4WT NO: 3333JOB NO: 2656CLIENT REF: Marty McAlenanREPORT NO: 1859
REPORTON THE TESTING
OF
CT1 POWER GRAB ‘n’ BOND
Supplied by:
C-Tec N.I LtdUnit 6
Ashtree Enterprise ParkNewry
County DownNorthern Ireland
BT34 1BY
Report Prepared by:
Lesley J Komatsu
www.4wardtesting.co.uk
Issue 01 29 July 2015 Page 2 of 12
R1859/3333/2656/MartyMcAlenan
Report on the testing of
CT1 Power Grab ‘n’ Bond
4ward Testing Ltd were contacted by C-Tec N.I. Ltd of Unit 6, Ashtree Enterprise Park,Newry, County Down, Northern Ireland, BT34 1BY and asked to carry out a series of testson CT1 Power Grab ‘n’ Bond
Identification
Material: Construction AdhesiveCustomer Identification: CT1 Power Grab ‘n’ BondBatch No: 5790499Customer Reference: Marty McAlenan4ward Sample No: 3333Job No: 2656Date Received: 01/07/2015
Test Data
The Construction Adhesive was tested as received from the customer with samples beingprepared by the Laboratory.
The following tests were carried out using CT1 Power Grab ‘n’ Bond
Vertical butt pull-off test
The Construction Adhesive was used to adhere a steel dollie to a concrete substrate.Following cure time the dollie was removed from the concrete substrate which was held ina vertical position.
No of dollies: 3Diameter of dollie: 50mmCure time: 7 days @ 23±2°C, 50±5%RHTest machine: Instron 4204, UKAS calibration certificate:E105060515100830Speed of test: 5mm/min
www.4wardtesting.co.uk
Issue 01 29 July 2015 Page 3 of 12
R1859/3333/2656/MartyMcAlenan
Photo to show Vertical butt pull-off sample
Test set-up for Vertical butt pull-off test
www.4wardtesting.co.uk
Issue 01 29 July 2015 Page 4 of 12
R1859/3333/2656/MartyMcAlenan
Shear test based on BS EN 12003
The Construction Adhesive was used to prepare Shear test samples according to BS EN12003
Ceramic Tile type: V2 (fully vitrified)No of Shear assemblies: 3Cure time: 7 days @ 23±2°C, 50±5%RHTest machine: Instron 4204, UKAS calibration certificate: E105060515100830Speed of test: 5mm/min
Photo to show typical sample assembly
www.4wardtesting.co.uk
Issue 01 29 July 2015 Page 5 of 12
R1859/3333/2656/MartyMcAlenan
Photo to sample in shear test rig
www.4wardtesting.co.uk
Issue 01 29 July 2015 Page 6 of 12
R1859/3333/2656/MartyMcAlenan
Determination of Slip resistance based on BS EN 1308
The Construction Adhesive was used to prepare Shear test samples according to BS EN1308
Size of concrete base:Ceramic tile type: V2 (fully vitrified)No of samples: 3Load applied: 50±0.1NTime allowed for slip: 20mins
Photos to show test set up
www.4wardtesting.co.uk
Issue 01 29 July 2015 Page 7 of 12
R1859/3333/2656/MartyMcAlenan
Date of testing: 14/07 – 28/07/2015
www.4wardtesting.co.uk
Issue 01 29 July 2015 Page 8 of 12
R1859/3333/2656/MartyMcAlenan
Test results
Vertical butt pull off strength
Photo to show typical failure mode
SAMPLE MAXIMUM LOAD (N)VERTICAL BUTT PULL
OFF STRENGTH(N/mm²)
FAILURE MODE
1 740.4 0.38
2 634.5 0.32
3 1364.4 0.69
Mean 913.1 0.46
SOME SMALL PATCHYCOHESIVE FAILURE OF
CONCRETE TOADHESIVE BUT MAILNLYADHESIVE FAILURE TOCONCRETE ( COHESIVE
FAILURE TO METAL)
www.4wardtesting.co.uk
Issue 01 29 July 2015 Page 9 of 12
R1859/3333/2656/MartyMcAlenan
0.00
200.00
400.00
600.00
800.00
1000.00
1200.00
1400.00
1600.00
0 20 40 60 80 100 120
Load (N)
Scans
Typical Vertical butt pull-off
www.4wardtesting.co.uk
Issue 01 29 July 2015 Page 10 of 12
R1859/3333/2656/MartyMcAlenan
Shear Adhesion of CT1 Power Grab ‘n’ Bond
Point of failure is determined by drop in load, the only visible sign is possibly the ceramictile cracking or breaking.
SAMPLE MAXIMUM LOAD (N)SHEAR ADHESIVE
STRENGTH (N/mm²)
1 2465.3 1.49
2 2458.2 1.48
3 2698.2 1.63
Mean 2540.6 1.53
0.00
500.00
1000.00
1500.00
2000.00
2500.00
3000.00
0 10 20 30 40 50 60 70 80 90
Load (N)
Scans
Typical Shear Strength graph
www.4wardtesting.co.uk
Issue 01 29 July 2015 Page 11 of 12
R1859/3333/2656/MartyMcAlenan
Resistance to Slip of CT1 Power Grab ‘n’ Bond
Photo to show typical lack of any slip after 20mins
These results relate only to the material tested
SAMPLE SLIP (mm) AFTER 20 MINS
1 0
2 0
3 0
Mean 0
www.4wardtesting.co.uk
Issue 01 29 July 2015 Page 12 of 12
R1859/3333/2656/MartyMcAlenan
Work carried out and recorded by the following personnel:
L J Komatsu ACQITechnical Manager
Anthony HansonQuality Engineer
Work approved by the following personnel:
L J Komatsu ACQITechnical Manager
This Report shall not be reproduced except in full,without the prior approval of 4ward Testing Ltd in writing.