4/13/2013 - cpsschoolreports.cps.edu/asbestosinspectionreport_2013...re: chicago public schools -...

72
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-0061 SCHOOL NAME: Hamline Early Childhood Center ADDRESS OF SCHOOL: 4652 S. Bishop CITY: Chicago, IL, 60609 DATE LAST THREE YEAR REINSPECTION WAS COMPLETED 2/16/2010 If the address on this form is different than the address of the building, submit a written explanation. SECTION II (Please type or print) PLEASE COMPLETE THE FOLLOWING FOR YOUR THREE YEAR REINSPECTION: DATE REINSPECTION COMPLETED: 4/13/2013 ENROLLMENT 141 IDPH INSPECTOR LICENSE NUMBER: 100-11170 IDPH LICENSED INSPECTOR NAME (Please Print): Jesus Delgado IDPH MP LICENSE NUMBER: 100-05171 IDPH LICENSED MANAGEMENT PLANNER NAME (Please Print): Stephen Diblik DESIGNATED PERSON (Please Print): Ms. Lynn Crivello PHONE: (773) 553-3113 4/13/2013 Signature of Designated Person Date SECTION III PLEASE COMPLETE THE FOLLOWING INFORMATION FOR ANY CHANGES WITHIN THE SCHOOL DISTRICT. School building has been sold. Date of Sale: School has been closed. Date closed: School building has been demolished. Date: School building is asbestos free since last reinspection: Please explain in writing why the school building is now asbestos free and include the supporting documentation. If a new school building has been added to the district, submit either and exclusionary statement or a management plan and inspection report. Include the complete name, address and city of school building. Explain in writing if the address of the building is different than the address on this form: IL-482-1026 Revised 10.03

Upload: others

Post on 25-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

ILLINOIS DEPARTMENT OF PUBLIC HEALTHAHERA THREE YEAR REINSPECTIONASBESTOS ABATEMENT PROGRAM

SCHOOL INFORMATION FORM

SECTION I

NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299SCHOOL ID NUMBER: 14-016-2990-0061SCHOOL NAME: Hamline Early Childhood CenterADDRESS OF SCHOOL: 4652 S. BishopCITY: Chicago, IL, 60609

DATE LAST THREE YEAR REINSPECTION WAS COMPLETED 2/16/2010If the address on this form is different than the address of the building, submit a written explanation.

SECTION II (Please type or print)PLEASE COMPLETE THE FOLLOWING FOR YOUR THREE YEAR REINSPECTION:

DATE REINSPECTION COMPLETED: 4/13/2013 ENROLLMENT 141

IDPH INSPECTOR LICENSE NUMBER: 100-11170

IDPH LICENSED INSPECTOR NAME (Please Print): Jesus Delgado

IDPH MP LICENSE NUMBER: 100-05171

IDPH LICENSED MANAGEMENT PLANNER NAME (Please Print): Stephen Diblik

DESIGNATED PERSON (Please Print): Ms. Lynn Crivello PHONE: (773) 553-3113

4/13/2013

Signature of Designated Person Date

SECTION III

PLEASE COMPLETE THE FOLLOWING INFORMATION FOR ANY CHANGES WITHIN THE SCHOOL DISTRICT.

School building has been sold. Date of Sale:

School has been closed. Date closed:

School building has been demolished. Date:

School building is asbestos free since last reinspection:

Please explain in writing why the school building is now asbestos free and include the supporting documentation.

If a new school building has been added to the district, submit either and exclusionary statement or a management plan and inspection report. Include the complete name, address and city of school building.

Explain in writing if the address of the building is different than the address on this form:

IL-482-1026 Revised 10.03

Page 2: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

THREE–YEAR REINSPECTION

CHICAGO SCHOOL DIST 299

Hamline Early Childhood Center

4652 S. BishopChicago, IL, 60609

Unit: 23513Building ID: 3742

IDPH ID Number: 14-016-2990-0061

REPORT DATE:Saturday, April 13, 2013

Prepared for:Chicago Public Schools

125 S. Clark StreetChicago, IL 60603

Prepared by:Carnow, Conibear and Associates

600 West Van Buren St., Ste 500

Phone (312) 762-2900

Fax (312) 782-5145

DO NOT REMOVE FROM SCHOOLREQUIRED BY FEDERAL LAW

Page 3: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

March 25, 2013

Mr. R. Kent CookAsbestos ProgramIllinois Department of Public Health525 West Jefferson StreetSpringfield, Illinois 62761

Re: Chicago Public Schools - 2013 Three-Year Reinspections

Dear Mr. Cook:

Carnow, Conibear and Associates, Managing Environmental Consultant (MEC), conducted the Three-Year Reinspections and performed management plan updates for the Chicago Public Schools (CPS) facilities in Region 3,4,5 Elementary Schools. Please update your records with the following information.

School District: 299 Unit: 23513 Region: 04 IDPH ID: 14-016-2990-0061

School: Hamline Early Childhood Center Building ID: 3742

Address: 4652 S. Bishop

Chicago, IL, 60609

Building Contact: Contact Phone:

Current Building Owners: Chicago Public Schools

Review Date: 4/13/2013

Inspector: Jesus Delgado Inspector IDPH License: 100-11170Management Planner: Stephen Diblik Management Planner IDPH License: 100-05171

If you have any questions or comments, please contact us at (312) 762-2900

Sincerely,Carnow, Conibear and Associates

Stephen Diblik100-05171

Page 4: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Environmental Notification to Occupants

To: Faculty, Staff and ParentsFrom: Chicago Public SchoolsDate: March 25, 2013

RE: Hamline Early Childhood Center, Unit 23513 4652 S. Bishop Chicago, IL, 60609

Dear Faculty, Staff and Parents,

This letter is to notify you that the 2013 asbestos three year re-inspection has been completed at Hamline Early Childhood Center , following the Federal Asbestos Hazard Emergency Response Act (AHERA), 40 CFR Part 763, Subpart E and is available for your review at the main office of the school.

Although asbestos-containing materials have been identified at Hamline Early Childhood Center, there is no reason to believe that any threat to the health of students or staff exists at this time. CPS will continue to carefully monitor the condition of asbestos-containing materials and if conditions warrant, all appropriate steps will be taken to maintain the health and safety of all building occupants.

If you have any questions regarding this matter or require additional information, please feel free to contact Ms. Lynn Crivello, the designated Local Education Authority's Designated Person at (773) 553-3113 .

Page 5: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Table of Contents

I. School and Inspection Information

II. Executive Summary

III. Methodology

IV. Abatement History

V. Reassessments and Recommendations

VI. Conclusions

Table I: Inspector's Reinspection Findings

Table II: Management Planner's Review

APPENDICES:

Appendix A: Assessment Sheets, Drawings and Photos

Appendix B: Inspector and Management Planner Licenses

Appendix C: Laboratory Accreditations

Appendix D: Laboratory Results

Appendix E: Chain of Custody Forms

Page 6: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

SCHOOL AND INSPECTION INFORMATION

1. School Information

School: Hamline Early Childhood Center

Unit: 23513 Region: 04

Address: 4652 S. Bishop Chicago, IL, 60609IDPH ID: 14-016-2990-0061 Building ID: 3742Contact: Phone:

2. Description of Facility

Original Construction: Additional Construction: Total Square Footage: 7560 No of Floors: Current Occupancy: 141

3. LEA Designated Person

Contact: Ms. Lynn Crivello Phone: (773) 553-3113Address: 125 South Clark Street, 17th Floor Chicago, IL 60603

4. Managing Environmental Consultant

MEC: Carnow, Conibear and AssociatesContact: Dan JuneauAddress 600 West Van Buren St., Ste 500Phone: (312) 762-2900 Fax: (312) 782-5145

5. Inspector

Inspector Name: Jesus Delgado

Signature: Inspector IDPH license # 100-11170 Date: 3/25/2013

6. Management Planner

Management Planner Name: Stephen Diblik

Signature: Management Planner IDPH license # 100-05171 Date: 4/13/2013

7. Review Date: 4/13/2013

8. LEA Designated Person's Acknowledgement

The reinspection report and recommendations have been received by me and appropriate action will be taken by the School District.

