1. MW & CMTSDESIGNPress F5 to startPress ESC to stop
2. The Future is HereFAIRY TELCO INC. Prepared by:BANATANTO, Roy D. prev next
3. FAIRY TELCOM INC. OBJECTIVES: Click here:! To Design a
CMTS via MW to the certain cities/municipalities of Rizal.Introduction Design Proper ! To offer the adaptation 4G LTE
technology. ! To Provides low latency and cost efciency ! To bethe Fastest and Most Advanced telecom provider in the Philippines.! To Increased Average Throughput ! To Adopt the next futuretechnology. ! To be the Best! Implementation/Funding prev next
4. INTRODUCTONPRESENTATION AGENDA: Proposed Sitelocation Overview Business Case Proposed Product BrandsProposed Spectrum Proposed Mobile Solution Proposed Contractprice Introduction: 1 of 13 prev next
5. SITE LOCATIONRizal is one of the Philippines rstclass provincesthat belongsto CALABARZON (CA-vite, LA-guna,BA-tangas, R-izal,Que-ZON)Region or region IV-A in the island ofLuzon. The provinceenjoys a naturalbeauty of nature and a perfect settingforinvestments, businessestablishments and settlements. Introduction:1 of 13 prev next
6. Proposed Network Solution:WHY WE CHOSE 4G LTE-As thefuture of the Fairy Telcom Inc. broadband network, 4G Long TermEvolution (LTE) allows us to offerusers more of what they want,which is untethered mobility.LTEs high speeds, low latency, andsecurity enhancements over 4G mean that youll be able to run
virtuallyany Web-based application imaginable on a mobile device.
-
8/12/2019 4G LTE.pdf
2/29
Web based High-Denition video. Real-timevideo conferencing. Video telephony. Voice over Internet Protocol (VoIP). Location-Based-Services (LBS) andmachine-to-machine. The technology
limitations that have kept many applications immobilized arenowhistory. Introduction: 3 of 13 prev next
7. Overview:3GPP Long Term Evolution (LTE), is the latest standardin the mobile network technology tree that producedthe GSM/EDGEand UMTS/HSDPA network technologies. It is a project of the 3rdGeneration PartnershipProject (3GPP), operating under a name
trademarked by one of the associations within the partnership,theEuropean Telecommunications Standards Institute.The currentgeneration of mobile telecommunication networks is collectivelyknown as 3G (for "thirdgeneration"). Although LTE is often marketedas 4G, rst-release LTE does not fully comply with the IMTAdvanced4G requirements. The pre-4G standard is a step toward LTE
Advanced, a 4th generation standard(4G) of radio technologies
designed to increase the capacity and speed of mobile telephonenetworks. LTEAdvanced is backwards compatible with LTE anduses the same frequency bands, while LTE is notbackwardscompatible with 3G systems.Huawei 3900 series LTEeNodeB is the base station in LTE radio networks. Its coverage andcapacity areexpanded through multi antenna technologies, itsmaintainability and testability are improved, and thus itprovides
subscribers with the wireless broadband access services of largecapacity and high quality. Introduction: 3 of 13 prev next
8. Business Case for 4G LTE Solution: Network InfrastructureContent & Aplications Content & Application Component VendorsDevice Providers Providers Developers Distributors Dual ModeChips To Demonstrated potential Innovative Focused efforts to
New, innovative GUI enable seamless 3G/4G through 4G LTE lab
-
8/12/2019 4G LTE.pdf
3/29
applications that take understand & address designs to takecoexistence tests and trials advantage of LTEs end-userrequirements advantage of rich Greater Computational Possibly,
multi- bandwidth and latency among consumers and multimediacontent and power on board standard base stations characteristicsbusinesses applications Improved battery life to facilitate migrationRich multimedia Willingness to take Development of new for media-intensive from and transitional content to drive eyeballs measuredrisks to device categories to applications coexistence of 3G to 4G tothe handset screen monetize 4G LTE leverage LTE beyond the
handset Introduction: 2 of 13 prev next
9. TECHNOLOGY COMPARATIVE Introduction: 4 of 13 prev next
10. TECHNOLOGYCOMPARATIVE Introduction: 4 of 13 prev next
11. Global-RoamingCapabilities4G LTE has been selected by morethan 150mobile operators worldwide as their globaltechnology for4G services. It will support devicesthat are backwards-compatiblewith existing 2Gand 3G networks, to provide the bestcoverageexperience while traveling around the globe. Introduction: 4of 13 prev next
12. PROPOSED PRODUCT BRANDS: Introduction: 9 of 13 prevnext
13. WHY HUAWEI FOR CORE NETWORK AND eNOBEsystem?Category 4: Signicant Progress for aCommercial Launch of LTE bya VendorWinner: Huawei TechnologiesCategory 9: Best LTENetwork ElementsWinner: Huawei Technologies forHuaweiBTS3900L Introduction: 9 of 13 prev next
14. Introduction: 3 of 13 prev next
-
8/12/2019 4G LTE.pdf
4/29
15. WHY ALCATEL_LUCENT FOR RAN NETWORK?Category 5:Best Network / Device TestingProduct for LTEWinner: Alcatel-Lucent for 9900 WirelessNetwork Guardian (WNG) Introduction: 9 of
13 prev next
16. PROPOSED PRODUCT BRAND for Microwave: Introduction: 9of 13 prev next
17. Proposed Spectrum: Introduction: 7 of 13 prev next
18. Proposed Best Spectrum: 1800MhzAdvantages of 4G LTE on
1800MHz:Better in-building coverage because of Lower frequency=> superior in-building coverage, especially in the cityscape Highercell site density in our 4G LTE on 1800MHz implementation. Forthose who implement 4G LTE on 2500/2600MHz, 30% more basestations isneeded to achieve the same level of in-building coverageIntroduction: 5 of 13 prev next
19. Expected LTE Subscribers:Shows the forecast growth in LTEsubscriber between 2010 to 2015 Introduction: 6 of 13 prev next
20. 2G/3G/4G LTE SOLUTION: Introduction: 9 of 13 prev next
