3mn-00467-1011-rjzzai1

112
Title page Alcatel-Lucent 9130 BSC/MFS Evolution | Installation Manual 3MN-00467-1011-RJZZA Issue 1 | March 2012

Upload: deepayan-choudhury

Post on 11-Jan-2016

10 views

Category:

Documents


0 download

DESCRIPTION

alu

TRANSCRIPT

Page 1: 3MN-00467-1011-RJZZAi1

Title page

Alcatel-Lucent 9130

BSC/MFS Evolution |

Installation Manual

3MN-00467-1011-RJZZA

Issue 1 | March 2012

Page 2: 3MN-00467-1011-RJZZAi1

Legal notice

Legal notice

Alcatel, Lucent, Alcatel-Lucent and the Alcatel-Lucent logo are trademarks of Alcatel-Lucent. All other trademarks are the property of their respective

owners.

The information presented is subject to change without notice. Alcatel-Lucent assumes no responsibility for inaccuracies contained herein.

Copyright © 2012 Alcatel-Lucent. All rights reserved.

Note:

Not to be used or disclosed except in accordance with applicable agreements.

Page 3: 3MN-00467-1011-RJZZAi1

Contents

About this document

Purpose ............................................................................................................................................................................................. ixix

Reason for reissue ........................................................................................................................................................................ ixix

New in this release ....................................................................................................................................................................... ixix

Intended audience ......................................................................................................................................................................... ixix

How to use this document ........................................................................................................................................................... xx

Safety information ......................................................................................................................................................................... xx

Prerequisites ..................................................................................................................................................................................... xx

Conventions used ........................................................................................................................................................................... xx

Related information ....................................................................................................................................................................... xx

Document support .......................................................................................................................................................................... xx

Technical support .......................................................................................................................................................................... xixi

How to order ................................................................................................................................................................................... xixi

How to comment ........................................................................................................................................................................... xixi

1 Safety Information

Structure of safety statements ............................................................................................................................................... 1-11-1

2 Overview

Overview ...................................................................................................................................................................................... 2-12-1

Presentation ................................................................................................................................................................................. 2-12-1

Preparation .................................................................................................................................................................................. 2-62-6

Scheduling ................................................................................................................................................................................... 2-72-7

Resources ..................................................................................................................................................................................... 2-82-8

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

iii

Page 4: 3MN-00467-1011-RJZZAi1

3 Scenario

Overview ...................................................................................................................................................................................... 3-13-1

Before Going Onsite

Overview ...................................................................................................................................................................................... 3-33-3

Before You Start

Before You Start ........................................................................................................................................................................ 3-43-4

Install Rack

Prepare Floor .............................................................................................................................................................................. 3-53-5

Rack Delivery and Positioning ............................................................................................................................................ 3-73-7

Prepare Site Cable Way ........................................................................................................................................................ 3-113-11

Fix Rack ..................................................................................................................................................................................... 3-133-13

Install Protective Earth and Power Supply Cables

How to Install Protective Earth and Power Supply Cables ..................................................................................... 3-223-22

Install Cables in Site Cable Way ....................................................................................................................................... 3-233-23

C1: Rack Top Entry of Cables ........................................................................................................................................... 3-253-25

C2: Rack Bottom Entry of Cables .................................................................................................................................... 3-283-28

Connect Earth Cable (GND) .............................................................................................................................................. 3-313-31

Connect DC 48 Volts Power Cables ................................................................................................................................ 3-343-34

Test Power Supply ................................................................................................................................................................. 3-383-38

Install PCM Cables

Run 120 Ohm PCM Cables ................................................................................................................................................ 3-413-41

Run 75 Ohm PCM Cables ................................................................................................................................................... 3-473-47

Install Cables in Cable Way ................................................................................................................................................ 3-563-56

O2: Install Second Equipment in Rack

Install PCM Cables ................................................................................................................................................................ 3-583-58

Install Second ATCA Shelf ................................................................................................................................................. 3-593-59

Contents

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

iv Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 5: 3MN-00467-1011-RJZZAi1

Install Second LIU Shelf ..................................................................................................................................................... 3-673-67

Install Internal Ethernet Cables ......................................................................................................................................... 3-703-70

O3, O4, O5, O6, O7: Install Ethernet Cables

O3: Install OMC-R Router Cables ................................................................................................................................... 3-713-71

O4: Install A-GPS Server Cable ....................................................................................................................................... 3-723-72

O5: Install External Alarm Box ......................................................................................................................................... 3-733-73

O6: Install SGSN Router Cables ...................................................................................................................................... 3-743-74

O7: Install Ethernet Cables for IP Telecom Traffic in Release B11 ..................................................................... 3-753-75

O8: Install Optical Cables for STM1 in Release B11

How to Install Optical Cables for STM1 in Release B11 ........................................................................................ 3-763-76

Install Optical Cables in Cable Way ................................................................................................................................ 3-773-77

Install SFP Modules .............................................................................................................................................................. 3-793-79

Route Optical Cables ............................................................................................................................................................ 3-813-81

Finish Installation

How to Finish Installation ................................................................................................................................................... 3-853-85

Contents

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

v

Page 6: 3MN-00467-1011-RJZZAi1

Contents

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

vi Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 7: 3MN-00467-1011-RJZZAi1

List of figures

2-1 9130 MFS/BSC Evolution Rack (Front View) ............................................................................................... 2-22-2

2-2 9130 MFS/BSC Evolution Configurations ...................................................................................................... 2-32-3

3-1 Fixing Items to be Removed on Shelf Back Side ........................................................................................ 3-103-10

3-2 Level Rack then Fix Rack to Concrete Floor ................................................................................................ 3-143-14

3-3 Raised Floor Fixing Example ............................................................................................................................. 3-163-16

3-4 Mechanical Assembling of Frame .................................................................................................................... 3-183-18

3-5 Fixing Raised Floor at Same Level of Earthquake Frame) ...................................................................... 3-203-20

3-6 Top Cable Entry ....................................................................................................................................................... 3-263-26

3-7 Power Cables Outlet General View .................................................................................................................. 3-273-27

3-8 Bottom Cable Entry ................................................................................................................................................ 3-293-29

3-9 Metallic Braid Fixed to Raised Floor Cable Way ........................................................................................ 3-303-30

3-10 Power Cables Connection .................................................................................................................................... 3-353-35

3-11 Site Fuse Breaker Example ................................................................................................................................. 3-363-36

3-12 Label Power Cables ................................................................................................................................................ 3-373-37

3-13 Bind Cables ............................................................................................................................................................... 3-413-41

3-14 Cable Routing Front View ................................................................................................................................... 3-423-42

3-15 Top Rack Cable Entry General View ............................................................................................................... 3-433-43

3-16 Cable Routing Front View ................................................................................................................................... 3-453-45

3-17 Cable Routing Side View ..................................................................................................................................... 3-463-46

3-18 Bottom Cable Entry ................................................................................................................................................ 3-523-52

3-19 Cable Routing Front View ................................................................................................................................... 3-543-54

3-20 Cable Routing Side View ..................................................................................................................................... 3-553-55

3-21 Wrong Handling of ATCA Shelf ........................................................................................................................ 3-603-60

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

vii

Page 8: 3MN-00467-1011-RJZZAi1

3-22 Ground Cable and ESD Jack Connection ...................................................................................................... 3-613-61

3-23 Rear View of ATCA Shelf Variant Before 3BK 27291 ABxx ................................................................. 3-623-62

3-24 Ground Cable and ESD Jack Connection ...................................................................................................... 3-643-64

3-25 Rear View of ATCA Shelf from Shelf Variant 3BK 27291 ABxx On ................................................. 3-653-65

3-26 Brackets at Shelf Rear ........................................................................................................................................... 3-673-67

3-27 Brackets at Shelf Front .......................................................................................................................................... 3-683-68

3-28 Install Optical Cable in cable tray ..................................................................................................................... 3-773-77

3-29 Cables Rack Top Entry .......................................................................................................................................... 3-813-81

3-30 Cables Routing Bottom Entry - Rear View ................................................................................................... 3-833-83

3-31 Optical Cable Connection on JBXTP3 Board .............................................................................................. 3-843-84

3-32 Fit Rack Bottom Cover Plate .............................................................................................................................. 3-853-85

3-33 Close Doors ............................................................................................................................................................... 3-863-86

List of figures

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

viii Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 9: 3MN-00467-1011-RJZZAi1

About this documentAbout this document

Purpose

This document describes how to install onsite an Alcatel-Lucent BSS 9130 MFS/BSC

Evolution and how to install a second equipment in an 9130 MFS/BSC Evolution rack.

Reason for reissue

Issue number Reason for reissue

Edition 01 First official release of the document.

New in this release

This section contains information about changes to the current document.

New features

None.

Other changes

None.

Intended audience

This document is intended for:

• Installers

• Site administrators

• Supervisors

• Project managers

• Field service technicians

• Occasional users.

...................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

ix

Page 10: 3MN-00467-1011-RJZZAi1

How to use this document

No specific recommendation applies regarding the way readers should read this

document.

Safety information

For your safety, this document contains safety statements. Safety statements are given at

points where risks of damage to personnel, equipment, and operation may exist. Failure to

follow the directions in a safety statement may result in serious consequences.

Prerequisites

You must have a basic understanding of the following:

• Alcatel-Lucent BSS equipment

• Experience of electrical mounting and cabling.

