AL RYUM GROUP – PROJECTS COMPLETED S. NO. PROJECT NAME CLIENT CONSULTANT STARTING DATE COMPLETION DATE 1 1 Contract No. BA/2/L/1476 Hard & Soft Landscape Works and Automatic Irrigation System in Al Bateen Palace for H.H. Sheikh Hamdan Bin Zayed Al Nahyan Abu Dhabi Municipality Arabian Engineering Center & Al Khatib Cracknell. 21.09.1998 30.11.1999 2 Contract No. BA/2/L/1568 For Construction, Completion and Remedying of defects of Ghantoot Racing and Polo Club Landscape at Abu Dhabi Abu Dhabi Municipality - 25.06.1999 31.01.2000 3 Contact No. BA/2/L/1254 For the Supply & Installation of Equipment in the Veterinary Laboratory at Al Wathba Clinic Abu Dhabi Municipality Spectrum Eng. Consultants 03.03.1999 01.10.2001 4 Contract No. 231/2000 External Landscaping Works for Marfa Hotel. Public works Department The Arab Office for Planning & Architecture 19.06.2000 06.11.2001 5 Housing Complex Expansion Project No.1215, Agreement No. 171215C8 / Package 7. Construction of Landscaping & Irrigation Branches ADNOC - 10.07.2001 06.08.2002 6 Supply and Installation of 353 Controllers Abu Dhabi Municipality - 12.08.2002 20.04.2003 7 Supply and Installation of 240 Controllers Abu Dhabi Municipality - 10.11.2002 12.05.2003 8 Contract No. BA/2/L/1959 H.H. Sheikh Sultan Bin Zayed Al Nahyan Residential Complex Landscape Works Abu Dhabi Municipality Sam Engineering Consultants 06.04.2002 12.05.2003 9 Construction & Completion of 170 Farms at Khalifa City "A" Abu Dhabi Municipality Jouzy & Partners Consulting Engineers 15.04.2002 27.05.2003 10 Abu Dhabi TRIP Contract No. 980 Umm Al Nar Bridge and Tunnel Interchange Landscaping Works Abu Dhabi Municipality Delew Cather 31.12.2002 31.07.2003 11 Landscaping and Maintenance at Ruwais Housing Comlex ADNOC ADNOC - 01.05.1999 08.08.2003

Upload: binesh-menon

Post on 01-Feb-2016

265 views

Category:

Documents


0 download

DESCRIPTION

al rayum

TRANSCRIPT

Page 1: 410371503Proj Completed - Without Value

AL RYUM GROUP – PROJECTS COMPLETED

S.

NO. PROJECT NAME CLIENT CONSULTANT

STARTING DATE

COMPLETION DATE

1

1

Contract No. BA/2/L/1476 Hard & Soft

Landscape Works and Automatic Irrigation System in Al Bateen Palace for H.H. Sheikh

Hamdan Bin Zayed Al Nahyan

Abu Dhabi Municipality

Arabian Engineering Center & Al

Khatib Cracknell.

21.09.1998 30.11.1999

2

Contract No. BA/2/L/1568 For Construction, Completion and Remedying of defects of

Ghantoot Racing and Polo Club Landscape at Abu Dhabi

Abu Dhabi Municipality

- 25.06.1999 31.01.2000

3

Contact No. BA/2/L/1254 For the Supply & Installation of Equipment in the Veterinary

Laboratory at Al Wathba Clinic

Abu Dhabi Municipality

Spectrum Eng. Consultants

03.03.1999 01.10.2001

4 Contract No. 231/2000 External

Landscaping Works for Marfa Hotel. Public works Department

The Arab Office for Planning & Architecture

19.06.2000 06.11.2001

5

Housing Complex Expansion Project No.1215, Agreement No. 171215C8 /

Package 7. Construction of Landscaping & Irrigation Branches

ADNOC - 10.07.2001 06.08.2002

6 Supply and Installation of 353 Controllers Abu Dhabi Municipality

- 12.08.2002 20.04.2003

7 Supply and Installation of 240 Controllers Abu Dhabi Municipality

- 10.11.2002 12.05.2003

8

Contract No. BA/2/L/1959 H.H. Sheikh Sultan Bin Zayed Al Nahyan Residential

Complex Landscape Works

Abu Dhabi Municipality

Sam Engineering Consultants

06.04.2002 12.05.2003

9

Construction & Completion of 170 Farms at

Khalifa City "A"

Abu Dhabi Municipality

Jouzy & Partners Consulting Engineers

15.04.2002 27.05.2003

10

Abu Dhabi TRIP Contract No. 980 Umm Al Nar Bridge and Tunnel Interchange

Landscaping Works

Abu Dhabi Municipality

Delew Cather 31.12.2002 31.07.2003

11

Landscaping and Maintenance at Ruwais

Housing Comlex ADNOC

ADNOC - 01.05.1999 08.08.2003

Page 2: 410371503Proj Completed - Without Value

AL RYUM GROUP – PROJECTS COMPLETED

S.

NO. PROJECT NAME CLIENT CONSULTANT

STARTING DATE

COMPLETION DATE

2

12

Contract No. BA/2/L/1664 Construction,

Completion and Maintenance of Al Wathba Park

Abu Dhabi Municipality

Derby Design 16.09.2000 31.08.2003

13

Contract No. BA/2/L/2072 Supply, Installation & Maintenance of Electrical &

Mechanical Playground Equipment at Different Locations in Abu Dhabi

Abu Dhabi Municipality

Pan Emirates 01.09.2002 18.10.2003

14

Renewal and Maintenance of (5) Fountains

in Abu Dhabi

Abu Dhabi Municipality

Arabian Engineering

Center 01.04.2002 15.12.2003

15

Contract No. BA/2/L/1606

Furnishing of the Surgery and X-ray Section at the Al Wathba Veterinary Clinic

Abu Dhabi Municipality

Spectrum Eng. Consultants

30.06.2000 29.02.2004

16

Contract No. BA/2/L/1547 Supply

and Installation of Computer Control System for Irrigation Network at Wadi Al Ryum

Abu Dhabi Municipality

Arabian Engineering

Center 10.10.2001 14.04.2004

17

Contract No. BA/2/L/2004 Construction &

Maintenance of 3 Nos. of Pumping Stations for Fodder Farms in Wadi Al Ryum

Abu Dhabi Municipality

Dr. M.H. Ali El Saie Consulting

Engineering 02.03.2002 22.05.2004

18

Contract No. BA/2/L/2222 Supply, Installation & Maintenance of Electrical &

Mechanical Playground Equipment at different locations in Abu

Dhabi

Abu Dhabi Municipality

Pan Emirates 01.06.2003 30.05.2004

19

Contract No. 230/2002 Development and

Beautification Works at Lulu Island.

