40 by 26 foot sag 75th percentile

40
Project: 40 by 26 foot SAG 75th percentile - printed: Flowsheet: 40 by 26 foot SAG 75th percentile Report: Report 1 Andersen/Whiten Crusher No. In Parallel 1 --------------- Operating data Closed side set.(mm) 12 Liner Length (mm) 0 Eccentric Throw (mm) 0 Liner Hours (Hours) 0 Cr. Feed Rate (TPH) 565.7 Cr. Feed F80 (mm) 38.24 Cr. Prod P80 (mm) 10.79 Classification equation data Parameter K1 12 derived from CSS * 1 + TPH feed * 0 + F80 * 0 + Liner Length * 0 + 0 Parameter K2 015 20.04 derived from CSS * 1.67 + TPH feed * 0 + F80 * 0 + Liner Hours * 0 + Eccentric Throw * 0 + 0 Parameter K3 2.3 Reduction Parameter equation Parameter T10 15 derived from CSS * 0 + TPH feed * 0 + F80 * 0 + 15 Power equation Calc. Power (kW) 511.6 derived from 332 pendulum power 1.3 =+ no load power' 80 AG/SAG Mill (Variable Rates) SAG No. In Parallel 1 --------------- Int. Mill Dia. (m) 11.99 Belly Mill Len. (m) 7.315 Feed trunion dia (m) 3.15 Feed cone angle (dg) 15

Upload: panchoscribd50

Post on 10-Apr-2016

10 views

Category:

Documents


2 download

DESCRIPTION

simulacion molienda sag

TRANSCRIPT

Page 1: 40 by 26 Foot SAG 75th Percentile

Project: 40 by 26 foot SAG 75th percentile - printed: Flowsheet: 40 by 26 foot SAG 75th percentileReport: Report 1

Andersen/Whiten CrusherNo. In Parallel 1---------------Operating dataClosed side set.(mm) 12Liner Length (mm) 0Eccentric Throw (mm) 0Liner Hours (Hours) 0Cr. Feed Rate (TPH) 565.7Cr. Feed F80 (mm) 38.24Cr. Prod P80 (mm) 10.79Classification equation dataParameter K1 12derived from CSS * 1+ TPH feed * 0+ F80 * 0+ Liner Length * 0+ 0Parameter K2 015 20.04derived from CSS * 1.67+ TPH feed * 0+ F80 * 0+ Liner Hours * 0+ Eccentric Throw * 0+ 0Parameter K3 2.3Reduction Parameter equationParameter T10 15derived from CSS * 0+ TPH feed * 0+ F80 * 0+ 15Power equationCalc. Power (kW) 511.6derived from 332pendulum power 1.3=+ no load power' 80

AG/SAG Mill (Variable Rates) SAGNo. In Parallel 1---------------Int. Mill Dia. (m) 11.99Belly Mill Len. (m) 7.315Feed trunion dia (m) 3.15Feed cone angle (dg) 15

Page 2: 40 by 26 Foot SAG 75th Percentile

Disch cone angle (dg) 15Grate Size xg (mm) 15Fine Size xm (mm) 1Grate OA fraction 0.08Pebble port open fr. 0.33Pebble Port Size (mm) 63.5Wt. radius 0.85Ball load 16Ball top size 127Recycle ratio 0Breakage Rate dataKnot #1(0.20) Const 0Rate 1.368Knot #2(4.00) Const 0Rate 4.308Knot #3(16.0) Const 0Rate 3.544Knot #4(44.8) Const 0.15Rate 3.412Knot #5(128.) Const 0Rate 5.593Mass Transfer ModelM1 0.394M2 0.5Disch. Coefficient 10000Mill Cap.(m3/h) 4398Appearance FunctionParameter A 70Parameter B 0.499Calculated Ecs 2.16E-04Parameter ta 0.277Morrell power calculationFr. critical speed 0.755Ball SG 7.8Charge porosity 0.4Net power factor 1.26Total charge density 4.455Void fill fraction 0.804No load power (kW) 1207Gross power (kW) 23234Cal Volumetric total load (%) 25.07

