WISCONN VALLEY DEVELOPMENT ROADS IMPROVEMENTS PUBLIC INVOLVEMENT MEETING OCTOBER 17, 2018 PAGE 1 WISCONN VALLEY DEVELOPMENT ROADS IMPROVEMENTS Public Involvement Meeting | October 17, 2018 PAGE 4 For more project information or to be added to the project contact list: Michael Pyritz, Communications Manager WisDOT Southeast Region (262) 521-5373 | [email protected] CANADIAN PACIFIC RR CANADIAN PACIFIC RR UNION PACIFIC RR UNION PACIFIC RR DEVELOPMENT AREA 1 DEVELOPMENT AREA 2 DEVELOPMENT AREA 3 20 11 A E 31 20 11 KR 45 C A D H EA MB 11 C H 94 41 Meachem Rd Meachem Rd 58th Rd 58th Rd 5 6 th Rd 5 6 th Rd 1st St 1st St 7th St 7th St E Frontage Rd E Frontage Rd West Rd West Rd Emmertsen Rd Emmertsen Rd Fancher Rd Fancher Rd 90th St 90th St I n t e r n a t i o nal Dr I n t e r n a t i o nal Dr W illow R d W illow R d Wisconn Valley Way Braun Rd Braun Rd Old G r e e n B a y R d T a ylor Ave INTERNATIONAL DRIVE (JT ROADWAY) LET: 6/12/2018 COMPLETE: Fall 2019 BRAUN RD PHASE I (JT ROADWAY) LET: 6/12/2018 COMPLETE: Fall 2019 WISCONN VALLEY WAY BOX CULVERT (STATE ROUTE) LET: 8/14/2018 COMPLETE: Spring 2019 WISCONN VALLEY WAY/ COUNTY KR INTERSECTION (STATE ROUTE) LET: 11/13/2018 COMPLETE: End 2019 COUNTY KR BOX CULVERT (JT ROADWAY) LET: 8/14/2018 COMPLETE: Spring 2019 COUNTY KR PHASE I (JT ROADWAY) LET: 11/13/2018 COMPLETE: End 2019 WILLOW ROAD/WIS 11 (LOCAL LET) LET: 6/21/2018 COMPLETE: Nov 2018 WIS 11/COUNTY H INTERSECTION (STATE ROUTE) LET: 7/9/2019 COMPLETE: End 2020 WISCONN VALLEY WAY (STATE ROUTE) LET: TBD COMPLETE: TBD WIS 11 PHASE I (STATE ROUTE) LET: 7/9/2019 COMPLETE: End 2020 WIS 11 PHASE III (STATE ROUTE) LET: 11/10/2020 COMPLETE: End 2021 BRAUN RD PHASE II (JT ROADWAY) LET: 11/10/2020 COMPLETE: End 2021 COUNTY KR PHASE II (JT ROADWAY) LET: 7/2020 COMPLETE: End 2022 WIS 11 PHASE II (STATE ROUTE) LET: 7/9/2019 COMPLETE: End 2020 COUNTY H PHASE II (JT ROADWAY) LET: 7/9/2019 COMPLETE: End 2020 COUNTY H PHASE I (JT ROADWAY) LET: 1/8/2019 COMPLETE: End 2019 T hank you for attending the meeting and for your interest in the Racine County road improvements project. The purpose of this meeting is to present updated design- and construction-related details, including the recon- struction of County KR to Old Green Bay Road. We invite you to talk with project staff, share your thoughts and ask questions. Today’s meeting is an open house. The Wisconsin Department of Transportation (WisDOT) will schedule additional meetings like this as project design and con- struction progresses. Project Description WisDOT took temporary jurisdiction over the following roadways: y County KR between I-94 and Old Green Bay Road y County H between County KR and WIS 20 y Braun Road between I-94 and 90th Street y International Drive from WIS 20 to WIS 11 Temporary jurisdiction was granted to allow WisDOT to complete the design and re- construction of these develop- ment roadways. WisDOT has planned significant construc- tion in the I-94 corridor, and a single entity coordinating all road construction in the area will be most efficient and cost effective. County KR Update WisDOT is conducting environmental reviews and preparing design plans to reconstruct County KR from County H to Old Green Bay Road. This reconstruction will upgrade the existing two-lane rural roadway into a four- lane divided urban roadway, includes new bridges over the Union Pacific and the Canadian Pacific Railroads, a new bridge over the Pike River, plus 10-foot multiuse CANADIAN P ACIFIC RR CANADIAN P ACIFIC RR UNION PACIFIC RR UNION PACIFIC RR MOUNT PLEASANT STURTEVANT MOUNT PLEASANT RACINE COUNTY KENOSHA COUNTY RACINE COUNTY KENOSHA COUNTY DEVELOPMENT AREA 1 DEVELOPMENT AREA 2 DEVELOPMENT AREA 3 20 31 KR C H EA 11 H 94 41 58th Rd 58th Rd 5 6 t h R d 5 6 t h R d 1st 1st e Rd e Rd West Rd West Rd Em Em Fancher Rd Fancher Rd 90th St 90th St W illow R d W illow R d Wisconn Valley Way Braun Rd Braun Rd Old G r e e n B a y R d T a I n t e r n a t i o n a l D r Road Improvements Project Area Foxconn Development Site PROJECT AREA MAP Watch for additional meeting notices via mail or email. Sign up for updates on our website https://wisconnvalley.wi.gov. 2018 2019 2020 2021 2022 Environmental Tasks Design Public Outreach Construction Project Schedule WisDOT will coordinate work on road improvements, I-94 and area developments to accommodate freeway diversion and local traffic, construction worker and materials delivery access, and utility work. Estimated Contract Packages and Construction Years The map shows road improvements to accommodate the Wisconn Valley Science and Technology Park development site (labeled Areas 1, 2, 3). Roadway staging is preliminary and subject to change. “JT” means “jurisdictional transfer,” indicating roads temporarily transferred to WisDOT until reconstruction is complete. CONTACT INFORMATION = Public Meeting 2018 2019 2020 2021 TBD paths throughout the corridor. The purpose of the County KR upgrades is to accommodate the anticipated increase in travel demand generated by local economic development plans and to maintain and important link between I-94 and WIS 31.

