AL RYUM GROUP – PROJECTS COMPLETED
S.
NO. PROJECT NAME CLIENT CONSULTANT
STARTING DATE
COMPLETION DATE
1
1
Contract No. BA/2/L/1476 Hard & Soft
Landscape Works and Automatic Irrigation System in Al Bateen Palace for H.H. Sheikh
Hamdan Bin Zayed Al Nahyan
Abu Dhabi Municipality
Arabian Engineering Center & Al
Khatib Cracknell.
21.09.1998 30.11.1999
2
Contract No. BA/2/L/1568 For Construction, Completion and Remedying of defects of
Ghantoot Racing and Polo Club Landscape at Abu Dhabi
Abu Dhabi Municipality
- 25.06.1999 31.01.2000
3
Contact No. BA/2/L/1254 For the Supply & Installation of Equipment in the Veterinary
Laboratory at Al Wathba Clinic
Abu Dhabi Municipality
Spectrum Eng. Consultants
03.03.1999 01.10.2001
4 Contract No. 231/2000 External
Landscaping Works for Marfa Hotel. Public works Department
The Arab Office for Planning & Architecture
19.06.2000 06.11.2001
5
Housing Complex Expansion Project No.1215, Agreement No. 171215C8 /
Package 7. Construction of Landscaping & Irrigation Branches
ADNOC - 10.07.2001 06.08.2002
6 Supply and Installation of 353 Controllers Abu Dhabi Municipality
- 12.08.2002 20.04.2003
7 Supply and Installation of 240 Controllers Abu Dhabi Municipality
- 10.11.2002 12.05.2003
8
Contract No. BA/2/L/1959 H.H. Sheikh Sultan Bin Zayed Al Nahyan Residential
Complex Landscape Works
Abu Dhabi Municipality
Sam Engineering Consultants
06.04.2002 12.05.2003
9
Construction & Completion of 170 Farms at
Khalifa City "A"
Abu Dhabi Municipality
Jouzy & Partners Consulting Engineers
15.04.2002 27.05.2003
10
Abu Dhabi TRIP Contract No. 980 Umm Al Nar Bridge and Tunnel Interchange
Landscaping Works
Abu Dhabi Municipality
Delew Cather 31.12.2002 31.07.2003
11
Landscaping and Maintenance at Ruwais
Housing Comlex ADNOC
ADNOC - 01.05.1999 08.08.2003
AL RYUM GROUP – PROJECTS COMPLETED
S.
NO. PROJECT NAME CLIENT CONSULTANT
STARTING DATE
COMPLETION DATE
2
12
Contract No. BA/2/L/1664 Construction,
Completion and Maintenance of Al Wathba Park
Abu Dhabi Municipality
Derby Design 16.09.2000 31.08.2003
13
Contract No. BA/2/L/2072 Supply, Installation & Maintenance of Electrical &
Mechanical Playground Equipment at Different Locations in Abu Dhabi
Abu Dhabi Municipality
Pan Emirates 01.09.2002 18.10.2003
14
Renewal and Maintenance of (5) Fountains
in Abu Dhabi
Abu Dhabi Municipality
Arabian Engineering
Center 01.04.2002 15.12.2003
15
Contract No. BA/2/L/1606
Furnishing of the Surgery and X-ray Section at the Al Wathba Veterinary Clinic
Abu Dhabi Municipality
Spectrum Eng. Consultants
30.06.2000 29.02.2004
16
Contract No. BA/2/L/1547 Supply
and Installation of Computer Control System for Irrigation Network at Wadi Al Ryum
Abu Dhabi Municipality
Arabian Engineering
Center 10.10.2001 14.04.2004
17
Contract No. BA/2/L/2004 Construction &
Maintenance of 3 Nos. of Pumping Stations for Fodder Farms in Wadi Al Ryum
Abu Dhabi Municipality
Dr. M.H. Ali El Saie Consulting
Engineering 02.03.2002 22.05.2004
18
Contract No. BA/2/L/2222 Supply, Installation & Maintenance of Electrical &
Mechanical Playground Equipment at different locations in Abu
Dhabi
Abu Dhabi Municipality
Pan Emirates 01.06.2003 30.05.2004
19
Contract No. 230/2002 Development and
Beautification Works at Lulu Island.
Public works Department
- 15.08.2002 14.06.2004
20
Contract No. BA/2/L/2151 Completion & Plantation of 240 Farmsat Khalifa City B -
Abu Dhabi
Abu Dhabi Municipality
Sam Engineering Consultants
01.09.2003 03.07.2004
21
Construction & Maintenance of 74 Farms
Abu Dhabi Municipality
Sam Engineering Consultants
01.03.2004 27.08.2004
22
Irrigation Control System at Quoryn Al Aich
Public works Department
- 10.05.2004 09.09.2004
AL RYUM GROUP – PROJECTS COMPLETED
S.
NO. PROJECT NAME CLIENT CONSULTANT
STARTING DATE
COMPLETION DATE
3
23
Contract No. BA/2/L/2105 Construction &
Maintenance of 800 Farms at Al Falah Area, Abu Dhabi
Abu Dhabi Municipality
Sam Engineering Consultants
01.07.2002 30.09.2004
24
Contract No. BA/2/L/2050 Construction & Maintenance of 649 Farms at Al Rehbah,
Abu Dhabi
Abu Dhabi Municipality
Sam Engineering Consultants
10.11.2001 08.12.2004
25
Contract No.910/1 Irrigation Control System at Abu Dhabi Industrial City - Phase I
Public works Department
Parsons 23.10.2004 11.12.2004
26
Supply & Installation of 20 Tanks 100,000
Gallons at the Western Region
Western Region Municipality
Joozy & Partners 17.11.2003 15.12.2004
27
Replacement of Irrigation System & Lighting
at Crown Prince Diwan
Abu Dhabi Municipality
Joozy & Partners 17.11.2003 15.12.2004
28
Landscaping Works at Conference Palace Hotel (Emirates Palace) - Abu Dhabi,
Package 14 A, B & C
Conference Palace Hotel
Executive Committee
Turner 25.07.2004 30.12.2004
29
Contract No. BA/2/L/2637 Replacement of Irrigation System at his Highness The
President Palace at Muzairah.
Abu Dhabi Municipality
Sam Engineering Consultants
24.07.2004 19.01.2005
30
Contract No. BA/2/L/2516 Removal, Supply, Installation & Maintenance of Garden Lights
at Mirfa Cornich.