Public works Department

- 15.08.2002 14.06.2004

20

Contract No. BA/2/L/2151 Completion & Plantation of 240 Farmsat Khalifa City B -

Abu Dhabi

Abu Dhabi Municipality

Sam Engineering Consultants

01.09.2003 03.07.2004

21

Construction & Maintenance of 74 Farms

Abu Dhabi Municipality

Sam Engineering Consultants

01.03.2004 27.08.2004

22

Irrigation Control System at Quoryn Al Aich

Public works Department

- 10.05.2004 09.09.2004

Page 3: 410371503Proj Completed - Without Value

AL RYUM GROUP – PROJECTS COMPLETED

S.

NO. PROJECT NAME CLIENT CONSULTANT

STARTING DATE

COMPLETION DATE

3

23

Contract No. BA/2/L/2105 Construction &

Maintenance of 800 Farms at Al Falah Area, Abu Dhabi

Abu Dhabi Municipality

Sam Engineering Consultants

01.07.2002 30.09.2004

24

Contract No. BA/2/L/2050 Construction & Maintenance of 649 Farms at Al Rehbah,

Abu Dhabi

Abu Dhabi Municipality

Sam Engineering Consultants

10.11.2001 08.12.2004

25

Contract No.910/1 Irrigation Control System at Abu Dhabi Industrial City - Phase I

Public works Department

Parsons 23.10.2004 11.12.2004

26

Supply & Installation of 20 Tanks 100,000

Gallons at the Western Region

Western Region Municipality

Joozy & Partners 17.11.2003 15.12.2004

27

Replacement of Irrigation System & Lighting

at Crown Prince Diwan

Abu Dhabi Municipality

Joozy & Partners 17.11.2003 15.12.2004

28

Landscaping Works at Conference Palace Hotel (Emirates Palace) - Abu Dhabi,

Package 14 A, B & C

Conference Palace Hotel

Executive Committee

Turner 25.07.2004 30.12.2004

29

Contract No. BA/2/L/2637 Replacement of Irrigation System at his Highness The

President Palace at Muzairah.

Abu Dhabi Municipality

Sam Engineering Consultants

24.07.2004 19.01.2005

30

Contract No. BA/2/L/2516 Removal, Supply, Installation & Maintenance of Garden Lights

at Mirfa Cornich.

Abu Dhabi Municipality

Agriculture Dept.

Dr. M.H. Ali El Saie Consulting

Engineering 15.05.2004 10.03.2005

31

Supply & Installation of 100 Pumps at Bida Yamrah 8

Abu Dhabi Municipality

Sam Engineering Consultants

10.01.2004 08.05.2005

32

Supply & Installation of Flow Control Valves at Taweelah, Rehba & Bahia

Abu Dhabi Municipality

Dr. M.H. Ali El Saie Consulting

Engineering 09.01.2004 09.05.2005

33

Contract No. BA/2/L/2472 Renovation & Maintenance of 8 Fountains inside & outside

Abu Dhabi - Phase 3

Abu Dhabi Municipality

Pan Emirates 13.12.2003 10.05.2005

34

Abu Dhabi TRIP Contract No. 982 Umm Al Nar Bridge and Tunnel Interchange

Landscape & Irrigation Works.

Public works Department

Delew Cather 10.03.2004 21.06.2005

Page 4: 410371503Proj Completed - Without Value

AL RYUM GROUP – PROJECTS COMPLETED

S.

NO. PROJECT NAME CLIENT CONSULTANT

STARTING DATE

COMPLETION DATE

4

35

Plantation Around the Villas at Rehba, Al Shahama, Al Sader, Al Shelilla, Helleeya North, Helleeya South, Shawmekh and

Baniyas - Phase II

Abu Dhabi Municipality

Sam Engineering Consultants

17.07.2004 16.07.2005

36

Contract No. 950 Irrigation, Agricultural Drainage and Landscaping Works at Abu

Dhabi International Airport - Phase I

Abu Dhabi Municipality SPC

Dept. Parsons 24.07.2004 18.07.2005

37

Contract No. 176/2004 Maintenance Works

at Ajban Race Track.

Public works Department

- 01.05.2004 28.02.2006

38

Plantation Around the Villas at Rehba, Al Shahama, Al Sader, Al Shelilla, Helleeya North, Helleeya South, Shawmekh and

Baniyas - Phase I

Abu Dhabi Municipality

Sam Engineering Consultants

17.07.2004 26.03.2006

39 Burj Dubai Development - The Residences

Hard & Soft Landscaping Works EMAAR MACE Int'l Ltd. 06.10.2005 31.05.2006

40 Maintenance Works at Mirfa Garden Abu Dhabi Municipality

Arab Officer for Planning and Architecture

04.06.2005 03.06.2007

41

Contract No. BA/2/L/2872 Natural

Beautification, Fountains & Landscaping Works at the area surrounding Mafraq Hotel

- Abu Dhabi

Abu Dhabi Municipality

Sam Engineering Consultants

09.07.2005 03.07.2006

42

Supply, Installation, Operation &

Maintenance of Steel Tank (1 M Gallon) & Pumping Stations & 600 Water Line for Al

Foah Farm at Al Ain Contract No. 08/2005

Al Foah Dev. Co. - 20.12.2005 15.07.2006

43

Contract No. BA/2/L/2705 Supply &

Installation of 4 Nos. R.O. Plants (10,000 GPD) in Western Region.

Abu Dhabi Municipality

Dr.M.S. Al Saie 24.01.2005 23.07.2006

44

Maintenance Works in Gardens & Parks –

PROJECT I

Abu Dhabi Municipality

Parsons 17.07.2004 16.07.2006

45

Shade Structures for various Schools in

Northern Emirates

Ministry of Public Works.

- 12.05.2006 11.08.2006

Page 5: 410371503Proj Completed - Without Value

AL RYUM GROUP – PROJECTS COMPLETED

S.

NO. PROJECT NAME CLIENT CONSULTANT

STARTING DATE

COMPLETION DATE

5

46

Contract No. BA/2/L/2874 Supply,

Installation & Maintenance of Mechanical & Electrical Playground Equipment inside &

outside Abu Dhabi

Abu Dhabi Municipality

Pan Emirates Consult

24.12.2005 20.08.2006

47 Arabian Ranches – Dubai EMAAR Parsons 01.05.2006 01.09.2006

48

Emirates Hills - Frayland Villas Streetscape

Landscaping & Irrigation Works.

EMAAR - 01.12.2005 15.09.2006

49

Maintenance Works in Gardens & Parks –

PROJECT 2

Abu Dhabi Municipality

- 04.10.2004 03.10.2006

50

Landscaping & Irrigation Works at Sea

Palace Side Road - Abu Dhabi

Abu Dhabi Municipality

Hyder 01.10.2006 22.10.2006

51

Contract No. BA/2/L/2707 Completion & Maintenance of Two Concrete Tanks at

Um al Nar.

Abu Dhabi Municipality

Agriculture Dept.

