4- plumbing mep - water-rev
TRANSCRIPT
1
DOMESTIC WATER SUPPLY
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
2
DEFINITION OF WATER SUPPLY
Water supply system means the water service pipe, the water distributing pipes, and the and the necessary connecting pipes, fittings, control valves and all appurtenances within the building or it may be outside the building, within the property boundary.
Water service pipe :-
"Water service pipe" means the pipe from the water main or other source of water supply to the water distributing system of the building served.
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
3
USAGE OF WATER
DOMESTIC :- The average daily domestic requirement of water like bathing, cooling, washing and toilet flushing for different type of building.
AIR CONDITIONING AND VENTILATION SYSTEM :- Large quantities of water are required for building equipped with evaporative cooled air conditioning/ refrigeration. In both cases the heat absorbed in the cooling equipment is exchanged with atmospheric air by spraying water on cooling tower.
SPECIAL REQUIREMENTS :- Water is required in buildings having laboratories, laundries, kitchens or other processes requiring water.
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
4
USAGE OF WATER
SWIMMING POOLS :- Large quantity water is required for ornamental pools, fountains, cascades for human comfort.
FIRE FIGHTING :-A small percentage of the gross storage of water is lost for fire fighting system provided in building for human safety.
GARDENING :- Building with gardens, internal landscape areas, plotted plants, and open courtyards require water for horticultural operations.
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
5
SOURCES OF WATER SUPPLY
• CITY SUPPLY.
• WELLS 1. TUBEWELLS
2. BOREWELLS 3. DUGWELLS
• OPENSTREAMS/REVERS/SPRINGS
• RAIN WATER HARVESTING
• RECYCLED WATER
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
6
WATER STORAGE
SHED
PUMP
DELIVERY
SUCTION
MAINHOLE
OVERFLOW
UNDERGROUND WATER TANK
UNDERGROUND STORAGE
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
7
WATER STORAGE
OVERHEAD STORAGE
OVERFLOW
OVERHEAD TANK
WATER SUPPLY PIPE
WATER DISTRIBUTION PIPE
OVERHEAD TANK
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
8
HOT WATER SYSTEM
INTRODUCTION :Hot water is needed for bathing and washing in domestic use. Higher temperature melt the sticky oil and grease from the human body, pot and pans, making the clean-up easy. Bathing with hot water opens the body pores, washing dirt and sweat easily and giving a sense of freshness. In other region at cold places hot water is necessary for daily life.
HOT WATER REQUIREMENT :Hot water is used in kitchens and bathrooms in residential areas. It is also required for laundries and industrial kitchens and in building like hotels, hospitals, schools, hostels, industrial canteens etc.
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
9
HOT WATER STORAGEAn ISO 9001:2000 Certified Organization
www.ramtech-corp.com
10
TYPES OF ELECTRICAL WATER HEATER
FLOOR MOUNTED ELECTRICAL WATER HEATER
FLOOR MOUNTED ELECTRIC WATER HEATER
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
11
TYPES OF ELECTRICAL WATER HEATER
WALL MOUNTED ELECTRICAL WATER HEATER
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
12
TYPES OF ELECTRICAL WATER HEATER
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
13
TYPES OF WATER HEATER
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
14
TYPES OF ELECTRICAL WATER HEATER
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
15
CWS – COLD WATER SUPPLY
HWS – HOT WATER SUPPLY
IV – ISOLATING VALVE
SV – SOLENOID VALVE
AMR – AUTOMETIC WATER METER
ABBREVEATIONS & SYMBOLSAn ISO 9001:2000 Certified Organization
www.ramtech-corp.com
16
EWH – ELECTRICAL WATER HEATER
HB – HOSS BIB
COP – CAP ON END OF PIPE
WHA – WATER HAMMER ARRESTER
STR – STRAINER
ABBREVEATIONS & SYMBOLS An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
17
ABBREVEATION & SYMBOLS
AN – PIPE ANCHOR
PG – PIPE GUIDE
EJ – EXPANSION JOINT
FC – FLEXIBLE CONNECTOR
AAV – AUTOMATIC AIR VENT
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
18
ABBREVEATION & SYMBOLS
BRANCH SIDE CONNECTION
BRANCH BOTTOM CONNECTION
BRANCH TOP CONNECTION
RISER OR DROP
RISER DOWN RISER UP
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
19
ABBREVEATIONS An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
20
ABBREVEATION, PURPOSE & STANDARD PIPE CONNECTION
• WC :- WATER CLOSET
The purpose of a WC is to carry out the soil waste to the stack. It is made up of ceramic material with an in-built trap with water seal which prevents the foul smell entering into the toilet. WC shall be provided with flush valve/cistern, seat and cover, connector. Only cold water is provided to WC with diameter 20mm to flush tank and 16mm for ablution hose and the standard height of WC is 370mm from the finish floor level.