Simple Combiner Sump 7No. In Parallel 1---------------********************************************º The simple combiner model sums the *º incoming streams and places the result *º into the output stream. º********************************************

Page 3: 40 by 26 Foot SAG 75th Percentile

Liquid Feeder - Required % Solids Liquid Feeder 2 Liquid Feeder 18No. In Parallel 1 1---------------Required % Solids 72 61.5New Liquid Add (t/h) 1131 754.5Solids Flow (t/h) 3182 3182Liquid Flow (t/h) 1237 1992% Solids 72 61.5Vol. Flow (m3/h) 2201 2956

Data Type: Sim Liquid Feeder 2 Liquid Feeder 2Combiner Prod

Solids (t/h)Solids SG (t/m³) 3.3 3.3Liquid (t/h)% SolidsPulp SG (t/m³)Vol. Flow (m³/h)% Passing 1.000mm80.00% passes (mm)Size (mm)

0 100 1000

Data Type: Sim Feed 1 Feed 1Combiner Prod

Solids (t/h) 2616 2616Solids SG (t/m³) 3.3 3.3Liquid (t/h) 89.27 89.27% Solids 96.7 96.7Pulp SG (t/m³) 3.067 3.067Vol. Flow (m³/h) 882 882% Passing 1.000mm 11.31 11.3180.00% passes (mm) 115.8 115.8Size (mm)

300 100 100203.2 92.58 92.58177.8 89.91 89.91152.4 86.45 86.45

127 82.32 82.32101.6 76.5 76.5

76.2 66.18 66.1850.8 55.37 55.3738.1 47.87 47.87

31.75 43.61 43.6125.4 39.23 39.23

19.05 34.3 34.315.88 31.47 31.47

Page 4: 40 by 26 Foot SAG 75th Percentile

12.7 28.39 28.399.525 24.99 24.99

6.35 20.08 20.084.76 18.02 18.023.36 16.1 16.12.38 14.44 14.44

1.7 13.08 13.081.19 11.77 11.770.85 10.9 10.9

0.6 9.994 9.9940.425 9.102 9.102

0.3 8.265 8.2650.212 7.304 7.304

0.15 6.469 6.4690.106 5.537 5.5370.075 4.666 4.6660.038 3.485 3.485

0 0.00519 0.00519

Data Type: Sim SAG ScreenLoad Combiner

Solids (t/h) 306.7 3182Solids SG (t/m³) 3.3 3.3Liquid (t/h) 41.27 1992% Solids 88.14 61.5Pulp SG (t/m³) 2.593 1.75Vol. Flow (m³/h) 134.2 2956% Passing 1.000mm 20.88 60.3580.00% passes (mm) 63.58 11.17Size (mm)

228.6 100 100203.2 99.46 100177.8 99.04 100152.4 98.28 100

127 96.91 100101.6 94.09 100

76.2 86.89 10050.8 70.07 99.5138.1 56.74 96.39

31.75 49.75 93.2925.4 43.32 89.99

19.05 37.75 86.0915.88 35.2 83.86

12.7 32.67 81.369.525 30.04 78.26

6.35 27.31 74.384.76 26.01 72.213.36 24.72 69.772.38 23.58 67.33

1.7 22.54 64.841.19 21.43 61.92

Page 5: 40 by 26 Foot SAG 75th Percentile

0.85 20.37 58.870.6 19.07 55.12

0.425 17.52 50.650.3 15.71 45.42

0.212 13.71 39.630.15 11.71 33.85

0.106 9.752 28.190.075 7.965 23.030.038 5.168 14.95

0 0.00448 0.0277

Data Type: Sim Screen CrusherBot Dk U/S Combiner

Solids (t/h) 2616 565.7Solids SG (t/m³) 3.3 3.3Liquid (t/h) 1975 16.86% Solids 56.98 97.11Pulp SG (t/m³) 1.659 3.094Vol. Flow (m³/h) 2768 188.3% Passing 1.000mm 72.81 2.87380.00% passes (mm) 2.079 38.38Size (mm)

