33kv jointing manual section 3 - cablejoints.co.uk

28
Section 3 I Page 1 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 3 STANDARD PROCEDURES FOR PREPARING 33KV CABLES 3.1 Single-Core Copper Wire Screened Polymeric Cables 3.1.1 Removing the Outer Sheath Clean and abrade the outer sheath with an approved abrasive paper for 150mm beyond the sheath removal point. Mark the removal point of the outer sheath as indicated on the relevant jointing instruction using a Chinagraph pencil. For cables with semi-conducting outer sheaths, either graphite or an extruded layer, extra care should be taken to ensure that all traces of conductive material are removed. Use an approved tool to remove the sheath. check the tool cutting wheel is set to the correct depth to avoid damaging the copper wire screens below. Starting at the removal point make a circular cut around the cable. Cut along the cable to the position of the sheath removal point, and remove the sheath. UNCONTROLLED

Upload: others

Post on 05-Feb-2022

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 1UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

3 STANDARD PROCEDURES FOR PREPARING 33KV CABLES

3.1 Single-Core Copper Wire Screened Polymeric Cables3.1.1 Removing the Outer Sheath • Cleanandabradetheoutersheathwithanapprovedabrasivepaperfor150mmbeyond

thesheathremovalpoint.MarktheremovalpointoftheoutersheathasindicatedontherelevantjointinginstructionusingaChinagraphpencil.

• Forcableswithsemi-conductingoutersheaths,eithergraphiteoranextrudedlayer,extracareshouldbetakentoensurethatalltracesofconductivematerialareremoved.

• Useanapprovedtooltoremovethesheath.checkthetoolcuttingwheelissettothecorrectdepthtoavoiddamagingthecopperwirescreensbelow.

• Startingattheremovalpointmakeacircularcutaroundthecable.Cutalongthecabletothepositionofthesheathremovalpoint,andremovethesheath.

UNCONTROLLED

Page 2: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 2 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Removethefabricorplastictapewrapfromthescreenwireusinganapprovedknife,takingcarenottodamagethecopperwiresbelow.

• UnwindthecopperwiresandlaythembackalongtheoversheathinthepositionrequiredbythejointbeingmadeandsecurewithPVCtape.Ifpreparingforaterminationalengthofredmasticsealingtapeshouldbeappliedtotheoutersheathfollowingtheappropriateinstruction.

3.1.2 Removing the Bonded Polymeric Screen • Theapprovedbondedscreenstrippingtoolcanbeusedtoleavevariouslengthsofblack

insulationscreenfromtheoutersheathcut.Thismeasurementvariesdependinguponthetypeofjoint:

• Single-Corestraightjoints=40mm.

• Single-Corebranchjoints=80mm.

• Trifurcatingjoints=100mm.

• Potends=80mm.

• Single-Coreterminations=40mm.UNCONTROLLED

Page 3: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 3UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• SmearathincoatingofSiliconegreaseovertheconductingscreenlayer.Startingattheopenendofthecable,setthetooltothecorrectcuttingdepthsothattheentirescreenisremovedwithonlytheminimumamountofinsulation.Itisessentialthatthecoreisasstraightaspossibleforthisoperationotherwisetracesofthescreenmaybeleftbehind.

• Continueturningthetooluntilitbuttsupagainstthestopposition(dependantonthescreenterminationpoint)andcontinuetoturnthetooluntilasmoothrightangledtaperisproduced.Testthetoolfirstlyontheoverlapsectionofthecoreifrequired.

• Theinsulationnowrequirespolishingsmoothwithanappropriatealuminiumoxidegritpaper(minimum150grade)untilsmoothandfreeofridges.Tofinishthisprocess,reversethepaperand'buffup'withthesmoothside.

UNCONTROLLED

Page 4: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section3IPage4 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Cleananddegreasetheinsulationwithanapprovedsolventwipetoremovealltracesofanyremainingloosematerial.Alwayswipefromtheopencoreendtowardsthescreenwirestoavoidcontaminatingtheinsulationwithcarbonfromtheremainingscreen.

