4th year 2010-2011

74
2010-2011 Dublin School of Architecture 4 TH YEAR Dublin School of Architecture 4 Year 2010-2011

Upload: paul-kelly

Post on 07-Mar-2016

232 views

Category:

Documents


1 download

DESCRIPTION

Summary document of 4th year students' projects from the Dublin School of Architecture

TRANSCRIPT

Page 1: 4th Year 2010-2011

2010

-201

1Dublin School of Architecture

4TH YEAR

Du

blin

Sch

oo

l of A

rch

ite

ctu

re

4T

H Y

ear 2

01

0-2

01

1

Page 2: 4th Year 2010-2011
Page 3: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 14th Year, 2011 -2012

2010-2011Dublin School of Architecture4TH YEAR

Page 4: 4th Year 2010-2011

2 Dublin School of Architecture 4th Year, 2011 -2012

Contact:Paul Kelly 4th yearModule Corordinator

Head of School Orna Hanly

Dublin School of ArchitectureDublin Institute of TechnologyBolton StreetDublin 1, IrelandTel: +353 1 4023690ww.dublinschoolofarchitecture.comwww.dit.ie/architecture/urban-design/

© Dublin School of Architecture Press. All rights reserved. All information presented in this publication is deemed to be the copyright of the creator or the Dublin School of Architecture, unless stated otherwise.

Typeface: Gil Sans + Helvetica

Design: Paul Kelly

Page 5: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 34th Year, 2011 -2012

Semester 1 05Building Conception to Completion 07Project No. 1 Brief 08Project No. 2 Brief 09Selected Semester 1 Projects 10Semester 2 23Project No. 1 Brief 24Project No. 2 Brief 26Selected Smester 2 Projects 28Class list 71

CONTENTS

Page 6: 4th Year 2010-2011

4 Dublin School of Architecture 4th Year, 2011 -2012

Page 7: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 54th Year, 2011 -2012

Module coordinator Paul Kelly

Peter CrowleyEmma GeogheanHelen LambBrien O’BrienLenzie O’SullivanJim RocheRaul SalgadoMartin SpillaneEthna WallsMarcin Wojcik

SEMESTER 1

Page 8: 4th Year 2010-2011

6 Dublin School of Architecture 4th Year, 2011 -2012

Page 9: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 74th Year, 2011 -2012

Building Conception to Completion Paul Kelly

The Building Technology Structures (BTS) studio is intended to inspire students to consider their conceptual thinking in the context of the realisation of their Architecture. To determine the value of a theory of architecture one must measure the theoretical intention against the physical realisation. 7KLV�SUHVHQWV� WKH�GLIÀFXOW\� RI� WU\LQJ� WR� IRUPXODWH�D� WKHRU\� LQ�DGYDQFH�RI�building. As undergraduates, students are challenged to approach their projects through critical theory and implementation. As with any pursuit, it is important to act; architecture demands a theory that develops over a period of time, and although a project can be a useful tool in this development, it ultimately denies the possibility of full assessment until the act of building has been undertaken. The ultimate challenge for a student is to convince.

All theory is dependent on action for validation, otherwise it simply remains in realm of a hypothesis. Each student must evolve a personal working method based on the range of interests that engage them. This personal working method will support the development of projects during the design stage and the ultimately inform the intentions associated with construction. Each project should be examined against the initial concept and at each stage decisions are examined in the context of the overall concept. In this context, criticism of a project can be measured against the initial intention. When the concept or thinking behind a building is challenged, then it is imperative that the project is robust and can be explained and —if necessary—defended. The strength of a student’s working method allows for a true, robust defence of the scheme. Just as the projects success can be measured against the concept so to can the validity of any criticism. A student’s work should stand up to scrutiny in the context which it is proposed.

The ultimate aim is for the clarity of the concept to be evident at a glance, possessing a formal quality that the viewer can understand. To this end, the choice of materials, their relationship and detailing, are critical. Any mis-judgement at concept development stage has critical consequences for the realisation of the project.

To achieve this clarity, the project should operate on the level of the abstract, the viewer responding to the building on an intuitive level. The viewer VKRXOG�LPPHGLDWHO\�VHQVH�D�GHWHUPLQHG�OHYHO�RI�FRQWURO��DQ�LQÁXHQFH�RQ�DOO�aspects of the design of the building. The subtle relationship between two panels of stone, for instance, can reinforce or deny an idea about folding, mass or skin. The proper resolution of these seemingly minor matters elevates a building to the level of architecture. To paraphrase Le Corbusier, we must pass from mere construction to architecture to achieve a high aim.

7KH�SURFHVV�GHVFULEHG�DERYH� LV� DQ�KRQHVW� DQG�XQÁLQFKLQJ�DSSURDFK� WR�architecture. The work of this studio seeks to produce unique work, modes of composition and aesthetics are eschewed to follow the path of the development of each project. The outcome at the beginning of each design is unknown; the unexpected is welcomed.

Page 10: 4th Year 2010-2011

8 Dublin School of Architecture 4th Year, 2011 -2012

Project No. 1 Semester 1

1 Material - GeneralDublin School of Architecture –BArch Programme –Stage 4 Advanced Design Studio – Building DT101- 4�2010– 2011 Version 1.0 2010_09_20Subject to review

The material for this project is subject to change. Any amendments to the brief or the material will be posted on Tuesdays in the studio.

Material - SiteThe site is the designated Fourth year Studio

Site Visit_

Material – Programme �'$�/1.)$"3 �(2�3.� #$2(&-� 9� *$� � �34#(.: �3' 3 �(2�3.� 3 *$�3'$�$7(23(-&�234#(.�2/ "$� -#�#$;-$� � 2$1($2�.%�'4, -�2" +$�spaces fabricated from 12mm plywood. The proposed forms will be used to display drawings and support and store models. Each student is required to limit the extent of material they use to one sheet of plywood.

Requirements - Each student is required to produce an A1 drawing describing their intervention in the space, the required scales range from 1:20 to 1:1. Students are asked to consider the following areas, how can a series of objects occupy space in a meaningful manner. What is the relationship between the limits of the space and the proposed object. Can the object have a utilitarian potential, is their scope for furniture?

Students may elect to work in groups of 4 maximum.

Submission dateTuesday September 28th, 2010

ConceptThe driving force behind all the work in this year will be that of a concept. The strength of the idea is of primary concern, this idea should be tested and interrogated using models and drawings. All detailed and material decisions should be examined in the context of reinforcing the conceptual basis of the project.

Note.Plywood can be obtained from builders suppliers precut to requested dimensions. Woodworkers supply 12mm ply at �22.22 per sheet and each cut is charged at �1.82 you may choose to cut the material yourself or use another supplier. The details below are intended for your convenience.

Woodworkers & Hobbies Supply Cntr.Phone�(01) 4901968Fax � (01) 4902639

1-10 Mt. Tallagh Ave. Harolds Cross Rd. D6w

Pk_2010_09_20 � Project No.01

Page 11: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 94th Year, 2011 -2012

1 Material - GeneralDublin School of Architecture –BArch Programme –Stage 4 Advanced Design Studio – Building DT101- 4�2010– 2011 Version 1.0 2010_09_20Subject to review

The material for this project is subject to change. Any amendments to the brief or the material will be posted on Tuesdays in the studio.

Material - SiteThe site is the stretch of the Broadstone rail line between Broadstone Station and Broombridge. There are 4 potential /%0!/�% !*0%7! �+*�0$!��00��$! ����)�,�

Site VisitDate: Tuesday 28th of September 2010 Time: 14.00

Material – Programme The project is to design an mixed use building in close proximity or above to the former railway line. Following last years initial investigation by the 4th year students of the issues of the site. You are asked to consider the following options 3$!.!�0$!� !2!(+,)!*0�+"�5+1.�,.+&!�0�3%((�.!8!�0�+*!�+"�0$!�/%01�0%+*/

1. The Luas will be implemented in the short term, say the next 5 years.2. The Luas will not happen allowing the line to be used for another form of public transport / cycleways

Requirements -Each student is required to submit an A0 drawing showing the general arrangement of their proposals at 1:200, with part plans, sections and elevations of the a selected part of the building at 1:20. There will also be a requirement for a minimum of three 1:1 details describing a critical aspect of the design that has a direct interface with the scale of the human body. An A3 booklet summarising the project showing the drawings and model photographs will also be required. All of the drawings and photographs and images shall be saved to a DVD, photographs 300dpi

Submission date -See attached semester planner

ConceptStudents are asked to consider the following areas,How is the concept of a building informed by the choice of material and structure? How much of an impact does or should it make? Is “truth” a valid concept in today�s architecture and can or should it be a touchstone for a project.

The brief will be developed against the backdrop of the requirements of the Dublin City Council development plan (zoning 10a is assumed across each site) among other criteria of plot ratio, site coverage, public open space, private open space. Each site will have a variety of uses

1. A large span structure with a community use, a sports hall or a swimming pool2. an element of housing, student housing, artists residences with a studio, live-work units or social housing3. �+))!.�%�(�+"7�!��3+.'/$+,/��//+�%�0! �3%0$�(+��(��1/%*!//!/4. Retail where viable.

The driving force for the project will be “The Idea”, a fundamental aspect of design is the concept, this concept is realised in built form and dependent for coherency for all decisions in relation to material choice, structure, environment and ultimately the integration of all of these issues. The success of this project will be the clarity of implementation of the concept for the building, tested against the detailed 1:1 decisions reinforcing the concept.

PK_2010_09_20 � Project No.02

Project No. 2 Semester 1

Page 12: 4th Year 2010-2011

10 Dublin School of Architecture 4th Year, 2011 -2012

0RGHO�����������������������3UHYLRXV�SDSHU�VL]H����������[��������PP�������

Page 13: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 114th Year, 2011 -2012

Jamie Conway, Niamh Chambers, Declan Crowley, Emma ForristalTea House

The outer passageway denies the user direct access to the inner space and forms a spatial threshold which contains the Tea Station at the end. Through the internal walls, one enters into the internal volume which contains a stair to the upper deck. Conceptually the structure is comprised of a cube within another larger cube. The whole inside of the structure is then lined in butter paper so as to provide spacial autonomy inside and sculptural qualities on the outside, as well as giving the surface a unique animated appearance at night. The intention would be to provide internal lighting and audio to create a unique sensory experience within.

THE TEAHOUSE. This was conceived in response to the studio furniture project. The program for the brief was open and the concept was to take the existing HPSW\�VWXGLR�VSDFH�DQG�FUHDWH�RU�GHÀQH�D�VXE�VSDFH�RQ�D�KXPDQ�VFDOH�WKHUHLQ��It was stipulated that the spaces be fabricated from plywood and be used to GLVSOD\� GUDZLQJV� DQG� VXSSRUW� DQG� VWRUH� PRGHOV�� 7KH� ÀQDO� GHVLJQ� GHULYHV� IURP�the maximum dimension of a plywood sheet (2440mm). The deck is comprised of members at full length, supported by four structural walls of height 2440mm. The outer walls (of the same dimension) are elevated to +660mm to form a balustrade on the upper level. One member is truncated to form an entrance to the interior.