228.6 100 100203.2 100 100177.8 100 100152.4 100 100

127 100 100101.6 100 100

76.2 100 10050.8 100 97.2638.1 100 79.32

31.75 100 62.8825.4 100 43.7

19.05 99.98 21.6615.88 99.68 11.22

12.7 97.81 5.2689.525 94.27 3.917

6.35 89.69 3.5824.76 87.07 3.4543.36 84.14 3.3332.38 81.2 3.212

1.7 78.19 3.0921.19 74.67 2.9520.85 70.99 2.806

0.6 66.46 2.6270.425 61.07 2.414

0.3 54.76 2.1650.212 47.78 1.889

0.15 40.81 1.6140.106 33.99 1.3450.075 27.76 1.099

Page 6: 40 by 26 Foot SAG 75th Percentile

0.038 18.01 0.7140 0.0144 0.00372

Data Type: Sim Sump 7Prod

Solids (t/h) 2616Solids SG (t/m³) 3.3Liquid (t/h) 1975% Solids 56.98Pulp SG (t/m³) 1.659Vol. Flow (m³/h) 2768% Passing 1.000mm 72.8180.00% passes (mm) 2.079Size (mm)

228.6 100203.2 100177.8 100152.4 100

127 100101.6 100

76.2 10050.8 10038.1 100

31.75 10025.4 100

19.05 99.9815.88 99.68

12.7 97.819.525 94.27

6.35 89.694.76 87.073.36 84.142.38 81.2

1.7 78.191.19 74.670.85 70.99

0.6 66.460.425 61.07

0.3 54.760.212 47.78

0.15 40.810.106 33.990.075 27.760.038 18.01

0 0.0144

Page 7: 40 by 26 Foot SAG 75th Percentile

9/10/2012 10:55

Page 8: 40 by 26 Foot SAG 75th Percentile
Page 9: 40 by 26 Foot SAG 75th Percentile

Liquid Feeder 18 Liquid Feeder 18Combiner Prod

3.3 3.3

100 100

SAG SAGCombiner Prod

3182 31823.3 3.3

1237 123772 72

2.007 2.0072201 220111.46 60.3599.12 11.17

100 10093.9 100

91.72 10088.87 10085.46 10080.69 10072.22 10063.32 99.5157.16 96.3953.62 93.2950.05 89.9946.05 86.09

43.3 83.86

Page 10: 40 by 26 Foot SAG 75th Percentile

39.29 81.3633.13 78.2624.91 74.3821.23 72.21

18 69.7715.53 67.3313.67 64.8412.04 61.9210.95 58.879.904 55.128.924 50.658.018 45.427.034 39.636.179 33.855.265 28.194.424 23.033.263 14.950.007 0.0277

Screen ScreenTop Dk O/S Bot Dk O/S

334 231.83.3 3.3

1.992 14.8699.41 93.973.256 2.898103.2 85.090.575 6.18642.25 21.84

100 100100 100100 100100 100100 100100 100

99.99 10095.35 10067.39 10030.43 1006.283 97.61.131 52.77

0.76 25.380.76 11.72

0.746 8.5080.701 7.7110.681 7.4310.657 7.1660.634 6.906

0.61 6.6460.582 6.344

Page 11: 40 by 26 Foot SAG 75th Percentile

0.553 6.030.517 5.6440.474 5.1850.424 4.6480.369 4.0540.314 3.462

0.26 2.8820.211 2.3530.134 1.525

-0.00817 -0.00395

Crusher Sump 7Prod Combiner

565.7 26163.3 3.3

16.86 197597.11 56.983.094 1.659188.3 276812.16 72.8110.84 2.079

100 100100 100100 100100 100100 100100 100100 100100 100100 100100 100100 100

99.97 99.9898.77 99.6889.59 97.8170.44 94.2747.12 89.6935.94 87.0726.67 84.1420.49 81.216.34 78.1913.26 74.6711.15 70.999.462 66.468.074 61.076.846 54.765.756 47.784.809 40.813.982 33.993.277 27.76

Page 12: 40 by 26 Foot SAG 75th Percentile

2.208 18.01-0.013 0.0144

Page 13: 40 by 26 Foot SAG 75th Percentile

Project: 40 by 26 foot SAG 75th percentileFlowsheet: 40 by 26 foot SAG 75th % NO Pebble CrusReport: Report2