Consulting Engineering

Group 30.04.2005 30.09.2006

52

Burj Dubai Development: Old Town Sites A & B Contract No. 3020 Site

A,Phase I Contract No. 4070 Landscaping & Irrigation Works.

EMAAR MACE Int'l Ltd. 20.12.2005 15.10.2006

53

Contract No. JAP006/C94 The Palm

Jumeirah - Concrete Works for Chiller Plant (4000 Sq. Mtr. Concrete Works).

Nakheel Parsons 20.12.2005 20.10.2006

54

Maintenance Works in Gardens & Parks –

PROJECT 3

Abu Dhabi Municipality

Parsons 01.11.2004 31.10.2006

55

Burj Dubai Development: Business Park - Phase I Landscaping & Irrigation

Works.

EMAAR Shank Land -

Cox 08.02.2006 31.10.2006

56 Maintenance Works at Ajban Race Track. Public works Department

- 01.05.2004 10.11.2006

57

Contract No. BA/2/L/2270 Landscape, Irrigation System & Lighting for

Abu Dhabi Municipality

Sam Engineering Consultants

08.01.2006 15.11.2006

Page 6: 410371503Proj Completed - Without Value

AL RYUM GROUP – PROJECTS COMPLETED

S.

NO. PROJECT NAME CLIENT CONSULTANT

STARTING DATE

COMPLETION DATE

6

Development Projects at Waves Breaker - Villas Area

58

Maintenance Works in Gardens & Parks -

Project 4

Abu Dhabi Municipality

- 02.01.2005 01.01.2007

59

Irrigation and Landscaping Works at Abu

Dhabi - Golf Course.

Tourism Devl & Investment Co.

- 28.10.2006 17.01.2007

60

Construction of New Car Park with Shades

including Asphalt Works at Abu Dhabi Intercontinental Hotel Refurbishment Project

National Corporation for

Tourism and Hotels

Turner 09.07.2006 10.02.2007

61

Shade Structure Works for Seven Schools

at Ajman –Contract No.MB24/190202051015/156/2006

Ministry of Public Works

- 12.08.2006 11.02.2007

62

Shade Structure Works for Six Schools at

Dubai – Contract No. MB19020205105/155/2006

Ministry of Public Works

- 12.08.2006 11.02.2007

63

Shade Structure Works for Two Schools at

Al Quwain – Contract No. MB190202051015/157/2006

Ministry of Public

Works

-

12.08.2006

11.02.2007

64

Soft Landscape and Irrigation Works of

Shahil Accommodation /Replacement for ADMA-OPCO on Das Island

ADNOC - 24.03.2006 18.02.2007

65

New Corniche Road East Landscaping & Irrigation Works Contract No. 2015-2016

Abu Dhabi Municipality

Delew Cather 18.03.2004 19.04.2007

66

Burj Dubai Development - The Residences -

Phase II Hard & soft Landscaping Works

EMAAR MACE Int'l Ltd. 11.07.2006 31.05.2007

67

Landscaping & Irrigation Works at Shoreline Apartment

Nakheel - 11.03.2006 10.06.2007

68

Construction and Completion of The Armenian Embassy in Abu Dhabi

The Armenian Embassy in Abu

Dhabi

Spectrum Engineering Consultant

01.05.2006 30.07.2007

Page 7: 410371503Proj Completed - Without Value

AL RYUM GROUP – PROJECTS COMPLETED

S.

NO. PROJECT NAME CLIENT CONSULTANT

STARTING DATE

COMPLETION DATE

7

69

Contract No.952 Landscape, Agricultural & Irrigation Works at Abu Dhabi Int'l Airport -

Phase II

Abu Dhabi Municipality Agriculture

Department.

Parsons 10.09.2005 30.12.2007

70

Contract No. PJ 9167/2 Construction of New Community Facilities & Improvements

to Existing Facilities - Zone 2

Dubai Municipality Gulf Engineering

Consultant 28.10.2006 30.12.2007

71

Contract No. PJ 9167/3 Construction of New Community Facilities & Improvements

to Existing Facilities - Zone 3

Dubai Municipality Gulf Engineering

Consultant 28.10.2006 30.12.2007

72

Contract No. PJ 9167/4 Construction of New Community Facilities & Improvements

to Existing Facilities - Zone 4

Dubai Municipality Gulf Engineering

Consultant 28.10.2006 30.12.2007

73

Contract No. 910/2 - Agricultural & Irrigation Works at Abu Dhabi Industrial City - Phase

II

Abu Dhabi Municipality Agriculture

Department.

Hyder 20.05.2007 14.03.2008

74

Contract No. 017/2007 - Various

Landscaping & Irrigation Works for Armed Forces

G.H.Q. Armed Forces Directorate of Military Works.

- 01.04.2007 31.03.2008

75

Completion of Central Control Irrigation System for Water Distribution for locals farms at Mouazaz, Al Jarf & Al Nahda.

Abu Dhabi Municipality

SAM Engg. 01.05.2007 30.04.2008

76

Contract No.N026-040-13 – Palm Deira – Promenade at Deira Island Front

Nakheel - 15.01.2008 30.03.2009

77

Contract No. AE/A/493/2007, Various work

for Armed Forces

G.H.Q. Armed Forces Directorate of Military Works

- 20.02.2008 19.08.2008

78

Contract No. PJ-9163, Construction,

Completion and Maintenance of Mirdif Park

Dubai Municipality - 01.05.2007 31.12.2008

79

TenderL35/2007,Devl of Waves Breaker Area in Abu Dhabi (Landscaping & Agric.

Works-Lighting Network-Irrigation Network, Hardscaping

(Interlocks pavers II)

Abu Dhabi Municipality &

Agriculture

SAM Engineering Consultant

18.03.2008 17.01.2009

Page 8: 410371503Proj Completed - Without Value

AL RYUM GROUP – PROJECTS COMPLETED

S.

NO. PROJECT NAME CLIENT CONSULTANT

STARTING DATE

COMPLETION DATE

8

80

Kempinski Hotel & Residences at the Palm Jumeirah – Phase II

Emerald Palace

Group Management FZ-

LLC

- 28.09.2009 28.12.2010

81

Contract No.A219999/2008/C/004 – 400MM External Infrastructure Trunk Sewer - Al

Raha Garden.

ALDAR Properties PJSC

GHD 09.01.2009 30.06.2009

82

Contract No. 350 - Rehabilitation of Water Tanks and Irrigation Network at Western

Region - Ghayathy City - Phase 1.

Abu Dhabi Municipality

KEO 07.04.2007 31.07.2009

83

Green Reconstruction of Abu Dhabi Golf &

Equestrian Club

ALDAR Properties PJSC

- 01.06.2009 15.10.2009

84

Contract No. A219999/2007/C/001 -

Landscaping Works for Parks, Gardens & planting adjacent to roads, boundary walls for the Residential Compounds of Al Raha

Gardens I & II, Abu Dhabi

ALDAR Properties PJSC

GHD Global PTY Ltd.

