HCPT 3G New Deployment
Huawei RNP/RNO Team
Huawei Confidential
HCPT 3G Expansion Sites
Page 2
Area RNC Name Site NumberBanten
Plaza Kuningan
31
DKI 45
Jakarta 222
Bandung Bandung 52
Semarang
Semarang
61
Sleman 6
Yogyakarta 17
Surabaya Surabaya 65
BatamBatam
43
Riau 10
Medan Medan 26
Grand Total Null 578
Huawei Confidential
Project Flow Progress
After Integration site will be locked and will unlocked during SSV, Site will be locked again after finished functionality test.
After ATP site will unlocked and starting stability test, we monitoring KPI Statistic and alarm, if during 5 days there no finding problem site will be stated On Air
Page 3
Integration ATP On Air PAC FACCAC
SSV Stabillity Test Single site Optimization FAC RNC Level- CSSR- DCR- SHO- ISHO- Coverage
-KPI Monitoring 5 days- Alarm Monitoring
Unblock
Huawei Confidential Page 4
On Air Procedure
IntegrationSite will be block
Unblock the SiteDuring SSV
SSV
SSV Pass
Inform Project
Team to Troubleshoot
Block the site
Inform HCPTFunctionality Test Done
HCPT
Request
OA
Submit CRTo make site OA
Block Site
OAStabillity Test Periode
Yes
NOKNO
Stability Test
PassState OA
Troubleshooting
OK
NOK
Huawei Confidential
New Site On Air Procedure
1. All sites to be blocked after integration.
2. To perform call tests during ATP Node B to be unblocked but to be blocked as soon as ATP is completed
3. During execution of single site verification drive tests sites to be unblocked and blocked as soon as the drive tests are completed.
4. After successful completion of single site verification Huawei RNP to send report to HCPT
5. Huawei Radio planning team requires a written request (via email) from HCPT (pls define a PIC) to unblock a batch of sites (list to be attached) sites.
6. HW RNP team will submits a Change Request (CR) into Huawei CR System to unblock the sites. Standard MS CR process to be followed
7. HW MS configuration team to unblock sites and notify HCPT CC. (-> Sites on air).
8. HW MS to start hourly monitoring of new sites and initiate a fall back in case of bad performance. HCPT Performance team to be informed about fallback directly via SMS.
9. Site on air status to be included in daily operations report.
10. Sites on air to be included in daily performance report
Page 5
Huawei Confidential
RNP Flow Procedure
Page 6
Prepare 3G Enginering ParameterPrepare Database to register in Billing and MSSPrepare 2G SitedatabasePrepare Neighbor Relationshil 3G-3G, 3G-2G, 2G–3G
Integration On Air Optimization & PAC
Preparing for PACOptimization for site below KPIMake PAC Report, submit and get approval
1. Preparation 3. After On Air2. On Air
Preparation FAC
Network Performance Improvement
Acceptance
Add Neighbor RelationshipChecking ParamaeterChecking AlarmChecking site Functionality (SSV) Make SSV Report
Monitoring Site performance base on StatisticDo regulary Optimization (RF/parameter)
Huawei Confidential
Database Registration
Page 7
Huawei LAC_CI Registration
Datafill LAC_CI Registration
Plan work
(Mantis)
Site Database
Billing SystemEmail to : [email protected]
MSSEmail to : [email protected]
Output : Registration
Confirmation
Output : Datafill
Upload
Huawei Confidential Page 8
Neighbor Preparation
Ask 2G Database
From NSN
Neighbor Plan
3G to 2G
Neighbor Plan
3G to 3G
Sent neighbor
2G to 3G to NSN
Create Neighbor
to RNC
Asking 2G database from NSN regional PIC, then submit neighbor script from 2G to 3G to NSN regional Team
BSC 6900 Neighbor
NSN BSCDB
NSN Update DatabaseModify 2G
Database
Huawei Confidential
RNP Flow Procedure
Engineering Parameter Neighbor 3G to 3G, Neighbor 3G to 2G (ask NSN Regional team to
get 2G Database) Neighbor 2G to 3G, ask NSN team to make neighbor 2G to 3G Registering database (LAC & CI) in Billing system and MSS
Page 9
Preparing Database
Add Neighbor 3G to 3G, Neighbor 3G to 2G Ask to NSN to provide 2G update Database Cross check with NSN the already create 2G to 3G Neighbor Checking Alarm Drivetest to check site performance
Single Sites Verification
SSV Template Report
PAC Template Report
Huawei Confidential
Performance Report
Page 10
Daily Report Daily Performance Report Daily Utilization Report Capacity Monitoring Report Presentation Daily Performance Report NSN Data Change
Weekly Report Weekly Performance Report
Performance Map
Worst Performance Cell
Huawei Confidential
Optimization Flow
Page 11
New Site Integrated
Single Site Verification
RF Optimization
Service Test and Parameter Optimization
Regular Reference Route Testing and Stats Analysis
Re-optimization Needed ?
N
Y
Single Site Optimization
Provisional Acceptance Certificate
Huawei Confidential
Need to Escalate
Integration definition On Air Procedure, when we can unlock the site for stability Test When On Air status will state for new site When Optimization process will start Report SSV submision
Page 12