Conventions used

This section gives information on conventions.

Vocabulary conventions

None.

Typographical conventions

The following typographical conventions are used in this document:

Appearance Description

Italicized text Emphasized information.

graphical user interface text Text that is displayed in a graphical user interface or in a

hardware label.

Document reference, reference

number

Related document that is referenced in the document.

Related information

None.

Document support

For support in using this or any other Alcatel-Lucent document, contact Alcatel-Lucent at

one of the following telephone numbers:

• 1-888-582-3688 (for the United States)

• 1-317-377-8618 (for all other countries)

About this document

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

x Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 11: 3MN-00467-1011-RJZZAi1

Technical support

For technical support, contact your local Alcatel-Lucent customer support team. See the

Alcatel-Lucent Support web site (http://www.alcatel-lucent.com/support/) for contact

information.

How to order

To order Alcatel-Lucent documents, contact your local sales representative or use Online

Customer Support (OLCS) (http://support.alcatel-lucent.com)

How to comment

To comment on this document, go to the Online Comment Form (http://infodoc.alcatel-

lucent.com/comments/) or e-mail your comments to the Comments Hotline

([email protected]).

About this document

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

xi

Page 12: 3MN-00467-1011-RJZZAi1

About this document

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

xii Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 13: 3MN-00467-1011-RJZZAi1

1 1Safety Information

Structure of safety statements

Overview

This topic describes the components of safety statements that appear in this document.

General structure

Safety statements include the following structural elements:

Item Structure element Purpose

1 Safety alert symbol Indicates the potential for personal injury

(optional)

2 Safety symbol Indicates hazard type (optional)

3 Signal word Indicates the severity of the hazard

4 Hazard type Describes the source of the risk of damage or

injury

5 Safety message Consequences if protective measures fail

6 Avoidance message Protective measures to take to avoid the hazard

SAMPLEB C D

E F

G

H

Lifting this equipment by yourself can result in injurydue to the size and weight of the equipment.

Always use three people or a lifting device to transportand position this equipment. [ABC123]

CAUTION

Lifting hazard

...................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

1-1

Page 14: 3MN-00467-1011-RJZZAi1

Item Structure element Purpose

7 Identifier The reference ID of the safety statement

(optional)

Signal words

The signal words identify the hazard severity levels as follows:

Signal word Meaning

DANGER Indicates an extremely hazardous situation which, if not avoided, will

result in death or serious injury.

WARNING Indicates a hazardous situation which, if not avoided, could result in

death or serious injury.

CAUTION Indicates a hazardous situation which, if not avoided, could result in

minor or moderate injury.

NOTICE Indicates a hazardous situation not related to personal injury.

Safety Information Structure of safety statements

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

1-2 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 15: 3MN-00467-1011-RJZZAi1

2 2Overview

Overview

Purpose

This Overview gives information needed by project managers and foremen, for

presentation to the customer and for site planning.

Contents

Presentation 2-1

Preparation 2-6

Scheduling 2-7

Resources 2-8

Presentation

Hardware Description

The following sections describe the hardware.

Rack Layout and Configurations

The following figure shows the front view of the 9130 MFS/BSC Evolution rack.

...................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

2-1

Page 16: 3MN-00467-1011-RJZZAi1

The following figure shows all 9130 MFS/BSC Evolution possible configurations.

Figure 2-1 9130 MFS/BSC Evolution Rack (Front View)

Overview Presentation

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

2-2 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 17: 3MN-00467-1011-RJZZAi1

Regardless of the configuration, the installation principle is the same.

Weight and Dimensions

The following table gives the dimensions and weight of the cabinet.

Description Dimensions

Width

Depth

Height (including a 100 mm plinth)1

*

600 mm

600 mm

2000 mm

Weight ≈ 300 kg (maximum configuration)

Notes:

1. * Earthquake option is not included in total height

Cases

The following cases apply:

• C1: Concrete floor installation

• C2: Raised floor installation.

Figure 2-2 9130 MFS/BSC Evolution Configurations

Overview Presentation

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

2-3

Page 18: 3MN-00467-1011-RJZZAi1

Options

The following options apply:

• O1: Earthquake fixing.

• O2: Install the second equipment in a rack

• O3: Ethernet cables installation towards the OMC-R

• O4: A-GPS server cable installation

• O5: External Alarm box installation.

• O6: Ethernet cables installation towards SGSN

• O7: Ethernet cables installation for IP telecom traffic, applies for Release B11

• O8: Optical cables installation for STM1, applies for Release B11.

Initial State

Before the installation, the rack and installation kits are packed and delivered onsite.

Final State

After finishing the installation:

• The rack is ready for commissioning

• The rack is not powered up.

Restrictions

None.

Grouped Task Sequence

The following figure shows the task sequence for dismantling onsite an Alcatel-Lucent

BSS 9130 MFS/BSC Evolution.

Overview Presentation

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

2-4 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 19: 3MN-00467-1011-RJZZAi1

Overview Presentation

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

2-5

Page 20: 3MN-00467-1011-RJZZAi1

Preparation

Prerequisites

The following prerequisites apply:

• The site must comply with the safety rules given in the General Wiring Handbook

• The site is ready to receive the racks, according to the SPP 59 - Specification for 9130

BSC/MFS Evolution Site Preparation.

Site Specific Information

You must have the following specific information to complete the scenario.

Site:

• Grounding plate location

• Power supply cabinet location

• Fuse breaker locations in the power box

• 2 wire or 3 wire power system (if applicable)

• Precise rack location

• PCM terminal block location

• Usage of External Alarm Block

• Number of STM1 cables to be installed

• Number of alarms to be connected.

Rack:

• Door opening direction (left or right)

• Rack fixing (wall, raised floor, steel construction, concrete foundation).

Kits:

PCM cables impedance (120-ohm, 75-ohm).

Overview Preparation

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

2-6 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 21: 3MN-00467-1011-RJZZAi1

Scheduling

Time based on technical constraints

The number of resources shown in the table below does not take into account individual

customer or safety requirements.

Task Time / Task

1st person

Time / Task

2nd person

“Before Going Onsite” (p. 3-3) 15 min. 15 min.

“Before You Start” (p. 3-4) 15 min. 15 min.

“Install Rack” (p. 3-5)1

* 15 min.

“Prepare Floor” (p. 3-5) 15 min. 15 min.

“Rack Delivery and Positioning” (p. 3-7) 15 min. 15 min.

“Prepare Site Cable Way” (p. 3-11) 15 min. 15 min.

“Fix Rack” (p. 3-13) 15 min. 15 min.

“How to Install Protective Earth and Power Supply

Cables” (p. 3-22)

“Install Cables in Site Cable Way” (p. 3-23) 10 min. -

“C1: Rack Top Entry of Cables” (p. 3-25) - 10 min.

“C2: Rack Bottom Entry of Cables” (p. 3-28) 10 min. 10 min.

“Connect Earth Cable (GND)” (p. 3-31) 10 min. -

“Connect DC 48 Volts Power Cables” (p. 3-34) - 10 min.

“Test Power Supply” (p. 3-38) 10 min. 10 min.

“Install PCM Cables” (p. 3-41)

“Install Cables in Cable Way” (p. 3-56) 10 min. 10 min.

“Run 120 Ohm PCM Cables” (p. 3-41) 20 min. 20 min.

“How to Finish Installation” (p. 3-85) 15 min. 15 min.

Total Time 2h 55 min. 2h 55 min.

Notes:

1. * Transportation time to final location depending of the site

The following table gives the duration for the optional tasks.

Overview Scheduling

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

2-7

Page 22: 3MN-00467-1011-RJZZAi1

Task Time / Task

1st person

Time / Task

2nd person

“O2: Install Second Equipment in Rack” (p. 3-58)

“Install PCM Cables” (p. 3-58) 30 min. 30 min.

“Install Second ATCA Shelf” (p. 3-59) 30 min. 30 min.

“Install Second LIU Shelf” (p. 3-67) 10 min. 10 min.

“O3, O4, O5, O6, O7: Install Ethernet Cables”

(p. 3-71)

“O3: Install OMC-R Router Cables” (p. 3-71) 10 min. -

“O4: Install A-GPS Server Cable” (p. 3-72) - 10 min.

“O5: Install External Alarm Box” (p. 3-73) 10 min. -

“O6: Install SGSN Router Cables” (p. 3-74) 10 min. -

“O8: Install Optical Cables for STM1 in Release B11”

(p. 3-76)

15 min. 15 min.

Resources

Tools

The following tables describe the necessary hardware tools, software tools, and forms.

Installation Kits

Use the following table to check, onsite, the mandatory or optional delivery item kits.

The following symbols apply:

• • mandatory kit

• ∇ technical choice kit

• ◊ customer option kit.

