Pipe Coating and Failure Modes of Mainline & Field Joint Coatings – Pictorial Learning's
Michael Surkein – Senior Corrosion and Materials Consultant&
Jeff Didas – Corrosion Specialist ExxonMobil Development Company
Houston, Texas
OGP Coatings Committee – London
![Page 2: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/2.jpg)
2
Pipe Coatings
• Pipe coating purpose
• Typical selection• Mainline & field joint
• Why coatings fail ?
• What is the life of a coating ?
• Pictorial experiences
• Lessons learned
• Conclusions
![Page 3: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/3.jpg)
3
Pipe Coating Purpose• Prevent corrosion of pipe steel
• Reduce cathodic protection current demand
• Easy to apply pipe coating
• Availability
• Performance• Handling• Cathodic disbondment
• Long life
• Simple field joint
• EM Global Practices References• API & NACE• ISO• AFNOR• ASTM• CSA
![Page 4: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/4.jpg)
4
Typical - Pipe Coatings of Choice
Selected from EM Global PracticesMain Line Pipe Coatings • Fusion Bonded Epoxy (FBE)
• Mostly in North America• Single or dual layer up to 95 C (200 F) • Dual layer for HDD’s
• 3 Layer Polyethylene (3LPE) - up to 80 C (175 F)• Common outside US
• 3 Layer Polypropylene (3LPP) - up to 110 C (230 F)• More common outside US
Field Joint Coatings• FBE, 3LPE, 3LPP• Liquid
• Epoxy • Epoxy Urethane• Tar Urethane
• No heat shrink sleeves
![Page 5: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/5.jpg)
5
Field Joint Selection
Mainline Pipe Coating Preferred Field Joint
Alternate Field Joint
FBE - Onshore FBE Liquid epoxy or epoxy urethaneLiquid urethane
FBE - Offshore FBE
3LPE - Onshore 3LPE Liquid urethaneLiquid epoxy urethane
3LPE - Offshore 3LPE FBE + Solid Polyurethane
3LPP - Onshore 3LPP Epoxy novalocFused polypropylene (PP) sheet under evaluation
3LPP - Offshore 3LPP (injection molded)
Flame spray PP & new technology under evaluation
Infill Materials - Offshore
• Polyurethane foam
![Page 6: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/6.jpg)
6
Pipe End Detail
1)Coating cut-back shall be 125 mm, 30 degree to 40 degree chamfer, and a 50 mm fusion bonded epoxy (FBE) tail; +10 mm or −20 mm. Figure 1: Pipe End Cross Section
Pipe Wall
30°-40° Chamfer of Outer Layers125 mm Cut-Back
50 mm FBE Tail
PP or PE Outer LayerAdhesive
FBE Primer
Coating cut-back shall be 125 mm, 30 degree to 40 degree chamfer, and a 50 mm fusion bonded epoxy (FBE) tail; +10 mm or −20 mm.
![Page 7: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/7.jpg)
7
Field Joint Coatings• Quality & Integrity
• Typically the weak point in a pipe coating system• Aligning field joint coating requirements with mill
applied coatings• Cutback configuration and integrity is
important• Multi-layer systems are often challenging
• Employing skilled field joint coating contractors is critical.
![Page 8: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/8.jpg)
8
Why Coatings Fail ?
• Age
• Selection
• Application
Which is most important?
![Page 9: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/9.jpg)
9
What is the Life of a Coating?
• Determined by design
• Determined by use
• Determined by selection
• Determined by application
![Page 10: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/10.jpg)
10
Is Handling of Coated Pipe Important?
![Page 11: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/11.jpg)
11
Do Pipe Coatings Like Sunlight?
![Page 12: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/12.jpg)
12
Do Pipe Coatings Like Sunlight?
• Coating thickness• Impacted by UV • Epoxy will chalk
![Page 13: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/13.jpg)
13
Coating Damage?
• Long weld seam
![Page 14: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/14.jpg)
14
Coating End Bonding
![Page 15: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/15.jpg)
15
Coating End Bonding
![Page 16: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/16.jpg)
16
Handling Damage
![Page 17: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/17.jpg)
17
Storage Protection
![Page 18: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/18.jpg)
18
Handling Damage
![Page 19: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/19.jpg)
19
Application Quality
![Page 20: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/20.jpg)
20
Application Quality
• Cathodic Disbondment
![Page 21: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/21.jpg)
21
Cathodic Disbondment
• Cathodic disbondment testing• International standards• Company standards• Third party labs
![Page 22: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/22.jpg)
22
Field Coating Repair
![Page 23: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/23.jpg)
23
Coating Blistering
• Overheating• Surface contamination
![Page 24: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/24.jpg)
24
Coating Bendability
• Field bends• Coating qualification• International standards• Company standards• Testing at lowest
installation temperature
![Page 25: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/25.jpg)
25
Coating Over Thickness
![Page 26: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/26.jpg)
26
Coating Over Thickness
![Page 27: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/27.jpg)
27
Coating Poor Adhesion
![Page 28: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/28.jpg)
28
Wrinkling
• Poor adhesion• Temperature• Soil stress• UV degradation
![Page 29: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/29.jpg)
29
Wrinkling
![Page 30: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/30.jpg)
30
Wrinkling
![Page 31: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/31.jpg)
31
Wrinkling
![Page 32: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/32.jpg)
32
Thickness & Curing
![Page 33: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/33.jpg)
33
• Curing• Over thickness• Overheating• Heating too fast
Field Joint Coating Quality
![Page 34: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/34.jpg)
34
Field Joint Coating Quality
![Page 35: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/35.jpg)
35
Cracking
![Page 36: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/36.jpg)
36
Cracking
• Over thickness• Curing• Bendability• Qualification
![Page 37: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/37.jpg)
37
Weld Surface Preparation
• Difficulty abrasive blasting rough welds
![Page 38: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/38.jpg)
38
Final Coating - Visual
• Is final visual inspection suitable to determine field joint coating quality?
![Page 39: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/39.jpg)
39
Field Joint Coating Quality
• Was surface preparation suitable?• Adhesion seem questionable.
![Page 40: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/40.jpg)
40
Heat Shrink Sleeve Field Joint
![Page 41: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/41.jpg)
41
Field Joint Coating & Repair
Heat Shrink Sleeve
Coating Repairs
![Page 42: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/42.jpg)
42
Tape Coating – Poor Adhesion
![Page 43: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/43.jpg)
43
Coating Experts???
Do Too Many Cooks Spoil the
Meal???
![Page 44: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/44.jpg)
44
Pipeline Coating Testing
![Page 45: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/45.jpg)
45
Lessons Learned• Select coatings by service
conditions• Current and future• Shipment and storage
• Do not select coatings by price only
• Use a quality specification• Include detailed requirements• Include qualifications• Conduct preproduction meeting
• Use a qualified applicator• Pre-qualify
• Use a qualified and experienced inspector
![Page 46: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/46.jpg)
46
Coating Manufacturer
“We have the very best materials – nosecond-best here!”
Coating applicator
“We’re the best and the greatest coatingapplicators – no improper coating jobs!”
Customer… is left holding the bag when the coating
fails
Three Players Involved
![Page 47: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/47.jpg)
47
Wrap Up
• Any more discussion?
• Questions?
![Page 48: 3LPE](https://reader034.vdocuments.site/reader034/viewer/2022051517/55cf9915550346d0339b72e3/html5/thumbnails/48.jpg)
48
Contact Information
Michael Surkein
ExxonMobil Development Company
12450 Greenspoint Drive
Houston, TX 77060
281-654-4821