4 diehl k 12

18
ENTRY ATRIUM ADDITION BEACHWOOD HIGH SCHOOL Beachwood, OH Opened 2004 2,000sf $900,000 The High School in Beachwood had lost its front door. It lacked a sense of entry, a sense of identity. Like many such institutions, it suffered from too many poorly done additions over the course of time. This was a transformational design: - create a door - create a welcoming lobby - create breakout space for the auditorium that killed the entry in the first place - create a strong entry identity and focal point K-12 selected projects christopher diehl

Upload: christopher-diehl

Post on 25-Mar-2016

217 views

Category:

Documents


0 download

DESCRIPTION

2 representative projects for Beachwood, OH - New Middle School - New High School entry

TRANSCRIPT

Page 1: 4 diehl k 12

ENTRY ATRIUM ADDITION

BEACHWOOD HIGH SCHOOL

Beachwood, OH

Opened 2004

2,000sf

$900,000

The High School in Beachwood had lost its front

door.

It lacked a sense of entry, a sense of identity.

Like many such institutions, it suffered from too

many poorly done additions over the course of

time.

This was a transformational design:

- create a door

- create a welcoming lobby

- create breakout space for the auditorium

that killed the entry in the first place

- create a strong entry identity and focal

point

K-12

selected projects

christopher diehl

Page 2: 4 diehl k 12

Beachwood High School 2004

existing entry

Page 3: 4 diehl k 12

Beachwood High School 2004

new entry portal

Page 4: 4 diehl k 12

Beachwood High School 2004

money shot new entry portal

Page 5: 4 diehl k 12

Beachwood High School 2004

existing entry courtyard

Page 6: 4 diehl k 12

Beachwood High School 2004

new entry atrium + lobby

Beachwood High School Entry Atrium / Beachwood, OH 2004

Page 7: 4 diehl k 12

Beachwood High School 2004

new entry atrium + lobby

Beachwood High School Entry Atrium / Beachwood, OH 2004

Page 8: 4 diehl k 12

christopher diehl

refashioned stair + bench casework

Beachwood High School Entry Atrium / Beachwood, OH 2004

Page 9: 4 diehl k 12

christopher diehl

BEACHWOOD MIDDLE SCHOOL

Beachwood, OH

Opened 2003

40,000sf

$9m

An elegant, 2-story spiral of classrooms sets the

conceptual and geometric framework for the

Beachwood Middle School. Located on a

gentle rise removed from a hectic

thoroughfare,

visitors are received by the extended arm of

the building’s spiral. Masonry weaving, with

two colors of norman unit bricks, are

developed into two patterns for the two

feature, large boxes of the program: the

Theater and the Gymnasium.

On the building’s interior, the spiral encloses a

modest courtyard next to the school commons

and library.

Page 10: 4 diehl k 12

christopher diehl

view of entry courtyard

Beachwood Middle School/ Beachwood, OH 2003

Page 11: 4 diehl k 12

christopher diehl

floor plans

Beachwood Middle School/ Beachwood, OH 2003

Page 12: 4 diehl k 12

christopher diehl

elevations + masonry weaving

Beachwood Middle School/ Beachwood, OH 2003

Page 13: 4 diehl k 12

christopher diehl

elevations + masonry weaving

Beachwood Middle School/ Beachwood, OH 2003

Page 14: 4 diehl k 12

christopher diehl

view of entry courtyard

Beachwood Middle School/ Beachwood, OH 2003

Page 15: 4 diehl k 12

christopher diehl

view of entry courtyard

Beachwood Middle School/ Beachwood, OH 2003

Page 16: 4 diehl k 12

christopher diehl

view of gymnasium

Beachwood Middle School/ Beachwood, OH 2003

Page 17: 4 diehl k 12

christopher diehl

view of inner courtyard

Beachwood Middle School/ Beachwood, OH 2003

building section

commons

library

Page 18: 4 diehl k 12

christopher diehl

theater

Beachwood Middle School/ Beachwood, OH 2003

classroom

science classroom