Santa Barbara County North County Public Works Office
620 West Foster Road Santa Maria, California 93455
Attention: Cliff Replogle, P.E. Resident Engineer
Office: 805-739-8776
Agency Information
• Valley Slurry Seal is a member in good standing with the ISSA and has been an active part of the ISSA since 1963
• Project acceptance date is November 29, 2012 • Project was completed on time, within the owner’s
budget • There were no safety issues on this project • All pavement preservation techniques were performed by
Valley Slurry Seal and its subsidiaries.
• Total Contract Value: $2,419,318.00
• Contract Time: 50 Working Days
• Liquidated Damages: $3,000.00 Per Day
• Working Hours: 7 am until 5 pm (All roads open at 5 pm)
• Contractor Provided Quality Control Manager (QCM) On Site + Independent 3rd Party Testing
• Intense Storm Water Pollution Prevention Requirements
• Maintenance of Traffic per Caltrans Standard Specifications
3rd Party Testing & Inspection As Follows:
Scrub Seal: Micro Surfacing: Robert Staugaard Chris Starke APART Laboratories Fugro West Shafter, CA Santa Barbara, CA 661-393-2748 805-963-4450
County of Santa Barbara required stringent quality assurance testing on emulsions, and emulsion components. Special attention was paid to the use of cationic polychloroprenes in the polymer modified rejuvenating emulsions
• The County has a long history of utilizing preservation techniques, and the scope of work in this contract consisted of scrub seal and micro-surfacing application on approximately 40 roadway locations scattered throughout 5 Districts.
• Santa Barbara County is one of the larger geographical counties in California, and the scope included both arterial and residential roadways with varying daily traffic counts
• A total of 470,031 square yards of pavement received pavement preservation treatments
• Scrub seal, Type II & Type III micro surfacing applications were determined by condition of existing roadway, daily traffic volumes and whether the roadway was residential or rural arterials
District: Scrub Seal Type II Micro Type III Micro Fog Seal 1 9,150 SY 81,203 SY 0 SY 730 SY 2 31,586 SY 53,053 SY 0 SY 1,610 SY 3 14,768 SY 119,963 SY 60,450 SY 1,440 SY 4 23,486 SY 39,456 SY 62,861 SY 590 SY 5 53,046 SY 0 SY 53,046 SY 0 SY Totals: 132,036 SY 293,675 SY 176,356 SY 4,370 SY
Traffic Control System Asphalt Emulsion (Fog Seal) Scrub Seal (Type C, Grading) Micro surfacing (Type 2) Micro surfacing (Type 3) Replace Asphalt Concrete Hot Mix AC Dike (Type A) Roadway Signs Painted Pavement Markings (Temporary) Painted Pavement Markings (Permanent) Reflective Pavement Markers
The 2012 County of Santa Barbara Pavement Preservation Project :
• Was consistently applied to roads exhibiting wide , fatigue cracking and heavily oxidized pavements
• The project was performed across as wide variety of roads: • Rural farm to market with heavy truck traffic • Hilly terrain with shady areas and tight turning
radiuses • Affluent residential neighborhoods streets • Major thoroughfares and collectors with high traffic
volumes
The polymer modified rejuvenating emulsion (PMRE) was applied at 0.3 3gallons per square yard and covered with xx pounds of a 3/8 “ chip
Black Road – Near Santa Maria, CA
Key materials used on the project supplied as follows: Micro surfacing emulsion: VSS Emultech, Bakersfield, CA. Type II Micro surfacing aggregates: Graniterock, Inc. – Aromis Quarry Type III Micro surfacing aggregates: Graniterock, Inc. – Aromis Quarry Styraflex scrub seal emulsion: VSS Emultech, Bakersfield, CA. Chip seal aggregates: Cal Portland Aggregates
Existing Roadway Conditions Diverse roads across a large geographical section required several different treatments
This section of Stowell Road above and Black Road to the right show wide, deep cracking on severely oxidized pavements. These section received a Cape Seal
The picture to the right shows the wide cracking of the pavement which necessitated the use of a polymer modified rejuvenating emulsion in a scrub seal application. The scrub seal was applied in both sunny and overcast, cool conditions in October of 2012
Scrub Seal Install 2
This collector through a residential neighborhood was completed in one day, with fresh striping applied
This rural road was completed in one day, and striping applied
Painted temporary markings were Required at the end of each shift
Critical to the success of this project was • Intensive pre-planning and staging over a diverse
workzone • Continuous and rigorous quality assurance testing by third
party testing laboratories • The use of advanced materials such as polymer modified
rejuvenating emulsions coupled with enhanced equipment such as scrub brooms
• Next generation materials, such as fiber modified microsurfacing placed concurrent with this job with partnering agencies.
During the execution of this contract several local agencies benefited from the use of synthetic fibers placed as follows:
• The City of Lompoc, California had several residential roadways with severe
alligator cracking. The use of a two step fiber reinforced slurry seal was used in an effort to extend the life of the existing roadways until adequate funding can be secured to replace at a later date.
• The City of Goleta, California agreed to allow the use of fiber reinforced slurry seal on roadways that had been specified to received a hot rubber crack seal ahead of a conventional polymer modified slurry seal product. The fibers were used in lieu of the more conventional crack treatment.
Existing roadway conditions exhibit severe alligator cracking
Step 1: Apply Type III Slurry Seal with fiber reinforcement
Step 2: Apply Type II Slurry Seal with fiber reinforcement
This section from Goleta shows Fiber slurry being applied
Pav
emen
t C
ondi
tion
Pavement Age
Fog Sealing Crackfilling
Slurry/Microsurfacing/Chip Seals
Cape Seals
3 Step Process
Cold In Place
Reconstruction
Mar
riage
Con
ditio
n
Time
Roses Dinner
Holiday
Legal Bills
Sports Car Jewelry
Spa
Thank you for your consideration of this project nomination