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
21
FLUSH TANK DETAILS An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
22
TYPES OF FLUSH TANK & STANDARD DIMENSION
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
23
• WB :- WASH BASIN(LAVATORY) It is called as “Wash basin”. The purpose of a WHB is to carry out the waste water to the stack. It is also made up of ceramic material. WB shall be provided drain with a trap, over flow passage, with or with out pop up waste coupling and hot and cold mixer. As per the standard both cold & and hot water pipe sizes are 16mm supply. The bottom of pipe of WB is 600mm from finished floor level.
ABBREVEATION, PURPOSE & STANDARD PIPE CONNECTION
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
24
• UR :- URINAL
The purpose of urinal is for urination, which is associated with men. It is provided with waste coupling with dome type grating, trap with extension pipe, push on/off lever. It is made up of ceramic material and only cold water supply is provided to the UR. The standard pipe connection to the UR is 20mm & the bottom of pipe to the UR is 1050mm from finished floor level.
ABBREVEATION, PURPOSE & STANDARD PIPE CONNECTION
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
25
TYPES OF URINAL & WATER SUPPLYDISTRIBUSION
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
26
TYPES OF URINAL & WATER SUPPLYDISTRIBUSION
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
27
• BT :- BATH TUB
The purpose of BT is to carry out the bath water to the stack. BT shall be provided with an in built over flow, drain with a trap, hot and cold mixer, overhead shower and hand shower. Diameter 16mm cold water and hot water supply to the mixture and the bottom of pipe connected to the bath tub is elevated 550mm from finished floor level.
ABBREVEATION, PURPOSE & STANDARD PIPE CONNECTION
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
28
SOME TYPES OF BATH TUB WITH ITS STANDARD DIMENSION
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
29
SOME TYPES OF BATH TUB WITH ITS STANDARD DIMENSION
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
30
• BDT :- BIDET The purpose of bidet is for the external cleaning of body associated with women. A bidet shall be provided with a water spray, designed for external cleaning that directs the jet of water upward to the body. Both hot water and cold water pipes are connected to bidet. 16mm diameter pipes are connected to bidet having bottom of level 400mm from
finished floor level.
ABBREVEATION, PURPOSE & STANDARD PIPE CONNECTION
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
31
BIDET WITH WATER CONNECTION An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
32
• SH :- SHOWER
The purpose of the Shower is to carry out the bath water to the stack. Shower shall be provided with overhead shower, jets, hot and cold mixer, drain with trap, glass or synthetic enclosure to prevent water spillage to the dry area of the room. The standard sizes of hot water and cold water is 16mm & 16mm respectfully. Bottom of pipe connected to shower is 1000mm from finished floor level.
ABBREVEATION, PURPOSE & STANDARD PIPE CONNECTION
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
33
• KS :- KITCHEN SINK
The purpose of kitchen sink is to carry out the domestic food waste generated to stack. Sink shall be provided with hot and cold mixer, drain with trap and overflow passage. The pipes size provided to kitchen sink is 16mm respectfully & the bottom of pipes are 600mm from finished floor level.
