7/28/2019 3D Modelling of Cehegin Historical Drilling Data
1/5
3D Modelling of Cehegin Historical Drilling
Data
-
7/28/2019 3D Modelling of Cehegin Historical Drilling Data
2/5
El Coloso Longitudinal Orebody open to the West and East
El Colos Profile Orebody open at depth
During early exploration, several holes were drilled to over 200
metres in length. These holes intersected several layers of
magnetite, however the original company - AHV subsequently only
-
7/28/2019 3D Modelling of Cehegin Historical Drilling Data
3/5
concentrated on only the most superficial layers which they
planned to exploit by open-pit.
El Coloso Open Pit
El Coloso Digital 3D Image of Open
-
7/28/2019 3D Modelling of Cehegin Historical Drilling Data
4/5
Soledad
3D Model of the
Soledad Concession,
which shows the
orebody open to the
East & West.
Several holes weredrilled to depths over200 meters, whichintersected manymagnetite layers atdepth.
-
7/28/2019 3D Modelling of Cehegin Historical Drilling Data
5/5
The focus of the original operating company AHV was to only prove outsufficient quantity and grades for open pit operations of up to 30 meters.
From the historical data already revised, we can concludethat there is a good potential to increase the mineralresources in the vicinity of virtually any of the depositsstudied
As a general summary of the analysis on the historicaldata we are presently doing, it can be concluded tha the
project has potential far beyond what was know up untilnow
Dr. Alfonso Gracia, Senior Geologist May 15, 2013
Orebody Open to the
Orebody Open at