Abu Dhabi Municipality
Agriculture Dept.
Dr. M.H. Ali El Saie Consulting
Engineering 15.05.2004 10.03.2005
31
Supply & Installation of 100 Pumps at Bida Yamrah 8
Abu Dhabi Municipality
Sam Engineering Consultants
10.01.2004 08.05.2005
32
Supply & Installation of Flow Control Valves at Taweelah, Rehba & Bahia
Abu Dhabi Municipality
Dr. M.H. Ali El Saie Consulting
Engineering 09.01.2004 09.05.2005
33
Contract No. BA/2/L/2472 Renovation & Maintenance of 8 Fountains inside & outside
Abu Dhabi - Phase 3
Abu Dhabi Municipality
Pan Emirates 13.12.2003 10.05.2005
34
Abu Dhabi TRIP Contract No. 982 Umm Al Nar Bridge and Tunnel Interchange
Landscape & Irrigation Works.
Public works Department
Delew Cather 10.03.2004 21.06.2005
AL RYUM GROUP – PROJECTS COMPLETED
S.
NO. PROJECT NAME CLIENT CONSULTANT
STARTING DATE
COMPLETION DATE
4
35
Plantation Around the Villas at Rehba, Al Shahama, Al Sader, Al Shelilla, Helleeya North, Helleeya South, Shawmekh and
Baniyas - Phase II
Abu Dhabi Municipality
Sam Engineering Consultants
17.07.2004 16.07.2005
36
Contract No. 950 Irrigation, Agricultural Drainage and Landscaping Works at Abu
Dhabi International Airport - Phase I
Abu Dhabi Municipality SPC
Dept. Parsons 24.07.2004 18.07.2005
37
Contract No. 176/2004 Maintenance Works
at Ajban Race Track.
Public works Department
- 01.05.2004 28.02.2006
38
Plantation Around the Villas at Rehba, Al Shahama, Al Sader, Al Shelilla, Helleeya North, Helleeya South, Shawmekh and
Baniyas - Phase I
Abu Dhabi Municipality
Sam Engineering Consultants
17.07.2004 26.03.2006
39 Burj Dubai Development - The Residences
Hard & Soft Landscaping Works EMAAR MACE Int'l Ltd. 06.10.2005 31.05.2006
40 Maintenance Works at Mirfa Garden Abu Dhabi Municipality
Arab Officer for Planning and Architecture
04.06.2005 03.06.2007
41
Contract No. BA/2/L/2872 Natural
Beautification, Fountains & Landscaping Works at the area surrounding Mafraq Hotel
- Abu Dhabi
Abu Dhabi Municipality
Sam Engineering Consultants
09.07.2005 03.07.2006
42
Supply, Installation, Operation &
Maintenance of Steel Tank (1 M Gallon) & Pumping Stations & 600 Water Line for Al
Foah Farm at Al Ain Contract No. 08/2005
Al Foah Dev. Co. - 20.12.2005 15.07.2006
43
Contract No. BA/2/L/2705 Supply &
Installation of 4 Nos. R.O. Plants (10,000 GPD) in Western Region.
Abu Dhabi Municipality
Dr.M.S. Al Saie 24.01.2005 23.07.2006
44
Maintenance Works in Gardens & Parks –
PROJECT I
Abu Dhabi Municipality
Parsons 17.07.2004 16.07.2006
45
Shade Structures for various Schools in
Northern Emirates
Ministry of Public Works.
- 12.05.2006 11.08.2006
AL RYUM GROUP – PROJECTS COMPLETED
S.
NO. PROJECT NAME CLIENT CONSULTANT
STARTING DATE
COMPLETION DATE
5
46
Contract No. BA/2/L/2874 Supply,
Installation & Maintenance of Mechanical & Electrical Playground Equipment inside &
outside Abu Dhabi
Abu Dhabi Municipality
Pan Emirates Consult
24.12.2005 20.08.2006
47 Arabian Ranches – Dubai EMAAR Parsons 01.05.2006 01.09.2006
48
Emirates Hills - Frayland Villas Streetscape
Landscaping & Irrigation Works.
EMAAR - 01.12.2005 15.09.2006
49
Maintenance Works in Gardens & Parks –
PROJECT 2
Abu Dhabi Municipality
- 04.10.2004 03.10.2006
50
Landscaping & Irrigation Works at Sea
Palace Side Road - Abu Dhabi
Abu Dhabi Municipality
Hyder 01.10.2006 22.10.2006
51
Contract No. BA/2/L/2707 Completion & Maintenance of Two Concrete Tanks at
Um al Nar.
Abu Dhabi Municipality
Agriculture Dept.
Consulting Engineering
Group 30.04.2005 30.09.2006
52
Burj Dubai Development: Old Town Sites A & B Contract No. 3020 Site
A,Phase I Contract No. 4070 Landscaping & Irrigation Works.
EMAAR MACE Int'l Ltd. 20.12.2005 15.10.2006
53
Contract No. JAP006/C94 The Palm
Jumeirah - Concrete Works for Chiller Plant (4000 Sq. Mtr. Concrete Works).
Nakheel Parsons 20.12.2005 20.10.2006
54
Maintenance Works in Gardens & Parks –
PROJECT 3
Abu Dhabi Municipality
Parsons 01.11.2004 31.10.2006
55
Burj Dubai Development: Business Park - Phase I Landscaping & Irrigation
Works.
EMAAR Shank Land -
Cox 08.02.2006 31.10.2006
56 Maintenance Works at Ajban Race Track. Public works Department
- 01.05.2004 10.11.2006
57
Contract No. BA/2/L/2270 Landscape, Irrigation System & Lighting for
Abu Dhabi Municipality
Sam Engineering Consultants
08.01.2006 15.11.2006
AL RYUM GROUP – PROJECTS COMPLETED
S.
NO. PROJECT NAME CLIENT CONSULTANT
STARTING DATE
COMPLETION DATE
6
Development Projects at Waves Breaker - Villas Area
58
Maintenance Works in Gardens & Parks -
Project 4
Abu Dhabi Municipality
- 02.01.2005 01.01.2007
59
Irrigation and Landscaping Works at Abu
Dhabi - Golf Course.
Tourism Devl & Investment Co.