21. 2G/3G/4G LTE SOLUTION: Introduction: 9 of 13 prev next
22. Proposed Contract Price: CONTRACT PRICE = $10,000,000.00
OTHERS 15% ADREW 5% ALCATEL -LUCENT HUAWEI 20% 60%HUAWEI ALCATEL -LUCENT ADREW OTHERS Introduction: 13 of13 prev next
23. DESIGN PROPERPresentation Agenda: ! Microwave ! Equipment ! Installation Standards ! BTS ! BTS Equipment ! Engineering Label ! Proposed RF ! Design Description ! MW
Budget Link Analysis ! MW LOS/Path loss ! BTS theoretical
-
8/12/2019 4G LTE.pdf
5/29
Propagation Design Proper: 1 of 27 prev next
24. MICROWAVE EQUIPMENT OptiX RTN 600 is a PDH/SDH
integrated short-haul digital microwave transmission systemdeveloped by Huawei. The maximum microwave transmissioncapacity is STM-1. The system provides the backhaul transmissionlink in the mobile communication system or private network, andalso networks with optical transmission equipments. prev next
25. Contents 1. Equipment Overview 2. Equipment Structure 3.Equipment Protection prev next
26. Contents 1. Equipment Overview 1.1 Equipment Components IDU ODU Antenna Intermediate Frequency (IF) Cable Hybrid coupler 1.2 Equipment Characteristics prev next
27. Equipment Components Antenna Hybrid coupler IF cable ODUPole IDU prev next
28. IDU Indoor unit (IDU) realizes the mutual conversion betweenthe service signal and IF analog signal. Two types of IDU areavailable: IDU 610 is 1U high and supports one IDU 610microwave direction. IDU 620 is 2U high and supports maximumfour microwave directions. IDU 620 prev next
29. IF Cable The IF cable provides -48V power for ODU andtransmits the IF signal and ODU management signal between IDUand ODU. Three types of IF cable in OptiX RTN 600: IF jumper:connection between IDU and other IF cable. 1/2 inch and RG-8U(1/4 inch) cable: connection between ODU and IF jumper. RG-8U(1/4 inch) cable is used for the distance less than 180 meter. 1/2inch cable is used for the distance between 180m and 300m. IFtransit jumper IF cable prev next
-
8/12/2019 4G LTE.pdf
6/29
30. ODU Outdoor unit (ODU) realizes the mutual conversionbetween IF analog signal and RF signal. ODU is irrelevant to themicrowave transmission capacity. An ODU of the OptiX RTN 600
can support the transmission capacity from 4 E1 to one STM-1.prev next
31. Hybrid Coupler When two ODUs share one antenna, theODUs must be connected to an RF signal coupler/ splitter (hybridcoupler). Then, the hybrid coupler is connected to the antenna. prevnext
32. Antenna The antenna performs the directional transmissionand reception of RF signals. The main parameters are frequencyband, diameter and antenna gain. prev next
33. Equipment Characteristics PDH/SDH integrated microwavetransmission system. The modulation mode and link capacity areset through software. Microwave link supports the SNCP. Built-in ADM provides exible service add/drop function. Providing theclock tracing function. Supporting mobile FLASH card. Theboards of IDU 610 and IDU 620 are compatible each other. prevnext
34. Contents Equipment Structure 2.1 System Diagram 2.2Software Structure 2.3 IDU Structure and Boards 2.4 ODU
Interfaces and Parameters 2.5 Hybrid coupler Parameters prevnext
35. System Diagram ! OptiX RTN 600 is divided based on
functional units. It consists of service interface unit, cross-connection unit, IF unit, control unit, clock unit, auxiliary interfaceunit, and ODU. Antenna RF signal Baseband Baseband E1 Service
Cross- IF signal signal signal STM-1e interface connect IF unit ODU
-
8/12/2019 4G LTE.pdf
7/29
STM-1o unit unit Overhead and control bus Order wire Auxiliary Fanand External alarm interface Clock unit Control unit power -48Vpower supply Transparent data unit supply unit interface NM
External clock network or WS signal NM serial port NM cascadingport network port prev next
36. Software Structure ! In the OptiX RTN 600, all the board
software and host software are NM software integrated together andrun on the SCC board. Host software ! ODU is regarded as a
logical board. The ODU board software in the SCC Board software
ODU board manages and controls the ODU SCC hardware throughthe management signal between the IDU and ODU. prev next
37. PDH Microwave Overhead When the IF board is set as PDHmode, such as 4E1/8E1/16E1, the DCC, order wire, andasynchronous transparent data interface can only use one byte. When the IF board is changed from STM-1 mode to PDH mode, if
the transparent transmission setting of DCC byte occupies the D1byte, the manual modication is required. Set the working mode toDI mode rst. Otherwise, when the IF board is changed to the PDHmode, the DCC is interrupted. prev next
38. ODU -- Interface Grounding RSSI test double-screw boltinterface IF interface Antenna port Dimension: < 260 mm X 260 mm
X 92 mm (width X height X depth) Weight: < 5 kg Powerconsumption: < 40W prev next
39. ODU -- Block Diagram Control unit Up Amplier Amplierconversion Antenna port IF interface IF Frequency Duplexer interfacesynthesizer unit Down Amplier Amplier conversion Power unit prevnext
40. ODU -- Main Performance ! The ODU frequency bands covers
-
8/12/2019 4G LTE.pdf
8/29
from 7G to 38G. Some commonly used frequency band indexes arelisted in the table. Performance Item 7G 15G 18G 23G Frequencyrange 7.114- 14.501- 17.685- 22.000- (GHz) 7.743 15.257 19.710
23.608 TR spacing (MHz) 161 420 1010 1008 3.5, 7, Channelspacing 3.5, 7, 14, 3.5, 7, 14, 3.5, 7, 14, 13.75, (MHz) 28 28 2827.5
41. ODU -- Main Performance (cont.) Performance Item 7G 15G18G 23G QPSK 25.5 24.5 24 22.5 maximum Tx (dBm) 16QAM 2120 20 19 128QAM 15 14 14 13 minimum Tx (dBm) -4 Transceiver
frequency stability 5 (ppm) [Note]: If the transmitting power exceedsthe maximum level ,the Bite Error will occur in the service.