Upload: others

Post on 11-Feb-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 31 U 38 WISCONN VALLEY DEVELOPMENT ROADS …...WISCONN VALLEY DEVELOPMENT ROADS IMPROVEMENTS Public Involvement Meeting | October 17, 2018 PAGE 2 PAGE 3 L Michigan Pik e 94 R i v e

WISCONN VALLEY DEVELOPMENT ROADS IMPROVEMENTS

PUBLIC INVOLVEMENT MEETING OCTOBER 17, 2018

PAGE 1

WISCONN VALLEY DEVELOPMENT ROADS IMPROVEMENTS Public Involvement Meeting | October 17, 2018

PAGE 4

For more project information or to be added to the project contact list:

Michael Pyritz, Communications Manager WisDOT Southeast Region (262) 521-5373 | [email protected]

LakeMichigan

CANADIAN PACIFIC RRCANADIAN PACIFIC RR

UNION PACIFIC RRUNION PACIFIC RR

UNION PACIFIC RRUNION PACIFIC RR

AMTRAK / CANADIAN PACIFIC RR

AMTRAK / CANADIAN PACIFIC RR

General MitchellInternationalAirport

KenoshaRegionalAirport

DEVELOPMENTAREA 1

DEVELOPMENTAREA 2

DEVELOPMENTAREA 3

94

V

V

36

241

119

32

K

100

100

32

32

3138

38

38

20

11

32

A

E

31

31

20

11

50

50

142

158

31

158

G

KR

142

24

36

45

45

45

20

45

45

45

C

A

D

U

U

D

H

EA

EA

MB

UE

H

100

45

45

43

24

100

J

G

MB

142

11

C

C

K

H

94

41

94

41

Elm RdElm Rd

Edgerton AveEdgerton Ave

Grange AveGrange Ave

Drexel AveDrexel Ave

Puetz RdPuetz Rd

Rawson AveRawson Ave

Ramsey AveRamsey Ave

College AveCollege Ave

13th

St

13th

St

51st

St

51st

St

76th

St

76th

St

92nd

St

92nd

St

How

ell A

veH

owel

l Ave

Ryan RdRyan Rd

Oakwood RdOakwood Rd

7 Mile Rd7 Mile Rd

8 Mile Rd8 Mile Rd

5th

St

5th

St

4 Mile Rd4 Mile Rd

2 Mile Rd2 Mile Rd

50th Rd50th Rd

27th

St

27th

St

51st

St

51st

St

100t

h A

ve10

0th

Ave

38th St38th St

60th St60th St

22nd

Ave

22nd

Ave

Mea

chem

Rd

Mea

chem

Rd

22nd

Ave

22nd

Ave

58th Rd58th Rd

How

ell R

dH

owel

l Rd

Nic

hols

on R

dN

icho

lson

Rd

Nic

hols

on R

dN

icho

lson

Rd

56th Rd56th Rd

Kraut RdKraut Rd

Golf RdGolf Rd

60th

St

60th

St

7½ Mile Rd7½ Mile Rd

88th

Ave

88th

Ave

104t

h A

ve10

4th

Ave

76th

St

76th

St

92nd

St

92nd

St

Cap

e R

dC

ape

Rd

Oakwood RdOakwood Rd

108t

hSt

108t

hSt

68th

St

68th

St

Bell RdBell Rd

