DESCRIPTION
Tim Allen PropertiesTRANSCRIPT
inspiration only comes from what one’s imagination can picture,
from what the mind conjures up as a dream or as a fantasy. to
find real inspiration there must be a stimulus and it is here, along
Pebble Beach’s fabled 17 mile Drive that you will find all the in-
spiration you will need. Here, on one of the last vacant parcels
to become available for sale, here on a spacious two acres of
precious land fronting the mighty Pacific, here as the waves crash
on the shore and the sun sets over the far horizon and the otters
bob in the surf, here is the ultimate when it comes to true inspira-
tion. So, dream your dreams, think your thoughts but when you
are ready for inspiration, come and…fill your dreams by the sea.
offered at $9,995,000
Presented by tim Allen
coldwell Banker Del monte realty
“ f i ll You r DreAmS BY tHe SeA”3180 Seventeen mile Drive, PeBBle BeAcH
Item 1 Project Analysis 1 monthItem 2 Consultants Work 1.5 monthItem 3 Pebble Beach ARB 1 monthItem 4 Initial Planning Submittal 0.5 monthItem 5 Planning Review 5.5 monthItem 6 County Hearing 0.5 monthItem 7 Appeal Period 1 monthItem 8 Planning Final Approval 0.5 month
Total Timeline Total 11.5 months
PLANNING PERMIT TIMELINE
ERIC MILLER ARCHITECTS, INC.
co n cePt uA l D r Aw i n g
A/E FEES for PLANNING PHASE 10/3/12
.000-000-000
ARCHAEOLOGICAL 800$ SURVEY 2,200$ SURVEYOR CONSTRUCTION STAKING -$ Future
SURVEY WORK DURING CONSTRUCTION -$ Future
GEOTECHNICAL 3,250$ FIELD TEST DURING CONSTRUCTION -$ Future
BIOTECH REVIEW 2,300$ ARBORIST REPORT 1,800$ FORESTER MANAGEMENT 2,200$ STORY POLES 2,500$ LANDSCAPE ARCHITECT -$ TBD
CIVIL -$ Future
STRUCTURAL -$ Future
MECHANICAL -$ Future
ELECTRICAL -$ Future
ARCHITECT'S FEE PLANNING PHASE -$ TBD
ARCHITECT'S CONSTRUCTION DOCUMENTS -$ TBD
A/E FEES SUBTOTAL 15,050$ REIMBURSABLE 4% -$ TBD
A/E FEES GRAND TOTAL 15,050$
AGENCY & PERMIT FEESPebble Beach, California
PEBBLE BEACH ARCHITECTURAL REVIEW 8,000$ WATER PERMIT 1,000$ SEWER CAPACITY 1,200$ SCHOOL 3,381$ PARKS & RECREATION 1,000$ PB WATER ENTITLEMENT -$ by owners
WATER PERMIT (PB ADDT. PURCHASE ) -$ TRAFFIC IMPACT 1,500$ TANCE FEE 3,000$ PG&E 1,250$ PLANNING PERMIT 9,325$ estimated
COASTAL -$ TBD
BUILDING PERMIT & PLAN CHECK -$ Future
AGENCY & PERMIT FEES TOTAL 29,656$
Note: Fees are estimated only, to be confirmed.