Signature: Date: 4/13/2013

Name: Ms. Lynn Crivello

Unit : 23513 Hamline Early Childhood Center Building: 3742

Page 7: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Unit: 23513 Hamline Early Childhood Center

Building: 3742

II. EXECUTIVE SUMMARY

Carnow, Conibear and Associates was retained by the Chicago Public Schools (CPS) to perform a three-year asbestos reinspection of the Hamline Early Childhood Center. This inspection was conducted in accordance with the United States Environmental Protection Agency (USEPA) Asbestos Hazard Emergency Response Act (AHERA) part 763.92 (b), and the ongoing Operations and Maintenance Program (O&M) originally designed in the School's Asbestos Management Plan. The purpose of this three-year reinspection is to record any condition changes in the asbestos-containing building material (ACBM) in the school since theprevious three-year reinspection and the six-month periodic surveillance, to identify, assess, and include any Homogeneous Areas (HA) not identified in the Management Plan, and to recommend an appropriate response action to manage asbestos.

The inspector conducted a three-year reinspection of this facility under Illinois Department of Public Health (IDPH) school reinspection requirements and AHERA, sections 763.85 and 763.88. The main building and each addition to the main building, if constructed at different dates, were inspected separately. Laboratory accreditations are included in Appendix C, laboratory results are included in Appendix D, and chain of custody forms are included in Appendix E.

Note: During previous inspections, some of the HA(s) were identified together as 9" x 9" floor tile (FT), mastics assoc. with 9" x 9" FT, 12" x 12" FT, mastics assoc. with 12" x 12" FT, pipe insulation, etc. Some of these HA(s) have been re-identified by areas that are uniform in color, texture, construction date, application date, and general appearance.

The inspector has determined the following:

A. The following HAs have changed assessment categories for Building 3742:

Page 8: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Unit: 23513 Hamline Early Childhood Center

Building: 3742

B. The following new homogenous areas have been identified for Building 3742:

Page 9: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Unit: 23513 Hamline Early Childhood Center

Building: 3742

C. This reinspection covered only physically accessible and visible areas and materials that were identified in the LEA's management plan. The following materials were concealed and/orcontained in areas that were inaccessible for sampling and have been classified as Assumed:

001 2' x 2' Lay In Ceiling Panels002 Drywall003 Drywall Compound004 12" x 12"White Floor Tile w/ Blue Streaks005 12"x12" White Floor Tile w/ Blue Streaks - Mastic006 12" x 12" Yellow Floor Tile w/ Blue Streaks007 12"x12" Yellow Floor Tile w/ Blue Streak - Mastic008 White Linoleum009 White Linoleum Adhesive010 4" Beige Vinyl Baseboard011 4" Beige Vinyl Baseboard Adhesive012 4" Brown Vinyl Baseboard013 4" Brown Vinyl Baseboard Adhesive014 White Wallboard015 White Wallboard Adhesive016 White Wallboard Caulk017 Marker Board Adhesive018 Tack Board Adhesive019 Window Glazing020 Insulation in Firedoors021 Sink Undercoat

The following areas were deemed to be inaccessible:

017 Marker Board Adhesive018 Tack Board Adhesive020 Insulation in Firedoors

Materials were also listed as "assumed" if they were in good condition and sampling was not conducted to avoid damage.

This reinspection was conducted by Jesus Delgado, IDPH License # 100-11170. The Management Plan was updated by Stephen Diblik, IDPH License # 100-05171. Inspector and Management Planner Licenses are included in Appendix B.

Page 10: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Unit: 23513 Hamline Early Childhood Center Building: 3742

III. METHODOLOGY

Tasks performed on-site included the following:

1. Review current management plan, identify HA(s) and extract appropriate information.

2. Examine and verify abatement records.

3. Touch and visually and physically reinspect and reassess the condition of all friable known or assumed ACBM.

4. Touch and visually and physically reinspect all non-friable known or assumed ACBM to determine whether thesematerials have become friable since the last inspection or periodic surveillance.

5. Identify any condition changes that may affect Hazard Ranking of known ACBM or Assumed ACBM, as well as anyHA(s) that have become friable since the last reinspection.

6. Collect bulk samples from each newly discovered friable HA or previously assumed and submit for laboratory analysis.

7. Tabulate reinspection findings and submit for management planner review and recommendations with appropriateresponse actions based on the AHERA Damage Category of the ACBM.

8. Submit reinspection findings and management planner recommendations to the LEA within thirty (30) days forinclusion into the management plan.

IV. ABATEMENT HISTORYThe information collected from the existing management plan and inspection report(s) and from interviews with the schoolofficial revealed that the following asbestos abatement was conducted at the school since the previous Three year Reinspection.

Abatement Dates:

V. REASSESSMENTS AND RECOMMENDATIONSThe reassessments and recommendations are summarized in Tables I and II on the following pages. Detailed Hazard AssessmentSheets and Drawings and Photos (if applicable) are included in Appendix A.

VI. CONCLUSIONSThe Hamline Early Childhood Center Building 3742 Three-Year reinspection has been completed and response actions have beenrecommended for both friable and non-friable materials. A timely execution of the response actions recommended will enable theLEA and the Designated Person(s) to effectively manage the existing ACBM.

This three-year reinspection report should be inspected in the current Management plan at the CPS Central Office, and one (1)copy should be kept at the school for use when planning any renovation and/or demolition activities in areas where ACBM hasbeen identified. Also, periodic surveillance documentation and any summary reports from any response actions that are executedat the school should be used to update the Management Plan.

Page 11: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Table IInspector's Reinspection Findings

Page 12: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools School Hamline Early Childhood Center Unit 23513 Building ID 3742 Address 4652 S. Bishop Region 04

ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONSInspector's Reinspection Findings Table 1

Managing Environmental Consultant (MEC) Carnow, Conibear and Associates

600 West Van Buren St., Ste 500 Phone: (312) 762-2900 Fax: (312) 782-5145

Inspector's Comments are Summarized at the End of the Report

HA No Material Description Material Quantity

Material Units

Material Location Asbestos Type

Material Category

Friable Damage Type

Damage Quantity

Damage Units Change in Assessment Category

Damage Category Damage Reason Disturbance Potential

001 2' x 2' Lay In Ceiling Panels 7,000 SF Throughout Facility ASSUMED MISC Y NONE 0 No ACBM with the potential for damage

MODERATE

002 Drywall 17,310 SF Throughout Facility ASSUMED MISC Y NONE 0 No ACBM with the potential for damage

HIGH

003 Drywall Compound 17,310 SF Throughout Facility ASSUMED MISC Y NONE 0 No ACBM with the potential for damage

MODERATE

004 12" x 12"White Floor Tile w/ Blue Streaks 4,500 SF Reception Office and Classrooms 6,13,14,15 and 17, Staff Lounge

ASSUMED MISC N NONE 0 No ACBM with the potential for damage

HIGH

005 12"x12" White Floor Tile w/ Blue Streaks -Mastic

4,500 SF Reception, Office and classrooms 6,13,14,15 and 17, Staff Lounge

ASSUMED MISC N NONE 0 No ACBM with the potential for damage

LOW

006 12" x 12" Yellow Floor Tile w/ Blue Streaks

2,450 SF Washrooms, MDF Room, Corridors and Janitor's Closet, reception

ASSUMED MISC N NONE 0 No ACBM with the potential for damage

HIGH

007 12"x12" Yellow Floor Tile w/ Blue Streak -Mastic

2,450 SF Washrooms, MDF Room, Corridors and Janitor's Closet, reception

ASSUMED MISC N NONE 0 No ACBM with the potential for damage

LOW

008 White Linoleum 625 SF Kitchen ASSUMED MISC N NONE 0 No ACBM with the potential for damage

HIGH

009 White Linoleum Adhesive 625 SF Kitchen ASSUMED MISC N NONE 0 No ACBM with the potential for damage

LOW

010 4" Beige Vinyl Baseboard 625 LF Staff Lounge, Classrooms 7,13,14,15 and 17, reception