152n

d A

ve15

2nd

Ave

128t

h A

ve12

8th

Ave

35th

St

35th

St

1st St1st St

5 Mile Rd5 Mile Rd

6½ Mile Rd6½ Mile Rd

51st

St

51st

St

43rd

St

43rd

St

7th St7th St

Somers RdSomers Rd

W F

ront

age

Rd

W F

ront

age

Rd

E F

ront

age

Rd

E F

ront

age

Rd

Wes

t Rd

Wes

t Rd

Spring StSpring St

Em

mer

tsen

Rd

Em

mer

tsen

Rd

Fanc

her R

dFa

nche

r Rd

108t

hSt

108t

hSt

Church RdChurch Rd

90th

St

90th

St

Inte

rnat

iona

l Dr

Inte

rnat

iona

l Dr

Will

ow R

dW

illow

Rd

Wis

conn

Val

ley

Way

Braun RdBraun Rd

Old G

reen

Bay

Rd

Taylo

r Ave

INTERNATIONAL DRIVE(JT ROADWAY)

LET: 6/12/2018COMPLETE: Fall 2019

BRAUN RD PHASE I(JT ROADWAY)

LET: 6/12/2018COMPLETE: Fall 2019

WISCONN VALLEY WAYBOX CULVERT(STATE ROUTE)

LET: 8/14/2018COMPLETE: Spring 2019

WISCONN VALLEY WAY/COUNTY KR INTERSECTION(STATE ROUTE)

LET: 11/13/2018COMPLETE: End 2019

COUNTY KR BOX CULVERT(JT ROADWAY)

LET: 8/14/2018COMPLETE: Spring 2019

COUNTY KR PHASE I(JT ROADWAY)

LET: 11/13/2018COMPLETE: End 2019

WILLOW ROAD/WIS 11(LOCAL LET)

LET: 6/21/2018COMPLETE: Nov 2018

WIS 11/COUNTY HINTERSECTION(STATE ROUTE)

LET: 7/9/2019COMPLETE: End 2020

WISCONN VALLEY WAY(STATE ROUTE)

LET: TBDCOMPLETE: TBD

WIS 11 PHASE I(STATE ROUTE)

LET: 7/9/2019COMPLETE: End 2020

WIS 11 PHASE III(STATE ROUTE)

LET: 11/10/2020COMPLETE: End 2021

BRAUN RD PHASE II(JT ROADWAY)

LET: 11/10/2020COMPLETE: End 2021

COUNTY KR PHASE II(JT ROADWAY)

LET: 7/2020COMPLETE: End 2022

WIS 11 PHASE II(STATE ROUTE)

LET: 7/9/2019COMPLETE: End 2020

COUNTY H PHASE II(JT ROADWAY)

LET: 7/9/2019COMPLETE: End 2020

COUNTY H PHASE I(JT ROADWAY)

LET: 1/8/2019COMPLETE: End 2019

T hank you for attending the meeting and for your

interest in the Racine County road improvements project.

The purpose of this meeting is to present updated design- and construction-related details, including the recon-struction of County KR to Old Green Bay Road. We invite you to talk with project staff, share your thoughts and ask questions.

Today’s meeting is an open house. The Wisconsin Department of Transportation (WisDOT) will schedule additional meetings like this as project design and con-struction progresses.