Equipment: Feed 1Equipment Model: Feeder- StandardProcess Model: FeederParallel Units: 1

Equipment: Liquid Feeder 2Equipment Model: Liquid Feeder - Required % Solids - StandardProcess Model: Liquid Feeder - Required % SolidsParallel Units: 1

Operating ConditionsRequired % Solids (%) 72New Liquid Addition (t/h) 837.7Solids Flow (t/h) 2380Liq Flow (t/h) 925.5% Solids (%) 72Volume (m3/h) 1647Equipment: SAGEquipment Model: 435 - AG/SAG Mill (Variable Rates) - StandardProcess Model: AG/SAG Mill (Variable Rates)Parallel Units: 1

RecyclesRequired % Solids (%) SimReference F80 (fn(ta)) see V5.1 Manual P A-118 107.8New Feed (tph) 0New Feed % -20 + 4mm 0Fixed Recycle (-20+4mm) (tph) 0Recycle (-20+4mm) (tph) 0Recycle ratio (-20+4mm) 0Use Recycles in calculations? (1=Yes, 0 = No) 0DimensionsRequired % Solids (%) SimDiameter (inside liners) (m) 11.99Belly length (inside liners) (m) 7.315Feed trunion diameter (m) 3.15Feed end Cone Angle (flat=0) 15Discharge end Cone Angle (flat=0) 15Grate Size, xg (mm) 30Fine Size, xm (mm) 0.5Grate Open Area fraction 0.08Pebble Port fraction of total Open Area 0Pebble Port Size, xp (mm) 0Mean rel. radial pos. of the grate aperture 0.85Ball LoadRequired % Solids (%) SimBall Load (%by vol) 16

Page 14: 40 by 26 Foot SAG 75th Percentile

Calculated Load (tonnes) 707.3Ball Top Size (mm) 127Ball Charge SizingSize 1 = Ts/Root 2 (%) 54Size 2 = Ts/2 (%) 27Size 3 = Ts/2Root2 (%) 13Size 4 = Ts/4 (%) 6Calc Sub Size 0Breakage RatesNo of Active Spline Knots 5Knot Size (mm)

1 0.252 43 164 44.85 128

Breakage FunctionImpact Breakage SimParameter A 70Parameter B 0.499Abrasion ta 0.277Calculated Ecs 2.14E-04Mass TransferImpact Breakage SimDischarge Coefficient 10000m1 0.407m2 0.5Coarse Factor 1.125Max Mill Capacity (m3/h) 4126User design tot load (%) 25Max design flow (m3/h) 4095PowerImpact Breakage SimFraction critical speed 0.755Ball specific gravity 7.8Ball and "rock" charge porosity 0.4Net power adjustment factor 1.26Total charge density (t/m3) 4.379Void fill fraction 0.737No load power (kW) 1207Gross power (kW) 22966Measured Power (kW) 0Exp Volumetric total load (%) 25Cal Volumetric total load (%) 25.08SD Volumetric total load 0.1Err Volumetric total load (exp - cal) 0.803Calculated ParametersInternal Sizing (mm)

at size#Size 1 203.2

Page 15: 40 by 26 Foot SAG 75th Percentile

Size 2 143.7Size 3 101.6Size 4 71.84Size 5 50.8Size 6 35.92Size 7 25.4Size 8 17.96Size 9 12.7Size 10 8.98Size 11 6.35Size 12 4.49Size 13 3.175Size 14 2.245Size 15 1.588Size 16 1.123Size 17 0.794Size 18 0.561Size 19 0.397Size 20 0.281Size 21 0.198Size 22 0.14Size 23 0.0992Size 24 0.0702Size 25 0.0496Size 26 0.0351Size 27 0.0248Size 28 0.0175Size 29 0.0124Size 30 0.00877Ore LoadAverage size of Top 20% (mm) 156Mill Pulp Load (% by vol) 12.31Equipment: ScreenEquipment Model: 215 - Double Efficiency Curve - StandardProcess Model: Double Efficiency CurveParallel Units: 1