ABBREVEATION, PURPOSE & STANDARD PIPE CONNECTION
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
34
FLOW CHART FOR PREPARATION OF SHOP DRAWING OF WATER SUPPLY
WATER TENDER DRAWING(CONSULTANT DOCUMENT)
REMOVE UNWANTED ARCHITECTURAL DATA
AND PREPARE IT
INSERT ARCHITECHTURAL
DRAWING APPROVED BY CONSULTANT
PREPARE THE SHOP DRAWING BY FOLLOWING
THE STANDARDS GIVEN BY
CONSULATANT
FIXTURES(WC, WB, BT,KS ETC),EWH, WHA AND OTHER SCHEDULE APPROVED BY CONSULTANT
CHECK THE DRAWING AS PER CHECK LIST & TAKE CHECK PRINT
AFTER CHECKING EDIT THE MISTAKESON THE DRAWING
OUT PUT DRAWING
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
35
STEPS FOLLOWED BY DRAUGHTS MAN
TO PREPARE A SHOP DRAWING
INPUT ARCHITECTURAL FILE OUTPUT ARCHITECTURAL FILE
1.Client is provided the architectural drawing for all floors or areas. It contains all information like room patrons, plumbing fixtures, walls, columns, beams etc., So create one arch. drawing for reference purpose.• Delete unwanted text and dimensions• Change text height as per shop drawing scale• Change grid bubbles as per shop drawing scale• Change all entities into AutoCAD colour 8 For example see below snap shots Input and Out put drawings.
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
36
2. AS PER CONSULTANT REQUREMENT, FOLLOWS THE CAD STANDARD MEANS (LINE WEIGHT, LINE TYPE, LINE COLOUR, TEXT HEIGHT ETC.)
3. PIPE LINE MORE THAN DIA 65 MM IS CONSIDERED AS A DOUBLE LINE DRAFTING & LESS THAN DIA 65 MM AS A SINGLE LINE DRAFTING. SEE THE BELOW DWG.
NOTE:-
OUTPUT SHOP DRAWING
STEPS FOLLOWED BY DRAUGHTS MAN
TO PREPARE A SHOP DRAWING
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
37
4. SUITABLE WATER FITTING BLOCKS SHOULD BE PLACED IN DOUBLE LINE PIPE WORK.
(SOME STANDARD WATER FITTINGS BLOCKS ARE AS SHOWN BELOW.)
STEPS FOLLOWED BY DRAUGHTS MAN
TO PREPARE A SHOP DRAWING
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
38
WATER FITTING BLOCKS & BLOCKS USE AT SHOP DRAWING.
STEPS FOLLOWED BY DRAUGHTS MAN
TO PREPARE A SHOP DRAWING
OUTPUT SHOP DRAWINGSTANDARD BLOCKS
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
39
5. LINE DIAGRAM TEE & ELBOW MUST BE PLACED AT EVERY SINGLE LINE PIPE JUNCTION AND WHEREVER PIPE BENDS, FILLET ACCORDING TO STANDARD RADIUS.
STEPS FOLLOWED BY DRAUGHTS MAN
TO PREPARE A SHOP DRAWING
OUTPUT SHOP DRAWING
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
40
6. ALWAYS CONSIDERED ON DRAWING THAT HOT WATER MUST BE PLACED AT LEFT AND COLD WATER AT THE RIGHT POSITION OF THE USER FACING TOWARDS THE FIXTURES.
STEPS FOLLOWED BY DRAUGHTS MAN
TO PREPARE A SHOP DRAWING
OUTPUT SHOP DRAWING
OUTPUT SHOP DRAWING
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
41
7. GIVE PIPE SIZE & BOTTOM OF PIPE (BOP) ANNOTATION TO EVERY PIPES.
INPUT DRAWING
STEPS FOLLOWED BY DRAUGHTS MAN
TO PREPARE A SHOP DRAWING
OUTPUT SHOP DRAWING
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
42
8. MENTIONED THE FLOW DIRECTION (ARROW) OF WATER THROUGH PIPE TO ALL THE PIPE LINE THAT IS HOT WATER AND COLD WATER PIPES.
•MEANS FOR COLD WATER ITS FROM RISER TO THE TILL END OF EVERY CONNECTIONS.