Page 14: 4th Year 2010-2011

12 Dublin School of Architecture 4th Year, 2011 -2012

Page 15: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 134th Year, 2011 -2012

Selected Projects

Page 16: 4th Year 2010-2011

14 Dublin School of Architecture 4th Year, 2011 -2012

STUDENT ACCOMMODATION. The concept for this project is to establish a center or system of trade for Cabra, Phibsbrough, and Glasneven. The site is located between the three districts, which are divided by the Royal Canal and the Great Western railway line. The project’s objectives are to make use of the disused or wasteland areas to the north of the canal by cultivating the land into a series of allotments. These allotments will be allocated to the neighboring communities to encourage a sense of ownership over the area. The surplus food produced from these allotments will be housed and then brought to the south of the canal over a

new bridge to St. Bernard park, where the aim is to establish a bimonthly market where trade of all varieties is encouraged. Finally there is a third building, more prominent in scale, which will act as a gateway building between the allotments DQG�WKH�WUDGH�FHQWHU��7KH�EULHI�RI�WKLV�EXLOGLQJ�LV�WR�SURYLGH�ÁH[�VSDFHV�IRU�DOO�WKUHH�community districts to hold meetings, preform shows or small productions and hold lectures of community interest. The main aim of this building is to integrate the community with the students of the nearby Grangegorman DIT campus.

Page 17: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 154th Year, 2011 -2012

Donnchadha GallagherCommunity School

Page 18: 4th Year 2010-2011

16 Dublin School of Architecture 4th Year, 2011 -2012

Eoin ByrneGlass Recycling centre

BROOMBRIDGE GLASS RECYCLING. This project looks at how an industrial process might inform an architectural exploration. This new building is a beacon for the more austere and pragmatic economic condition we are faced with. This new facility would engage the public on two levels, by opening its process out to the exterior, and by allowing people to visit and see the workings of the plant. This would encourage people to engage with the idea of waste management and the LPSRUWDQFH�RI�LWV�FRQWLQXHG�GHYHORSPHQW��7KH�VLWH�LV�HVVHQWLDOO\�D�JUHHQ�ÀHOG�VLWH��therefore, this building uses as small a ecological footprint as possible. It engages with Dublin and taller buildings in the future, having accelerated the sprawl into its hinterlands by refusing to engage with high rise buildings. This will also give Broombrige a sense of identity and place within the city that it is currently lacking. The rest of the site is to be occupied by an integrated constructed wetland, that will be used to treat the waste water from the surrounding areas. There is currently one operating very successfully in the nearby Tolka Park, and the Dublin City Council wish to expand their use across the city as a means of treating storm water.

Page 19: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 174th Year, 2011 -2012

Paul MaherDesign Centre, Phibsborough

3+,%6%2528*+�'(6,*1�&(175(��$V�D�FDVH�RI�XUEDQ�LQÀOO�RQ�D�IUDFWXUHG�EORFN��this project aims to relate to the surrounding conditions in terms of scale, materiality and function. The Phibsborough design centre comprises workshops, a community arts centre, gallery and live/work units for artists. Conceived as a punctured brick DQG�FRQFUHWH�IRUP��WKH�EXLOGLQJ�DLPV�WR�UHÁHFW�ERWK�LWV�URXJK�DQG�UHÀQHG�IXQFWLRQV��Wrapping around a block of terraced houses, a working courtyard is formed. The OLIH�F\FOH�RI�D�SLHFH�RI�DUW�� IURP�UDZ�PDWHULDO� WR�ÀQLVKHG�SLHFH�FLUFXODWHV� WKURXJK�the building from workshop to gallery. The project is split into two elements: a taller, public block which forms a hard edge to the street and relates to the scale of

St. Peter’s church, and a lower scale private block which addresses the terraced neighbourhood and Great Western Square. The street facing element, a punctured DQG� RSHQ� IRUP�� UHÁHFWV� LWV� SXEOLF� IXQFWLRQV�� VXFK� DV� JDOOHULHV� DQG� FRPPXQLW\�workshops. In contrast, the rear element is more monolithic in its language to articulate the robust workshop functions. A ground level route is opened between the private and public elements of the building, allowing permeability throughout the site and a public route into the working courtyard. The project aims to build on a cultural and artistic Phibsborough, while providing a community focal point.

Page 20: 4th Year 2010-2011

18 Dublin School of Architecture 4th Year, 2011 -2012

Niall HowardBotanical Research Facility

MT. BERNARD PARK BOTANICAL RESEARCH. This is intended to re-accomodate the existing post-graduate and PhD department of Trinity College Dublin. The facilities currently in Trinity are out of date and the test sites and greenhouses were mostly removed to make way for Trinity Hall’s development. The taxonomy department within botany is currently situated in the national botanical gardens, located ten minutes from this site. The remaining eco-physiological and phenological departments became the programme for this project. The location is ideal, with the National Botanic Gardens of Ireland (NBGI) and the new Luas line only minutes away. The nature of this research facility meshes well with the surrounding domestic environments with its predominantly nocturnal and introverted presence. The driving force behind this project was to continue the bank of the canal and turn the awkward geometry of the site into something that is used throughout the seasons. I wanted to create a faint contact between the researchers and the members of the community, but at no point hinder the research in any way. The natural three and a half metre rise across the site was something I wanted to use to my EHQHÀW�DQG��LQ�GRLQJ�VR��FUHDWH�D�SXEOLF�SULYDWH�GLYLGH�WKDW�ZDV�QRW�LPPHGLDWHO\�REYLRXV��This divide exists in both plan and section, distinguished by a mirrored courtyard.

Page 21: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 194th Year, 2011 -2012

Shane MorganMicro Brewery

MICRO-BREWERY. Perched on the edge of an old rail line, the site abuts a crossroads of the consistently busy North Circular Road and the sunken, disused Great Western Railway. With the re-integration of the LUAS tramline along this marshy, scenic route, an urban environment is created. The site itself is surrounded by typically lower density housing. Sandwiched between Cabra and Phibsborough Village, there are very few public destinations in the area. The main use of the area is to get through it to somewhere else. A decision was made to create a public plaza in the heart of the site, allowing moments of rest within these busy corridors. Pedestrian route-ways were created joining the North Circular Road with Cabra Road, allowing a more generous entrance to the newly installed light rail. For the site itself, a recessed frontage coupled with an active growth buffer softens the noises of these to allow for that moment of rest, or at least a calm before it begins DQHZ��,Q�WKH�KHDUW�RI�WKH�VFKHPH��D�PLFUR�EUHZHU\�GZHOOV�XQGHUQHDWK�WKH�ÁRDWLQJ�plaza, giving glimpses of itself to elevated positions. Holding onto the ideals of the lifeline’s caretakers, the micro-brewery utilises artisan craft, local skill sets and natural ingredients. It comes from a rich tradition of brewing within Dublin City and part of a renewal of interest in the advantages of agricultural responsibilty.

Page 22: 4th Year 2010-2011

20 Dublin School of Architecture 4th Year, 2011 -2012

Simon HarringtonMarket Place

MT. BERNARD PARK. A New Linear Park connects the Fassaugh Road with the new Luas station at Broombridge. Existing routes are maintained and new ones provide additional connections to and from a new community facility. The park is imagined as a series of planted strata that cover the existing feral landscape. Walkways and bike paths cut across the green areas and open up new vistas. The planting is in the form of additional trees, new reed beds for the existing canal, meadow areas and wild berry hedges. A community building rises up from the park and reconnects the landscape back to the surrounding neighbourhoods. The brick PDVV�LV�HURGHG�WR�DOORZ�OLJKW�WR�ÁRRG�WKH�LQWHULRUV�DQG�RSHQ�XS�GLIIHUHQW�YLHZV�RI�the landscape. The variety of functions allows different age groups and users to be involved in community activities. The building is envisaged as a place for people to meet collectively and exchange ideas while learning from one another.

Page 23: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 214th Year, 2011 -2012

Luke GleesonPhysicality Building

PHYSICALITY BUILDING. This design used the context to become a node of DFWLYLW\� DQG� FRQQHFWLRQ� RQ� D� VLWH� SUHYLRXVO\� GHÀQHG� E\� LQIUDVWUXFWXUDO� EDUULHUV��The brief of a sports and physical activity building was chosen as the ideal brief, considering the possibilities of a site adjoining a public park. The building became the division between traditional recreational Mount Bernard park to the south east DQG�WKH�DUWLÀFLDO�ODQGVFDSH�RI�SLWFKHV�DQG�UXQQLQJ�WUDFN�WR�WKH�QRUWK�ZHVW��6SDFHV�

IRU� VSRUW� DQG� SK\VLFDO� DFWLYLW\� DUH� SUHGHÀQHG� VSDFHV� ZLWK� ULJLG� UHTXLUHPHQWV�� ,�wanted to assemble them in a different way, to create novel and impressive spatial conditions. The structural approach was generated by stacking the spaces on top of one another. Changing rooms and spaces that require less height (and smaller spans) were grouped together to create bridges that span the larger spaces of the main hall and swimming pool.

Page 24: 4th Year 2010-2011

22 Dublin School of Architecture 4th Year, 2011 -2012

Page 25: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 234th Year, 2011 -2012

Module coordinator Ethna Walls

Peter CrowleyEmma GeogheanPaul KellyHelen LambBrien O’BrienLenzie O’SullivanJim RocheRaul SalgadoMartin SpillaneMarcin Wojcik

SEMESTER 2

Page 26: 4th Year 2010-2011

24 Dublin School of Architecture 4th Year, 2011 -2012

6

Architectural Design Studio. V111 ( ESM) 2011Project 1 - Semester 2 Date: 31.1.11

Town 2011 – Study of a framework for town living in the 21st, Century. “ One building standing alone in the countryside is experienced as a work of architecture, but bring half a dozen buildings together and an art other than architecture is made possible. Several things begin to happen in the group which would be impossible for the isolated building.” Gordon Cullen “Concise Townscape”

Image – Francis Tibbauds – People Friendly Spaces.

Introduction:

Ireland is one of the few countries in Europe that was not conquered by the Romans. It has a very unique character having been inhabited by the Celts, Vikings, Normans etc. The influence of this rich history is best seen in the development of our towns. The origin, function and reason for being can be quite varied, yet this is not evident from the similarity in housing developments which have sprung up in our towns over the past decade.

