Page 1: 50 MW METRO WIND POWER PROJECT

50 MW METRO WIND POWER PROJECT

Page 2: 50 MW METRO WIND POWER PROJECT

50 MW METRO WIND POWER PROJECT

Project Detail

Project Location = Jhimpir Sindh Pakistan

Client Name = Metro Power Company Limited.

EPC Contractor = Nordex Pakistan Pvt Ltd. Descon Engineering Ltd.

Page 3: 50 MW METRO WIND POWER PROJECT

50 MW METRO WIND POWER PROJECT

Project Brief Introduction  Award of Contract = Sep 8, 2011.

First Amendment to Contract = July 1, 2013.

Second Amendment to Contract = May 15, 2014.  PNTC (Preliminary Notice to Commence) = July 8, 2013

PCD (Project Commencement date) establishment = October 9, 2013

PNTC-II (Preliminary Notice to Commence-II) = May 16, 2014

NTC (Notice to Commence) = October 22, 2014

CD (Commencement Date) establishment = Expected March 20, 2015  Project Completion Date (TOC) = Expected June 20, 2016(15 Month from CD)

Page 4: 50 MW METRO WIND POWER PROJECT

50 MW METRO WIND POWER PROJECT

Preliminary Works-I (Off Shore & On Shore)

Micrositting Topography Survey for Access Road Design of Causeway for Naulla crossing Geological Survey for WTG Topography Survey for Metro Internal Road Design Initiation for E-BOP Project Management preparation

Page 5: 50 MW METRO WIND POWER PROJECT

50 MW METRO WIND POWER PROJECT

Preliminary Works-I Micrositing

Page 6: 50 MW METRO WIND POWER PROJECT

50 MW METRO WIND POWER PROJECT

Preliminary Works-I Geological Survey

Page 7: 50 MW METRO WIND POWER PROJECT

50 MW METRO WIND POWER PROJECT

Preliminary Works-I Topographical Survey

Page 8: 50 MW METRO WIND POWER PROJECT

50 MW METRO WIND POWER PROJECT

Preliminary Works-II (Off Shore) Order Confirmation and Advance payment of E-BOP Equipment

Order Confirmation and Advance payment of Tower Plates

Order Confirmation and Advance payment of Anchor cage (10 nos)Tower Plates

Beside Above, PO has been issued for following and ready for shipment upon CD

1. Tower Flanges 11. Earthing conductor and accessories for WTG. 111. Tower internals (Weld shocked and oil proof plate farms)

Page 9: 50 MW METRO WIND POWER PROJECT

50 MW METRO WIND POWER PROJECT

Preliminary Works-II (On Shore)

Construction of Causeways and Access Road

Temporary Site Facility (office and residence)

Lay down Area and Work shop

Civil works for Batch plat (60 & 30 Cu meter)

Batch Plant Installation and Calibration

Apart from above, civil works for Metro Internal roads has almost been completed

Page 10: 50 MW METRO WIND POWER PROJECT

50 MW METRO WIND POWER PROJECT

Project Progress

Overall Project Progress

Overall Project Progress = 31.93 %

Page 11: 50 MW METRO WIND POWER PROJECT

50 MW METRO WIND POWER PROJECT

Project Progress

Project Management Progress

Overall Project Progress = 0.25 %

Main Highlights Submission of project procedures (HSE, QA/QC, Progress monitoring, Project

Security, Document management Plans etc)Geotech Survey Topography Survey

Page 12: 50 MW METRO WIND POWER PROJECT

50 MW METRO WIND POWER PROJECT

Project Progress

Engineering works

Overall Engineering Works Progress = 62.40 (Discipline wise), 3.43 % (Overall)

Civil Engineering works = 53.87 %

E & I Engineering works = 8.808 %

Page 13: 50 MW METRO WIND POWER PROJECT

50 MW METRO WIND POWER PROJECT

Project Progress

Procurement works

Overall Procurement Works Progress = 50.8 % (Discipline wise), 23.65 % (Overalll)