•FOR HOT WATER IT MAY BE FROM ELECTRICAL WATER HEATER OR FROM RISER TO THE TILL END OF EVERY CONNECTIONS.
INPUT DRAWING
STEPS FOLLOWED BY DRAUGHTS MAN
TO PREPARE A SHOP DRAWING
OUTPUT SHOP DRAWING
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
43
9. ALL HIGH LEVEL PIPES ARE DROPPED IN WALL TO LOW LEVEL.
STEPS FOLLOWED BY DRAUGHTS MAN
TO PREPARE A SHOP DRAWING
INPUT DRAWING OUTPUT DRAWING
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
44
10. ANGLE VALVE MUST BE PLACED AT WALL WHEN WATER PIPES SUPPLIES FOR FIXTURE AT LOW LEVEL.
STEPS FOLLOWED BY DRAUGHTS MAN
TO PREPARE A SHOP DRAWING
INPUT DRAWING OUTPUT DRAWING
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
45
11. SUPPORTS AND HANGERS ARE PLACE AS PER CONSULTANT RECOMMENDATION.
STEPS FOLLOWED BY DRAUGHTS MAN
TO PREPARE A SHOP DRAWING
HANGERS PLACE ON HIGH LEVEL PIPE
PLAN
ELEVATION
SECTIONAL ELEVATION OF HANGER
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
46
PIPE FIXING CLIP
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
47
12. DIMENSIONED(AS PER STANDARD) BOTH DOUBLE LINE AND SINGLE LINE PIPE WORK FROM THE NEAREST WALL OR FROM GRID LINE.
STEPS FOLLOWED BY DRAUGHTS MAN
TO PREPARE A SHOP DRAWING
INPUT DRAWING OUTPUT DRAWING
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
48
13. PREPARE THE SECTION DRAWING AT TYPICAL TOILET AREAS AND COMPLICATED PIPE LINE AREAS.
STEPS FOLLOWED BY DRAUGHTS MAN
TO PREPARE A SHOP DRAWING
SECTIONAL ELEVATION OF TOILET
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
49
14. PREPARE THE ISOMETRIC LINE DIAGRAM OF EVERY INDIVIDUAL APPARTMENT.
STEPS FOLLOWED BY DRAUGHTS MAN
TO PREPARE A SHOP DRAWING
REFERENCE OUTPUT SHOP DRAWING
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
50
14. PREPARE THE ISOMETRIC LINE DIAGRAM OF EVERY INDIVIDUAL APPARTMENT.
STEPS FOLLOWED BY DRAUGHTS MAN
TO PREPARE A SHOP DRAWING
PREPARED ISOMETRIC VIEW
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
51
15. ATTACH THE ABOVE FLOOR STRUCTURAL XREF FILE OF THAT PARTICULAR FLOOR AND CHECK WHETHER THE PIPE LINES HITTING TO THE BEAM, CONSIDERING THE BEAM SCHEDULE FILE GIVEN BY CONSULTANT.
STEPS FOLLOWED BY DRAUGHTS MAN
TO PREPARE A SHOP DRAWING
SHOP DRAWING
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
52
STEPS FOLLOWED BY DRAUGHTS MAN
TO PREPARE A SHOP DRAWING
ABOVE FLOOR STRUCTURAL FILE
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
53
STEPS FOLLOWED BY DRAUGHTS MAN
TO PREPARE A SHOP DRAWING
AFTER ATTACHED STRUCTER FILE
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
54
STEPS FOLLOWED BY DRAUGHTS MAN
TO PREPARE A SHOP DRAWING
BEAMS SCHEDULE FILE
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
55
16. CO-ORDINATE WITH OTHER SERVICES WHETHER THE PIPES STRIKE TO OTHER SERVICES.
STEPS FOLLOWED BY DRAUGHTS MAN
TO PREPARE A SHOP DRAWING
7.TH
DFCU
OUTPUT CSD DRAWING
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
56
17. IF ANY FIND, CONSIDERING THE ABOVE TWO POINT THAN, POSIBLE REMAIDEIS MUST BE TAKEN BY THE OPPERATOR.
•EITHER POSSIBLE DISPLACEMENT OF PIPE.
