CAPITULO SUBCAPITULO ACTIVIDAD CODIGO UNIDAD CANTIDAD TOTAL CÓDIGO ITEM UNIDAD CANTIDAD VALOR UNITARIO VALOR TOTAL CÓDIGO ITEM UNIDAD CANTIDAD VALOR UNITARIO VALOR TOTAL 1. PRELIMINARES 1.1 CAMPAMENTO P. CAMP 01 UN 1 PLAST 01 TEJA TRASLUCIDA P 1000 PREMIUM UN 8 $35.380,00 $283.040,00 PLAST 01 TEJA TRASLUCIDA P 1000 PREMIUM UN 8 $35.380,00 $283.040,00 HERR 03 PORTA CANDADO GATO SIMPLE 3 UN 2 $1.850,00 $3.700,00 HERR 03 PORTA CANDADO GATO SIMPLE 3 UN 2 $1.850,00 $3.700,00 HERR 02 BISAGRA GATO OMEGA 3 UN 3 $1.783,00 $5.349,00 HERR 02 BISAGRA GATO OMEGA 3 UN 3 $1.783,00 $5.349,00 HERR 01 PUNTILLA CABEZA 2 LB 3 $2.552,00 $7.656,00 HERR 01 PUNTILLA CABEZA 2 LB 3 $2.552,00 $7.656,00 HERR 04 GANCHO TEJA ETERNIT 55 MM UN 16 $269,00 $4.304,00 HERR 04 GANCHO TEJA ETERNIT 55 MM UN 16 $269,00 $4.304,00 HH 02 VARA DE CLAVO DIAM. 6 A 8 CM X 3.00 M UN 4,13 $4.950,00 $20.443,50 HH 02 VARA DE CLAVO DIAM. 6 A 8 CM X 3.00 M UN 4,13 $4.950,00 $20.443,50 MAD 03 TABLA CHAPA 30 X 1.8 A 2.0 CM X 2.9 UN 10,34 $13.428,00 $138.845,52 MAD 03 TABLA CHAPA 30 X 1.8 A 2.0 CM X 2.9 UN 10,34 $13.428,00 $138.845,52 AR 02 BASE GRANULAR M3 1,17 $33.640,00 $39.358,80 AR 02 BASE GRANULAR M3 1,17 $33.640,00 $39.358,80 MO 01 MANO DE OBRA AA Hc 15,18 $17.486,00 $265.437,48 MO 01 MANO DE OBRA AA Hc 15,18 $17.486,00 $265.437,48 TOTAL $768.134,30 TOTAL $768.134,30 1.2 DESCAPOTE P. DESCAP 01 M2 162 MAQUI 02 VOLQUETA M3 Vj 0,37 $55.000,00 $20.350,00 MAQUI 02 VOLQUETA M3 Vj 59,94 $55.000,00 $3.296.700,00 MO 03 MANO DE OBRA AA ALBAÑILERIA Hc 0,26 $16.351,00 $4.251,26 MO 03 MANO DE OBRA AA ALBAÑILERIA Hc 42,12 $16.351,00 $688.704,12 MO 03 MANO DE OBRA AYUDANTE ALBAÑILERIA Hh 0,16 $6.310,00 $1.009,60 MO 03 MANO DE OBRA AYUDANTE ALBAÑILERIA Hh 25,92 $6.310,00 $163.555,20 TOTAL $25.610,86 TOTAL $4.148.959,32 1.3 REPLANTEO 1.3.1 CIMENTACION GENERAL P. REPL 01 M2 162 HERR 05 PUNTILLA CABEZA 1 LB 0,02 $2.645,00 $52,90 HERR 05 PUNTILLA CABEZA 1 LB 3,24 $2.645,00 $8.569,80 HERR 01 PUNTILLA CABEZA 2 LB 0,02 $2.552,00 $51,04 HERR 01 PUNTILLA CABEZA 2 LB 3,24 $2.552,00 $8.268,48 MAD 02 DURMIENTE ORDINARIA UN 0,34 $3.550,00 $1.207,00 MAD 02 DURMIENTE ORDINARIA UN 55,08 $3.550,00 $195.534,00 MO 01 MANO DE OBRA AA Hc 0,28 $17.486,00 $4.896,08 MO 01 MANO DE OBRA AA Hc 45,36 $17.486,00 $793.164,96 TOTAL $6.207,02 TOTAL $1.005.537,24 1.3.2 PILOTES P. REPL 02 M2 18,85 HERR 05 PUNTILLA CABEZA 1 LB 0,02 $2.645,00 $52,90 HERR 05 PUNTILLA CABEZA 1 LB 0,377 $2.645,00 $997,17 HERR 01 PUNTILLA CABEZA 2 LB 0,02 $2.552,00 $51,04 HERR 01 PUNTILLA CABEZA 2 LB 0,377 $2.552,00 $962,10 MAD 02 DURMIENTE ORDINARIA UN 0,34 $3.550,00 $1.207,00 MAD 02 DURMIENTE ORDINARIA UN 6,409 $3.550,00 $22.751,95 MO 01 MANO DE OBRA AA Hc 0,28 $17.486,00 $4.896,08 MO 01 MANO DE OBRA AA Hc 5,278 $17.486,00 $92.291,11 TOTAL $6.207,02 TOTAL $117.002,33 2. MOVIMIENTO DE TIERRAS 2.1 CIMENTACION 2.1.1 EXCAVACION GENERAL M. CIM 01 M3 162 MAQUI 02 VOLQUETA M3 Vj 0,37 $55.000,00 $20.350,00 MAQUI 02 VOLQUETA M3 Vj 59,94 $55.000,00 $3.296.700,00 MO 01 MANO DE OBRA AA Hc 0,93 $17.486,00 $16.261,98 MO 01 MANO DE OBRA AA Hc 150,66 $17.486,00 $2.634.440,76 TOTAL $36.611,98 TOTAL $5.931.140,76 2.1.2 EXCAVACION PILOTES M. CIM 02 M3 339,3 MAQUI 02 VOLQUETA M3 Vj 0,37 $55.000,00 $20.350,00 MAQUI 02 VOLQUETA M3 Vj 125,541 $55.000,00 $6.904.755,00 MO 01 MANO DE OBRA AA Hc 0,93 $17.486,00 $16.261,98 MO 01 MANO DE OBRA AA Hc 315,549 $17.486,00 $5.517.689,81 TOTAL $36.611,98 TOTAL $12.422.444,81 3. ESTRUCTURA 3.1 CIMENTACION 3.1.1 PILOTES E. CIM 01 M3 339,3 MAQUI 02 VOLQUETA M3 Vj 0,37 $55.000,00 $20.350,00 MAQUI 02 VOLQUETA M3 Vj 125,541 $55.000,00 $6.904.755,00 HH 12 ACERO FIGURADO 60000 PSI 3/8" KG 80 $2.050,00 $164.000,00 HH 12 ACERO FIGURADO 60000 PSI 3/8" KG 27144 $2.050,00 $55.645.200,00 AR 01 CONCRETO 3000 PSI M3 1 $340.390,00 $340.390,00 AR 01 CONCRETO 3000 PSI M3 339,3 $340.390,00 $115.494.327,00 TOTAL $524.740,00 TOTAL $178.044.282,00 3.1.2 DEMOLICION CABEZA PILOTES E. CIM 02 M3 7,54 EQUIP 03 COMPRESOR DE AIRE PEQUEÑO H 6,95 $31.320,00 $217.674,00 EQUIP 03 COMPRESOR DE AIRE PEQUEÑO H 52,403 $31.320,00 $1.641.261,96 MAQUI 03 RETROEXCAVADORA ORUGA CAT320 + OPERADOR H 0,04 $14.951,11 $598,04 MAQUI 03 RETROEXCAVADORA ORUGA CAT320 + OPERADOR H 0,3016 $14.951,11 $4.509,25 MAQUI 02 VOLQUETA M3 Vj 0,45 $55.000,00 $24.750,00 MAQUI 02 VOLQUETA M3 Vj 3,393 $55.000,00 $186.615,00 MO 01 MANO DE OBRA AA Hc 8,91 $17.486,00 $155.800,26 MO 01 MANO DE OBRA AA Hc 67,1814 $17.486,00 $1.174.733,96 TOTAL $398.822,30 TOTAL $3.007.120,18 3.1.3 PLACA FLOTANTE E. CIM 03 M3 64,8 AR 01 CONCRETO 3000 PSI M3 0,46 $340.390,00 $156.579,40 AR 01 CONCRETO 3000 PSI M3 29,808 $340.390,00 $10.146.345,12 EQUIP 04 COSTO ADICIONAL DE BOMBEO M2 0,46 $35.000,00 $16.100,00 EQUIP 04 COSTO ADICIONAL DE BOMBEO M2 29,808 $35.000,00 $1.043.280,00 EQUIP 01 VIBRADOR CONCRETO GASOLINA D 0,04 $27.840,00 $1.113,60 EQUIP 01 VIBRADOR CONCRETO GASOLINA D 2,592 $27.840,00 $72.161,28 MO 03 MANO DE OBRA AA ALBAÑILERIA Hc 1,83 $16.351,00 $29.922,33 MO 03 MANO DE OBRA AA ALBAÑILERIA Hc 118,584 $16.351,00 $1.938.966,98 POLIEST 01 ICOPOR 1 X 1 ESPESOR 1 CM M 0,8 $2.900,00 $2.320,00 POLIEST 01 ICOPOR 1 X 1 ESPESOR 1 CM M 51,84 $2.900,00 $150.336,00 HERR 01 PUNTILLA CABEZA 2 LB 0,03 $2.552,00 $76,56 HERR 01 PUNTILLA CABEZA 2 LB 1,944 $2.552,00 $4.961,09 MAD 03 TABLA CHAPA 30 X 1.8 A 2.0 CM X 2.9 UN 0,04 $13.428,00 $537,12 MAD 03 TABLA CHAPA 30 X 1.8 A 2.0 CM X 2.9 UN 2,592 $13.428,00 $34.805,38 TOTAL $206.649,01 TOTAL $13.390.855,85 3.2 PRIMER PISO 3.2.1 PLACA ALIGERADA E. PRIM 01 M2 162 HH 04 ACERO FIGURADO 60000 PSI 1/4" KG 4,5 $1.833,11 $8.249,00 HH 04 ACERO FIGURADO 60000 PSI 1/4" KG 729 $1.833,11 $1.336.337,19 HH 05 ALAMBRE NEGRO NO. 18 (RECOCIDO) KG 0,14 $2.671,43 $374,00 HH 05 ALAMBRE NEGRO NO. 18 (RECOCIDO) KG 22,68 $2.671,43 $60.588,03 AR 01 CONCRETO 3000 PSI M3 0,17 $340.390,00 $57.866,30 AR 01 CONCRETO 3000 PSI M3 27,54 $340.390,00 $9.374.340,60 MAD 06 ESTERILLA GUADUA ANCHO 30 CM X 4.00 M UN 1,43 $6.950,35 $9.939,00 MAD 06 ESTERILLA GUADUA ANCHO 30 CM X 4.00 M UN 231,66 $6.950,35 $1.610.118,08 FORM 01 FORMALETA ENTREPISOS MS 0,88 $6.062,50 $5.335,00 FORM 01 FORMALETA ENTREPISOS MS 142,56 $6.062,50 $864.270,00 MAD 07 LISTON 10 X 1.8 CM X 2.90 M AMARILLO UN 1,33 $9.191,72 $12.224,99 MAD 07 LISTON 10 X 1.8 CM X 2.90 M AMARILLO UN 215,46 $9.191,72 $1.980.447,99 HERR 01 PUNTILLA CABEZA 2 LB 0,02 $2.552,00 $51,04 HERR 01 PUNTILLA CABEZA 2 LB 3,24 $2.552,00 $8.268,48 MAD 05 REPISA 8 X 4 CM X 2.90 MORDINARIO UN 0,02 $7.100,00 $142,00 MAD 05 REPISA 8 X 4 CM X 2.90 MORDINARIO UN 3,24 $7.100,00 $23.004,00 MAD 04 TABLA BURRA 30 X 2.7CM X 2.90MORD UN 0,02 $14.700,00 $294,00 MAD 04 TABLA BURRA 30 X 2.7CM X 2.90MORD UN 3,24 $14.700,00 $47.628,00 EQUIP 01 VIBRADOR CONCRETO GASOLINA D 0,01 $27.840,00 $278,40 EQUIP 01 VIBRADOR CONCRETO GASOLINA D 1,62 $27.840,00 $45.100,80 MO 01 MANO DE OBRA AA Hc 2,01 $17.486,00 $35.146,86 MO 01 MANO DE OBRA AA Hc 325,62 $17.486,00 $5.693.791,32 TOTAL $129.900,58 TOTAL $21.043.894,49 3.2.2 COLUMNAS E. PRIM 02 M3 4,2 AR 01 CONCRETO 3000 PSI M3 1,1 $340.390,00 $374.429,00 AR 01 CONCRETO 3000 PSI M3 4,62 $340.390,00 $1.572.601,80 HERR 01 PUNTILLA CABEZA 2 LB 8 $2.552,00 $20.416,00 HERR 01 PUNTILLA CABEZA 2 LB 33,6 $2.552,00 $85.747,20 MAD 05 REPISA 8 X 4 CM X 2.90 MORDINARIO UN 2,5 $7.100,00 $17.750,00 MAD 05 REPISA 8 X 4 CM X 2.90 MORDINARIO UN 10,5 $7.100,00 $74.550,00 