3.1.3 Removing the Polymeric Insulation • UsetheapprovedAlroctoolandsetthe'stopgauge'totheconnectorinsertiondepth.

• Positionthetoolattheopencoreendandadjustthebladetotherequireddepth;justdeepenoughsothebladedoesnotdamagetheconductor.

• Rotatethetoolalongthecoreusingthespiralcutsettinguntilthestopgaugepreventsitfrommovinganyfurther.

UNCONTROLLED

Page 5: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section3IPage5UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Removethetoolandtheinsulationspiral.Carefullyremovetheremainingconductorscreenusinganapprovedknife.

3.2 Single-Core Lead Covered Cables3.2.1 Removing the Outer Serving or Sheath • Markthepositionoftheservingorsheathterminationasindicatedontherelevantjointing

instruction.

• Makeacircularcutatthismarkusinganappropriateapprovedtool.Checkthatthecutisonlythreequartersthroughthesheaththickness.

UNCONTROLLED

Page 6: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 6 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Nowmakealengthwisecutalongthesheathtowardsthesheathcutpositiontakingcarenottodamagetheunderlyingleadsheath.

• Lifttheedgeofthesheathandunwrapalongitslength,tearingoffatthecircularcutpoint.Theuseofagastorchmayassistthisoperationifnecessary.

3.2.2 Removing the Lead Sheath • Cleananddegreasetheleadsheathusingtheapprovedsolventwipes.Markthelead

sheathattheremovalpointasindicatedontherelevantjointinginstructionusingaChinagraphpencil.

UNCONTROLLED

Page 7: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 7UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Useanapprovedhackknifetomakeanindentedcircularcutaroundtheleadsheath,takingcaretoonlycutpartwaythroughthesheath.

• Cuttheleadsheathacrossfromtheopencableendtothecircularcut.Useanappropriateapprovedhackknife.TakecarenottodamagetheCopperWoventapebelow.

• Opentheleadsheathupalongthelengthofthecutandcarefullyunwraptheleadsheathagainsttheringcut.

UNCONTROLLED

Page 8: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section3IPage8 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

3.2.3 Removing the Copper Woven Tape (CWT) • UnwindtheCWTandcarefullyremoveitbycuttingitagainsttheleadsheathedgewithan

approvedknifetoleaveasmoothfinish.

3.2.4 Removing the Insulation Screen • MarkthescreenpaperswithaChinagraphpencilattheremovalpointindicatedinthe

relevantjointinginstruction.Tieatwinebinderaroundthescreenatthispoint.

• Unwrapthescreencarefullytotheterminationpointandremoveitbyneatlytearingagainstthetwinebinder.Removeanycarbonpaperbelowthescreentothesameterminationposition,followedbytwooftheinsulationpapers.

UNCONTROLLED

Page 9: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 9UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

3.2.5 Removing the Insulation Papers • Onlyremovethepapersafterfittingthebarriertubingasdescribedinsection4.1.1.

Marktheinsulationpapersatthepointofremovalasindicatedintheappropriatejointinginstruction.Usinganapprovedsharpknife,cutaroundthecorethroughthepapersandclearbarriertubetakingcarenottodamagetheconductorbelow.

• Removetheclearbarriertubebypullingtowardstheendwithagentletwistingmovement.

• Unwrapthepapersuptothecutpositionandtearoffneatlyagainstthebarriertubeedge.

• Cleananysurpluscompoundfromthecableconductorwithanapprovedsolventwipe.

UNCONTROLLED

Page 10: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section3IPage10 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

3.3 Three-Core Paper Insulated Cables3.3.1 Removing the Outer Hessian Serving or (PE) Sheath • Markthepositionoftheservingorsheathterminationasindicatedontherelevantjointing

instruction.

• Wearsuitablegloveswhileremovingtheserving.Placeawirebinderaroundtheservingattheremovalpointandscoreinfrontofthebinderusinganapprovedknife.