•CHANGING THE BOTTOM OF PIPE HITTING TO THE OTHER SERVICES.
•18. IN CASE OF DOUBT OR DISCREPENCY RAISE QUERY.
19. CHECK PRESENTATION OF VIEWPORTS.
STEPS FOLLOWED BY DRAUGHTS MAN
TO PREPARE A SHOP DRAWING
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
57
STEPS FOLLOWED BY DRAUGHTS MAN
TO PREPARE A SHOP DRAWING
VIEWPORTS SETTING
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
58
STEPS FOLLOWED BY DRAUGHTS MAN
TO PREPARE A SHOP DRAWING
20. UPDATE THE TITLE BLOCK AND LOGO AS PER APPROVED CONSULTANT.
• UPDATE THE NOTES AS FOR CONSULTANT REQUIRMENTS.• PLACE EVERY LEGENDS AND ABBREVIATIONS USED ON
THAT PERTICULAR DRAWINGS ON TITLE BLOCK.• MENTION ALL REFERENCE DRAWINGS NUMBER AND NAMES
IN TITLE BLOCK.• PREPARE A SMALL KEY PLAN OF ARCITECTURAL DRAWING
AND HILIGHT THE AREA SHOWN ON VIEW PORT OF THE SHEET.• PLACE IF ANY CLIENT, PROJECT, CONSULTANT, PROJECT
MANAGEMENT, CONTRACTOR, SUB CONTRACTORS LOGO ON TITLIE BLOCK.
• AT LAST UPDATE THE TITLE BLOCK MENTION DRAWING TITLE, DATE, CHECKED BY, DRAWN BY,SCALE ACCORDING TO CONSULTANT REQUIREMENT ETC.
21. FILL THE CHECKLIST AND TAKE CHECK PRINT.
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
59
MEP CHECKLIST (ANNESURE-11c)
MEP (Plumbing) -Checklist (Annexure-11c)Project:Title:Drawing Number: Revision:
1. Check level 2. Check level 3. Check level
A Compliance to the Specifications1 Actual version of the Domestic water and Drainage drawing
2 Specific requirements, rules regarding the detailing
B Title Block1 Title / Dwg. No. / Rev. Index. / Scale
2 Complete revision block incl. corresponding dates, indications etc.
3 Keyplan with indication of the relevant part
4 General notes
5 Drawn by, checked by, appr. by, corresponding dates
C Depiction (Representation)1 Text Heights
2 Headings and scales written
3 standard Layers and Linetypes
4 Checked section names
5 General presentation and orientation correct
D Detailing1 Assigned the BOP
2 Setting out Dimensions
3 Representation of pipe fittings
4 Prepared sections at Critical areas
5 Add standard Details
6 Checked Pipe foulings with other services
7 Checked Pipe foulings with structure
8 Pipe sizes are shown as per schematic drawing
9 Prepared Isometric views for Domestic water
10 Add valves if necessary
11 Riser Sizes are shown
12 check representaion of view ports
Comments………………………………………………………………………………………………………
…………………………………………………………………………………………………………………..
…………………………………………………………………………………………………………………..
Checked in the 1. Level - Name: Sign: Date:
Checked in the 2. Level - Name: Sign: Date:
Checked in the 3. Level - Name: Sign: Date:
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
60
PREPARING A SECTIONAL
VIEW
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
61
• PREPARE THE PLAN (SHOP DRAWING) AS PER ABOVE MENTION POINTS.
• DRAW THE CUTTING PLANE LINE ON TYPICAL TOILET AREA OR LOCATING COMPLICATED PIPE AREA.
• THE DRAUGHFTS MAN SHOULD THOUGHT THAT HE STANDING FACING TOWARDS THE ARROW MARK OF CUTTING PLANE LINE.
• BEHIND THE CUTTING PLANE LINE NEED NOT TO BE CONSIDER ON SECTIONAL VIEW.
• CONSIDER UP TO 1.5 METER FROM THE CUTTING PLANE LINE MARKING THE DIRECTION OF ARROW MARK.