Some towns developed around a port, river, monastic settlement or demesne. Other towns became centres for trade and became vibrant market towns. Most towns in Ireland have a very unique character, yet some towns have evolved from the expansion of original villages. The function of many towns have changed over time but this has not been evident from recent mundane, soulless development, which in many cases have been built on the fringes of our towns, independent of the framework of the original town.

Victor Gruen the American Architect / Planner stated as far back as 1969 : “ By detaching our houses from each other, by isolating them from their neighbours, we have detached ourselves also from human experiences, we have isolated ourselves from our fellow men…. In as much as we are living in a middle – class society, we acquire only middling – sized space and build on it middling houses with middling gardens. In spite of this, we insist on sealing ourselves off hermetically, and in doing so we are losing some elementary advantages.” Victor Gruen 1969 “ The Heart of Our Cities.”

Project: You are asked to analyse an existing town from the list given in the enclosed brief with a view to developing a framework for 21st. century living. The towns of Kilcock and Abbeyleix have been chosen for this purpose. Kilcock has experienced extensive growth since it was by- passed over the past twenty years, while Abbeyleix is a town due to expand further from the opening up of a recent by- pass.

The town should be analysed to understand how it has evolved over time, to enable you to select and design your proposal to satisfy the brief. An analysis of Place, Environment ( both natural and built) and Community is necessary to reach an understanding of the specific “genius loci” offered by the town. A list of headings have been suggested for this purpose. A low energy sustainable solution is imperative, this will help to strengthen the urban fabric and improve the quality of living for all concerned. ( See attached stage 1 brief, ref. R.I.A.I. brief.)

Aim of Project. To satisfy Aims in R.I.A.I. brief and attached Semester guideline document, also to -

� To emphasise the need to establish a hierarchy when dealing with an open brief.

Project No. 1 Semester 2

Page 27: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 254th Year, 2011 -2012

Page 1 of 2

TOWN 2011 Travelling scholarship

Introduction Following on from the RURAL 2010 Travelling Scholarship, this year the brief proposed for the competition will seek to explore the issue of small town settlements nationally. The manner in which these towns has expanded over the past ten years is currently the subject of much debate and has raised justifiable concerns in respect of the quality of individual developments and the social issues that have arisen as a result. This year the Travelling Scholarship aims to explore how to approach new residential developments within towns and also to develop a strategy for correcting or improving poor developments. It also seeks to focus debate on how town living and the expansion of smaller towns could best be handled in the future, taking reference from nationally and internationally successful examples.

Site

Given the geographical spread of the architectural schools around the country we feel there is an opportunity to select a number of sites nationally. Satellite towns located within the commuter belt of larger urban settlements have been identified. A choice of towns is listed below with the main selection criteria being that they have a population of between 1,500 and 5,000 and that they are located close to larger urban settlements or along national primary Routes. Within Northern Ireland larger settlements have been selected due to different development patterns around Belfast. Latitude is given to the schools to select towns from the list below and indicated on the adjoining map and are as follows: Abbeyleix, Abbeyfeale, Athenry, Athboy, Ballaghaderreen, Bandon, Boyle,

Cahir, Callan, Comber, Croom, Dromore,

Dunshaughlin, Ferbane, Ferns, Holywood, Kanturk, Kilcock, Kilcoole, Lifford, Lismore, Loughrea,

Macroom, Midleton, Monasterevan,

Newmarket-on-Fergus, New Ross, Tyrrellspass, Sixmilebridge, Whiteabbey, Yougal.

Brief

With a view to opening up the scope and in order to embrace the aspiration of the brief to propose a new framework for town living in the 21st century, the students are asked to select a town with a recent residential development, the quality of which they believe could be improved, could be better integrated into the existing town fabric or could be better supported with facilities to

promote more sustainable ways of living in that town.

Students proposals should include a response to the following considerations :

� Propose interventions which would support better ways of living in the town giving consideration to movement patterns, open space, community facilities etc.

� Propose patterns for future development of residential accommodation in the town, whether it be expansion of recent developments or development elsewhere in the town

� Develop one element which supports/illustrates possibilities for new ways of living in the town either

residential or community element.

Residential

The scale and number of residential units provided is dependant on the Town and Site selected by the individual student. The brief is for a development of mixed residential units. The only stipulation is that the design of the individual units must be in compliance with the requirements of the Department of the Environment housing guidelines. Innovation of design within the living units is encouraged while at the same time maintaining a sense of balance in terms of the economic viability within this sector. Community

Project No. 1 Semester 2

Page 28: 4th Year 2010-2011

26 Dublin School of Architecture 4th Year, 2011 -2012

Project No. 1 Semester 2

Page 2 of 2

In addition to the residential element of the brief a local/ community facility may also be considered. The accommodation to be provided within this local centre is flexible and the students have discretion in the selection of the facilities to be provided. The scale of the communal facilities should reflect the requirements of both the development itself and the facilities already existing within the town. Uses considered as acceptable include the following;

1. Local shop 2. Crèche 3. Live/work units 4. Community building e.g library, youth club, hall.

Environment

Consideration must be given to environmental concerns, both in terms of sustainability of design - energy consumption, orientation, passive solar gain, method of construction etc as well as the natural environment of the development. Particular attention should be given to the accessibility and use of shared open space as well as to the private open space afforded to each of the residential units paying due attention to orientation and sunlight.

Conclusion

TOWN 2011 is seen as the next step in an overall study of a framework for living in the 21st century and we are looking at

how you, the students, think it can be best achieved. Submission and Assessment

Assessment

The assessment of individual designs will take into consideration the aspects of the project selected by the student . Each submission is required to address in detail at least one of the following issues while demonstrating an awareness of all aspect affecting their submission.

1. Site selection and integration within the local town 2. Site strategy 3. Home designs 4. community buildings

Submission

1. Competitors should submit a MAXIMUM of 3 no. A1 sheets. 2. High resolution PDF’s and jpegs or tiffs of your submission MUST be included on a separate CD with your entry

number printed clearly on the CD. This is to allow publication of the projects in paper and web format 3. The submission should include drawings sufficient to explain the scheme as well as Plans, sections, elevations etc,

Site layout, Landscaping Proposals, Structural Concept, Utilisation of Daylight and Passive Ventilation/Thermal Strategies, and an illustration of detail element in 3D that evokes the feeling of the design. This could be an integration of sustainable systems, passive solar strategy etc.

4. Models of buildings may NOT be submitted. However competitors are encouraged to use study models to examine the volume and massing of the building in its context. Photographs of these models may be submitted as part of the presentation. 3d movies of your proposal may be submitted on the CD

5. The Assessors would welcome three dimensional drawings, sketches or photographs of models which may be included on the panels at the discretion of the competitor.

6. A short report NO MORE than 200 words which explain the design intention is mandatory and it must be included as part of the submission and is to be incorporated on the A1 sheets or attached separately to the rear and text in word or PDF format must be included on the CD.

7. Remember that the submissions will be transported to the RIAI, and stored prior to adjudication, following which they will be exhibited Therefore, please note the following:

� Sheets should be mounted on lightweight board or card � Models may NOT be submitted. Boards should be flat with no raised or three dimensional element � Boards should not be covered with glass, plexiglass or any other especially heavy or fragile material � Registration number should be marked clearly on the top right corner of each A1 sheet

Entries must be submitted by 5.00 Wednesday 20

th April 2011 to the RIAI, 8 Merrion Square, Dublin 8.

Page 29: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 274th Year, 2011 -2012

Dublin School of Architecture - Barch ProgrammeD.I.T. Bolton St. Stage 4 Advanced Design StudioArchitectural Design Studio. ADS V111 ( ESM) 2011Project 2, Workshop “ Performance “ 8th. April 2011

WORKSHOP WITH GAVIN GREEN, CHARCOAL BLUE THEATRE CONSULTANTANT.

Models from Renzo Piano Workshop. PROGRAMME :

11.00 a.m. Studio - Students divided up into groups for day session. 11.15 a.m Lecture - Lecture by Gavin Green on Music performance, Acoustics, Case Studies. 12.30 a.m. Workshop All students to develop an aspect of their work further. Models, Drgs. Group 1 discussion - 12.30a.m. with Gavin Green Group 2 discussion - 1.00p.m.1.30 a.m. Lunch break. 2.00p.m. Workshop Cont. Group 3 discussion - 2.00p.m.. with Gavin Green Group 4 discussion - 2.30p.m.. Group 5 discussion - 3.00p.m. Group 6 discussion - 3.30p.m.4.00p.m. Break. 4.15p.m. – 5.00p.m. Crit with Gavin Green.

WORKSHOP: All students are expected to have work completed in advance of Workshop, this includes :

(1) 1: 200 scale model and drawings prepared for Review 1 (2) 1: 50 min. part sectional model of your performance space.

All models to incorporate your thinking on lighting, ventilation, cooling, acoustics, structure and materials as an integral part of your design concept.

12.30 – 4.00p.m. all students are expected to advance the design of their performance space based on the talk by Gavin Green, by enlarging part of their scheme, detailing an aspect further etc. Your 1: 50 pre prepared model will probably inform you to what area you need to expand on.

Crit: Students will present their work – models / drgs. at 4.00p.m. for Crit. Assessment – 20% ESM.Studio Staff: Ethna Walls, Paul Kelly, Jim Roche, Marcin Wojcek ,Gavin Buggy, Brian O`Brian, Peter Crowley, Emma Geoghegan, Helen Lamb, Lenzie O`Sullivan, Raul Salgado, Martin Spillane.

Project No. 2 Semester 2

Page 30: 4th Year 2010-2011

28 Dublin School of Architecture 4th Year, 2011 -2012

Dublin School of Architecture - Barch ProgrammeD.I.T. Bolton St. Stage 4 Advanced Design StudioArchitectural Design Studio. ADS V111 ( ESM) 2011Project 2, Semester 2 “ Performance “ 21st. Mar. 2011

Introduction. “In the early stages a composer`s invention seldom flows freely. The control of melodic, rhythemic and harmonic factors impedes the spontaneous conception of musical ideas. It is possible to stimulate the inventive faculties and acquire technical facility by making a great many sketches of phrases based on a predetermined harmony. At first, such attempts may be stiff and awkward, but with patience, the co-ordination of the various elements will rapidly become smoother, until real fluency and even expressiveness is attained. “ Schoenberg. A 1970 “Fundamentals of Musical Composition” Faber & Faber

The design process involved in musical composition described by Schoenberg can be compared to the design process involved for a large scale complex building. It is difficult to comprehend the site, scale, spatial requirements, structure, materials, light, acoustical qualities, services etc.initially all at once and create a strong concept with functionality and beauty combined, “ a great many sketches” as Schoenberg describes are necessary “ until real fluency and even expressiveness is attained.”

Lecture Theatre, Otaneimi, Aalto.

