393sys airport engineering practice lecture 1 fundamentals of maintenance

43
1 393SYS 393SYS Airport Engineering Airport Engineering Practice Practice Lecture 1 Lecture 1 Fundamentals of Fundamentals of Maintenance Maintenance

Upload: bevis-powers

Post on 30-Dec-2015

47 views

Category:

Documents


0 download

DESCRIPTION

393SYS Airport Engineering Practice Lecture 1 Fundamentals of Maintenance. Airport Engineering Practices. Course Examiner : Andrew LAYFIELD Lecturers : Andrew LAYFIELD and Ivan LI. Airport Engineering Practices. Course Text Book. Publisher : McGraw-Hill Edition : 1 st , 2004 - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

1

393SYS 393SYS Airport Engineering Airport Engineering

PracticePractice

Lecture 1Lecture 1Fundamentals of Fundamentals of

MaintenanceMaintenance

Page 2: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

2

Airport Engineering Practices

WeekWeek LecturerLecturer DetailsDetails

1 - 41 - 4Andrew Andrew

LAYFIELDLAYFIELDRoom P6955Room P6955

Tel. 2784-Tel. 2784-47724772Email : Email : [email protected]@cityu.edu.hkhk

5 - 135 - 13Ivan LIIvan LI Room P6855Room P6855

Tel. 2788-Tel. 2788-86378637Email : Email : [email protected]@cityu.edu.hk

Course Examiner : Andrew LAYFIELD

Lecturers : Andrew LAYFIELD and Ivan LI

Page 3: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

3

Airport Engineering Practices

Course Text Book

Publisher : McGraw-Hill

Edition : 1st, 2004

ISBN : 007142251X

ISBN : 978-0771422512

Covers aircraft maintenance programme development and operations from a managerial as well as a technical perspective.

Page 4: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

4

Airport Engineering Practices

Indicative Syllabus

Week #Week # TopicTopic Reading Reading AssignmentAssignment

11 Fundamentals of MaintenanceFundamentals of Maintenance Chapters 1 & 2Chapters 1 & 2

22 Aviation Industry Certification Aviation Industry Certification RequirementsRequirements

Chapter 4Chapter 4

33 Documentation for Maintenance Documentation for Maintenance Chapter 5Chapter 5

44 Requirements of Maintenance Requirements of Maintenance ProgrammeProgramme

Chapter 6Chapter 6

55 Engineering ServicesEngineering Services Chapters 8 and 9Chapters 8 and 9

66 Aviation law / Airline maintenance Aviation law / Airline maintenance CostsCosts

TBATBA

77 Quality AssuranceQuality Assurance Chapter 17Chapter 17

88 ISO9000 Quality StandardISO9000 Quality Standard TBATBA

99 Quality Management SystemsQuality Management Systems TBATBA

1010 Quality AuditsQuality Audits TBATBA

1111 Quality ControlQuality Control Chapter 18Chapter 18

1212 Statistical Quality Control Tools & Statistical Quality Control Tools & TechniquesTechniques

TBATBA

1313 ReliabilityReliability Chapters 19 & n3Chapters 19 & n3

Page 5: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

5

Airport Engineering Practices

Assessment

Exam : 50%

Course Work : 50%

Coursework : Andrew ~ 15% Test (Week 5)

Ivan ~ 35% TBA

Page 6: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

6

1.0 Why We Have to Do Maintenance

Page 7: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

7

The Three Laws of Thermodynamics

1st  Law:  Energy can neither be created or destroyed

2nd Law:  All spontaneous events act to increase total entropy .

3rd Law:  Absolute zero is removal of all thermal molecular motion

1.0 Why We Have to Do Maintenance

Page 8: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

8

The second law of thermodynamics states that, in a closed system, the entropy increases.

Cars rust, dead trees decay, buildings collapse; all these things are examples of entropy in action, the spontaneous movement from order to disorder.

1.0 Why We Have to Do Maintenance

Page 9: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

9

1.0 Why We Have to Do Maintenance

S = Q / TS = Entropy

Q = the heat content of the system

T = the temperature of the system

There is also another formula for entropy which uses probabilities – the probability that a particular state of a system will occur at random.

Highly ordered states are very improbable.

The main point here is that entropy is something that can be quantified !

Page 10: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

10

1.0 Why We Have to Do Maintenance

Note that –

- the increase in entropy gives a direction to time because entropy increases with time

- recognizing ordered and disordered states is a function of human consciousness.

Page 11: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

11

1.0 Why We Have to Do Maintenance

Aircraft systems degrade

with time – they

wear out !

Their entropy

increases.

Page 12: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

12

1.0 Why We Have to Do Maintenance

Perfect systems can be designed on paper but perfect systems cannot be built in the real world.