- 28.10.2006 17.01.2007
60
Construction of New Car Park with Shades
including Asphalt Works at Abu Dhabi Intercontinental Hotel Refurbishment Project
National Corporation for
Tourism and Hotels
Turner 09.07.2006 10.02.2007
61
Shade Structure Works for Seven Schools
at Ajman –Contract No.MB24/190202051015/156/2006
Ministry of Public Works
- 12.08.2006 11.02.2007
62
Shade Structure Works for Six Schools at
Dubai – Contract No. MB19020205105/155/2006
Ministry of Public Works
- 12.08.2006 11.02.2007
63
Shade Structure Works for Two Schools at
Al Quwain – Contract No. MB190202051015/157/2006
Ministry of Public
Works
-
12.08.2006
11.02.2007
64
Soft Landscape and Irrigation Works of
Shahil Accommodation /Replacement for ADMA-OPCO on Das Island
ADNOC - 24.03.2006 18.02.2007
65
New Corniche Road East Landscaping & Irrigation Works Contract No. 2015-2016
Abu Dhabi Municipality
Delew Cather 18.03.2004 19.04.2007
66
Burj Dubai Development - The Residences -
Phase II Hard & soft Landscaping Works
EMAAR MACE Int'l Ltd. 11.07.2006 31.05.2007
67
Landscaping & Irrigation Works at Shoreline Apartment
Nakheel - 11.03.2006 10.06.2007
68
Construction and Completion of The Armenian Embassy in Abu Dhabi
The Armenian Embassy in Abu
Dhabi
Spectrum Engineering Consultant
01.05.2006 30.07.2007
AL RYUM GROUP – PROJECTS COMPLETED
S.
NO. PROJECT NAME CLIENT CONSULTANT
STARTING DATE
COMPLETION DATE
7
69
Contract No.952 Landscape, Agricultural & Irrigation Works at Abu Dhabi Int'l Airport -
Phase II
Abu Dhabi Municipality Agriculture
Department.
Parsons 10.09.2005 30.12.2007
70
Contract No. PJ 9167/2 Construction of New Community Facilities & Improvements
to Existing Facilities - Zone 2
Dubai Municipality Gulf Engineering
Consultant 28.10.2006 30.12.2007
71
Contract No. PJ 9167/3 Construction of New Community Facilities & Improvements
to Existing Facilities - Zone 3
Dubai Municipality Gulf Engineering
Consultant 28.10.2006 30.12.2007
72
Contract No. PJ 9167/4 Construction of New Community Facilities & Improvements
to Existing Facilities - Zone 4
Dubai Municipality Gulf Engineering
Consultant 28.10.2006 30.12.2007
73
Contract No. 910/2 - Agricultural & Irrigation Works at Abu Dhabi Industrial City - Phase
II
Abu Dhabi Municipality Agriculture
Department.
Hyder 20.05.2007 14.03.2008
74
Contract No. 017/2007 - Various
Landscaping & Irrigation Works for Armed Forces
G.H.Q. Armed Forces Directorate of Military Works.
- 01.04.2007 31.03.2008
75
Completion of Central Control Irrigation System for Water Distribution for locals farms at Mouazaz, Al Jarf & Al Nahda.
Abu Dhabi Municipality
SAM Engg. 01.05.2007 30.04.2008
76
Contract No.N026-040-13 – Palm Deira – Promenade at Deira Island Front
Nakheel - 15.01.2008 30.03.2009
77
Contract No. AE/A/493/2007, Various work
for Armed Forces
G.H.Q. Armed Forces Directorate of Military Works
- 20.02.2008 19.08.2008
78
Contract No. PJ-9163, Construction,
Completion and Maintenance of Mirdif Park
Dubai Municipality - 01.05.2007 31.12.2008
79
TenderL35/2007,Devl of Waves Breaker Area in Abu Dhabi (Landscaping & Agric.
Works-Lighting Network-Irrigation Network, Hardscaping
(Interlocks pavers II)
Abu Dhabi Municipality &
Agriculture
SAM Engineering Consultant
18.03.2008 17.01.2009
AL RYUM GROUP – PROJECTS COMPLETED
S.
NO. PROJECT NAME CLIENT CONSULTANT
STARTING DATE
COMPLETION DATE
8
80
Kempinski Hotel & Residences at the Palm Jumeirah – Phase II
Emerald Palace
Group Management FZ-
LLC
- 28.09.2009 28.12.2010
81
Contract No.A219999/2008/C/004 – 400MM External Infrastructure Trunk Sewer - Al
Raha Garden.
ALDAR Properties PJSC
GHD 09.01.2009 30.06.2009
82
Contract No. 350 - Rehabilitation of Water Tanks and Irrigation Network at Western
Region - Ghayathy City - Phase 1.
Abu Dhabi Municipality
KEO 07.04.2007 31.07.2009
83
Green Reconstruction of Abu Dhabi Golf &
Equestrian Club
ALDAR Properties PJSC
- 01.06.2009 15.10.2009
84
Contract No. A219999/2007/C/001 -
Landscaping Works for Parks, Gardens & planting adjacent to roads, boundary walls for the Residential Compounds of Al Raha
Gardens I & II, Abu Dhabi
ALDAR Properties PJSC
GHD Global PTY Ltd.
07.04.2007
30.10.2009
85
Contract No.ssc-08-02004-000000029 - Irrigation works at Interchange 4 & 5, for the
Al Raha Beach Development
ALDAR Properties PJSC
Cansult Maunsell 26.04.2009 01.11.2009
86
Contract No.147/2008 - Maint, Rehabilitation & Additional Works for the
Roads and Brigdes of Emirate, Main Land – North, Farms in Al Idlah
Abu Dhabi Municipality
- 04.08.2009 04.11.2009
87
Saadiyat Island Expressway Early Landscape Works – Project # C40
Tourism Development & Investment Co.
Parsons Engr. 13.06.2009 12/11/2009
88
Landscaping Works for Parks, Gardens & planting adjacent to roads, boundary walls for the Residential Compounds of Al Raha
Gardens III, Abu Dhabi
ALDAR Properties PJSC
GHD Global PTY Ltd.
30.09.2008 30.11.2009
89
Soft Landscaping and Irrigation Works for 5
nos. of Operative Village at Yas Island
ALDAR Properties PJSC
Whitby Bird 25.06.2008 30.11.2009
AL RYUM GROUP – PROJECTS COMPLETED
S.