ASSUMED MISC N NONE 0 No ACBM with the potential for damage

MODERATE

011 4" Beige Vinyl Baseboard Adhesive 625 LF Staff Lounge, Classrooms 6,13,14,15 and 17, reception

ASSUMED MISC N NONE 0 No ACBM with the potential for damage

LOW

012 4" Brown Vinyl Baseboard 375 LF Corridors, Reception, Offices, Washrooms, Janitor's Closet, Rear Office, Consultation Room and MDF

ASSUMED MISC N NONE 0 No ACBM with the potential for damage

MODERATE

013 4" Brown Vinyl Baseboard Adhesive 375 LF Corridors, Reception, Offices, Washrooms, Janitor's Closet,

ASSUMED MISC N NONE 0 No ACBM with the potential for damage

LOW

Page 13: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools School Hamline Early Childhood Center Unit 23513 Building ID 3742 Address 4652 S. Bishop Region 04

ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONSInspector's Reinspection Findings Table 1

Managing Environmental Consultant (MEC) Carnow, Conibear and Associates

600 West Van Buren St., Ste 500 Phone: (312) 762-2900 Fax: (312) 782-5145

Inspector's Comments are Summarized at the End of the Report

HA No Material Description Material Quantity

Material Units

Material Location Asbestos Type

Material Category

Friable Damage Type

Damage Quantity

Damage Units Change in Assessment Category

Damage Category Damage Reason Disturbance Potential

Rear Office, Consultation Room and MDF

014 White Wallboard 1,500 SF Classrooms ASSUMED MISC N NONE 0 No ACBM with the potential for damage

HIGH

015 White Wallboard Adhesive 1,500 SF Classrooms ASSUMED MISC N NONE 0 No ACBM with the potential for damage

LOW

016 White Wallboard Caulk 200 LF Classrooms ASSUMED MISC N NONE 0 No ACBM with the potential for damage

LOW

017 Marker Board Adhesive 160 SF Classrooms ASSUMED MISC N NONE 0 No ACBM with the potential for damage

LOW

018 Tack Board Adhesive 160 SF CLassrooms ASSUMED MISC N NONE 0 No ACBM with the potential for damage

LOW

019 Window Glazing 650 LF Throughout Building

ASSUMED MISC N NONE 0 No ACBM with the potential for damage

MODERATE

020 Insulation in Firedoors 74 SF Metal Exit Doors ASSUMED TSI N NONE 0 No ACBM with the potential for damage

LOW

021 Sink Undercoat 10 SF Corridor ASSUMED SURFACE N NONE 0 No ACBM with the potential for damage

LOW

Page 14: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools School Hamline Early Childhood Center Unit 23513 Building ID 3742 Address 4652 S. Bishop Region 04

ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONSInspector's Reinspection Findings Table 1

Managing Environmental Consultant (MEC) Carnow, Conibear and Associates

600 West Van Buren St., Ste 500 Phone: (312) 762-2900 Fax: (312) 782-5145

Inspector's Comments are Summarized at the End of the Report

Reinspection Date 3/25/2013

Inspector Name Jesus Delgado

100-11170 5/15/2013

Inspector's IDPH License Number / Expiration Date

Inspector's Comments

HA Number: Inspector Comments:001002003004005006007008009010011012013014015016017018019020021

Page 15: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools School Hamline Early Childhood Center Unit 23513 Building ID 3742 Address 4652 S. Bishop Region 04

ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONSInspector's Reinspection Findings Table 1

Managing Environmental Consultant (MEC) Carnow, Conibear and Associates

600 West Van Buren St., Ste 500 Phone: (312) 762-2900 Fax: (312) 782-5145

Inspector's Comments are Summarized at the End of the Report

Page 16: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Table II

Management Planner's Review

Page 17: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

SchoolHamline Early Childhood Center Unit 23513 Building ID 3742

Address 4652 S. Bishop Chicago, IL, 60609 Region 04

ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS

Management Planner's Review Table II

Managing Environmental Consultant (MEC) Carnow, Conibear and Associates

600 West Van Buren St., Ste 500

Phone: (312) 762-2900 Fax: (312) 782-5145

Management Planner's Comments Summarized at the End of the ReportHA Num

Material Description Material Quantity

Material Units

Material Location AsbestosType

Material Category

Friable Damage Quantity

Damage Units

Damage Category Response

001 2' x 2' Lay In Ceiling Panels 7,000 SF Throughout Facility Assumed MISC Yes 0 SF 6 ACBM with the potential for damage Operations and Maintenance002 Drywall 17,310 SF Throughout Facility Assumed MISC Yes 0 SF 6 ACBM with the potential for damage Operations and Maintenance003 Drywall Compound 17,310 SF Throughout Facility Assumed MISC Yes 0 SF 6 ACBM with the potential for damage Operations and Maintenance004 12" x 12"White Floor Tile w/ Blue Streaks 4,500 SF Reception Office and Classrooms

6,13,14,15 and 17, Staff LoungeAssumed MISC No 0 SF 6 ACBM with the potential for damage Operations and Maintenance

005 12"x12" White Floor Tile w/ Blue Streaks - Mastic 4,500 SF Reception, Office and classrooms 6,13,14,15 and 17, Staff Lounge

Assumed MISC No 0 SF 6 ACBM with the potential for damage Operations and Maintenance

006 12" x 12" Yellow Floor Tile w/ Blue Streaks 2,450 SF Washrooms, MDF Room, Corridors andJanitor's Closet, reception

Assumed MISC No 0 SF 6 ACBM with the potential for damage Operations and Maintenance

007 12"x12" Yellow Floor Tile w/ Blue Streak - Mastic 2,450 SF Washrooms, MDF Room, Corridors andJanitor's Closet, reception

Assumed MISC No 0 SF 6 ACBM with the potential for damage Operations and Maintenance

008 White Linoleum 625 SF Kitchen Assumed MISC No 0 SF 6 ACBM with the potential for damage Operations and Maintenance009 White Linoleum Adhesive 625 SF Kitchen Assumed MISC No 0 SF 6 ACBM with the potential for damage Operations and Maintenance010 4" Beige Vinyl Baseboard 625 LF Staff Lounge, Classrooms 7,13,14,15

and 17, receptionAssumed MISC No 0 LF 6 ACBM with the potential for damage Operations and Maintenance

011 4" Beige Vinyl Baseboard Adhesive 625 LF Staff Lounge, Classrooms 6,13,14,15 and 17, reception

Assumed MISC No 0 LF 6 ACBM with the potential for damage Operations and Maintenance

012 4" Brown Vinyl Baseboard 375 LF Corridors, Reception, Offices, Washrooms, Janitor's Closet, Rear Office, Consultation Room and MDF

Assumed MISC No 0 LF 6 ACBM with the potential for damage Operations and Maintenance

013 4" Brown Vinyl Baseboard Adhesive 375 LF Corridors, Reception, Offices, Washrooms, Janitor's Closet, Rear Office, Consultation Room and MDF

Assumed MISC No 0 LF 6 ACBM with the potential for damage Operations and Maintenance

