39th ave welcome - denver · welcome open house . to the 39th avenue greenway and open channel ....
TRANSCRIPT
39th Ave Greenway connecting & enhancing neighborhoods
WELCOME
Open House to the
39th Avenue Greenway and Open Channel
July 24, 2018
SMITH RD
BLAKE ST
INTRODUCTION|Drainage Improvement Projects
LEGEND Greenway I-70GLOBEVILLE LANDING OUTFALL & 1 Detention Area Proposed Pipe
PARK EXPANSION/UPGRADES 40TH & COLORADO TRANSIT STATION Existing Pipe
CLAY
TON
ST
MO
NRO
E ST
FORE
ST S
T
40TH AVE 38TH & BLAKE
TRANSIT STATION 39TH AVE 39TH AVE
PARK HILL GOLF 39TH AVENUE GREENWAY CLUB 2
PARK HILL DETENTION 4 & STORMWATER PIPES
MLK BLVD
26TH AVE
3 CITY PARK GOLF COURSE RE-DESIGN
MO
NAC
O P
KWY
DO
WN
ING
ST
YORK
ST
CITY PARK
COLO
RAD
O B
LVD
17TH AVE
COLFAX AVE
39th Ave Greenway connecting & enhancing neighborhoods
17-062 07/23/201817-062 07/23/2018
INTRODUCTION|Public Process Problem
Definition Identification of
Alternatives Analysis &Feasibility
Preferred Alternative
Summer Fall Winter 2015 2015 2015/16
Basis of Design
Spring2016
Final Design &Construction
Fall 2016
Begin Mid2018
WHERE WE’VE BEEN: 368 subscribers to project email blasts
515+ email blast recipients
11 design workgroup meetings
25+ small group and one-on-one meetings
360+ individuals met with
86 community surveys completed
5 open houses/community workshops
Presented to Great Outdoors Colorado Coalition Registered Neighborhood Organizations, and other community groups
Who is in the Design Work Group?
Leadership from Registered Neighborhood Organizations
Civic groups & business organizations
Residents reflecting broad and diverse representation
17-062 07/18/201817 062 07/18/2018
39th Ave Greenway connecting & enhancing neighborhoods
INTRODUCTION|Project Facts 12-acre recreational greenway along 39th Avenue between Franklin and Steele Streets.
Community amenities such as multi-use trails and an outdoor amphitheater.
Needed conveyance of water to reduce flood risk to nearby homes and businesses.
INNOVATIVE FIRSTS Programmable decorative LED lighting incorporated under bridges Progressive “Shared Street” design integrating all modes oftransportation within the street Enhanced lighting along the multi-use trail Multi-functional designs that create public space around technicalstructures
5,000 sq ft2 pedestrian bridges
over the Greenway for 2 community gardens
20,000 sq ftfor 3 plaza areas 2
new vehicular bridges
86 pedestrian
lights alongmulti-use
trail*5
4 natural paths for accessshade structures across the channel *estimated quantities
1.1 miles multi-use trails
2.44 miles sidewalks
2.77 miles improvedroadways
10,000 linear feet of new stormwater pipe
17 062 07/18/2018
39th Ave Greenway connecting & enhancing neighborhoods
17-062 07/18/2018