NO. PROJECT NAME CLIENT CONSULTANT
STARTING DATE
COMPLETION DATE
9
90
Soft Landscaping and Irrigation Works for
Links Golf Course at Yas Island
ALDAR Properties PJSC
Whitby Bird 25.06.2008 30.11.2009
91
Contract No.A219999/2008/C/005 –
1200MM External Infrastructure Sewerage Trunk
Service – Al Raha Garden
ALDAR Properties PJSC
GHD Global PTY Ltd
08.11.2008 30.11.2009
92
Reactivation of Abu Dhabi Corniche Beach
Improvement Works – Phase I
M/s. UPC – Urban Planning Council
M/s. Hyder Consulting Middle East
Limited
02.06.2009 31.12.2009
93
Const of Iraqi Embassy Building,
Ambassador Residence, Servant's Accom, Utility Blocks and Boundary Walls.
Iraqi Embassy DEWAN 29.04.2008 30.01.2010
94
Ref. No. S439001/2008/T/001 Infrastructure,
Soft Landscape and Irrigation Works, Yas Island Development Zone – P Central Park /
F1 Car Park
ALDAR Properties PJSC
HALCROW 06.11.2008 30.01.2010
95
Hotels H3 & H4 (Crown Plaza Stay Bridge)
Contt#A430852/2007/c/007/sub/0021
ALDAR Properties PJSC
Kannfinche 05.12.2008 31.01.2010
96
Development & Landscape for the Garden &
Entrance of Ministry of Presidential Affairs
Ministry of Presidential
Affairs - 17.12.2009 17.02.2010
97
Abu Dhabi International Shooting Club
External Landscape & Irrigation Planting System – Built For Wake Board
Facilities and Landscape Upgrade – Design for Paint Ball Area including Old Wake
Facilities
Private Property Management
ATKINS 24.12.2008 31.03.2010
98
Al Forsan Int’l Sports Resorts/AFISR
Complete Design & Build Air Supported Structure
Private Property Management
- 12.01.2010 30.04.2010
99
Landscaping and Maintenance at Ruwais
Housing Complex ADNOC Agreement No.1740301
ADNOC 07.08.2003 30.06.2010
AL RYUM GROUP – PROJECTS COMPLETED
S.
NO. PROJECT NAME CLIENT CONSULTANT
STARTING DATE
COMPLETION DATE
10
100
Additional Car Parks @ Emirates Palace
Emirates Palace
KEO
05.06.2010
30.07.2010
101
Nareel Island Development External Roads
and Fence
ALDAR Properties PJSC
Parsons Engineering
06.05.2010
30.08.2010
102
Al Ain Equestrian Club – Steel Water Tank
Musanada - 24.10.2009 23.10.2010
103
Ph. 1A Welcome Pavilion Water Cascades
MEP Works
Al Dar – Besix - 03.02.2010 30.10.2010
104
Kempinski Residences – Palm Jumeirah
Landscaping Works
KEMPINSKI LMS Intl 05.08.2009 30.10.2010
105
MW/D/25/2010 - Supply & Installation
of Two Water Tanks in Al Ain
Crown Prince Court
- 13.04.2010 14.11.2010
107
Landscaping Beautification Works to the Area Located at West 2/19, Abu Dhabi
Abu Dhabi Municipality
Dorsch Holding GmBH
15.08.2010 11.09.2010
108
Al Gurm Villas Irrigation and Landscaping Works
AL Dar Properties PJSC
Dar Al Handasah 31.08.2010 15.01.2011
109
Annual Maintenance Contract for Landscaping and Irrigation system maintenance for Marina Office Park
National Investment Corporation
- 01.03.2010 28.02.2011
110
Contract No. 488 – Subsoil Drainage for Ghantoot Polo Club
Abu Dhabi Municipality
Dorsch Holding GmbH
11.04.2010 30.04.2011
111
Cont. #MW-OU-059-2009 Const. of Concrete Boundary Wall, Observation
Towers, Road Works and Other Works at Falag Hazza Camp – Al Ain
GHD - 07.03.2010 30.04.2011
112
Contract No. GC-26 Al Jawaher Temporary utility Works
TDIC - 07.12.2010 07.05.2011
AL RYUM GROUP – PROJECTS COMPLETED
S.
NO. PROJECT NAME CLIENT CONSULTANT
STARTING DATE
COMPLETION DATE
11
113 New Pump Station at Rawdat Al Reef Crown Prince
Court - 3.01.2010 30.04.2011
114
T-FM-42-2010 Supply, Installation, Testing and Commissioning and Operating of (23)
Traveller Irrigation Systems in Ghantoot Racing and Polo Club
Abu Dhabi General Services PJSC trading as
MUSANADA
15.01.2011
15.06.2011
115
Supply, Installation and Commissioning of 500mm Water Supply to Plot (A) in Razeen
Labour City – Abu Dhabi
MUSANADA Dr. M.H. Ali El-Saie Consulting
Engineers 12.07.2011 12.11.2011
116
AC7143 – Al Raha Beach Development Southside IC6 Extension – Complete Works
– Removal/Relocation of Palm Trees
Balfour Beatty LLC
Parsons Engineering
15.08.2011 31.09.2011
117
Civil & Landscaping Works at Al Bateen
Palace
Crown Prince Court
Dorsch Holding GmbH
06.06.2011 30.10.2011
118
Contract No. 469 – Landscape & Irrigation Works for the VIP Entrance of H.H. Sheikh
Zayed Bin Sultan Al Nahyan Mosque
Abu Dhabi Municipality
Dorsch Holding GmBH
20.03.2011 17.09.2011
119
Supply & Installation of Tensile Fabric for
Private Villa Island
Shield Cont. Co. - 01.08.2011 30.09.2011
120
Construction, Completion of Football Pitch Facilities Building, Emirates Palace, Abu
Dhabi
Emirates Palace, Abu Dhabi
- 21.09.2011 30.09.2011
121
Landscape and Irrigation Maintenance
Works at H.H. Sheikh Hamdan Al Nakheel Palace – Abu Dhabi
The Private Office
of H.H. Sheikh Hamdan Al Nakheel Bin
Zayed
- 01.10.2010 01.10.2011
122
Construction of Beach Restaurant & Grill –
Phase 1 Kempinski Residences – Palm Jumeirah
Sunny Beach Properties LTD, Abu Dhabi, UAE
- 15.05.2011 30.09.2011
AL RYUM GROUP – PROJECTS COMPLETED
S.