42. Microwave Antenna
43. Hybrid coupler Secondary tributary port Antenna port Primarytributary port prev next
44. Hybrid coupler -- Main Performance Item Performance Flatness(dB) ! 0.5 Attenuation (dB) ! 1.7 Coupling (dB) 6.50.6 Isolation (dB)" 25 Standing wave ratio ! 1.2 Weight (kg)
-
8/12/2019 4G LTE.pdf
9/29
52. BTS EQUIPMENT ATN950 (Outdoor) CX600-X2 (Indoor) BSC6900(GSM & UMTS) BTS3900L/A RRU3806 RECTIFIER:
TP48300A (outdoor) Cabinet and rack installation FCS and
CTBC Cable Layout and Routing Antenna Installation Standards Engineering Labels prev next
53. ANT950 prev next
54. CX600-X2 prev next
55. CX600-X2 prev next
56. BSC6900(GSM & UMTS) prev next
57. BSC6900(GSM & UMTS) prev next
58. BSC6900(GSM & UMTS) prev next
59. BSC6900(GSM & UMTS) prev next
60. BTS3900L prev next
61. BTS3900L prev next
62. BTS3900L prev next
63. BTS3900L prev next
64. BTS3900L prev next
65. BTS3900A prev next
66. BTS3900A prev next
67. BTS3900A prev next
-
8/12/2019 4G LTE.pdf
10/29
68. RECTIFIER: TP48300A (Outdoor) prev next
69. CABINET & RACK INSTALLATION prev next
70. CABINET & RACK INSTALLATION prev next
71. CABINET & RACK INSTALLATION prev next
72. CABINET & RACK INSTALLATION prev next
73. CABINET & RACK INSTALLATION prev next
74. FCS and CTBC prev next
75. FCS and CTBC Air Inlet Unit (AIU) Fan Monitor Box (FMB) FreeCooling Box Air Condition Monitor (ACM) Canopy prev next
76. FCS and CTBC With two layers two rows of battery prev nextWith four layer one row of battery
77. FCS and CTBC Site Congurations for FCS+CTBC prev next
78. CABLE LAYOUT & ROUTING prev next
79. CABLE LAYOUT & ROUTING prev next
80. CABLE LAYOUT & ROUTING prev next
81. CABLE LAYOUT & ROUTING prev next
82. CABLE LAYOUT & ROUTING prev next
83. CABLE LAYOUT & ROUTING prev next
84. CABLE LAYOUT & ROUTING prev next
85. CABLE LAYOUT & ROUTING prev next
-
8/12/2019 4G LTE.pdf
11/29
86. CABLE LAYOUT & ROUTING prev next
87. CABLE LAYOUT & ROUTING prev next
88. ANTENNA INSTALLATION STANDARDS prev next
89. ANTENNA INSTALLATION STANDARDS prev next
90. ANTENNA INSTALLATION STANDARDS prev next
91. ANTENNA INSTALLATION STANDARDS prev next
92. ANTENNA INSTALLATION STANDARDS prev next
93. ANTENNA INSTALLATION STANDARDS prev next
94. ENGINEERING LABELS prev next
95. ENGINEERING LABELS prev next
96. PROPOSE RF SPECTRUM: Spectrum Band Smart + Sun GlobeFairy Telco 850 MHz 10 MHz 17.5 MHz 8Mhz 900 MHz 7.5 MHz17.5 MHz 14Mhz 1800 MHz 37.5 MHz 12.5 MHz 16Mhz 2100MHz 35 MHz 10 MHz 20Mhz 2300 MHz 30 MHz None 40Mhz2500 MHz 35 MHz 45 MHz 50Mhz 3400 MHz 94 MHz 14 MHz80Mhz 5400 MHz 123 MHz None None TOTAL 372 MHz 99 MHz228Mhz Republic Act 7925, Article II, Section 4(c) prev next
97. PROPOSED NUMBER OF CELLSITES:Legend/Note:Cell - siteClassicationGreeneld 2Rooftop/ Indoor 8Rooftop/ Outdoor1Trunk SystemFibre OpticMW Design Proper: 2 of 27 prev next
98. PROPOSED NUMBER OF CELLSITES:Legend/Note:Cell -siteClassicationGreeneld 2Rooftop/Indoor 8Rooftop/Outdoor
1Trunk SystemFibre OpticMW Design Proper: 2 of 27 prev next
-
8/12/2019 4G LTE.pdf
12/29
99. Cell-site 1: TaytayNewType Rooftop/IndoorLatitude143336.32NLongitude 121810.23NProposed 40mantennaheightMicrowave 6GhzFrequencies 6.5Ghz 7GhzDishes
0.6mantennaDiameterProposed 40mAntennaHeightSectors 3 prevnext
100. Cell-site 1: RF / TELECOM WORKS CHECKLIST Post - SwapConguration S.N. Post - Swap Data GSM900 GSM1800UMTS900 UMTS2100 WIMAX LTE ANDREW - ANDREW -858DG65T6ESY 858DG65T6ESY / ARGUS - NPX310M / /
CS72111.02 / KATHREIN - CS72111.02 / KATHREIN - ANDREW -HBX- 1 Antenna Type ARGUS - NPX310M N/A N/A 80010203V01- Xpol Panel 80010203V01 - Xpol 6516DS-VTM / ARGUS 790-96065 17 dBi OT Panel 790-960 65 17 dBi - NPX310M OT 2
Antenna Height 33/33/33 36/36/36 33/33/33 35/35/35 N/A N/A 3 Antenna Mechanical Tilt 4/2/1 3/N/A/4 4/2/1 3/2/3 N/A N/A 4 Antenna Electrical Tilt N/A/N/A/N/A N/A/N/A/N/A N/A/N/A/N/A
3/3/2 N/A N/A 5 Tower Height 40 40 40 40 N/A N/A 6 Antenna Azimuth / Orientation 310/90/230 120/N/A/240 310/90/230340/40/305 N/A N/A 7 Additional Sector 0 0 N/A 0 N/A N/A 8Number of Antenna per Sector 1/1/1 1/N/A/1 1/1/1 1/1/1 N/A N/A9 Presence of TMA Null Null Null YES N/A N/A 10 Presence of
TMB Null Null Null Null N/A N/A RRU Locations (Near Antenna orRadio 11 N/A N/A N/A N/A N/A Room) 12 # of RRUs N/A N/A N/A
N/A N/A 13 Feeder Length 38/39/39 41/N/A/38 38/39/3940/40/40 N/A N/A 14 Feeder Type 7/8"/7/8"/7/8" 7/8"/N/A/7/8"7/8"/7/8"/7/8" 7/8"/7/8"/7/8" N/A N/A 15 Jumper Length AntennaEnd 3/3/3 3/N/A/3 3/3/3 2/2/2 N/A N/A 16 Jumper Length BTSEnd 3/3/3 3/N/A/3 3/3/3 2/2/2 N/A N/A 17 FOC Length (BBU -RRU) N/A N/A N/A N/A N/A prev next
101. Cell-site 1: Proposed Diesel Generator & ATS System Site DG
-
8/12/2019 4G LTE.pdf
13/29