MAD 04 TABLA BURRA 30 X 2.7CM X 2.90MORD UN 0,91 $14.700,00 $13.377,00 MAD 04 TABLA BURRA 30 X 2.7CM X 2.90MORD UN 3,822 $14.700,00 $56.183,40 EQUIP 01 VIBRADOR CONCRETO GASOLINA D 0,04 $27.840,00 $1.113,60 EQUIP 01 VIBRADOR CONCRETO GASOLINA D 0,168 $27.840,00 $4.677,12 ESTRUC 01 ANDAMIO TUBULAR 1.50 X 1.50 ALQUILER MS 0,2 $20.880,00 $4.176,00 ESTRUC 01 ANDAMIO TUBULAR 1.50 X 1.50 ALQUILER MS 0,84 $20.880,00 $17.539,20 ESTRUC 02 PARAL METÁLICO HASTA 3.30 M MS 1 $3.828,00 $3.828,00 ESTRUC 02 PARAL METÁLICO HASTA 3.30 M MS 4,2 $3.828,00 $16.077,60 MO 01 MANO DE OBRA AA Hc 10,29 $17.486,00 $179.930,94 MO 01 MANO DE OBRA AA Hc 43,218 $17.486,00 $755.709,95 TOTAL $615.020,54 TOTAL $2.583.086,27 3.2.3 ESCALERA E. PRIM 03 M3 1,06 MO 03 MANO DE OBRA AA ALBAÑILERIA Hc 17,7 $16.351,00 $289.412,70 MO 03 MANO DE OBRA AA ALBAÑILERIA Hc 18,76 $16.351,00 $306.744,76 MAD 14 PARAL TELESCOPICO D 2,9 $150,00 $435,00 MAD 14 PARAL TELESCOPICO D 3,96 $150,00 $594,00 AR 01 CONCRETO 3000 PSI M3 1,1 $340.390,00 $374.429,00 AR 01 CONCRETO 3000 PSI M3 2,16 $340.390,00 $735.242,40 FORM 01 FORMALETA ENTREPISOS MS 8,69 $6.062,50 $52.683,13 FORM 01 FORMALETA ENTREPISOS MS 9,75 $6.062,50 $59.109,38 EQUIP 01 VIBRADOR CONCRETO GASOLINA D 0,04 $27.840,00 $1.113,60 EQUIP 01 VIBRADOR CONCRETO GASOLINA D 1,1 $27.840,00 $30.624,00 HERR 01 PUNTILLA CABEZA 2 LB 1,49 $2.552,00 $3.802,48 HERR 01 PUNTILLA CABEZA 2 LB 2,55 $2.552,00 $6.507,60 MAD 15 PARAL TELESCOPICO 2 D 2,9 $309,00 $896,10 MAD 15 PARAL TELESCOPICO 2 D 3,96 $309,00 $1.223,64 MAD 05 REPISA 8 X 4 CM X 2.90 MORDINARIO UN 0,95 $7.100,00 $6.745,00 MAD 05 REPISA 8 X 4 CM X 2.90 MORDINARIO UN 2,01 $7.100,00 $14.271,00 MAD 16 TABLA BURRA 30 X 2.2 A 2.7 X 2.9 UN 3,14 $17.284,00 $54.271,76 MAD 16 TABLA BURRA 30 X 2.2 A 2.7 X 2.9 UN 4,2 $17.284,00 $72.592,80 MAD 17 TABLA BURRA 25 X 2.2 A 2.7 X 2.9 UN 3,74 $14.345,72 $53.652,99 MAD 17 TABLA BURRA 25 X 2.2 A 2.7 X 2.9 UN 4,8 $14.345,72 $68.859,46 TOTAL $837.441,76 TOTAL $1.295.769,03 3.3 SEGUNDO PISO 3.3.1 PLACA ALIGERADA E. PRIM 01 M2 162 HH 04 ACERO FIGURADO 60000 PSI 1/4" KG 4,5 $1.833,11 $8.249,00 HH 04 ACERO FIGURADO 60000 PSI 1/4" KG 729 $1.833,11 $1.336.337,19 HH 05 ALAMBRE NEGRO NO. 18 (RECOCIDO) KG 0,14 $2.671,43 $374,00 HH 05 ALAMBRE NEGRO NO. 18 (RECOCIDO) KG 22,68 $2.671,43 $60.588,03 AR 01 CONCRETO 3000 PSI M3 0,17 $340.390,00 $57.866,30 AR 01 CONCRETO 3000 PSI M3 27,54 $340.390,00 $9.374.340,60 MAD 06 ESTERILLA GUADUA ANCHO 30 CM X 4.00 M UN 1,43 $6.950,35 $9.939,00 MAD 06 ESTERILLA GUADUA ANCHO 30 CM X 4.00 M UN 231,66 $6.950,35 $1.610.118,08 FORM 01 FORMALETA ENTREPISOS MS 0,88 $6.062,50 $5.335,00 FORM 01 FORMALETA ENTREPISOS MS 142,56 $6.062,50 $864.270,00 MAD 07 LISTON 10 X 1.8 CM X 2.90 M AMARILLO UN 1,33 $9.191,72 $12.224,99 MAD 07 LISTON 10 X 1.8 CM X 2.90 M AMARILLO UN 215,46 $9.191,72 $1.980.447,99 HERR 01 PUNTILLA CABEZA 2 LB 0,02 $2.552,00 $51,04 HERR 01 PUNTILLA CABEZA 2 LB 3,24 $2.552,00 $8.268,48 MAD 05 REPISA 8 X 4 CM X 2.90 MORDINARIO UN 0,02 $7.100,00 $142,00 MAD 05 REPISA 8 X 4 CM X 2.90 MORDINARIO UN 3,24 $7.100,00 $23.004,00 MAD 04 TABLA BURRA 30 X 2.7CM X 2.90MORD UN 0,02 $14.700,00 $294,00 MAD 04 TABLA BURRA 30 X 2.7CM X 2.90MORD UN 3,24 $14.700,00 $47.628,00 EQUIP 01 VIBRADOR CONCRETO GASOLINA D 0,01 $27.840,00 $278,40 EQUIP 01 VIBRADOR CONCRETO GASOLINA D 1,62 $27.840,00 $45.100,80 MO 01 MANO DE OBRA AA Hc 2,01 $17.486,00 $35.146,86 MO 01 MANO DE OBRA AA Hc 325,62 $17.486,00 $5.693.791,32 TOTAL $129.900,58 TOTAL $21.043.894,49 3.3.2 COLUMNAS E. PRIM 02 M3 4,2 AR 01 CONCRETO 3000 PSI M3 1,1 $340.390,00 $374.429,00 AR 01 CONCRETO 3000 PSI M3 4,62 $340.390,00 $1.572.601,80 HERR 01 PUNTILLA CABEZA 2 LB 8 $2.552,00 $20.416,00 HERR 01 PUNTILLA CABEZA 2 LB 33,6 $2.552,00 $85.747,20 MAD 05 REPISA 8 X 4 CM X 2.90 MORDINARIO UN 2,5 $7.100,00 $17.750,00 MAD 05 REPISA 8 X 4 CM X 2.90 MORDINARIO UN 10,5 $7.100,00 $74.550,00 MAD 04 TABLA BURRA 30 X 2.7CM X 2.90MORD UN 0,91 $14.700,00 $13.377,00 MAD 04 TABLA BURRA 30 X 2.7CM X 2.90MORD UN 3,822 $14.700,00 $56.183,40 EQUIP 01 VIBRADOR CONCRETO GASOLINA D 0,04 $27.840,00 $1.113,60 EQUIP 01 VIBRADOR CONCRETO GASOLINA D 0,168 $27.840,00 $4.677,12 ESTRUC 01 ANDAMIO TUBULAR 1.50 X 1.50 ALQUILER MS 0,2 $20.880,00 $4.176,00 ESTRUC 01 ANDAMIO TUBULAR 1.50 X 1.50 ALQUILER MS 0,84 $20.880,00 $17.539,20 ESTRUC 02 PARAL METÁLICO HASTA 3.30 M MS 1 $3.828,00 $3.828,00 ESTRUC 02 PARAL METÁLICO HASTA 3.30 M MS 4,2 $3.828,00 $16.077,60 MO 01 MANO DE OBRA AA Hc 10,29 $17.486,00 $179.930,94 MO 01 MANO DE OBRA AA Hc 43,218 $17.486,00 $755.709,95 TOTAL $615.020,54 TOTAL $2.583.086,27 3.3.3 ESCALERA E. PRIM 03 M3 1,06 MO 03 MANO DE OBRA AA ALBAÑILERIA Hc 17,7 $16.351,00 $289.412,70 MO 03 MANO DE OBRA AA ALBAÑILERIA Hc 18,76 $16.351,00 $306.744,76 MAD 14 PARAL TELESCOPICO D 2,9 $150,00 $435,00 MAD 14 PARAL TELESCOPICO D 3,96 $150,00 $594,00 AR 01 CONCRETO 3000 PSI M3 1,1 $340.390,00 $374.429,00 AR 01 CONCRETO 3000 PSI M3 2,16 $340.390,00 $735.242,40 FORM 01 FORMALETA ENTREPISOS MS 8,69 $6.062,50 $52.683,13 FORM 01 FORMALETA ENTREPISOS MS 9,75 $6.062,50 $59.109,38 EQUIP 01 VIBRADOR CONCRETO GASOLINA D 0,04 $27.840,00 $1.113,60 EQUIP 01 VIBRADOR CONCRETO GASOLINA D 1,1 $27.840,00 $30.624,00 HERR 01 PUNTILLA CABEZA 2 LB 1,49 $2.552,00 $3.802,48 HERR 01 PUNTILLA CABEZA 2 LB 2,55 $2.552,00 $6.507,60 MAD 15 PARAL TELESCOPICO 2 D 2,9 $309,00 $896,10 MAD 15 PARAL TELESCOPICO 2 D 3,96 $309,00 $1.223,64 MAD 05 REPISA 8 X 4 CM X 2.90 MORDINARIO UN 0,95 $7.100,00 $6.745,00 MAD 05 REPISA 8 X 4 CM X 2.90 MORDINARIO UN 2,01 $7.100,00 $14.271,00 MAD 16 TABLA BURRA 30 X 2.2 A 2.7 X 2.9 UN 3,14 $17.284,00 $54.271,76 MAD 16 TABLA BURRA 30 X 2.2 A 2.7 X 2.9 UN 4,2 $17.284,00 $72.592,80 MAD 17 TABLA BURRA 25 X 2.2 A 2.7 X 2.9 UN 3,74 $14.345,72 $53.652,99 MAD 17 TABLA BURRA 25 X 2.2 A 2.7 X 2.9 UN 4,8 $14.345,72 $68.859,46 TOTAL $837.441,76 TOTAL $1.295.769,03 3.4 TERCER PISO 3.4.1 PLACA ALIGERADA E. PRIM 01 M2 162 HH 04 ACERO FIGURADO 60000 PSI 1/4" KG 4,5 $1.833,11 $8.249,00 HH 04 ACERO FIGURADO 60000 PSI 1/4" KG 729 $1.833,11 $1.336.337,19 HH 05 ALAMBRE NEGRO NO. 18 (RECOCIDO) KG 0,14 $2.671,43 $374,00 HH 05 ALAMBRE NEGRO NO. 18 (RECOCIDO) KG 22,68 $2.671,43 $60.588,03 AR 01 CONCRETO 3000 PSI M3 0,17 $340.390,00 $57.866,30 AR 01 CONCRETO 3000 PSI M3 27,54 $340.390,00 $9.374.340,60 MAD 06 ESTERILLA GUADUA ANCHO 30 CM X 4.00 M UN 1,43 $6.950,35 $9.939,00 MAD 06 ESTERILLA GUADUA ANCHO 30 CM X 4.00 M UN 231,66 $6.950,35 $1.610.118,08 FORM 01 FORMALETA ENTREPISOS MS 0,88 $6.062,50 $5.335,00 FORM 01 FORMALETA ENTREPISOS MS 142,56 $6.062,50 $864.270,00 MAD 07 LISTON 10 X 1.8 CM X 2.90 M AMARILLO UN 1,33 $9.191,72 $12.224,99 MAD 07 LISTON 10 X 1.8 CM X 2.90 M AMARILLO UN 215,46 $9.191,72 $1.980.447,99 HERR 01 PUNTILLA CABEZA 2 LB 0,02 $2.552,00 $51,04 HERR 01 PUNTILLA CABEZA 2 LB 3,24 $2.552,00 $8.268,48 MAD 05 REPISA 8 X 4 CM X 2.90 MORDINARIO UN 0,02 $7.100,00 $142,00 MAD 05 REPISA 8 X 4 CM X 2.90 MORDINARIO UN 3,24 $7.100,00 $23.004,00 MAD 04 TABLA BURRA 30 X 2.7CM X 2.90MORD UN 0,02 $14.700,00 $294,00 MAD 04 TABLA BURRA 30 X 2.7CM X 2.90MORD UN 3,24 $14.700,00 $47.628,00 EQUIP 01 VIBRADOR CONCRETO GASOLINA D 0,01 $27.840,00 $278,40 EQUIP 01 VIBRADOR CONCRETO GASOLINA D 1,62 $27.840,00 $45.100,80 MO 01 MANO DE OBRA AA Hc 2,01 $17.486,00 $35.146,86 MO 01 MANO DE OBRA AA Hc 325,62 $17.486,00 $5.693.791,32 TOTAL $129.900,58 TOTAL $21.043.894,49 3.4.2 COLUMNAS E. PRIM 02 M3 4,2 AR 01 CONCRETO 3000 PSI M3 1,1 $340.390,00 $374.429,00 AR 01 CONCRETO 3000 PSI M3 4,62 $340.390,00 $1.572.601,80 HERR 01 PUNTILLA CABEZA 2 LB 8 $2.552,00 $20.416,00 HERR 01 PUNTILLA CABEZA 2 LB 33,6 $2.552,00 $85.747,20 MAD 05 REPISA 8 X 4 CM X 2.90 MORDINARIO UN 2,5 $7.100,00 $17.750,00 MAD 05 REPISA 8 X 4 CM X 2.90 MORDINARIO UN 10,5 $7.100,00 $74.550,00 MAD 04 TABLA BURRA 30 X 2.7CM X 2.90MORD UN 0,91 $14.700,00 $13.377,00 MAD 04 TABLA BURRA 30 X 2.7CM X 2.90MORD UN 3,822 $14.700,00 $56.183,40 EQUIP 01 VIBRADOR CONCRETO GASOLINA D 0,04 $27.840,00 $1.113,60 EQUIP 01 VIBRADOR CONCRETO GASOLINA D 0,168 $27.840,00 $4.677,12 ESTRUC 01 ANDAMIO TUBULAR 1.50 X 1.50 ALQUILER MS 0,2 $20.880,00 $4.176,00 ESTRUC 01 ANDAMIO TUBULAR 1.50 X 1.50 ALQUILER MS 0,84 $20.880,00 $17.539,20 ESTRUC 02 PARAL METÁLICO HASTA 3.30 M MS 1 $3.828,00 $3.828,00 ESTRUC 02 PARAL METÁLICO HASTA 3.30 M MS 4,2 $3.828,00 $16.077,60 MO 01 MANO DE OBRA AA Hc 10,29 $17.486,00 $179.930,94 MO 01 MANO DE OBRA AA Hc 43,218 $17.486,00 $755.709,95 TOTAL $615.020,54 TOTAL $2.583.086,27 3.4.3 ESCALERA E. PRIM 03 M3 1,06 MO 03 MANO DE OBRA AA ALBAÑILERIA Hc 17,7 $16.351,00 $289.412,70 MO 03 MANO DE OBRA AA ALBAÑILERIA Hc 18,76 $16.351,00 $306.744,76 MAD 14 PARAL TELESCOPICO D 2,9 $150,00 $435,00 MAD 14 PARAL TELESCOPICO D 3,96 $150,00 $594,00 AR 01 CONCRETO 3000 PSI M3 1,1 $340.390,00 $374.429,00 AR 01 CONCRETO 3000 PSI M3 2,16 $340.390,00 $735.242,40 FORM 01 FORMALETA ENTREPISOS MS 8,69 $6.062,50 $52.683,13 FORM 01 FORMALETA ENTREPISOS MS 9,75 $6.062,50 $59.109,38 EQUIP 01 VIBRADOR CONCRETO GASOLINA D 0,04 $27.840,00 $1.113,60 EQUIP 01 VIBRADOR CONCRETO GASOLINA D 1,1 $27.840,00 $30.624,00 HERR 01 PUNTILLA CABEZA 2 LB 1,49 $2.552,00 $3.802,48 HERR 01 PUNTILLA CABEZA 2 LB 2,55 $2.552,00 $6.507,60 MAD 15 PARAL TELESCOPICO 2 D 2,9 $309,00 $896,10 MAD 15 PARAL TELESCOPICO 2 D 3,96 $309,00 $1.223,64 MAD 05 REPISA 8 X 4 CM X 2.90 MORDINARIO UN 0,95 $7.100,00 $6.745,00 MAD 05 REPISA 8 X 4 CM X 2.90 MORDINARIO UN 2,01 $7.100,00 $14.271,00 MAD 16 TABLA BURRA 30 X 2.2 A 2.7 X 2.9 UN 3,14 $17.284,00 $54.271,76 MAD 16 TABLA BURRA 30 X 2.2 A 2.7 X 2.9 UN 4,2 $17.284,00 $72.592,80 MAD 17 TABLA BURRA 25 X 2.2 A 2.7 X 2.9 UN 3,74 $14.345,72 $53.652,99 MAD 17 TABLA BURRA 25 X 2.2 A 2.7 X 2.9 UN 4,8 $14.345,72 $68.859,46 TOTAL $837.441,76 TOTAL $1.295.769,03 3.5 CUARTO PISO 3.5.1 PLACA ALIGERADA E. PRIM 01 M2 162 HH 04 ACERO FIGURADO 60000 PSI 1/4" KG 4,5 $1.833,11 $8.249,00 HH 04 ACERO FIGURADO 60000 PSI 1/4" KG 729 $1.833,11 $1.336.337,19 HH 05 ALAMBRE NEGRO NO. 18 (RECOCIDO) KG 0,14 $2.671,43 $374,00 HH 05 ALAMBRE NEGRO NO. 18 (RECOCIDO) KG 22,68 $2.671,43 $60.588,03 AR 01 CONCRETO 3000 PSI M3 0,17 $340.390,00 $57.866,30 AR 01 CONCRETO 3000 PSI M3 27,54 $340.390,00 $9.374.340,60 MAD 06 ESTERILLA GUADUA ANCHO 30 CM X 4.00 M UN 1,43 $6.950,35 $9.939,00 MAD 06 ESTERILLA GUADUA ANCHO 30 CM X 4.00 M UN 231,66 $6.950,35 $1.610.118,08 FORM 01 FORMALETA ENTREPISOS MS 0,88 $6.062,50 $5.335,00 FORM 01 FORMALETA ENTREPISOS MS 142,56 $6.062,50 $864.270,00 MAD 07 LISTON 10 X 1.8 CM X 2.90 M AMARILLO UN 1,33 $9.191,72 $12.224,99 MAD 07 LISTON 10 X 1.8 CM X 2.90 M AMARILLO UN 215,46 $9.191,72 $1.980.447,99 HERR 01 PUNTILLA CABEZA 2 LB 0,02 $2.552,00 $51,04 HERR 01 PUNTILLA CABEZA 2 LB 3,24 $2.552,00 $8.268,48 MAD 05 REPISA 8 X 4 CM X 2.90 MORDINARIO UN 0,02 $7.100,00 $142,00 MAD 05 REPISA 8 X 4 CM X 2.90 MORDINARIO UN 3,24 $7.100,00 $23.004,00 MAD 04 TABLA BURRA 30 X 2.7CM X 2.90MORD UN 0,02 $14.700,00 $294,00 MAD 04 TABLA BURRA 30 X 2.7CM X 2.90MORD UN 3,24 $14.700,00 $47.628,00 EQUIP 01 VIBRADOR CONCRETO GASOLINA D 0,01 $27.840,00 $278,40 EQUIP 01 VIBRADOR CONCRETO GASOLINA D 1,62 $27.840,00 $45.100,80 MO 01 MANO DE OBRA AA Hc 2,01 $17.486,00 $35.146,86 MO 01 MANO DE OBRA AA Hc 325,62 $17.486,00 $5.693.791,32 TOTAL $129.900,58 TOTAL $21.043.894,49 3.5.2 COLUMNAS E. PRIM 02 M3 4,2 AR 01 CONCRETO 3000 PSI M3 1,1 $340.390,00 $374.429,00 AR 01 CONCRETO 3000 PSI M3 4,62 $340.390,00 $1.572.601,80 HERR 01 PUNTILLA CABEZA 2 LB 8 $2.552,00 $20.416,00 HERR 01 PUNTILLA CABEZA 2 LB 33,6 $2.552,00 $85.747,20 MAD 05 REPISA 8 X 4 CM X 2.90 MORDINARIO UN 2,5 $7.100,00 $17.750,00 MAD 05 REPISA 8 X 4 CM X 2.90 MORDINARIO UN 10,5 $7.100,00 $74.550,00 MAD 04 TABLA BURRA 30 X 2.7CM X 2.90MORD UN 0,91 $14.700,00 $13.377,00 MAD 04 TABLA BURRA 30 X 2.7CM X 2.90MORD UN 3,822 $14.700,00 $56.183,40 EQUIP 01 VIBRADOR CONCRETO GASOLINA D 0,04 $27.840,00 $1.113,60 EQUIP 01 VIBRADOR CONCRETO GASOLINA D 0,168 $27.840,00 $4.677,12 ESTRUC 01 ANDAMIO TUBULAR 1.50 X 1.50 ALQUILER MS 0,2 $20.880,00 $4.176,00 ESTRUC 01 ANDAMIO TUBULAR 1.50 X 1.50 ALQUILER MS 0,84 $20.880,00 $17.539,20 ESTRUC 02 PARAL METÁLICO HASTA 3.30 M MS 1 $3.828,00 $3.828,00 ESTRUC 02 PARAL METÁLICO HASTA 3.30 M MS 4,2 $3.828,00 $16.077,60 MO 01 MANO DE OBRA AA Hc 10,29 $17.486,00 $179.930,94 MO 01 MANO DE OBRA AA Hc 43,218 $17.486,00 $755.709,95 TOTAL $615.020,54 TOTAL $2.583.086,27 3.5.3 ESCALERA E. PRIM 03 M3 1,06 MO 03 MANO DE OBRA AA ALBAÑILERIA Hc 17,7 $16.351,00 $289.412,70 MO 03 MANO DE OBRA AA ALBAÑILERIA Hc 18,76 $16.351,00 $306.744,76 MAD 14 PARAL TELESCOPICO D 2,9 $150,00 $435,00 MAD 14 PARAL TELESCOPICO D 3,96 $150,00 $594,00 AR 01 CONCRETO 3000 PSI M3 1,1 $340.390,00 $374.429,00 AR 01 CONCRETO 3000 PSI M3 2,16 $340.390,00 $735.242,40 FORM 01 FORMALETA ENTREPISOS MS 8,69 $6.062,50 $52.683,13 FORM 01 FORMALETA ENTREPISOS MS 9,75 $6.062,50 $59.109,38 EQUIP 01 VIBRADOR CONCRETO GASOLINA D 0,04 $27.840,00 $1.113,60 EQUIP 01 VIBRADOR CONCRETO GASOLINA D 1,1 $27.840,00 $30.624,00 HERR 01 PUNTILLA CABEZA 2 LB 1,49 $2.552,00 $3.802,48 HERR 01 PUNTILLA CABEZA 2 LB 2,55 $2.552,00 $6.507,60 MAD 15 PARAL TELESCOPICO 2 D 2,9 $309,00 $896,10 MAD 15 PARAL TELESCOPICO 2 D 3,96 $309,00 $1.223,64 MAD 05 REPISA 8 X 4 CM X 2.90 MORDINARIO UN 0,95 $7.100,00 $6.745,00 MAD 05 REPISA 8 X 4 CM X 2.90 MORDINARIO UN 2,01 $7.100,00 $14.271,00 MAD 16 TABLA BURRA 30 X 2.2 A 2.7 X 2.9 UN 3,14 $17.284,00 $54.271,76 MAD 16 TABLA BURRA 30 X 2.2 A 2.7 X 2.9 UN 4,2 $17.284,00 $72.592,80 MAD 17 TABLA BURRA 25 X 2.2 A 2.7 X 2.9 UN 3,74 $14.345,72 $53.652,99 MAD 17 TABLA BURRA 25 X 2.2 A 2.7 X 2.9 UN 4,8 $14.345,72 $68.859,46 TOTAL $837.441,76 TOTAL $1.295.769,03 3.6 QUINTO PISO 3.6.1 PLACA ALIGERADA E. PRIM 01 M2 162 HH 04 ACERO FIGURADO 60000 PSI 1/4" KG 4,5 $1.833,11 $8.249,00 HH 04 ACERO FIGURADO 60000 PSI 1/4" KG 729 $1.833,11 $1.336.337,19 HH 05 ALAMBRE NEGRO NO. 18 (RECOCIDO) KG 0,14 $2.671,43 $374,00 HH 05 ALAMBRE NEGRO NO. 18 (RECOCIDO) KG 22,68 $2.671,43 $60.588,03 AR 01 CONCRETO 3000 PSI M3 0,17 $340.390,00 $57.866,30 AR 01 CONCRETO 3000 PSI M3 27,54 $340.390,00 $9.374.340,60 MAD 06 ESTERILLA GUADUA ANCHO 30 CM X 4.00 M UN 1,43 $6.950,35 $9.939,00 MAD 06 ESTERILLA GUADUA ANCHO 30 CM X 4.00 M UN 231,66 $6.950,35 $1.610.118,08 FORM 01 FORMALETA ENTREPISOS MS 0,88 $6.062,50 $5.335,00 FORM 01 FORMALETA ENTREPISOS MS 142,56 $6.062,50 $864.270,00 MAD 07 LISTON 10 X 1.8 CM X 2.90 M AMARILLO UN 1,33 $9.191,72 $12.224,99 MAD 07 LISTON 10 X 1.8 CM X 2.90 M AMARILLO UN 215,46 $9.191,72 $1.980.447,99 HERR 01 PUNTILLA CABEZA 2 LB 0,02 $2.552,00 $51,04 HERR 01 PUNTILLA CABEZA 2 LB 3,24 $2.552,00 $8.268,48 MAD 05 REPISA 8 X 4 CM X 2.90 MORDINARIO UN 0,02 $7.100,00 $142,00 MAD 05 REPISA 8 X 4 CM X 2.90 MORDINARIO UN 3,24 $7.100,00 $23.004,00