Project : The Royal Irish Academy of Music ( RIAM) have a distinguished history for more than 160 years in Ireland, in promoting excellence in music, in composition and particularly in the field of ” performance “The Conservatory are at present looking at the possibility of expanding their facilities to serve the 1,300 plus student body . ( See attached from RIAM.) You are asked to design a new School of Music for the RIAM with a particular emphasis on “ Performance” The focal point of the school will be a specially designed performance space for full scale operatic performances, along with all the other spaces facilities necessary to nurture and promote such excellence.

This project is about integrated holistic design, like the design of a musical instrument, every element should have a purpose and by their combination produce a beautiful piece of Architecture. The design must allow for versatility and flexibility where required and be economical in terms of space, material use and preferably cost. Reynar Banham stated in 1969 “ .. It will often prove that drawing a blind over a window, or actuating some other equally simple control, is all that is required. In the right circumstances, a truly sophisticated approach to the man / environment system may involve no complex mechanisms ……. “ Sophistication is not necessarily the product of highly developed machinery, nor intensive capital investment. It is more a way of using available equipment and resources with cunning and intelligence:”

Banham, R 1984,“ The Architecture of the Well – tempered Environment.

Project No. 2 Semester 2

Page 31: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 294th Year, 2011 -2012

Brian JordanRemnants of a Half Acre

REMNANTS OF A HALF ACRE. At the time of its foundation as a market town for the De Vesci Estate, tenants were given a home with a half acre of land to the rear and an acre for use elsewhere. From this it has developed in a linear fashion along its main axes with recent housing developments being built at the periphery of the town. As a result, vast amounts of space are left as backlands behind the hard edge of the main street due to the dense grain of the urban fabric. This proposal intends to explore these backlands which mainly remain unused and to create a third dimension to the town behind the main street, a new layer which will create public spaces and new routes around the town. The centre of the town

would be sustainably developed to a suitable density with housing, buildings for the townspeople and the encouragement of small, local industry. This particular proposal includes: a theatre space seating 160 people, a cinema screen and a meeting room for the community. Housing has been introduced as three family homes and two smaller homes with dedicated studio spaces. The long-term vision of this proposal is that it can be expanded upon when required, with an emphasis on linking with the existing estates. It could also be applied to other parts of Abbeyleix or, in fact, other towns in Ireland where this dense grain pattern and backlands exist.

Page 32: 4th Year 2010-2011

30 Dublin School of Architecture 4th Year, 2011 -2012

Page 33: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 314th Year, 2011 -2012

Brian JordanRemnants of a Half Acre

Page 34: 4th Year 2010-2011

32 Dublin School of Architecture 4th Year, 2011 -2012

ABBEYLEIX BOG. The town of Abbeyleix can be characterised by its unique planned form and its relationship with Abbeyleix House, designed in 1773 by James Wyatt for John II, Viscount de Vesci. In many cases, the back of the town’s buildings meet farmland in a direct manner and this relationship between agrarian land and the built environment becomes an interesting condition, which repeats itself. Dense woodlands offer a different type of boundary to the town while providing hidden trails for more adventurous walkers. Another type of landscape emerges alongside

these woodlands. A hundred hectare bog lies to the south of the town. Killamuck Bog is the most south-eastern raised bog in county Laois. The land was given to the community of Abbeyleix by Bord na Mona. This proposal examines the potential resources of the bog and offers a solution which would connect this landscape to the town, educating both locals and visitors about the rich biodiversity and promoting eco-tourism.

Page 35: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 334th Year, 2011 -2012

Simon HarringtonAbbeylix Bog

Page 36: 4th Year 2010-2011

34 Dublin School of Architecture 4th Year, 2011 -2012

Page 37: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 354th Year, 2011 -2012

Jamie ConwayAn Urban Living Room Abbeylix

Abbeyleix is a town richly endowed with heritage and architectural harmony. 7KLV� ZRXOG� VXJJHVW� D� ÁRXULVKLQJ� XUEDQ� FHQWUH�� KRZHYHU�� RQ� FORVHU� LQVSHFWLRQ�one can see that the town has become stagnant through neglect both in terms of FRPPXQLW\�VHUYLFHV�DQG�XQWLO�YHU\�UHFHQWO\��WKH�LQWHQVH�WUDIÀF�FRQJHVWLRQ�WKURXJK�the town. In recent years, the town has experienced some growth, although has been spared the relentless expansion of some other towns in Dublin’s catchment area. They have little architectural consideration and are not informed by the built heritage of the town or its layout. Currently the town under-utilises its vast potential (historical, recreational and sport) due to the lack of local discussion, debate and

self organisation. The following proposal seeks to create a new typology, an urban ‘Living Room’ containing space for childcare, a park for recreation, a reading and dining room, and a town meeting room. The siting for this building is such that it re-enforces the strong existing route going north-south linking the north and south churches, the town square, the main street, the hall, the GAA grounds, the tennis grounds and the primary school. The external expression is of local stone with a substantial insulating layer and a fair-face concrete inner layer. The roofs are bronze which catch water used for the day to day requirements of the building.

Page 38: 4th Year 2010-2011

36 Dublin School of Architecture 4th Year, 2011 -2012

Page 39: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 374th Year, 2011 -2012

James BrownSustainability Research Centre, Abbeylix

ABBEYLEIX. The idea of this project is the typology of a typical Irish town. Through a series of strategic planning decisions, a pattern of development is established WKDW� ZLOO� EULQJ� LW� EDFN� WR� LWV� SRVLWLRQ� DV� D� ORFDOO\� VHOI�VXIÀFLHQW� FRPPXQLW\�� 7KH�aim is to integrate the estates at the periphery into the town, encouraging the “untapped” populations to use the town on a more regular basis. This involves the establishment of a network of pedestrian pathways through parklands, offering an alternative to the car biased entry roads, and the thickening of the complexity DQG�TXDOLW\�RI�WKH�PDLQ�VWUHHW�ZLWKRXW�FRPSURPLVLQJ�LWV�GHÀQLWLRQ��&DU�SDUNLQJ�ZLOO�be provided between the blocks, and the new buildings will face the green areas.

Future residential development to be in the form of terraced housing behind the existing core buildings. The parklands are designed with the aim of indicating the SDWWHUQ�RI�IXWXUH�GHYHORSPHQW��7KH�SDWKZD\V�IROORZ�H[LVWLQJ�ÀHOG�ERXQGDULHV��+HUH�the existing hedgerows are maintained and the park will be planted with high and low native trees and shrubs. At the nodal point of the routes is a square, which leads to the heart of the town, the market square. The square is enclosed by two bed live-work units to the south, and a sustainability research centre to the north, with a passage through the building to the parklands beyond.

Page 40: 4th Year 2010-2011

38 Dublin School of Architecture 4th Year, 2011 -2012

KILCOCK LANEWAYS. “Work is something you do, not something you travel to”. This project seeks to improve the lives of the inhabitants of Kilcock by breaking down barriers and improving permeability to the town. By identifying the physical barriers including tall estate walls, blank gable walls and dead ends, nodes were established that could be used to link disjointed areas and provide much needed community facilities. These hubs of community activity are linked by a series of new mews lanes that allow the existing inhabitants to increase their living/working space

and use their back gardens more effectively. The mews developments densify the area and increase diversity by encouraging residents to live and work at home. :RUNLQJ� IURP� KRPH� DOORZV� JUHDWHU� ÁH[LELOLW\�� UHGXFHV� WUDIÀF� DQG� DOVR� PDNHV� LW�easier for disabled people to work. The community facilities can support these businesses and provide larger facilities such as conference rooms, function rooms and research facilities.

Page 41: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 394th Year, 2011 -2012

Anna PierceWorking Mews Laneways, Kilcock

Page 42: 4th Year 2010-2011

40 Dublin School of Architecture 4th Year, 2011 -2012

ABBEYLEIX BIOETHANOL PLANT. Unused farmland has become a problem in Ireland. EU incentives mean that farmers are encouraged to not farm their land. The result is large areas of land that are declining in agricultural use. If bureaucracy is ignored, local farmland could be used to provide for and sustain a town. The town’s landscape and countryside would become a positive structuring and generative tool, food miles would disappear, and the town could become totally VHOI�VXIÀFLHQW��7KLV�FDQ�EH�DSSOLHG�WR�$EEH\OHL[��WKH�H[LVWLQJ�DJULFXOWXUDO�EXLOGLQJV�can be readopted and an agricultural focus reinstated. Buildings with an agricultural and/or residential function are proposed to act as catalysts, offering society an opportunity to reconnect with the land. Organised in a radial pattern, the farmland ZLOO�FRPSULVH�JUDLQ� �ÁRXU��ELRIXHO��HWF��� OLYHVWRFN�DQG� IUXLW�YHJ��7KH�DLP� LV� WKDW�DOO�IRRG�DQG�IXHO�IRU�WKH�WRZQ�ZLOO�EH�SURYLGHG�E\�WKH�VXUURXQGLQJ�ODQG��(PSW\�ÀHOGV�located between the main street and the peripheral housing estates will become working farms, creating new plot lines and pedestrian routes in the landscape and reinforcing movement towards the town centre. A bio-ethanol plant is introduced to RQH�RI�WKHVH�YDFDQW�ÀHOGV��'HÀQHG�E\�D�PRQROLWKLF�PLOO�WRZHU��WKH�IDFWRU\�UHSUHVHQWV�D�PRYH�WRZDUGV�VHOI�VXIÀFLHQF\�

Page 43: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 414th Year, 2011 -2012

Paul MaherBioethanol Plant, Abbeyleix

Page 44: 4th Year 2010-2011

42 Dublin School of Architecture 4th Year, 2011 -2012

AA

AA

The Royal Irish Academy of Music required a new building to house a complex accommodation on a com-pact site. This proposal celebrates the traditional form of a terraced performance space and expresses this form while creating an activated central courtyard. A large piece of glass separates an inner communal area for students of music to meet, socialize and exchange ideas from an outer courtyard space. This paved landscape offers both students and visitors to the school to listen to music in an alternative exterior space on warm summer evenings. This external plaza explores brick construction by integrating lighting, furniture, planting and fenestration into a folded brick landscape. The meeting point of this brick sculpture and school is imagined as a fracture which allows natural daylight to the music theory and practice spaces below. The different faculties that make up the school are housed around this central courtyard space. In this way, all classrooms, rehearsal spaces and library receive natu-ral light from more than one orientation, resulting in animated and inspirational learning environments for students playing a variety of instruments. A series of hollows puncture the brick building creating external garden spaces; these places are imagined as small social spaces and are intended to create unpredictable meeting spaces be-tween students from different faculties. This thinking aided in the organization of the building with stairways and small niche spaces in circulation areas providing informal social spaces for a constant exchange of ideas between students and staff.

view of common area with external plaza space in background

site plan 1:1000

Royal Irish Academy of MusicSimon Harrington

Royal Irish Academy of Music

Page 45: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 434th Year, 2011 -2012

Anna PierceRoyal Irish Academy of Music

ROYAL IRISH ACADEMY OF MUSIC. “Architecture as a Musical Instrument”. This project seeks to explore architecture through the medium of music and sound. The building becomes a musical instrument, an instrument of parts. Each sound is stacked YHUWLFDOO\�DQG�WKH�LQWHUQDO�ZDOOV�DEVRUE�DQG�UHÁHFW�WKH�VRXQG�RXW�WKURXJK�D�VHULHV�RI�‘vents’. The vertical voids inbetween these stacked ‘instruments’ act as a buffer, yet they also combine individual sounds. These void spaces refract the music so that it echoes and chimes through the building and it becomes alive with music.