NO. PROJECT NAME CLIENT CONSULTANT
STARTING DATE
COMPLETION DATE
12
123
Renovation of Pump Sets & Controller and
Related Works at Al Maha Farm
Elite Agro LLC Al Salaam
KLhalil N. Khoury 09.06.2011 31.12.2011
124
Supply & Installation of New Pipeline &
Electrical Lines to CPI’s and Related Works
Elite Agro LLC Al Salaam
KLhalil N. Khoury 09.06.2011 30.11.2011
125
Supply & Installation of One MIG Water
Tank in Al Maha Farm
Elite Agro LLC Al Salaam
KLhalil N. Khoury 15.08.2011 30.11.2011
126
Gen. Maint. for Aljeel KG in Al Shamkha –
Building no. C1142
MUSANADA - 26.07.2011 30.11.2011
127
Gen. Maint. for Al Maha School in Al Falah –
Building no. C1143
MUSANADA - 26.07.2011 30.11.2011
128
Gen. Maint for Capital School in Al Shamkha
– Building no. C11139
MUSANADA - 26.07.2011 30.11.2011
129
Gen. Maint. for Al Janeen School in Al
Shamkha – Building no. C1142
MUSANADA - 26.07.2011 30.11.2011
130
Gen. Maint. for Al Taleeaa School in Al
Shamkha – Building no. C1144
MUSANADA - 26.07.2011 30.11.2011
131
Gen. Maint. for Gurun Yafour School in Al
Falah – Building no. C1133
MUSANADA - 26.07.2011 30.11.2011
132
Gen. Maint. for Al Tawan School in Al
Shamkha – Building no. C1124
MUSANADA - 26.07.2011 30.11.2011
133
Gen. Maint. for Al Hisn Secondary Shool in
Al Shamkha – Building no. C1114
MUSANADA - 26.07.2011 30.11.2011
134
Gen. Maint. for Mariam Bint Imran School –
Baniyas – Buildning no. C1134
MUSANADA - 03.08.2011 30.11.2011
AL RYUM GROUP – PROJECTS COMPLETED
S.
NO. PROJECT NAME CLIENT CONSULTANT
STARTING DATE
COMPLETION DATE
13
135
Gen. Maint. for Al Bidaya School Al
Shamkha – Building no. C1433
MUSANADA - 02.08.2011 30.11.2011
136
Gen. Maint. for Al Mo’ Tasem School –
Baniyas – Building no. C1117
MUSANADA - 26.07.2011 30.10.2011
137
Gen. Maint. for Al Norr School – Baniyas –
Building no. C1121
MUSANADA - 03.08.2011 30.11.2011
138
Gen. Maint. for Al Mafraq High School –
Baniyas – Building no. C1116
MUSANADA - 26.07.2011 30.11.2011
139
Restoration & Maintenance Works of Existing Buildings at Al Maha Farm
Elite Agro LLC Al Salaam
KLhalil N. Khoury 13.08.2011 30.11.2011
140
Contract # MW-Gs-180-2008 – Construction
of Headquarter Bldg. Stores & Different Works for H.Q. of Logistic & Transforming
Arm at Maleeha
GHQ Armed Forces
- 15.01.2010 30.11.2011
141
Contract No. 1004 – Landscaping Works at
Raha – Yas Tunnel Road Entrance
Abu Dhabi Municipality
Parsons Engineering
11.07.2010 31.12.2011
142
Khalifa City District Cooling – Installation
of 4 Tanks in Khalifa City
Drake & scull Int’l - 01.08.2011
31.12.2011
143
CW/630/2007 – const. of 2 pumping stations each with 60 MIGD capacity in loc. no. 5 & loc. no. 7 complete with surge protection
system and associated MEP works.
DEWA
Al - Diar
15.06.2008
15.12.2011
144
Contract C2010/3- Irrigation and
Landscaping Works for H.H. Crown Prince Court, Abu Dhabi
Crown Prince Court
Dorsch Holding GmbH
15.01.2011
31.12.2011
145
Contract No. MW-AF-043-2009 -
Construction of 7 nos. Ammunition Stores and Modification Works for Fence at Safran
Air Base
UAE Armed Forces
- 25.09.2010 30.11.2011
AL RYUM GROUP – PROJECTS COMPLETED
S.
NO. PROJECT NAME CLIENT CONSULTANT
STARTING DATE
COMPLETION DATE
14
146
Abu Dhabi Corniche Landscaping Services
(Maintenance)
John Buck International Properties
Hyder 15.11.2009 31.12.2011
147
Contract No. P042-C45 Electrically
Operated Sliding Gates
TDIC - 01.05.2011 31.12.2011
148
Contract No. MW/D/27/2010, Supply and Installation of 1 Water Tank with 1 Million
Gallon capacity along with Installation of an Irrigation
Network at Farms of Mehier – Al Ain
Private Dept. of H.H. Sheik Fatima
Bint Mubarak - 07.11.2010 30.11.2011
149
Contract No. MW/D/26/2010, Supply and Installation of 1 Water Tank with 1 Million
Gallon capacity along with Installation of an Irrigation Network at Al Maqam –
Al Ain
Private Dept. of H.H. Sheik Fatima
Bint Mubarak - 07.11.2010 29.02.2012
150
Saadiyat Island Beach Resort Landscape &
Irrigation Works
TDIC Parsons
Engineering 16.01.2010 29.02.2012
151
Main Irrigation Line from Mafraq WWTP to
Al Faya along Abu Dhabi Al Ain – Road Contract No. 956
Abu Dhabi Municipality
Parsons Engineering
01.05.2010
21.02.2012
152
Landscaping & Irrigation System
Maintenance for Marina Office Park – Abu Dhabi
National Investment Corporation
-
01.03.2011
29.02.2012
153
CONTRACT NO.SC-09-2048-0000011 – Al Raha Beach Development/Infrastructure –
Irrigation Network at Eastern Precinct
ALDAR Properties PJSC
- 19.02.2009 29.02.2012
154
CW/146A/2010 – Design, Supply,
Installation, Testing and Commissioning of Chlorine Dioxide
Dosing System at Mushrif Reservoir Phases 1 to 6
DEWA - 09.01.2011 09.02.2012
155
Contract No. P001-C47 Saadiyat
Expressway Permanent Landscape Works
TDIC Parsons
Engineering 11.02.2010
29.02.2012
AL RYUM GROUP – PROJECTS COMPLETED
S.