Project DescriptionWisDOT took temporary jurisdiction over the following roadways:

y County KR between I-94 and Old Green Bay Road

y County H between County KR and WIS 20

y Braun Road between I-94 and 90th Street

y International Drive from WIS 20 to WIS 11

Temporary jurisdiction was granted to allow WisDOT to

complete the design and re-construction of these develop-ment roadways. WisDOT has planned significant construc-tion in the I-94 corridor, and a single entity coordinating all road construction in the area will be most efficient and cost effective.

County KR UpdateWisDOT is conducting environmental reviews and preparing design plans to reconstruct County KR from County H to Old Green Bay

Road. This reconstruction will upgrade the existing two-lane rural roadway into a four-lane divided urban roadway, includes new bridges over the Union Pacific and the Canadian Pacific Railroads, a new bridge over the Pike River, plus 10-foot multiuse

LakeMichigan

CANADIAN PACIFIC RRCANADIAN PACIFIC RR

UNION PACIFIC RRUNION PACIFIC RR

UNION PACIFIC RRUNION PACIFIC RR

AMTRAK / CANADIAN PACIFIC RR

AMTRAK / CANADIAN PACIFIC RR

General MitchellInternationalAirport

KenoshaRegionalAirport

CITY OF MILWAUKEE

CITY OF RACINE

CITY OF KENOSHA

MOUNT PLEASANT

STURTEVANT

KNEELAND

OAK CREEK

PLEASANT PRAIRIE

CALEDONIA

BRISTOL

UNION GROVE

HALES CORNERS

SOUTHMILWAUKEE

MOUNT PLEASANT

R A C I N E C O U N T Y

K E N O S H A C O U N T Y

R A C I N E C O U N T Y

K E N O S H A C O U N T Y

DEVELOPMENTAREA 1

DEVELOPMENTAREA 2

DEVELOPMENTAREA 3

94

V

V

36

241

119

32

K

100

100

32

32

3138

38

38

20

11

32

A

E

31

31

20

11

50

50

142

158

31

158

G

KR

142

24

36

45

45

45

20

45

45

45

C

A

D

U

U

D

H

EA

EA

MB

UE

H

100

45

45

43

24

100

J

G

MB

142

11

C

C

K

H

94

41

94

41

94

41

Elm RdElm Rd

Edgerton AveEdgerton Ave

Grange AveGrange Ave

Drexel AveDrexel Ave

Puetz RdPuetz Rd

Rawson AveRawson Ave

Ramsey AveRamsey Ave

College AveCollege Ave

13th

St

13th

St

51st

St

51st

St

76th

St

76th

St

92nd

St

92nd

St

How

ell A

veH

owel

l Ave

Ryan RdRyan Rd

Oakwood RdOakwood Rd

7 Mile Rd7 Mile Rd

8 Mile Rd8 Mile Rd

5th

St

5th

St

4 Mile Rd4 Mile Rd

2 Mile Rd2 Mile Rd

50th Rd50th Rd

27th

St

27th

St

51st

St

51st

St

100t

h A

ve10

0th

Ave

38th St38th St

60th St60th St

22nd

Ave

22nd

Ave

Mea

chem

Rd

Mea

chem

Rd

22nd

Ave

22nd

Ave

58th Rd58th Rd

How

ell R

dH

owel

l Rd

Nic

hols

on R

dN

icho

lson

Rd

Nic

hols

on R

dN

icho

lson

Rd

56th Rd56th Rd

Kraut RdKraut Rd

Golf RdGolf Rd

60th

St

60th

St

7½ Mile Rd7½ Mile Rd

88th

Ave

88th

Ave

104t

h A

ve10

4th

Ave

76th

St

76th

St

92nd

St

92nd

St

Cap

e R

dC

ape

Rd

Oakwood RdOakwood Rd

108t

hSt

108t

hSt

68th

St

68th

St

Bell RdBell Rd

152n

d A

ve15

2nd

Ave

128t

h A

ve12

8th

Ave

35th

St

35th

St

1st St1st St

5 Mile Rd5 Mile Rd

6½ Mile Rd6½ Mile Rd

51st

St

51st

St

43rd

St

43rd

St

7th St7th St

Somers RdSomers Rd

W F

ront

age

Rd

W F

ront

age

Rd

E F

ront

age

Rd

E F

ront

age

Rd

Wes

t Rd

Wes

t Rd

Spring StSpring St

Em

mer

tsen

Rd

Em

mer

tsen

Rd

Fanc

her R

dFa

nche

r Rd

108t

hSt

108t

hSt

Church RdChurch Rd

90th

St

90th

St

Will

ow R

dW

illow

Rd

Wis

conn

Val

ley

Way

Braun RdBraun Rd

Old G

reen

Bay

Rd

Taylo

r Ave

Inter

natio

nal D

r

Road Improvements Project Area

Foxconn Development Site

PROJECT AREA MAP

Watch for additional meeting notices via mail or email. Sign up for updates on our website https://wisconnvalley.wi.gov.