Conguration Dual Standby (With AC power plus 1 Genset asstandby DG Model Power City PDG-75S AC Out of DG Type SinglePhase Controller panel Dry Contact Fuel tank Part External Fuel
Tank Capacity 1145L Diameter 1.23 m Length 2m prev next
102. Cell-site 1: Ventilation Site Cooling Type Air-Conditioner ACUBrand Carrier Capacity (HP or BTU) 2.5hp Supply Type Single PhaseControl Mode Auto Capacity 1145L prev next
103. Cell-site 1: ACPDB LOAD SCHEDULED ACPDB LOADSCHEDULED Main Breaker 100AT No. of AC PDB/PP-BTS 10Branches Capacity Amps. Branches Ckt no. Brand Rating No ofPole Load Description Status Remarks 1 GE 100 2 TP48300B ON2 GE 80 2 OB LIGHT ON 3 GE 60 2 ACU 1 ON 4 GE 60 2 ACU 2ON 5 GE 30 2 CTBC ON 6 GE 60 2 Spare OFF 7 GE 30 2 SpareOFF 8 GE 30 2 Spare OFF 9 GE 30 2 Spare OFF 10 GE 30 2 SpareOFF prev next
104. Cell-site 1: DCPDB LOAD SCHEDULEDPROPOSED DCPDBBreakers BLVD Ckt no. Brand Rating No of Pole Load DescriptionStatus REMARKS 1 NADER 63AT 1 Spare OFF 2 NADER 63AT 1Spare OFF 3 NADER 63AT 1 Spare OFF 4 NADER 63AT 1 SpareOFF 5 NADER 32AT 1 Spare OFF 6 NADER 32AT 1 Spare OFF 7NADER 32AT 1 Spare OFF 8 NADER 32AT 1 Spare OFF 9 NADER16AT 1 FMS ON 10 NADER 16AT 1 CX600-X2 Main ON 11NADER 16AT 1 CX600-X2 Redundant ON 12 NADER 16AT 1Spare ON LLVD 13 NADER 80AT 1 14 15 16 NADER NADERNADER 80AT 80AT 80AT 1 1 1 BTS3900L ON 17 NADER 63AT 1RTN-600 Facing TAYTAYOLD ON Replace to 16AT 18 NADER63AT 1 RTN-600 Facing TAYTAYMED ON Replace to 16AT 19NADER 32AT 1 RTN-600 Facing FLOODWAY ON Replace to 16AT20 NADER 32AT 1 Spare OFF prev next
-
8/12/2019 4G LTE.pdf
14/29
105. Cell-site 1: DCPDB LOAD SCHEDULEDPROPOSED DCPDBBreakers BLVD Ckt no. Brand Rating No of Pole Load DescriptionStatus REMARKS 1 NADER 63AT 1 Spare OFF 2 NADER 63AT 1
Spare OFF 3 NADER 63AT 1 Spare OFF 4 NADER 63AT 1 SpareOFF 5 NADER 32AT 1 Spare OFF 6 NADER 32AT 1 Spare OFF 7NADER 32AT 1 Spare OFF 8 NADER 32AT 1 Spare OFF 9 NADER16AT 1 FMS ON 10 NADER 16AT 1 CX600-X2 Main ON 11NADER 16AT 1 CX600-X2 Redundant ON 12 NADER 16AT 1Spare ON LLVD 13 NADER 80AT 1 14 15 16 NADER NADERNADER 80AT 80AT 80AT 1 1 1 BTS3900L ON 17 NADER 63AT 1
RTN-600 Facing TAYTAYOLD ON Replace to 16AT 18 NADER63AT 1 RTN-600 Facing TAYTAYMED ON Replace to 16AT 19NADER 32AT 1 RTN-600 Facing FLOODWAY ON Replace to 16AT20 NADER 32AT 1 Spare OFF prev next
106. Rooftop/Indoor Field : Proposed Site Layout Site Name TaytayNew Site type Rooftop/ Indoor Tower 40 m height MW 3
Sectors 3 Tower Type Guyed prev next
107. Rooftop/Indoor Field : Proposed Site Layout prev next
108. Rooftop/Indoor Field : Proposed Site Layout MW 0.6m Facingto TaytayOLdMW 0.6m Facing to Floodway MW 0.6m Facing to
TaytayMed prev next
109. Rooftop/Indoor Field : Proposed Equipment Layout prev next
110. Rooftop/Indoor Field : Proposed Cable Layout prev next
111. Rooftop/Indoor Field : Single Line Diagram prev next
112. Cell-site 2: Angono1Type Rooftop/IndoorLatitude143214.20NLongitude 121921.27EProposed 30mantennaheightMicrowave 6.6Ghz TeresaFrequencies 6.7Ghz
-
8/12/2019 4G LTE.pdf
15/29
Agono 2Dishes 0.6mantennaDiameterSectors 3x3Height 20mabove sealevelTrunk Sytem Fiber Optic from TaytayNew prev next
113. Cell-site 2: RF / TELECOM WORKS CHECKLIST Post - SwapConguration S.N. Post - Swap Data GSM900 GSM1800UMTS900 UMTS2100 WIMAX LTE ANDREW - ANDREW -858DG65T6ESY 858DG65T6ESY / ARGUS - NPX310M / /CS72111.02 / KATHREIN - CS72111.02 / KATHREIN - ANDREW -HBX- 1 Antenna Type ARGUS - NPX310M N/A N/A 80010203V01- Xpol Panel 80010203V01 - Xpol 6516DS-VTM / ARGUS 790-960
65 17 dBi OT Panel 790-960 65 17 dBi - NPX310M OT 2 Antenna Height 29/29/29 29/29/29 29/29/29 29/29/29 N/A N/A 3 Antenna Mechanical Tilt 3/3/3 3/3/3 3/3/3 3/3/3 N/A N/A 4 Antenna Electrical Tilt N/A/N/A/N/A N/A/N/A/N/A N/A/N/A/N/A3/3/2 N/A N/A 5 Tower Height 40 40 40 40 N/A N/A 6 Antenna
Azimuth / Orientation 310/90/230 340/40/305 310/90/230340/40/305 N/A N/A 7 Additional Sector 0 0 N/A 0 N/A N/A 8
Number of Antenna per Sector 1/1/1 1/1/1 1/1/1 1/1/1 N/A N/A 9Presence of TMA Null Null Null YES N/A N/A 10 Presence of TMBNull Null Null Null N/A N/A RRU Locations (Near Antenna or Radio11 N/A N/A N/A N/A N/A Room) 12 # of RRUs N/A N/A N/A N/AN/A 13 Feeder Length 40/40/40 40/40/40 40/40/40 40/40/40 N/AN/A 14 Feeder Type 7/8"/7/8"/7/8" 7/8"/7/8"/7/8" 7/8"/7/8"/7/8"7/8"/7/8"/7/8" N/A N/A 15 Jumper Length Antenna End 3/3/3
3/3/3 3/3/3 3/3/3 N/A N/A 16 Jumper Length BTS End 3/3/33/3/3 3/3/3 3/3/3 N/A N/A 17 FOC Length (BBU - RRU) N/A N/AN/A N/A N/A prev next
114. Cell-site 2: Proposed Diesel Generator & ATS System Site DGConguration Dual Standby (With AC power plus 1 Genset asstandby DG Model Power City PDG-75S AC Out of DG Type Single
Phase Controller panel Dry Contact Fuel tank Part External Fuel
-
8/12/2019 4G LTE.pdf
16/29
Tank Capacity 1145L Diameter 1.23 m Length 2m prev next
