30 weeks portfolio

15
JOSEPH KOON Floor 3 2007 - 2013 Portfolio

Upload: joseph-koon

Post on 28-Mar-2016

219 views

Category:

Documents


5 download

DESCRIPTION

 

TRANSCRIPT

JOSEPH KOON

Floor 32007 - 2013Portfolio

v

Furni tureFurniture for the information age. Repetition. Serialization. Reflectivity. Variations within a standardized construction system of steel channels, plexiglass, and sheet metal.

v The concrete form emerges from the hillside. The semi-exterior program includes outdoor seating, a covered performance space and a large event space. Light is filtered through a suspended trellis.

House

View From Below Hillside

v

ParcelThe schematic design resolves tight mechanical systems, square footage, and circulation constraints into a singular spatial experience. The 750 square foot apartment units are stacked and shifted to define an internal void. Variation in plan is produced as each apartment is rotated around a centralized utility core. Circulation is carved from the volumes and detailed in raw plywood. The entire assemblage is clad in a diaphanous trellis to condition light and support plant growth. The project was completed in collaboration at Rice + Lipka Architects in New York.

Sectional Perspective Through Wood-Clad Circulation and Site Plan

Sun Path and Solar Shading Analysis

v

FactoryThe iridescent building volume is sited within a vacant property in a distressed Pittsburgh neighborhood. The facility expands the adjacent rowhouse and provides necessary utilities for the area’s developing arts community. The renovations include a sawtooth ceiling with an integrated photovoltaic array and an escape stair to satisfy egress requirements. The project was presented to the community through a town meeting and included a business and event plan.

Section with Roof and Stair Renovations

Section with Roof and Stair Renovations

1.17

6.69

7.32

28.12

26.2

5

4.05

28.61

4.25

12.2

5

11.50

3.33

1.00

10.0

0

0.50

1.00

27.44

34.6717.31

13.7

5

2.41

1.50

15.5

8

66.51

0.50 15.50 0.50 12.5036.50

1. NEW STRUCTURAL STEEL MEMBERS2. EXISTING BRICK WALL WITH NEW CONCRETE BLOCK BACKUP3. NEW GYPSUM PARTITION WALLS4. NEW PREFABRICATED CONCRETE WALL PANEL WITH PRECAST COLUMNS 5. EXISTING WINDOWS WITH NEW ALUMINIUM FRAME6. NEW POLYCARBONATE CURTAIN WALL7. NEW CONCRETE FLOOR8. NEW METAL STAIRS9. NEW FIRE-PROOF CURTAIN GLASS WALL10. EXISTING WOOD SIDING WITH NEW INSULATION AND DRYWALL BACKUP11. NEW METAL ROOFING DECK WITH CONCRETE12. NEW SAWTOOTH ROOF13. CONCRETE PARAPET14. NEW GARAGE15. NEW STOREFRONT TYPE DOOR16. NEW STRUCTURAL STEEL MEMBERS

W1- CURTAIN GLASS WALL [ 084413100150 , 088410102100 ]W2- IMPROVED BRICK WALL [ 040120200320 , 042210140300 , 072123200200 , 072510100401 ]W3- POLYCARBONATE WALL ASSEMBLY [ 051423050100 , 051516500550 , 055316500020 , 088130100280 , 088410101000 , 088723132010 , 051223050020 , 088420101500 ] REFER TO IP 5.00, IP5.01 & IP5.02W4- PREFABRICATED CONCRETE WALL PANELS [ 072113130700 , 072510100401 , 034513500210 , 034105150700 ]W5- PARTITION WALLS [ 092113100600 ]W6- STOREFRONT GLASS [ 079213200060 , 084113200250 ]W7- WOODSIDING WALL [ 072123200600 , 072113130600 , 061636100105 , 072510100401 , 074623103200 , 092910300350 ]W8- SKYLIGHTS, INSULATED SAFETY GLASS WITH ALUMINIUM FRAME [ 086213202300 ]

