5 JOB SAFETY ANALYSES Task Name: QAFCO 5 PROJECT Team Composition: HDEC and Sub-Contractor
Step No.
Description of Task
Hazard/Potential Incident
Who or What might be harmed
Control measures Recovery Measures Action/` Party
1 Grinding Damage to body parts Wheel burst
Workers Properties
Authorized personnel can use the grinding machine Discuss the potential hazard of the job befor stating work Maintenance and regular check up of grinding tools and its connection will be done
Appropriate PPE Pre Job Talk Training and orientation for the worker
Supervisor
2 Manual handling of material
Personnel injuries
Workers Properties
Personnel will be trained in manual handling techniques. Glove and Safety footwear will be worn by personnel engaged in material handling Good house keeping measure will be enforced in order to prevent slips, trips, and falls Material will be stored in designated areas
Training and orientation for the worker Pre Job Talk Good housekeeping standards
Safety Officer Supervisor
3 Lifting of heavy equipment
Damage to equipment and materials Personnel injured by falling materials.
Workers Properties
Personnel shall be trained in handling of heavy equipment in order to ensure that the material is handled in a safe manner Suitable tools will be used to lift heavy equipment Material will be stored in a designated area on wooden skids/sleepers Personnel not involved in any heavy equipment lifting operation will be kept away from the working area
Training and orientation for the worker Pre Job Talk Good housekeeping standards
Safety Officer Supervisor
4 Concrete pours
Defective equipment Contamination
Workers Properties
Personnel placing concrete will wear suitable gloves footwear and eye protection Equipment to be used for pouring will be operated by trained and authorized personnel and under close supervision Unauthorized Personnel will be kept away from the working area
Training and orientation for the worker Pre Job Talk
Safety Officer Supervisor
5 Removal of Waste Material
Stumble and fall Occupational health problems
Workers
Give specific instruction to workers Supervise the workers while working Discuss the potential hazard of the job Enough knowledge of worker to their job
Good housekeeping Pre Job Talk Training and orientation for the worker
Safety Officer Supervisor
6
Emergency response plan (ERP)
Emergency Wokers
All personnels involved in the project should be aware of what to do, in case emergency happens During ERP all other activities in the area shall be immediately stopped The scene should be sealed, either by staff or barriers if possible for photographs and investigation. All personnel involved in the activity should identify themselves to HSE officer to assist the investigation
Pre Job Talk Safety induction
Safety Officer Supervisor
7 Scaffoling Working at heights
Personnel injuries
Workers Engineer
All scaffolds shall display a current “SCAFFOLD TAG”. Working at height more than 1.80 meter even with handrail should required the worn of safety harness. The harness is suitable and fitted on the person involved and the other end is fixed to a firm support.
Pre Job Talk Safety induction
Safety Officer Supervisor
6. QA/QC – INSPECTION Refer wms for Concrete Work Inspection.
7. ATTACHMENT Attachment1 CONCRETE LOGISTICS PLAN – SAMPLE DRAWING
* Concrete Logistics Plan shall be attached to inspection sheet. Attachment 2 CONCRETE LOGISTICS PLAN – SAMPLE
* Concrete Logistics Plan shall be attached to inspection sheet.
Attachment 3 BLOCK INSTALLATION
QAFCO 5 Project
1ST pouring 2ND pouring 3RD pouring 4TH pouring
1 Location of Pump car / Direction of pouring 1ST Floor Slab
2 Concrete Quantity (m3/hour) of Batcher 1 Batcher
3 No. of Concrete Pump Mobilization
4 No. of Vibrators Mobilization
5 HDEC ( Supervisor) Site
Engr.
Surveyor / Assistant
Con'c Foreman
Carp. Foreman
Foreman
Form Labour
Concrete Labour
7 Curing of Concrete
9
No. Description Remarks1ST Slab Concrete
Others
Concrete Logistics Plan
Status of Preparation for Concrete
(Hyundai Engineering & Construction Co.)
8 Action for Delays
6 Subcontractor (Supervisor)
Initial concrete pouring team