NO. PROJECT NAME CLIENT CONSULTANT
STARTING DATE
COMPLETION DATE
15
156
Agreement No. 1741118 – Supply & Lay of
a High Density Polyethylene (HDPE) Pipeline from a Supplementary High Rise
Pumping Station (SHRPS) to H.H. the Presi.Palace Plant Yard at Ruwais Housing
Complex
ADNOC - 14.07.2011 29.02.2012
157 The Landmark Tower Project, Abu Dhabi Al Habtoor & CCIC Joint
Venture - 30.10.2011 31.01.2012
158
Proposed Arzanah Development, Sector W-57, Abu Dhabi-UAE-Rihan Heights (Phase
1A-Plot H)
MUBADALA Capital and Real
Estate LLC - 08.11.2011 31.01.2012
159
Landscaping & Irrigation Works of the Burj Khalifa Boulevard Centre Media
EMAAR Properties
- 09.11.2011 08.01.2012
160
Contract No. CW/0146A/2010 – Design, Supply, Installation, Testing &
Commissioning of Chlorine Dioxide Dosing System at
Mushrif Reserviors Phases 1 to 6 including Al Chlorination Lines, Interconnection with Existing Chlorination Lines, All Associated Earthworks, Civil, Electrical and Drainage
Works, Automation System and Safety Equipment
DEWA - 09.01.2011 31.01.2012
161
Contract no. 151/1 Removal of Weeds and
Pruning of Trees in Abu Dhabi Island
Abu Dhabi Municipality
Parsons Engineering
02.09.2010. 30.04.2012
162
Construction Works of irrigation Main Lines at Khalifa Bin Zayed Town B – Contract No.
481
Abu Dhabi Municipality
Dorsch Holding GmbH
28.04.2010 31.03.2012
163 Al Dhabeya Maritime Residential Complex Crown Prince
Court Dorsch Holding
GmbH 22.05.2010 28.04.2012
164
Maintenance and irrigation Services of
Landscaped Areas at ADNOC premises in Abu Dhabi, Sas Al Nakhil and Al
Shawamekh – Agreement No. 1720736
ADNOC - 01.11.2008 03.05.2012
AL RYUM GROUP – PROJECTS COMPLETED
S.
NO. PROJECT NAME CLIENT CONSULTANT
STARTING DATE
COMPLETION DATE
16
165
Contract No. 6W/2010-4MIG & 2x1MIG RCC Water Tanks & Pumping Station in
Central Area
FEWA Dr. M. H. Ali El-
Saie 01.06.2011 31.03.2012
166
Contract No. CMW – 11051 – C002
Construction of Stores at Al Maryal Camp Camp No. (220802)
GHQ Armed Forces
- 01.11.2011 31.03.2012
167
Modification to Boundary Wall For H.H. the
Crown Prince Diwan at W-35, Abu Dhabi – UAE
H.H. The Crown Prince Diwan
Architectural & Engineering Consultant
20.01.2012 20.05.2012
168
Maintenance of Landscape Works, Sport
Field and Irrigation Network
Private Property Management
- 10.07.2011 30.08.2012
169 CMW-11098-C002 GHQ Armed
Forces -
17.07.2012
31.10.2012
171
Yas Island Development – Modification of Potable Water Network for Gateway Park
Al Dar Properties PSJC
- 23.04.2012
31.10.2012
172
Contract no. 151/2 Removal of Weeds and
Pruning of Trees in Abu Dhabi Island
Abu Dhabi Municipality
Parsons Engineering
02.09.2010 31.12.2012
173 Oman Botanic Gardens, Phase IV BAM International - 01.12.2011 31.12.2012
174
Contract No. A199999/2011/C/025 – Geo-
textile Fabric under Gravel Mulch at Al Gurm Berm Area (Al Gurm Development)
Al Dar Properties PSJC
- 26.12.2011 26.12.2012
175
New Management Building and New Auditorium Building at Buhasa – Soft
Landscaping & Irrigation Works
Abu Dhabi Gas Industries Ltd.
(GASCO) AECOM 01.05.2012 31.12.2012
176
Contract No. M46/2012 – Landscaping & Irrigation Works at Falj Al Mua ‘ala Palace,
Ajman
Crown Prince Court
- 19.10.2012 20.01.2013
177
Tender No. EPD-CT-12020 Design, Supply & Installation of Dense
Planting Screen at Khaleej Al Arabi Service Station – Abu Dhabi
ADNOC - 30.01.2013 15.02.2013
AL RYUM GROUP – PROJECTS COMPLETED
S.
NO. PROJECT NAME CLIENT CONSULTANT
STARTING DATE
COMPLETION DATE
17
178
Maintenance of Emirates Palace Football Pitch
Emirates Palace Hotel
- 15.01.2012 28.02.2013
179
C410 – Development & Const. Works for irrigation Network & Pumping Station in
Farm Areas (Dhaharat, Al Tayeb, Al Wafiya, Al Wathba)
Abu Dhabi Municipality
Dorsch Holding GmbH
01.06.2010 11.03.2013
181
Millenium Hotel, Sulaimani, Kurdistan
Region – Iraq
Faruk Holding Company Ltd.
- 02.02.2012 31.03.2013
182 Landscape Complementary of Faruk
Medixal Center ( FMC) Faruk Holding Company Ltd.
- 19.07.2012 19.12.2012
183
Contract No. 15W/2010(2) – 3x2MIG RCC
Water Tanks & Pumping Station in Rak Area
Federal Electricity & Water Authority
(FEWA)
Dr. M. H. Ali El-Saie
01.06.2011 30.04.2013
184 Supply and Installation of Water Features Al Dar Properties
PSJC - 01.09.2012 31.03.2013
185
4EW/2011 – Construction of New Water
Well Fields at Surrah – UAE
Federal Electricity & Water Authority
(FEWA)
- 13.02.2012 30.04.2013
186
Maintenance Works for Soft Landscape and
Irrigation System – Zayed Sports City – Phase 1A
MUBADLA Capital and Real Estate
LLC - 02.01.2012 30.06.2013
187
Construction Works for Al Raha Gardens
Attached Housing Project – Contract No. ARG-00-C-NET-C-00
Sorouh Real Estate
Const. Gen. Contracting House Ltd.
25.12.2012 25.06.2013
188
Supply & Installation of Landscaping Works – Habshan 5 Industrial Facilities, Habshan
Abu Dhabi Gas Industries Ltd.