Page 46: 4th Year 2010-2011

44 Dublin School of Architecture 4th Year, 2011 -2012

Page 47: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 454th Year, 2011 -2012

Donnchadha GallagherRoyal Irish Academy of Music

Page 48: 4th Year 2010-2011

46 Dublin School of Architecture 4th Year, 2011 -2012

dŚĞ�ZŽLJĂů�/ƌŝƐŚ��ĐĂĚĞŵLJ�ŽĨ�DƵƐŝĐ�ŝƐ�ĂŶ�ŽƌŐĂŶŝƐĂƟŽŶ�ƚŚĂƚ�ƉƌŽŵŽƚĞƐ�ĞdžĐĞůůĞŶĐĞ�ŝŶ�ƚŚĞ�ƉĞƌĨŽƌŵŝŶŐ�ĂƌƚƐ�ŝŶ�/ƌĞůĂŶĚ�ƚŚƌŽƵŐŚ�ĞĚƵĐĂƟŽŶ�ĂŶĚ�ŝŶŶŽǀĂƟŽŶ͘�dŚĞŝƌ�ďƌŝĞĨ�ĨŽƌ�Ă�ŶĞǁ�ƐĐŚŽŽů�ŽĨ�ŵƵƐŝĐ�ŚĂƐ�ƚǁŽ�ŵĂŝŶ�ŐŽĂůƐ͖�ĮƌƐƚůLJ͕ �ƚƵŝƟŽŶ�ĂŶĚ�ƉƌĂĐƟĐĞ�ƐƉĂĐĞƐ�ĨŽƌ�Z/�D�ƐƚƵĚĞŶƚƐ�ĂŶĚ͕�ƐĞĐŽŶĚůLJ͕ �ƚŽ�ĞŶŐĂŐĞ�ƚŚĞ�ƉƵďůŝĐ�ǁŝƚŚ�ƚŚĞ�ƐĐŚŽŽů͘�dŚĞƐĞ�ƚǁŽ�ĂŝŵƐ�ĚĞĮŶĞ�ƚŚĞ�ŶĂƚƵƌĞ�ŽĨ�ƚŚĞ�ƐĐŚŽŽů͖�ƉƌŝǀĂƚĞ�ƐĐŚŽŽů�ƐƉĂĐĞƐ�ĂŶĚ�ƉƵďůŝĐ�ƉĞƌĨŽƌŵĂŶĐĞ�ĂƌĞĂƐ͘

�ƵďůŝŶ Ɛ͛� dŚŽŵĂƐ� ^ƚƌĞĞƚ͕� ŝŶ� ƚŚĞ� ŚĞĂƌƚ� ŽĨ� ƚŚĞ� >ŝďĞƌƟĞƐ͕� ŝƐ� ĐŚĂƌĂĐ-ƚĞƌŝƐĞĚ�ďLJ�Ă� ƐŵĂůůͲƐĐĂůĞ�ƵƌďĂŶ�ŐƌĂŝŶ�ĂŶĚ�Ă�ŵĞĚŝĞǀĂů� ƐƚƌĞĞƚ� ůĂLJŽƵƚ͘�dŚŽŵĂƐ�^ƚƌĞĞƚ� ŝƐ� ůŝŶĞĚ�ďLJ�Ă� ĨĂĐĂĚĞ�ŽĨ� ƐŵĂůů� ƐŚŽƉ� ĨƌŽŶƚƐ�ǁŝƚŚ� ƌĞƐŝ-ĚĞŶƟĂů� ŽǀĞƌŚĞĂĚ͘� dŚĞƐĞ� ĨĂĐĂĚĞƐ� ĞŶŐĂŐĞ� ǁŝƚŚ� ƚŚĞ� ƐƚƌĞĞƚ͕� ǁŚŝůĞ�ƚŚĞ� ƌĞƐŝĚĞŶƟĂů� ĂƌĞĂ� ŽǀĞƌŚĞĂĚ� ŝƐ� Ă� ƉƌŝǀĂƚĞ� ǁŽƌůĚ͘� /Ŷ� ƚŚŝƐ� ǁĂLJ͕ �ƚŚĞ� ŽƌŝŐŝŶĂů� ƚLJƉŽůŽŐLJ� ŽĨ� dŚŽŵĂƐ� ^ƚƌĞĞƚ͕� ƚŚĂƚ� ŽĨ� ůŝǀŝŶŐ� ŽǀĞƌ� ƚŚĞ�ƐŚŽƉ͕� ƐĂƟƐĮĞƐ� ƚŚĞ� ƚǁŽ� ĂŝŵƐ� ŽĨ� ƚŚĞ� Z/�D� ĨŽƌ� ƚŚĞŝƌ� ŶĞǁ� ƐĐŚŽŽů͘

dŚĞ�ŶĞǁ�ƐĐŚŽŽů�ŽŶ�dŚŽŵĂƐ�^ƚƌĞĞƚ� ŝƐ�ĂŶ�ĂĚĂƉƚĂƟŽŶ�ŽĨ�ƚŚĞ�ĞdžŝƐƟŶŐ�'ĞŽƌŐŝĂŶ� ďƵŝůĚŝŶŐƐ� ŽŶ� ƚŚĞ� ƐƚƌĞĞƚ͘� /Ŷ� ƐĞĐƟŽŶ� ƚŚĞ� ƐĐŚŽŽů� ŚĂƐ� ƚŚƌĞĞ�ůĞǀĞůƐ� ŽĨ� ŽĐĐƵƉĂŶĐLJ͖� ŐƌŽƵƉ� ŵƵƐŝĐ� ďĞůŽǁ� ŐƌŽƵŶĚ͕� ƚƵŝƟŽŶ� ƐƉĂĐĞƐ�ĂďŽǀĞ� ŐƌŽƵŶĚ� ĂŶĚ� ŝŶĚŝǀŝĚƵĂů� ƉƌĂĐƟĐĞ� ƐƉĂĐĞƐ� ŝŶ� ƚŚĞ� ƌŽŽĨƐĐĂƉĞ͘

dŚĞ� ůĂƌŐĞƌ�ĞŶƐĞŵďůĞ�ƐƉĂĐĞƐ�ĂƌĞ�ďĞůŽǁ�ŐƌŽƵŶĚ� ŝŶ�Ă�ĐŽŶĐƌĞƚĞ�ƉŝĞĐĞ�ƚŚĂƚ� ƐůŝĚĞƐ� ƵŶĚĞƌ� dŚŽŵĂƐ� ^ƚƌĞĞƚ� ĂŶĚ� ďĞůŽǁ� ƚŚĞ� ĐĞŶƚƌĂů� ĐŽƵƌƚ-LJĂƌĚ͘� �ďŽǀĞ� ŐƌŽƵŶĚ͕� ůŝŐŚƚ� ǁĞůůƐ� ƚĂŬĞ� ƚŚĞ� ƉůĂĐĞ� ŽĨ� ƚŚĞ� ŽƌŝŐŝŶĂů�ƐŚŽƉ� ǁŝŶĚŽǁƐ͕� ĂůůŽǁŝŶŐ� ƉĂƐƐĞƌƐͲďLJ� Ă� ŐůŝŵƉƐĞ� ŽĨ� ƚŚĞ� ǁŽƌůĚ� ďĞ-ůŽǁ͘� dŚĞƌĞ� ĂƌĞ� ƚŚƌĞĞ� ůĞǀĞůƐ� ĂďŽǀĞ� ŐƌŽƵŶĚ� ǁŚŝĐŚ� ŚŽƵƐĞ� ƚŚĞ� ƚƵŝ-ƟŽŶ� ƐƉĂĐĞƐ͘� dŚĞƐĞ� ŚŽƵƐĞƐ� ĂďŽǀĞ� ŐƌŽƵŶĚ� ĂƌĞ� ĚŝǀŝĚĞĚ� ŝŶƚŽ� ĮǀĞ�ƵŶŝƚƐ͕� ĞĂĐŚ� ŚŽƵƐŝŶŐ� Ă� ĚŝīĞƌĞŶƚ� ƚLJƉĞ� ŽĨ� ŵƵƐŝĐ͘� �ĂĐŚ� ƵŶŝƚ� ŝƐ� ĐŽŵ-ƉŽƐĞĚ� ŽĨ� ƚŚƌĞĞ� ŚŽƵƐĞƐ͕� ŽĨ� Ă� ƐŝŵŝůĂƌ� ƉƌŽƉŽƌƟŽŶ� ƚŽ� ƚŚĞ� ĞdžŝƐƟŶŐ�'ĞŽƌŐŝĂŶ� ďƵŝůĚŝŶŐƐ� ŽŶ� ƚŚĞ� ƐƚƌĞĞƚ͕� ǁŝƚŚ� Ă� ĐĞŶƚƌĂů� ĂĐĐĞƐƐ� ĐŽƌĞ͘

dŚĞ�ŽǀĞƌĂůů�ĐŽŵƉŽƐŝƟŽŶ�ŽĨ�ƚŚĞ�ďƵŝůĚŝŶŐ�ŝƐ�Ă�hͲƐŚĂƉĞĚ�ĐŽƵƌƚLJĂƌĚ͕�ŽƌŝĞŶ-ƚĂƚĞĚ�ƚŽ�ƌĞĐĞŝǀĞ�ĂŌĞƌŶŽŽŶ�ĂŶĚ�ĞǀĞŶŝŶŐ�ƐƵŶ͘�dŚĞ�ĐŽƵƌƚLJĂƌĚ�ŽƉĞŶƐ�ŽŶƚŽ�ƚŚĞ�ĞdžŝƐƟŶŐ�ŐƌĞĞŶ�ĂƌĞĂ�ďĞŚŝŶĚ�̂ ƚ͘��ĂƚŚĞƌŝŶĞ Ɛ͛��ŚƵƌĐŚ͕�ǁŚĞƌĞ�ƚŚĞƌĞ�ŝƐ�Ă�ƐƉĂĐĞ�ĨŽƌ�ŽƵƚĚŽŽƌ�ƉĞƌĨŽƌŵĂŶĐĞƐ͘�dŚĞ�ĐŽŵƉůĞdž�ĂƐ�Ă�ǁŚŽůĞ�ŝƐ�ĐŽŵƉŽƐĞĚ�ŽĨ�ŚŽƵƐĞƐ͕�ƐĐŚŽŽů�ŚŽƵƐĞƐ�ĂŶĚ�ĂŶ�ŽƉĞƌĂ�ŚŽƵƐĞ͕�ƚŽŐĞƚŚĞƌ�ƚŚĞLJ�ĨŽƌŵ�Ă�ĐŽŵŵƵŶŝƚLJ�ŽĨ�ďƵŝůĚŝŶŐƐ�ŐŝǀŝŶŐ�ƚŚĞ�Z/�D�Ă�ŚŽŵĞ�ŝŶ�ƚŚĞ�ĐŝƚLJ�ĐĞŶƚƌĞ͘