115. Cell-site 2: Ventilation Site Cooling Type Air-Conditioner ACU
Brand Carrier Capacity (HP or BTU) 2.5hp Supply Type Single PhaseControl Mode Auto Capacity 1145L prev next
116. Cell-site 2: ACPDB LOAD SCHEDULED ACPDB LOADSCHEDULED Main Breaker 100AT No. of AC PDB/PP-BTS 10Branches Capacity Amps. Branches Ckt no. Brand Rating No ofPole Load Description Status Remarks 1 GE 100 2 TP48300B ON2 GE 80 2 OB LIGHT ON 3 GE 60 2 ACU 1 ON 4 GE 60 2 ACU 2ON 5 GE 30 2 CTBC ON 6 GE 60 2 Spare OFF 7 GE 30 2 SpareOFF 8 GE 30 2 Spare OFF 9 GE 30 2 Spare OFF 10 GE 30 2 SpareOFF prev next
117. Cell-site 2: DCPDB LOAD SCHEDULEDPROPOSED DCPDBBreakers BLVD Ckt no. Brand Rating No of Pole Load DescriptionStatus REMARKS 1 NADER 63AT 1 Spare OFF 2 NADER 63AT 1Spare OFF 3 NADER 63AT 1 Spare OFF 4 NADER 63AT 1 SpareOFF 5 NADER 32AT 1 Spare OFF 6 NADER 32AT 1 Spare OFF 7NADER 32AT 1 Spare OFF 8 NADER 32AT 1 Spare OFF 9 NADER16AT 1 FMS ON 10 NADER 16AT 1 CX600-X2 Main ON 11NADER 16AT 1 CX600-X2 Redundant ON 12 NADER 16AT 1Spare ON LLVD 13 NADER 80AT 1 14 15 16 NADER NADERNADER 80AT 80AT 80AT 1 1 1 BTS3900L ON 17 NADER 63AT 1RTN-600 Facing TAYTAYOLD ON Replace to 16AT 18 NADER63AT 1 RTN-600 Facing TAYTAYMED ON Replace to 16AT 19NADER 32AT 1 RTN-600 Facing FLOODWAY ON Replace to 16AT20 NADER 32AT 1 Spare OFF prev next
118. Cell-site 2: DCPDB LOAD SCHEDULEDPROPOSED DCPDBBreakers BLVD Ckt no. Brand Rating No of Pole Load DescriptionStatus REMARKS 1 NADER 63AT 1 Spare OFF 2 NADER 63AT 1
-
8/12/2019 4G LTE.pdf
17/29
Spare OFF 3 NADER 63AT 1 Spare OFF 4 NADER 63AT 1 SpareOFF 5 NADER 32AT 1 Spare OFF 6 NADER 32AT 1 Spare OFF 7NADER 32AT 1 Spare OFF 8 NADER 32AT 1 Spare OFF 9 NADER
16AT 1 FMS ON 10 NADER 16AT 1 CX600-X2 Main ON 11NADER 16AT 1 CX600-X2 Redundant ON 12 NADER 16AT 1Spare ON LLVD 13 NADER 80AT 1 14 15 16 NADER NADERNADER 80AT 80AT 80AT 1 1 1 BTS3900L ON 17 NADER 63AT 1RTN-600 Facing TAYTAYOLD ON Replace to 16AT 18 NADER63AT 1 RTN-600 Facing TAYTAYMED ON Replace to 16AT 19NADER 32AT 1 RTN-600 Facing FLOODWAY ON Replace to 16AT
20 NADER 32AT 1 Spare OFF prev next
119. Green Field : Proposed Site Layout Site Name Angono 1 Sitetype Greeneld Tower 32 mMW Facing to Angono 2 MW Facing to
Teresa 1 height MW 2 Sectors 3x3 BTS Cabinet Tower Type GuyedGenset prev next
120. Green Field : Proposed Site Layout prev next
121. Green Field : Proposed Equipment Room Layout prev next
122. Green Field : Proposed Cable Layout prev next
123. C1 MW Line 1:Line 1 TaytayNewLatitude143336.32NLongitude 121810.23NProposed 40 mantenna
heightMicrowave 6GhzFrequenciesRange 1.61kmDestination TaytayOldDishes antenna 0.6mDiameterProposed 30mAntennaHeightSectors 3Transmit Power 32dBm prev next
124. C1 MW Line 1:Line 1 TaytayNewLatitude143336.32NLongitude 121810.23NProposed 40 mantennaheightMicrowave 6GhzFrequenciesRange 1.61kmDestination
TaytayOldDishes antenna 0.6mDiameterProposed 30mAntenna
-
8/12/2019 4G LTE.pdf
18/29
HeightSectors 3 prev next
125. C1 MW Line 1:Line 1 TaytayNewLatitude
143336.32NLongitude 121810.23NProposed 40 mantennaheightMicrowave 6GhzFrequenciesRange 1.61kmDestination
TaytayOldDishes antenna 0.6mDiameterProposed 30mAntennaHeightSectors 3 prev next
126. C1 MW Line 1: MANUAL DESIGN PARAMETERS ANDCOMPUTATIONS CONDITION Approximate Path Length 1.6kmReliability requirement 99.9999% Conguration Non-protected (1 +0 ) Trafc capacity 1 x E3 with a rate of 34.368 Mbps and a capacityof 480 channel. SITE A Latitude 143336.32N Longitude121810.23E SITE B Latitude 143427.13N Longitude121836.66E prev next
127. C1 MW Line 1: MANUAL DESIGN PARAMETERS ANDCOMPUTATIONS Computation for azimuth angle C = Longitude B Longitude A = LOB LOA = 121 8 36.66 - 121 8 10.22 = 032 30 # C = 0 16 15 (LB + LA) = 09 18 15.92 + 8 41 20.26= 17 59 36.18 # (LB + LA) = 8 59 48.09 (LB - LA) = 09 1815.92 - 8 41 20.26 = 0 36 55.66 # (LB LA) = 0 18 27.83Log tan # (Y+X) = log cot # C + log cos # (LB LA) log sin# (LB + LA) prev next
128. C1 MW Line 1: MANUAL DESIGN PARAMETERS ANDCOMPUTATIONS tan# (Y+X) = log -1 [log cot # C + log cos # (LB LA) log sin # (LB + LA)] Azimuth Angle# (Y+X) = tan -1 {log -1[log cot # C + log cos # (LB LA) log sin# (LB + LA)]} Y =# (Y +X) + # (Y-X)# (Y+X) = tan -1 {log -1 [log cot 0 16 15 + log cos0 18 27.83 log sin 8 59 48.09]} Y = - 89 56 10.69 - 7 3420.91 # (Y+X) = 89 56 10.69 Y = 262 28 28.4 or 97 3131.6 Log tan # (Y-X) = log cot # C + log sin # (LB LA) log
-
8/12/2019 4G LTE.pdf
19/29
cos # (LB + LA) tan# (Y-X ) = log -1[log cot # C + log sin # (LB LA) log cos # (LB + LA)] X =# (Y+X) # (Y-X)# (Y-X) = tan -1{log -1 [log cot # C + log sin # (LB LA) log cos # (LB + LA)]} X