(GASCO) - 10.11.2011 31.08.2013
189
Supplying Agriculture Equipment
UAE University
- 01.09.2010
01.10.2013
AL RYUM GROUP – PROJECTS COMPLETED
S.
NO. PROJECT NAME CLIENT CONSULTANT
STARTING DATE
COMPLETION DATE
18
190
Elixier II Mirfa – Landscaping & Irrigation
Works
ADNOC LindeIndustrial Gases Co. Ltd.
- 28.09.2011 27.09.2013
191
GS/RFP-0212-Landscape Works for the
Surrounding Areas of Al Bahr Tower Sector -25, Plot 70 & 71
Abu Dhabi Investment
Council - 15.12.2012 15.09.2013
192
Bab Al Bahar – A Luxury Collection Hotel on Plot No. 44, Al Nakheel Area in Ajman –
UAE
H.H. Crown Prince of Ajman
Badri & Bensouda
Architectural Engineering
04.03.2012 30.09.2013
193
Contract No: 2012/97 – Irrigation & Landscape Works for H.H. Prince Crown
( VIP Entrance)
Crown Prince Court
Dorsch Holding GmbH
19.06.2013 15.11.2013
194
Removal of Existing Services Within Basement Extension For the First Gulf Bank Office Bldg, Plot C 110, Sector 48, Al Qurm
Area, Abu Dhabi
First Gulf Bank M/s. Architectural
& Engr. Cons. 04.07.2013 03.11.2013
195
Contract No.PGD-O&M-309-Operation & Maint. Of Landscape, Forests and Irrig.
Infrastructure at Ghayathi, Ghayathi (A,B,C), Markaz/Hezam Ghayathi, Mashtal Ghayathi, Qasr saleh Al Mazari, Gurnama (1,2) Bida
Rashed and Shamal Gharb Ghayadhi
Municipality of Western Region -
WRM KEO Int’l 15.02.2007
31.12.2013
196
Sea Palace - The Governess House & Boudary Wall
Crown Prince Court
Dorsch Holding GmbH
01.10.2012
31.12.2013
197
Recreational Park & Landscaping Works & Plantation of Trees Along Main Road, Al
Ajban
Tawazun Holding Co. LLC
- 05.12.2012
31.12.2013
198 GC-43Saadiyat Beach Public Realm
Streetscape –Landscape Works
Tourism Development & Investment Co.
Parsons Engineering
03.03.2013
31.12.2013
199 Al Maryah Island Public Realm &
Promenade MUBADALA -
08.05.2013
31.12.2013
200
Lusail Underground Car Park Project- Phase 2B
Lusail Real Estate Development Co.
(LREDC)
ACE 10.10.2013 31.03.2014
AL RYUM GROUP – PROJECTS COMPLETED
S.
NO. PROJECT NAME CLIENT CONSULTANT
STARTING DATE
COMPLETION DATE
19
201 Contract No. E19/2 Landscaping & irrigation
Works for Public Park E19/2 Crown Prince
Court Dorsch Holding
GmbH
04.10.2012
31.03.2014
202
Contract no. 467/1 Removal of Weeds and Pruning of Trees in Abu Dhabi Island
Abu Dhabi Municipality
Dorsch Holding GmbH
02.09.2010 01.04.2014
203
Contract no. 467/4 Removal of Weeds and Pruning of Trees in Abu Dhabi Island
Abu Dhabi Municipality
Dorsch Holding GmbH
02.09.2010 01.04.2014
204
Landscape works at Ambulatory Healthcare Center At Al Shamkha & Al Bahya(Site 108
A & B), Abu Dhabi
SEHA - 01.02.2013 30.04.2014
205
Mussafah Water Transmission Scheme, Mussafah to Abu Dhabi ( Lot M) –
Landscaping Works
AYDINER Const. – Abu Dhabi
Khatib & Alami 27.01.2014 20.04.2014
206 Infrastructure Works including all MEP
Works & Playground Foundation – Baghdad-Iraq Adjacent to Green Zone
Al Zawraa Park for
Games & Commercial
Agencies Ltd. Liability Co.
- 13.03.2013 31.05.2014
207
Contract No. 2013/58 – External Miscellaneous Works for Crown Prince
Court
Crown Prince Court
Dorsch Holding GmbH
01.09.2013 31.05.2014
208 6W2011-Network Rehabilitation at Khuzam
Rak Area
Federal Electricity & Water Authority
(FEWA)
Dr. M. H. Ali El-Saie
27.09.2011 31.07.2014
209
Contract No. PD/CA/FM/SB/R530/Gen/13/51 – Blanket Agreement for Supply of Potable Drinking
Water to Schools in Al Ain City
MUSANADA - 04.04.2013 03.07.2014
210
Agreement No. 1741257 – Renovation of the Children and Families Park in Ruwais
Housing Complex – Ruwais UAE
ADNOC - 14.09.2013 12.07.2014
211 Contract No. 21W/2012 – Water Distribution
Networks in UAQ Areas
Federal Electricity & Water Authority
(FEWA)
Dr. M. H. Ali El-Saie
22.08.2012 31.07.2014
AL RYUM GROUP – PROJECTS COMPLETED
S.
NO. PROJECT NAME CLIENT CONSULTANT
STARTING DATE
COMPLETION DATE
20
212 25W/2012 – 5MIG RCC Water Tank at
Hiniya WDC - Fujairah
Federal Electricity & Water Authority
(FEWA)
- 06.10.2012 12.07.2014
213 18W/2012 – Rehabilitation of Distribution
Netwrok at Rams - RAK
Federal Electricity & Water Authority
(FEWA)
Dr. M. H. Ali El-Saie
05.05.2012 31.07.2014
214 Contract no. 1W/2011/
Transmission/Distribution Pipeline System in Al Jurf and Pumps at A. Zawra - Ajman
Federal Electricity & Water Authority
(FEWA)
Dr. M. H. Ali El-Saie
01.09.2011 30.09.2014
215 Church Compound for Armenian Community
of Abu Dhabi
Armenian Community of Abu
Dhabi
Kojakian Engineering Consultants
01.05.2012
29.11.2014
216 Tender No. 14EW/2013 – Design, Supply &
Const. of RCC Brine Reject & Outfall Structure at Ghallilah, Ras Al Khaimah, UAE
Federal Electricity & Water Authority
(FEWA)
- 15.02.2014 30.11.2014
217 Landscape Works for New York University
Tourism Development & Inv. Co. (TDIC)
- 01.05.2014 31.10.2014
218
Modification in the Gate Building for H.H. the
Crown Prince Diwan at W-35, Abu Dhabi, UAE
Crown Prince Court
M/s. Architectural & Engineering Consultants
01.04..2014 31.11.2014
219
CW/200B/2011 – Supply, Installation,
Testing & Commissioning of Fibre Cement/Glass Reinforced Expoxy Water Transmission Pipelines and Associated
Works at Various Locations in the Emirate of Dubai
Dubai Electricity & Water Authority
(DEWA)
NJS Consultants Co. Ltd.
