Any Company Any Street 21 54321 Any Town Tel.: +49 123 456-0 Fax: +49 123 456-100 E-Mail: [email protected] Internet: www.any-company.de Any Company • Any Street 21 • 54321 Any Town 45kw --- Location: Romania / Constanţa Grid voltage: 230V (230V / 400V) Project name: Project number: System overview 65 x .SMA SMA Demo Poly 240 (PV array 1) Azimuth angle: 0 °, Inclination: tracked, Mounting type: Ground mount, PV peak power: 15.60 kWp 65 x .SMA SMA Demo Poly 240 (PV array 2) Azimuth angle: 0 °, Inclination: tracked, Mounting type: Ground mount, PV peak power: 15.60 kWp 65 x .SMA SMA Demo Poly 240 (PV array 3) Azimuth angle: 0 °, Inclination: tracked, Mounting type: Ground mount, PV peak power: 15.60 kWp 65 x SB 240-10 65 x SB 240-10 65 x SB 240-10 17 x Sunny Multigate Technical data Total number of PV modules: 195 PV peak power: 46.80 kWp Number of inverters: 195 Nominal AC power: 44.85 kW AC active power: 44.85 kW Active power ratio: 95.8 % Annual energy yield (approx.)*: 62,263.50 kWh Energy usability factor: 100 % Performance ratio (approx.)*: 87.9 % Spec. energy yield (approx.)*: 1330 kWh/kWp Line losses (in % of PV energy): --- Unbalanced load: 2.76 kVA *Important: The yield values displayed are estimates. They are determined mathematically. SMA Solar Technology AG accepts no responsibility for the real yield value which can deviate from the yield values displayed here. Reasons for deviations are various external conditions, such as soiling of the PV modules or fluctuations in the efficiency of the PV modules. Version: 3.20.1.R Signature 1 / 7

Upload: tudorel-iancu

Post on 22-Jul-2016

11 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 45kw

Any Company

Any Street 21

54321 Any Town

Tel.: +49 123 456-0

Fax: +49 123 456-100

E-Mail: [email protected]

Internet: www.any-company.de

Any Company • Any Street 21 • 54321 Any Town

45kw

---

Location: Romania / Constanţa

Grid voltage: 230V (230V / 400V)

Project name:

Project number:

System overview

65 x .SMA SMA Demo Poly 240 (PV array 1)Azimuth angle: 0 °, Inclination: tracked, Mounting type: Ground mount, PV peak power: 15.60 kWp

65 x .SMA SMA Demo Poly 240 (PV array 2)Azimuth angle: 0 °, Inclination: tracked, Mounting type: Ground mount, PV peak power: 15.60 kWp

65 x .SMA SMA Demo Poly 240 (PV array 3)Azimuth angle: 0 °, Inclination: tracked, Mounting type: Ground mount, PV peak power: 15.60 kWp

65 x SB 240-10 65 x SB 240-10

65 x SB 240-10 17 x Sunny Multigate

Technical data

Total number of PV modules: 195

PV peak power: 46.80 kWp

Number of inverters: 195

Nominal AC power: 44.85 kW

AC active power: 44.85 kW

Active power ratio: 95.8 %

Annual energy yield (approx.)*: 62,263.50 kWh

Energy usability factor: 100 %

Performance ratio (approx.)*: 87.9 %

Spec. energy yield (approx.)*: 1330 kWh/kWp

Line losses (in % of PV energy): ---

Unbalanced load: 2.76 kVA

*Important: The yield values displayed are estimates. They are determined mathematically. SMA Solar Technology AG accepts no

responsibility for the real yield value which can deviate from the yield values displayed here. Reasons for deviations are various external

conditions, such as soiling of the PV modules or fluctuations in the efficiency of the PV modules.

Version: 3.20.1.R

Signature

1 / 7

Page 2: 45kw

Project name: 45kw

Project number:

Location: Romania / Constanţa

Annual extreme low temperature: -12 °C

Average high Temperature: 25 °C

Annual extreme high temperature: 34 °CPart project 1

Ambient temperature:

Evaluation of design

65 x SB 240-10

SB 240-10

PV peak power:

Total number of PV modules:

Number of inverters:

Max. DC power:

Max. AC power:

Grid voltage:

Nominal power ratio:

15.60 kWp

65

65

245.00 W

230.00 W

230V (230V / 400V)

102 %

Technical data

Max. PV voltage:

Min. DC voltage (Grid voltage 230 V):

Number of strings:

PV modules per string:

Peak power (input):

Min. PV voltage:

Typical PV voltage:

Max. DC voltage:

Max. current of PV array:

Max. DC current:

Input A: PV array 1

1 x .SMA SMA Demo Poly 240, Azimuth angle: 0 °, Inclination: tracked, Mounting type: Ground mount