• Removetheservingwiththeapprovedknifeandheatfromagastorchifrequiredorinthecaseofapolyethylenesheathusetheapprovedtoolforthisoperation.

3.3.2 Removing the Steel Wire Armour • Placeawirebinderaroundthearmourwiresatthepointofremovalasindicatedinthe

relevantjointinginstruction.

UNCONTROLLED

Page 11: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 11UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Usinganapprovedsaw,makeacircularcutaroundthearmoursatthebinderposition.Cutthroughonlyhalfthewidthofthearmourtoavoiddamagingtheleadsheathbelow.

• Wearsuitablegloveswhileremovingthearmour.Liftandunwrapthearmourwiresafewatatimeandbreakthemoffagainstthebinderbybendingthembackwardsandforwards.

• Removethebinderandliftthearmourswithahackknifesotheyare90°tothecable.Cleanoffalltracesofbitumenfromthewiresusingagastorchandapprovedsolventwipes.

UNCONTROLLED

Page 12: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 12 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

3.3.3 Removing the Inner Bitumen Layer • Wearsuitableglovesforthisoperation.Scorearoundtheinnerbeddinglayerswithan

approvedknifeadjacenttotheverticalarmourstakinggreatcarenottoscoreintotheunderlyingleadsheath.

• Attheopencableendliftthebitumenimpregnatedtextilelayerwithaknifeandunwrapitbacktotheverticalarmourposition,tearingitagainstthescorepreviouslymade.Theuseofagastorchmayassistthisprocess.

• Applymoreheattothefinallayerofbitumenontheleadsheathandarmoursandwipeoffanyremainingtracesofbitumenwithapprovedsolventwipes.Theleadsheathandarmoursshouldbecleanandbrightafterthisprocess.

UNCONTROLLED

Page 13: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 13UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Applytwowrapsofblackmasticsealantaroundtheleadsheathbuttingupagainsttheraisedarmours.

• MakeamarkwithaChinagraphpencil130mmfromtheendoftheoutersheath.Wrapalengthofcoppermesharoundtheleadsheathuptothe130mmmark.

UNCONTROLLED

Page 14: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section3IPage14 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Laythearmoursdownoverthemastic,ensuringthatnonearecrossed,andsecurethearmoursoverthecoppermeshareawiththetwowormdriveclipsprovided.

• ApplyalayerofPVCtapetothewormdriveclipstocoveranysharpedges.Positionthearmoursealingsleeve30mmbeyondthearmouredgeandshrinkdownstartingattheleadsheathendbeforeproceedingtowardsthecableover-sheath.

UNCONTROLLED

Page 15: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section3IPage15UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

3.3.4 Removing the Lead Sheath • Cleananddegreasetheleadsheathusingapprovedsolventwipes.UseaChinagraph

penciltomarktheleadsheath430mmfromtheoutersheathasindicatedontherelevantjointinginstruction.

• Wearsuitableglovesforthisoperation.Useanapprovedhackknifetomakeacircularindentedringcutaroundtheleadsheathatthepencilmark,takingcaretoonlycutpartwaythroughthesheath.

• Fromtheopencableend,cuttheleadsheathlongitudinallytothecircularcutusingtheappropriateapprovedhackknife.TakecarenottodamagetheCopperWovenTape(CWT)below.

UNCONTROLLED

Page 16: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 16 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Opentheleadsheathupalongthelengthofthecutandcarefullyunwraptheleadsheathagainsttheringcut.

3.3.5 Removing the Copper Woven Tapes (CWT) • UnwindtheCWTandremovethecorefillerscarefullywiththesidecutters.

• RewindtheCWTtightlyaroundthecablecoresatthecrutchpositionforadistanceof20mmfromtheleadsheath,thencutandtieoff.Removeanysurplustapewithinsulatedsidecutters.

UNCONTROLLED

Page 17: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 17UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

3.3.6 Removing the Insulation Screen • Usinganapprovedsolventwipe,removeanysurpluscablecompoundfromthescreened

coreinsulation.