07.04.2007

30.10.2009

85

Contract No.ssc-08-02004-000000029 - Irrigation works at Interchange 4 & 5, for the

Al Raha Beach Development

ALDAR Properties PJSC

Cansult Maunsell 26.04.2009 01.11.2009

86

Contract No.147/2008 - Maint, Rehabilitation & Additional Works for the

Roads and Brigdes of Emirate, Main Land – North, Farms in Al Idlah

Abu Dhabi Municipality

- 04.08.2009 04.11.2009

87

Saadiyat Island Expressway Early Landscape Works – Project # C40

Tourism Development & Investment Co.

Parsons Engr. 13.06.2009 12/11/2009

88

Landscaping Works for Parks, Gardens & planting adjacent to roads, boundary walls for the Residential Compounds of Al Raha

Gardens III, Abu Dhabi

ALDAR Properties PJSC

GHD Global PTY Ltd.

30.09.2008 30.11.2009

89

Soft Landscaping and Irrigation Works for 5

nos. of Operative Village at Yas Island

ALDAR Properties PJSC

Whitby Bird 25.06.2008 30.11.2009

Page 9: 410371503Proj Completed - Without Value

AL RYUM GROUP – PROJECTS COMPLETED

S.

NO. PROJECT NAME CLIENT CONSULTANT

STARTING DATE

COMPLETION DATE

9

90

Soft Landscaping and Irrigation Works for

Links Golf Course at Yas Island

ALDAR Properties PJSC

Whitby Bird 25.06.2008 30.11.2009

91

Contract No.A219999/2008/C/005 –

1200MM External Infrastructure Sewerage Trunk

Service – Al Raha Garden

ALDAR Properties PJSC

GHD Global PTY Ltd

08.11.2008 30.11.2009

92

Reactivation of Abu Dhabi Corniche Beach

Improvement Works – Phase I

M/s. UPC – Urban Planning Council

M/s. Hyder Consulting Middle East

Limited

02.06.2009 31.12.2009

93

Const of Iraqi Embassy Building,

Ambassador Residence, Servant's Accom, Utility Blocks and Boundary Walls.

Iraqi Embassy DEWAN 29.04.2008 30.01.2010

94

Ref. No. S439001/2008/T/001 Infrastructure,

Soft Landscape and Irrigation Works, Yas Island Development Zone – P Central Park /

F1 Car Park

ALDAR Properties PJSC

HALCROW 06.11.2008 30.01.2010

95

Hotels H3 & H4 (Crown Plaza Stay Bridge)

Contt#A430852/2007/c/007/sub/0021

ALDAR Properties PJSC

Kannfinche 05.12.2008 31.01.2010

96

Development & Landscape for the Garden &

Entrance of Ministry of Presidential Affairs

Ministry of Presidential

Affairs - 17.12.2009 17.02.2010

97

Abu Dhabi International Shooting Club

External Landscape & Irrigation Planting System – Built For Wake Board

Facilities and Landscape Upgrade – Design for Paint Ball Area including Old Wake

Facilities

Private Property Management

ATKINS 24.12.2008 31.03.2010

98

Al Forsan Int’l Sports Resorts/AFISR

Complete Design & Build Air Supported Structure

Private Property Management

- 12.01.2010 30.04.2010

99

Landscaping and Maintenance at Ruwais

Housing Complex ADNOC Agreement No.1740301

ADNOC 07.08.2003 30.06.2010

Page 10: 410371503Proj Completed - Without Value

AL RYUM GROUP – PROJECTS COMPLETED

S.

NO. PROJECT NAME CLIENT CONSULTANT

STARTING DATE

COMPLETION DATE

10

100

Additional Car Parks @ Emirates Palace

Emirates Palace

KEO

05.06.2010

30.07.2010

101

Nareel Island Development External Roads

and Fence

ALDAR Properties PJSC

Parsons Engineering

06.05.2010

30.08.2010

102

Al Ain Equestrian Club – Steel Water Tank

Musanada - 24.10.2009 23.10.2010

103

Ph. 1A Welcome Pavilion Water Cascades

MEP Works

Al Dar – Besix - 03.02.2010 30.10.2010

104

Kempinski Residences – Palm Jumeirah

Landscaping Works

KEMPINSKI LMS Intl 05.08.2009 30.10.2010

105

MW/D/25/2010 - Supply & Installation

of Two Water Tanks in Al Ain

Crown Prince Court

- 13.04.2010 14.11.2010

107

Landscaping Beautification Works to the Area Located at West 2/19, Abu Dhabi

Abu Dhabi Municipality

Dorsch Holding GmBH

15.08.2010 11.09.2010

108

Al Gurm Villas Irrigation and Landscaping Works

AL Dar Properties PJSC

Dar Al Handasah 31.08.2010 15.01.2011

109

Annual Maintenance Contract for Landscaping and Irrigation system maintenance for Marina Office Park

National Investment Corporation

- 01.03.2010 28.02.2011

110

Contract No. 488 – Subsoil Drainage for Ghantoot Polo Club

Abu Dhabi Municipality

Dorsch Holding GmbH

11.04.2010 30.04.2011

111

Cont. #MW-OU-059-2009 Const. of Concrete Boundary Wall, Observation

Towers, Road Works and Other Works at Falag Hazza Camp – Al Ain

GHD - 07.03.2010 30.04.2011

112

Contract No. GC-26 Al Jawaher Temporary utility Works

TDIC - 07.12.2010 07.05.2011

Page 11: 410371503Proj Completed - Without Value

AL RYUM GROUP – PROJECTS COMPLETED

S.

NO. PROJECT NAME CLIENT CONSULTANT

STARTING DATE

COMPLETION DATE

11

113 New Pump Station at Rawdat Al Reef Crown Prince

Court - 3.01.2010 30.04.2011

114

T-FM-42-2010 Supply, Installation, Testing and Commissioning and Operating of (23)

Traveller Irrigation Systems in Ghantoot Racing and Polo Club

Abu Dhabi General Services PJSC trading as

MUSANADA

15.01.2011

15.06.2011

115

Supply, Installation and Commissioning of 500mm Water Supply to Plot (A) in Razeen

Labour City – Abu Dhabi

MUSANADA Dr. M.H. Ali El-Saie Consulting

Engineers 12.07.2011 12.11.2011

116

AC7143 – Al Raha Beach Development Southside IC6 Extension – Complete Works

– Removal/Relocation of Palm Trees

Balfour Beatty LLC

Parsons Engineering

15.08.2011 31.09.2011

117

Civil & Landscaping Works at Al Bateen

Palace

Crown Prince Court

Dorsch Holding GmbH

06.06.2011 30.10.2011

118

Contract No. 469 – Landscape & Irrigation Works for the VIP Entrance of H.H. Sheikh