014 White Wallboard 1,500 SF Classrooms Assumed MISC No 0 SF 6 ACBM with the potential for damage Operations and Maintenance015 White Wallboard Adhesive 1,500 SF Classrooms Assumed MISC No 0 SF 6 ACBM with the potential for damage Operations and Maintenance016 White Wallboard Caulk 200 LF Classrooms Assumed MISC No 0 LF 6 ACBM with the potential for damage Operations and Maintenance017 Marker Board Adhesive 160 SF Classrooms Assumed MISC No 0 SF 6 ACBM with the potential for damage Operations and Maintenance018 Tack Board Adhesive 160 SF CLassrooms Assumed MISC No 0 SF 6 ACBM with the potential for damage Operations and Maintenance019 Window Glazing 650 LF Throughout Building Assumed MISC No 0 LF 6 ACBM with the potential for damage Operations and Maintenance020 Insulation in Firedoors 74 SF Metal Exit Doors Assumed TSI No 0 SF 6 ACBM with the potential for damage Operations and Maintenance021 Sink Undercoat 10 SF Corridor Assumed SURFACE No 0 SF 6 ACBM with the potential for damage Operations and Maintenance

Page 18: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

SchoolHamline Early Childhood Center Unit 23513 Building ID 3742

Address 4652 S. Bishop Chicago, IL, 60609 Region 04

ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS

Management Planner's Review Table II

Managing Environmental Consultant (MEC) Carnow, Conibear and Associates

600 West Van Buren St., Ste 500

Phone: (312) 762-2900 Fax: (312) 782-5145

Management Planner's Comments Summarized at the End of the Report

Review Date 4/13/2013

Manager Planner Name Stephen Diblik100-05171 5/15/2013Manager IDPH License No/Expiration

HA Number Management Comments001002003004005006007008

Page 19: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

SchoolHamline Early Childhood Center Unit 23513 Building ID 3742

Address 4652 S. Bishop Chicago, IL, 60609 Region 04

ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS

Management Planner's Review Table II

Managing Environmental Consultant (MEC) Carnow, Conibear and Associates

600 West Van Buren St., Ste 500

Phone: (312) 762-2900 Fax: (312) 782-5145

Management Planner's Comments Summarized at the End of the ReportHA Number Management Comments009010011012013014015016017018019020021

Page 20: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Inspector Assessment Form (REASSESSMENT) LEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois AHERA INSPECTOR: Jesus Delgado

SCHOOL NAME: Hamline Early Childhood Center INSPECTION DATE: 3/25/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

INFORMATION FROM PREVIOUS INSPECTION

HOMOGENEOUS AREA: 001

MATERIAL DESCRIPTION: 2' x 2' Lay In Ceiling Panels

HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage

HISTORICAL DAMAGE REASON:

HISTORICAL RESPONSE ACTION: Operations and Maintenance

ASBESTOS TYPE: Assumed FRIABLE: Yes

RESULTS OF REINSPECTION AND REASSESSMENT

This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection.

The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage

DAMAGE REASON:

DISTURBANCE POTENTIAL: MODERATE

MATERIAL LOCATION: Throughout Facility

MATERIAL QUANTITY: 7000 MATERIAL UNITS: SF

DAMAGE QUANTITY: DAMAGE UNITS: SF

COMMENTS:

Inspector's Signature: Date: 03/25/2013

Page 21: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Management Planner Review FormLEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois MANAGEMENT PLANNER: Stephen Diblik

SCHOOL NAME: Hamline Early Childhood Center

REVIEW DATE: 4/13/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

HOMOGENEOUS AREA: 001

MATERIAL DESCRIPTION: 2' x 2' Lay In Ceiling Panels

MATERIAL LOCATION: Throughout Facility

MATERIAL QUANTITY: 7000 MATERIAL UNITS: SF

DAMAGE QUANTITY: 0 DAMAGE UNITS: SF

In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations.

The RESPONSE ACTION recommendation is:

Operations and Maintenance

Comments:

Management Planner's Signature: Date: 04/13/2013

Page 22: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Inspector Assessment Form (REASSESSMENT) LEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois AHERA INSPECTOR: Jesus Delgado

SCHOOL NAME: Hamline Early Childhood Center INSPECTION DATE: 3/25/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

INFORMATION FROM PREVIOUS INSPECTION

HOMOGENEOUS AREA: 002

MATERIAL DESCRIPTION: Drywall

HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage

HISTORICAL DAMAGE REASON:

HISTORICAL RESPONSE ACTION: Operations and Maintenance

ASBESTOS TYPE: Assumed FRIABLE: Yes

RESULTS OF REINSPECTION AND REASSESSMENT

This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection.

The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage

DAMAGE REASON:

DISTURBANCE POTENTIAL: HIGH

MATERIAL LOCATION: Throughout Facility

MATERIAL QUANTITY: 17310 MATERIAL UNITS: SF

DAMAGE QUANTITY: DAMAGE UNITS: SF

COMMENTS:

Inspector's Signature: Date: 03/25/2013

Page 23: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Management Planner Review FormLEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois MANAGEMENT PLANNER: Stephen Diblik

SCHOOL NAME: Hamline Early Childhood Center

REVIEW DATE: 4/13/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

HOMOGENEOUS AREA: 002

MATERIAL DESCRIPTION: Drywall

MATERIAL LOCATION: Throughout Facility

MATERIAL QUANTITY: 17310 MATERIAL UNITS: SF

DAMAGE QUANTITY: 0 DAMAGE UNITS: SF

In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations.

The RESPONSE ACTION recommendation is:

Operations and Maintenance

Comments:

Management Planner's Signature: Date: 04/13/2013

Page 24: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Inspector Assessment Form (REASSESSMENT) LEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois AHERA INSPECTOR: Jesus Delgado

SCHOOL NAME: Hamline Early Childhood Center INSPECTION DATE: 3/25/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

INFORMATION FROM PREVIOUS INSPECTION

HOMOGENEOUS AREA: 003

MATERIAL DESCRIPTION: Drywall Compound

HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage

HISTORICAL DAMAGE REASON:

HISTORICAL RESPONSE ACTION: Operations and Maintenance

ASBESTOS TYPE: Assumed FRIABLE: Yes

RESULTS OF REINSPECTION AND REASSESSMENT

This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection.

The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage

DAMAGE REASON:

DISTURBANCE POTENTIAL: MODERATE

MATERIAL LOCATION: Throughout Facility

MATERIAL QUANTITY: 17310 MATERIAL UNITS: SF

DAMAGE QUANTITY: DAMAGE UNITS: SF

COMMENTS:

Inspector's Signature: Date: 03/25/2013

Page 25: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Management Planner Review FormLEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois MANAGEMENT PLANNER: Stephen Diblik

SCHOOL NAME: Hamline Early Childhood Center

REVIEW DATE: 4/13/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

HOMOGENEOUS AREA: 003

MATERIAL DESCRIPTION: Drywall Compound

MATERIAL LOCATION: Throughout Facility

MATERIAL QUANTITY: 17310 MATERIAL UNITS: SF

DAMAGE QUANTITY: 0 DAMAGE UNITS: SF

In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations.

The RESPONSE ACTION recommendation is:

Operations and Maintenance

Comments:

Management Planner's Signature: Date: 04/13/2013

Page 26: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Inspector Assessment Form (REASSESSMENT) LEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois AHERA INSPECTOR: Jesus Delgado

SCHOOL NAME: Hamline Early Childhood Center INSPECTION DATE: 3/25/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

INFORMATION FROM PREVIOUS INSPECTION

HOMOGENEOUS AREA: 004

MATERIAL DESCRIPTION: 12" x 12"White Floor Tile w/ Blue Streaks

HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage

HISTORICAL DAMAGE REASON:

HISTORICAL RESPONSE ACTION: Operations and Maintenance

ASBESTOS TYPE: Assumed FRIABLE: No

RESULTS OF REINSPECTION AND REASSESSMENT

This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection.