= 89 56 10.69- 7 34 20.91 # (Y-X) = tan -1{log -1 [log cot 016 15+ log sin 0 2 6- log cos 8 59 48.09]} X = 82 21 49.78# (Y-X) = 7 34 20.91 Y = 262 28 28.4 Log tan # (Z) = log tan# (LB LA) + (Y+X) log sin# (Y-X) tan# (Z) = log -1[log tan # (LB LA) + (Y+X) log sin# (Y-X)]# (Z) = 2 {tan -1[log tan 0 2 6 +log sin 89 56 10.69 - log sin 7 34 20.9]} # (Z) = 0 31 52.26 +7 34 20.91 D = Z *111.12 X = 82 21 49.78 Where: D =
distance in km. D = 0 31 52.26 *111.12 prev next D = 1.6 km
129. C1 MW Line 1: MANUAL DESIGN PARAMETERS ANDCOMPUTATIONS Radio Conguration = Outdoor Mounted RFModule (ODU) Free Space Loss (FSL): Transmit Power = 32 dBmFor Low Band: Receiver Threshold (1 x E3 at 6 GHz) = -86 dBm FSL= 92.45 + 20 log10 (f * d) FSL = 92.45 + 20 log10 (7.89 * 1.66)
Flexible Waveguide loss: FSL = 145.81 dB Low band frequency =(0.2624 dB/m) (0.6) For High Band: = 0.1574 dB FSL = 92.45 + 20log10 (f * d) High band frequency = (0.2624 dB/m) (0.6) FSL =92.45 + 20 log10 (8.20 * 59) FSL = 146.14 dB = 0.1574 dB
Antenna used = 0.6 m in diameter (6 GHz) with Mid Band Gain ofWhere: f = frequency 37.5 dB d = path length in Km Waveguideused = WR112 (0.6 m exible waveguide in site A and site B)
Connector Loss = 0.5 dB Where: f = frequency prev next d = pathlength in Km
130. C1 MW Line 1: LINK BUDGET CALCULATIONComputationfor Low Band Frequency Computation for High Band Frequency(5.89 GHz) (6.20 GHz) prev next
131. C1 MW Line 1: LINK BUDGET CALCULATION DispersiveFade Margin Dispersive Fade Margin at 1 x E3 is 90 dB. Interference
-
8/12/2019 4G LTE.pdf
20/29
Fade Margin Assume that no interference fade margin is given;therefore it is not included in the computation prev next
132. C1 MW Line 1: LINK BUDGET CALCULATION prev next
133. C1 MW Line 1: LINK BUDGET CALCULATION Rain LossesCCIR/ITU-R Recommendation 530 rain attenuation For Low BandFrequency (5.89 GHz) M = (log10 f1 log10 fx)/ (log10 f1 log10f2) note: f1 < fx
-
8/12/2019 4G LTE.pdf
21/29
heightMicrowave 6.5GhzFrequenciesRange 1.77kmDestination TaytayMedDishes antenna 0.6mDiameterProposed 35mAntennaHeightSectors 3 prev next
137. C1 MW Line 2:Line 1 TaytayNewLatitude143336.32NLongitude 121810.23NProposed 40 mantennaheightMicrowave 6.5GhzFrequenciesRange 1.77kmDestination
TaytayMedDishes antenna 0.6mDiameterProposed 35mAntennaHeightSectors 3 prev next
138. C1 MW Line 3:Line 1 TaytayNewLatitude143336.32NLongitude 121810.23NProposed 40 mantennaheightMicrowave 7GhzFrequenciesRange 2.09kmDestinationFloodwayDishes antenna 0.6mDiameterProposed 30mAntennaHeightSectors 3 prev next
139. C1 MW Line 3:Line 1 TaytayNewLatitude143336.32NLongitude 121810.23NProposed 40 mantennaheightMicrowave 7GhzFrequenciesRange 2.09kmDestinationFloodwayDishes antenna 0.6mDiameterProposed 30mAntennaHeightSectors 3 prev next
140. C1 MW Line 3:Line 1 TaytayNewLatitude143336.32NLongitude 121810.23NProposed 40 mantennaheightMicrowave 7GhzFrequenciesRange 2.09kmDestination
FloodwayDishes antenna 0.6mDiameterProposed 30mAntennaHeightSectors 3 prev next
141. Theoretical Propagation: Proposed 228Mhz Spectrum F157Mhz F2 144Mhz F3 171Mhz F4 228Mhz prev next
142. Theoretical Propagation: Proposed 228Mhz Spectrum F157Mhz F2 144Mhz F3 171Mhz F4 228Mhz prev next
-
8/12/2019 4G LTE.pdf
22/29
143. Theoretical Propagation: Frequency Reuse Proposed 228MhzSpectrum F1 57Mhz F2 144Mhz F3 171Mhz F4 228Mhz prev next
144. Theoretical Propagation: Frequency ReuseProposed228MhzSpectrumF1 57MhzF2 144MhzF3 171MhzF4 228Mhz prevnext
145. CELLSITE 3 prev next
146. CELLSITE 4 prev next
147. CELLSITE 5 prev next
148. CELLSITE 6 prev next
149. CELLSITE 7 prev next
150. CELLSITE 8 prev next
151. CELLSITE 9 prev next
152. CELLSITE 10 prev next
153. CELLSITE 11 prev next
154. GENERAL PROCESS FLOW Site Development Start andConstruction Marketing and RNE Collaboration Telecom Works Site
Hunting and Survey Site Optimization Joint Technical SiteSurvey/Deliberation Site Acceptance Approval of Site End Plans and Pre-con Word: 1 of 5 Word: 1 of 5
155. Marketing and RNE CollaborationFairytelco Marketing RNE TNE Start Validate: is target areaTarget area nomination Receivestarget areas already covered N ? Feedback to Marketing; Y target
area is already coveredSign-off; agrees on the Generate coverageplots Prepare link-upprojected coverage area and NP transmission
-
8/12/2019 4G LTE.pdf
23/29
solution plan Produce the SR document Endorse to TNE Endorselink-up transmission solution plan to PMI Endorse SR to SAQ / PMIW A
156. GENERAL PROCESS FLOW Site Development Start andConstruction Marketing and RNE Collaboration Telecom Works SiteHunting / Survey Site Optimization Joint Technical SiteSurvey/Deliberation Site Acceptance Approval of Site EndPlans and Pre-con