Zayed Bin Sultan Al Nahyan Mosque

Abu Dhabi Municipality

Dorsch Holding GmBH

20.03.2011 17.09.2011

119

Supply & Installation of Tensile Fabric for

Private Villa Island

Shield Cont. Co. - 01.08.2011 30.09.2011

120

Construction, Completion of Football Pitch Facilities Building, Emirates Palace, Abu

Dhabi

Emirates Palace, Abu Dhabi

- 21.09.2011 30.09.2011

121

Landscape and Irrigation Maintenance

Works at H.H. Sheikh Hamdan Al Nakheel Palace – Abu Dhabi

The Private Office

of H.H. Sheikh Hamdan Al Nakheel Bin

Zayed

- 01.10.2010 01.10.2011

122

Construction of Beach Restaurant & Grill –

Phase 1 Kempinski Residences – Palm Jumeirah

Sunny Beach Properties LTD, Abu Dhabi, UAE

- 15.05.2011 30.09.2011

Page 12: 410371503Proj Completed - Without Value

AL RYUM GROUP – PROJECTS COMPLETED

S.

NO. PROJECT NAME CLIENT CONSULTANT

STARTING DATE

COMPLETION DATE

12

123

Renovation of Pump Sets & Controller and

Related Works at Al Maha Farm

Elite Agro LLC Al Salaam

KLhalil N. Khoury 09.06.2011 31.12.2011

124

Supply & Installation of New Pipeline &

Electrical Lines to CPI’s and Related Works

Elite Agro LLC Al Salaam

KLhalil N. Khoury 09.06.2011 30.11.2011

125

Supply & Installation of One MIG Water

Tank in Al Maha Farm

Elite Agro LLC Al Salaam

KLhalil N. Khoury 15.08.2011 30.11.2011

126

Gen. Maint. for Aljeel KG in Al Shamkha –

Building no. C1142

MUSANADA - 26.07.2011 30.11.2011

127

Gen. Maint. for Al Maha School in Al Falah –

Building no. C1143

MUSANADA - 26.07.2011 30.11.2011

128

Gen. Maint for Capital School in Al Shamkha

– Building no. C11139

MUSANADA - 26.07.2011 30.11.2011

129

Gen. Maint. for Al Janeen School in Al

Shamkha – Building no. C1142

MUSANADA - 26.07.2011 30.11.2011

130

Gen. Maint. for Al Taleeaa School in Al

Shamkha – Building no. C1144

MUSANADA - 26.07.2011 30.11.2011

131

Gen. Maint. for Gurun Yafour School in Al

Falah – Building no. C1133

MUSANADA - 26.07.2011 30.11.2011

132

Gen. Maint. for Al Tawan School in Al

Shamkha – Building no. C1124

MUSANADA - 26.07.2011 30.11.2011

133

Gen. Maint. for Al Hisn Secondary Shool in

Al Shamkha – Building no. C1114

MUSANADA - 26.07.2011 30.11.2011

134

Gen. Maint. for Mariam Bint Imran School –

Baniyas – Buildning no. C1134

MUSANADA - 03.08.2011 30.11.2011

Page 13: 410371503Proj Completed - Without Value

AL RYUM GROUP – PROJECTS COMPLETED

S.

NO. PROJECT NAME CLIENT CONSULTANT

STARTING DATE

COMPLETION DATE

13

135

Gen. Maint. for Al Bidaya School Al

Shamkha – Building no. C1433

MUSANADA - 02.08.2011 30.11.2011

136

Gen. Maint. for Al Mo’ Tasem School –

Baniyas – Building no. C1117

MUSANADA - 26.07.2011 30.10.2011

137

Gen. Maint. for Al Norr School – Baniyas –

Building no. C1121

MUSANADA - 03.08.2011 30.11.2011

138

Gen. Maint. for Al Mafraq High School –

Baniyas – Building no. C1116

MUSANADA - 26.07.2011 30.11.2011

139

Restoration & Maintenance Works of Existing Buildings at Al Maha Farm

Elite Agro LLC Al Salaam

KLhalil N. Khoury 13.08.2011 30.11.2011

140

Contract # MW-Gs-180-2008 – Construction

of Headquarter Bldg. Stores & Different Works for H.Q. of Logistic & Transforming

Arm at Maleeha

GHQ Armed Forces

- 15.01.2010 30.11.2011

141

Contract No. 1004 – Landscaping Works at

Raha – Yas Tunnel Road Entrance

Abu Dhabi Municipality

Parsons Engineering

11.07.2010 31.12.2011

142

Khalifa City District Cooling – Installation

of 4 Tanks in Khalifa City

Drake & scull Int’l - 01.08.2011

31.12.2011

143

CW/630/2007 – const. of 2 pumping stations each with 60 MIGD capacity in loc. no. 5 & loc. no. 7 complete with surge protection

system and associated MEP works.

DEWA

Al - Diar

15.06.2008

15.12.2011

144

Contract C2010/3- Irrigation and

Landscaping Works for H.H. Crown Prince Court, Abu Dhabi

Crown Prince Court

Dorsch Holding GmbH

15.01.2011

31.12.2011

145

Contract No. MW-AF-043-2009 -

Construction of 7 nos. Ammunition Stores and Modification Works for Fence at Safran

Air Base

UAE Armed Forces

- 25.09.2010 30.11.2011

Page 14: 410371503Proj Completed - Without Value

AL RYUM GROUP – PROJECTS COMPLETED

S.

NO. PROJECT NAME CLIENT CONSULTANT

STARTING DATE

COMPLETION DATE

14

146

Abu Dhabi Corniche Landscaping Services

(Maintenance)

John Buck International Properties

Hyder 15.11.2009 31.12.2011

147

Contract No. P042-C45 Electrically

Operated Sliding Gates

TDIC - 01.05.2011 31.12.2011

148

Contract No. MW/D/27/2010, Supply and Installation of 1 Water Tank with 1 Million

Gallon capacity along with Installation of an Irrigation

Network at Farms of Mehier – Al Ain

Private Dept. of H.H. Sheik Fatima

Bint Mubarak - 07.11.2010 30.11.2011

149

Contract No. MW/D/26/2010, Supply and Installation of 1 Water Tank with 1 Million

Gallon capacity along with Installation of an Irrigation Network at Al Maqam –

Al Ain

Private Dept. of H.H. Sheik Fatima

Bint Mubarak - 07.11.2010 29.02.2012

150

Saadiyat Island Beach Resort Landscape &

Irrigation Works

TDIC Parsons

Engineering 16.01.2010 29.02.2012

151

Main Irrigation Line from Mafraq WWTP to

Al Faya along Abu Dhabi Al Ain – Road Contract No. 956

Abu Dhabi Municipality

Parsons Engineering

01.05.2010

21.02.2012

152

Landscaping & Irrigation System

Maintenance for Marina Office Park – Abu Dhabi

National Investment Corporation

-

01.03.2011

29.02.2012

153

CONTRACT NO.SC-09-2048-0000011 – Al Raha Beach Development/Infrastructure –

Irrigation Network at Eastern Precinct

ALDAR Properties PJSC

- 19.02.2009 29.02.2012

154

CW/146A/2010 – Design, Supply,

Installation, Testing and Commissioning of Chlorine Dioxide

Dosing System at Mushrif Reservoir Phases 1 to 6

DEWA - 09.01.2011 09.02.2012

155

Contract No. P001-C47 Saadiyat

Expressway Permanent Landscape Works

TDIC Parsons

Engineering 11.02.2010

29.02.2012

Page 15: 410371503Proj Completed - Without Value

AL RYUM GROUP – PROJECTS COMPLETED

S.