The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage

DAMAGE REASON:

DISTURBANCE POTENTIAL: HIGH

MATERIAL LOCATION: Reception Office and Classrooms 6,13,14,15 and 17, Staff Lounge

MATERIAL QUANTITY: 4500 MATERIAL UNITS: SF

DAMAGE QUANTITY: DAMAGE UNITS: SF

COMMENTS:

Inspector's Signature: Date: 03/25/2013

Page 27: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Management Planner Review FormLEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois MANAGEMENT PLANNER: Stephen Diblik

SCHOOL NAME: Hamline Early Childhood Center

REVIEW DATE: 4/13/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

HOMOGENEOUS AREA: 004

MATERIAL DESCRIPTION: 12" x 12"White Floor Tile w/ Blue Streaks

MATERIAL LOCATION: Reception Office and Classrooms 6,13,14,15 and 17, Staff Lounge

MATERIAL QUANTITY: 4500 MATERIAL UNITS: SF

DAMAGE QUANTITY: 0 DAMAGE UNITS: SF

In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations.

The RESPONSE ACTION recommendation is:

Operations and Maintenance

Comments:

Management Planner's Signature: Date: 04/13/2013

Page 28: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Inspector Assessment Form (REASSESSMENT) LEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois AHERA INSPECTOR: Jesus Delgado

SCHOOL NAME: Hamline Early Childhood Center INSPECTION DATE: 3/25/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

INFORMATION FROM PREVIOUS INSPECTION

HOMOGENEOUS AREA: 005

MATERIAL DESCRIPTION: 12"x12" White Floor Tile w/ Blue Streaks - Mastic

HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage

HISTORICAL DAMAGE REASON:

HISTORICAL RESPONSE ACTION: Operations and Maintenance

ASBESTOS TYPE: Assumed FRIABLE: No

RESULTS OF REINSPECTION AND REASSESSMENT

This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection.

The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage

DAMAGE REASON:

DISTURBANCE POTENTIAL: LOW

MATERIAL LOCATION: Reception, Office and classrooms 6,13,14,15 and 17, Staff Lounge

MATERIAL QUANTITY: 4500 MATERIAL UNITS: SF

DAMAGE QUANTITY: DAMAGE UNITS: SF

COMMENTS:

Inspector's Signature: Date: 03/25/2013

Page 29: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Management Planner Review FormLEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois MANAGEMENT PLANNER: Stephen Diblik

SCHOOL NAME: Hamline Early Childhood Center

REVIEW DATE: 4/13/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

HOMOGENEOUS AREA: 005

MATERIAL DESCRIPTION: 12"x12" White Floor Tile w/ Blue Streaks - Mastic

MATERIAL LOCATION: Reception, Office and classrooms 6,13,14,15 and 17, Staff Lounge

MATERIAL QUANTITY: 4500 MATERIAL UNITS: SF

DAMAGE QUANTITY: 0 DAMAGE UNITS: SF

In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations.

The RESPONSE ACTION recommendation is:

Operations and Maintenance

Comments:

Management Planner's Signature: Date: 04/13/2013

Page 30: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Inspector Assessment Form (REASSESSMENT) LEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois AHERA INSPECTOR: Jesus Delgado

SCHOOL NAME: Hamline Early Childhood Center INSPECTION DATE: 3/25/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

INFORMATION FROM PREVIOUS INSPECTION

HOMOGENEOUS AREA: 006

MATERIAL DESCRIPTION: 12" x 12" Yellow Floor Tile w/ Blue Streaks

HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage

HISTORICAL DAMAGE REASON:

HISTORICAL RESPONSE ACTION: Operations and Maintenance

ASBESTOS TYPE: Assumed FRIABLE: No

RESULTS OF REINSPECTION AND REASSESSMENT

This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection.

The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage

DAMAGE REASON:

DISTURBANCE POTENTIAL: HIGH

MATERIAL LOCATION: Washrooms, MDF Room, Corridors and Janitor's Closet, reception

MATERIAL QUANTITY: 2450 MATERIAL UNITS: SF

DAMAGE QUANTITY: DAMAGE UNITS: SF

COMMENTS:

Inspector's Signature: Date: 03/25/2013

Page 31: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Management Planner Review FormLEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois MANAGEMENT PLANNER: Stephen Diblik

SCHOOL NAME: Hamline Early Childhood Center

REVIEW DATE: 4/13/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

HOMOGENEOUS AREA: 006

MATERIAL DESCRIPTION: 12" x 12" Yellow Floor Tile w/ Blue Streaks

MATERIAL LOCATION: Washrooms, MDF Room, Corridors and Janitor's Closet, reception

MATERIAL QUANTITY: 2450 MATERIAL UNITS: SF

DAMAGE QUANTITY: 0 DAMAGE UNITS: SF

In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations.

The RESPONSE ACTION recommendation is:

Operations and Maintenance

Comments:

Management Planner's Signature: Date: 04/13/2013

Page 32: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Inspector Assessment Form (REASSESSMENT) LEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois AHERA INSPECTOR: Jesus Delgado

SCHOOL NAME: Hamline Early Childhood Center INSPECTION DATE: 3/25/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

INFORMATION FROM PREVIOUS INSPECTION

HOMOGENEOUS AREA: 007

MATERIAL DESCRIPTION: 12"x12" Yellow Floor Tile w/ Blue Streak - Mastic

HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage

HISTORICAL DAMAGE REASON:

HISTORICAL RESPONSE ACTION: Operations and Maintenance

ASBESTOS TYPE: Assumed FRIABLE: No

RESULTS OF REINSPECTION AND REASSESSMENT

This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection.

The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage

DAMAGE REASON:

DISTURBANCE POTENTIAL: LOW

MATERIAL LOCATION: Washrooms, MDF Room, Corridors and Janitor's Closet, reception

MATERIAL QUANTITY: 2450 MATERIAL UNITS: SF

DAMAGE QUANTITY: DAMAGE UNITS: SF

COMMENTS:

Inspector's Signature: Date: 03/25/2013

Page 33: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Management Planner Review FormLEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois MANAGEMENT PLANNER: Stephen Diblik

SCHOOL NAME: Hamline Early Childhood Center

REVIEW DATE: 4/13/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

HOMOGENEOUS AREA: 007

MATERIAL DESCRIPTION: 12"x12" Yellow Floor Tile w/ Blue Streak - Mastic

MATERIAL LOCATION: Washrooms, MDF Room, Corridors and Janitor's Closet, reception

MATERIAL QUANTITY: 2450 MATERIAL UNITS: SF

DAMAGE QUANTITY: 0 DAMAGE UNITS: SF

In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations.

The RESPONSE ACTION recommendation is:

Operations and Maintenance

Comments:

Management Planner's Signature: Date: 04/13/2013

Page 34: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Inspector Assessment Form (REASSESSMENT) LEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois AHERA INSPECTOR: Jesus Delgado

SCHOOL NAME: Hamline Early Childhood Center INSPECTION DATE: 3/25/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

INFORMATION FROM PREVIOUS INSPECTION

HOMOGENEOUS AREA: 008

MATERIAL DESCRIPTION: White Linoleum

HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage

HISTORICAL DAMAGE REASON:

HISTORICAL RESPONSE ACTION: Operations and Maintenance

ASBESTOS TYPE: Assumed FRIABLE: No

RESULTS OF REINSPECTION AND REASSESSMENT

This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection.

The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage

DAMAGE REASON:

DISTURBANCE POTENTIAL: HIGH

MATERIAL LOCATION: Kitchen

MATERIAL QUANTITY: 625 MATERIAL UNITS: SF

DAMAGE QUANTITY: DAMAGE UNITS: SF

COMMENTS:

Inspector's Signature: Date: 03/25/2013

Page 35: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Management Planner Review FormLEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois MANAGEMENT PLANNER: Stephen Diblik

SCHOOL NAME: Hamline Early Childhood Center

REVIEW DATE: 4/13/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

HOMOGENEOUS AREA: 008

MATERIAL DESCRIPTION: White Linoleum

MATERIAL LOCATION: Kitchen

MATERIAL QUANTITY: 625 MATERIAL UNITS: SF

DAMAGE QUANTITY: 0 DAMAGE UNITS: SF

In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations.