• Markthescreenpapersattheremovalpointindicatedintherelevantjointinginstruction.Tieafinewirebinderaroundthescreensatthispoint.

• Carefullyunwrapthefirst50mmofthescreen.Securetheendofthecoreinsulationpaperswithnumberedphasetapematchingthenumeralpaper.Unwindtheremainderofthescreentotheterminationpointandremoveitbyneatlytearingagainsttheappliedbinder.

• Removethenumeralpaperandonelayerofpaperbelowtothesamepointasthescreenpapers,usingthesamemethodandmarkingthecoreswiththematchingnumberedphasetape.

UNCONTROLLED

Page 18: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section3IPage18 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

Note:Itisimportanttomarkthecoreswiththecorrectphasenumbersimmediatelyaftereach numeralpaperisremoved.

3.3.7 Removing the Insulation Papers • Onlyremovethepapersafterfittingtheclearbarriertubesdescribedinsection4.1.3.

• Marktheclearbarriertubeoverthecorepapersatthepointofremovalasindicatedintheappropriatejointinginstruction.

• Usingasharpknifecutaroundthecoreandthroughthepaperstakingcarenottodamagetheconductorbelow.

UNCONTROLLED

Page 19: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 19UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Removetheclearbarriertubebypullingtowardstheendwithagentletwistingmovement.

• Roundingoftheconductorwithwaterpumporsimilarplierswillassistthisoperationandwillhelppreparetheconductorforinsertionintotheappropriateconnector.

• Unwrapthepaperstothecutpositionandtearoffagainsttheclearbarriertubeedge.

• Cleananysurpluscompoundfromthecableconductorwithanapprovedsolventwipe.

UNCONTROLLED

Page 20: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section3IPage20 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

3.4 Three-Core HSL Paper Insulated Cables3.4.1 Removing the Outer Serving or Sheath • Markthepositionoftheservingorsheathterminationasindicatedontherelevantjointing

instruction.

• Wearsuitablegloveswhileremovingtheserving.Placeawirebinderaroundtheservingattheremovalpointandscoreinfrontofthebinderusinganapprovedknife.

• Removetheservingwiththeapprovedknifeandheatfromagastorchifrequired.

UNCONTROLLED

Page 21: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 21UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

3.4.2 Removing the Steel Wire Armour • Placeawirebinderaroundthearmourwiresatthepointofremovalasindicatedinthe

relevantjointinginstruction.

• Usinganapproveddepthguardedorjuniorsawmakeacircularcutaroundthearmoursatthebinderposition.Cutthroughonlyhalfthewidthofthearmourtoavoiddamagingtheleadsheathsbelow.

• Wearsuitablegloveswhileremovingthearmour.Liftandunwrapthearmourwiresafewatatimeandbreakthemoffagainstthebinderbybendingthembackwardsandforwards.

UNCONTROLLED

Page 22: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 22 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Attheopencableendliftthebitumenimpregnatedlayerwithaknifeandunwrapitbacktothearmourcutposition.Removeitatthispoint,takingcarenottodamagetheunderlyingleadsheaths.

• Removethebinderandliftthearmourswithanapprovedhackknifesotheyare90°tothecable.Cleanoffalltracesofbitumenfromthewiresusingagastorchandapprovedsolventwipes.

3.4.3 Removing the Bitumen Layer • Openoutthethreeleadsheathscarefullyandremovethebitumen/paperlayerandfillers

fromallthreesheathsuptothepointwheretheunderarmourbeddingremains.

UNCONTROLLED

Page 23: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 23UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Applymoreheattothefinallayerofbitumenontheleadsheathsandwipeoffalltracesofbitumenwiththeapprovedsolventwipes.

• Theleadsheathsshouldbefreefrombitumenoncompletionofthistask.

• BuilduptheremaininginnerbeddingusingtheblackmasticfromtheThree-CoretransitionjointandtheHSLmoduletosuitthesupportring’sinnerdiameter.Fitthesupportringoverthebuilduptape,positioningit60mmfromtheupliftedarmours.