NO. PROJECT NAME CLIENT CONSULTANT

STARTING DATE

COMPLETION DATE

15

156

Agreement No. 1741118 – Supply & Lay of

a High Density Polyethylene (HDPE) Pipeline from a Supplementary High Rise

Pumping Station (SHRPS) to H.H. the Presi.Palace Plant Yard at Ruwais Housing

Complex

ADNOC - 14.07.2011 29.02.2012

157 The Landmark Tower Project, Abu Dhabi Al Habtoor & CCIC Joint

Venture - 30.10.2011 31.01.2012

158

Proposed Arzanah Development, Sector W-57, Abu Dhabi-UAE-Rihan Heights (Phase

1A-Plot H)

MUBADALA Capital and Real

Estate LLC - 08.11.2011 31.01.2012

159

Landscaping & Irrigation Works of the Burj Khalifa Boulevard Centre Media

EMAAR Properties

- 09.11.2011 08.01.2012

160

Contract No. CW/0146A/2010 – Design, Supply, Installation, Testing &

Commissioning of Chlorine Dioxide Dosing System at

Mushrif Reserviors Phases 1 to 6 including Al Chlorination Lines, Interconnection with Existing Chlorination Lines, All Associated Earthworks, Civil, Electrical and Drainage

Works, Automation System and Safety Equipment

DEWA - 09.01.2011 31.01.2012

161

Contract no. 151/1 Removal of Weeds and

Pruning of Trees in Abu Dhabi Island

Abu Dhabi Municipality

Parsons Engineering

02.09.2010. 30.04.2012

162

Construction Works of irrigation Main Lines at Khalifa Bin Zayed Town B – Contract No.

481

Abu Dhabi Municipality

Dorsch Holding GmbH

28.04.2010 31.03.2012

163 Al Dhabeya Maritime Residential Complex Crown Prince

Court Dorsch Holding

GmbH 22.05.2010 28.04.2012

164

Maintenance and irrigation Services of

Landscaped Areas at ADNOC premises in Abu Dhabi, Sas Al Nakhil and Al

Shawamekh – Agreement No. 1720736

ADNOC - 01.11.2008 03.05.2012

Page 16: 410371503Proj Completed - Without Value

AL RYUM GROUP – PROJECTS COMPLETED

S.

NO. PROJECT NAME CLIENT CONSULTANT

STARTING DATE

COMPLETION DATE

16

165

Contract No. 6W/2010-4MIG & 2x1MIG RCC Water Tanks & Pumping Station in

Central Area

FEWA Dr. M. H. Ali El-

Saie 01.06.2011 31.03.2012

166

Contract No. CMW – 11051 – C002

Construction of Stores at Al Maryal Camp Camp No. (220802)

GHQ Armed Forces

- 01.11.2011 31.03.2012

167

Modification to Boundary Wall For H.H. the

Crown Prince Diwan at W-35, Abu Dhabi – UAE

H.H. The Crown Prince Diwan

Architectural & Engineering Consultant

20.01.2012 20.05.2012

168

Maintenance of Landscape Works, Sport

Field and Irrigation Network

Private Property Management

- 10.07.2011 30.08.2012

169 CMW-11098-C002 GHQ Armed

Forces -

17.07.2012

31.10.2012

171

Yas Island Development – Modification of Potable Water Network for Gateway Park

Al Dar Properties PSJC

- 23.04.2012

31.10.2012

172

Contract no. 151/2 Removal of Weeds and

Pruning of Trees in Abu Dhabi Island

Abu Dhabi Municipality

Parsons Engineering

02.09.2010 31.12.2012

173 Oman Botanic Gardens, Phase IV BAM International - 01.12.2011 31.12.2012

174

Contract No. A199999/2011/C/025 – Geo-

textile Fabric under Gravel Mulch at Al Gurm Berm Area (Al Gurm Development)

Al Dar Properties PSJC

- 26.12.2011 26.12.2012

175

New Management Building and New Auditorium Building at Buhasa – Soft

Landscaping & Irrigation Works

Abu Dhabi Gas Industries Ltd.

(GASCO) AECOM 01.05.2012 31.12.2012

176

Contract No. M46/2012 – Landscaping & Irrigation Works at Falj Al Mua ‘ala Palace,

Ajman

Crown Prince Court

- 19.10.2012 20.01.2013

177

Tender No. EPD-CT-12020 Design, Supply & Installation of Dense

Planting Screen at Khaleej Al Arabi Service Station – Abu Dhabi

ADNOC - 30.01.2013 15.02.2013

Page 17: 410371503Proj Completed - Without Value

AL RYUM GROUP – PROJECTS COMPLETED

S.

NO. PROJECT NAME CLIENT CONSULTANT

STARTING DATE

COMPLETION DATE

17

178

Maintenance of Emirates Palace Football Pitch

Emirates Palace Hotel

- 15.01.2012 28.02.2013

179

C410 – Development & Const. Works for irrigation Network & Pumping Station in

Farm Areas (Dhaharat, Al Tayeb, Al Wafiya, Al Wathba)

Abu Dhabi Municipality

Dorsch Holding GmbH

01.06.2010 11.03.2013

181

Millenium Hotel, Sulaimani, Kurdistan

Region – Iraq

Faruk Holding Company Ltd.

- 02.02.2012 31.03.2013

182 Landscape Complementary of Faruk

Medixal Center ( FMC) Faruk Holding Company Ltd.

- 19.07.2012 19.12.2012

183

Contract No. 15W/2010(2) – 3x2MIG RCC

Water Tanks & Pumping Station in Rak Area

Federal Electricity & Water Authority

(FEWA)

Dr. M. H. Ali El-Saie

01.06.2011 30.04.2013

184 Supply and Installation of Water Features Al Dar Properties

PSJC - 01.09.2012 31.03.2013

185

4EW/2011 – Construction of New Water

Well Fields at Surrah – UAE

Federal Electricity & Water Authority

(FEWA)

- 13.02.2012 30.04.2013

186

Maintenance Works for Soft Landscape and

Irrigation System – Zayed Sports City – Phase 1A

MUBADLA Capital and Real Estate

LLC - 02.01.2012 30.06.2013

187

Construction Works for Al Raha Gardens

Attached Housing Project – Contract No. ARG-00-C-NET-C-00

Sorouh Real Estate

Const. Gen. Contracting House Ltd.