A design engineer may be limited from making the perfect design by –

imperfections in the natural world

technology

ability

economics

Very often there is just not enough money to build a (nearly) perfect system.

The Role of the Engineer

Page 13: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

13

1.0 Why We Have to Do Maintenance

However, the designer is obliged to build the best system possible within the constraints which exist.

A project manager for a new aircraft will be responsible for the project budget.

He will ask his design manager, “how much will it cost to build this ?”

The design manager might say $120M.

The project manager, however, might be limited to a budget of $100M for the production cost of each of the new

aircraft.

In this case, the design manager must redesign the new aeroplane so it can be built for $100M.

Page 14: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

14

1.0 Why We Have to Do Maintenance

That usually means – reduced tolerances, cheaper materials, and, consequently, more entropy.

More entropy in the design will mean more maintenance is required.

The design engineer’s main problem is then to minimize (not eliminate) the entropy of the system he or she is designing

while staying within the required constraints.

Page 15: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

15

1.0 Why We Have to Do Maintenance

Entropy exists in every system and the entropy of a system is always increasing.

This means not only that a real system which starts off being new will have some entropy already built into it, but that the entropy will increase with time.

Some components or systems will deteriorate from use, or even lack of use.

Misuse by an operator may cause some deterioration.

Therefore, while the engineer’s job is to minimize the entropy of a system during design, the mechanics job is to fight the continual increase in the entropy of a system during its lifetime.

The Role of the Mechanic

Page 16: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

16

1.0 Why We Have to Do Maintenance

100%

ENTROPY

PERFECTION

TIME

NATURAL DECAY OF SYSTEM

(Increasing Entropy)

ATTAINABLE LEVEL OF PERFECTION

This graph shows the level of perfection of a typical system :

100% perfection is at the very top of the y-axis.

The x-axis shows time.

The solid curve shows the level of perfection of a real world system.

Note that the curve turns downwards with time.

Page 17: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

17

1.0 Why We Have to Do MaintenanceWhen the system deteriorates to some lower level of perfection, it is necessary to perform some corrective action - adjusting, servicing, etc.

TIME

100%

ENTROPY

PERFECTION NATURAL DECAY OF SYSTEM

(Increasing Entropy)

ATTAINABLE LEVEL OF PERFECTION

System needs to be corrected when it reaches some lower level.

Page 18: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

18

1.0 Why We Have to Do MaintenanceIn other words, at some point, we have to perform some

maintenance to restore the system to its designed-in level of perfection.

We need to reduce the entropy to its original level.

This is called preventative maintenance and is usually performed at regular intervals.

This is done to prevent deterioration of the system to an unusable level.

Preventative maintenance is also sometimes referred to as sscheduled maintenance.

This schedule could be daily, every flight, every 200 flight hours, or every 100 cycles ( a cycle is a takeoff and landing).

Page 19: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

19

Considering the number of components on a modern aircraft, maintenance is a complex, on-going process.

For this reason, we will see that aircraft maintenance must be approached systematically.

Definition systematic adjective done using a fixed and organized plan e.g. “the systematic collection and analysis of information”systematically adverb

1.0 Why We Have to Do Maintenance

Page 20: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

20

1.0 Why We Have to Do Maintenance

100%

ENTROPY

PERFECTION

(OR RELIABILITY)

TIME

DESIGNED-IN LEVEL OF PERFECTION

POINT AT WHICH SCHEDULED

MAINTENANCE IS DONE

a b

c

d

This graph shows the system restored to its normal level (curves a and b):

Sometimes the system can deteriorate rapidly in service to a low level of perfection (curve c).

At other times the system breaks down completely (curve d).

In these cases, the maintenance actions require extensive testing, trouble shooting, adjustment.

Page 21: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

21

1.0 Why We Have to Do Maintenance

100%

ENTROPY

PERFECTION

(OR RELIABILITY)

TIME

DESIGNED-IN LEVEL OF PERFECTION

POINT AT WHICH SCHEDULED

MAINTENANCE IS DONE

a b

c

d

This graph shows the system restored to its normal level (curves a and b): Very often, the

replacement or complete overhaul of parts or subsystems is required.

Since these breakdowns occur at various unpredictable intervals, the maintenance actions required to correct the problems are referred to as unscheduled maintenance.

Page 22: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

22

1.0 Why We Have to Do Maintenance

100%

ENTROPY

PERFECTION

(OR RELIABILITY)

TIME

DESIGNED-IN LEVEL OF PERFECTION

POINT AT WHICH SCHEDULED

MAINTENANCE IS DONE

a b

c

d

Reliability

The level of perfection of a system can also be referred to as the reliability of the system.

The designed-in level of perfection is known as the inherent reliability of that system.