Efficiency Curve ParametersParameter Deck 1Sharpness of Efficiency Curve - Alpha 15Initial Dip in Efficiency Curve - Beta 0Water Split to Fine Product (%) 99.9Corrected D50 - d50c (mm) 25Calculated Value - Beta* 1Equipment: Sump 7Equipment Model: 800 - Simple Combiner - StandardProcess Model: Simple CombinerParallel Units: 1

No ParametersThe simple combiner model sums the

Page 16: 40 by 26 Foot SAG 75th Percentile

incoming streams and places the resultinto the output stream.No parameters are required.Equipment: Liquid Feeder 18Equipment Model: Liquid Feeder - Required % Solids - StandardProcess Model: Liquid Feeder - Required % SolidsParallel Units: 1

Operating ConditionsRequired % Solids (%) 61.5New Liquid Addition (t/h) 564.3Solids Flow (t/h) 2380Liq Flow (t/h) 1490% Solids (%) 61.5Volume (m3/h) 2211Feed 1 Combiner

ExpSolids (t/h) 2203Solids SG (t/m³) 3.3Liquid (t/h) 75.18% Solids 96.7Pulp SG (t/m³) 3.067Vol. Flow (m³/h) 742.8% Passing 1.000mm 11.3180.00% passes (mm) 116.8Size (mm)

300 100203.2 92.58177.8 90.17152.4 86.61

127 82101.6 76.51

76.2 66.1250.8 55.3838.1 47.84

31.75 43.6625.4 39.24

19.05 34.3315.88 31.43

12.7 28.49.525 25.03

6.35 20.094.76 18.043.36 16.112.38 14.44

1.7 13.091.19 11.760.85 10.9

0.6 9.990.425 9.09

Page 17: 40 by 26 Foot SAG 75th Percentile

0.3 8.270.212 7.29

0.15 6.470.106 5.530.075 4.660.038 3.48

0 -1.24E-05

Feed 1 Prod

ExpSolids (t/h)Solids SG (t/m³) 3.3Liquid (t/h)% SolidsPulp SG (t/m³)Vol. Flow (m³/h)% Passing 1.000mm 11.3180.00% passes (mm) 116.8Size (mm)

300 100203.2 92.58177.8 90.17152.4 86.61

127 82101.6 76.51

76.2 66.1250.8 55.3838.1 47.84

31.75 43.6625.4 39.24

19.05 34.3315.88 31.43

12.7 28.49.525 25.03

6.35 20.094.76 18.043.36 16.112.38 14.44

1.7 13.091.19 11.760.85 10.9

0.6 9.990.425 9.09

0.3 8.270.212 7.29

0.15 6.470.106 5.530.075 4.660.038 3.48

0 -1.24E-05

Page 18: 40 by 26 Foot SAG 75th Percentile

Liquid Feeder 2 Combiner

ExpSolids (t/h)Solids SG (t/m³) 3.3Liquid (t/h)% SolidsPulp SG (t/m³)Vol. Flow (m³/h)% Passing 1.000mm 080.00% passes (mm) 0Size (mm)

0 1000 0

Liquid Feeder 2 Prod

ExpSolids (t/h)Solids SG (t/m³) 3.3Liquid (t/h)% SolidsPulp SG (t/m³)Vol. Flow (m³/h)% Passing 1.000mm 080.00% passes (mm) 0Size (mm)

0 1000 0

SAG Combiner

ExpSolids (t/h)Solids SG (t/m³) 3.3Liquid (t/h)% SolidsPulp SG (t/m³)Vol. Flow (m³/h)% Passing 1.000mm 10080.00% passes (mm) 0Size (mm)

228.6 100203.2 100177.8 100152.4 100

127 100101.6 100

76.2 10050.8 100

Page 19: 40 by 26 Foot SAG 75th Percentile

38.1 10031.75 100

25.4 10019.05 10015.88 100

12.7 1009.525 100

6.35 1004.76 1003.36 1002.38 100

1.7 1001.19 1000.85 100

0.6 1000.425 100

0.3 1000.212 100

0.15 1000.106 1000.075 1000.038 100

0 0

SAG Prod

ExpSolids (t/h)Solids SG (t/m³) 3.3Liquid (t/h)% Solids 72Pulp SG (t/m³)Vol. Flow (m³/h)% Passing 1.000mm 10080.00% passes (mm) 0Size (mm)