2018 2019 2020 2021 2022

Environmental Tasks

Design

Public Outreach

Construction

Project ScheduleWisDOT will coordinate work on road improvements, I-94 and area developments to accommodate freeway diversion and local traffic, construction worker and materials delivery access, and utility work.

Estimated Contract Packages and Construction YearsThe map shows road improvements to accommodate the Wisconn Valley Science and Technology Park development site (labeled Areas 1, 2, 3). Roadway staging is preliminary and subject to change. “JT” means “jurisdictional transfer,” indicating roads temporarily transferred to WisDOT until reconstruction is complete.

CONTACTINFORMATION

= Public Meeting

2018

2019

2020

2021

TBD

paths throughout the corridor.

The purpose of the County KR upgrades is to accommodate the anticipated increase in travel demand generated by local economic development plans and to maintain and important link between I-94 and WIS 31.

Page 2: 31 U 38 WISCONN VALLEY DEVELOPMENT ROADS …...WISCONN VALLEY DEVELOPMENT ROADS IMPROVEMENTS Public Involvement Meeting | October 17, 2018 PAGE 2 PAGE 3 L Michigan Pik e 94 R i v e

WISCONN VALLEY DEVELOPMENT ROADS IMPROVEMENTS Public Involvement Meeting | October 17, 2018

