3100 ozada ave parkade roof membrane

16
Failing membrane evident by leaks into parkade. Signs of rust were minimal with no spalling. Optimum time to replace the membrane. Concrete stair riser failure. Creates tripping hazard. To be replaced.

Upload: roaron

Post on 15-Aug-2015

206 views

Category:

Engineering


0 download

TRANSCRIPT

Page 1: 3100 Ozada Ave parkade roof membrane

Failing membrane

evident by leaks into parkade. Signs of rust

were minimal with no spalling.

Optimum time to replace the

membrane.

Concrete stairriser failure.

Creates tripping hazard. To be

replaced.

Page 2: 3100 Ozada Ave parkade roof membrane

Planters and soil removals completed. Next, dismantle playground equipment

and remove concrete topping.

Page 3: 3100 Ozada Ave parkade roof membrane

Excessive thickness of the topping slab without a separation or drain mat on the membrane made removals more difficult

than expected.

Typical 4” thick topping was 7” average thickness.

Page 4: 3100 Ozada Ave parkade roof membrane

Existing membrane under the concrete topping was still flexible but did show

some locations of oxidation and cracking as shown.

Membrane was a seamless liquid polymer modified asphalt with a good

bond.

Page 5: 3100 Ozada Ave parkade roof membrane

Unexpected poor

construction detail of

downspout tie in through the structural slab. Cast iron pipe

was broken at all locations.

Poor drainage on the structural

slab meant the need for

additionaldrains.

Page 6: 3100 Ozada Ave parkade roof membrane

Deck concrete topping removed.All loose membrane removed.

Structural deck surface washed and ready for new drains.

Page 7: 3100 Ozada Ave parkade roof membrane

16 new drains were installed using proper cast pipe and Watts 4” drains

with bi-level drainage for the membrane and surface runoff.

Page 8: 3100 Ozada Ave parkade roof membrane

16 new drains were installed with double reinforced tie in details.

Page 9: 3100 Ozada Ave parkade roof membrane

Problematic with a failed membrane system. Water has ingressed under the

occupant units and now is trying to egress back out.

Waiting for it to dry out is not an option but resolved with special techniques.

Page 10: 3100 Ozada Ave parkade roof membrane

Application of the Bakor 790-11 liquid rubberized asphalt membrane reinforced

with a polyester sheet before a top coat is placed.

Page 11: 3100 Ozada Ave parkade roof membrane

Application of Bakor drain boards to ensure drainage under the concrete

topping and eliminate ice lens lifting of the topping and hydraulic cracking of the

topping slab.

BASF polyurethane coating applied to vertical surface to protect membrane tie

in edge.

New hydro conduit installed for new lighting system.

Page 12: 3100 Ozada Ave parkade roof membrane

New fiber reinforced concrete is placed on top the drain mat.

Page 13: 3100 Ozada Ave parkade roof membrane

Front entrance redone (straightened & wider). Landscaping to be completed.

Page 14: 3100 Ozada Ave parkade roof membrane

Stairs reconstructed and painted.

Page 15: 3100 Ozada Ave parkade roof membrane

New electrical complete to replace the old as wiring was not to code and corroded.

Landscaping is completed with new Gardenscape wall and turf.