25.12.2012 25.06.2013

188

Supply & Installation of Landscaping Works – Habshan 5 Industrial Facilities, Habshan

Abu Dhabi Gas Industries Ltd.

(GASCO) - 10.11.2011 31.08.2013

189

Supplying Agriculture Equipment

UAE University

- 01.09.2010

01.10.2013

Page 18: 410371503Proj Completed - Without Value

AL RYUM GROUP – PROJECTS COMPLETED

S.

NO. PROJECT NAME CLIENT CONSULTANT

STARTING DATE

COMPLETION DATE

18

190

Elixier II Mirfa – Landscaping & Irrigation

Works

ADNOC LindeIndustrial Gases Co. Ltd.

- 28.09.2011 27.09.2013

191

GS/RFP-0212-Landscape Works for the

Surrounding Areas of Al Bahr Tower Sector -25, Plot 70 & 71

Abu Dhabi Investment

Council - 15.12.2012 15.09.2013

192

Bab Al Bahar – A Luxury Collection Hotel on Plot No. 44, Al Nakheel Area in Ajman –

UAE

H.H. Crown Prince of Ajman

Badri & Bensouda

Architectural Engineering

04.03.2012 30.09.2013

193

Contract No: 2012/97 – Irrigation & Landscape Works for H.H. Prince Crown

( VIP Entrance)

Crown Prince Court

Dorsch Holding GmbH

19.06.2013 15.11.2013

194

Removal of Existing Services Within Basement Extension For the First Gulf Bank Office Bldg, Plot C 110, Sector 48, Al Qurm

Area, Abu Dhabi

First Gulf Bank M/s. Architectural

& Engr. Cons. 04.07.2013 03.11.2013

195

Contract No.PGD-O&M-309-Operation & Maint. Of Landscape, Forests and Irrig.

Infrastructure at Ghayathi, Ghayathi (A,B,C), Markaz/Hezam Ghayathi, Mashtal Ghayathi, Qasr saleh Al Mazari, Gurnama (1,2) Bida

Rashed and Shamal Gharb Ghayadhi

Municipality of Western Region -

WRM KEO Int’l 15.02.2007

31.12.2013

196

Sea Palace - The Governess House & Boudary Wall

Crown Prince Court

Dorsch Holding GmbH

01.10.2012

31.12.2013

197

Recreational Park & Landscaping Works & Plantation of Trees Along Main Road, Al

Ajban

Tawazun Holding Co. LLC

- 05.12.2012

31.12.2013

198 GC-43Saadiyat Beach Public Realm

Streetscape –Landscape Works

Tourism Development & Investment Co.

Parsons Engineering

03.03.2013

31.12.2013

199 Al Maryah Island Public Realm &

Promenade MUBADALA -

08.05.2013

31.12.2013

200

Lusail Underground Car Park Project- Phase 2B

Lusail Real Estate Development Co.

(LREDC)

ACE 10.10.2013 31.03.2014

Page 19: 410371503Proj Completed - Without Value

AL RYUM GROUP – PROJECTS COMPLETED

S.

NO. PROJECT NAME CLIENT CONSULTANT

STARTING DATE

COMPLETION DATE

19

201 Contract No. E19/2 Landscaping & irrigation

Works for Public Park E19/2 Crown Prince

Court Dorsch Holding

GmbH

04.10.2012

31.03.2014

202

Contract no. 467/1 Removal of Weeds and Pruning of Trees in Abu Dhabi Island

Abu Dhabi Municipality

Dorsch Holding GmbH

02.09.2010 01.04.2014

203

Contract no. 467/4 Removal of Weeds and Pruning of Trees in Abu Dhabi Island

Abu Dhabi Municipality

Dorsch Holding GmbH

02.09.2010 01.04.2014

204

Landscape works at Ambulatory Healthcare Center At Al Shamkha & Al Bahya(Site 108

A & B), Abu Dhabi

SEHA - 01.02.2013 30.04.2014

205

Mussafah Water Transmission Scheme, Mussafah to Abu Dhabi ( Lot M) –

Landscaping Works

AYDINER Const. – Abu Dhabi

Khatib & Alami 27.01.2014 20.04.2014

206 Infrastructure Works including all MEP

Works & Playground Foundation – Baghdad-Iraq Adjacent to Green Zone

Al Zawraa Park for

Games & Commercial

Agencies Ltd. Liability Co.

- 13.03.2013 31.05.2014

207

Contract No. 2013/58 – External Miscellaneous Works for Crown Prince

Court

Crown Prince Court

Dorsch Holding GmbH

01.09.2013 31.05.2014

208 6W2011-Network Rehabilitation at Khuzam

Rak Area

Federal Electricity & Water Authority

(FEWA)

Dr. M. H. Ali El-Saie

27.09.2011 31.07.2014

209

Contract No. PD/CA/FM/SB/R530/Gen/13/51 – Blanket Agreement for Supply of Potable Drinking

Water to Schools in Al Ain City

MUSANADA - 04.04.2013 03.07.2014

210

Agreement No. 1741257 – Renovation of the Children and Families Park in Ruwais

Housing Complex – Ruwais UAE

ADNOC - 14.09.2013 12.07.2014

211 Contract No. 21W/2012 – Water Distribution

Networks in UAQ Areas

Federal Electricity & Water Authority

(FEWA)

Dr. M. H. Ali El-Saie

22.08.2012 31.07.2014

Page 20: 410371503Proj Completed - Without Value

AL RYUM GROUP – PROJECTS COMPLETED

S.

NO. PROJECT NAME CLIENT CONSULTANT

STARTING DATE

COMPLETION DATE

20

212 25W/2012 – 5MIG RCC Water Tank at

Hiniya WDC - Fujairah

Federal Electricity & Water Authority

(FEWA)

- 06.10.2012 12.07.2014

213 18W/2012 – Rehabilitation of Distribution

Netwrok at Rams - RAK

Federal Electricity & Water Authority

(FEWA)

Dr. M. H. Ali El-Saie

05.05.2012 31.07.2014

214 Contract no. 1W/2011/

Transmission/Distribution Pipeline System in Al Jurf and Pumps at A. Zawra - Ajman

Federal Electricity & Water Authority

(FEWA)

Dr. M. H. Ali El-Saie

01.09.2011 30.09.2014

215 Church Compound for Armenian Community

of Abu Dhabi

Armenian Community of Abu

Dhabi

Kojakian Engineering Consultants

01.05.2012

29.11.2014

216 Tender No. 14EW/2013 – Design, Supply &

Const. of RCC Brine Reject & Outfall Structure at Ghallilah, Ras Al Khaimah, UAE

Federal Electricity & Water Authority

(FEWA)

- 15.02.2014 30.11.2014

217 Landscape Works for New York University

Tourism Development & Inv. Co. (TDIC)

- 01.05.2014 31.10.2014

218

Modification in the Gate Building for H.H. the

Crown Prince Diwan at W-35, Abu Dhabi, UAE

Crown Prince Court

M/s. Architectural & Engineering Consultants

01.04..2014 31.11.2014

219

CW/200B/2011 – Supply, Installation,

Testing & Commissioning of Fibre Cement/Glass Reinforced Expoxy Water Transmission Pipelines and Associated

Works at Various Locations in the Emirate of Dubai

Dubai Electricity & Water Authority

(DEWA)

NJS Consultants Co. Ltd.

