXPANSION TANK
M1.1
FLOOR PLANSCHEDULES, AND
HVAC LEGEND,
11
11 11
1 2 1
FIR
E P
RO
TE
CTIO
N
MAIN
12
12
1
1
FLOOR PLAN NOTES (1/M1.1 & 2/M1.1):
34
5
2
B
1 7
P
8
P 1
10
P
9
P
13
14
15
13
13
14
14
14
15
15
15
15
15
15
7 71515
16
16
16
16
16
16
17
1717
17
17 17
17
17
17
17
8
8
1
B 14
HWS
HW
SH
WS
HWS
HWR
HWR
HW
R
CHECK VALVE
EQUIPMENT. TYPICAL ALL.NEW PUMPS SHALL BE REPLACED WITH NEW CONTROLS CONTROLS ASSOCIATED WITH CONDENSER WATER LOOP AND
TYPICAL ALL.MECHANICAL ROOM OR MECHANICAL YARD PER SPECIFICATIONS. REPAIR OR REPLACE TORN OR DAMAGED INSULATION IN
PUMP DETAIL.SUPPLY AND RETURN OF THE PUMP PER THE ASSOCIATED PROVIDE AND INSTALL NEW PRESSURE GAUGES ON THE
AND RETURN PIPES CONNECTED TO EQUIPMENT.PROVIDE AND INSTALL NEW TEMPERATURE GAUGES ON SUPPLY
4/M2.1.REQUIRED FOR PUMP CONNECTION. INSTALL PUMP PER DETAIL EXISTING IN-LINE PUMP TO BE REPLACED. ADJUST MAINS AS
CONTRACTOR TO REFILL SYSTEM WITH SAME MIXTURE.PERCENT GLYCOL WITH EXISTING CHEMICAL TREATMENT EXISTING CHILLED WATER SYSTEM HAS A GLYCOL MIX. VERIFY
DETAIL 3/M2.1.REQUIRED FOR TOWER CONNECTION. INSTALL TOWER PER EXISTING TOWER TO BE REPLACED. ADJUST MAINS AS
TOWER WATER FILL METERS SHALL BE REPLACED.
CONTRACTOR TO FIELD VERIFY OTHER PIPE HANGERS.6" DIA CONDENSER WATER SUPPLIES AT LOCATIONS SHOWN. MECHANICAL ROOM. FIELD WORK INDICATES THERE ARE (2) ON REPAIR OR REPLACE ALL DAMAGED PIPE HANGERS IN
SEE 1/M2.1 FOR PIPE SIZES AND PLANT SCHEMATIC.
SECONDARY WATER PUMP VFD TO BE REPLACED WITH NEW.
NEW. SEE SPECIFICATIONS FOR MORE INFORMATION.EXISTING CHEMICAL TREATMENT LOCATED HERE. REPLACE WITH
PIPE CONNECTIONS.AIR SEPARATOR TO BE REPLACED. RECONNECT TO EXISTING
PIPE CONNECTIONS.SHOT FEEDER TO BE REPLACED. RECONNECT TO EXISTING
PIPE CONNECTIONS.EXPANSION TANK TO BE REPLACED. RECONNECT TO EXISTING
BYPASS PIPE.
PER DETAIL 2/M2.1.DIFFUSERS (IF APPLICABLE) TO MATCH EXISTING. INSTALL PUMP CONNECTIONS, TRIPLE DUTY VALVES, AND END SUCTION FOR PUMP CONNECTION. PROVIDE AND INSTALL NEW FLEX EXISTING PUMP TO BE REPLACED. ADJUST MAINS AS REQUIRED
UNDERGROUND PIPING (EXISTING TO REMAIN).
NEW CONSTRUCTION.
EXISTING TO REMAIN.
M1.1
1 SCALE: 1 / 4 " = 1' - 0"
BOILER ROOM - HVAC
M1.1
2 SCALE: 1 / 4 " = 1' - 0"
MECHANICAL ROOM AND YARD - HVAC
1 3 2 2 2 21 3 1 3 1 3 2 2
CADD PLOT
jmitchell
10:57
30-JUL-2018
c
Sheet No.Date
Checked
Drawn
Job No.
Sheet Title
Revisions
No. Date Description
109 P
ark of
Co
mm
erc
e Drive, Suite 6
Savannah,
Georgia 3
1405
This dra
win
g a
nd all prints of it are the pro
perty of
for
whic
h they w
ere issued.