F1- METAL DECKING FLOOR WITH CAST IN PLACE CONCRETE [ 033053402150 , 033543100210 , 053113505100 , 054113305120 ]

R1- METAL ROOF DECKING WITH CAST IN PLACE CONCRETE [ 053123502400 , 071616200020 , 072216101932 ]R2-

E1- RAINWATER SYSTEMS AND COMPONENTS [ 221455102080 ]E2-SOLAR HEATING COMPONENTS [ 235619503080 ]

KEY NOTES

ASSEMBLY LEGEND

3

W1

3

3

2

2

4

5

5

6

777

8

9

10

11

12

1314

15

16

16

7

8

W1

W1

W3

W4

W4

W5

W5

W6

W7

W8

F1

F1

F1

R1

v

Exhibt ionThe aluminum and fabric structure was the centerpiece for the annual Arbitare design exhibition in Heslinki, Finland. As one moves around the structure, the layered figures elicit different expressions. The light-absorbing materiality is carried through the exhibition as a set of suspended planes placed between the displays of exhibitors. The sys-tem of modular, minimal surfaces simplified fabrication and assembly. The project was completed in collaboration at Sotamaa in Helsinki, Finland.

A1.1 B1.2

B1.2A1

.1

6. Unit A - Unit B

bottom

138.76°

Ahead!Marimekko Forum

Suomen Messut

SUUNNITTELIJA

SOTAMAA 

Tallberginkatu 1C 7100180 Helsinki

t. +358 50 511 2642t. + 358 50 530 9831

[email protected]

Päivämäärä: 24.8.2011Mittakaava: ei

ARK - 6.5

Kommentteja / Muutokset:

Ahead! Marimekko Forum. Alumiiniraken-teiden pystytys. 

FE2

E1

D2

D1

C2

C1B1

B2A2

A1

3173

9022

8298

55916276

5692

5699

67.06

82.15

68896713

8765 8020

6276 5661

6134

6869

8388

57.41

5305

9022

7529 4592

5340

6000

9150

83.09

5713

136.30 8388

5699

5340

8978

7266

42.6

3

34.32

94.61

42.76

108.58

37.10

35.2

5

32.98

65.84

78.92v

123.91

60.06

32.39

63.1

8

83.84

42.31

59.12

55.4

1

78.57

67.53

57.06

54.94

63.96

61.1

0

74.5261.8

5

43.63

51.24

32.63

71.1

0

57.66

112.51

34.86

143.64

Ahead!Marimekko Forum

Suomen Messut

SUUNNITTELIJA

SOTAMAA

Tallberginkatu 1C 7100180 Helsinki

t. +358 50 511 2642t. + 358 50 530 9831

[email protected]

Päivämäärä: 16.8.2011Mittakaava: ei

ARK - 3.0

Kommentteja / Muutokset:

Ahead! Marimekko Forum. Alumiiniraken-teiden mitoitus.

C2.1B2.1A2.1

D2.1 E2.1

B1.1A1.1 C1.1

D1.1 E1.1

B1.2

A1.2

C1.2

D1.2E1.2

E2.2D2.2

B2.2

A2.2

C2.2

F1.2F1.4

E2.3D2.3

A2.3

B2.3

C2.3

E1.3D1.3

C1.3

A1.3

B1.3

F1.1

F1.3

B

13500

4899

1500

3822

3278

2056 5926

4191

5484

7702

6484

11000

1. Unit B

Ahead!Marimekko Forum

Suomen Messut

SUUNNITTELIJA

SOTAMAA 

Tallberginkatu 1C 7100180 Helsinki

t. +358 50 511 2642t. + 358 50 530 9831

[email protected]

Päivämäärä: 24.8.2011Mittakaava: ei

ARK - 6.0

Kommentteja / Muutokset:

Ahead! Marimekko Forum. Alumiiniraken-teiden pystytys. 

Aluminium Fabrication

Component Position

Component Assembly