HOW THE SECTIONAL VIEWOBSERVED ?
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
62
3D EXAMPLE FOROBSERVATION A SECTION
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
63
3D EXAMPLE FOROBSERVATION A SECTION
REMOVING THE SLAB
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
64
3D EXAMPLE FOROBSERVATION A SECTION
OBSERVATION OF PLAN FROM ABOVE & PLACING THE SECTION LINE.
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
65
3D EXAMPLE FOROBSERVATION A SECTION
SECTIONAL PLANE CUT AT THE ABOVE MARKED POSITION
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
66
3D EXAMPLE FOROBSERVATION A SECTION
REMOVING THE BACK PORTION OF SECTIONAL PLANE.
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
67
3D EXAMPLE FOROBSERVATION A SECTION
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
68
3D EXAMPLE FOROBSERVATION A SECTION
OBSERVATION
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
69
GETTING A SECTIONAL VIEW
SECTIONAL VIEW OF ABOVE SLIDE
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
70
• MAKING THE AUTO CAD FILES IN TO TWO HORIZENTAL VIEW PORTS BY USING “VIEWPORTS COMMAND” AND SET PLAN ON UPPER VIEW PORTS AND DRAW THE SECTIONAL ELEVATION BELOW THE PLAN ON LOWER VIEW PORT. (SEE THE BELOW SNAP SHOT)
HOW THE SECTIONAL VIEW IS PREPARE ?
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
71
• DRAW ARCHITECTURAL ELEVATION FROM PLAN BY DRAWNING X-LINE FROM THE WALL WITH CONSIDERING THE FALSE CEILING HIEGHT, SLAB THICKNESS, FINISHED FLOOR LEVEL AND BEAMS REFERING THE SRUCTURAL AND ARCHITECTURAL FILE GIVEN BY CONSULTANT. (SEE THE BELOW SNAP SHOTS)
HOW THE SECTIONAL VIEW IS PREPARE ?
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
72
• DRAW ALL PIPES AT SECTIONAL VIEW IN DOUBLE LINE WHETHER IT APPEAR IN PLAN IN SINGLE LINE OR MAY BE IN DOUBLE LINE.
• SHOWING ALL PIPES WHETHER IT IS IN HIEGH LEVEL OR AT LOW LEVEL WITH ITS FITTINGS, CONSIDERING THE SHOP DRAWING AND MENTION THE BOTTOM OF PIPE AND PIPE DIAMETER AS FOLLOWS BY STANDARD RECOMMENDED BY CONSULTANT.
HOW THE SECTIONAL VIEW IS PREPARE ?
SINGLE LINE PLAN OUTPUT
PIPES IN DOUBLE LINE AT SECTION
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
73
• PLACING ALL THE ELEVATIONAL FIXTURES APPROVED BY CONSULTANT WITHIN THE SECTIONAL VIEW.
• MENTION THE TYPE OF PIPE AND BOTTOM OF EVERY PIPE FROM FINISHED FLOOR LEVEL
• DIMENTION THE HOT WATER AND COLD WATER PIPES SUPPLY TO THE FIXTURES AS PER STANDARDS GIVEN BY CONSULTANT
HOW THE SECTIONAL VIEW IS PREPARE ?
FIXTURE AND BOP SHOWN IN SECTION
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
74
FIXTURES SHOWN IN SECTIONAL VIEW
HOW THE SECTIONAL VIEW IS PREPARE ?
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
75
WATER SUPPLY SECTION An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
76
WATER SUPPLY SECTION An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
77
WATER SUPPLY SECTION An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
78
WATER SUPPLY SECTION An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
79
BOTTOM OF PIPE
THE DISTANCE FROM THE FINISHED FLOOR LEVEL(FFL) TO THE BOTTOM OF INSULATED PIPE IS BOP. THE WATER PIPES HANGS BETWEEN SLAB AND FALSE CEILING LEVEL WITH SUPPORTERS. IF IS INTERFERENCE & FOULING WITH DUCT OR OTHER EQUIPMENT, IN THAT CASE WE USE TO BEND THE PIPE AS UP & DOWN, THEN FOLLOWS THE ROUTING.