Repro
ductions of this dra
win
g without th
e
E:\BOE Savannah High Cooling Towers - 18044.00\CADD\M2_1.dgn1 INCH
Stamp
PH
ON
E (912) 238-2
400 F
AX (912) 238-2
412
Chath
am E
ngin
eering C
om
pany, LLC
Prints are to b
e return
ed to C
hath
am E
ngin
eering C
om
pany, LLC u
pon c
om
pletion of use
written c
onsent of
Chath
am E
ngin
eering C
om
pany, LLC is n
ot permitte
d
18044.00
2018
RELE
ASE
D
FO
R
CO
NSTR
UC
TIO
N
SA
VA
NN
AH,
GE
OR
GIA
SC
CPSS P
ROJE
CT BID C
19-0
6
CO
OLIN
G T
OW
ER R
EP
LA
CE
ME
NT
SA
VA
NN
AH HIG
H S
CH
OO
L
07/30/18
JM
MP
M2.1
SCHEMATICHVAC - PLANT
M2.1
1 SCALE: NOT TO SCALE
PLANT SCHEMATIC
1
2
3
4
5
6
NOTES:
7
1 01/31/18 Tag Correction
AI
R
SE
PA
RA
TO
R
2
P
1
P
SHOT FEEDER
AHU
*
AHU
*
AHU
*
CH
1
CH
2
4
P
3
P
6
P
5
P
CT
1
CT
2
MAI
N
BUI
LDI
NG
ME
CH
RO
OM
MAI
N
BUI
LDI
NG
ME
CH
RO
OM
ME
CH
YA
RD
ME
CH
RO
OM
UN
DE
RG
RO
UN
D
UN
DE
RG
RO
UN
D
ME
CH
RO
OM
ME
CH
YA
RD
UN
DE
RG
RO
UN
D
UN
DE
RG
RO
UN
D
CHWS
CHWR CHWR
CHWS
BY
PA
SS
CHWR
CHWS CHWS
PRIMARY WITH VARIABLE SECONDARY CHILLED WATER LOOP
CWS
CWS CWS
CWS
CW
S CW
S
CWR
CWR CWR
CWR
BY
PA
SS
BY
PA
SS
MA
KE-
UP
WA
TE
R
MA
KE-
UP
WA
TE
R
DRAIN
DRAIN
MAKE-UP WATER
6"/ 6"/
6"/ 6"/
6"/
6"/
6"/ 6"/
6"/ 6"/
6"/
6"/
6"/
6"/
6"/
6"/
6"/
6"/
6"/
6"/
6"/
6"/
6"/ 6"/
6"/
6"/
6"/
5"/
5"/
5"/
5"/
5"/
5"/
5
6
8
9
11
10
12 12
13
16
9. PUMP HOLD DOWN BOLT, TYP.
13. PRESSURE GAUGE
14. SUCTION
15. DISCHARGE
1
3
11. FLOOR
1. PUMP
14
16. GROUT PUMP BEDPLATE, A.S.T.M. C476 TYPE PM
12. 1/4" GAUGE COCK
12
2
4
5. ƒ" DRAIN VALVE
5 17
17. COUPLING GAURD
15
20. MANUAL AIR VENT
18. PIPE REDUCING FITTING
20
18 18
6. ADJUSTABLE PIPE SUPPORT; BOLT FLANGE TO FLOOR
M2.1
2 SCHEMATIC ONLY
END SUCTION CENTRIFUGAL PUMP PIPING
7. OMITTED
8. TRIPLE DUTY VALVE
M2.1
3 SCHEMATIC ONLY
COOLING TOWER PIPING
1
4
5
10
11
6. DRAIN PIPE
4. MAKE-UP WATER
3. CONDENSER WATER RETURN
2. CONDENSER WATER SUPPLY
1. COOLING TOWER
9
9
99
8
8. SHUT-OFF VALVE
9. UNION OR FLANGE
10. TO DRAIN
11. WATER LEVEL
2
3
6
5. OVERFLOW PIPE
7. WATER METER
7
9
TWO SEPARATE CONDENSER WATER LOOPS
2. SUCTION DIFFUSER W/SCREEN STRAINER
1
1
1
1
1
1
1
2 2
22
2
22
2
2 2
2
2
2
2
2
2
22
2
22
2
3 3
3
3
33
4 4
44
4
4 4
44
4 4
4
44
5
5
6
6
66
7 7
3. SHUT-OFF VALVE; POSITION STEM INLINE WITH PUMP
4. ƒ" HOSE END DRAIN VALVE AS CLOSE TO CHECK AS POSSIBLE
10. CONCRETE BASE
19. OMITTED
AI
R
SE
PA
RA
TO
R
8
P
7
P
SHOT FEEDER
AHU
*
AHU
*
AHU
*
10
P
MAI
N
BUI
LDI
NG
MAI
N
BUI
LDI
NG
HWS
HWR HWR
HWS
BY
PA
SS
HWR
HWS HWS
DRAIN
MAKE-UP WATER
4"/
4"/
4"/
4"/
4"/ 4"/
4"/
4"/
4"/
BOI
LE
R
RO
OM
BOI
LE
R
RO
OM
1
B
2
B
9
P
EXPANSION TANK
EXPANSION TANK
2.
5"/
2.
5"/
2.
5"/
2.
5"/
2.
5"/
2.
5"/
PRIMARY WITH VARIABLE SECONDARY HOT WATER LOOP
1. SUCTION
2. DISCHARGE
3. PUMP
4. SHUT-OFF VALVE
5. STRAINER
6. REDUCING TEE
3
7
8
9 6 10 11964
7
8
5
1
4
2
11. BALANCING VALVE
10. CHECK VALVE
9. UNION
8. PRESSURE GAUGE
7. 1/4" GAUGE COCK
M2.1
4 SCHEMATIC ONLY
IN-LINE CENTRIFUGAL PUMP PIPING
2 2
224
242
2
4
1
2
2
2
2
4
44
4
4 4
22
2 2
3
3
SEE 4/M2.1 FOR END SUCTION PUMP DETAIL.
SEE 3/M2.1 FOR COOLING TOWER DETAIL.
THIS FUNCTION. ABANDON EXISTING MOTOR OPERATED VALVES IN PLACE IN POSITION INDICATED IN NOTE 4 OR 5.
COLD START / HEAD PRESSURE CONTROL LOOP VALVES AND BYPASS. EXISTING CHILLERS ARE NOT SET FOR
NORMALLY CLOSE.
NORMALLY OPEN.
SEE 2/M2.1 FOR END SUCTION PUMP DETAIL.
CONNECT TO EXISTING. EXTEND OR TRANSITION AS REQUIRED.
FIELD VERIFY PIPE SIZES. TYPICAL ALL PIPES.
EXISTING TO REMAIN.
NEW CONSTRUCTION.
8
8 8