PAGE 2 PAGE 3

LakeMichigan

Pike River

Pike River

Root River

AMTRAK / CANADIAN PACIFIC RR

AMTRAK / CANADIAN PACIFIC RR

UNION PACIFIC RRUNION PACIFIC RR

UNION PACIFIC RRUNION PACIFIC RR

AMTRAK / CANADIAN PACIFIC RR

AMTRAK / CANADIAN PACIFIC RR

Racineworkers

Kenoshaworkers

General MitchellInternationalAirport

KenoshaRegionalAirport

CITY OF MILWAUKEE

CITY OF RACINE

CITY OF KENOSHA

MOUNT PLEASANT

STURTEVANT

KNEELAND

OAK CREEK

CALEDONIA

UNION GROVE

HALES CORNERS

SOUTHMILWAUKEE

MOUNT PLEASANT

M I L W A U K E E C O U N T Y

R A C I N E C O U N T Y

M I L W A U K E E C O U N T Y

R A C I N E C O U N T Y

R A C I N E C O U N T Y

K E N O S H A C O U N T Y

R A C I N E C O U N T Y

K E N O S H A C O U N T Y

DEVELOPMENTAREA 1

DEVELOPMENTAREA 2

DEVELOPMENTAREA 3

94

V

V

36

241

119

32

K

100

100

32

32

3138

38

38

20

11

32

A

E

31

31

20

11

50

50

142

158

31

158

G

KR

142

24

36

45

45

45

20

45

45

45

C

A

D

U

U

D

H

EA

EA

MB

UE

H

100

45

45

43

24

100

J

G

MB

142

11

C

C

K

H

94

41

94

41

Elm RdElm Rd

Edgerton AveEdgerton Ave

Grange AveGrange Ave

Drexel AveDrexel Ave

Puetz RdPuetz Rd

Rawson AveRawson Ave

Ramsey AveRamsey Ave

College AveCollege Ave

13th

St

13th

St

51st

St

51st

St

76th

St

76th

St

92nd

St

92nd

St

How

ell A

veH

owel

l Ave

Ryan RdRyan Rd

Oakwood RdOakwood Rd

7 Mile Rd7 Mile Rd

8 Mile Rd8 Mile Rd

5th

St

5th

St

4 Mile Rd4 Mile Rd

2 Mile Rd2 Mile Rd

50th Rd50th Rd

27th

St

27th

St

51st

St

51st

St

Braun RdBraun Rd

100t

h A

ve10

0th

Ave

38th St38th St

60th St60th St

22nd

Ave

22nd

Ave

Mea

chem

Rd

Mea

chem

Rd

22nd

Ave

22nd

Ave

58th Rd58th Rd

How

ell R

dH

owel

l Rd

Nic

hols

on R

dN

icho

lson

Rd

Nic

hols

on R

dN

icho

lson

Rd

56th Rd56th Rd

Kraut RdKraut Rd

Golf RdGolf Rd

60th

St

60th

St

7½ Mile Rd7½ Mile Rd

88th

Ave

88th

Ave

104t

h A

ve10

4th

Ave

76th

St

76th

St

92nd

St

92nd

St

Cap

e R

dC

ape

Rd

Oakwood RdOakwood Rd

108t

hSt

108t

hSt

68th

St

68th

St

Bell RdBell Rd

152n

d A

ve15

2nd

Ave

128t

h A

ve12

8th

Ave

35th

St

35th

St

1st St1st St

5 Mile Rd5 Mile Rd

6½ Mile Rd6½ Mile Rd

51st

St

51st

St

43rd

St

43rd

St

7th St7th St

Somers RdSomers Rd

W F

ront

age

Rd

W F

ront

age

Rd

E F

ront

age

Rd

E F

ront

age

Rd

Wes

t Rd

Wes

t Rd

Spring StSpring St

Em

mer

tsen

Rd

Em

mer

tsen

Rd

Fanc

her R

dFa

nche

r Rd

108t

hSt

108t

hSt

Church RdChurch Rd

90th

St

90th

St

Inte

rnat

iona

l Dr

Inte

rnat

iona

l Dr

Will

ow R

dW

illow

Rd

Wis

conn

Val

ley

Way

Wis

conn

Val

ley

Way

DEVELOPMENT ROADS ACCESS ROUTES

SPEED LIMITS OVERVIEW

Protecting the Environment

This summer, the US Army Corps of Engineers issued Section 404 permits for work in waterways and wetlands for these Development Roads:

y Braun Road, from I-94 to County H

y County KR, from I-94 to County H

y Wisconn Valley Way box culvert

y International Drive

The USACE confirmed no Section 404 permit is required for WIS 11 construction, and authorized work for County H (from KR to Braun Road).

WisDOT recently submitted additional Section 404 permit applications to USACE for Wisconn Valley Way. Additional applications for County H (Braun Road to WIS 11) and Braun Road (County H to 90th Street) will be submitted this