FOR CALCULATING THE BOP VALUE
FFL OF CURRENT FLOOR______________(FROM ARCH. LAYOUT) SSL & SLAB THICKNESS OF THE ABOVE FLOOR__________(FROM STRUCTURAL LAYOUT) FALSE CEILING LEVEL MUST BE GREATER THAN 2400MM FROM FFL.
• CONSIDERING THE FALSE CEILING LEVEL WATER PIPES RUNNING 100MM APPARTS.
• ALWAYS PREPARED HOT WATER RUNNING APPROXIMATELY 100MM DISTANCE ABOVE FROM THE COLD WATER PIPE LINES.
PROCEDURE FOR BOTTOM OF PIPE An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
80
• BOTTOM OF PIPE MUST BE GIVEN FROM THE STARTING POINT THAT IS FROM RISER TO THE TILL END OF THE WATER SUPPLY TO FIXTURES AND SHOULD BE GIVEN TO ALL INDIVIDUAL PIPE LINES.
FOR EXAMPLE : LET Ø65 PIPE IS RUNNING TO THE APPARTMENT FROM RISER CONSIDERING THE BOTTOM OF LEVEL AT STARTING POINT FOR HOT WATER 2850 MM AND FOR COLD WATER 2750 MM FROM FINISHED FLOOR LEVEL.
• AFTER SOME DISTANCE IT REDUCES TO Ø42 MM
• CALCULATING THE BOP 65-42=23MM/2=11.5MM ROUNDING IT TO 12 MM APPX.
• MEANS Ø42 MM HOT WATER PIPES BOP 2850-12= 2838 MM FROM FINISHED FLOOR LEVEL.
• SIMILARLY FOR Ø12 MM COLD WATER 2750-12= 27385MM FROM FINISHED FLOOR LEVEL.
PROCEDURE FOR BOTTOM OF PIPE
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
81
PREPARING A ISOMETRIC DRAWING
• SET THE DRAWING AREA INTO TWO HORIZONTAL VIEWPORTS BY USING “VIEWPORTS” COMMAND.
• ADJUST THE UPPER VIEWPORT IN SOUTH\WEST ISOMETRIC VIEW TO THE PLAN.
• ADJUST THE LOWER VIEWPORTS IN THE ISOPLANE ANGLE TO WORK IN 90 DEGREE AND 30 DEGREE ANGLE, BY USING “SNAP” COMMAND.
• Specify snap spacing or [ON/OFF/Aspect/Rotate/Style/Type] <0.5000>: S
• snap grid style [Standard/Isometric] <S>: I• Specify vertical spacing <0.5000>: Enter• THIS COMMAND PROMPT SET THE CROSSHAIR INTO ISOPLANE.• “F5” BUTTON IS USE TO CHANGE THE CROSSHAIR INTO
VARIOUS X AND Y DIRECTION.• REFERING THE ROUTING OF HOT WATER & COLD WATER AS
PER SHOWN IN PLAN STARTING FROM ELECTRICAL WATER HEATER TO TILL END OF THE WATER SUPPLY.
• GIVE ALL THE PIPES BOTTOM OF PIPE AND SIZES CONSIDERING A FINISH FLOOR LEVEL LINE.
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
82
PREPARING A ISOMETRIC DRAWING
SETTING THE SHOP DTAWING IN SOUTH WEST ISOMETRIC VIEW
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
83
PREPARING A ISOMETRIC DRAWING
PREPARED ISOMETRIC VIEW REFERING THE ROUTING OF PIPES
FROM SHOP DRAWING .
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
84
PREPARING A ISOMETRIC DRAWING
ISOMETRIC DRAWING OF AN ANOTHER APARTMENT
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
85
Output : Plumbing Layout 3D (ABS)An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
86
Output : Plumbing Layout 3D (ABS)An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
87
Output : Plumbing hot & cold water Layout 3D (ABS)
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com
88
Output : Cold & Hot water high level Connection 3D (ABS)
An ISO 9001:2000 Certified Organization
www.ramtech-corp.com