157. Site Hunting and Survey FAIRYTELCO-RNE SUBCONReceives SR from A Network Engineering All Conducts site huntingpossible within SR (100m sites are Y diameter area) Validate sitelocation within SR if possible as one of site candidates Provide RNEcoordinates N of site outside SR for verication Possible as 1.Conduct initial negotiation with owner one of site candidate? Y 2.
Verify property docs with owner N Check clearance for ATO, zoning
and Inform SAQ that other local restrictions site location is not validFinalize all site candidates Send survey invitation and schedule tothe technical survey team B
158. GENERAL PROCESS FLOW Site Development Start andConstruction Marketing andRNE Collaboration Telecom Works SiteHunting / Survey Site OptimizationJoint Technical SiteSurvey/ Deliberation Site Acceptance Approval of Site End Plans and Pre-con
159. Joint Technical Site Survey/Deliberation Transmission FAIRY TELCO Radio Network/SUBCON Network/SUBCON Civil Works &Power/ SUBCON*Endorsementfrom TNE W*Endorsementfrom RNEB Initiates survey of candidate sites Conducts joint technical sitesurvey based on the minimum requirements set forth by Fairy TelcoInc. (RNE/TNE/SAQ/CIVIL WORKS and POWER) Fill up the site
-
8/12/2019 4G LTE.pdf
24/29
deliberation sheet (SDR); Deliberate site options and ranking (rank 1as the most feasible); Sign-off of technical survey team in the SDRProduce SDR,TSR and TSSR (6 options per search ring) Endorse to
Network Engineering the SDR, TSR and TSSR (6 options per SR) forapproval C
160. GENERAL PROCESS FLOW Site Development Start andConstruction Marketing andRNE Sign-off of SR Collaboration
Telecom Works Site Hunting / Survey Site Optimization Joint Technical SiteSurvey/ Deliberation Site Acceptance Approval of Site
End Plans and Pre-con
161. Approval of Site Plans and Pre-conFAIRYTELCO/SUBCONRNE TNE CW & P Engg C Review and approve all site optionsbased on SDR Secure MOC and barangay clearance based on rank1 1. secure as-built, then proceed for SI (RT) 2. Conduct segplan,then proceed for SBT (GF) RNE/ TNE/ CWE/ PE, Drop site option
Produce technical Y approve? N site plans of approved nal siteoption Endorse technical site Review technical site plans plans forapproval Revise plans and Y Needs submit to Engineering revision?N Approve technical site plans RNE/RNO/TNE/Core EngineeringEndorse approved plans and Engg documents Prepare engineeringDocuments to Fairy Telco: to Fairy Telco for implementation D 1. E1transmission allocation for backhaul (TWO) 2. BTS parameters (per
site) 3. BSC port assignments
162. GENERAL PROCESS FLOW Site Development Start andConstruction Marketing and RNE Collaboration Telecom Works SiteHunting / Survey Site Optimization Joint Technical SiteSurvey/Deliberation Site Acceptance Approval of Site End Plans and Pre-con
163. Site Development and Construction / Telecom Works FAIRY
-
8/12/2019 4G LTE.pdf
25/29
TELCO SUBCON/ CIVIL WORKS SUBCON / TELECOM WORKSReceives approved Site construction Telecom worksD technicalplans from process process Network Engineering Issue Ready Issue
Ready for Telecom to Build Works Installation (RFTI) (RTB) Siteintegration/ Site completed on-airAcquired permits1. Socialacceptability Endorsement2. Precon permits PAT PAT to RadioNetwork OptimizationAfter site construction completed, secure postconstruction permits; PAC PAC requirements: E1. Log book2. As-built plans FAT FAT FAC FAC FAC
164. GENERAL PROCESS FLOW Site Development Start andConstruction Marketing andRNE Sign-off of SR Collaboration
Telecom Works Site Hunting / Survey Site OptimizationSiteDeliberation Site Acceptance Approval of Site EndPlans and Pre-con
165. Site Optimization and Acceptance BTI-RNE BTI-RNO Receives
endorsement of site for optimization E Conducts site audit Conductthe required rectication/ correction to Implemente follow approvedd as plan planned? NReceives site audit report Y Endorsement ofsite audit report to Radio Network Engineering Updates databaseand RF planning tool Conducts RF acceptance test RFAC End
166. Implementation PlanPlanning for the InstallDocumentationready for installation, preliminary restoration plans readyTest plancompleteSchedule and start date set for installation, all partiesnotiedComponents ordered and delivery date set, plans made forreceiving materials (time, place) arrangesecurity if let outside or onconstruction siteContractor plans reviewed with contractorsLink tourwith contractorsConstruction plans reviewed with contractor(s)Components chosen reviewed with contractor(s)Schedule reviewedwith contractor (s) Word: 1 of 5 prev next
-
8/12/2019 4G LTE.pdf
26/29
167. Implementation PlanPlanning for the InstallSafety rulesreviewed with contractor(s)Excess materials being kept forrestoration reviewed with contractor(s)Test plan reviewed with
contractor(s) Word: 1 of 5 prev next