228.6 100203.2 100177.8 100152.4 100

127 100101.6 100

76.2 10050.8 10038.1 100

31.75 10025.4 100

19.05 10015.88 100

12.7 1009.525 100

Page 20: 40 by 26 Foot SAG 75th Percentile

6.35 1004.76 1003.36 1002.38 100

1.7 1001.19 1000.85 100

0.6 1000.425 100

0.3 1000.212 100

0.15 1000.106 1000.075 1000.038 100

0 0

SAG Load

ExpSolids (t/h)Solids SG (t/m³) 3.3Liquid (t/h)% SolidsPulp SG (t/m³)Vol. Flow (m³/h)% Passing 1.000mm 10080.00% passes (mm) 0Size (mm)

228.6 100203.2 100177.8 100152.4 100

127 100101.6 100

76.2 10050.8 10038.1 100

31.75 10025.4 100

19.05 10015.88 100

12.7 1009.525 100

6.35 1004.76 1003.36 1002.38 100

1.7 1001.19 1000.85 100

Page 21: 40 by 26 Foot SAG 75th Percentile

0.6 1000.425 100

0.3 1000.212 100

0.15 1000.106 1000.075 1000.038 100

0 0

Screen Combiner

ExpSolids (t/h)Solids SG (t/m³) 3.3Liquid (t/h)% Solids 0Pulp SG (t/m³)Vol. Flow (m³/h)% Passing 1.000mm 10080.00% passes (mm) 0Size (mm)

228.6 100203.2 100177.8 100152.4 100

127 100101.6 100

76.2 10050.8 10038.1 100

31.75 10025.4 100

19.05 10015.88 100

12.7 1009.525 100

6.35 1004.76 1003.36 1002.38 100

1.7 1001.19 1000.85 100

0.6 1000.425 100

0.3 1000.212 100

0.15 1000.106 1000.075 100

Page 22: 40 by 26 Foot SAG 75th Percentile

0.038 1000 0

Screen Top Dk O/S

ExpSolids (t/h)Solids SG (t/m³) 3.3Liquid (t/h)% Solids 95Pulp SG (t/m³)Vol. Flow (m³/h)% Passing 1.000mm 10080.00% passes (mm) 0Size (mm)

228.6 100203.2 100177.8 100152.4 100

127 100101.6 100

76.2 10050.8 10038.1 100

31.75 10025.4 100

19.05 10015.88 100

12.7 1009.525 100

6.35 1004.76 1003.36 1002.38 100

1.7 1001.19 1000.85 100

0.6 1000.425 100

0.3 1000.212 100

0.15 1000.106 1000.075 1000.038 100

0 0

Screen Bot Dk O/S

ExpSolids (t/h)

Page 23: 40 by 26 Foot SAG 75th Percentile

Solids SG (t/m³) 3.3Liquid (t/h)% Solids 95Pulp SG (t/m³)Vol. Flow (m³/h)% Passing 1.000mm 10080.00% passes (mm) 0Size (mm)

228.6 100203.2 100177.8 100152.4 100

127 100101.6 100

76.2 10050.8 10038.1 100

31.75 10025.4 100

19.05 10015.88 100

12.7 1009.525 100

6.35 1004.76 1003.36 1002.38 100

1.7 1001.19 1000.85 100

0.6 1000.425 100

0.3 1000.212 100

0.15 1000.106 1000.075 1000.038 100

0 0

Screen Bot Dk U/S

ExpSolids (t/h)Solids SG (t/m³) 3.3Liquid (t/h)% Solids 59Pulp SG (t/m³)Vol. Flow (m³/h)% Passing 1.000mm 10080.00% passes (mm) 0

