400 army navy drive - amazon web...

23
400 Army Navy Drive Final Site Plan Amendment (SP #2) SPRC #3 Aaron Shriber DCPHD—Planning Division April 24, 2014

Upload: others

Post on 27-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 400 Army Navy Drive - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/...2014/05/04  · to Advance Preliminary O & M Facility (Fall/Winter 2014; 15-18

400 Army Navy DriveFinal Site Plan Amendment (SP #2)

SPRC #3

Aaron Shriber

DCPHD—Planning Division

April 24, 2014

Page 2: 400 Army Navy Drive - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/...2014/05/04  · to Advance Preliminary O & M Facility (Fall/Winter 2014; 15-18

Existing Conditions

2

PenPlace

MetPark

Teardrop

Page 3: 400 Army Navy Drive - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/...2014/05/04  · to Advance Preliminary O & M Facility (Fall/Winter 2014; 15-18

Crystal City Sector Plan

3

Page 4: 400 Army Navy Drive - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/...2014/05/04  · to Advance Preliminary O & M Facility (Fall/Winter 2014; 15-18

Columbia Pike Transit Initiative

July 23, 2012 County Board Meeting

County Board Actions:

1) Accepted the Alternatives Analysis and Environmental Assessment, Volumes I & II and Preliminary Plans for the Columbia Pike Transit Initiative dated May 2012;

2) Adopted the streetcar alternative and alignment, as described in the Locally Preferred Alternative Report, as the Locally Preferred Alternative; and

3) Authorized the County Manager, in cooperation with Fairfax County, to submit an application as the project sponsor for project development approval within the New Starts/Small Starts program of the Federal Transit Administration.

4

Page 5: 400 Army Navy Drive - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/...2014/05/04  · to Advance Preliminary O & M Facility (Fall/Winter 2014; 15-18

Locally Preferred Alternative Report

5

Page 6: 400 Army Navy Drive - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/...2014/05/04  · to Advance Preliminary O & M Facility (Fall/Winter 2014; 15-18

Locally Preferred Alternative Report

6

Page 7: 400 Army Navy Drive - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/...2014/05/04  · to Advance Preliminary O & M Facility (Fall/Winter 2014; 15-18

7

Locally Preferred Alternative Report

Page 8: 400 Army Navy Drive - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/...2014/05/04  · to Advance Preliminary O & M Facility (Fall/Winter 2014; 15-18

8

Locally Preferred Alternative Report

Page 9: 400 Army Navy Drive - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/...2014/05/04  · to Advance Preliminary O & M Facility (Fall/Winter 2014; 15-18

Alternative Site Under Evaluation

9

Page 10: 400 Army Navy Drive - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/...2014/05/04  · to Advance Preliminary O & M Facility (Fall/Winter 2014; 15-18

Army Navy Drive Cycle Track

10

Page 11: 400 Army Navy Drive - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/...2014/05/04  · to Advance Preliminary O & M Facility (Fall/Winter 2014; 15-18

Streetscape Treatments

11

Applicant Proposed Plan Staff Proposed Plan

Applicant Proposed Section Staff Proposed Section

Page 12: 400 Army Navy Drive - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/...2014/05/04  · to Advance Preliminary O & M Facility (Fall/Winter 2014; 15-18

Section View from PenPlace to Site Plan

12

Page 13: 400 Army Navy Drive - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/...2014/05/04  · to Advance Preliminary O & M Facility (Fall/Winter 2014; 15-18

Next Steps

Focus on Ongoing Community Engagement and Facility Planning, Engineering and Design that will be Responsive to the Fabric of the Community

• Staff to Focus on Dual Pronged Approach to the Siting of the Streetcar O & M Facility (In-Progress)

• County to Retain Architectural and Engineering Consultant(s) to Advance Preliminary O & M Facility (Fall/Winter 2014; 15-18 month duration)

• Public Process to Address Site Planning, Design and Construction (Spring 2015)

• Public Facility Review Committee to be Convened as Part of Public Engagement Process

13

Page 14: 400 Army Navy Drive - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/...2014/05/04  · to Advance Preliminary O & M Facility (Fall/Winter 2014; 15-18

14

Page 15: 400 Army Navy Drive - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/...2014/05/04  · to Advance Preliminary O & M Facility (Fall/Winter 2014; 15-18

400 Army Navy Drive Existing Conditions

15

Page 16: 400 Army Navy Drive - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/...2014/05/04  · to Advance Preliminary O & M Facility (Fall/Winter 2014; 15-18

Initial Site Layout Proposal

16

Page 17: 400 Army Navy Drive - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/...2014/05/04  · to Advance Preliminary O & M Facility (Fall/Winter 2014; 15-18

Initial Site Plan Perspective from the Northwest

17

Page 18: 400 Army Navy Drive - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/...2014/05/04  · to Advance Preliminary O & M Facility (Fall/Winter 2014; 15-18

Initial Site Plan Proposal Perspective from Old Eads St.

18

Page 19: 400 Army Navy Drive - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/...2014/05/04  · to Advance Preliminary O & M Facility (Fall/Winter 2014; 15-18

Staff Suggested Site Plan Revisions

• Redesign building and layout to be considerate of existing and proposed institutional uses on adjacent parcels to the west and south

• Pursue vacation of Old Eads Street– Provide 20’ wide alley on west side of property– Alley may be incorporated into streetscape design to provide a buffer

between uses• Relocate residential lobbies to Army Navy Drive

– Eliminate individual residential entries from west and south facades– Secondary lobby entries may be appropriate on west and south facades

• Short term loading and drop-off layby may be provided along 11th Street South

19

Page 20: 400 Army Navy Drive - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/...2014/05/04  · to Advance Preliminary O & M Facility (Fall/Winter 2014; 15-18

Revised Site Plan Layout

20

Page 21: 400 Army Navy Drive - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/...2014/05/04  · to Advance Preliminary O & M Facility (Fall/Winter 2014; 15-18

Revised Site Plan Layout Section

21

Page 22: 400 Army Navy Drive - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/...2014/05/04  · to Advance Preliminary O & M Facility (Fall/Winter 2014; 15-18

Building Elevation Looking East

22

Page 23: 400 Army Navy Drive - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/...2014/05/04  · to Advance Preliminary O & M Facility (Fall/Winter 2014; 15-18

Streetscape Treatments

23

Applicant Proposed Plan Staff Proposed Plan

Applicant Proposed Section Staff Proposed Section