Page 23: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

23

1.0 Why We Have to Do Maintenance

DESIGNED-IN LEVEL OF RELIABILITY

Redesign IMPROVED RELIABILITY DUE TO REDESIGN

100%

ENTROPY

RELIABILITY

TIME

POINT AT WHICH SCHEDULED

MAINTENANCE IS DONE

A B C D

In this diagram, curve A is one of the original curves from the first diagram.

However, the system has now been redesigned to a higher level of perfection – see curves B, C and D.

Page 24: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

24

1.0 Why We Have to Do Maintenance

DESIGNED-IN LEVEL OF RELIABILITY

IMPROVED RELIABILITY DUE TO REDESIGN

100%

ENTROPY

RELIABILITY

TIME

POINT AT WHICH SCHEDULED

MAINTENANCE IS DONE

A B C D

The redesigned system now starts off at a higher level of reliability.

However, over time, the system will still deteriorate from this new initial level of perfection.

Page 25: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

25

1.0 Why We Have to Do Maintenance

DESIGNED-IN LEVEL OF RELIABILITY

IMPROVED RELIABILITY DUE TO REDESIGN

100%

ENTROPY

RELIABILITY

TIME

POINT AT WHICH SCHEDULED

MAINTENANCE IS DONE

A B C D

The rate of decay may change as a result of the redesign.

If the decay is steeper, as in (B), the point at which preventative maintenance needs to be performed might occur sooner.

Page 26: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

26

1.0 Why We Have to Do Maintenance

DESIGNED-IN LEVEL OF RELIABILITY

IMPROVED RELIABILITY DUE TO REDESIGN

100%

ENTROPY

RELIABILITY

TIME

POINT AT WHICH SCHEDULED

MAINTENANCE IS DONE

A B C D

So, for case (B), maintenance will be needed more often.

The inherent reliability is increased but more maintenance is required to maintain that level of reliability.

Page 27: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

27

1.0 Why We Have to Do Maintenance

DESIGNED-IN LEVEL OF RELIABILITY

IMPROVED RELIABILITY DUE TO REDESIGN

100%

ENTROPY

RELIABILITY

TIME

POINT AT WHICH SCHEDULED

MAINTENANCE IS DONE

A B C D

Conversely, if the decay rate is the same as before, as in case (C), or less steep as in case (D), then the maintenance interval would be increased and the overall amount of preventative maintenance might be reduced.

Page 28: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

28

1.0 Why We Have to Do MaintenanceThe question to be considered here is : Does the reduction in maintenance justify the cost of the redesign ?

This is a question for the designers to consider, not the maintenance people.

One of the major factors in redesign is cost.

This graph shows two opposing relationships :

INCREASE IN PERFECTION IS LOGARITHMIC

INCREASE IN COST IS EXPONENTIAL

PERFECTION VS COST

Page 29: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

29

1.0 Why We Have to Do Maintenance

INCREASE IN PERFECTION IS LOGARITHMIC

INCREASE IN COST IS EXPONENTIAL

PERFECTION VS COST

The upper curve is logarithmic. It represents the increasing perfection attained with more sophisticated design efforts – the closer we get to perfection, the harder it is to make a substantial increase.

The lower curve represents the cost of the efforts to improve the system. This is an exponential curve. The more we try to approach perfection, the more it is going to cost us.

Page 30: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

30

1.0 Why We Have to Do Maintenance

INCREASE IN PERFECTION IS LOGARITHMIC

INCREASE IN COST IS EXPONENTIAL

PERFECTION VS COST

Designers are limited in their goal of perfection by both entropy and costs.

Page 31: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

31

1.0 Why We Have to Do MaintenanceFailure Rate Patterns

Not all systems or components fail at the same rate nor do they all exhibit the same pattern of wear out and failure.

This is important because the nature of the maintenance to be performed on these systems and components is related to their failure rates and failure patterns.

United Airlines did some studies on lifetime failure rates and found six basic patterns.

These are shown in the following table.

Note :

1. The vertical axes show failure rates, not reliability ! The higher the vertical position, the worse the failure rate.

2. The horizontal axes show time.

Page 32: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

32

1.0 Why We Have to Do MaintenanceA. Infant mortality; constant or slightly rising failure rate; definite wear out period (4 %).

B. No infant mortality; slightly rising failure rate; definite wear out period (2 %).

C. No infant mortality; slightly rising failure rate; no definite wear out period (5 %).

D. Increasing failure rate at outset; constant or slightly rising failure rate; no definite wear out period (7 %).

E. No infant mortality; constant failure rate throughout life; no definite wear out period (14 %).

F. Infant mortality; constant failure rate throughout life; no definite wear out period (68 %).

Page 33: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

33

1.0 Why We Have to Do Maintenance

A. Infant mortality; constant or slightly rising failure rate; definite wear out period (4 %).

Curve A shows what is commonly referred to as a “bathtub” curve.