1

2

5

6

7

89

3

4

school

performance

public

Site Planscale 1:1000

^ĞĐƟŽŶ��Ͳ�ƐĐĂůĞ�ϭ͗ϮϬϬ

A A

ϭ�KƉĞƌĂ�,ŽƵƐĞ� � Ϯ��ĂĨĞ͕�&ŽLJĞƌ�Θ�dŝĐŬĞƚ�KĸĐĞ� ϯ�KƵƚĚŽŽƌ�WĞƌĨŽƌŵĂŶĐĞ�^ƉĂĐĞ�ϰ�^LJŵƉŚŽŶLJ�,Ăůů� � ϱ�^ĐŚŽŽů�ŽĨ�tŝŶĚ�ĂŶĚ��ƌĂƐƐ� ϲ�^ĐŚŽŽů�ŽĨ�WĞƌĐƵƐƐŝŽŶ�ϳ�^ĐŚŽŽů�ŽĨ�^ƚƌŝŶŐ�� ϴ�^ĐŚŽŽů�ŽĨ�^ŝŶŐŝŶŐ� � ϵ�DƵƐŝĐŝĂŶƐŚŝƉ�,ŽƵƐĞ

Ground Floor Planscale 1:400

Page 49: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 474th Year, 2011 -2012

Olivia HillaryRoyal Irish Academy of Music

ROYAL IRISH ACADEMY OF MUSIC. The brief for the new school of PXVLF�KDV�WZR�PDLQ�JRDOV��¿UVW��WXLWLRQ�DQG�SUDFWLFH�VSDFHV�IRU�5,$0�VWXGHQWV�DQG�VHFRQGO\��WR�HQJDJH�WKH�SXEOLF�ZLWK�WKH�VFKRRO��7KHVH�WZR�DLPV�GH¿QH�WKH�QDWXUH�RI�the school—private school spaces and public performance areas. Dublin’s Thomas Street is in the heart of one of Dublin’s oldest quarters, the Liberties. This area is characterised by a small-scale urban grain and a medieval street layout. Thomas Street is lined by a facade of small shop fronts with residential overhead. These facades engage with the street, while the residential area overhead is a private

ZRUOG�� ,Q� WKLV�ZD\�� WKH�RULJLQDO� W\SRORJ\�RI�7KRPDV�6WUHHW�� WKDW�RI� OLYLQJ�RYHU� WKH�VKRS��VDWLV¿HV�WKH�WZR�DLPV�RI�WKH�5,$0�IRU�WKHLU�QHZ�VFKRRO��7KH�QHZ�VFKRRO�RQ�7KRPDV�6WUHHW�LV�DQ�DGDSWDWLRQ�RI�WKH�H[LVWLQJ�*HRUJLDQ�EXLOGLQJV�RQ�WKH�VWUHHW��,Q�section the school has three levels of occupancy: group music below ground, tuition spaces above ground and individual practice spaces in the roofscape. The larger ensemble spaces are below ground in a concrete piece that slides under Thomas Street and below the central courtyard. Above ground, light wells take the place of the original shop windows, allowing passers-by a glimpse of the world below.

Page 50: 4th Year 2010-2011

48 Dublin School of Architecture 4th Year, 2011 -2012

Page 51: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 494th Year, 2011 -2012

DLJ�ĐŚŽƐĞŶ�ƌĞƐĞĂƌĐŚ�ƚŽƉŝĐ�ŝƐ�ƚŚĞ�ŝŶĚŝǀŝĚƵĂů�ƉƌĂĐƟĐĞ�ƌŽŽŵ�ŽĨ�ƚŚĞ�ƐĐŚŽŽů�ŽĨ�ŵƵƐŝĐ͘�/�ŚĂǀĞ�ĐŚŽƐĞŶ�ƚŽ�ŝŶǀĞƐƟŐĂƚĞ�ƚŚŝƐ�ĂƌĞĂ�ŽĨ�ƚŚĞ�ďƵŝůĚŝŶŐ�ĂƐ�ŝƚ�ĂůůŽǁƐ�ŵĞ�ƚŽ�ĞdžĂŵŝŶĞ�ĂƐƉĞĐƚƐ�ŽĨ�ůŝŐŚƟŶŐ͕�ĂĐŽƵƐƟĐƐ͕�ŵĂƚĞƌŝĂůŝƚLJ�ĂŶĚ�ƐƚƌƵĐƚƵƌĞ�ŝŶ�Ă�ǀĞƌLJ�ƐƉĞĐŝĮĐ�ƐƉĂĐĞ͘�dŚĞ�ŽƵƚĐŽŵĞ�ŽĨ�ƚŚŝƐ�ƌĞƐĞĂƌĐŚ�ǁŝůů�ŝŶĨŽƌŵ�ƚŚĞ�ƌĞƐƚ�ŽĨ�ƚŚĞ�ďƵŝůĚŝŶŐ�ĂƐ�ƚŚĞ�ƉƌŝŶĐŝƉůĞƐ�ůĞĂƌŶƚ�ĂŶĚ�ƚĞƐƚĞĚ�ŝŶ�ƚŚĞ�ƉƌĂĐƟĐĞ�ƐƉĂĐĞƐ�ĐĂŶ�ďĞ�ĂƉƉůŝĞĚ�ƚŽ�ŽƚŚĞƌ�ƐƉĂĐĞƐ�ǁŝƚŚŝŶ�ƚŚĞ�ďƵŝůĚŝŶŐ͘��ůƐŽ͕�ĚƵĞ�ƚŽ�ƚŚĞŝƌ�ůŽĐĂƟŽŶ�ŽŶ�ƚŚĞ�ƌŽŽĨ͕ �ƚŚŝƐ�ƌĞƐĞĂƌĐŚ�ǁŝůů�ĂůƐŽ�ŝŶĨŽƌŵ�ŚŽǁ�ƚŚĞ�ƌŽŽĨƐĐĂƉĞ�ǁŽƌŬƐ�ĂŶĚ�ŝƚƐ�ƉŽƚĞŶƟĂů�ŝŶ�ŽƚŚĞƌ�ĂƌĞĂƐ�ůŝŬĞ�ƉƌŽǀŝĚŝŶŐ�ĂůƚĞƌŶĂ-ƟǀĞ�ĞŶĞƌŐLJ�Žƌ�ƌĂŝŶͲǁĂƚĞƌ�ŚĂƌǀĞƐƟŶŐ͘

dŚĞ�ŝŶĚŝǀŝĚƵĂů�ƉƌĂĐƟĐĞ�ƌŽŽŵƐ�ĂƌĞ�ŝŶƚƌŽƐƉĞĐƟǀĞ�ƐƉĂĐĞƐ�ŽĨ�ŝŶƚĞŶƐĞ�ĐŽŶĐĞŶƚƌĂƟŽŶ͕�ƚŚĞLJ�ĂƌĞ�ƉůĂĐĞƐ�ŽĨ�ƌĞŇĞĐƚĂŶĐĞ�ĂŶĚ�ŵĞĚŝƚĂƟŽŶ�ŽŶ�ŽŶĞ Ɛ͛�ŝŶĚŝǀŝĚƵĂů�ĐƌĂŌ͘�dŚĞLJ�ĂƌĞ�ƉůĂĐĞƐ�ŽĨ�ĂŵďŝƟŽŶ�ǁŚĞƌĞ�ŵƵƐŝĐŝĂŶƐ�ƐƚƌŝǀĞ�ƚŽ�ŝŵƉƌŽǀĞ�ƚŚĞŝƌ�ƐŬŝůůƐ͘��ƵĞ�ƚŽ�ƚŚĞ�ŶĂƚƵƌĞ�ŽĨ�ƚŚĞƐĞ�ƐƉĂĐĞƐ�ƚŚĞLJ�ĂƌĞ�ůŽĐĂƚĞĚ�ŽŶ�ƚŚĞ�ƚŽƉ�ŇŽŽƌ�ŽĨ�ƚŚĞ�ŵƵƐŝĐ�ƐĐŚŽŽů͕�ƚŚĞ�ŵŽƐƚ�ƌĞŵŽǀĞĚ�ĂƌĞĂ�ĨƌŽŵ�ƚŚĞ�ŚƵƐƚůĞ�ĂŶĚ�ďƵƐƚůĞ�ŽĨ�ƚŚĞ�ƐĐŚŽŽů�ĂŶĚ�ƚŚĞ�ƉĞƌĨŽƌŵĂŶĐĞ�ƐƉĂĐĞƐ͘�dŚĞ�ƚƵŝƟŽŶ�ƌŽŽŵƐ�ĂƌĞ�ϰ͘ϯ�ŵĞƚƌĞƐ�ŝŶ�ŚĞŝŐŚƚ͕�ƚŚĞ�ŝŶĐƌĞĂƐĞĚ�ŚĞŝŐŚƚ�ĐƌĞĂƚĞƐ�ǀŽůƵŵĞ�ŝŶ�ƚŚĞ�ƐƉĂĐĞ�ĨŽƌ�Ă�ďĞƩĞƌ�ƌĞǀĞƌďĞƌĂƟŽŶ�ƟŵĞ͘�dŚĞ�ƚƵŝƟŽŶ�ƌŽŽŵƐ�ŚĂǀĞ�ŶŽ�ǀŝĞǁ�ǁŝŶĚŽǁƐ�ĂŶĚ�ŝŶƐƚĞĂĚ�ĚĂLJůŝŐŚƚ�ĞŶƚĞƌƐ�ƚŚĞ�ƐƉĂĐĞƐ�ƚŚƌŽƵŐŚ�ĂŶ�ŽƉĞŶŝŶŐ�ŝŶ�ƚŚĞ�ƉŝƚĐŚĞĚ�ƌŽŽĨ͘ �dŚĞ�ƐůĂŶƚĞĚ�ƐƵƌĨĂĐĞ�ĚŝƐƉĞƌƐĞƐ�ƚŚĞ�ƐƵŶ-ůŝŐŚƚ�ƚŽ�ĐƌĞĂƚĞ�ĂŶ�ĞǀĞŶůLJ�ůŝƚ�ƐƉĂĐĞ͘