Upload: maria-jose-aristizabal

Post on 04-Aug-2015

89 views

Category:

Data & Analytics


1 download

TRANSCRIPT

Page 1: 4. presupuesto detallado

CAPITULO SUBCAPITULO ACTIVIDAD CODIGO UNIDAD CANTIDAD  TOTAL CÓDIGO ITEM UNIDAD CANTIDAD VALOR  UNITARIO VALOR  TOTAL CÓDIGO ITEM UNIDAD CANTIDAD VALOR  UNITARIO VALOR  TOTAL1.  PRELIMINARES 1.1  CAMPAMENTO P.  CAMP  01 UN 1 PLAST  01 TEJA  TRASLUCIDA  P  1000  PREMIUM UN 8 $35.380,00 $283.040,00 PLAST  01 TEJA  TRASLUCIDA  P  1000  PREMIUM UN 8 $35.380,00 $283.040,00

HERR  03 PORTA  CANDADO  GATO  SIMPLE  3 UN 2 $1.850,00 $3.700,00 HERR  03 PORTA  CANDADO  GATO  SIMPLE  3 UN 2 $1.850,00 $3.700,00HERR  02 BISAGRA  GATO  OMEGA  3 UN 3 $1.783,00 $5.349,00 HERR  02 BISAGRA  GATO  OMEGA  3 UN 3 $1.783,00 $5.349,00HERR  01 PUNTILLA  CABEZA  2 LB 3 $2.552,00 $7.656,00 HERR  01 PUNTILLA  CABEZA  2 LB 3 $2.552,00 $7.656,00HERR  04 GANCHO  TEJA  ETERNIT  55  MM UN 16 $269,00 $4.304,00 HERR  04 GANCHO  TEJA  ETERNIT  55  MM UN 16 $269,00 $4.304,00HH  02 VARA  DE  CLAVO  DIAM.  6  A  8  CM  X  3.00  M UN 4,13 $4.950,00 $20.443,50 HH  02 VARA  DE  CLAVO  DIAM.  6  A  8  CM  X  3.00  M UN 4,13 $4.950,00 $20.443,50MAD  03 TABLA  CHAPA  30  X  1.8  A  2.0  CM  X  2.9 UN 10,34 $13.428,00 $138.845,52 MAD  03 TABLA  CHAPA  30  X  1.8  A  2.0  CM  X  2.9 UN 10,34 $13.428,00 $138.845,52AR  02 BASE  GRANULAR M3 1,17 $33.640,00 $39.358,80 AR  02 BASE  GRANULAR M3 1,17 $33.640,00 $39.358,80MO  01 MANO  DE  OBRA  AA Hc 15,18 $17.486,00 $265.437,48 MO  01 MANO  DE  OBRA  AA Hc 15,18 $17.486,00 $265.437,48

TOTAL $768.134,30 TOTAL $768.134,30

1.2  DESCAPOTE P.  DESCAP  01 M2 162 MAQUI  02 VOLQUETA  M3 Vj 0,37 $55.000,00 $20.350,00 MAQUI  02 VOLQUETA  M3 Vj 59,94 $55.000,00 $3.296.700,00MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 0,26 $16.351,00 $4.251,26 MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 42,12 $16.351,00 $688.704,12MO  03 MANO  DE  OBRA  AYUDANTE  ALBAÑILERIA Hh 0,16 $6.310,00 $1.009,60 MO  03 MANO  DE  OBRA  AYUDANTE  ALBAÑILERIA Hh 25,92 $6.310,00 $163.555,20

TOTAL $25.610,86 TOTAL $4.148.959,32

1.3  REPLANTEO 1.3.1  CIMENTACION  GENERAL P.  REPL  01 M2 162 HERR  05 PUNTILLA  CABEZA  1 LB 0,02 $2.645,00 $52,90 HERR  05 PUNTILLA  CABEZA  1 LB 3,24 $2.645,00 $8.569,80HERR  01 PUNTILLA  CABEZA  2 LB 0,02 $2.552,00 $51,04 HERR  01 PUNTILLA  CABEZA  2 LB 3,24 $2.552,00 $8.268,48MAD  02 DURMIENTE  ORDINARIA UN 0,34 $3.550,00 $1.207,00 MAD  02 DURMIENTE  ORDINARIA UN 55,08 $3.550,00 $195.534,00MO  01 MANO  DE  OBRA  AA Hc 0,28 $17.486,00 $4.896,08 MO  01 MANO  DE  OBRA  AA Hc 45,36 $17.486,00 $793.164,96

TOTAL $6.207,02 TOTAL $1.005.537,24

1.3.2  PILOTES P.  REPL  02 M2 18,85 HERR  05 PUNTILLA  CABEZA  1 LB 0,02 $2.645,00 $52,90 HERR  05 PUNTILLA  CABEZA  1 LB 0,377 $2.645,00 $997,17HERR  01 PUNTILLA  CABEZA  2 LB 0,02 $2.552,00 $51,04 HERR  01 PUNTILLA  CABEZA  2 LB 0,377 $2.552,00 $962,10MAD  02 DURMIENTE  ORDINARIA UN 0,34 $3.550,00 $1.207,00 MAD  02 DURMIENTE  ORDINARIA UN 6,409 $3.550,00 $22.751,95MO  01 MANO  DE  OBRA  AA Hc 0,28 $17.486,00 $4.896,08 MO  01 MANO  DE  OBRA  AA Hc 5,278 $17.486,00 $92.291,11

TOTAL $6.207,02 TOTAL $117.002,33

2.  MOVIMIENTO  DE  TIERRAS 2.1  CIMENTACION 2.1.1  EXCAVACION  GENERAL M.  CIM  01 M3 162 MAQUI  02 VOLQUETA  M3 Vj 0,37 $55.000,00 $20.350,00 MAQUI  02 VOLQUETA  M3 Vj 59,94 $55.000,00 $3.296.700,00MO  01 MANO  DE  OBRA  AA Hc 0,93 $17.486,00 $16.261,98 MO  01 MANO  DE  OBRA  AA Hc 150,66 $17.486,00 $2.634.440,76

TOTAL $36.611,98 TOTAL $5.931.140,76

2.1.2  EXCAVACION  PILOTES M.  CIM  02 M3 339,3 MAQUI  02 VOLQUETA  M3 Vj 0,37 $55.000,00 $20.350,00 MAQUI  02 VOLQUETA  M3 Vj 125,541 $55.000,00 $6.904.755,00MO  01 MANO  DE  OBRA  AA Hc 0,93 $17.486,00 $16.261,98 MO  01 MANO  DE  OBRA  AA Hc 315,549 $17.486,00 $5.517.689,81

TOTAL $36.611,98 TOTAL $12.422.444,81

3.  ESTRUCTURA 3.1  CIMENTACION 3.1.1  PILOTES E.  CIM  01 M3 339,3 MAQUI  02 VOLQUETA  M3 Vj 0,37 $55.000,00 $20.350,00 MAQUI  02 VOLQUETA  M3 Vj 125,541 $55.000,00 $6.904.755,00HH  12 ACERO  FIGURADO  60000  PSI  3/8" KG 80 $2.050,00 $164.000,00 HH  12 ACERO  FIGURADO  60000  PSI  3/8" KG 27144 $2.050,00 $55.645.200,00AR  01 CONCRETO  3000  PSI M3 1 $340.390,00 $340.390,00 AR  01 CONCRETO  3000  PSI M3 339,3 $340.390,00 $115.494.327,00

TOTAL $524.740,00 TOTAL $178.044.282,00

3.1.2  DEMOLICION  CABEZA  PILOTES E.  CIM  02 M3 7,54 EQUIP  03 COMPRESOR  DE  AIRE  PEQUEÑO   H 6,95 $31.320,00 $217.674,00 EQUIP  03 COMPRESOR  DE  AIRE  PEQUEÑO   H 52,403 $31.320,00 $1.641.261,96MAQUI  03 RETROEXCAVADORA  ORUGA  CAT320  +  OPERADOR H 0,04 $14.951,11 $598,04 MAQUI  03 RETROEXCAVADORA  ORUGA  CAT320  +  OPERADOR H 0,3016 $14.951,11 $4.509,25MAQUI  02 VOLQUETA  M3 Vj 0,45 $55.000,00 $24.750,00 MAQUI  02 VOLQUETA  M3 Vj 3,393 $55.000,00 $186.615,00MO  01 MANO  DE  OBRA  AA Hc 8,91 $17.486,00 $155.800,26 MO  01 MANO  DE  OBRA  AA Hc 67,1814 $17.486,00 $1.174.733,96

TOTAL $398.822,30 TOTAL $3.007.120,18

3.1.3  PLACA  FLOTANTE E.  CIM  03 M3 64,8 AR  01 CONCRETO  3000  PSI M3 0,46 $340.390,00 $156.579,40 AR  01 CONCRETO  3000  PSI M3 29,808 $340.390,00 $10.146.345,12EQUIP  04 COSTO  ADICIONAL  DE  BOMBEO M2 0,46 $35.000,00 $16.100,00 EQUIP  04 COSTO  ADICIONAL  DE  BOMBEO M2 29,808 $35.000,00 $1.043.280,00EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 0,04 $27.840,00 $1.113,60 EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 2,592 $27.840,00 $72.161,28MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 1,83 $16.351,00 $29.922,33 MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 118,584 $16.351,00 $1.938.966,98POLIEST  01 ICOPOR  1  X  1  ESPESOR  1  CM M 0,8 $2.900,00 $2.320,00 POLIEST  01 ICOPOR  1  X  1  ESPESOR  1  CM M 51,84 $2.900,00 $150.336,00HERR  01 PUNTILLA  CABEZA  2 LB 0,03 $2.552,00 $76,56 HERR  01 PUNTILLA  CABEZA  2 LB 1,944 $2.552,00 $4.961,09MAD  03 TABLA  CHAPA  30  X  1.8  A  2.0  CM  X  2.9 UN 0,04 $13.428,00 $537,12 MAD  03 TABLA  CHAPA  30  X  1.8  A  2.0  CM  X  2.9 UN 2,592 $13.428,00 $34.805,38

TOTAL $206.649,01 TOTAL $13.390.855,85

3.2  PRIMER  PISO 3.2.1  PLACA  ALIGERADA E.  PRIM  01 M2 162 HH  04 ACERO  FIGURADO  60000  PSI  1/4" KG 4,5 $1.833,11 $8.249,00 HH  04 ACERO  FIGURADO  60000  PSI  1/4" KG 729 $1.833,11 $1.336.337,19HH  05 ALAMBRE  NEGRO  NO.  18  (RECOCIDO) KG 0,14 $2.671,43 $374,00 HH  05 ALAMBRE  NEGRO  NO.  18  (RECOCIDO) KG 22,68 $2.671,43 $60.588,03AR  01 CONCRETO  3000  PSI M3 0,17 $340.390,00 $57.866,30 AR  01 CONCRETO  3000  PSI M3 27,54 $340.390,00 $9.374.340,60MAD  06 ESTERILLA  GUADUA  ANCHO  30  CM  X  4.00  M UN 1,43 $6.950,35 $9.939,00 MAD  06 ESTERILLA  GUADUA  ANCHO  30  CM  X  4.00  M UN 231,66 $6.950,35 $1.610.118,08FORM  01 FORMALETA  ENTREPISOS MS 0,88 $6.062,50 $5.335,00 FORM  01 FORMALETA  ENTREPISOS MS 142,56 $6.062,50 $864.270,00MAD  07 LISTON  10  X  1.8  CM  X  2.90  M  AMARILLO UN 1,33 $9.191,72 $12.224,99 MAD  07 LISTON  10  X  1.8  CM  X  2.90  M  AMARILLO UN 215,46 $9.191,72 $1.980.447,99HERR  01 PUNTILLA  CABEZA  2 LB 0,02 $2.552,00 $51,04 HERR  01 PUNTILLA  CABEZA  2 LB 3,24 $2.552,00 $8.268,48MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 0,02 $7.100,00 $142,00 MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 3,24 $7.100,00 $23.004,00MAD  04 TABLA  BURRA  30  X  2.7CM  X  2.90M-­‐ORD UN 0,02 $14.700,00 $294,00 MAD  04 TABLA  BURRA  30  X  2.7CM  X  2.90M-­‐ORD UN 3,24 $14.700,00 $47.628,00EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 0,01 $27.840,00 $278,40 EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 1,62 $27.840,00 $45.100,80MO  01 MANO  DE  OBRA  AA Hc 2,01 $17.486,00 $35.146,86 MO  01 MANO  DE  OBRA  AA Hc 325,62 $17.486,00 $5.693.791,32

TOTAL $129.900,58 TOTAL $21.043.894,49

3.2.2  COLUMNAS E.  PRIM  02 M3 4,2 AR  01 CONCRETO  3000  PSI M3 1,1 $340.390,00 $374.429,00 AR  01 CONCRETO  3000  PSI M3 4,62 $340.390,00 $1.572.601,80HERR  01 PUNTILLA  CABEZA  2 LB 8 $2.552,00 $20.416,00 HERR  01 PUNTILLA  CABEZA  2 LB 33,6 $2.552,00 $85.747,20MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 2,5 $7.100,00 $17.750,00 MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 10,5 $7.100,00 $74.550,00MAD  04 TABLA  BURRA  30  X  2.7CM  X  2.90M-­‐ORD UN 0,91 $14.700,00 $13.377,00 MAD  04 TABLA  BURRA  30  X  2.7CM  X  2.90M-­‐ORD UN 3,822 $14.700,00 $56.183,40EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 0,04 $27.840,00 $1.113,60 EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 0,168 $27.840,00 $4.677,12ESTRUC  01 ANDAMIO  TUBULAR  1.50  X  1.50  ALQUILER MS 0,2 $20.880,00 $4.176,00 ESTRUC  01 ANDAMIO  TUBULAR  1.50  X  1.50  ALQUILER MS 0,84 $20.880,00 $17.539,20ESTRUC  02 PARAL  METÁLICO  HASTA  3.30  M MS 1 $3.828,00 $3.828,00 ESTRUC  02 PARAL  METÁLICO  HASTA  3.30  M MS 4,2 $3.828,00 $16.077,60MO  01 MANO  DE  OBRA  AA Hc 10,29 $17.486,00 $179.930,94 MO  01 MANO  DE  OBRA  AA Hc 43,218 $17.486,00 $755.709,95

