Page 1: 48 Ron Gusek VP Corporate Engineering Sanjel Corporation

Building a Better Mousetrap

Opportunities for Improvement in Tight Oil Stimulation

Ron Gusek, Vice President – Corporate Engineering

Page 2: 48 Ron Gusek VP Corporate Engineering Sanjel Corporation

Outline

• Innovation § How do we define it? § Where do we focus? § What drives innovation?

• Innovation in Hydraulic Fracturing § Improved Completion

Efficiency § “Green” Fluids § Reduced Horsepower?

Page 3: 48 Ron Gusek VP Corporate Engineering Sanjel Corporation

0 5000 10000 15000 20000 25000 30000 35000 40000 45000

• Significant positive change • A creative idea that is realized • Change that creates a new dimension of performance

Evolution Plot

0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% 70.0% 80.0% 90.0%

100.0%

US Rig Count Percentages by Type

% DIR. % HORIZ. % VERT.

What is Innovation

Source: IADC Drilling Contractor March 2011 Source: Baker Rig Count

0

5000

10000

15000

20000

25000

30000

35000

40000

45000

Departure

Page 4: 48 Ron Gusek VP Corporate Engineering Sanjel Corporation

From Invention to Innovation

Page 5: 48 Ron Gusek VP Corporate Engineering Sanjel Corporation

The Reward

• Barnett gas production has exceeded the prior peak using half the previous number of rigs.

Source: Simmons and Company

0

20

40

60

80

100

120

140

160

180

200

0

20,000,000

40,000,000

60,000,000

80,000,000

100,000,000

120,000,000

140,000,000

160,000,000

180,000,000

Jan-

05

Apr-0

5 Ju

l-05

Oct-0

5 Ja

n-06

Ap

r-06

Jul-0

6 Oc

t-06

Jan-

07

Apr-0

7 Ju

l-07

Oct-0

7 Ja

n-08

Ap

r-08

Jul-0

8 Oc

t-08

Jan-

09

Apr-0

9 Ju

l-09

Oct-0

9 Ja

n-10

Ap

r-10

Jul-1

0 Oc

t-10

Jan-

11

Apr-1

1 Ju

l-11

Oct-1

1

Horiz

onta

l Gas

Rig

s

Prod

uctio

n (M

CF)

GW Gas Rig Count

Page 6: 48 Ron Gusek VP Corporate Engineering Sanjel Corporation

It’s Like Turning on a Lightbulb

The Best Ideas Always Win

People Love New Ideas

Myths of Innovation

Page 7: 48 Ron Gusek VP Corporate Engineering Sanjel Corporation

Opportunities in Stimulation

Page 8: 48 Ron Gusek VP Corporate Engineering Sanjel Corporation

Opportunities in Stimulation

Resource Play

Typical Depth (meters) Vertical Measured

Completion Stages

Fracturing Horsepower Required

Frac Size (Tonnes / Stage)

2011E Wells Completed

Amaranth 500 – 1000 1500 – 500 10 – 50 6000 – 8000 20 – 40 tonnes 200 – 250 Bakken 1500 – 2000 3000 – 3500 15 – 20 4000 – 8000 6 – 12 tonnes 700 – 800 Cardium 1000 – 1500 2000 – 3000 6 – 18 6000 – 12000 20 – 30 tonnes 500 – 600 Deep Basin 1500 – 2500 2000 – 3000 5 – 10 12000 – 35000 80 – 200 tonnes 600 – 700 Horn River 2000 – 2500 4000 – 4500 15 – 22 40000 – 50000 200 – 300 tonnes 70 – 80 Lower Shaunavon

1000 – 1500 2000 – 3000 10 – 15 6000 – 8000 20 – 40 tonnes 100 – 200

Montney 2000 – 2500 3000 – 3500 8 – 22 15000 – 35000 100 – 200 tonnes 450 – 550 Viking 1000 – 1500 1500 – 2500 10 – 20 6000 – 8000 20 – 40 tonnes 550 – 650

WCSB Well Completion Profile by Resource Play

Source: Company Reports and CIBC World Markets Inc.

Page 9: 48 Ron Gusek VP Corporate Engineering Sanjel Corporation

Pushing the Limits • During 2008/09, stage counts in the Bakken increased rapidly, followed by a shift toward

extended reach laterals. The long laterals should facilitate additional stages.

Incremental Bakken stages are showing declining returns, although an increase is still beneficial.