Mandatory kits Mnemonic Reference

Quan-

tity

• Cabinet equipped JRXMX 3BK 27154 AA 1

• Basic installation kit JDMX 3BK 27244 AB 1

◊ PCM cables 120 Ohm: - - -

∇ 120 ohm - 8 LIU (20 m) PVCABE10 1AB 060540027 1

∇ 120 ohm - 8 LIU (30 m) PVCABE11 1AB 060540023 1

∇ 120 ohm - 8 LIU (40 m) PVCABE13 1AB 060540026 1

Overview Scheduling

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

2-8 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 23: 3MN-00467-1011-RJZZAi1

Mandatory kits Mnemonic Reference

Quan-

tity

◊ PCM cables 75 Ohm -

∇ 75 ohm - 8 LIU (20 m) JLIU75E1 3BK 15053 AAAF *

∇ 75 ohm - 8 LIU (30 m) JLIU75E1 3BK 15054 AAAF *

∇ 75 ohm - 8 LIU (40 m) JLIU75E1 3BK 15055 AAAF *

◊ Jumpers for DDF: - - -

∇ 120 ohm L904 (roll 100 m) CA120S 3BK 08941 AA -

◊ GND cable Yellow/Green 1 x 35 mm2

(roll

100 m)

PC35YG1D 3BK 08960 BA 1

◊ DC 48 Volts power cables

For distance 0m < L < 20m:

▸ ∇ -48V blue 1 x 16 mm2

(roll 100 m) PC16BL1D 3BK 08955 BB -

▸ ∇ 0V black 1 x 16 mm2

(roll 100 m) PC16B1D 3BK 08956 BA -

For distance 20m < L < 40m:

▸ ∇ -48V blue 1 x 25 mm2

(roll 100 m) PV25BL1D 3BK 08963 BA -

▸ ∇ 0V black 1 x 25 mm2

(roll 100 m) PV25B1D 3BK 08963 BB -

◊ Ethernet cable straight (roll 30 m) ALETHD 3BW 01804 JA 1

◊ Ethernet cable crossed (roll 30 m) ALETHC 3BW 01805 JA 1

◊ Wall support for 4 x MP24 DDF 1AD 02846 0001 -

◊ Terminal block 64E1 120 TERBLO1 1AB 23960 0001 1

◊ Terminal block 32 E1 75 BNC TERBLO2 1AB 27681 0002 1

BNC connector M BNCCON1 1AB 00642 0011 128

◊ Terminal block 32 E1 75 1656 TERBLO3 1AB 27681 0001 1

1656 connector M FLEX BNCCON2 1AB 02546 0013 128

◊ LABO rack 43U LABRAC1 1AD 03905 0001 1

◊ Vertical cable way JDTCO 3BK 25297 AA 2

◊ External alarm box EABMX 1AB 24048 0001 1

◊ Raised floor fixing JDTCFF 3BK 25341 AA 1

◊ Earthquake kit for raised floor fixing JDSISM 3BK 25284 AA 1

◊ STM1 cabling kit - - 1

SFP modules 8

Overview Resources

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

2-9

Page 24: 3MN-00467-1011-RJZZAi1

Mandatory kits Mnemonic Reference

Quan-

tity

Optical Fibre Cable JLOPT6 Depending of length:

• 3BK28064 GLAA

for L=15m

• 3BK 28064 HAAA

for L=20m

• 3BK 28064 HLAA

for L=25m

• 3BK 28064 JAAA lor

L=30m

• 3BK 28064 JFAA for

L=35m

• 3BK 28064 JLAA for

L=40m

4

Basic installation kit for Optical Fibre

cable

OFC3SEC 3BK27700ABAA 1

Hardware Tools

Refer to the Tools Catalogue for Field Activity for more information.

Kit name Reference Calibration

Basic kit tools OUT 001 no

Forms

You must have the following forms:

• SPP 10 - Site Condition Inspection Specification (All SPG/SPP)

(8BL 00704 0016 DRBRA)

• Site Premises Inspection Form (CEL)

8BL 00704 0015 DRBRA

Supplies

The installer must supply these kits (not included in Alcatel-Lucent kits).

Item Quantity

Set of rubber sleeves for all cables 1

Wire terminal Ø 8 mm for 16 mm2

cable (lug) 4

Wire terminal Ø 6 mm for 16 mm2

cable (lug) 5

Overview Resources

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

2-10 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 25: 3MN-00467-1011-RJZZAi1

Applicable Documents

You must have the following documents or have electronic access to the following

documents:

• Catalogue of Instruction Operation (IO)

• Catalogue of Technical and Logistic Information (ITL–PRO)

• General Wiring Handbook

• Tools Catalogue for Field Activity

• CI-08 Site Equipment Inventory

• Dismantling Manual Generic CCL

• BSS Methods Handbook

• Install and Commission External Alarm Box

• Completion Check List (CCL)

• SPP 59 - Specification for 9130 BSC/MFS Evolution Site Preparation

• Install 9130 - BSC / MFS Evolution Digital Distribution Frame

• JLIU75E1 Wiring List, (3EJ 02719 AAAA JLZZA)

• JLIU75E1 Assembly Drawing, (3EJ 02719 AAAA HDZZA)

Overview Resources

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

2-11

Page 26: 3MN-00467-1011-RJZZAi1

Overview Resources

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

2-12 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 27: 3MN-00467-1011-RJZZAi1

3 3Scenario

Overview

Purpose

This Scenario presents all checks needed before beginning the scenario, and all detailed

tasks to be performed onsite.

Contents

Before Going Onsite 3-3

Overview 3-3

Before You Start 3-4

Before You Start 3-4

Install Rack 3-5

Prepare Floor 3-5

Rack Delivery and Positioning 3-7

Prepare Site Cable Way 3-11

Fix Rack 3-13

Install Protective Earth and Power Supply Cables 3-22

How to Install Protective Earth and Power Supply Cables 3-22

Install Cables in Site Cable Way 3-23

C1: Rack Top Entry of Cables 3-25

C2: Rack Bottom Entry of Cables 3-28

Connect Earth Cable (GND) 3-31

Connect DC 48 Volts Power Cables 3-34

Test Power Supply 3-38

Install PCM Cables 3-41

...................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-1

Page 28: 3MN-00467-1011-RJZZAi1

Run 120 Ohm PCM Cables 3-41

Run 75 Ohm PCM Cables 3-47

Install Cables in Cable Way 3-56

O2: Install Second Equipment in Rack 3-58

Install PCM Cables 3-58

Install Second ATCA Shelf 3-59

Install Second LIU Shelf 3-67

Install Internal Ethernet Cables 3-70

O3, O4, O5, O6, O7: Install Ethernet Cables 3-71

O3: Install OMC-R Router Cables 3-71

O4: Install A-GPS Server Cable 3-72

O5: Install External Alarm Box 3-73

O6: Install SGSN Router Cables 3-74

O7: Install Ethernet Cables for IP Telecom Traffic in Release B11 3-75

O8: Install Optical Cables for STM1 in Release B11 3-76

How to Install Optical Cables for STM1 in Release B11 3-76

Install Optical Cables in Cable Way 3-77

Install SFP Modules 3-79

Route Optical Cables 3-81

Finish Installation 3-85

How to Finish Installation 3-85

Scenario Overview

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-2 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 29: 3MN-00467-1011-RJZZAi1

Before Going Onsite

Overview

Overview

Before going onsite, check that the following information and supplies are available:

• All “Prerequisites” (p. 2-6) are met

• The customer has been informed of the following information:

You must indicate:

– Date and time

– Site name and address

– Purpose of the operation.

• Personnel are available; refer to “Scheduling” (p. 2-7)

• “Site Specific Information” (p. 2-6) is available

• “Tools” (p. 2-8) are available and ready for operation

• “Installation Kits” (p. 2-8) are available and ready for operation

• “Supplies” (p. 2-10) are available and ready for operation

• “Applicable Documents” (p. 2-11) are available.

Scenario

Before Going Onsite

Overview

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-3

Page 30: 3MN-00467-1011-RJZZAi1

Before You Start

Before You Start

Checks

Perform the following operations:

• Check that all “Prerequisites” (p. 2-6) are met

• Check applicable notifications and operating instructions (refer to the Catalogue of

Instruction Operation (IO) and Catalogue of Technical and Logistic Information

(ITL–PRO))

• Check the availability of all necessary “Tools” (p. 2-8), “Installation Kits” (p. 2-8) and

“Supplies” (p. 2-10)

• Refer to the SPP 10 - Site Condition Inspection Specification (All SPG/SPP) and

complete the Site Premises Inspection Form (CEL)

• Check that the safety precautions are taken in accordance with the safety instructions

described in the B11 BSS Methods Handbook

• Complete the header field of the CCL. Complete the CCL as each instruction is

carried out.

Attention: Among the “Cases” (p. 2-3) and the “Options” (p. 2-4), identify which

cases and options apply to you.

Required Knowledge

You must be familiar with the following:

• Safety Rules and Precautions

• How to document Faults and Anomalies.

Scenario

Before You Start

Before You Start

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-4 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 31: 3MN-00467-1011-RJZZAi1

Install Rack

Prepare Floor

Overview

Note: To be compliant with EN 60950 rules, it is mandatory that the rack be fixed to

the floor (refer to SPP 59 - Specification for 9130 BSC/MFS Evolution Site

Preparation).

There are two installation cases:

• Fixing to a concrete floor

• Fixing to a raised floor.

C1: Concrete Floor Drilling

The following figure shows concrete floor drilling.

Drill the concrete floor:

...................................................................................................................................................................................................

1 Using the supplied template, mark the concrete foundation.

...................................................................................................................................................................................................

2 Drill holes in the concrete foundation (Ø 12 mm, h = 70 mm).

C2: Raised Floor Drilling

The following figure shows raised floor drilling.

Drill the raised floor:

...................................................................................................................................................................................................

1 Using a template, cut a rectangular hole in the tile to pass the cables.

...................................................................................................................................................................................................