06.12.2011 31.12.2014
220
Supply & Installation of Yas Mall Main
Const. Works Ph. 2 Zone E Yas Island Devl. - Contract No. A430601/2010/C/063
Al Dar Properties PSJC
AECOM 01.10.2012 31.12.2014
(maintenance period)
221
Contract No. P.O. 3441200321 – Supply, Installation, Testing & Commissioning of
Glass Reinforced Epoxy Water Transmission Pipelines and Associated
Works at Various Locations in the Emirate of Dubai Including 600mm Dia Transmission Pipeline along Outer Bypass Road to Al Khawaneej Road in Wadi Al Mardi and
Interconnection Between the Two Existing
Dubai Electricity & Water Authority
(DEWA) - 09.12.2012 31.12.2014
AL RYUM GROUP – PROJECTS COMPLETED
S.
NO. PROJECT NAME CLIENT CONSULTANT
STARTING DATE
COMPLETION DATE
21
900mm Dia Pipeline by 600mm Dia Pipeline in Al Khawaneej Area
222
Replacing the Control System of the
Irrigation Network inside Abu Dhabi from the Manual System to an Automated System, Phase II, Contract No. 908/3A, Abu Dhabi,
UAE
Abu Dhabi Municipality
Dorsch Holding GmbH
01.10.2013 31.12.2014
223
Contract No.PGD-O&M-404-Operation &
Maint. For Irrig. Reservoirs with Transmission Pipeline, Landscape, Irrig.
Infrastructure & Forests - Al Khatim Area 1
Abu Dhabi Municipality
Dorsch Holding GmbH
15.02.2007 31.12.2014
224
Contract No.PGD-O&M-406-Operation &
Maint. For Irrig. Reservoirs with Transmission Pipeline, Landscape, Irrig.
Infrastructure & Forests - Al Khatim Area 3
Abu Dhabi Municipality
Dorsch Holding GmbH
25.02.2007 31.12.2014
225
Contract No.PGD-O&M-103 - Operation &
Maint. Of Landscape, Irrigation Storm Water and Associated Infrastructure Abu Dhabi
Quadrant 3 & Surrounding Islands
Abu Dhabi Municipality
Dorsch Holding GmbH
07.10.2007 03.01.2015
226
CONTRACT NO. 208 - Operation &
Maintenance for Landscape, Irrigation, and Landscape Facilities for Al Bahya & Al
Rahbah Gardens.
Abu Dhabi Municipality
Parsons Engineering
13.04.2009 03.01.2015
227 FP- 5020000006 - Dubai Endurance Table
Engineer’s Office
of HH Sheikh Mohammed Bin
Rashid Al Maktoum
- 19.01.2015 24.01.2015
228 FP- 2053000007 – Construction of Gym, Pool, Staff Accommodation, and Stable at
Lehbab, Dubai
Engineer’s Office
of HH Sheikh Mohammed Bin
Rashid Al Maktoum
- 17.01.2015 31.01.2015
229
Develop 20 Playgrounds in Abu Dhabi
Mainland – Phase 1C – Contract No. 393, Abu Dhabi, U.A.E.
Abu Dhabi Municipality
KEO International
15.12.2013 10.04.2015
AL RYUM GROUP – PROJECTS COMPLETED
S.
NO. PROJECT NAME CLIENT CONSULTANT
STARTING DATE
COMPLETION DATE
22
230
Contract No. 2014/51 – Civil Works of the
Fountain in the Private Entrance of the Bldg. of Crown Prince Court
Crown Prince Court
- 11.09.2014 15.04.2015
231
Contract No. D-8604, Replacement of GRP
Water Pipelines & Construction of New Connection in Madinat Zayed – Western
Region, Abu Dhabi
Abu Dhabi Distribution
Company (ADDC) Ital Consult 27.03.2012 26.04.2015
232 FP- 2023000012 – Landscaping and
Irrigation Works Infront of Main Villa at Habab Coservation- Dubai
Engineer’s Office
of HH Sheikh Mohammed Bin
Rashid Al Maktoum
- 18.01.2015 15.04.2015
233 Landscaping for Marina Office Park National
Investment Corporation
- 01.04.2012 01.03.2015
234
20W/2012-DN600 Transmission Pipeline
from Shouka to Huwailat Junction and Pumping Station at Shouka RAK
Federal Electricity & Water Authority
(FEWA) - 10.05.2013 31.05.2015
235
Commercial Bldg. For M/s. Inheritors of Late Abdulsalam Hamad Abdulrahman Rashed Al Mubarak, Located Sector E-25, Plot no.
C-13
ADCP ARKAN 15.01.2013 11.06.2015
Under maintenance
236
Landscaping & Irrigation Maintenance Services at Ruwais Housing Complex
Agreement No. 1740716
ADNOC -
01.07.2010
30.06.2015
237
Contract (12) – for the Operation, Water
Management, Development, Maintenance And Repair of Irrigation Water Supply and
Distribution System in Al Ain Region
Al Ain Municipality DMJM
International 01.07.2010 30.06.2015
238 C1004/1, Upgrading of VVIP Approach
Road Yas Island Abu Dhabi Municipality
Parson Int’l Ltd. 16.01.2014 30.07.2015
239
Contract 10/2012 - Construction and execution of a network for irrigation and
improving the main entrance for the eastern sector
Al Ain Municipality Dorsch Holding
GmbH 01.04.2013 31.08.2015
AL RYUM GROUP – PROJECTS COMPLETED
S.
NO. PROJECT NAME CLIENT CONSULTANT
STARTING DATE
COMPLETION DATE
23
240 Contract No. CPC-14014-M1 – Periodic Maintenance Works for Different Areas
Crown Prince Court
- 01.05.2014 30.08.2015
241
Contract No. CPC-14024-M1 – Maintenance
Palms in Falaj Mualla & Al Ain
Crown Prince Court
- 01.05.2014 30.08.2015