�/�ŵĂĚĞ�Ă�ϭ͗ϮϬ�ŵŽĚĞů�ŽĨ�ƚǁŽ�ŽĨ�ƚŚĞ�ƉƌĂĐƟĐĞ�ƌŽŽŵƐ�ƚŽ�ƚĞƐƚ�ƚŚĞ�ĚĂLJůŝŐŚƚ-ŝŶŐ�ĂŶĚ�ĂŶŐůĞƐ�ŽĨ�ƚŚĞ�ƌŽŽĨ͘ �/�ƚŚĞŶ�ƵƐĞĚ�ƚŚŝƐ�ŵŽĚĞů�ƚŽ�ƚĞƐƚ�ƚŚĞ�ĚĂLJůŝŐŚƟŶŐ�ŝŶ�ƚŚĞ�ƐƉĂĐĞ�Ăƚ�ĚŝīĞƌĞŶƚ�ƟŵĞƐ�ĚƵƌŝŶŐ�ƚŚĞ�LJĞĂƌ�ĂŶĚ�Ăƚ�ĚŝīĞƌĞŶƚ�ƟŵĞƐ�ŽĨ�ƚŚĞ�ĚĂLJ͘�dŚŝƐ�ŵŽĚĞů�ŝŶĨŽƌŵĞĚ�ƚŚĞ�ƐŚĂƉĞ�ŽĨ�ƚŚĞ�ƌŽŽĨƐĐĂƉĞ�ĨŽƌ�ŽƉƟŵƵŵ�ĚŝīƵƐĞĚ�ĚĂLJůŝŐŚƟŶŐ�ŝŶ�ƚŚĞ�ƐƉĂĐĞ͘��ůƐŽ͕�/�ƵƐĞĚ�ƚŚŝƐ�ŵŽĚĞů�ƚŽ�ďĞŐŝŶ�ĂŶ�ŝŶǀĞƐƟŐĂƟŽŶ�ŝŶƚŽ�ŵĂƚĞƌŝĂůƐ�ĂŶĚ�ĮŶŝƐŚĞƐ�ǁŝƚŚŝŶ�ƚŚĞ�ƐƉĂĐĞ͘

ϭ͗ϭϬϬ�ŵŽĚĞů�ŝŶǀĞƐƟŐĂƟŶŐ�ƚŚĞ�ƌŽůĞ�ŽĨ�ƚŚĞ�ƌŽŽĨƐĐĂƉĞ�ŝŶ�ƚŚĞ�ƐĞƌǀŝĐŝŶŐ�ŽĨ�ƚŚĞ�ďƵŝůĚŝŶŐ͘�^ƚĂĐŬ�ǀĞŶƟůĂƟŽŶ�ŝƐ�ƵƐĞĚ�ƚŽ�ǀĞŶƟůĂƚĞ�ƚŚĞ�ďƵŝůĚŝŶŐ͕�ƚŚĞ�Ăŝƌ�ŽƵƚůĞƚ�ŝƐ�ƚŚƌŽƵŐŚ�ĂŶ�ŽƉĞ�ŝŶ�ƚŚĞ�ƌŽŽĨƐĐĂƉĞ͘�dŚĞ�ƌŽŽĨ�ŝƐ�ƵƐĞĚ�ƚŽ�ďƌŝŶŐ�ŶĂƚƵƌĂů�ĚĂLJůŝŐŚƚ�ĚĞĞƉ�ŝŶƚŽ�ƚŚĞ�ƉůĂŶ�ŽĨ�ƚŚĞ�ďƵŝůĚŝŶŐ͘�dŚĞ�ƉŝƚĐŚĞĚ�ƌŽŽĨ�ĐŽŶƚĂŝŶƐ�ƉŚŽƚŽ�ǀŽůƚĂŝĐ�ĐĞůůƐ�ĨŽƌ�ŐĞŶĞƌĂƟŶŐ�ĞŶĞƌŐLJ͘

/�ƵƐĞĚ�Ă�ϭ͗ϭϬ�ƐĐĂůĞ�ŵŽĚĞů�ŽĨ�Ă�ƐŝŶŐůĞ�ƉƌĂĐƟĐĞ�ƐƉĂĐĞ�ƚŽ�ŝŶǀĞƐƟŐĂƚĞ�ƐƚƌƵĐ-ƚƵƌĞ͕�ŵĂƚĞƌŝĂůƐ�ĂŶĚ�ĮŶŝƐŚĞƐ�ǁŝƚŚŝŶ�ƚŚĞ�ƐƉĂĐĞ͘�dŚŝƐ�ŵŽĚĞů�ĂůůŽǁĞĚ�ŵĞ�ƚŽ�ŝŶǀĞƐƟŐĂƚĞ�Ă�ŶƵŵďĞƌ�ŽĨ�ĂƌĞĂƐ͕�ƐƵĐŚ�ĂƐ͕�ƚŚĞ��ƐĞƋƵĞŶĐĞ�ŽĨ�ĐŽŶƐƚƌƵĐƟŽŶ͕�ƚŚĞ�ŝŶƚĞŐƌĂƟŽŶ�ŽĨ�ƐĞƌǀŝĐĞƐ͕�ĂĐŽƵƐƟĐƐ�ĂŶĚ�ŵĂƚĞƌŝĂůƐ͘

Research Topic

�ĂLJůŝŐŚƟŶŐ�^ƚƵĚŝĞƐ

Building Servicing Studies

�ŽŶƐƚƌƵĐƟŽŶĂů�^ƚƵĚŝĞƐ

1

2

3

4

06.05.1104:30

Aerial view ^ĞĐƟŽŶĂů�ǀŝĞǁ Roofscape

^ĞĐƟŽŶscale 1:200

Plan level 4scale 1:400

South-facing facade

06.05.1108:00

06.05.1112:00

06.05.1102:00

06.05.1116:00

06.05.1117:00

RIAM Music School Project 2b Olivia Hillery DT101/4 18.05.11

&ůŽŽƌ�ϱϯŵŵ�ĐŽƵŶƚĞƌ�ďĂƩĞŶƐ /ŶƚĞƌŶĂů�ƉĂƌƟƟŽŶ�ǁĂůů ϲϬͬϭϬϬ�ŵŵ�ƟŵďĞƌ�ƐƚƵĚ�ĨƌĂŵĞϭϮ͘ϱŵŵ�ĂĐŽƵƐƟĐ�ƉůĂƐƚĞƌďŽĂƌĚ

>ĂŵŝŶĂƚĞĚ�ƟŵďĞƌ�ďĞĂŵƐ�ƐƵƉƉŽƌƚƐ�ĨŽƌ�ƌŽŽĨ�ƐƚƌƵĐƚƵƌĞ Roof structure

Olivia HilaryRoyal Irish Academy of Music

Page 52: 4th Year 2010-2011

50 Dublin School of Architecture 4th Year, 2011 -2012

site map

circulation diagramperformance space organisation

1

1

3

3

2

2

����0DLQ�2SHUD�SHUIRUPDQFH�VSDFH��������SSO�����6\PSKRQ\�SHUIRUPDQFH�VSDFH��������SSO�����5HFLWDO�6SDFH�������SSO�

1 Public entrance/ lobby2 Atrium/circulation space3 School entrance

thomas street view atrium space

atrium space

long sectioncross section

ground À oor plan third À oor plan

Page 53: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 514th Year, 2011 -2012

site map

circulation diagramperformance space organisation

1

1

3

3

2

2

����0DLQ�2SHUD�SHUIRUPDQFH�VSDFH��������SSO�����6\PSKRQ\�SHUIRUPDQFH�VSDFH��������SSO�����5HFLWDO�6SDFH�������SSO�

1 Public entrance/ lobby2 Atrium/circulation space3 School entrance

thomas street view atrium space

atrium space

long sectioncross section

ground À oor plan third À oor plan

site map

circulation diagramperformance space organisation

1

1

3

3

2

2

����0DLQ�2SHUD�SHUIRUPDQFH�VSDFH��������SSO�����6\PSKRQ\�SHUIRUPDQFH�VSDFH��������SSO�����5HFLWDO�6SDFH�������SSO�

1 Public entrance/ lobby2 Atrium/circulation space3 School entrance

thomas street view atrium space

atrium space

long sectioncross section

ground À oor plan third À oor plan

Paul MaherRoyal Irish Academy of Music

Page 54: 4th Year 2010-2011

52 Dublin School of Architecture 4th Year, 2011 -2012

Theatre Section

1. Front of House

2. Concert Hall

3. Roof Terrace

4. Opera Hall

5. Fly Tower

6. Stage

7. Understage Mechanical

8. Orchestra Pit

9. Recital Room

10. Plant Room

1. 6.

7.

5.

10. 9. 8.

2.

3.

4.

Royal Irish Academy of Music

62121

1818

10m5m2m1m

Bleacher seating in Recital Hall, to allow for re-arrangement of space to facilitate any use. Possible use for Black Box Theatre, workshops.

Plant Room located near theatres to facilitate heat management, air quality and ventilation changes with ease, while minimising duct work.

3OUNDÒRE¹ECTORSÒONÒPULLEYSÒFORÒadjustable tonal qualities and RE¹ECTIONÒTIMES�Ò

Roof terrace, allowing access for staff, students and guests throughout the course of the day, giving views back east to the city.

Adjustable mechanical supports for stage and orchestra pit allowing for variations.

Skylight at top of Fly Tower, allowing natural, Northern light for performers during daytime rehearsals, with screens/blinds to minimise varying conditions for performance

,IGHTÒANALYSISÒONÒ¹YÒTOWERTheatre Model 1:50

Ground Floor PlanExploded Axonometric Diagram

1

C

1

2 3

5

4

7

88 99

10

10

11

11

11

11

11

11

12

13

13

13

1415

Sw

an A

lley

Thomas Street

St.

Cat

herin

e’s

Lane

Wes

t

Page 55: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 534th Year, 2011 -2012 ,IGHTÒANALYSISÒONÒ¹YÒTOWERTheatre Model 1:50

Shane MorganRoyal Irish Academy of Music

ROYAL IRISH ACADEMY OF MUSIC. The concept of this project came about after looking at the grain patterns and plot sizes of the existing fabric. The UK\WKP� RI� 7KRPDV� 6WUHHW� LV� YHU\� DSSDUHQW�� HYHQ� RQ� ÀUVW� DUULYDO�� 7KH� DUHD� LV�soaked in rich history. To minimise the impact of a large, dense structure in the environs, the plot sizes were maintained to keep the rhythm of the street. /RQJ� EDUV� RYHU�VDLO� D� FRQVWDQW� IDFDGH� GHÀQLQJ� WKH� VWUXFWXUH� ZLWK� YDULRXV�areas of programme. Large voids have been removed from the bars, creating spaces that allow for student interaction and playing. The voids contain planting and small trees to create visual connections between the structures.