Main Procurement Works Highlights PO issuance of complete E-BOP Equipment

PO issuance of Tower Plates PO issuance of Tower FlangesPO issuance of 10 nos Anchor cagesPO issuance of WTG earthing conductor and accessoriesPO issuance of Tower internal (weld socket and oil proof plate farms)

Page 14: 50 MW METRO WIND POWER PROJECT

50 MW METRO WIND POWER PROJECT

Project Progress

Construction works

Overall Construction Works Progress = 8.07 % (Discipline wise), 3.68 % (Overall)

Main Civil Works Highlights Completion of Access Road Completion of Causeways Internal Road in progress

Page 15: 50 MW METRO WIND POWER PROJECT

50 MW METRO WIND POWER PROJECT

Project Progress

Fabrication works

Overall Fabrication Works Progress = 2.58 % (Discipline wise), 1.17 % (overall)

Main Fabrication Highlights

Marking, Cutting, beveling & Rolling = 10 Bottom , 10 Mid 1 , 3 Mid II Sections Marking, Cutting, beveling = 13 Mid II SectionsTacking & Welding completed = 4 Bottom, 6 Mid I Sections Tacking & Welding in progress = 6 Bottom, 4 Mid I, 3 Mid II Sections

Page 16: 50 MW METRO WIND POWER PROJECT

50 MW METRO WIND POWER PROJECT

Preliminary Works-II Construction of Cause Way-I

Page 17: 50 MW METRO WIND POWER PROJECT

50 MW METRO WIND POWER PROJECT

Preliminary Works-II Construction of Cause Way-II

Page 18: 50 MW METRO WIND POWER PROJECT

50 MW METRO WIND POWER PROJECT

Preliminary Works-II Construction of Cause Way-III

Page 19: 50 MW METRO WIND POWER PROJECT

50 MW METRO WIND POWER PROJECT

Preliminary Works-II Access Road

Page 20: 50 MW METRO WIND POWER PROJECT

50 MW METRO WIND POWER PROJECT

Preliminary Works-II Access Road

Page 21: 50 MW METRO WIND POWER PROJECT

50 MW METRO WIND POWER PROJECT

Preliminary Works-II Access Road

Page 22: 50 MW METRO WIND POWER PROJECT

50 MW METRO WIND POWER PROJECT

Preliminary Works-II Temporary Site Facilities

Page 23: 50 MW METRO WIND POWER PROJECT

50 MW METRO WIND POWER PROJECT

Preliminary Works-II Temporary Site Facilities

Page 24: 50 MW METRO WIND POWER PROJECT

50 MW METRO WIND POWER PROJECT

Preliminary Works-II Temporary Site Facilities

Page 25: 50 MW METRO WIND POWER PROJECT

50 MW METRO WIND POWER PROJECT

Preliminary Works-II Temporary Site Facilities

Page 26: 50 MW METRO WIND POWER PROJECT

50 MW METRO WIND POWER PROJECT

Preliminary Works-II Temporary Site Facilities

Page 27: 50 MW METRO WIND POWER PROJECT

50 MW METRO WIND POWER PROJECT

Preliminary Works-II Temporary Site Facilities

Page 28: 50 MW METRO WIND POWER PROJECT

50 MW METRO WIND POWER PROJECT

Preliminary Works-II Batch Plant Installation

Page 29: 50 MW METRO WIND POWER PROJECT

50 MW METRO WIND POWER PROJECT

Preliminary Works-II Tower Fabrication

Page 30: 50 MW METRO WIND POWER PROJECT

50 MW METRO WIND POWER PROJECT

Preliminary Works-II Tower Fabrication

Page 31: 50 MW METRO WIND POWER PROJECT

50 MW METRO WIND POWER PROJECT

Preliminary Works-II Tower Fabrication