Page 24: 40 by 26 Foot SAG 75th Percentile

Size (mm)228.6 100203.2 100177.8 100152.4 100

127 100101.6 100

76.2 10050.8 10038.1 100

31.75 10025.4 100

19.05 10015.88 100

12.7 1009.525 100

6.35 1004.76 1003.36 1002.38 100

1.7 1001.19 1000.85 100

0.6 1000.425 100

0.3 1000.212 100

0.15 1000.106 1000.075 1000.038 100

0 0

Sump 7 Combiner

ExpSolids (t/h)Solids SG (t/m³) 3.3Liquid (t/h)% SolidsPulp SG (t/m³)Vol. Flow (m³/h)% Passing 1.000mm 10080.00% passes (mm) 0Size (mm)

228.6 100203.2 100177.8 100152.4 100

127 100101.6 100

Page 25: 40 by 26 Foot SAG 75th Percentile

76.2 10050.8 10038.1 100

31.75 10025.4 100

19.05 10015.88 100

12.7 1009.525 100

6.35 1004.76 1003.36 1002.38 100

1.7 1001.19 1000.85 100

0.6 1000.425 100

0.3 1000.212 100

0.15 1000.106 1000.075 1000.038 100

0 0

Sump 7 Prod

ExpSolids (t/h)Solids SG (t/m³) 3.3Liquid (t/h)% SolidsPulp SG (t/m³)Vol. Flow (m³/h)% Passing 1.000mm 10080.00% passes (mm) 0Size (mm)

228.6 100203.2 100177.8 100152.4 100

127 100101.6 100

76.2 10050.8 10038.1 100

31.75 10025.4 100

19.05 10015.88 100

Page 26: 40 by 26 Foot SAG 75th Percentile

12.7 1009.525 100

6.35 1004.76 1003.36 1002.38 100

1.7 1001.19 1000.85 100

0.6 1000.425 100

0.3 1000.212 100

0.15 1000.106 1000.075 1000.038 100

0 0

Liquid Feeder 18 Combiner

ExpSolids (t/h)Solids SG (t/m³) 3.3Liquid (t/h)% SolidsPulp SG (t/m³)Vol. Flow (m³/h)% Passing 1.000mm 080.00% passes (mm) 0Size (mm)

0 1000 0

Liquid Feeder 18 Prod

ExpSolids (t/h)Solids SG (t/m³) 3.3Liquid (t/h)% SolidsPulp SG (t/m³)Vol. Flow (m³/h)% Passing 1.000mm 080.00% passes (mm) 0Size (mm)

0 1000 0

Page 27: 40 by 26 Foot SAG 75th Percentile

- printed: 9/10/2012 10:54

Org100

0

00

Org11.897.315

1.5151525

1.50.07

00

0.85

Org12

Page 28: 40 by 26 Foot SAG 75th Percentile

127Equivalent Ore Size (mm)

54 169.227 119.613 84.59

6 59.8142.29

Constant Breakage Rate Breakage RateSim Org

0 1.412 1.940 4.329 4.6050 3.484 3.4860 3.262 2.6260 5.593 4.157

Org70.730.7620.374

Org100000.415

0.51.125

Org0.77.80.4

1.26

Appearance Appearance Breakage Rate Discharge Rate5 200 0 1622 0

Page 29: 40 by 26 Foot SAG 75th Percentile

0 0 608.1 00 0 228 00 0 88.68 0

0.635 0 40.53 00.201 0 24.99 0

0.0735 0 22.33 00.0301 0 25.96 3.3010.0174 0 34.22 6.6690.0123 0 45.77 10.04

0.00844 0 59.13 13.40.00569 0 70.96 16.770.00395 0 76.05 20.140.00289 0 71.05 23.510.00219 0 58.6 26.880.00167 0 43.45 30.240.00129 0 29.5 33.610.00102 0 18.67 36.98

8.16E-04 0 11.23 39.796.55E-04 0.0399 6.527 39.795.31E-04 0.0152 3.737 39.794.30E-04 -0.0226 2.136 39.793.46E-04 -0.0286 1.221 39.792.77E-04 0.0234 0.698 39.792.22E-04 0.109 0.399 39.791.78E-04 0.145 0.228 39.791.43E-04 0.145 0.13 39.791.15E-04 0.129 0.0745 39.799.23E-05 0.108 0.0426 39.793.65E-04 0.337 0 39.79