168. Implementation Plan Before starting the install:a) All permitsavailable for inspectionb) Sites prepared, power availablec) Allcomponents on site, inspected, security arranged if necessaryd)Contractor availablee) Contractor availablef) Safety rules posted onthe job site Word: 1 of 5 prev next
169. Implementation Plan Before starting the install: Aftercompletion of cable plant installation:a) Inspect workmanshipb)Review test data on cable plantc) Set up and test communicationssystemd) Update and complete documentation Maximum of 6months for the overall completion Word: 1 of 5 prev next
170. TIMELINE: Our project development plan Inspection NetworkDesign Equipment Supply and Installation Work TestingCommisioning Word: 1 of 5 prev next
171. Product Design Constraints andRequirements !
DesignEngineers must consider a multitude of technical, economic,social, environmental, and political constraints when they designproducts and processes. ! Theremust be clear evidence in your
design project that you have addressed the constraints that arerelevant to your project. prev next
172. Effect of Constraints Better Designs Constraint Limits DesignChanges Design Changes prev next
173. Functional Constraints Overall Geometry size, width, space,arrangement Motion of parts type, direction, velocities,acceleration, kinematics Forces involved load direction,
-
8/12/2019 4G LTE.pdf
27/29
magnitude, load, impact Energy needed heating, cooling,conversion, pressure Materials to be used ow, transport,properties Control system electrical, hydraulic, mechanical,
pneumatic Information ow inputs, outputs, form, display prevnext
174. Safety Constraints Operational direct, indirect, hazardelimination Human warnings, training Environmental land,sea, air, noise, light, radiation, reaction, transport prev next
175. Quality Constraints Quality assurance regulations,standards, codes Quality control inspection, testing, labeling Reliability design life, failures, statistics prev next
176. Manufacturing Constraints Production of components factory limitations, means of production, wastes Purchase ofcomponents supplier quality, reliability, quality control, inspection Assembly installation, foundations, bolting, welding Transport material handling, clearance, packaging prev next
177. Timing Constraints Design schedule project planning,project control Development schedule design detailing,compliance tests Production schedule manufacture, assembly,packing, transport Delivery schedule delivery date, distributionnetwork, supply chains prev next
178. Economic Constraints Marketing analysis size of market,distribution, market segments Design costs design teamcomputing, information retrieval Development costs designdetailing, supplier costs, testing costs Manufacturing cost -tooling, labor, overhead, assembly, inspection Distribution costs -packing, transport, service centers, spare parts, warranty
Resources time, budget, labor, capital, machines, material $ prev
-
8/12/2019 4G LTE.pdf
28/29
next
179. Ergonomic Constraints User needs type of operation,
instructions, warnings Ergonomic design man-machinerelationships, operation, height, layout, comfort, lighting Cybernetic design controls, layout, clarity, interactions prev next
180. Ecological Constraints General environmental impact impact on natural resources, social resources Sustainability political and commercial consequences, implications for followinggenerations Material selection solid, liquid, gas, stability,protection, toxicity Working uid selection uid, gas,ammability, toxicity prev next
181. Aesthetic Constraints Customer appeal shape, color,texture, form, feel, smell, surprise and delight features Fashion culture, history, trends Future expectations rate of change intechnology, trends, product families prev next
182. Life-Cycle Constraints Distribution means of transport,nature and conditions of dispatch, rules, regulations Operation quietness, wear, special uses, working environments Maintenance servicing intervals, inspection, exchange and repair, cleaning,diagnostics Disposal recycle, scrap prev next
183. Life-Cycle Constraints Distribution means of transport,nature and conditions of dispatch, rules, regulations Operation quietness, wear, special uses, working environments Maintenance servicing intervals, inspection, exchange and repair, cleaning,diagnostics Disposal recycle, scrap prev next
184. Radio Control Law MEMORANDUM CIRCULAR NO. 20-12-92SUBJECT: IMPLEMENTING GUIDELINES FOR CELLULAR MOBILE
TELEPHONE SYSTEM (CMTS) OPERATIONS IN THE PHILIPPINES
-
8/12/2019 4G LTE.pdf
29/29
prev next
185. Legal/Ethical Constraints Regulations OSHA, FAA, FDA
Ethics public safety, health, welfare and integrity IntellectualProperty patents, trademarks, copyrights prev next