TOTAL $615.020,54 TOTAL $2.583.086,27

3.2.3  ESCALERA E.  PRIM  03 M3 1,06 MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 17,7 $16.351,00 $289.412,70 MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 18,76 $16.351,00 $306.744,76MAD  14 PARAL  TELESCOPICO   D 2,9 $150,00 $435,00 MAD  14 PARAL  TELESCOPICO   D 3,96 $150,00 $594,00AR  01 CONCRETO  3000  PSI M3 1,1 $340.390,00 $374.429,00 AR  01 CONCRETO  3000  PSI M3 2,16 $340.390,00 $735.242,40FORM  01 FORMALETA  ENTREPISOS MS 8,69 $6.062,50 $52.683,13 FORM  01 FORMALETA  ENTREPISOS MS 9,75 $6.062,50 $59.109,38EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 0,04 $27.840,00 $1.113,60 EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 1,1 $27.840,00 $30.624,00HERR  01 PUNTILLA  CABEZA  2 LB 1,49 $2.552,00 $3.802,48 HERR  01 PUNTILLA  CABEZA  2 LB 2,55 $2.552,00 $6.507,60MAD  15 PARAL  TELESCOPICO  2 D 2,9 $309,00 $896,10 MAD  15 PARAL  TELESCOPICO  2 D 3,96 $309,00 $1.223,64MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 0,95 $7.100,00 $6.745,00 MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 2,01 $7.100,00 $14.271,00MAD  16 TABLA  BURRA  30  X  2.2  A  2.7  X  2.9 UN 3,14 $17.284,00 $54.271,76 MAD  16 TABLA  BURRA  30  X  2.2  A  2.7  X  2.9 UN 4,2 $17.284,00 $72.592,80MAD  17 TABLA  BURRA  25  X  2.2  A  2.7  X  2.9 UN 3,74 $14.345,72 $53.652,99 MAD  17 TABLA  BURRA  25  X  2.2  A  2.7  X  2.9 UN 4,8 $14.345,72 $68.859,46

TOTAL $837.441,76 TOTAL $1.295.769,03

3.3  SEGUNDO  PISO   3.3.1  PLACA  ALIGERADA   E.  PRIM  01 M2 162 HH  04 ACERO  FIGURADO  60000  PSI  1/4" KG 4,5 $1.833,11 $8.249,00 HH  04 ACERO  FIGURADO  60000  PSI  1/4" KG 729 $1.833,11 $1.336.337,19HH  05 ALAMBRE  NEGRO  NO.  18  (RECOCIDO) KG 0,14 $2.671,43 $374,00 HH  05 ALAMBRE  NEGRO  NO.  18  (RECOCIDO) KG 22,68 $2.671,43 $60.588,03AR  01 CONCRETO  3000  PSI M3 0,17 $340.390,00 $57.866,30 AR  01 CONCRETO  3000  PSI M3 27,54 $340.390,00 $9.374.340,60MAD  06 ESTERILLA  GUADUA  ANCHO  30  CM  X  4.00  M UN 1,43 $6.950,35 $9.939,00 MAD  06 ESTERILLA  GUADUA  ANCHO  30  CM  X  4.00  M UN 231,66 $6.950,35 $1.610.118,08FORM  01 FORMALETA  ENTREPISOS MS 0,88 $6.062,50 $5.335,00 FORM  01 FORMALETA  ENTREPISOS MS 142,56 $6.062,50 $864.270,00MAD  07 LISTON  10  X  1.8  CM  X  2.90  M  AMARILLO UN 1,33 $9.191,72 $12.224,99 MAD  07 LISTON  10  X  1.8  CM  X  2.90  M  AMARILLO UN 215,46 $9.191,72 $1.980.447,99HERR  01 PUNTILLA  CABEZA  2 LB 0,02 $2.552,00 $51,04 HERR  01 PUNTILLA  CABEZA  2 LB 3,24 $2.552,00 $8.268,48MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 0,02 $7.100,00 $142,00 MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 3,24 $7.100,00 $23.004,00MAD  04 TABLA  BURRA  30  X  2.7CM  X  2.90M-­‐ORD UN 0,02 $14.700,00 $294,00 MAD  04 TABLA  BURRA  30  X  2.7CM  X  2.90M-­‐ORD UN 3,24 $14.700,00 $47.628,00EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 0,01 $27.840,00 $278,40 EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 1,62 $27.840,00 $45.100,80MO  01 MANO  DE  OBRA  AA Hc 2,01 $17.486,00 $35.146,86 MO  01 MANO  DE  OBRA  AA Hc 325,62 $17.486,00 $5.693.791,32

TOTAL $129.900,58 TOTAL $21.043.894,49

3.3.2  COLUMNAS   E.  PRIM  02 M3 4,2 AR  01 CONCRETO  3000  PSI M3 1,1 $340.390,00 $374.429,00 AR  01 CONCRETO  3000  PSI M3 4,62 $340.390,00 $1.572.601,80HERR  01 PUNTILLA  CABEZA  2 LB 8 $2.552,00 $20.416,00 HERR  01 PUNTILLA  CABEZA  2 LB 33,6 $2.552,00 $85.747,20MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 2,5 $7.100,00 $17.750,00 MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 10,5 $7.100,00 $74.550,00MAD  04 TABLA  BURRA  30  X  2.7CM  X  2.90M-­‐ORD UN 0,91 $14.700,00 $13.377,00 MAD  04 TABLA  BURRA  30  X  2.7CM  X  2.90M-­‐ORD UN 3,822 $14.700,00 $56.183,40EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 0,04 $27.840,00 $1.113,60 EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 0,168 $27.840,00 $4.677,12ESTRUC  01 ANDAMIO  TUBULAR  1.50  X  1.50  ALQUILER MS 0,2 $20.880,00 $4.176,00 ESTRUC  01 ANDAMIO  TUBULAR  1.50  X  1.50  ALQUILER MS 0,84 $20.880,00 $17.539,20ESTRUC  02 PARAL  METÁLICO  HASTA  3.30  M MS 1 $3.828,00 $3.828,00 ESTRUC  02 PARAL  METÁLICO  HASTA  3.30  M MS 4,2 $3.828,00 $16.077,60MO  01 MANO  DE  OBRA  AA Hc 10,29 $17.486,00 $179.930,94 MO  01 MANO  DE  OBRA  AA Hc 43,218 $17.486,00 $755.709,95

TOTAL $615.020,54 TOTAL $2.583.086,27

3.3.3  ESCALERA   E.  PRIM  03 M3 1,06 MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 17,7 $16.351,00 $289.412,70 MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 18,76 $16.351,00 $306.744,76MAD  14 PARAL  TELESCOPICO   D 2,9 $150,00 $435,00 MAD  14 PARAL  TELESCOPICO   D 3,96 $150,00 $594,00AR  01 CONCRETO  3000  PSI M3 1,1 $340.390,00 $374.429,00 AR  01 CONCRETO  3000  PSI M3 2,16 $340.390,00 $735.242,40FORM  01 FORMALETA  ENTREPISOS MS 8,69 $6.062,50 $52.683,13 FORM  01 FORMALETA  ENTREPISOS MS 9,75 $6.062,50 $59.109,38EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 0,04 $27.840,00 $1.113,60 EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 1,1 $27.840,00 $30.624,00HERR  01 PUNTILLA  CABEZA  2 LB 1,49 $2.552,00 $3.802,48 HERR  01 PUNTILLA  CABEZA  2 LB 2,55 $2.552,00 $6.507,60MAD  15 PARAL  TELESCOPICO  2 D 2,9 $309,00 $896,10 MAD  15 PARAL  TELESCOPICO  2 D 3,96 $309,00 $1.223,64MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 0,95 $7.100,00 $6.745,00 MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 2,01 $7.100,00 $14.271,00MAD  16 TABLA  BURRA  30  X  2.2  A  2.7  X  2.9 UN 3,14 $17.284,00 $54.271,76 MAD  16 TABLA  BURRA  30  X  2.2  A  2.7  X  2.9 UN 4,2 $17.284,00 $72.592,80MAD  17 TABLA  BURRA  25  X  2.2  A  2.7  X  2.9 UN 3,74 $14.345,72 $53.652,99 MAD  17 TABLA  BURRA  25  X  2.2  A  2.7  X  2.9 UN 4,8 $14.345,72 $68.859,46

TOTAL $837.441,76 TOTAL $1.295.769,03

3.4  TERCER  PISO   3.4.1  PLACA  ALIGERADA E.  PRIM  01 M2 162 HH  04 ACERO  FIGURADO  60000  PSI  1/4" KG 4,5 $1.833,11 $8.249,00 HH  04 ACERO  FIGURADO  60000  PSI  1/4" KG 729 $1.833,11 $1.336.337,19HH  05 ALAMBRE  NEGRO  NO.  18  (RECOCIDO) KG 0,14 $2.671,43 $374,00 HH  05 ALAMBRE  NEGRO  NO.  18  (RECOCIDO) KG 22,68 $2.671,43 $60.588,03AR  01 CONCRETO  3000  PSI M3 0,17 $340.390,00 $57.866,30 AR  01 CONCRETO  3000  PSI M3 27,54 $340.390,00 $9.374.340,60MAD  06 ESTERILLA  GUADUA  ANCHO  30  CM  X  4.00  M UN 1,43 $6.950,35 $9.939,00 MAD  06 ESTERILLA  GUADUA  ANCHO  30  CM  X  4.00  M UN 231,66 $6.950,35 $1.610.118,08FORM  01 FORMALETA  ENTREPISOS MS 0,88 $6.062,50 $5.335,00 FORM  01 FORMALETA  ENTREPISOS MS 142,56 $6.062,50 $864.270,00MAD  07 LISTON  10  X  1.8  CM  X  2.90  M  AMARILLO UN 1,33 $9.191,72 $12.224,99 MAD  07 LISTON  10  X  1.8  CM  X  2.90  M  AMARILLO UN 215,46 $9.191,72 $1.980.447,99HERR  01 PUNTILLA  CABEZA  2 LB 0,02 $2.552,00 $51,04 HERR  01 PUNTILLA  CABEZA  2 LB 3,24 $2.552,00 $8.268,48MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 0,02 $7.100,00 $142,00 MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 3,24 $7.100,00 $23.004,00MAD  04 TABLA  BURRA  30  X  2.7CM  X  2.90M-­‐ORD UN 0,02 $14.700,00 $294,00 MAD  04 TABLA  BURRA  30  X  2.7CM  X  2.90M-­‐ORD UN 3,24 $14.700,00 $47.628,00EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 0,01 $27.840,00 $278,40 EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 1,62 $27.840,00 $45.100,80MO  01 MANO  DE  OBRA  AA Hc 2,01 $17.486,00 $35.146,86 MO  01 MANO  DE  OBRA  AA Hc 325,62 $17.486,00 $5.693.791,32

TOTAL $129.900,58 TOTAL $21.043.894,49

3.4.2  COLUMNAS   E.  PRIM  02 M3 4,2 AR  01 CONCRETO  3000  PSI M3 1,1 $340.390,00 $374.429,00 AR  01 CONCRETO  3000  PSI M3 4,62 $340.390,00 $1.572.601,80HERR  01 PUNTILLA  CABEZA  2 LB 8 $2.552,00 $20.416,00 HERR  01 PUNTILLA  CABEZA  2 LB 33,6 $2.552,00 $85.747,20MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 2,5 $7.100,00 $17.750,00 MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 10,5 $7.100,00 $74.550,00MAD  04 TABLA  BURRA  30  X  2.7CM  X  2.90M-­‐ORD UN 0,91 $14.700,00 $13.377,00 MAD  04 TABLA  BURRA  30  X  2.7CM  X  2.90M-­‐ORD UN 3,822 $14.700,00 $56.183,40EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 0,04 $27.840,00 $1.113,60 EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 0,168 $27.840,00 $4.677,12ESTRUC  01 ANDAMIO  TUBULAR  1.50  X  1.50  ALQUILER MS 0,2 $20.880,00 $4.176,00 ESTRUC  01 ANDAMIO  TUBULAR  1.50  X  1.50  ALQUILER MS 0,84 $20.880,00 $17.539,20ESTRUC  02 PARAL  METÁLICO  HASTA  3.30  M MS 1 $3.828,00 $3.828,00 ESTRUC  02 PARAL  METÁLICO  HASTA  3.30  M MS 4,2 $3.828,00 $16.077,60MO  01 MANO  DE  OBRA  AA Hc 10,29 $17.486,00 $179.930,94 MO  01 MANO  DE  OBRA  AA Hc 43,218 $17.486,00 $755.709,95

TOTAL $615.020,54 TOTAL $2.583.086,27

3.4.3  ESCALERA   E.  PRIM  03 M3 1,06 MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 17,7 $16.351,00 $289.412,70 MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 18,76 $16.351,00 $306.744,76MAD  14 PARAL  TELESCOPICO   D 2,9 $150,00 $435,00 MAD  14 PARAL  TELESCOPICO   D 3,96 $150,00 $594,00AR  01 CONCRETO  3000  PSI M3 1,1 $340.390,00 $374.429,00 AR  01 CONCRETO  3000  PSI M3 2,16 $340.390,00 $735.242,40FORM  01 FORMALETA  ENTREPISOS MS 8,69 $6.062,50 $52.683,13 FORM  01 FORMALETA  ENTREPISOS MS 9,75 $6.062,50 $59.109,38EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 0,04 $27.840,00 $1.113,60 EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 1,1 $27.840,00 $30.624,00HERR  01 PUNTILLA  CABEZA  2 LB 1,49 $2.552,00 $3.802,48 HERR  01 PUNTILLA  CABEZA  2 LB 2,55 $2.552,00 $6.507,60MAD  15 PARAL  TELESCOPICO  2 D 2,9 $309,00 $896,10 MAD  15 PARAL  TELESCOPICO  2 D 3,96 $309,00 $1.223,64MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 0,95 $7.100,00 $6.745,00 MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 2,01 $7.100,00 $14.271,00MAD  16 TABLA  BURRA  30  X  2.2  A  2.7  X  2.9 UN 3,14 $17.284,00 $54.271,76 MAD  16 TABLA  BURRA  30  X  2.2  A  2.7  X  2.9 UN 4,2 $17.284,00 $72.592,80MAD  17 TABLA  BURRA  25  X  2.2  A  2.7  X  2.9 UN 3,74 $14.345,72 $53.652,99 MAD  17 TABLA  BURRA  25  X  2.2  A  2.7  X  2.9 UN 4,8 $14.345,72 $68.859,46