2 Using a template, drill the following holes.

Scenario

Install Rack

Prepare Floor

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-5

E N D O F S T E P S...................................................................................................................................................................................................

Page 32: 3MN-00467-1011-RJZZAi1

You must:

• Drill the tile Ø12 mm

• Drill the floor Ø12 mm, h = 60 mm +/-3 mm.

Scenario

Install Rack

Prepare Floor

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-6 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

E N D O F S T E P S...................................................................................................................................................................................................

Page 33: 3MN-00467-1011-RJZZAi1

Rack Delivery and Positioning

Overview

The following figure shows the rack delivery and positioning.

Scenario

Install Rack

Rack Delivery and Positioning

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-7

Page 34: 3MN-00467-1011-RJZZAi1

Scenario

Install Rack

Rack Delivery and Positioning

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-8 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 35: 3MN-00467-1011-RJZZAi1

Procedure

Position the rack:

...................................................................................................................................................................................................

1 Place the rack in position.

You must:

• Lift the rack by crane with packaging or,

• Lift the rack by crane using eyebolts of rack or,

• Transport the rack by pallet near to its final position.

...................................................................................................................................................................................................

2 Unpack the rack.

...................................................................................................................................................................................................

3 Remove the bottom cover plate of rack.

...................................................................................................................................................................................................

4 At top of the rack, remove the craning eyebolts.

...................................................................................................................................................................................................

5 A box with four Ethernet cables is delivered inside the rack. Leave the cables in the rack.

The cables are connected during commissioning.

...................................................................................................................................................................................................

6 On the back side of the ATCA shelf, remove metallic parts used during transportation. If

two shelves are equipped, remove the metallic parts on both shelves.

Note: If the metallic parts used for transportation are removed during the installation,

keep the parts safely onsite to be reused for transportation in the case of dismantling.

Scenario

Install Rack

Rack Delivery and Positioning

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-9

Page 36: 3MN-00467-1011-RJZZAi1

...................................................................................................................................................................................................

7 Slightly unfasten the screws fixing the JSXPDU (one or two turns).

...................................................................................................................................................................................................

8 Shift the JSXPDU to the top of the rack as much as possible.

...................................................................................................................................................................................................

9 Fasten the screws to fix the JSXPDU.

Figure 3-1 Fixing Items to be Removed on Shelf Back Side

Scenario

Install Rack

Rack Delivery and Positioning

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-10 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

E N D O F S T E P S...................................................................................................................................................................................................

Page 37: 3MN-00467-1011-RJZZAi1

Prepare Site Cable Way

C1: Top Rack Entry of Cables

Nr Materials Reference Kit

1 Vertical cable way kit 3BK 25297 AAAA JDTCO

2 Edge protection 1AD 01782 0001 JDMX

The following figure shows the cable way.

Procedure

Prepare the cable way:

...................................................................................................................................................................................................

1 Cut a hole in the site cable way for each used cable entry.

Scenario

Install Rack

Prepare Site Cable Way

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-11

Page 38: 3MN-00467-1011-RJZZAi1

...................................................................................................................................................................................................

2 Cover the cut-out with edge protection (1AD 01782 0001).

...................................................................................................................................................................................................

3 Fix the support to the rack.

...................................................................................................................................................................................................

4 Fix the separating corner to the vertical cable way.

...................................................................................................................................................................................................

5 Fix the vertical cable way to the support at top of rack.

...................................................................................................................................................................................................

6 Fix the vertical cable way to the site cable way.

...................................................................................................................................................................................................

7 Follow the same procedure to install the second vertical cable way.

C2: Bottom Rack Entry of Cables

No specific preparation of cable way. Use the same rules for cable separating.

Scenario

Install Rack

Prepare Site Cable Way

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-12 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

E N D O F S T E P S...................................................................................................................................................................................................

Page 39: 3MN-00467-1011-RJZZAi1

Fix Rack

C1: Concrete Floor Fixing

Nr Materials Reference Kit

1 Expanding plug for hole Ø 12 mm 1AD 01166 0001 3BK 27244 ABAA

(JDMX)2 Screws HM 8 x 65 mm 1AD 00215 0042

3 Washer Ø 8 mm 1AD 00087 0149

The following figure shows how to level the rack then fix the rack to the concrete floor.

Scenario

Install Rack

Fix Rack

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-13

Page 40: 3MN-00467-1011-RJZZAi1

Figure 3-2 Level Rack then Fix Rack to Concrete Floor

Scenario

Install Rack

Fix Rack

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-14 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 41: 3MN-00467-1011-RJZZAi1

Procedure

Fix the rack to the concrete floor:

...................................................................................................................................................................................................

1 Put the expanding plug in the concrete floor.

...................................................................................................................................................................................................

2 Place the rack to its final position.

...................................................................................................................................................................................................

3 Level the rack.

...................................................................................................................................................................................................

4 Screw the screw with the washer to fix the rack.

C2: Raised Floor Fixing

Nr Materials Reference Kit

1 Screw Ø 8 mm x 80 mm 1AD 00215 0092 3BK 25341 AA

(JDTCFF)

+

3BK 27244 AB

(JDMX)

2 Washer Ø 8 mm 1AD 00087 0149

3 Frame of rack -

4 Raised floor support 3BK 08094 AA

5 Coupling nut Ø 8 mm 1AD 01655 0001

6 Threaded rod Ø 8 mm 1AD 01660 0003

7 Hexagon nut Ø 8 mm 1AD 00197 0006

8 Washer Ø 8 mm 1AD 00087 0149

9 Wall plug Ø 8 mm for hole Ø 12 mm 1AD 01666 0001

The following figure shows a raised floor fixing.

Scenario

Install Rack

Fix Rack

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-15

E N D O F S T E P S...................................................................................................................................................................................................

Page 42: 3MN-00467-1011-RJZZAi1

Note: In this case, do not level the rack.

Fix the rack to the raised floor:

...................................................................................................................................................................................................

1 Place the rack to its final position.

Figure 3-3 Raised Floor Fixing Example

Scenario

Install Rack

Fix Rack

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-16 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 43: 3MN-00467-1011-RJZZAi1

...................................................................................................................................................................................................

2 Put the expanding plug (9) in the concrete floor (see Figure 3-3, “Raised Floor Fixing

Example” (p. 3-16)).

...................................................................................................................................................................................................

3 Screw the threaded rod (6), then the washer (8) and nut (7).

...................................................................................................................................................................................................

4 Screw the coupling nut (5) as shown in Figure 3-3, “Raised Floor Fixing Example”

(p. 3-16).

...................................................................................................................................................................................................

5 Screw the screw (1) with the washer (2).

O1: Earthquake Fixing

Attention: This option can be installed only with a raised floor exactly 34 cm high

from the concrete ground.

Scenario

Install Rack

Fix Rack

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-17

E N D O F S T E P S...................................................................................................................................................................................................

Page 44: 3MN-00467-1011-RJZZAi1

Figure 3-4 Mechanical Assembling of Frame

Scenario

Install Rack

Fix Rack

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-18 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 45: 3MN-00467-1011-RJZZAi1

Nr Materials Reference Kit

1 Pedestal 3BK 25339 AAAA 3BK 25284 AAAA

(JDSISM)2 Bracket 3BK 25340 AAAA

3 Screw 16 x 40 1AD 00204 0059

4 Washer M16 1AD 00254 0006

5 Screw 8 x 35 1AD 00254 0038

6 Washer M8 1AD 00254 0003

7 Nut H8 1AD 00197 0006

8 Expanding wall plug 1AD 02655 0001

9 Washer M10 1AD 00453 0005

10 Screw 10 x 65 1AD 00050 0010

The following figure shows how to fix an earthquake frame.

Scenario

Install Rack

Fix Rack

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-19

Page 46: 3MN-00467-1011-RJZZAi1

Fix the earthquake frame:

...................................................................................................................................................................................................

1 Assemble the earthquake frame using screw (3) and washer (4) (see Figure 3-4,

“Mechanical Assembling of Frame” (p. 3-18)).

Figure 3-5 Fixing Raised Floor at Same Level of Earthquake Frame)

Scenario

Install Rack

Fix Rack

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-20 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 47: 3MN-00467-1011-RJZZAi1

...................................................................................................................................................................................................

2 Using the earthquake frame, mark the concrete ground.

...................................................................................................................................................................................................

3 Drill the ground and fit the wall plug (8) (see Figure 3-5, “Fixing Raised Floor at Same

Level of Earthquake Frame)” (p. 3-20)).

...................................................................................................................................................................................................

4 Fix the earthquake frame using the washer (9) and screw (10).

...................................................................................................................................................................................................

5 Fix the rack to the frame using (5) (6) (7).

...................................................................................................................................................................................................

6 Cut and fit the tiles around the earthquake frame.

Scenario

Install Rack

Fix Rack

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-21

E N D O F S T E P S...................................................................................................................................................................................................

Page 48: 3MN-00467-1011-RJZZAi1

Install Protective Earth and Power Supply Cables

How to Install Protective Earth and Power Supply Cables

Overview

DANGER

Electric-shock hazard

Risk of electrocution to personnel and damage to equipment.

Before making any electrical connections to the rack, ensure that the safety instructions

are followed.

It is essential that:

• The electrical power supply is disconnected. Ensure all breakers or fuses devoted to

the new rack into the site connection box are switched OFF

• The protective EARTH (GND) must be connected to the equipment before DC power

cable connection. It must be firstly connected at site side and secondly at rack side.