LakeMichigan

Pike River

Pike River

Root River

AMTRAK / CANADIAN PACIFIC RR

AMTRAK / CANADIAN PACIFIC RR

UNION PACIFIC RRUNION PACIFIC RR

UNION PACIFIC RRUNION PACIFIC RR

AMTRAK / CANADIAN PACIFIC RR

AMTRAK / CANADIAN PACIFIC RR

General MitchellInternationalAirport

KenoshaRegionalAirport

CITY OF MILWAUKEE

CITY OF RACINE

CITY OF KENOSHA

MOUNT PLEASANT

STURTEVANT

KNEELAND

OAK CREEK

CALEDONIA

UNION GROVE

HALES CORNERS

SOUTHMILWAUKEE

MOUNT PLEASANTDEVELOPMENT

AREA 1

DEVELOPMENTAREA 2

DEVELOPMENTAREA 3

94

V

V

36

241

119

32

K

100

100

32

32

3138

38

38

20

11

32

A

E

31

31

20

11

50

50

142

158

31

158

G

KR

142

24

36

45

45

45

20

45

45

45

C

A

D

U

U

D

H

EA

EA

MB

UE

H

100

45

45

43

24

100

J

G

MB

142

11

C

C

K

H

94

41

94

41

Elm RdElm Rd

Edgerton AveEdgerton Ave

Grange AveGrange Ave

Drexel AveDrexel Ave

Puetz RdPuetz Rd

Rawson AveRawson Ave

Ramsey AveRamsey Ave

College AveCollege Ave

13th

St

13th

St

51st

St

51st

St

76th

St

76th

St

92nd

St

92nd

St

How

ell A

veH

owel

l Ave

Ryan RdRyan Rd

Oakwood RdOakwood Rd

7 Mile Rd7 Mile Rd

8 Mile Rd8 Mile Rd

5th

St

5th

St

4 Mile Rd4 Mile Rd

2 Mile Rd2 Mile Rd

50th Rd50th Rd

27th

St

27th

St

51st

St

51st

St

Braun RdBraun Rd

100t

h A

ve10

0th

Ave

38th St38th St

60th St60th St

22nd

Ave

22nd

Ave

Mea

chem

Rd

Mea

chem

Rd

22nd

Ave

22nd

Ave

58th Rd58th Rd

How

ell R

dH

owel

l Rd

Nic

hols

on R

dN

icho

lson

Rd

Nic

hols

on R

dN

icho

lson

Rd

56th Rd56th Rd

Kraut RdKraut Rd

Golf RdGolf Rd

60th

St

60th

St

7½ Mile Rd7½ Mile Rd

88th

Ave

88th

Ave

104t

h A

ve10

4th

Ave

76th

St

76th

St

92nd

St

92nd

St

Cap

e R

dC

ape

Rd

Oakwood RdOakwood Rd

108t

hSt

108t

hSt

68th

St

68th

St

Bell RdBell Rd

152n

d A

ve15

2nd

Ave

128t

h A

ve12

8th

Ave

35th

St

35th

St

1st St1st St

5 Mile Rd5 Mile Rd

6½ Mile Rd6½ Mile Rd

51st

St

51st

St

43rd

St

43rd

St

7th St7th St

Somers RdSomers Rd

W F

ront

age

Rd

W F

ront

age

Rd

E F

ront

age

Rd

E F

ront

age

Rd

Wes

t Rd

Wes

t Rd

Spring StSpring St

Em

mer

tsen

Rd

Em

mer

tsen

Rd

Fanc

her R

dFa

nche

r Rd

108t

hSt

108t

hSt

Church RdChurch Rd

90th

St

90th

St

Inte

rnat

iona

l Dr

Inte

rnat

iona

l Dr

Will

ow R

dW

illow

Rd

Wis

conn

Val

ley

Way

Wis

conn

Val

ley

Way

Shared-Use Path

Potential Rails to Trails*

Potential Shared-Use PathPending Funding Determination

LEGEND

*Rails-to-Trails Conservancy works with the Wisconsin DNR to create a network of trails from former rail lines, connecting corridors and building active communities across Wisconsin and the nation.

Shared-Use Path OverviewThe project includes a 10-foot-wide, paved asphalt path for bicyclists and pedestrians.

Shared-Use Path

Potential Rails to Trails*

Potential Shared-Use Path Pending Funding Determination

*Rails-to-Trails Conservancy works with the Wisconsin DNR to create a network of trails from former rail lines, connecting corridors and building active communities across Wisconsin and the nation.