In the main music halls, construction build-up consists of eco-cem reinforced concrete to minimise vibration resonance with partial timber slat cladding. The timber gives a warm tone, while dividing the space, both visually and acoustically. Externally the building is clad in an extruded aluminium mesh. This wraps over the opes, offering privacy without restricting light. The aluminium is from recycled sources, regaining up to 94% of the embodied energy. It contrasts with the warmer, more mellow quality of the interior timbers. An investigation of the FODGGLQJ�FRQGLWLRQ�RI�WKH�EXLOGLQJ��IRFXVLQJ�RQ�WKH�VSHFLÀFV�RI�WKH�UHKHDUVDO�VSDFH�

Page 56: 4th Year 2010-2011

54 Dublin School of Architecture 4th Year, 2011 -2012

Page 57: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 554th Year, 2011 -2012

Shane MorganRoyal Irish Academy of Music

Page 58: 4th Year 2010-2011

56 Dublin School of Architecture 4th Year, 2011 -2012

Bush Hammered Concrete

w/ Crushed Silver Granite

Aggregate, flat finish at joint.

Double Glazed Windows

1050mm by 3000mm

Inclined to eachother, zig-zag.

Box Office

Douglas Fir

Granite

Sandstone

Brass Guardrail

Bush Hammered Concrete

w/ Crushed Silver Granite

Aggregate, flat finish at joint.

Double Glazed Windows

1050mm by 3000mm

Inclined to eachother, zig-zag.

Box Office

Douglas Fir

Granite

Sandstone

Brass Guardrail

ROYAL IRISH ACADEMY OF MUSIC. The idea behind this project is the retention of the four existing buildings on Thomas Street, one of the oldest parts of Dublin City. An Sligh Mhor was an ancient route to the city and forms a major axis in the present day structure in the form of this street. A building of ÀYH� VWRUH\V� ZRXOG� DGG� WR� WKH� SUHVHQFH� RQ� WKH� VWUHHW�� EXW� QRW� RYHUVKDGRZ� 6W��Catherine’s Church. The facade of the new building on Thomas Street is informed by the existing street condition. An indent on the facade keeps the shape of the footpath and is seen as a natural point at which the footpath widens, where the entrance is located. Clients interested in a ‘chance encounter’ would be able to use the building. I also wanted to explore the idea of large circulation spaces in the form of stepped platforms into the ground. By creating a division of musical IDFXOWLHV³SHUFXVVLRQ� LQ� WKH� JURXQG� RU� VWULQJV� RQ� WKH� XSSHU� ÁRRUV³WKLV� ZRXOG�change how the public engaged with the building from the street for passing through or for performances. The route would be through, not around the building.

Page 59: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 574th Year, 2011 -2012

Bush Hammered Concrete

w/ Crushed Silver Granite

Aggregate, flat finish at joint.

Double Glazed Windows

1050mm by 3000mm

Inclined to eachother, zig-zag.

Box Office

Douglas Fir

Granite

Sandstone

Brass Guardrail

Brian JordanRoyal Irish Academy of Music

Page 60: 4th Year 2010-2011

58 Dublin School of Architecture 4th Year, 2011 -2012

60’

Page 61: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 594th Year, 2011 -2012

60’

Brian JordanRoyal Irish Academy of Music

Page 62: 4th Year 2010-2011

60 Dublin School of Architecture 4th Year, 2011 -2012

COURTYARD MUSIC. This project began from an idea about a split circulation between students of the RIAM and the public coming to watch performances. Layout is generated to maximise the required sound levels and light intensities for certain types of rooms. Smaller practice room, not in use during the day, buffer the sound from the peripheral large tutorial rooms and the corridors and atrium. Natural stack ventilation is expressed in the façade through a series of expressed ducts. Each room is looked at as an autonomous bock where some protrude out

and some recess back in to create an undulated skin structure and allow visual connections between rooms. A large exposed stairs draws the attention of the public to the school of music and to the large internal atrium seen from the street. As one descends under the arch in the stairs you enter into the foyer for assembly before concerts. It is a cast concrete structure and timber lining with air cavities DQG�EDIÁLQJ��ZKLFK� OLQHV�WKH�URRPV�GHSHQGLQJ�RQ�WKH� OHYHOV�RI�DFRXVWLF�EXIIHULQJ�required.

Page 63: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 614th Year, 2011 -2012

Grace CounihanRoyal Irish Academy of Music

Page 64: 4th Year 2010-2011

62 Dublin School of Architecture 4th Year, 2011 -2012

Page 65: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 634th Year, 2011 -2012

Jamie ConwayRoyal Irish Academy of Music

ROYAL IRISH ACADEMY OF MUSIC. The building takes its form from the site boundary with the theatre placed centrally, embedded within the structure and encased by the remainder of the program. The theatre mass is contained between WZR� YRLGV�ZLWK� HTXDO� GLPHQVLRQ�� D� SXEOLF� URRI�OLW� DWULXP�DQG� WKH� Á\�WRZHU��3XEOLF�access is through a northern courtyard addressing Thomas Street and the school’s academic presence forms part of the streetscape and access for services and

students is through the southern courtyard. Sound and its proliferation throughout the common spaces establishes an internal metal structure of seven sound networks contained within the supporting beam section and allows highly controlled ventilation and soundscapes to be introduced to the rooms through an internal perforated oak lining. This network also penetrates the roof to become a ventilation stack, sucking air in and forcing stale air out through fenestration.

Page 66: 4th Year 2010-2011

64 Dublin School of Architecture 4th Year, 2011 -2012

Page 67: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 654th Year, 2011 -2012

Jamie ConwayRoyal Irish Academy of Music

Page 68: 4th Year 2010-2011

66 Dublin School of Architecture 4th Year, 2011 -2012

0 2 5 10

G

ROYAL IRISH ACADEMY OF MUSIC. This building comprises the majority of the school program for the RIAM. In it, is housed tuition, rehearsal and accompanying ensemble rooms for string, brass, vocal and keyboard musicians. It is a very simple structure that is based on a modular framework derived from the space required to house instruments of this nature. The facade takes this modular framework and embellishes it further. The vertical structural lines become hidden amongst a “serialist” arrangement of vertical elements. The aim of this was simply to create

an abstract composition that was decentralised and that played with the idea of repetition and the contrast of the horizontal and the vertical. The smaller of the two auxiliary buildings comprises additional program for the school of the RIAM. In it is housed tuition and accompanying rehearsal rooms for wind and percussion. It is the VDPH�VWUXFWXUDO�DQG�PRGXODU�IUDPHZRUN�XVHG�LQ�WKH�ÀUVW�EXLOGLQJ��$GGLWLRQDOO\��WKH�facade works along the same basis.

Page 69: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 674th Year, 2011 -2012

Second Building

This building, the smaller of the two auxiliary build-

ings, comprises additional program for the school of

the RIAM. In it, is housed tuition and accompanying

rehearsal rooms for wind and percussion. It is the

same structural and modular framework used in the

first building. Additionally, the facade works along

the sam basis.

Number 29

This building is a protected structure located next to

the site. At present it stands without use. As part of

the scheme i would propose that it house a librarby

facility for the RIAM.

G 1 2 3

-1

1 Wind Tuion Room

2 Wind Rehearsal Room

3 Unisex Toilets

1

1 Percussion Room

2 Office

3 Unisex Toilets

G

1 Wind Tuion Room

2 Wind Rehearsal Room

3 Unisex Toilets

4 Reception

1 1 1 1 1 1 1

2 2 2 2 2 2 2

3

2 1 1 1 3

-1

1

1

2

11

2 1

1

1

G

1 Lobby

2 Office

1

1 Library

2 Reception

2

1 Library

3

1 Library

0 2 5 10

Robert Chapman DT101 4 0 2 5 10

Robert ChapmanRoyal Irish Academy of Music

Page 70: 4th Year 2010-2011

68 Dublin School of Architecture 4th Year, 2011 -2012

Page 71: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 694th Year, 2011 -2012

James BrownRoyal Irish Academy of Music

THE ROYAL IRISH ACADEMY OF MUSIC. Two scales of typology border a busy street, a school of music, and several performance spaces. The main opera hall is situated against Thomas Street to the north, creating an entrance below an overhang, and affording the school quieter spaces behind. A second entrance, to the west, offers a view up through an atrium, to most of the school. These two typologies are brought together in the atrium space in the heart of the building, where a cafe, bar and student common areas offer an intermediate atmosphere, between the school and the performance spaces. Users can experience the depth of the building and, with this, it’s various musical and educational functions: the making of music. Visitors are drawn to this area below the atrium via a stairs, which then leads on to the opera hall. The chamber music hall is adjacent, and there is a service area which serves both these performance spaces, and the hall for the symphony orchestra. A break between the black concrete envelope of the opera KDOO��DQG�WKH�ÁRRUSODWHV�WR�WKH�VRXWK��DOORZV�OLJKW�WR�WKH�SDVVDJHZD\�EHORZ��$ERYH�this, the structural module of the school building is continued across, where there are more educational facilities. An 18th century research room is in the Victorian building to the west, itself connected back to the RIAM internally.

Page 72: 4th Year 2010-2011

70 Dublin School of Architecture 4th Year, 2011 -2012

Page 73: 4th Year 2010-2011

Dublin School of Architecture 4th Year, 2011 -2012 714th Year, 2011 -2012

Sarah BaranowskiKlara BindlBernard N. BrennanJames R. BrowneCiaran J. ByrneEoin ByrneMargaux CalvetAmy CatsinasNiamh ChambersRobert ChapmanKevin CoffeyJamie ConwayAnna CorbettaDeclan CrowleyJosephine FlahiveEmma ForristalDonnchadha GallagherLuke GleesonSimon HarringtonEdwyn J. HickeyOlivia HilleryNiall HowardRuth HynesBoris IkedaDavid IversBrian JordanJan KaplanLaura KennyClaire KiltyMaria B. LarkinBryan LedgerNicole MaassPaul MaherSophia MartinezCourtney Mc DonnellDaniela MestShane A. MorganGrainne Ni ChuanachainDavid O’BrienMary O’BrienAlen O’FarrellSaran H O’RourkeJames M. O’TooleAnna PierceEgle PruckuteMichele Realis LucJimmy RoelofsAdrian RooneyEmmet SmithElaine Wynne

4TH YEAR

Gavin GreenGary LysaghtMichael McGarryJohn ParkerNiall Rowan

GUEST CRITICS

Page 74: 4th Year 2010-2011

72 Dublin School of Architecture 4th Year, 2011 -2012

2010-2011

Dublin School of Architecture4TH YEAR