TOTAL $837.441,76 TOTAL $1.295.769,03

3.5  CUARTO  PISO   3.5.1  PLACA  ALIGERADA E.  PRIM  01 M2 162 HH  04 ACERO  FIGURADO  60000  PSI  1/4" KG 4,5 $1.833,11 $8.249,00 HH  04 ACERO  FIGURADO  60000  PSI  1/4" KG 729 $1.833,11 $1.336.337,19HH  05 ALAMBRE  NEGRO  NO.  18  (RECOCIDO) KG 0,14 $2.671,43 $374,00 HH  05 ALAMBRE  NEGRO  NO.  18  (RECOCIDO) KG 22,68 $2.671,43 $60.588,03AR  01 CONCRETO  3000  PSI M3 0,17 $340.390,00 $57.866,30 AR  01 CONCRETO  3000  PSI M3 27,54 $340.390,00 $9.374.340,60MAD  06 ESTERILLA  GUADUA  ANCHO  30  CM  X  4.00  M UN 1,43 $6.950,35 $9.939,00 MAD  06 ESTERILLA  GUADUA  ANCHO  30  CM  X  4.00  M UN 231,66 $6.950,35 $1.610.118,08FORM  01 FORMALETA  ENTREPISOS MS 0,88 $6.062,50 $5.335,00 FORM  01 FORMALETA  ENTREPISOS MS 142,56 $6.062,50 $864.270,00MAD  07 LISTON  10  X  1.8  CM  X  2.90  M  AMARILLO UN 1,33 $9.191,72 $12.224,99 MAD  07 LISTON  10  X  1.8  CM  X  2.90  M  AMARILLO UN 215,46 $9.191,72 $1.980.447,99HERR  01 PUNTILLA  CABEZA  2 LB 0,02 $2.552,00 $51,04 HERR  01 PUNTILLA  CABEZA  2 LB 3,24 $2.552,00 $8.268,48MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 0,02 $7.100,00 $142,00 MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 3,24 $7.100,00 $23.004,00MAD  04 TABLA  BURRA  30  X  2.7CM  X  2.90M-­‐ORD UN 0,02 $14.700,00 $294,00 MAD  04 TABLA  BURRA  30  X  2.7CM  X  2.90M-­‐ORD UN 3,24 $14.700,00 $47.628,00EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 0,01 $27.840,00 $278,40 EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 1,62 $27.840,00 $45.100,80MO  01 MANO  DE  OBRA  AA Hc 2,01 $17.486,00 $35.146,86 MO  01 MANO  DE  OBRA  AA Hc 325,62 $17.486,00 $5.693.791,32

TOTAL $129.900,58 TOTAL $21.043.894,49

3.5.2  COLUMNAS   E.  PRIM  02 M3 4,2 AR  01 CONCRETO  3000  PSI M3 1,1 $340.390,00 $374.429,00 AR  01 CONCRETO  3000  PSI M3 4,62 $340.390,00 $1.572.601,80HERR  01 PUNTILLA  CABEZA  2 LB 8 $2.552,00 $20.416,00 HERR  01 PUNTILLA  CABEZA  2 LB 33,6 $2.552,00 $85.747,20MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 2,5 $7.100,00 $17.750,00 MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 10,5 $7.100,00 $74.550,00MAD  04 TABLA  BURRA  30  X  2.7CM  X  2.90M-­‐ORD UN 0,91 $14.700,00 $13.377,00 MAD  04 TABLA  BURRA  30  X  2.7CM  X  2.90M-­‐ORD UN 3,822 $14.700,00 $56.183,40EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 0,04 $27.840,00 $1.113,60 EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 0,168 $27.840,00 $4.677,12ESTRUC  01 ANDAMIO  TUBULAR  1.50  X  1.50  ALQUILER MS 0,2 $20.880,00 $4.176,00 ESTRUC  01 ANDAMIO  TUBULAR  1.50  X  1.50  ALQUILER MS 0,84 $20.880,00 $17.539,20ESTRUC  02 PARAL  METÁLICO  HASTA  3.30  M MS 1 $3.828,00 $3.828,00 ESTRUC  02 PARAL  METÁLICO  HASTA  3.30  M MS 4,2 $3.828,00 $16.077,60MO  01 MANO  DE  OBRA  AA Hc 10,29 $17.486,00 $179.930,94 MO  01 MANO  DE  OBRA  AA Hc 43,218 $17.486,00 $755.709,95

TOTAL $615.020,54 TOTAL $2.583.086,27

3.5.3  ESCALERA   E.  PRIM  03 M3 1,06 MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 17,7 $16.351,00 $289.412,70 MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 18,76 $16.351,00 $306.744,76MAD  14 PARAL  TELESCOPICO   D 2,9 $150,00 $435,00 MAD  14 PARAL  TELESCOPICO   D 3,96 $150,00 $594,00AR  01 CONCRETO  3000  PSI M3 1,1 $340.390,00 $374.429,00 AR  01 CONCRETO  3000  PSI M3 2,16 $340.390,00 $735.242,40FORM  01 FORMALETA  ENTREPISOS MS 8,69 $6.062,50 $52.683,13 FORM  01 FORMALETA  ENTREPISOS MS 9,75 $6.062,50 $59.109,38EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 0,04 $27.840,00 $1.113,60 EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 1,1 $27.840,00 $30.624,00HERR  01 PUNTILLA  CABEZA  2 LB 1,49 $2.552,00 $3.802,48 HERR  01 PUNTILLA  CABEZA  2 LB 2,55 $2.552,00 $6.507,60MAD  15 PARAL  TELESCOPICO  2 D 2,9 $309,00 $896,10 MAD  15 PARAL  TELESCOPICO  2 D 3,96 $309,00 $1.223,64MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 0,95 $7.100,00 $6.745,00 MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 2,01 $7.100,00 $14.271,00MAD  16 TABLA  BURRA  30  X  2.2  A  2.7  X  2.9 UN 3,14 $17.284,00 $54.271,76 MAD  16 TABLA  BURRA  30  X  2.2  A  2.7  X  2.9 UN 4,2 $17.284,00 $72.592,80MAD  17 TABLA  BURRA  25  X  2.2  A  2.7  X  2.9 UN 3,74 $14.345,72 $53.652,99 MAD  17 TABLA  BURRA  25  X  2.2  A  2.7  X  2.9 UN 4,8 $14.345,72 $68.859,46

TOTAL $837.441,76 TOTAL $1.295.769,03

3.6  QUINTO  PISO   3.6.1  PLACA  ALIGERADA   E.  PRIM  01 M2 162 HH  04 ACERO  FIGURADO  60000  PSI  1/4" KG 4,5 $1.833,11 $8.249,00 HH  04 ACERO  FIGURADO  60000  PSI  1/4" KG 729 $1.833,11 $1.336.337,19HH  05 ALAMBRE  NEGRO  NO.  18  (RECOCIDO) KG 0,14 $2.671,43 $374,00 HH  05 ALAMBRE  NEGRO  NO.  18  (RECOCIDO) KG 22,68 $2.671,43 $60.588,03AR  01 CONCRETO  3000  PSI M3 0,17 $340.390,00 $57.866,30 AR  01 CONCRETO  3000  PSI M3 27,54 $340.390,00 $9.374.340,60MAD  06 ESTERILLA  GUADUA  ANCHO  30  CM  X  4.00  M UN 1,43 $6.950,35 $9.939,00 MAD  06 ESTERILLA  GUADUA  ANCHO  30  CM  X  4.00  M UN 231,66 $6.950,35 $1.610.118,08FORM  01 FORMALETA  ENTREPISOS MS 0,88 $6.062,50 $5.335,00 FORM  01 FORMALETA  ENTREPISOS MS 142,56 $6.062,50 $864.270,00MAD  07 LISTON  10  X  1.8  CM  X  2.90  M  AMARILLO UN 1,33 $9.191,72 $12.224,99 MAD  07 LISTON  10  X  1.8  CM  X  2.90  M  AMARILLO UN 215,46 $9.191,72 $1.980.447,99HERR  01 PUNTILLA  CABEZA  2 LB 0,02 $2.552,00 $51,04 HERR  01 PUNTILLA  CABEZA  2 LB 3,24 $2.552,00 $8.268,48MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 0,02 $7.100,00 $142,00 MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 3,24 $7.100,00 $23.004,00

Page 2: 4. presupuesto detallado

MAD  04 TABLA  BURRA  30  X  2.7CM  X  2.90M-­‐ORD UN 0,02 $14.700,00 $294,00 MAD  04 TABLA  BURRA  30  X  2.7CM  X  2.90M-­‐ORD UN 3,24 $14.700,00 $47.628,00EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 0,01 $27.840,00 $278,40 EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 1,62 $27.840,00 $45.100,80MO  01 MANO  DE  OBRA  AA Hc 2,01 $17.486,00 $35.146,86 MO  01 MANO  DE  OBRA  AA Hc 325,62 $17.486,00 $5.693.791,32

TOTAL $129.900,58 TOTAL $21.043.894,49

3.6.2  COLUMNAS   E.  PRIM  02 M3 4,2 AR  01 CONCRETO  3000  PSI M3 1,1 $340.390,00 $374.429,00 AR  01 CONCRETO  3000  PSI M3 4,62 $340.390,00 $1.572.601,80HERR  01 PUNTILLA  CABEZA  2 LB 8 $2.552,00 $20.416,00 HERR  01 PUNTILLA  CABEZA  2 LB 33,6 $2.552,00 $85.747,20MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 2,5 $7.100,00 $17.750,00 MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 10,5 $7.100,00 $74.550,00MAD  04 TABLA  BURRA  30  X  2.7CM  X  2.90M-­‐ORD UN 0,91 $14.700,00 $13.377,00 MAD  04 TABLA  BURRA  30  X  2.7CM  X  2.90M-­‐ORD UN 3,822 $14.700,00 $56.183,40EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 0,04 $27.840,00 $1.113,60 EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 0,168 $27.840,00 $4.677,12ESTRUC  01 ANDAMIO  TUBULAR  1.50  X  1.50  ALQUILER MS 0,2 $20.880,00 $4.176,00 ESTRUC  01 ANDAMIO  TUBULAR  1.50  X  1.50  ALQUILER MS 0,84 $20.880,00 $17.539,20ESTRUC  02 PARAL  METÁLICO  HASTA  3.30  M MS 1 $3.828,00 $3.828,00 ESTRUC  02 PARAL  METÁLICO  HASTA  3.30  M MS 4,2 $3.828,00 $16.077,60MO  01 MANO  DE  OBRA  AA Hc 10,29 $17.486,00 $179.930,94 MO  01 MANO  DE  OBRA  AA Hc 43,218 $17.486,00 $755.709,95

TOTAL $615.020,54 TOTAL $2.583.086,27

3.6.3  ESCALERA   E.  PRIM  03 M3 1,06 MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 17,7 $16.351,00 $289.412,70 MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 18,76 $16.351,00 $306.744,76MAD  14 PARAL  TELESCOPICO   D 2,9 $150,00 $435,00 MAD  14 PARAL  TELESCOPICO   D 3,96 $150,00 $594,00AR  01 CONCRETO  3000  PSI M3 1,1 $340.390,00 $374.429,00 AR  01 CONCRETO  3000  PSI M3 2,16 $340.390,00 $735.242,40FORM  01 FORMALETA  ENTREPISOS MS 8,69 $6.062,50 $52.683,13 FORM  01 FORMALETA  ENTREPISOS MS 9,75 $6.062,50 $59.109,38EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 0,04 $27.840,00 $1.113,60 EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 1,1 $27.840,00 $30.624,00HERR  01 PUNTILLA  CABEZA  2 LB 1,49 $2.552,00 $3.802,48 HERR  01 PUNTILLA  CABEZA  2 LB 2,55 $2.552,00 $6.507,60MAD  15 PARAL  TELESCOPICO  2 D 2,9 $309,00 $896,10 MAD  15 PARAL  TELESCOPICO  2 D 3,96 $309,00 $1.223,64MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 0,95 $7.100,00 $6.745,00 MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 2,01 $7.100,00 $14.271,00MAD  16 TABLA  BURRA  30  X  2.2  A  2.7  X  2.9 UN 3,14 $17.284,00 $54.271,76 MAD  16 TABLA  BURRA  30  X  2.2  A  2.7  X  2.9 UN 4,2 $17.284,00 $72.592,80MAD  17 TABLA  BURRA  25  X  2.2  A  2.7  X  2.9 UN 3,74 $14.345,72 $53.652,99 MAD  17 TABLA  BURRA  25  X  2.2  A  2.7  X  2.9 UN 4,8 $14.345,72 $68.859,46