The RESPONSE ACTION recommendation is:

Operations and Maintenance

Comments:

Management Planner's Signature: Date: 04/13/2013

Page 36: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Inspector Assessment Form (REASSESSMENT) LEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois AHERA INSPECTOR: Jesus Delgado

SCHOOL NAME: Hamline Early Childhood Center INSPECTION DATE: 3/25/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

INFORMATION FROM PREVIOUS INSPECTION

HOMOGENEOUS AREA: 009

MATERIAL DESCRIPTION: White Linoleum Adhesive

HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage

HISTORICAL DAMAGE REASON:

HISTORICAL RESPONSE ACTION: Operations and Maintenance

ASBESTOS TYPE: Assumed FRIABLE: No

RESULTS OF REINSPECTION AND REASSESSMENT

This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection.

The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage

DAMAGE REASON:

DISTURBANCE POTENTIAL: LOW

MATERIAL LOCATION: Kitchen

MATERIAL QUANTITY: 625 MATERIAL UNITS: SF

DAMAGE QUANTITY: DAMAGE UNITS: SF

COMMENTS:

Inspector's Signature: Date: 03/25/2013

Page 37: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Management Planner Review FormLEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois MANAGEMENT PLANNER: Stephen Diblik

SCHOOL NAME: Hamline Early Childhood Center

REVIEW DATE: 4/13/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

HOMOGENEOUS AREA: 009

MATERIAL DESCRIPTION: White Linoleum Adhesive

MATERIAL LOCATION: Kitchen

MATERIAL QUANTITY: 625 MATERIAL UNITS: SF

DAMAGE QUANTITY: 0 DAMAGE UNITS: SF

In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations.

The RESPONSE ACTION recommendation is:

Operations and Maintenance

Comments:

Management Planner's Signature: Date: 04/13/2013

Page 38: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Inspector Assessment Form (REASSESSMENT) LEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois AHERA INSPECTOR: Jesus Delgado

SCHOOL NAME: Hamline Early Childhood Center INSPECTION DATE: 3/25/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

INFORMATION FROM PREVIOUS INSPECTION

HOMOGENEOUS AREA: 010

MATERIAL DESCRIPTION: 4" Beige Vinyl Baseboard

HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage

HISTORICAL DAMAGE REASON:

HISTORICAL RESPONSE ACTION: Operations and Maintenance

ASBESTOS TYPE: Assumed FRIABLE: No

RESULTS OF REINSPECTION AND REASSESSMENT

This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection.

The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage

DAMAGE REASON:

DISTURBANCE POTENTIAL: MODERATE

MATERIAL LOCATION: Staff Lounge, Classrooms 7,13,14,15 and 17, reception

MATERIAL QUANTITY: 625 MATERIAL UNITS: LF

DAMAGE QUANTITY: DAMAGE UNITS: LF

COMMENTS:

Inspector's Signature: Date: 03/25/2013

Page 39: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Management Planner Review FormLEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois MANAGEMENT PLANNER: Stephen Diblik

SCHOOL NAME: Hamline Early Childhood Center

REVIEW DATE: 4/13/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

HOMOGENEOUS AREA: 010

MATERIAL DESCRIPTION: 4" Beige Vinyl Baseboard

MATERIAL LOCATION: Staff Lounge, Classrooms 7,13,14,15 and 17, reception

MATERIAL QUANTITY: 625 MATERIAL UNITS: LF

DAMAGE QUANTITY: 0 DAMAGE UNITS: LF

In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations.

The RESPONSE ACTION recommendation is:

Operations and Maintenance

Comments:

Management Planner's Signature: Date: 04/13/2013

Page 40: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Inspector Assessment Form (REASSESSMENT) LEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois AHERA INSPECTOR: Jesus Delgado

SCHOOL NAME: Hamline Early Childhood Center INSPECTION DATE: 3/25/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

INFORMATION FROM PREVIOUS INSPECTION

HOMOGENEOUS AREA: 011

MATERIAL DESCRIPTION: 4" Beige Vinyl Baseboard Adhesive

HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage

HISTORICAL DAMAGE REASON:

HISTORICAL RESPONSE ACTION: Operations and Maintenance

ASBESTOS TYPE: Assumed FRIABLE: No

RESULTS OF REINSPECTION AND REASSESSMENT

This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection.

The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage

DAMAGE REASON:

DISTURBANCE POTENTIAL: LOW

MATERIAL LOCATION: Staff Lounge, Classrooms 6,13,14,15 and 17, reception

MATERIAL QUANTITY: 625 MATERIAL UNITS: LF

DAMAGE QUANTITY: DAMAGE UNITS: LF

COMMENTS:

Inspector's Signature: Date: 03/25/2013

Page 41: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Management Planner Review FormLEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois MANAGEMENT PLANNER: Stephen Diblik

SCHOOL NAME: Hamline Early Childhood Center

REVIEW DATE: 4/13/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

HOMOGENEOUS AREA: 011

MATERIAL DESCRIPTION: 4" Beige Vinyl Baseboard Adhesive

MATERIAL LOCATION: Staff Lounge, Classrooms 6,13,14,15 and 17, reception

MATERIAL QUANTITY: 625 MATERIAL UNITS: LF

DAMAGE QUANTITY: 0 DAMAGE UNITS: LF

In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations.

The RESPONSE ACTION recommendation is:

Operations and Maintenance

Comments:

Management Planner's Signature: Date: 04/13/2013

Page 42: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Inspector Assessment Form (REASSESSMENT) LEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois AHERA INSPECTOR: Jesus Delgado

SCHOOL NAME: Hamline Early Childhood Center INSPECTION DATE: 3/25/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

INFORMATION FROM PREVIOUS INSPECTION

HOMOGENEOUS AREA: 012

MATERIAL DESCRIPTION: 4" Brown Vinyl Baseboard

HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage

HISTORICAL DAMAGE REASON:

HISTORICAL RESPONSE ACTION: Operations and Maintenance

ASBESTOS TYPE: Assumed FRIABLE: No

RESULTS OF REINSPECTION AND REASSESSMENT

This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection.

The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage

DAMAGE REASON:

DISTURBANCE POTENTIAL: MODERATE

MATERIAL LOCATION: Corridors, Reception, Offices, Washrooms, Janitor's Closet, Rear Office, ConsultationRoom and MDF

MATERIAL QUANTITY: 375 MATERIAL UNITS: LF

DAMAGE QUANTITY: DAMAGE UNITS: LF

COMMENTS:

Inspector's Signature: Date: 03/25/2013

Page 43: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Management Planner Review FormLEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois MANAGEMENT PLANNER: Stephen Diblik

SCHOOL NAME: Hamline Early Childhood Center

REVIEW DATE: 4/13/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

HOMOGENEOUS AREA: 012

MATERIAL DESCRIPTION: 4" Brown Vinyl Baseboard

MATERIAL LOCATION: Corridors, Reception, Offices, Washrooms, Janitor's Closet, Rear Office, Consultation Room and MDF

MATERIAL QUANTITY: 375 MATERIAL UNITS: LF

DAMAGE QUANTITY: 0 DAMAGE UNITS: LF

In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations.

The RESPONSE ACTION recommendation is:

Operations and Maintenance

Comments:

Management Planner's Signature: Date: 04/13/2013

Page 44: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Inspector Assessment Form (REASSESSMENT) LEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois AHERA INSPECTOR: Jesus Delgado

SCHOOL NAME: Hamline Early Childhood Center INSPECTION DATE: 3/25/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

INFORMATION FROM PREVIOUS INSPECTION

HOMOGENEOUS AREA: 013

MATERIAL DESCRIPTION: 4" Brown Vinyl Baseboard Adhesive

HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage

HISTORICAL DAMAGE REASON:

HISTORICAL RESPONSE ACTION: Operations and Maintenance

ASBESTOS TYPE: Assumed FRIABLE: No

RESULTS OF REINSPECTION AND REASSESSMENT

This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection.