06.12.2011 31.12.2014

220

Supply & Installation of Yas Mall Main

Const. Works Ph. 2 Zone E Yas Island Devl. - Contract No. A430601/2010/C/063

Al Dar Properties PSJC

AECOM 01.10.2012 31.12.2014

(maintenance period)

221

Contract No. P.O. 3441200321 – Supply, Installation, Testing & Commissioning of

Glass Reinforced Epoxy Water Transmission Pipelines and Associated

Works at Various Locations in the Emirate of Dubai Including 600mm Dia Transmission Pipeline along Outer Bypass Road to Al Khawaneej Road in Wadi Al Mardi and

Interconnection Between the Two Existing

Dubai Electricity & Water Authority

(DEWA) - 09.12.2012 31.12.2014

Page 21: 410371503Proj Completed - Without Value

AL RYUM GROUP – PROJECTS COMPLETED

S.

NO. PROJECT NAME CLIENT CONSULTANT

STARTING DATE

COMPLETION DATE

21

900mm Dia Pipeline by 600mm Dia Pipeline in Al Khawaneej Area

222

Replacing the Control System of the

Irrigation Network inside Abu Dhabi from the Manual System to an Automated System, Phase II, Contract No. 908/3A, Abu Dhabi,

UAE

Abu Dhabi Municipality

Dorsch Holding GmbH

01.10.2013 31.12.2014

223

Contract No.PGD-O&M-404-Operation &

Maint. For Irrig. Reservoirs with Transmission Pipeline, Landscape, Irrig.

Infrastructure & Forests - Al Khatim Area 1

Abu Dhabi Municipality

Dorsch Holding GmbH

15.02.2007 31.12.2014

224

Contract No.PGD-O&M-406-Operation &

Maint. For Irrig. Reservoirs with Transmission Pipeline, Landscape, Irrig.

Infrastructure & Forests - Al Khatim Area 3

Abu Dhabi Municipality

Dorsch Holding GmbH

25.02.2007 31.12.2014

225

Contract No.PGD-O&M-103 - Operation &

Maint. Of Landscape, Irrigation Storm Water and Associated Infrastructure Abu Dhabi

Quadrant 3 & Surrounding Islands

Abu Dhabi Municipality

Dorsch Holding GmbH

07.10.2007 03.01.2015

226

CONTRACT NO. 208 - Operation &

Maintenance for Landscape, Irrigation, and Landscape Facilities for Al Bahya & Al

Rahbah Gardens.

Abu Dhabi Municipality

Parsons Engineering

13.04.2009 03.01.2015

227 FP- 5020000006 - Dubai Endurance Table

Engineer’s Office

of HH Sheikh Mohammed Bin

Rashid Al Maktoum

- 19.01.2015 24.01.2015

228 FP- 2053000007 – Construction of Gym, Pool, Staff Accommodation, and Stable at

Lehbab, Dubai

Engineer’s Office

of HH Sheikh Mohammed Bin

Rashid Al Maktoum

- 17.01.2015 31.01.2015

229

Develop 20 Playgrounds in Abu Dhabi

Mainland – Phase 1C – Contract No. 393, Abu Dhabi, U.A.E.

Abu Dhabi Municipality

KEO International

15.12.2013 10.04.2015

Page 22: 410371503Proj Completed - Without Value

AL RYUM GROUP – PROJECTS COMPLETED

S.

NO. PROJECT NAME CLIENT CONSULTANT

STARTING DATE

COMPLETION DATE

22

230

Contract No. 2014/51 – Civil Works of the

Fountain in the Private Entrance of the Bldg. of Crown Prince Court

Crown Prince Court

- 11.09.2014 15.04.2015

231

Contract No. D-8604, Replacement of GRP

Water Pipelines & Construction of New Connection in Madinat Zayed – Western

Region, Abu Dhabi

Abu Dhabi Distribution

Company (ADDC) Ital Consult 27.03.2012 26.04.2015

232 FP- 2023000012 – Landscaping and

Irrigation Works Infront of Main Villa at Habab Coservation- Dubai

Engineer’s Office

of HH Sheikh Mohammed Bin

Rashid Al Maktoum

- 18.01.2015 15.04.2015

233 Landscaping for Marina Office Park National

Investment Corporation

- 01.04.2012 01.03.2015

234

20W/2012-DN600 Transmission Pipeline

from Shouka to Huwailat Junction and Pumping Station at Shouka RAK

Federal Electricity & Water Authority

(FEWA) - 10.05.2013 31.05.2015

235

Commercial Bldg. For M/s. Inheritors of Late Abdulsalam Hamad Abdulrahman Rashed Al Mubarak, Located Sector E-25, Plot no.

C-13

ADCP ARKAN 15.01.2013 11.06.2015

Under maintenance

236

Landscaping & Irrigation Maintenance Services at Ruwais Housing Complex

Agreement No. 1740716

ADNOC -

01.07.2010

30.06.2015

237

Contract (12) – for the Operation, Water

Management, Development, Maintenance And Repair of Irrigation Water Supply and

Distribution System in Al Ain Region

Al Ain Municipality DMJM

International 01.07.2010 30.06.2015

238 C1004/1, Upgrading of VVIP Approach

Road Yas Island Abu Dhabi Municipality

Parson Int’l Ltd. 16.01.2014 30.07.2015

239

Contract 10/2012 - Construction and execution of a network for irrigation and

improving the main entrance for the eastern sector

Al Ain Municipality Dorsch Holding

GmbH 01.04.2013 31.08.2015

Page 23: 410371503Proj Completed - Without Value

AL RYUM GROUP – PROJECTS COMPLETED

S.

NO. PROJECT NAME CLIENT CONSULTANT

STARTING DATE

COMPLETION DATE

23

240 Contract No. CPC-14014-M1 – Periodic Maintenance Works for Different Areas

Crown Prince Court

- 01.05.2014 30.08.2015

241

Contract No. CPC-14024-M1 – Maintenance

Palms in Falaj Mualla & Al Ain

Crown Prince Court

- 01.05.2014 30.08.2015