TOTAL $837.441,76 TOTAL $1.295.769,03

3.7  SEXTO  PISO 3.7.1  PLACA  ALIGERADA   E.  PRIM  01 M2 162 HH  04 ACERO  FIGURADO  60000  PSI  1/4" KG 4,5 $1.833,11 $8.249,00 HH  04 ACERO  FIGURADO  60000  PSI  1/4" KG 729 $1.833,11 $1.336.337,19HH  05 ALAMBRE  NEGRO  NO.  18  (RECOCIDO) KG 0,14 $2.671,43 $374,00 HH  05 ALAMBRE  NEGRO  NO.  18  (RECOCIDO) KG 22,68 $2.671,43 $60.588,03AR  01 CONCRETO  3000  PSI M3 0,17 $340.390,00 $57.866,30 AR  01 CONCRETO  3000  PSI M3 27,54 $340.390,00 $9.374.340,60MAD  06 ESTERILLA  GUADUA  ANCHO  30  CM  X  4.00  M UN 1,43 $6.950,35 $9.939,00 MAD  06 ESTERILLA  GUADUA  ANCHO  30  CM  X  4.00  M UN 231,66 $6.950,35 $1.610.118,08FORM  01 FORMALETA  ENTREPISOS MS 0,88 $6.062,50 $5.335,00 FORM  01 FORMALETA  ENTREPISOS MS 142,56 $6.062,50 $864.270,00MAD  07 LISTON  10  X  1.8  CM  X  2.90  M  AMARILLO UN 1,33 $9.191,72 $12.224,99 MAD  07 LISTON  10  X  1.8  CM  X  2.90  M  AMARILLO UN 215,46 $9.191,72 $1.980.447,99HERR  01 PUNTILLA  CABEZA  2 LB 0,02 $2.552,00 $51,04 HERR  01 PUNTILLA  CABEZA  2 LB 3,24 $2.552,00 $8.268,48MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 0,02 $7.100,00 $142,00 MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 3,24 $7.100,00 $23.004,00MAD  04 TABLA  BURRA  30  X  2.7CM  X  2.90M-­‐ORD UN 0,02 $14.700,00 $294,00 MAD  04 TABLA  BURRA  30  X  2.7CM  X  2.90M-­‐ORD UN 3,24 $14.700,00 $47.628,00EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 0,01 $27.840,00 $278,40 EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 1,62 $27.840,00 $45.100,80MO  01 MANO  DE  OBRA  AA Hc 2,01 $17.486,00 $35.146,86 MO  01 MANO  DE  OBRA  AA Hc 325,62 $17.486,00 $5.693.791,32

TOTAL $129.900,58 TOTAL $21.043.894,49

3.7.2  COLUMNAS   E.  PRIM  02 M3 4,2 AR  01 CONCRETO  3000  PSI M3 1,1 $340.390,00 $374.429,00 AR  01 CONCRETO  3000  PSI M3 4,62 $340.390,00 $1.572.601,80HERR  01 PUNTILLA  CABEZA  2 LB 8 $2.552,00 $20.416,00 HERR  01 PUNTILLA  CABEZA  2 LB 33,6 $2.552,00 $85.747,20MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 2,5 $7.100,00 $17.750,00 MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 10,5 $7.100,00 $74.550,00MAD  04 TABLA  BURRA  30  X  2.7CM  X  2.90M-­‐ORD UN 0,91 $14.700,00 $13.377,00 MAD  04 TABLA  BURRA  30  X  2.7CM  X  2.90M-­‐ORD UN 3,822 $14.700,00 $56.183,40EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 0,04 $27.840,00 $1.113,60 EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 0,168 $27.840,00 $4.677,12ESTRUC  01 ANDAMIO  TUBULAR  1.50  X  1.50  ALQUILER MS 0,2 $20.880,00 $4.176,00 ESTRUC  01 ANDAMIO  TUBULAR  1.50  X  1.50  ALQUILER MS 0,84 $20.880,00 $17.539,20ESTRUC  02 PARAL  METÁLICO  HASTA  3.30  M MS 1 $3.828,00 $3.828,00 ESTRUC  02 PARAL  METÁLICO  HASTA  3.30  M MS 4,2 $3.828,00 $16.077,60MO  01 MANO  DE  OBRA  AA Hc 10,29 $17.486,00 $179.930,94 MO  01 MANO  DE  OBRA  AA Hc 43,218 $17.486,00 $755.709,95

TOTAL $615.020,54 TOTAL $2.583.086,27

3.7.3  ESCALERA   E.  PRIM  03 M3 1,06 MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 17,7 $16.351,00 $289.412,70 MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 18,76 $16.351,00 $306.744,76MAD  14 PARAL  TELESCOPICO   D 2,9 $150,00 $435,00 MAD  14 PARAL  TELESCOPICO   D 3,96 $150,00 $594,00AR  01 CONCRETO  3000  PSI M3 1,1 $340.390,00 $374.429,00 AR  01 CONCRETO  3000  PSI M3 2,16 $340.390,00 $735.242,40FORM  01 FORMALETA  ENTREPISOS MS 8,69 $6.062,50 $52.683,13 FORM  01 FORMALETA  ENTREPISOS MS 9,75 $6.062,50 $59.109,38EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 0,04 $27.840,00 $1.113,60 EQUIP  01 VIBRADOR  CONCRETO  GASOLINA D 1,1 $27.840,00 $30.624,00HERR  01 PUNTILLA  CABEZA  2 LB 1,49 $2.552,00 $3.802,48 HERR  01 PUNTILLA  CABEZA  2 LB 2,55 $2.552,00 $6.507,60MAD  15 PARAL  TELESCOPICO  2 D 2,9 $309,00 $896,10 MAD  15 PARAL  TELESCOPICO  2 D 3,96 $309,00 $1.223,64MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 0,95 $7.100,00 $6.745,00 MAD  05 REPISA  8  X  4  CM  X  2.90  M-­‐ORDINARIO UN 2,01 $7.100,00 $14.271,00MAD  16 TABLA  BURRA  30  X  2.2  A  2.7  X  2.9 UN 3,14 $17.284,00 $54.271,76 MAD  16 TABLA  BURRA  30  X  2.2  A  2.7  X  2.9 UN 4,2 $17.284,00 $72.592,80MAD  17 TABLA  BURRA  25  X  2.2  A  2.7  X  2.9 UN 3,74 $14.345,72 $53.652,99 MAD  17 TABLA  BURRA  25  X  2.2  A  2.7  X  2.9 UN 4,8 $14.345,72 $68.859,46

TOTAL $837.441,76 TOTAL $1.295.769,03

4.  CERRAMIENTO   4.1  PRIMER  PISO   4.1.1  MAMPOSTERIA  REFORZADA   C.  PRIM  01 M2 184,76 AR  05 LADRILLO  P-­‐V  PRENSADO  LIVIANO  6  CM UN 56 $577,00 $32.312,00 AR  05 LADRILLO  P-­‐V  PRENSADO  LIVIANO  6  CM UN 10346,56 $577,00 $5.969.965,12MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 1,25 $16.351,00 $20.438,75 MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 230,95 $16.351,00 $3.776.263,45ESTRUC  01 ANDAMIO  TUBULAR  1.50  X  1.50  ALQUILER MS 0,16 $20.880,00 $3.340,80 ESTRUC  01 ANDAMIO  TUBULAR  1.50  X  1.50  ALQUILER MS 29,5616 $20.880,00 $617.246,21MAD  13 TABLA  BURRA  15  X  2.2  A  2.7  X  2.9 UN 0,04 $6.902,00 $276,08 MAD  13 TABLA  BURRA  15  X  2.2  A  2.7  X  2.9 UN 7,3904 $6.902,00 $51.008,54AR  06 MORTERO  1:3 M3 0,03 $344.480,00 $10.334,40 AR  06 MORTERO  1:3 M3 5,5428 $344.480,00 $1.909.383,74HH  12 ACERO  FIGURADO  60000  PSI  3/8" KG 80 $2.050,00 $0,00 HH  12 ACERO  FIGURADO  60000  PSI  3/8" KG 14780,8 $2.050,00 $30.300.640,00

TOTAL $66.702,03 TOTAL   $42.624.507,06

4.1.2  VENTANERIA   C.  PRIM  02 UN 9 VENT  01 VENTANA  FIJA  1  X  1  VIDRIO  4  MM UN 1 $120.000,00 $120.000,00 VENT  01 VENTANA  FIJA  1  X  1  VIDRIO  4  MM UN 9 $120.000,00 $1.080.000,00TOTAL $120.000,00 TOTAL $1.080.000,00

4.2  SEGUNDO  PISO   4.2.1  MAMPOSTERIA  REFROZADA   C.  PRIM  01 M2 184,76 AR  05 LADRILLO  P-­‐V  PRENSADO  LIVIANO  6  CM UN 56 $577,00 $32.312,00 AR  05 LADRILLO  P-­‐V  PRENSADO  LIVIANO  6  CM UN 10346,56 $577,00 $5.969.965,12MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 1,25 $16.351,00 $20.438,75 MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 230,95 $16.351,00 $3.776.263,45ESTRUC  01 ANDAMIO  TUBULAR  1.50  X  1.50  ALQUILER MS 0,16 $20.880,00 $3.340,80 ESTRUC  01 ANDAMIO  TUBULAR  1.50  X  1.50  ALQUILER MS 29,5616 $20.880,00 $617.246,21MAD  13 TABLA  BURRA  15  X  2.2  A  2.7  X  2.9 UN 0,04 $6.902,00 $276,08 MAD  13 TABLA  BURRA  15  X  2.2  A  2.7  X  2.9 UN 7,3904 $6.902,00 $51.008,54AR  06 MORTERO  1:3 M3 0,03 $344.480,00 $10.334,40 AR  06 MORTERO  1:3 M3 5,5428 $344.480,00 $1.909.383,74HH  12 ACERO  FIGURADO  60000  PSI  3/8" KG 80 $2.050,00 $0,00 HH  12 ACERO  FIGURADO  60000  PSI  3/8" KG 14780,8 $2.050,00 $30.300.640,00

TOTAL $66.702,03 TOTAL   $42.624.507,06

4.2.2  VENTANERIA   C.  PRIM  02 UN 9 VENT  01 VENTANA  FIJA  1  X  1  VIDRIO  4  MM UN 1 $120.000,00 $120.000,00 VENT  01 VENTANA  FIJA  1  X  1  VIDRIO  4  MM UN 9 $120.000,00 $1.080.000,00TOTAL $120.000,00 TOTAL $1.080.000,00

4.3  TERCER  PISO   4.3.1  MAMPOSTERIA  REFORZADA   C.  PRIM  01 M2 184,76 AR  05 LADRILLO  P-­‐V  PRENSADO  LIVIANO  6  CM UN 56 $577,00 $32.312,00 AR  05 LADRILLO  P-­‐V  PRENSADO  LIVIANO  6  CM UN 10346,56 $577,00 $5.969.965,12MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 1,25 $16.351,00 $20.438,75 MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 230,95 $16.351,00 $3.776.263,45ESTRUC  01 ANDAMIO  TUBULAR  1.50  X  1.50  ALQUILER MS 0,16 $20.880,00 $3.340,80 ESTRUC  01 ANDAMIO  TUBULAR  1.50  X  1.50  ALQUILER MS 29,5616 $20.880,00 $617.246,21MAD  13 TABLA  BURRA  15  X  2.2  A  2.7  X  2.9 UN 0,04 $6.902,00 $276,08 MAD  13 TABLA  BURRA  15  X  2.2  A  2.7  X  2.9 UN 7,3904 $6.902,00 $51.008,54AR  06 MORTERO  1:3 M3 0,03 $344.480,00 $10.334,40 AR  06 MORTERO  1:3 M3 5,5428 $344.480,00 $1.909.383,74HH  12 ACERO  FIGURADO  60000  PSI  3/8" KG 80 $2.050,00 $0,00 HH  12 ACERO  FIGURADO  60000  PSI  3/8" KG 14780,8 $2.050,00 $30.300.640,00

TOTAL $66.702,03 TOTAL   $42.624.507,06

4.3.2  VENTANERIA   C.  PRIM  02 UN 9 VENT  01 VENTANA  FIJA  1  X  1  VIDRIO  4  MM UN 1 $120.000,00 $120.000,00 VENT  01 VENTANA  FIJA  1  X  1  VIDRIO  4  MM UN 9 $120.000,00 $1.080.000,00TOTAL $120.000,00 TOTAL $1.080.000,00

4.4  CUARTO  PISO   4.4.1  MAMPOSTERIA  REFORZADA   C.  PRIM  01 M2 184,76 AR  05 LADRILLO  P-­‐V  PRENSADO  LIVIANO  6  CM UN 56 $577,00 $32.312,00 AR  05 LADRILLO  P-­‐V  PRENSADO  LIVIANO  6  CM UN 10346,56 $577,00 $5.969.965,12MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 1,25 $16.351,00 $20.438,75 MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 230,95 $16.351,00 $3.776.263,45ESTRUC  01 ANDAMIO  TUBULAR  1.50  X  1.50  ALQUILER MS 0,16 $20.880,00 $3.340,80 ESTRUC  01 ANDAMIO  TUBULAR  1.50  X  1.50  ALQUILER MS 29,5616 $20.880,00 $617.246,21MAD  13 TABLA  BURRA  15  X  2.2  A  2.7  X  2.9 UN 0,04 $6.902,00 $276,08 MAD  13 TABLA  BURRA  15  X  2.2  A  2.7  X  2.9 UN 7,3904 $6.902,00 $51.008,54AR  06 MORTERO  1:3 M3 0,03 $344.480,00 $10.334,40 AR  06 MORTERO  1:3 M3 5,5428 $344.480,00 $1.909.383,74HH  12 ACERO  FIGURADO  60000  PSI  3/8" KG 80 $2.050,00 $0,00 HH  12 ACERO  FIGURADO  60000  PSI  3/8" KG 14780,8 $2.050,00 $30.300.640,00

TOTAL $66.702,03 TOTAL   $42.624.507,06

4.4.2  VENTANERIA   C.  PRIM  02 UN 9 VENT  01 VENTANA  FIJA  1  X  1  VIDRIO  4  MM UN 1 $120.000,00 $120.000,00 VENT  01 VENTANA  FIJA  1  X  1  VIDRIO  4  MM UN 9 $120.000,00 $1.080.000,00TOTAL $120.000,00 TOTAL $1.080.000,00