The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage

DAMAGE REASON:

DISTURBANCE POTENTIAL: LOW

MATERIAL LOCATION: Corridors, Reception, Offices, Washrooms, Janitor's Closet, Rear Office, ConsultationRoom and MDF

MATERIAL QUANTITY: 375 MATERIAL UNITS: LF

DAMAGE QUANTITY: DAMAGE UNITS: LF

COMMENTS:

Inspector's Signature: Date: 03/25/2013

Page 45: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Management Planner Review FormLEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois MANAGEMENT PLANNER: Stephen Diblik

SCHOOL NAME: Hamline Early Childhood Center

REVIEW DATE: 4/13/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

HOMOGENEOUS AREA: 013

MATERIAL DESCRIPTION: 4" Brown Vinyl Baseboard Adhesive

MATERIAL LOCATION: Corridors, Reception, Offices, Washrooms, Janitor's Closet, Rear Office, Consultation Room and MDF

MATERIAL QUANTITY: 375 MATERIAL UNITS: LF

DAMAGE QUANTITY: 0 DAMAGE UNITS: LF

In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations.

The RESPONSE ACTION recommendation is:

Operations and Maintenance

Comments:

Management Planner's Signature: Date: 04/13/2013

Page 46: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Inspector Assessment Form (REASSESSMENT) LEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois AHERA INSPECTOR: Jesus Delgado

SCHOOL NAME: Hamline Early Childhood Center INSPECTION DATE: 3/25/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

INFORMATION FROM PREVIOUS INSPECTION

HOMOGENEOUS AREA: 014

MATERIAL DESCRIPTION: White Wallboard

HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage

HISTORICAL DAMAGE REASON:

HISTORICAL RESPONSE ACTION: Operations and Maintenance

ASBESTOS TYPE: Assumed FRIABLE: No

RESULTS OF REINSPECTION AND REASSESSMENT

This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection.

The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage

DAMAGE REASON:

DISTURBANCE POTENTIAL: HIGH

MATERIAL LOCATION: Classrooms

MATERIAL QUANTITY: 1500 MATERIAL UNITS: SF

DAMAGE QUANTITY: DAMAGE UNITS: SF

COMMENTS:

Inspector's Signature: Date: 03/25/2013

Page 47: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Management Planner Review FormLEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois MANAGEMENT PLANNER: Stephen Diblik

SCHOOL NAME: Hamline Early Childhood Center

REVIEW DATE: 4/13/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

HOMOGENEOUS AREA: 014

MATERIAL DESCRIPTION: White Wallboard

MATERIAL LOCATION: Classrooms

MATERIAL QUANTITY: 1500 MATERIAL UNITS: SF

DAMAGE QUANTITY: 0 DAMAGE UNITS: SF

In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations.

The RESPONSE ACTION recommendation is:

Operations and Maintenance

Comments:

Management Planner's Signature: Date: 04/13/2013

Page 48: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Inspector Assessment Form (REASSESSMENT) LEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois AHERA INSPECTOR: Jesus Delgado

SCHOOL NAME: Hamline Early Childhood Center INSPECTION DATE: 3/25/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

INFORMATION FROM PREVIOUS INSPECTION

HOMOGENEOUS AREA: 015

MATERIAL DESCRIPTION: White Wallboard Adhesive

HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage

HISTORICAL DAMAGE REASON:

HISTORICAL RESPONSE ACTION: Operations and Maintenance

ASBESTOS TYPE: Assumed FRIABLE: No

RESULTS OF REINSPECTION AND REASSESSMENT

This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection.

The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage

DAMAGE REASON:

DISTURBANCE POTENTIAL: LOW

MATERIAL LOCATION: Classrooms

MATERIAL QUANTITY: 1500 MATERIAL UNITS: SF

DAMAGE QUANTITY: DAMAGE UNITS: SF

COMMENTS:

Inspector's Signature: Date: 03/25/2013

Page 49: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Management Planner Review FormLEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois MANAGEMENT PLANNER: Stephen Diblik

SCHOOL NAME: Hamline Early Childhood Center

REVIEW DATE: 4/13/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

HOMOGENEOUS AREA: 015

MATERIAL DESCRIPTION: White Wallboard Adhesive

MATERIAL LOCATION: Classrooms

MATERIAL QUANTITY: 1500 MATERIAL UNITS: SF

DAMAGE QUANTITY: 0 DAMAGE UNITS: SF

In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations.

The RESPONSE ACTION recommendation is:

Operations and Maintenance

Comments:

Management Planner's Signature: Date: 04/13/2013

Page 50: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Inspector Assessment Form (REASSESSMENT) LEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois AHERA INSPECTOR: Jesus Delgado

SCHOOL NAME: Hamline Early Childhood Center INSPECTION DATE: 3/25/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

INFORMATION FROM PREVIOUS INSPECTION

HOMOGENEOUS AREA: 016

MATERIAL DESCRIPTION: White Wallboard Caulk

HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage

HISTORICAL DAMAGE REASON:

HISTORICAL RESPONSE ACTION: Operations and Maintenance

ASBESTOS TYPE: Assumed FRIABLE: No

RESULTS OF REINSPECTION AND REASSESSMENT

This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection.

The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage

DAMAGE REASON:

DISTURBANCE POTENTIAL: LOW

MATERIAL LOCATION: Classrooms

MATERIAL QUANTITY: 200 MATERIAL UNITS: LF

DAMAGE QUANTITY: DAMAGE UNITS: LF

COMMENTS:

Inspector's Signature: Date: 03/25/2013

Page 51: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Management Planner Review FormLEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois MANAGEMENT PLANNER: Stephen Diblik

SCHOOL NAME: Hamline Early Childhood Center

REVIEW DATE: 4/13/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

HOMOGENEOUS AREA: 016

MATERIAL DESCRIPTION: White Wallboard Caulk

MATERIAL LOCATION: Classrooms

MATERIAL QUANTITY: 200 MATERIAL UNITS: LF

DAMAGE QUANTITY: 0 DAMAGE UNITS: LF

In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations.

The RESPONSE ACTION recommendation is:

Operations and Maintenance

Comments:

Management Planner's Signature: Date: 04/13/2013

Page 52: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Inspector Assessment Form (REASSESSMENT) LEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois AHERA INSPECTOR: Jesus Delgado

SCHOOL NAME: Hamline Early Childhood Center INSPECTION DATE: 3/25/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

INFORMATION FROM PREVIOUS INSPECTION

HOMOGENEOUS AREA: 017

MATERIAL DESCRIPTION: Marker Board Adhesive

HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage

HISTORICAL DAMAGE REASON:

HISTORICAL RESPONSE ACTION: Operations and Maintenance

ASBESTOS TYPE: Assumed FRIABLE: No

RESULTS OF REINSPECTION AND REASSESSMENT

This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection.

The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage

DAMAGE REASON:

DISTURBANCE POTENTIAL: LOW

MATERIAL LOCATION: Classrooms

MATERIAL QUANTITY: 160 MATERIAL UNITS: SF

DAMAGE QUANTITY: DAMAGE UNITS: SF

COMMENTS:

Inspector's Signature: Date: 03/25/2013

Page 53: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Management Planner Review FormLEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois MANAGEMENT PLANNER: Stephen Diblik

SCHOOL NAME: Hamline Early Childhood Center

REVIEW DATE: 4/13/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

HOMOGENEOUS AREA: 017

MATERIAL DESCRIPTION: Marker Board Adhesive

MATERIAL LOCATION: Classrooms

MATERIAL QUANTITY: 160 MATERIAL UNITS: SF

DAMAGE QUANTITY: 0 DAMAGE UNITS: SF

In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations.