Source: Bernstein Research Oil Services Group - 2011

Given slowing incremental gains per stage, optimal stage count appears to be in the low 30’s in extended reach wells

0.00

100.00

200.00

300.00

400.00

500.00

600.00

0 10 20 30

Aver

age I

P (b

oep

d)

Bakken Average Stages The shift to almost exclusive use of extended reach laterals should accommodate additional stages.

0.00

0.50

1.00

1.50

2.00

2.50

3.00

0

2000

4000

6000

8000

10000

12000

1Q08

2Q

08

3Q08

4Q

08

1Q09

2Q

09

3Q09

4Q

09

1Q10

2Q

10

3Q10

4Q

10

1Q11

2Q

11

Avg.

Frac

Den

sity (

Stag

es / 1

000 f

t)

Bakk

en A

vera

ge La

tera

l Len

gth

(ft)

Avg. Lateral Length

Avg. Frac Density

Page 10: 48 Ron Gusek VP Corporate Engineering Sanjel Corporation

Coiled Tubing Limitations

Page 11: 48 Ron Gusek VP Corporate Engineering Sanjel Corporation

Do We Need to Mill Out the Seats? MC

FD

Source: SPE138322 # DAYS TIL

MCFD

LINE

PRE

SSUR

E

Frac sleeves milled out: day 157

Page 12: 48 Ron Gusek VP Corporate Engineering Sanjel Corporation

The columns represent stages that are producing below the theoretical average by the percentages shown.

0

10

20

30

40

50

60

Woodford Barnett Fayetteville Eagleford Haynesville Marcellus STUDY TOTAL

Below 90% of Avg. Below 75% of Avg. Below 50% of Avg. Below 25% of Avg. Below 10% of Avg. Not Producing

Snapshot of Completion Efficiency

Source: SPE 144326

Actual stage production versus theoretical average production

Page 13: 48 Ron Gusek VP Corporate Engineering Sanjel Corporation

What if the Ball Seats were Retrievable?

• Single trip retrievable system • No milling • Maximize lateral length • Minimize required coiled

tubing size • Ensure a debris-free full drift

liner • Add NPV through higher IP

and EUR

Page 14: 48 Ron Gusek VP Corporate Engineering Sanjel Corporation

Environmental Footprint

Page 15: 48 Ron Gusek VP Corporate Engineering Sanjel Corporation

Why Develop a Low Health & Environmental Impact Acid Spearhead?

• Objective is to reduce the hazard of all the blends and additives

• Regulatory and public pressure for low hazard chemicals in fracturing operations

• Fracturing operations often begin with acid spearhead treatment

• Hazards associated with acid spearhead outweigh those associated with fracturing fluid systems

Page 16: 48 Ron Gusek VP Corporate Engineering Sanjel Corporation

“Green” Acid Blend

Additives Total Volume and Weight Rating Other Blend Additives Corrosion inhibitor

17.5 gal/1000 gal, 30.0 lb/1000 gal

32 • De-foamer • Iron control • Demulsifier

Additives Total Volume and Weight Rating Other Blend Additives Low toxicity corrosion inhibitor

7.5 gal/1000 gal, 50.0 lb/ 1000 gal

15 • De-foamer • Low toxicity iron control • Low toxicity demulsifier (2

options)

Original Blend

Low Health & Environmental Impact Blend

Page 17: 48 Ron Gusek VP Corporate Engineering Sanjel Corporation

Horsepower Growth in North America

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

18,000

20,000

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

Hor

sepo

wer

(000

s)

Source: Various Historical Reports

Page 18: 48 Ron Gusek VP Corporate Engineering Sanjel Corporation
Page 19: 48 Ron Gusek VP Corporate Engineering Sanjel Corporation

“Hold Your Horses”

• Examine opportunities to obtain effective treatment at reduced rates and pressures

• New chemistry to generate controlled energy downhole rather than on surface

• Investigate means to augment existing stimulation

Page 20: 48 Ron Gusek VP Corporate Engineering Sanjel Corporation

Summary • Effective innovation requires: § The ability to clearly understand the problem, the talent to solve it and the successful use of it to improve things § A seed to get started § A network of support § Someone who is willing to be the first

• Successful application of innovation results in § Efficiency improvement § Reduced environmental footprint § Improved IP and/or EUR

Page 21: 48 Ron Gusek VP Corporate Engineering Sanjel Corporation

Questions ?

Page 22: 48 Ron Gusek VP Corporate Engineering Sanjel Corporation

Worldwide Innovation, Commitment, Performance, and Results sanjel.com