Deck 210

099.25

151

Page 30: 40 by 26 Foot SAG 75th Percentile

Sim2203

3.375.18

96.73.067742.811.31115.8

10092.5889.9186.4582.32

76.566.1855.3747.8743.6139.23

34.331.4728.3924.9920.0818.02

16.114.4413.0811.7710.9

9.9949.102

Page 31: 40 by 26 Foot SAG 75th Percentile

8.2657.3046.4695.5374.6663.485

0.00519

Sim2203

3.375.18

96.73.067742.811.31115.8

10092.5889.9186.4582.32

76.566.1855.3747.8743.6139.23

34.331.4728.3924.9920.0818.02

16.114.4413.0811.7710.9

9.9949.1028.2657.3046.4695.5374.6663.485

0.00519

Page 32: 40 by 26 Foot SAG 75th Percentile

Sim

3.3

100

Sim

3.3

100

Sim2380

3.3925.5

722.007164711.05108.9

10093.1390.6687.4683.6378.2568.6958.69

Page 33: 40 by 26 Foot SAG 75th Percentile

51.6748.0943.7535.8931.3727.3123.9219.33

17.415.6

14.0312.74

11.510.669.782

8.918.0837.1366.3065.3884.5323.363

0.00621

Sim2380

3.3925.5

722.0071647

68.693.501

100100100100100100100

99.9599.74

99.498.5996.5694.5591.6788.66

Page 34: 40 by 26 Foot SAG 75th Percentile

84.7882.4279.6876.8873.9770.5366.9162.3556.9150.6843.9137.2430.7924.9716.020.015

Sim306.8

3.323.2692.95

2.84116.213.5460.76

10099.6

99.2798.6697.5395.08

88.572.0356.4647.2438.06

29.826.3923.56

21.218.8917.78

16.715.7514.8913.9913.14

Page 35: 40 by 26 Foot SAG 75th Percentile

12.1711.1

9.8888.5677.2676.0094.8743.129

0.00908

Sim2380

3.3149061.51.752211

68.693.501

100100100100100100100

99.9599.74

99.498.5996.5694.5591.6788.6684.7882.4279.6876.8873.9770.5366.9162.3556.9150.6843.9137.2430.7924.97

Page 36: 40 by 26 Foot SAG 75th Percentile

16.020.015

Sim14.25 176.75

3.3 8.02315024971.49

90.532.71

5.80711.46208.2

10062.1

58.9455.3351.1546.2240.2632.7328.0525.3722.3818.9717.0815.45

14.814.1613.76

13.312.8312.3411.7611.1610.4

9.4928.4527.3216.2075.1294.1572.662

-0.0111

Sim162.5

Page 37: 40 by 26 Foot SAG 75th Percentile

3.311.1293.6

2.87660.377.50821.24

100100100100100100100100100100

98.459.6229.6713.5210.179.3739.0458.7328.413

8.097.71

7.3126.8126.2165.5344.7934.0643.3582.7221.743

-0.00605

Sim2203

3.31477

59.861.7162145

73.591.846

Page 38: 40 by 26 Foot SAG 75th Percentile

100100100100100100100100100100100

99.9999.7297.9194.8690.7888.2585.3382.3379.2275.5371.6566.7760.9554.2847.0339.8832.9726.7417.15

0.00707

Sim2203

3.31477

59.861.7162145

73.591.846

100100100100100100

Page 39: 40 by 26 Foot SAG 75th Percentile

100100100100100

99.9999.7297.9194.8690.7888.2585.3382.3379.2275.5371.6566.7760.9554.2847.0339.8832.9726.7417.15

0.00707

Sim2203

3.31477

59.861.7162145

73.591.846

100100100100100100100100100100100

99.9999.72

Page 40: 40 by 26 Foot SAG 75th Percentile

97.9194.8690.7888.2585.3382.3379.2275.5371.6566.7760.9554.2847.0339.8832.9726.7417.15

0.00707

Sim

3.3

100

Sim

3.3

100