The RESPONSE ACTION recommendation is:

Operations and Maintenance

Comments:

Management Planner's Signature: Date: 04/13/2013

Page 54: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Inspector Assessment Form (REASSESSMENT) LEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois AHERA INSPECTOR: Jesus Delgado

SCHOOL NAME: Hamline Early Childhood Center INSPECTION DATE: 3/25/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

INFORMATION FROM PREVIOUS INSPECTION

HOMOGENEOUS AREA: 018

MATERIAL DESCRIPTION: Tack Board Adhesive

HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage

HISTORICAL DAMAGE REASON:

HISTORICAL RESPONSE ACTION: Operations and Maintenance

ASBESTOS TYPE: Assumed FRIABLE: No

RESULTS OF REINSPECTION AND REASSESSMENT

This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection.

The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage

DAMAGE REASON:

DISTURBANCE POTENTIAL: LOW

MATERIAL LOCATION: CLassrooms

MATERIAL QUANTITY: 160 MATERIAL UNITS: SF

DAMAGE QUANTITY: DAMAGE UNITS: SF

COMMENTS:

Inspector's Signature: Date: 03/25/2013

Page 55: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Management Planner Review FormLEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois MANAGEMENT PLANNER: Stephen Diblik

SCHOOL NAME: Hamline Early Childhood Center

REVIEW DATE: 4/13/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

HOMOGENEOUS AREA: 018

MATERIAL DESCRIPTION: Tack Board Adhesive

MATERIAL LOCATION: CLassrooms

MATERIAL QUANTITY: 160 MATERIAL UNITS: SF

DAMAGE QUANTITY: 0 DAMAGE UNITS: SF

In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations.

The RESPONSE ACTION recommendation is:

Operations and Maintenance

Comments:

Management Planner's Signature: Date: 04/13/2013

Page 56: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Inspector Assessment Form (REASSESSMENT) LEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois AHERA INSPECTOR: Jesus Delgado

SCHOOL NAME: Hamline Early Childhood Center INSPECTION DATE: 3/25/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

INFORMATION FROM PREVIOUS INSPECTION

HOMOGENEOUS AREA: 019

MATERIAL DESCRIPTION: Window Glazing

HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage

HISTORICAL DAMAGE REASON:

HISTORICAL RESPONSE ACTION: Operations and Maintenance

ASBESTOS TYPE: Assumed FRIABLE: No

RESULTS OF REINSPECTION AND REASSESSMENT

This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection.

The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage

DAMAGE REASON:

DISTURBANCE POTENTIAL: MODERATE

MATERIAL LOCATION: Throughout Building

MATERIAL QUANTITY: 650 MATERIAL UNITS: LF

DAMAGE QUANTITY: DAMAGE UNITS: LF

COMMENTS:

Inspector's Signature: Date: 03/25/2013

Page 57: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Management Planner Review FormLEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois MANAGEMENT PLANNER: Stephen Diblik

SCHOOL NAME: Hamline Early Childhood Center

REVIEW DATE: 4/13/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

HOMOGENEOUS AREA: 019

MATERIAL DESCRIPTION: Window Glazing

MATERIAL LOCATION: Throughout Building

MATERIAL QUANTITY: 650 MATERIAL UNITS: LF

DAMAGE QUANTITY: 0 DAMAGE UNITS: LF

In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations.

The RESPONSE ACTION recommendation is:

Operations and Maintenance

Comments:

Management Planner's Signature: Date: 04/13/2013

Page 58: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Inspector Assessment Form (REASSESSMENT) LEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois AHERA INSPECTOR: Jesus Delgado

SCHOOL NAME: Hamline Early Childhood Center INSPECTION DATE: 3/25/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

INFORMATION FROM PREVIOUS INSPECTION

HOMOGENEOUS AREA: 020

MATERIAL DESCRIPTION: Insulation in Firedoors

HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage

HISTORICAL DAMAGE REASON:

HISTORICAL RESPONSE ACTION: Operations and Maintenance

ASBESTOS TYPE: Assumed FRIABLE: No

RESULTS OF REINSPECTION AND REASSESSMENT

This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection.

The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage

DAMAGE REASON:

DISTURBANCE POTENTIAL: LOW

MATERIAL LOCATION: Metal Exit Doors

MATERIAL QUANTITY: 74 MATERIAL UNITS: SF

DAMAGE QUANTITY: DAMAGE UNITS: SF

COMMENTS:

Inspector's Signature: Date: 03/25/2013

Page 59: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Management Planner Review FormLEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois MANAGEMENT PLANNER: Stephen Diblik

SCHOOL NAME: Hamline Early Childhood Center

REVIEW DATE: 4/13/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

HOMOGENEOUS AREA: 020

MATERIAL DESCRIPTION: Insulation in Firedoors

MATERIAL LOCATION: Metal Exit Doors

MATERIAL QUANTITY: 74 MATERIAL UNITS: SF

DAMAGE QUANTITY: 0 DAMAGE UNITS: SF

In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations.

The RESPONSE ACTION recommendation is:

Operations and Maintenance

Comments:

Management Planner's Signature: Date: 04/13/2013

Page 60: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Inspector Assessment Form (REASSESSMENT) LEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois AHERA INSPECTOR: Jesus Delgado

SCHOOL NAME: Hamline Early Childhood Center INSPECTION DATE: 3/25/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

INFORMATION FROM PREVIOUS INSPECTION

HOMOGENEOUS AREA: 021

MATERIAL DESCRIPTION: Sink Undercoat

HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage

HISTORICAL DAMAGE REASON:

HISTORICAL RESPONSE ACTION: Operations and Maintenance

ASBESTOS TYPE: Assumed FRIABLE: No

RESULTS OF REINSPECTION AND REASSESSMENT

This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection.

The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage

DAMAGE REASON:

DISTURBANCE POTENTIAL: LOW

MATERIAL LOCATION: Corridor

MATERIAL QUANTITY: 10 MATERIAL UNITS: SF

DAMAGE QUANTITY: DAMAGE UNITS: SF

COMMENTS:

Inspector's Signature: Date: 03/25/2013

Page 61: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Management Planner Review FormLEA NAME: Chicago Public Schools UNIT NUMBER: 23513 BUIDLING ID: 3742

CITY/STATE: Chicago, Illinois MANAGEMENT PLANNER: Stephen Diblik

SCHOOL NAME: Hamline Early Childhood Center

REVIEW DATE: 4/13/2013

ADDRESS: 4652 S. Bishop IDPH LICENSE NO: 100-11170

HOMOGENEOUS AREA: 021

MATERIAL DESCRIPTION: Sink Undercoat

MATERIAL LOCATION: Corridor

MATERIAL QUANTITY: 10 MATERIAL UNITS: SF

DAMAGE QUANTITY: 0 DAMAGE UNITS: SF

In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations.

The RESPONSE ACTION recommendation is:

Operations and Maintenance

Comments:

Management Planner's Signature: Date: 04/13/2013

Page 62: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Chicago Public Schools

Carnow, Conibear and Associates

2013 AHERA REINSPECTION

Page 63: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

APPENDIX B

Inspector and Management Planner Licenses

Page 64: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing
Page 65: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing
Page 66: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing
Page 67: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing
Page 68: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing
Page 69: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

APPENDIX C

Laboratory Accreditations

Page 70: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

APPENDIX D

Laboratory Results

Page 71: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

APPENDIX E

Chain of Custody Forms

Page 72: 4/13/2013 - CPSschoolreports.cps.edu/AsbestosInspectionReport_2013...Re: Chicago Public Schools - 2013 Three-Year Reinspections Dear Mr. Cook: Carnow, Conibear and Associates, Managing

Three-Year Reinspection Key to Terms

CODE KEYMATERIAL

ACBM Asbestos Containing Building MaterialsMATERIAL CATEGORY

MISC Miscellaneous

SURF Surfacing

TSI Thermal System InsulationMATERIAL UNITS

LF Linear Feet

SF Square Feet

CF Cubic FeetDAMAGE TYPE

Loc Localized

Dist Distributed