4.5  QUINTO  PISO   4.5.1  MAMPOSTERIA  REFORZADA   C.  PRIM  01 M2 184,76 AR  05 LADRILLO  P-­‐V  PRENSADO  LIVIANO  6  CM UN 56 $577,00 $32.312,00 AR  05 LADRILLO  P-­‐V  PRENSADO  LIVIANO  6  CM UN 10346,56 $577,00 $5.969.965,12MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 1,25 $16.351,00 $20.438,75 MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 230,95 $16.351,00 $3.776.263,45ESTRUC  01 ANDAMIO  TUBULAR  1.50  X  1.50  ALQUILER MS 0,16 $20.880,00 $3.340,80 ESTRUC  01 ANDAMIO  TUBULAR  1.50  X  1.50  ALQUILER MS 29,5616 $20.880,00 $617.246,21MAD  13 TABLA  BURRA  15  X  2.2  A  2.7  X  2.9 UN 0,04 $6.902,00 $276,08 MAD  13 TABLA  BURRA  15  X  2.2  A  2.7  X  2.9 UN 7,3904 $6.902,00 $51.008,54AR  06 MORTERO  1:3 M3 0,03 $344.480,00 $10.334,40 AR  06 MORTERO  1:3 M3 5,5428 $344.480,00 $1.909.383,74HH  12 ACERO  FIGURADO  60000  PSI  3/8" KG 80 $2.050,00 $0,00 HH  12 ACERO  FIGURADO  60000  PSI  3/8" KG 14780,8 $2.050,00 $30.300.640,00

TOTAL $66.702,03 TOTAL   $42.624.507,06

4.5.2  VENTANERIA   C.  PRIM  02 UN 9 VENT  01 VENTANA  FIJA  1  X  1  VIDRIO  4  MM UN 1 $120.000,00 $120.000,00 VENT  01 VENTANA  FIJA  1  X  1  VIDRIO  4  MM UN 9 $120.000,00 $1.080.000,00TOTAL $120.000,00 TOTAL $1.080.000,00

4.6  SEXTO  PISO   4.6.1  MAMPOSTERIA  REFORZADA   C.  PRIM  01 M2 184,76 AR  05 LADRILLO  P-­‐V  PRENSADO  LIVIANO  6  CM UN 56 $577,00 $32.312,00 AR  05 LADRILLO  P-­‐V  PRENSADO  LIVIANO  6  CM UN 10346,56 $577,00 $5.969.965,12MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 1,25 $16.351,00 $20.438,75 MO  03 MANO  DE  OBRA  AA  -­‐  ALBAÑILERIA Hc 230,95 $16.351,00 $3.776.263,45ESTRUC  01 ANDAMIO  TUBULAR  1.50  X  1.50  ALQUILER MS 0,16 $20.880,00 $3.340,80 ESTRUC  01 ANDAMIO  TUBULAR  1.50  X  1.50  ALQUILER MS 29,5616 $20.880,00 $617.246,21MAD  13 TABLA  BURRA  15  X  2.2  A  2.7  X  2.9 UN 0,04 $6.902,00 $276,08 MAD  13 TABLA  BURRA  15  X  2.2  A  2.7  X  2.9 UN 7,3904 $6.902,00 $51.008,54AR  06 MORTERO  1:3 M3 0,03 $344.480,00 $10.334,40 AR  06 MORTERO  1:3 M3 5,5428 $344.480,00 $1.909.383,74HH  12 ACERO  FIGURADO  60000  PSI  3/8" KG 80 $2.050,00 $0,00 HH  12 ACERO  FIGURADO  60000  PSI  3/8" KG 14780,8 $2.050,00 $30.300.640,00

TOTAL $66.702,03 TOTAL   $42.624.507,06

4.6.2  VENTANERIA   C.  PRIM  02 UN 9 VENT  01 VENTANA  FIJA  1  X  1  VIDRIO  4  MM UN 1 $120.000,00 $120.000,00 VENT  01 VENTANA  FIJA  1  X  1  VIDRIO  4  MM UN 9 $120.000,00 $1.080.000,00TOTAL $120.000,00 TOTAL $1.080.000,00

5.  ACABADOS   5.1  PRIMER  PISO 5.1.1  PAÑETE  Y  PINTURA   A.  PIM  01   M2 184,76 PINTU  01 ESTUCO  Y  VINILOS  3  MANOS M2 1 $13.597,68 $13.597,68 PINTU  01 ESTUCO  Y  VINILOS  3  MANOS M2 185,76 $13.597,68 $2.525.905,04AR  07 PAÑETE  LISO  MUROS  1:4 M2 1 $3.266,08 $3.266,08 AR  07 PAÑETE  LISO  MUROS  1:4 M2 185,76 $3.266,08 $606.707,02

TOTAL $16.863,76 TOTAL   $3.132.612,06

5.1.2  PISO  MADERA   A.  PRIM  02 M2 162 MO  06 MANO  DE  OBRA  -­‐  PULIDA  /  LACADA M2 1 $40.600,00 $40.600,00 MO  06 MANO  DE  OBRA  -­‐  PULIDA  /  LACADA M2 163 $40.600,00 $6.617.800,00LACAS  01 BARNIZ  VIRTIFLEX  A  BASE  DE  AGUA GAL 0,1 $193.900,00 $19.390,00 LACAS  01 BARNIZ  VIRTIFLEX  A  BASE  DE  AGUA GAL 162,1 $193.900,00 $31.431.190,00

TOTAL $59.990,00 TOTAL   $38.048.990,00

5.2  SEGUNDO  PISO   5.2.1  PAÑETE  Y  PINTURA A.  PIM  01   M2 184,76 PINTU  01 ESTUCO  Y  VINILOS  3  MANOS M2 1 $13.597,68 $13.597,68 PINTU  01 ESTUCO  Y  VINILOS  3  MANOS M2 185,76 $13.597,68 $2.525.905,04AR  07 PAÑETE  LISO  MUROS  1:4 M2 1 $3.266,08 $3.266,08 AR  07 PAÑETE  LISO  MUROS  1:4 M2 185,76 $3.266,08 $606.707,02

TOTAL $16.863,76 TOTAL   $3.132.612,06

5.2.2  PISO  MADERA   A.  PRIM  02 M2 162 MO  06 MANO  DE  OBRA  -­‐  PULIDA  /  LACADA M2 1 $40.600,00 $40.600,00 MO  06 MANO  DE  OBRA  -­‐  PULIDA  /  LACADA M2 163 $40.600,00 $6.617.800,00LACAS  01 BARNIZ  VIRTIFLEX  A  BASE  DE  AGUA GAL 0,1 $193.900,00 $19.390,00 LACAS  01 BARNIZ  VIRTIFLEX  A  BASE  DE  AGUA GAL 162,1 $193.900,00 $31.431.190,00

TOTAL $59.990,00 TOTAL   $38.048.990,00

5.3  TERCER  PISO   5.3.1  PAÑETE  Y  PINTURA   A.  PIM  01   M2 184,76 PINTU  01 ESTUCO  Y  VINILOS  3  MANOS M2 1 $13.597,68 $13.597,68 PINTU  01 ESTUCO  Y  VINILOS  3  MANOS M2 185,76 $13.597,68 $2.525.905,04AR  07 PAÑETE  LISO  MUROS  1:4 M2 1 $3.266,08 $3.266,08 AR  07 PAÑETE  LISO  MUROS  1:4 M2 185,76 $3.266,08 $606.707,02

TOTAL $16.863,76 TOTAL   $3.132.612,06

5.3.2  PISO  MADERA   A.  PRIM  02 M2 162 MO  06 MANO  DE  OBRA  -­‐  PULIDA  /  LACADA M2 1 $40.600,00 $40.600,00 MO  06 MANO  DE  OBRA  -­‐  PULIDA  /  LACADA M2 163 $40.600,00 $6.617.800,00LACAS  01 BARNIZ  VIRTIFLEX  A  BASE  DE  AGUA GAL 0,1 $193.900,00 $19.390,00 LACAS  01 BARNIZ  VIRTIFLEX  A  BASE  DE  AGUA GAL 162,1 $193.900,00 $31.431.190,00

TOTAL $59.990,00 TOTAL   $38.048.990,00

5.4  CUARTO  PISO   5.4.1  PAÑETE  Y  PINTURA A.  PIM  01   M2 184,76 PINTU  01 ESTUCO  Y  VINILOS  3  MANOS M2 1 $13.597,68 $13.597,68 PINTU  01 ESTUCO  Y  VINILOS  3  MANOS M2 185,76 $13.597,68 $2.525.905,04AR  07 PAÑETE  LISO  MUROS  1:4 M2 1 $3.266,08 $3.266,08 AR  07 PAÑETE  LISO  MUROS  1:4 M2 185,76 $3.266,08 $606.707,02

TOTAL $16.863,76 TOTAL   $3.132.612,06

5.4.2  PISO  MADERA   A.  PRIM  02 M2 162 MO  06 MANO  DE  OBRA  -­‐  PULIDA  /  LACADA M2 1 $40.600,00 $40.600,00 MO  06 MANO  DE  OBRA  -­‐  PULIDA  /  LACADA M2 163 $40.600,00 $6.617.800,00LACAS  01 BARNIZ  VIRTIFLEX  A  BASE  DE  AGUA GAL 0,1 $193.900,00 $19.390,00 LACAS  01 BARNIZ  VIRTIFLEX  A  BASE  DE  AGUA GAL 162,1 $193.900,00 $31.431.190,00

TOTAL $59.990,00 TOTAL   $38.048.990,00

5.5  QUINTO  PISO   5.5.1  PAÑETE  Y  PINTURA   A.  PIM  01   M2 184,76 PINTU  01 ESTUCO  Y  VINILOS  3  MANOS M2 1 $13.597,68 $13.597,68 PINTU  01 ESTUCO  Y  VINILOS  3  MANOS M2 185,76 $13.597,68 $2.525.905,04AR  07 PAÑETE  LISO  MUROS  1:4 M2 1 $3.266,08 $3.266,08 AR  07 PAÑETE  LISO  MUROS  1:4 M2 185,76 $3.266,08 $606.707,02

TOTAL $16.863,76 TOTAL   $3.132.612,06

5.5.2  PISO  MADERA   A.  PRIM  02 M2 162 MO  06 MANO  DE  OBRA  -­‐  PULIDA  /  LACADA M2 1 $40.600,00 $40.600,00 MO  06 MANO  DE  OBRA  -­‐  PULIDA  /  LACADA M2 163 $40.600,00 $6.617.800,00LACAS  01 BARNIZ  VIRTIFLEX  A  BASE  DE  AGUA GAL 0,1 $193.900,00 $19.390,00 LACAS  01 BARNIZ  VIRTIFLEX  A  BASE  DE  AGUA GAL 162,1 $193.900,00 $31.431.190,00

TOTAL $59.990,00 TOTAL   $38.048.990,00

5.6  SEXTO  PISO   5.6.1  PAÑETE  Y  PINTURA   A.  PIM  01   M2 184,76 PINTU  01 ESTUCO  Y  VINILOS  3  MANOS M2 1 $13.597,68 $13.597,68 PINTU  01 ESTUCO  Y  VINILOS  3  MANOS M2 185,76 $13.597,68 $2.525.905,04AR  07 PAÑETE  LISO  MUROS  1:4 M2 1 $3.266,08 $3.266,08 AR  07 PAÑETE  LISO  MUROS  1:4 M2 185,76 $3.266,08 $606.707,02

TOTAL $16.863,76 TOTAL   $3.132.612,06

5.6.2  PISO  MADERA   A.  PRIM  02 M2 162 MO  06 MANO  DE  OBRA  -­‐  PULIDA  /  LACADA M2 1 $40.600,00 $40.600,00 MO  06 MANO  DE  OBRA  -­‐  PULIDA  /  LACADA M2 163 $40.600,00 $6.617.800,00LACAS  01 BARNIZ  VIRTIFLEX  A  BASE  DE  AGUA GAL 0,1 $193.900,00 $19.390,00 LACAS  01 BARNIZ  VIRTIFLEX  A  BASE  DE  AGUA GAL 162,1 $193.900,00 $31.431.190,00

TOTAL $59.990,00 TOTAL   $38.048.990,00

6.  INSTALACIONES   6.1  DUCTO   6.1.1  DUCTO  VERTICAL   I.  DUC  01   ML   17,3 HERR  10 ANCLAJE  AUTOPERFORANTE  1/2 UN   4 $6.000,00 $24.000,00 HERR  10 ANCLAJE  AUTOPERFORANTE  1/2 UN   69,2 $6.000,00 $415.200,00DUC  01 DUCTOS  METALICO   UN   1,2 $33.640,00 $40.368,00 DUC  01 DUCTOS  METALICO   UN   20,76 $33.640,00 $698.366,40ESTRUC  04 SOPORTE  PARA  BANDEJA  PORTA  CABLES UN 0,6 $20.450,00 $12.270,00 ESTRUC  04 SOPORTE  PARA  BANDEJA  PORTA  CABLES UN 10,38 $20.450,00 $212.271,00EQUIP  05 TALADRO  3/4  PERCUTOR D 0,07 $17.000,00 $1.190,00 EQUIP  05 TALADRO  3/4  PERCUTOR D 1,211 $17.000,00 $20.587,00MO  07 CUADRILLA  INSTALACIONES  INTERNAS Hc 0,56 $17.986,00 $10.072,16 MO  07 CUADRILLA  INSTALACIONES  INTERNAS Hc 9,688 $17.986,00 $174.248,37

TOTAL $87.900,16 TOTAL   $1.520.672,77