30 weeks portfolio
DESCRIPTION
ÂTRANSCRIPT
v
Furni tureFurniture for the information age. Repetition. Serialization. Reflectivity. Variations within a standardized construction system of steel channels, plexiglass, and sheet metal.
v The concrete form emerges from the hillside. The semi-exterior program includes outdoor seating, a covered performance space and a large event space. Light is filtered through a suspended trellis.
House
v
ParcelThe schematic design resolves tight mechanical systems, square footage, and circulation constraints into a singular spatial experience. The 750 square foot apartment units are stacked and shifted to define an internal void. Variation in plan is produced as each apartment is rotated around a centralized utility core. Circulation is carved from the volumes and detailed in raw plywood. The entire assemblage is clad in a diaphanous trellis to condition light and support plant growth. The project was completed in collaboration at Rice + Lipka Architects in New York.
v
FactoryThe iridescent building volume is sited within a vacant property in a distressed Pittsburgh neighborhood. The facility expands the adjacent rowhouse and provides necessary utilities for the area’s developing arts community. The renovations include a sawtooth ceiling with an integrated photovoltaic array and an escape stair to satisfy egress requirements. The project was presented to the community through a town meeting and included a business and event plan.
Section with Roof and Stair Renovations
Section with Roof and Stair Renovations
1.17
6.69
7.32
28.12
26.2
5
4.05
28.61
4.25
12.2
5
11.50
3.33
1.00
10.0
0
0.50
1.00
27.44
34.6717.31
13.7
5
2.41
1.50
15.5
8
66.51
0.50 15.50 0.50 12.5036.50
1. NEW STRUCTURAL STEEL MEMBERS2. EXISTING BRICK WALL WITH NEW CONCRETE BLOCK BACKUP3. NEW GYPSUM PARTITION WALLS4. NEW PREFABRICATED CONCRETE WALL PANEL WITH PRECAST COLUMNS 5. EXISTING WINDOWS WITH NEW ALUMINIUM FRAME6. NEW POLYCARBONATE CURTAIN WALL7. NEW CONCRETE FLOOR8. NEW METAL STAIRS9. NEW FIRE-PROOF CURTAIN GLASS WALL10. EXISTING WOOD SIDING WITH NEW INSULATION AND DRYWALL BACKUP11. NEW METAL ROOFING DECK WITH CONCRETE12. NEW SAWTOOTH ROOF13. CONCRETE PARAPET14. NEW GARAGE15. NEW STOREFRONT TYPE DOOR16. NEW STRUCTURAL STEEL MEMBERS
W1- CURTAIN GLASS WALL [ 084413100150 , 088410102100 ]W2- IMPROVED BRICK WALL [ 040120200320 , 042210140300 , 072123200200 , 072510100401 ]W3- POLYCARBONATE WALL ASSEMBLY [ 051423050100 , 051516500550 , 055316500020 , 088130100280 , 088410101000 , 088723132010 , 051223050020 , 088420101500 ] REFER TO IP 5.00, IP5.01 & IP5.02W4- PREFABRICATED CONCRETE WALL PANELS [ 072113130700 , 072510100401 , 034513500210 , 034105150700 ]W5- PARTITION WALLS [ 092113100600 ]W6- STOREFRONT GLASS [ 079213200060 , 084113200250 ]W7- WOODSIDING WALL [ 072123200600 , 072113130600 , 061636100105 , 072510100401 , 074623103200 , 092910300350 ]W8- SKYLIGHTS, INSULATED SAFETY GLASS WITH ALUMINIUM FRAME [ 086213202300 ]
F1- METAL DECKING FLOOR WITH CAST IN PLACE CONCRETE [ 033053402150 , 033543100210 , 053113505100 , 054113305120 ]
R1- METAL ROOF DECKING WITH CAST IN PLACE CONCRETE [ 053123502400 , 071616200020 , 072216101932 ]R2-
E1- RAINWATER SYSTEMS AND COMPONENTS [ 221455102080 ]E2-SOLAR HEATING COMPONENTS [ 235619503080 ]
KEY NOTES
ASSEMBLY LEGEND
3
W1
3
3
2
2
4
5
5
6
777
8
9
10
11
12
1314
15
16
16
7
8
W1
W1
W3
W4
W4
W5
W5
W6
W7
W8
F1
F1
F1
R1
v
Exhibt ionThe aluminum and fabric structure was the centerpiece for the annual Arbitare design exhibition in Heslinki, Finland. As one moves around the structure, the layered figures elicit different expressions. The light-absorbing materiality is carried through the exhibition as a set of suspended planes placed between the displays of exhibitors. The sys-tem of modular, minimal surfaces simplified fabrication and assembly. The project was completed in collaboration at Sotamaa in Helsinki, Finland.
A1.1 B1.2
B1.2A1
.1
6. Unit A - Unit B
bottom
138.76°
Ahead!Marimekko Forum
Suomen Messut
SUUNNITTELIJA
SOTAMAA
Tallberginkatu 1C 7100180 Helsinki
t. +358 50 511 2642t. + 358 50 530 9831
Päivämäärä: 24.8.2011Mittakaava: ei
ARK - 6.5
Kommentteja / Muutokset:
Ahead! Marimekko Forum. Alumiiniraken-teiden pystytys.
FE2
E1
D2
D1
C2
C1B1
B2A2
A1
3173
9022
8298
55916276
5692
5699
67.06
82.15
68896713
8765 8020
6276 5661
6134
6869
8388
57.41
5305
9022
7529 4592
5340
6000
9150
83.09
5713
136.30 8388
5699
5340
8978
7266
42.6
3
34.32
94.61
42.76
108.58
37.10
35.2
5
32.98
65.84
78.92v
123.91
60.06
32.39
63.1
8
83.84
42.31
59.12
55.4
1
78.57
67.53
57.06
54.94
63.96
61.1
0
74.5261.8
5
43.63
51.24
32.63
71.1
0
57.66
112.51
34.86
143.64
Ahead!Marimekko Forum
Suomen Messut
SUUNNITTELIJA
SOTAMAA
Tallberginkatu 1C 7100180 Helsinki
t. +358 50 511 2642t. + 358 50 530 9831
Päivämäärä: 16.8.2011Mittakaava: ei
ARK - 3.0
Kommentteja / Muutokset:
Ahead! Marimekko Forum. Alumiiniraken-teiden mitoitus.
C2.1B2.1A2.1
D2.1 E2.1
B1.1A1.1 C1.1
D1.1 E1.1
B1.2
A1.2
C1.2
D1.2E1.2
E2.2D2.2
B2.2
A2.2
C2.2
F1.2F1.4
E2.3D2.3
A2.3
B2.3
C2.3
E1.3D1.3
C1.3
A1.3
B1.3
F1.1
F1.3
B
13500
4899
1500
3822
3278
2056 5926
4191
5484
7702
6484
11000
1. Unit B
Ahead!Marimekko Forum
Suomen Messut
SUUNNITTELIJA
SOTAMAA
Tallberginkatu 1C 7100180 Helsinki
t. +358 50 511 2642t. + 358 50 530 9831
Päivämäärä: 24.8.2011Mittakaava: ei
ARK - 6.0
Kommentteja / Muutokset:
Ahead! Marimekko Forum. Alumiiniraken-teiden pystytys.
Aluminium Fabrication
Component Position
Component Assembly