Ensure that the safety rules are applied.

Scenario

Install Protective Earth and Power Supply Cables

How to Install Protective Earth and Power Supply Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-22 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 49: 3MN-00467-1011-RJZZAi1

Install Cables in Site Cable Way

Overview

The following figure shows how to install the cables in the site cable way.

Procedure

Install the cables in the cable way:

...................................................................................................................................................................................................

1 Install a yellow/green cable in the power compartment of the cable way.

...................................................................................................................................................................................................

2 Install DC 48V power cables in the power compartment of the cable way (BATA, BATB

and BATR cables).

...................................................................................................................................................................................................

3 Attach the cables with plastic tie wraps.

Scenario

Install Protective Earth and Power Supply Cables

Install Cables in Site Cable Way

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-23

Page 50: 3MN-00467-1011-RJZZAi1

...................................................................................................................................................................................................

4 Cut the cables to the required length.

Scenario

Install Protective Earth and Power Supply Cables

Install Cables in Site Cable Way

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-24 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

E N D O F S T E P S...................................................................................................................................................................................................

Page 51: 3MN-00467-1011-RJZZAi1

C1: Rack Top Entry of Cables

Procedure

Run the cables:

...................................................................................................................................................................................................

1 Remove the top cover plate.

...................................................................................................................................................................................................

2 Cover the cable entry window with edge protection.

...................................................................................................................................................................................................

3 Fit the corner profile to the left or to the right of the cabinet according to the site

configuration.

...................................................................................................................................................................................................

4 Fix the 200 mm braid to the cable way (mechanical ground) (see Figure 3-7, “Power

Cables Outlet General View” (p. 3-27)).

...................................................................................................................................................................................................

5 Fix the earth braid to the specific stud of the rack.

Additional information

The following figure shows the top cable entry.

Scenario

Install Protective Earth and Power Supply Cables

C1: Rack Top Entry of Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-25

E N D O F S T E P S...................................................................................................................................................................................................

Page 52: 3MN-00467-1011-RJZZAi1

The following figure shows a general view of the power cable outlet.

Figure 3-6 Top Cable Entry

Scenario

Install Protective Earth and Power Supply Cables

C1: Rack Top Entry of Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-26 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 53: 3MN-00467-1011-RJZZAi1

Figure 3-7 Power Cables Outlet General View

Scenario

Install Protective Earth and Power Supply Cables

C1: Rack Top Entry of Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-27

Page 54: 3MN-00467-1011-RJZZAi1

C2: Rack Bottom Entry of Cables

Procedure

Run the cables:

...................................................................................................................................................................................................

1 Cover the cable entry windows with edge protection.

...................................................................................................................................................................................................

2 Pass the power cables for branch A through the left cable entry.

Scenario

Install Protective Earth and Power Supply Cables

C2: Rack Bottom Entry of Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-28 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 55: 3MN-00467-1011-RJZZAi1

...................................................................................................................................................................................................

3 Pass the GND cable and power cables for branch B through the right cable entry.

...................................................................................................................................................................................................

4 Fix the metallic braid to the raised floor cable way.

Figure 3-8 Bottom Cable Entry

Scenario

Install Protective Earth and Power Supply Cables

C2: Rack Bottom Entry of Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-29

Page 56: 3MN-00467-1011-RJZZAi1

...................................................................................................................................................................................................

5 Cut the metallic sheet to the required length and fit a lug.

...................................................................................................................................................................................................

6 Screw the metallic sheet to the dedicated studs of the rack.

...................................................................................................................................................................................................

7 Run the power cables for branch A through the left cable duct to the top of the rack.

...................................................................................................................................................................................................

8 Run the GND cable and power cables for branch B through the right cable duct to the top

of the rack.

Figure 3-9 Metallic Braid Fixed to Raised Floor Cable Way

Scenario

Install Protective Earth and Power Supply Cables

C2: Rack Bottom Entry of Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-30 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

E N D O F S T E P S...................................................................................................................................................................................................

Page 57: 3MN-00467-1011-RJZZAi1

Connect Earth Cable (GND)

Overview

Nr Materials Reference Kit

1 90° bent lugs Depending on diameter of cables Basic kit 3BK 27244 ABAA

(JDMX)

2 Tie wrap - Consumable supplies

3 Label -

The following figure shows how to connect the earth cable.

Scenario

Install Protective Earth and Power Supply Cables

Connect Earth Cable (GND)

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-31

Page 58: 3MN-00467-1011-RJZZAi1

Procedure

Connect the earth cable:

...................................................................................................................................................................................................

1 Label the site end of the GND cable (for example: 9130 MFS/BSC Evolution N° 4).

...................................................................................................................................................................................................

2 Crimp an adapted lug at the site side and at the rack side of the GND yellow/green cable.

Scenario

Install Protective Earth and Power Supply Cables

Connect Earth Cable (GND)

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-32 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 59: 3MN-00467-1011-RJZZAi1

...................................................................................................................................................................................................

3 Before connecting to the rack, connect the yellow/green GND cable to the site earth plate.

...................................................................................................................................................................................................

4 Connect the yellow/green GND cable to the rack.

Scenario

Install Protective Earth and Power Supply Cables

Connect Earth Cable (GND)

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-33

E N D O F S T E P S...................................................................................................................................................................................................

Page 60: 3MN-00467-1011-RJZZAi1

Connect DC 48 Volts Power Cables

Overview

Nr Materials Reference Kit

1 Labels 3BK 25932 AAAA Basic kit 3BK 27244 ABAA

(JDMX)2 90° bent lugs Depending on diameter of cables

3 Tie wrap - Consumable supplies

Procedure

Install the power cables:

...................................................................................................................................................................................................

1 Remove the protective covers for Branch A and Branch B.

...................................................................................................................................................................................................

2 Crimp a Ø 6 lug at rack side for each power cable.

...................................................................................................................................................................................................

3 Fit sleeves on all cables.

...................................................................................................................................................................................................

4 Connect the black cables to BATR studs.

...................................................................................................................................................................................................

5 Connect the -48 Volts blue cables to BATA and BATB studs.

Scenario

Install Protective Earth and Power Supply Cables

Connect DC 48 Volts Power Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-34 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 61: 3MN-00467-1011-RJZZAi1

...................................................................................................................................................................................................

6 Crimp an adapted lug for all cables at the site side.

...................................................................................................................................................................................................

7 Connect the cables to the site fuse breakers.

Figure 3-10 Power Cables Connection

Scenario

Install Protective Earth and Power Supply Cables

Connect DC 48 Volts Power Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-35

Page 62: 3MN-00467-1011-RJZZAi1

...................................................................................................................................................................................................

8 Label the ends of each cable.

Figure 3-11 Site Fuse Breaker Example

Scenario

Install Protective Earth and Power Supply Cables

Connect DC 48 Volts Power Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-36 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 63: 3MN-00467-1011-RJZZAi1

Figure 3-12 Label Power Cables

Scenario

Install Protective Earth and Power Supply Cables

Connect DC 48 Volts Power Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-37

E N D O F S T E P S...................................................................................................................................................................................................

Page 64: 3MN-00467-1011-RJZZAi1

Test Power Supply

Procedure

Test the power supply:

...................................................................................................................................................................................................

1 On the site power cabinet, check if DC 48 volts fuse breakers are switched OFF (BATA

and BATB).

...................................................................................................................................................................................................

2 On the rack side, check that all power breakers on JSXPDU are switched OFF;

otherwise switch them OFF.

...................................................................................................................................................................................................

3 On the rack side, check that the power breakers on all JBXPSs are switched OFF;

otherwise switch them OFF.

...................................................................................................................................................................................................

4 On the rack side, on the connection box, with an ohmmeter, test if there is no short

circuit between -48 volts (BATA or BATB) and 0 volts (BATR).

Scenario

Install Protective Earth and Power Supply Cables

Test Power Supply

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-38 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 65: 3MN-00467-1011-RJZZAi1

...................................................................................................................................................................................................

5 On the rack side, perform the same test between the -48V cables.

...................................................................................................................................................................................................

6 On the site power cabinet, check that the site fuse breakers correspond to the

recommendations from SPP 59 - Specification for 9130 BSC/MFS Evolution Site

Preparation.

...................................................................................................................................................................................................

7 On the site power cabinet, switch ON the DC 48 volts fuse breakers (BATA and BATB).

...................................................................................................................................................................................................

8 On the rack side, measure if 48 V is present on the BATA and verify the polarity.

Scenario

Install Protective Earth and Power Supply Cables

Test Power Supply

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-39

Page 66: 3MN-00467-1011-RJZZAi1

...................................................................................................................................................................................................

9 On the rack side, measure if 48 V is present on the BATB and verify the polarity.

...................................................................................................................................................................................................

10 On the site power cabinet, switch OFF the site fuse breakers.

...................................................................................................................................................................................................

11 When all power lines are checked, replace the JSXPDU covers and fix them with the

provided screws.

Scenario

Install Protective Earth and Power Supply Cables

Test Power Supply

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-40 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

E N D O F S T E P S...................................................................................................................................................................................................

Page 67: 3MN-00467-1011-RJZZAi1

Install PCM Cables

Run 120 Ohm PCM Cables

C1: Top Entry of Cables

Route the cables from the top:

...................................................................................................................................................................................................

1 Bind the cables in groups of eight cables as shown in the following figure.

...................................................................................................................................................................................................