LakeMichigan

CANADIAN PACIFIC RRCANADIAN PACIFIC RR

UNION PACIFIC RRUNION PACIFIC RR

UNION PACIFIC RRUNION PACIFIC RR

AMTRAK / CANADIAN PACIFIC RR

AMTRAK / CANADIAN PACIFIC RR

General MitchellInternationalAirport

KenoshaRegionalAirport

CITY OF MILWAUKEE

CITY OF RACINE

CITY OF KENOSHA

STURTEVANT

KNEELAND

OAK CREEK

PLEASANT PRAIRIE

CALEDONIA

BRISTOL

UNION GROVE

HALES CORNERS

SOUTHMILWAUKEE

DEVELOPMENTAREA 1

DEVELOPMENTAREA 2

DEVELOPMENTAREA 3

LEGEND

ExistingSpeed Limit

ProposedSpeed Limit

LIMITSPEED

40LIMITSPEED

55

LIMITSPEED

35LIMITSPEED

45

LIMITSPEED

35LIMITSPEED

35

LIMITSPEED

55

LIMITSPEED

35

LIMITSPEED

45

LIMITSPEED

35

LIMITSPEED

35

LIMITSPEED

45LIMITSPEED

45LIMITSPEED

45LIMITSPEED

45

LIMITSPEED

45LIMITSPEED

55LIMITSPEED

45LIMITSPEED

45

LIMITSPEED

45LIMITSPEED

45

LIMITSPEED

35LIMITSPEED

55

LIMITSPEED

45LIMITSPEED

55

Between frontage roadsBetween frontage roads

Between frontage roadsBetween frontage roads

Between frontage roadsBetween frontage roads

94

V

V

36

241

119

32

K

100

100

32

32

3138

38

38

20

11

32

A

E

31

31

20

11

50

50

142

158

31

158

G

KR

142

24

36

45

45

45

20

45

45

45

C

A

D

U

U

D

H

EA

EA

MB

UE

H

100

45

45

43

24

100

J

G

MB

142

11

C

C

K

H

94

41

94

41

94

41

Elm RdElm Rd

Edgerton AveEdgerton Ave

Grange AveGrange Ave

Drexel AveDrexel Ave

Puetz RdPuetz Rd

Rawson AveRawson Ave

Ramsey AveRamsey Ave

College AveCollege Ave

13th

St

13th

St

51st

St

51st

St

76th

St

76th

St

92nd

St

92nd

St

How

ell A

veH

owel

l Ave

Ryan RdRyan Rd

Oakwood RdOakwood Rd

7 Mile Rd7 Mile Rd

8 Mile Rd8 Mile Rd

5th

St

5th

St

4 Mile Rd4 Mile Rd

2 Mile Rd2 Mile Rd

50th Rd50th Rd

27th

St

27th

St

51st

St

51st

St

100t

h A

ve10

0th

Ave

38th St38th St

60th St60th St

22nd

Ave

22nd

Ave

Mea

chem

Rd

Mea

chem

Rd

22nd

Ave

22nd

Ave

58th Rd58th Rd

How

ell R

dH

owel

l Rd

Nic

hols

on R

dN

icho

lson

Rd

Nic

hols

on R

dN

icho

lson

Rd

56th Rd56th Rd

Kraut RdKraut Rd

Golf RdGolf Rd

60th

St

60th

St

7½ Mile Rd7½ Mile Rd

88th

Ave

88th

Ave

104t

h A

ve10

4th

Ave

76th

St

76th

St

92nd

St

92nd

St

Cap

e R

dC

ape

Rd

Oakwood RdOakwood Rd

108t

hSt

108t

hSt

68th

St

68th

St

Bell RdBell Rd

152n

d A

ve15

2nd

Ave

128t

h A

ve12

8th

Ave

35th

St

35th

St

1st St1st St

5 Mile Rd5 Mile Rd

6½ Mile Rd6½ Mile Rd

51st

St

51st

St

43rd

St

43rd

St

7th St7th St

Somers RdSomers Rd

W F

ront

age

Rd

W F

ront

age

Rd

E F

ront

age

Rd

E F

ront

age

Rd

Wes

t Rd

Wes

t Rd

Spring StSpring St

Em

mer

tsen

Rd

Em

mer

tsen

Rd

Fanc

her R

dFa

nche

r Rd

108t

hSt

108t

hSt

Church RdChurch Rd

90th

St

90th

St

Will

ow R

dW

illow

Rd

Wis

conn

Val

ley

Way

Braun RdBraun Rd

Old G

reen

Bay

Rd

Taylo

r Ave

Inter

natio

nal D

r

winter. WisDOT anticipates submitting the Section 404 permit application for County KR (County H to Old Green Bay Road) in late 2019.

As compensation for unavoid-able wetland impacts from the Development Roads, WisDOT has already purchased over 12 mitigation credits through DNR’s Wisconsin Wetland Conservation In-Lieu (ILF) Program. The ILF Program uses the funds to implement

wetland restoration projects to offset wetland impacts. In this case, WisDOT purchased credits at a 2:1 ratio; mean-ing, for every acre of wetland impact, WisDOT purchased 2 ILF credits. At least 10 additional credits will be purchased in January 2019 for approximately 5 acres of wetland impacts from WIS 11, Wisconn Valley Way and County H. Final ILF payments for remaining projects are expected in 2020.

LEGEND

Site Development (Areas 1, 2, 3)

General Access Route

Haul Route

Construction Update

y WisDOT began construction on Braun Road between East Frontage Road and County H in August. The road will be closed to through traffic until late fall 2019.

y Construction began in August on the International Drive extension to WIS 11. WisDOT expects the new road to open to traffic by the end of late fall 2019.

y Willow Road-WIS 11 intersection construction began in July. WIS 11 traffic will be reduced to one lane in each direction until completion in November.

y WisDOT is reconstructing the box culvert under County KR just of the east of East Frontage Road. This construc-tion requires closing County KR fall 2018 through January 2019.