3.4.2 cable crimping and testing

Upload: ridzuan-wr

Post on 14-Apr-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/29/2019 3.4.2 Cable Crimping and Testing

    1/3

    LESSON PLAN

    School : SMK KETARI, Bentong, PahangSubject : Information and Communication Technology

    Date : 8 September 2009

    Class : 4 SN/STTime : 9.00 - 10.20pm (80 minute )

    Student : 11 /15

    Title : 3.0 Computer Networks and CommunicationsTopic : 3.4. Setting network Facilities

    Learning Outcomes:

    4.1.2 Cable Crimping and Testing

    3.4.2.1 Crimping and test UTP Cable

    Straight cable

    3.4.2.2 Create awareness of the correct way when crimping a cable.

    Learning objectives: At the end of lesson, student will be able to

    i) list the process of crimping and testing the Unshielded Twisted-Pair (UTP) straightcable

    Pre-requisite knowledge:

    i) Student has learned about the basic concept computer network.

    ii) Students should know about communications.

    Teaching materials:

    Teaching Courseware CD6

    Unshielded Twisted-Pair cable

    Cable stripper

    Crimp Tool RJ-45 Plug

    Cable tester.

    Teaching steps :

    Step Contents/Skill Teaching/Learning activitiesStrategy/Method/

    Value/CCTS

    Induction set

    5 minutes9.00 - 9.05

    Introduction the topic and

    learning outcomes.

    1. Teacher asks students the

    topics that have learn before.2. Students give responds to

    the teacher.

    3. Teacher tells studentsabout the topic that they will

    learn today.

    Strategy :

    Teacher centred

    Method :

    Question and

    Answer.Explanation

    Value :

    Memorizing,

    Responsible.

    CCTS :

    Generate ideas

    Notes :

  • 7/29/2019 3.4.2 Cable Crimping and Testing

    2/3

    Step 1

    10 minutes9.05 - 9.15

    crimping straight cable 1. Teacher tell student about

    this lesson will give themthe opportunity to making

    the UTP straight cable.

    2. Students will state the

    steps by-step process ofcrimping and testing.

    Strategy:

    Teacher centred

    Methodology:

    Explaining, Question

    and Answer.

    Value:Respect, Active

    thinking,

    Appreciation

    CCTS:

    Active thinking

    Visualizing

    Notes :

    Step 2

    10 minutes9.15 - 9.25

    The items for making

    straight cable.

    1. Students will be

    show the items and tools formaking straight cable.

    2. Students listenteacher explanations the toolto making crimping straight

    cable.

    3. Student can asteacher if they wont

    understand

    4. Student willidentify the items for making

    straight cable.

    Strategy :

    Material centered

    Method :

    ExplanationQuestion and Answer

    Value :

    Alert

    Self-Confidence

    CCTS :

    Visualizing

    Classifying

    Notes :

    Unshielded

    Twisted-Pair cable

    Cable stripper Crimp Tool

    RJ-45 Plug

    Cable tester.

    Step 310 minutes

    9.25 - 9.35

    Cable crimping process. 1. Students will be showanimation about cable

    crimping process.

    2. Students listen and watchthe animation.

    3. Teacher explains the

    step-by-step process ofcrimping and testing the

    UTP straight cable while

    exercising the necessary care

    and caution.4. Student can as teacher if

    they wont understand

    5. Student will state step bystep process of crimping and

    Strategy :Material centered

    Method :

    ExplanationQuestion and Answer

    Value :

    AlertSelf-Confidence

    CCTS :

    Visualizing

    Classifying

    Notes :

    Teaching Courseware

    CD6

  • 7/29/2019 3.4.2 Cable Crimping and Testing

    3/3

    testing.

    Step 4

    30 minutes9.35 - 10.05

    Making straight cable. 1. Students divide in two

    groups.2. Teacher gives the tool to

    making straight cable to

    each group.3. Teacher tell student about

    step-by-step process of

    crimping and testing theUTP straight cable while

    exercising the necessary

    care and caution.4. Students will apply the steps

    by-step process to crimping

    straight cable and testing.

    Strategy :

    Student centered

    Method :

    Explanation

    Question and AnswerValue :

    Alert

    Self-Confidence

    CCTS :

    Visualizing

    Classifying

    Notes :

    Teaching Courseware

    CD6

    Step 5

    10 minutes10.05 - 10.15

    Testing straight cable. 1. Student will complete the

    steps by-step process tocrimping straight cable

    Teacher will use cable

    testing to check student cablethat connection.

    All students must be able to

    making right connection ofstraight cable.

    Strategy :

    Mastery learning.Method :

    Explanation

    Question and Answer

    Value :

    Alert

    Self-Confidence

    CCTS :

    Visualizing

    Classifying

    Notes :

    Teaching CoursewareCD6

    Closure5 minutes

    10.15 - 10.20

    Teacher concludes thelesson

    1. Teacher will ask studentswhat they had learned just

    now.

    2. Students will discuss toteacher.

    3. Teacher conclude today

    lesson

    Strategy :Student Centered

    Deductive Learning

    Method :

    Question and Answer

    Value :

    Discipline

    CCTS :

    Revise the lesson

    Reflection:

    Today lesson work very well. All students very give cooperation to my explanation and active

    doing their task to making straight cable. All my student can complete to follow the step by step

    to process of crimping straight cable Unshielded Twisted-Pair (UTP).