2 Run the group of eight cables through the cable ducts to the bottom of the rack.

...................................................................................................................................................................................................

3 Run the cables under the rack through the side cable entries of the rack.

Figure 3-13 Bind Cables

Scenario

Install PCM Cables

Run 120 Ohm PCM Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-41

Page 68: 3MN-00467-1011-RJZZAi1

...................................................................................................................................................................................................

4 Run the cables to the JSXLIU shelf through the front cable entry of the rack.

...................................................................................................................................................................................................

5 Separate the cables.

...................................................................................................................................................................................................

6 Label the PCM cables.

...................................................................................................................................................................................................

7 Leave the cables near JSXLIU shelf, not connected.

...................................................................................................................................................................................................

8 If a second ATCA shelf must be installed, run the cables before ATCA shelf installation.

Figure 3-14 Cable Routing Front View

Scenario

Install PCM Cables

Run 120 Ohm PCM Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-42 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 69: 3MN-00467-1011-RJZZAi1

Figure 3-15 Top Rack Cable Entry General View

Scenario

Install PCM Cables

Run 120 Ohm PCM Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-43

E N D O F S T E P S...................................................................................................................................................................................................

Page 70: 3MN-00467-1011-RJZZAi1

C2: Bottom Entry of Cables

Route the cables from the bottom:

...................................................................................................................................................................................................

1 Run the cables through the front window in the bottom plate (see Figure 3-8, “Bottom

Cable Entry” (p. 3-29)).

...................................................................................................................................................................................................

2 Attach the cables to the rack using adhesive cable ties.

...................................................................................................................................................................................................

3 Label the PCM cables.

...................................................................................................................................................................................................

4 Leave the cables near the JSXLIU shelf, not connected.

...................................................................................................................................................................................................

5 If a second ATCA shelf must be installed, run the cables before ATCA shelf installation.

Scenario

Install PCM Cables

Run 120 Ohm PCM Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-44 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 71: 3MN-00467-1011-RJZZAi1

Figure 3-16 Cable Routing Front View

Scenario

Install PCM Cables

Run 120 Ohm PCM Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-45

Page 72: 3MN-00467-1011-RJZZAi1

Figure 3-17 Cable Routing Side View

Scenario

Install PCM Cables

Run 120 Ohm PCM Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-46 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

E N D O F S T E P S...................................................................................................................................................................................................

Page 73: 3MN-00467-1011-RJZZAi1

Run 75 Ohm PCM Cables

Top Entry of Cables

Route the cables:

...................................................................................................................................................................................................

1 For the first eight cables on each side of the rack, run the free end of the cables, from the

bottom, through the cable duct to the top of the rack.

...................................................................................................................................................................................................

2 If more than eight cables are required on each side, run the cables between the cable duct

and the rack back side, close to the side walls.

Attention: Ensure that the PCM cables:

• Are as close as possible to the side wall

• Do not block a potential JSXLIU shelf dismantling from the back side of the rack

• Cannot be damaged when running out at the rack top (edge protection is

available).

Scenario

Install PCM Cables

Run 75 Ohm PCM Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-47

Page 74: 3MN-00467-1011-RJZZAi1

...................................................................................................................................................................................................

3 Run the cables under the JXSLIU shelf.

Scenario

Install PCM Cables

Run 75 Ohm PCM Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-48 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 75: 3MN-00467-1011-RJZZAi1

...................................................................................................................................................................................................

4 Ensure that the PCM cables are close to the rack side panels.

Scenario

Install PCM Cables

Run 75 Ohm PCM Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-49

Page 76: 3MN-00467-1011-RJZZAi1

...................................................................................................................................................................................................

5 Label the PCM cables.

...................................................................................................................................................................................................

6 Connect the PCM cables to the JBXLIU boards.

...................................................................................................................................................................................................

7 Fit the PCM cables at the required length.

Scenario

Install PCM Cables

Run 75 Ohm PCM Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-50 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 77: 3MN-00467-1011-RJZZAi1

...................................................................................................................................................................................................

8 Disconnect the PCM cables from the JBXLIU boards and leave them near the JSXLIU

shelf, not connected. PCM cable connection is performed during commissioning,

according to customer requirements.

Bottom Entry of Cables

Route the cables from the bottom:

...................................................................................................................................................................................................

1 Run the cables through the front window in the bottom plate.

Note: If two JSXLIU shelves are used, the PCM cables can also be routed through the

side cable windows.

Scenario

Install PCM Cables

Run 75 Ohm PCM Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-51

E N D O F S T E P S...................................................................................................................................................................................................

Page 78: 3MN-00467-1011-RJZZAi1

...................................................................................................................................................................................................

2 Attach the cables to the rack using adhesive cable ties.

...................................................................................................................................................................................................

3 Label the PCM cables.

...................................................................................................................................................................................................

4 Connect the PCM cables to the JBXLIU boards.

Figure 3-18 Bottom Cable Entry

Scenario

Install PCM Cables

Run 75 Ohm PCM Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-52 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 79: 3MN-00467-1011-RJZZAi1

...................................................................................................................................................................................................

5 Fit the PCM cables at the required length.

...................................................................................................................................................................................................

6 Disconnect the PCM cables from the JBXLIU boards and leave them near the JSXLIU

shelf, not connected. PCM cable connection is performed during commissioning,

according to customer requirements.

The following figures show a front and side view for the cable routing solution.

Scenario

Install PCM Cables

Run 75 Ohm PCM Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-53

Page 80: 3MN-00467-1011-RJZZAi1

Figure 3-19 Cable Routing Front View

Scenario

Install PCM Cables

Run 75 Ohm PCM Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-54 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 81: 3MN-00467-1011-RJZZAi1

Figure 3-20 Cable Routing Side View

Scenario

Install PCM Cables

Run 75 Ohm PCM Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-55

E N D O F S T E P S...................................................................................................................................................................................................

Page 82: 3MN-00467-1011-RJZZAi1

Install Cables in Cable Way

Overview

Note: Refer to “Site Specific Information” (p. 2-6) to know the quantity of PCM

cables to install.

If a second ATCA shelf must be installed, install the PCM cables now for this ATCA

shelf.

Nr Materials Reference Kit

1 Tie wraps - Consumable supplies

Note: Before starting the installation, ensure that the PCM cables have the required

length.

Scenario

Install PCM Cables

Install Cables in Cable Way

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-56 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 83: 3MN-00467-1011-RJZZAi1

Procedure

Install the cables in the cable way:

...................................................................................................................................................................................................

1 Install cables in the PCM compartment of the cable tray.

...................................................................................................................................................................................................

2 Attach the cables with plastic tie wraps.

...................................................................................................................................................................................................

3 Mark the cables with a marker.

Scenario

Install PCM Cables

Install Cables in Cable Way

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-57

E N D O F S T E P S...................................................................................................................................................................................................

Page 84: 3MN-00467-1011-RJZZAi1

O2: Install Second Equipment in Rack

Install PCM Cables

Procedure

To install the PCM cables for the second equipment, refer to “Install PCM Cables”

(p. 3-41).

Scenario

O2: Install Second Equipment in Rack

Install PCM Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-58 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 85: 3MN-00467-1011-RJZZAi1

Install Second ATCA Shelf

Prepare ATCA Shelf

Before starting the installation:

...................................................................................................................................................................................................

1 Unpack the second ATCA shelf.

...................................................................................................................................................................................................

2 Visually check that the ATCA shelf is in a good state.

...................................................................................................................................................................................................

3 Check on the rack that the 16 screws and/or nuts required for second ATCA shelf

installation are available.

...................................................................................................................................................................................................

4 Ensure that nothing can block the second ATCA shelf insertion in the cabinet.

...................................................................................................................................................................................................

5 Ensure that PCM cables for the second ATCA shelf are already installed; if they are not,

install the PCM cables before ATCA shelf installation.

Install ATCA Shelf

Install the second ATCA shelf:

...................................................................................................................................................................................................

1 Put on an ESD wrist strap.

...................................................................................................................................................................................................

2 Connect the strap to the shelf by attaching the front or rear ESD jack.

...................................................................................................................................................................................................

3 Lift the shelf and place it above the existing one.

Attention: Do not hold the ATCA shelf from inside; hold it by the side panels.

Scenario

O2: Install Second Equipment in Rack

Install Second ATCA Shelf

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-59

E N D O F S T E P S...................................................................................................................................................................................................

Page 86: 3MN-00467-1011-RJZZAi1

...................................................................................................................................................................................................

4 Fasten the shelf to the rack with the provided screws.

Install ATCA Shelf Power Cables

Perform the following steps:

...................................................................................................................................................................................................

1 Depending on the ATCA shelf variant

Apply the appropriate case:

• “Install ATCA Shelf Power Cables in Case of Shelf Variant Before 3BK 27291 ABxx”

(p. 3-61)

• “Install ATCA Shelf Power Cables in Case from Shelf Variant 3BK 27291 ABxx On”

(p. 3-64).

Figure 3-21 Wrong Handling of ATCA Shelf

Scenario

O2: Install Second Equipment in Rack

Install Second ATCA Shelf

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-60 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

E N D O F S T E P S...................................................................................................................................................................................................

E N D O F S T E P S...................................................................................................................................................................................................

Page 87: 3MN-00467-1011-RJZZAi1

Install ATCA Shelf Power Cables in Case of Shelf Variant Before 3BK 27291 ABxx

Connect the ground and power cables to the second ATCA shelf:

...................................................................................................................................................................................................