UNCONTROLLED

Page 24: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section3IPage24 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Wrapthelengthofsuppliedblackmasticbehindthesupportring,buttingitagainstthearmourswires.Laythearmoursdownontotheringandsecurethemwithawirebinder.

3.4.4 Removing the Lead Sheaths • Onlyremovetheleadsheathsafterfirstlyfollowingthenecessarystepsdescribedin

section4.1.5.(HSLmoduleapplication).

• Cleananddegreasetheleadsheathsusingapprovedsolventwipes.UseaChinagraphpenciltomarktheleadsheathsattheremovalpointasindicatedontherelevantjointinginstruction.

• Useanapprovedhackknife,makeacircularindentedringcutaroundtheleadsheathatthepencilmark,takingcaretoonlycutpartwaythroughthesheath.

• Cuttheleadsheathacrossfromtheopencableendtothecircularcut.Useanappropriateapprovedhackknife.TakecarenottodamagetheCopperWoventapebelow.UNCONTROLL

ED

Page 25: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section3IPage25UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Opentheleadsheathupalongthelengthofthecutandcarefullyunwraptheleadsheathagainsttheringcut.

3.4.5 Removing the Copper Woven Tape (CWT) • UnwindtheCWTandcarefullyremoveitbycuttingitagainsttheleadsheathedgewithan

approvedknifetoleaveasmoothfinish.

3.4.6 Removing the Insulation Screen • MarkthescreenpaperswithaChinagraphpencilattheremovalpointindicatedinthe

relevantjointinginstruction.Tieatwinebinderaroundthescreenatthispoint.

UNCONTROLLED

Page 26: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 26 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Unwrapthescreencarefullytotheterminationpointandremoveitbyneatlytearingagainstthetwinebinder.Removeanycarbonpaperbelowthescreentothesameterminationposition,followedbytwooftheinsulationpapers.

3.4.7 Removing the Insulation Papers • Onlyremovethepapersafterfittingthebarriertubingasdescribedinsection3.1.2.

Marktheinsulationpapersatthepointofremovalasindicatedintheappropriatejointinginstruction.Usinganapprovedsharpknife,cutaroundthecorethroughthepapersandclearbarriertubetakingcarenottodamagetheconductorbelow.

• Removetheclearbarriertubebypullingtowardstheendwithagentletwistingmovement.

UNCONTROLLED

Page 27: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 27UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Unwrapthepapersuptothecutpositionandtearoffneatlyagainstthebarriertubeedge.

• Cleananysurpluscompoundfromthecableconductorwithanapprovedwipe.

3.5 Moisture Testing on Paper Insulated Cables • Fullpersonalprotectiveequipmentshallbewornatalltimesforthistest.

• Gentlyheattheparaffinwaxcontaineronalowheat,insertthethermometerthroughoneoftherubbergrommetsinthetopandwaituntilthewaxreachesatemperatureof125°C.

• Alwayshandlethepaperstobetestedwithgloves,asmoisturefromyourhandsisenoughtogiveapositivetest.

• Liftoutthebasketandplacethepapertapestobetestedinit.

UNCONTROLLED

Page 28: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section3IPage28 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Thesamplesfromthefollowinglayersshallbetested:

• Innerandouterbeltpapers.

• Paperorstringfillers.

• Innerandoutercorepapers.

• Immersethebasketcompletewithpapersintheparaffinwaxbathandnotetheresults.

• Ifthereisnoreactionfromthewaxoritfrothsslightly,thepapersaredryandthecableisfittobejointed.

• Ifthewaxfrothsexcessivelyandacracklingnoiseisheard,thepapersarewetandthecableshouldnotbejointed.

• Removetheheatfromcontainerandleavetocoolbeforemoving.

• Thewaxcanbere-useduntilitstartstodiscolourandthereisnoneedtodisposeofitaftereachmoisturetest.