This failure rate pattern exhibits a high rate of failure during the early portion of the system’s/component’s life known as infant mortality.

Some systems/components exhibit high early failure rates for several reasons – poor design, improper parts, incorrect usage.

Once the bugs are worked out and the equipment settles into its “pattern”, the failure rate levels off or rises only slightly over time.

Near the end of its life, the curve shows a rapid rise in failure rate as the materials of the system/component reach some kind of physical limit.

Page 34: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

34

1.0 Why We Have to Do Maintenance

The United Airlines study showed that only about 11 % of the items included in the experiment (curves A, B and C) would benefit from setting operating limits, or from applying a repeated check of wear conditions. The other 89 % would not.

Consequently, time of failure, or deterioration beyond useful levels could be predicted on only 11 % of the items.

Only components with definite life time limits and/or wear out periods will benefit from scheduled maintenance !

The required maintenance activity for these items can be spread out over the available time to even out the work load.

Page 35: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

35

1.0 Why We Have to Do Maintenance

For the other 89 %, these items will have to be operated to failure before replacement or repair is done.

This is unpredictable and would result in a need for maintenance at odd times – i.e.. unscheduled maintenance.

These characteristics of failure make it necessary to approach maintenance in a systematic manner, to reduce periods of unscheduled maintenance.

The aviation industry has developed three management techniques for handling in-service interruptions which

occur where items must be operated to failure before maintenance can be done.

Page 36: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

36

1.0 Why We Have to Do Maintenance1. Redundant Systems

In redundant systems, if one unit fails, one or more backups are available to immediately take over the function :

Example 1

Aircraft elevator hydraulic actuator.

Page 37: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

37

1.0 Why We Have to Do MaintenanceExample 2

Aircraft flight data recorders.

Page 38: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

38

1.0 Why We Have to Do Maintenance

Another example would be the VHF radios used in commercial aircraft.

A unique feature of redundant units also affects the maintenance requirements.

If both the primary and the backup units are instrumented such that the flight crew is aware of any malfunction, no prior maintenance check is required.

On the other hand, if neither system is so instrumented, maintenance personnel would need to perform some

check on both the primary and backup systems.

Page 39: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

39

1.0 Why We Have to Do Maintenance2. Line Replaceable Unit (LRU)

An LRU is a component or system that has been designed in such a manner that the parts that most commonly fail can be quickly removed and replaced on the vehicle.

The vehicle can then continue in without any significant interruption in service.

The failed part can be discarded or repaired later.

Page 40: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

40

1.0 Why We Have to Do Maintenance3. Minimum Equipment List (MEL)

This list allows a vehicle to be dispatched into service with certain items inoperative – provided that the loss of the function does not affect the safety and operation of the flight.

These items are carefully determined by the aircraft manufacturer and must also be sanctioned by the appropriate regulatory authority during the early stages of vehicle design and test.

The manufacturer issues a master minimum equipment list (MMEL) which indicates all equipment and accessories available for a particular aircraft model.

The airline then customizes this document to produce its own MEL.

Page 41: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

41

1.0 Why We Have to Do Maintenance

Many of the MEL items are associated with redundant systems.

The MEL allows deferral of maintenance without upsetting the mission requirements.

The maintenance, however, must be performed within certain prescribed periods – typically 1, 3, 10 or 30 days.

MELs may be part of laptop based computer software for aircraft maintenance.

Page 42: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

42

1.0 Why We Have to Do MaintenanceSummary

Why We Have To Do Maintenance

Entropy and the Laws of Thermodynamics

The Role of the Engineer

The Role of the Mechanic

Perfection and Reliability

Failure Rate Patterns

Management Techniques for In-Service Interruptions –

Redundant Systems

Line Replaceable Units

Minimum Equipment List

Page 43: 393SYS  Airport Engineering Practice Lecture 1 Fundamentals of Maintenance

43

What you need to know for the exam ! Explain what entropy is and its relationship to the need for maintenance.

What is the role of an engineer in the context of entropy ?

What is the role of a mechanic in the context of entropy ?

With the aid of a sketch diagram, explain the relationship between entropy or perfection and time.

With the aid of a sketch diagram illustrating the relationship between reliability and time, explain what is meant by the “designed-in level of perfection” and the “point at which scheduled maintenance is done”.

With the aid of a sketch diagram, explain the relationship between perfection and cost.

Give some examples of failure rate patterns. What is the “bath tub” curve ?

Explain each of the three management techniques which have been developed by the aviation industry for handling in-service interruptions due to equipment failures. What failure rate curves characterize these types of failures ?