1 Open the back door of the rack.

...................................................................................................................................................................................................

2 Connect the ground cable to the ground stud of the shelf.

...................................................................................................................................................................................................

3 Remove the M6 nuts and lockwashers from each of the connections on the JBXPSs and

set aside.

...................................................................................................................................................................................................

4 Install the power cables to the connections on the JBXPSs with the M6 nuts and

lockwashers previously removed. Torque nuts to 7.1 Nm (63 lbf.in).

...................................................................................................................................................................................................

5 Connect the power cables.

As follows:

• -48V blue cable labeled Shelf 4 A1 M83 to JBXPS1 Power studs

• 0V blue-black cable labeled Shelf 4 A1 M83 to JBXPS1 Return studs

• -48V blue cable labeled Shelf 4 A1 M81 to JBXPS3 Power studs

• 0V blue-black cable labeled Shelf 4 A1 M81 to JBXPS3 Return studs

Figure 3-22 Ground Cable and ESD Jack Connection

Scenario

O2: Install Second Equipment in Rack

Install Second ATCA Shelf

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-61

Page 88: 3MN-00467-1011-RJZZAi1

• -48V blue cable labeled Shelf 4 B1 M82 to JBXPS2 Power studs

• 0V blue-black cable labeled Shelf 4 B1 M82 to JBXPS2 Return studs

• -48V blue cable labeled Shelf 4 B1 M80 to JBXPS4 Power studs

• 0V blue-black cable labeled Shelf 4 B1 M80 to JBXPS4 Return studs

...................................................................................................................................................................................................

6 Fit the rubber protection caps on the terminals.

Figure 3-23 Rear View of ATCA Shelf Variant Before 3BK 27291 ABxx

Scenario

O2: Install Second Equipment in Rack

Install Second ATCA Shelf

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-62 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 89: 3MN-00467-1011-RJZZAi1

...................................................................................................................................................................................................

7 Switch JBXPSs handle switch to the Closed position.

Scenario

O2: Install Second Equipment in Rack

Install Second ATCA Shelf

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-63

Page 90: 3MN-00467-1011-RJZZAi1

...................................................................................................................................................................................................

8 Disconnect the wrist strap from the shelf.

...................................................................................................................................................................................................

9 Remove the ESD wrist strap from your hand.

...................................................................................................................................................................................................

10 Close the back door of the rack.

Install ATCA Shelf Power Cables in Case from Shelf Variant 3BK 27291 ABxx On

Connect the ground and power cables to the second ATCA shelf:

...................................................................................................................................................................................................

1 Open the back door of the rack.

...................................................................................................................................................................................................

2 Connect the ground cable to the ground stud of the shelf.

...................................................................................................................................................................................................

3 Remove the M6 nuts and lockwashers from each of the connections on the JBXPSs and

set aside.

Figure 3-24 Ground Cable and ESD Jack Connection

Scenario

O2: Install Second Equipment in Rack

Install Second ATCA Shelf

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-64 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

E N D O F S T E P S...................................................................................................................................................................................................

Page 91: 3MN-00467-1011-RJZZAi1

...................................................................................................................................................................................................

4 Install the power cables to the connections on the JBXPSs with the M6 nuts and

lockwashers previously removed. Torque nuts to 7.1 Nm (63 lbf.in).

...................................................................................................................................................................................................

5 Connect the power cables.

As follows:

• -48V blue cable labeled Shelf 4 A1 M81 to JBXPS1 Power studs

• 0V blue-black cable labeled Shelf 4 A1 M81 to JBXPS1 Return studs

• -48V blue cable labeled Shelf 4 B1 M82 to JBXPS2 Power studs

• 0V blue-black cable labeled Shelf 4 B1 M82 to JBXPS2 Return studs

Note: Do not remove the protection from the free end of the unused power cables.

...................................................................................................................................................................................................

6 Fit the rubber protection caps on the terminals.

Figure 3-25 Rear View of ATCA Shelf from Shelf Variant 3BK 27291 ABxx On

Scenario

O2: Install Second Equipment in Rack

Install Second ATCA Shelf

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-65

Page 92: 3MN-00467-1011-RJZZAi1

...................................................................................................................................................................................................

7 Disconnect the wrist strap from the shelf.

...................................................................................................................................................................................................

8 Remove the ESD wrist strap from your hand.

...................................................................................................................................................................................................

9 Close the back door of the rack.

Scenario

O2: Install Second Equipment in Rack

Install Second ATCA Shelf

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-66 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

E N D O F S T E P S...................................................................................................................................................................................................

Page 93: 3MN-00467-1011-RJZZAi1

Install Second LIU Shelf

Prepare Second LIU Shelf

Before starting the installation:

...................................................................................................................................................................................................

1 Unpack the second LIU shelf.

...................................................................................................................................................................................................

2 Visually check that the LIU shelf is in a good state.

...................................................................................................................................................................................................

3 Ensure that nothing can block the second LIU shelf insertion in the cabinet.

...................................................................................................................................................................................................

4 Identify the installation case.

As follows:

• The existing LIU shelf is installed from the rear

• The existing LIU shelf is installed from the front.

...................................................................................................................................................................................................

5 Perform the following steps only if the shelf must be installed from the front.

...................................................................................................................................................................................................

6 Loosen the screws fixing the brackets at the rear of the shelf and remove the brackets.

Figure 3-26 Brackets at Shelf Rear

Scenario

O2: Install Second Equipment in Rack

Install Second LIU Shelf

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-67

Page 94: 3MN-00467-1011-RJZZAi1

...................................................................................................................................................................................................

7 Fit the screws to the former position.

...................................................................................................................................................................................................

8 Loosen the screws at the front of the shelf.

...................................................................................................................................................................................................

9 Mount the fixation brackets at the front of the shelf and fix them with the screws.

Figure 3-27 Brackets at Shelf Front

Scenario

O2: Install Second Equipment in Rack

Install Second LIU Shelf

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-68 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

E N D O F S T E P S...................................................................................................................................................................................................

Page 95: 3MN-00467-1011-RJZZAi1

Install LIU Shelf

Install the LIU shelf:

...................................................................................................................................................................................................

1 Put on an ESD wrist strap.

...................................................................................................................................................................................................

2 Connect the strap to the shelf by attaching the front or rear ESD jack.

...................................................................................................................................................................................................

3 Lift the shelf and place it above the existing one.

As follows:

• From the back when the existing LIU shelf is installed from the rear

• From the front when the existing LIU shelf is installed from the front.

Attention: Do not hold the LIU shelf from inside; hold it by the side panels.

...................................................................................................................................................................................................

4 Fasten the shelf to the rack with the provided screws.

...................................................................................................................................................................................................

5 Connect the power cables to the JBXPEM boards.

Scenario

O2: Install Second Equipment in Rack

Install Second LIU Shelf

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-69

E N D O F S T E P S...................................................................................................................................................................................................

Page 96: 3MN-00467-1011-RJZZAi1

Install Internal Ethernet Cables

Procedure

Install the internal Ethernet cables:

...................................................................................................................................................................................................

1 Connect the first JLCAT6 Ethernet cable (1AB 22983 0005) between ATCA shelf 4,

JAXSSW1, Ethernet port 2 and the GbE port on JBXMUX1 (slot 10) in JSXLIU shelf 2.

...................................................................................................................................................................................................

2 Connect the second JLCAT6 Ethernet cable (1AB 22983 0005) between ATCA shelf 4,

JAXSSW2, Ethernet port 2 and the GbE port on JBXMUX2 (slot 12) in JSXLIU shelf 2.

Scenario

O2: Install Second Equipment in Rack

Install Internal Ethernet Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-70 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

E N D O F S T E P S...................................................................................................................................................................................................

Page 97: 3MN-00467-1011-RJZZAi1

O3, O4, O5, O6, O7: Install Ethernet Cables

O3: Install OMC-R Router Cables

Overview

Nr Materials Reference Kit

1 Labels OMC-R

Ethernet cables

- Basic kit 3BK 27244 ABAA (JDMX)

2 OMC-R Ethernet

cables (ALETHD)

3BW 01804 JA -

Procedure

Install the OMC-R (and CBC for the 9130 BSC Evolution) router cables:

...................................................................................................................................................................................................

1 Refer to “Site Specific Information” (p. 2-6) for quantity and cabling of OMC-R cables.

...................................................................................................................................................................................................

2 Pass the cables into the cabinet the same way as for PCM cables.

...................................................................................................................................................................................................

3 Attach the cable to the rack.

...................................................................................................................................................................................................

4 If the connecting position is unknown, do not connect the cables.

...................................................................................................................................................................................................

5 Label the cables at each end, near the connectors.

Scenario

O3, O4, O5, O6, O7: Install Ethernet Cables

O3: Install OMC-R Router Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-71

E N D O F S T E P S...................................................................................................................................................................................................

Page 98: 3MN-00467-1011-RJZZAi1

O4: Install A-GPS Server Cable

Overview

Nr Materials Reference Kit

1 Labels A-GPS

Ethernet cable

- Basic kit 3BK 27244 ABAA (JDMX)

2 A-GPS Ethernet

cables (ALETHD)

3BW 01804 JA -

Procedure

Install the A-GPS cables:

...................................................................................................................................................................................................

1 Refer to “Site Specific Information” (p. 2-6) for quantity and cabling of A-GPS cables.

...................................................................................................................................................................................................