42 V

Input A:

1

1

240.00 Wp

26 V

28 V

23 V

45 V

8.1 A [STC: ---]

8.5 A

PV/Inverter compatible

Version: 3.20.1.R

2 / 7

Page 3: 45kw

Project name: 45kw

Project number:

Location: Romania / Constanţa

Annual extreme low temperature: -12 °C

Average high Temperature: 25 °C

Annual extreme high temperature: 34 °CPart project 1

Ambient temperature:

Evaluation of design

65 x SB 240-10

SB 240-10

PV peak power:

Total number of PV modules:

Number of inverters:

Max. DC power:

Max. AC power:

Grid voltage:

Nominal power ratio:

15.60 kWp

65

65

245.00 W

230.00 W

230V (230V / 400V)

102 %

Technical data

Max. PV voltage:

Min. DC voltage (Grid voltage 230 V):

Number of strings:

PV modules per string:

Peak power (input):

Min. PV voltage:

Typical PV voltage:

Max. DC voltage:

Max. current of PV array:

Max. DC current:

Input A: PV array 2

1 x .SMA SMA Demo Poly 240, Azimuth angle: 0 °, Inclination: tracked, Mounting type: Ground mount

42 V

Input A:

1

1

240.00 Wp

26 V

28 V

23 V

45 V

8.1 A [STC: ---]

8.5 A

PV/Inverter compatible

Version: 3.20.1.R

3 / 7

Page 4: 45kw

Project name: 45kw

Project number:

Location: Romania / Constanţa

Annual extreme low temperature: -12 °C

Average high Temperature: 25 °C

Annual extreme high temperature: 34 °CPart project 1

Ambient temperature:

Evaluation of design

65 x SB 240-10

SB 240-10

PV peak power:

Total number of PV modules:

Number of inverters:

Max. DC power:

Max. AC power:

Grid voltage:

Nominal power ratio:

15.60 kWp

65

65

245.00 W

230.00 W

230V (230V / 400V)

102 %

Technical data

Max. PV voltage:

Min. DC voltage (Grid voltage 230 V):

Number of strings:

PV modules per string:

Peak power (input):

Min. PV voltage:

Typical PV voltage:

Max. DC voltage:

Max. current of PV array:

Max. DC current:

Input A: PV array 3

1 x .SMA SMA Demo Poly 240, Azimuth angle: 0 °, Inclination: tracked, Mounting type: Ground mount

42 V

Input A:

1

1

240.00 Wp

26 V

28 V

23 V

45 V

8.1 A [STC: ---]

8.5 A

PV/Inverter compatible

Version: 3.20.1.R

4 / 7

Page 5: 45kw

System Monitoring

Project name: 45kw

Project number:

Location: Romania / Constanţa

PV System System Monitoring

Part project 1

65 x SB 240-10

65 x SB 240-10

65 x SB 240-10

Within the plant

Link between micro inverter and

power distribution grid

17 x Sunny Multigate

Version: 3.20.1.R

5 / 7

Page 6: 45kw

Economic viability analysis

Project name: 45kw

Project number:

Location: Romania / Constanţa

Details

Total revenue from grid feed-in after 20

year(s) (approx.)

Expected amortization period in years

(approx.)

The total investment is

The specific capital expenditure costs are

225,197 EUR

49,000.00 EUR

---

1,047.01 EUR

Version: 3.20.1.R

6 / 7

Page 7: 45kw

Economic viability analysis

Project name: 45kw

Project number:

Location: Romania / Constanţa

Cost structure

The total costs for the PV modules are 19,500.00 EUR

The average power degradation of the PV modules is 0.50 %

The total costs for the inverters and PV system monitoring are 0.00 EUR

The costs for planning and installation are 10,000.00 EUR

The annual fixed costs are 1,500.00 EUR

The total investment is 49,000.00 EUR

The specific capital expenditure costs are 1,047.01 EUR

PV system costs

The currency is EUR

The equity ratio is 20 %

The debt ratio is 80 %

The grant amount is 40,000.00 EUR

The inflation rate is 3.00 %

The analysis period of economic viability is 20 Years

Selected type of credit: Redeemable loan

Financing

The credit period is 10 Years

The redemption-free period is 0 Years

The interest rate is 4.0 %

The electricity purchase price is 0.131 EUR/kWh

The annual rate of electricity price increase is 3.0 %

The feed-in tariff is 0.181 EUR/kWh

The duration of the feed-in tariff is 20 Years

The feed-in revenue on expiration of the remuneration period is 0.050 EUR/kWh

Electricity purchase costs and feed-in tariff

Special tariffs are not taken into account

Version: 3.20.1.R

7 / 7