2 Pass the cables into the cabinet the same way as for the PCM cables.

...................................................................................................................................................................................................

3 Attach the cable to the rack.

...................................................................................................................................................................................................

4 If the connecting position is unknown, do not connect the cables.

...................................................................................................................................................................................................

5 Label the cables at each end, near the connectors.

Scenario

O3, O4, O5, O6, O7: Install Ethernet Cables

O4: Install A-GPS Server Cable

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-72 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

E N D O F S T E P S...................................................................................................................................................................................................

Page 99: 3MN-00467-1011-RJZZAi1

O5: Install External Alarm Box

Overview

Nr Materials Reference Kit

1 Labels EAB

Ethernet cable

- Basic kit 3BK 27244 ABAA (JDMX)

2 External Alarm Box 3BW 01804 JA -

Procedure

Install the External Alarm Box:

...................................................................................................................................................................................................

1 Refer to External Alarm Box Installation and Commissioning.

...................................................................................................................................................................................................

2 Pass the cable for EAB into the cabinet in the same way as for the PCM cables.

...................................................................................................................................................................................................

3 Attach the cable to the rack.

...................................................................................................................................................................................................

4 If the connecting position is unknown, do not connect the cable.

...................................................................................................................................................................................................

5 Label the cable at each end, near the connectors.

Scenario

O3, O4, O5, O6, O7: Install Ethernet Cables

O5: Install External Alarm Box

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-73

E N D O F S T E P S...................................................................................................................................................................................................

Page 100: 3MN-00467-1011-RJZZAi1

O6: Install SGSN Router Cables

Overview

Nr Materials Reference Kit

1 Labels SGSN

Ethernet cables

- Basic kit 3BK 27244 ABAA (JDMX)

2 SGSN Ethernet

cables (ALETHD)

3BW 01804 JA -

Procedure

Install the SGSN router cables:

...................................................................................................................................................................................................

1 Refer to “Site Specific Information” (p. 2-6) for the quantity and cabling of SGSN cables.

...................................................................................................................................................................................................

2 Pass the cables into the cabinet the same way as for the PCM cables.

...................................................................................................................................................................................................

3 Attach the cable to the rack.

...................................................................................................................................................................................................

4 If the connecting position is unknown, do not connect the cables.

...................................................................................................................................................................................................

5 Label the cables at each end, near the connectors.

Scenario

O3, O4, O5, O6, O7: Install Ethernet Cables

O6: Install SGSN Router Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-74 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

E N D O F S T E P S...................................................................................................................................................................................................

Page 101: 3MN-00467-1011-RJZZAi1

O7: Install Ethernet Cables for IP Telecom Traffic in Release

B11

Overview

Nr Materials Reference Kit

1 Labels IP telecom

traffic Ethernet

cables

- Basic kit 3BK 27244 ABAA (JDMX)

2 IP telecom traffic

Ethernet cables

(ALETHD)

3BW 01804 JA -

Procedure

Install the IP telecom traffic router cables:

...................................................................................................................................................................................................

1 Refer to the BSS Telecom Routing Configuration.

...................................................................................................................................................................................................

2 Pass the cables into the cabinet the same way as for the PCM cables.

...................................................................................................................................................................................................

3 Attach the cable to the rack.

...................................................................................................................................................................................................

4 If the connecting position is unknown, do not connect the cables.

...................................................................................................................................................................................................

5 Label the cables at each end, near the connectors.

Scenario

O3, O4, O5, O6, O7: Install Ethernet Cables

O7: Install Ethernet Cables for IP Telecom Traffic in Release

B11

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-75

E N D O F S T E P S...................................................................................................................................................................................................

Page 102: 3MN-00467-1011-RJZZAi1

O8: Install Optical Cables for STM1 in Release B11

How to Install Optical Cables for STM1 in Release B11

Overview

Note: This task must be performed only if the STM1 option was selected at BSC side.

An optical fiber cable (patch cord) is a very sensitive object. Please handle it with

care.

When routing the optical fiber cables, ensure that the bending radius is higher than the

minimum bending radius provided by the manufacturer. Generally the bending radius

of a optical cable is greater than 20D, where D is the diameter of cable.

Follow the manufacturer's recommendations.

Refer to “Site Specific Information” (p. 2-6) for the number of STM1 cables to install.

Scenario

O8: Install Optical Cables for STM1 in Release B11

How to Install Optical Cables for STM1 in Release B11

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-76 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

Page 103: 3MN-00467-1011-RJZZAi1

Install Optical Cables in Cable Way

Overview

Nr Materials Reference Kit

1 Basic installation

kit for Optical Fibre

cable

3BK27700ABAA Consumable supplies

Procedure

Install the optical cables in the cable way:

...................................................................................................................................................................................................

1 Install the optical cables in the STM1 compartment of the cable tray.

...................................................................................................................................................................................................

2 Attach the optical cables with plastic tie wraps.

Figure 3-28 Install Optical Cable in cable tray

Scenario

O8: Install Optical Cables for STM1 in Release B11

Install Optical Cables in Cable Way

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-77

Page 104: 3MN-00467-1011-RJZZAi1

...................................................................................................................................................................................................

3 Mark the optical cables with a marker.

Scenario

O8: Install Optical Cables for STM1 in Release B11

Install Optical Cables in Cable Way

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-78 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

E N D O F S T E P S...................................................................................................................................................................................................

Page 105: 3MN-00467-1011-RJZZAi1

Install SFP Modules

Procedure

Install an SFP Module:

...................................................................................................................................................................................................

1 Connect the anti-static wrist strap.

...................................................................................................................................................................................................

2 Replace the protective rubber from the SFP module and insert straight into the slot until

the module clicks firmly into place. When inserting the SFP, be sure that the hinged face

is closed.

Scenario

O8: Install Optical Cables for STM1 in Release B11

Install SFP Modules

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-79

Page 106: 3MN-00467-1011-RJZZAi1

...................................................................................................................................................................................................

3 Disconnect the anti-static wrist strap.

Scenario

O8: Install Optical Cables for STM1 in Release B11

Install SFP Modules

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-80 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

E N D O F S T E P S...................................................................................................................................................................................................

Page 107: 3MN-00467-1011-RJZZAi1

Route Optical Cables

Overview

Note: The optical fiber cable cannot be cut to the correct length. You must therefore

adjust the cable length by making loops with the cable in the rack or cable tray.

C1: Route Optical Cables by Top Entry of Rack

Run the optical cables from the top of rack:

...................................................................................................................................................................................................

1 Run the optical cables at the top rack entry.

...................................................................................................................................................................................................

2 Run the optical cables at the back of the rack from top to bottom. Attach the optical cables

with plastic tie wraps.

Figure 3-29 Cables Rack Top Entry

Scenario

O8: Install Optical Cables for STM1 in Release B11

Route Optical Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-81

Page 108: 3MN-00467-1011-RJZZAi1

...................................................................................................................................................................................................

3 From the bottom of the rack pass optical cable in front of the rack, route them until you

reach front of the JBXTP3 boards. Attach the optical cables with plastic tie wraps from

this point. Refer to Figure 3-31, “Optical Cable Connection on JBXTP3 Board” (p. 3-84).

C2: Route Optical Cables by Bottom Entry of Rack

Note: The optical fibre cable cannot be cut to the correct length. You must therefore

adjust the cable length making loops with the optical cable in the rack or cable tray.

Perform the following steps:

...................................................................................................................................................................................................

1 Run the optical cables at the bottom rack entry.

...................................................................................................................................................................................................

2 Run the optical cables from the bottom of the rack to the front side of the JBXTP3.

Scenario

O8: Install Optical Cables for STM1 in Release B11

Route Optical Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-82 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

E N D O F S T E P S...................................................................................................................................................................................................

Page 109: 3MN-00467-1011-RJZZAi1

Figure 3-30 Cables Routing Bottom Entry - Rear View

Scenario

O8: Install Optical Cables for STM1 in Release B11

Route Optical Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-83

Page 110: 3MN-00467-1011-RJZZAi1

The following figure shows the optical fibre cable connection positions on the front plate

of the JBXTP3 boards.

Figure 3-31 Optical Cable Connection on JBXTP3 Board

Scenario

O8: Install Optical Cables for STM1 in Release B11

Route Optical Cables

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-84 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

E N D O F S T E P S...................................................................................................................................................................................................

Page 111: 3MN-00467-1011-RJZZAi1

Finish Installation

How to Finish Installation

Procedure

Finish the installation:

...................................................................................................................................................................................................

1 Fit the plinth cover.

...................................................................................................................................................................................................

2 Fit the top cover and fix it with provided screws.

...................................................................................................................................................................................................

3 Fit the labels to the rack (for example: 9130 MFS/BSC Evolution n°12).

...................................................................................................................................................................................................

4 Close the front door and leave the rack key to the door with the customer.

Figure 3-32 Fit Rack Bottom Cover Plate

Scenario How to Finish Installation

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

3-85

Page 112: 3MN-00467-1011-RJZZAi1

...................................................................................................................................................................................................

5 Clear away packaging.

...................................................................................................................................................................................................

6 Clean the site. Do not put packages into the customer bin.

Figure 3-33 Close Doors

Scenario

Finish Installation

How to Finish Installation

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-86 Alcatel-Lucent 9130 BSC/MFS

3MN-00467-1011-RJZZA

Issue 1 March 2012

E N D O F S T E P S...................................................................................................................................................................................................