3. statički proračun pos 200,100,000,tt i seizmika

57
Sadrzaj Ulazni podaci Ulazni podaci - Konstrukcija_________________________________________________________________________________________________26 Ulazni podaci - Opterecenje__________________________________________________________________________________________________28 Dodaci MEĐUSPRATNA TAVANICA - POS 200_______________________________________________________________________________________________30 MEĐUSPRATNA TAVANICA - POS 100, 000__________________________________________________________________________________________40 TEMELJNA KONSTRUKCIJA - POS TT_______________________________________________________________________________________________47 DIMENZIONISANJE VERTIKALNIH ELEMENATA - STUBOVA______________________________________________________________________________56 SEIZMIČKI PRORAČUN___________________________________________________________________________________________________________59 NADPROZORNICI I NADVRATNICI__________________________________________________________________________________________________64 25

Upload: zlatko-krsic

Post on 21-Jul-2016

158 views

Category:

Documents


12 download

DESCRIPTION

statiski proracun

TRANSCRIPT

Page 1: 3. Statički Proračun POS 200,100,000,TT i Seizmika

SadrzajUlazni podaci

Ulazni podaci - Konstrukcija__________________________________________________________________________________________________________________________26

Ulazni podaci - Opterecenje__________________________________________________________________________________________________________________________28

Dodaci

MEĐUSPRATNA TAVANICA - POS 200_________________________________________________________________________________________________________________30

MEĐUSPRATNA TAVANICA - POS 100, 000____________________________________________________________________________________________________________40

TEMELJNA KONSTRUKCIJA - POS TT___________________________________________________________________________________________________________________47

DIMENZIONISANJE VERTIKALNIH ELEMENATA - STUBOVA_____________________________________________________________________________________________56

SEIZMIČKI PRORAČUN_______________________________________________________________________________________________________________________________59

NADPROZORNICI I NADVRATNICI_____________________________________________________________________________________________________________________64

25

Page 2: 3. Statički Proračun POS 200,100,000,TT i Seizmika

Ulazni podaci - KonstrukcijaTabela materijala

No Naziv materijala E[kN/m2] μ γ[kN/m3] αt[1/C] Em[kN/m2] μm1 Opeka 5.600e+4 0.20 16.00 1.000e-5 5.600e+6 0.202 Betoni MB 30 3.150e+7 0.20 25.00 1.000e-5 3.150e+7 0.20

Setovi plocaNo d[m] e[m] Materijal Tip proracuna Ortotropija E2[kN/m2] G[kN/m2] α

<1> 0.250 0.125 1 Tanka ploca Izotropna<2> 0.120 0.060 2 Tanka ploca Izotropna<3> 0.200 0.100 2 Tanka ploca Izotropna

Setovi linijskih oslonacaSet K,R1 K,R2 K,R3 K,M1 Tlo [m]1 1.000e+10 1.000e+4 1.000e+10 0.550

Setovi gredaSet: 1 Presek: b/d=25/25, Fiktivna ekscentricnost

3

2

25

25

[cm]

T

Mat. A1 A2 A3 I1 I2 I32 - Betoni MB 30 6.250e-2 5.208e-2 5.208e-2 5.501e-4 3.255e-4 3.255e-4

Set: 2 Presek: b/d=75/25, Fiktivna ekscentricnost

3

2

75

25

[cm]25

T

Mat. A1 A2 A3 I1 I2 I32 - Beton MB 30 1.875e-1 1.563e-1 1.563e-1 3.087e-3 8.789e-3 9.766e-4

Set: 3 Presek: b/d=25/30, Fiktivna ekscentricnost

3

2

25

30

[cm]

9

T

Mat. A1 A2 A3 I1 I2 I32 - Betoni MB 30 7.500e-2 6.250e+0 6.250e-2 7.752e-4 3.906e-4 5.625e-4

Set: 4 Presek: b/d=25/20, Fiktivna ekscentricnost

3

2

25

20

[cm]

4

T

Mat. A1 A2 A3 I1 I2 I32 - Betoni MB 30 5.000e-2 4.167e-2 4.167e-2 3.421e-4 2.604e-4 1.667e-4

Set: 5 Presek: T 55/80, Fiktivna ekscentricnost

3

2

55

50

25

80

[cm]

α=180°T

Mat. A1 A2 A3 I1 I2 I32 - Betoni MB 30 3.500e-1 2.951e-1 3.155e-1 2.448e-2 7.323e-3 1.572e-2

26

Page 3: 3. Statički Proračun POS 200,100,000,TT i Seizmika

Set: 6 Presek: b/d=30/30, Fiktivna ekscentricnost

3

2

3030

[cm]

T

Mat. A1 A2 A3 I1 I2 I32 - Beton MB 30 9.000e-2 7.500e-2 7.500e-2 1.141e-3 6.750e-4 6.750e-4

d = 0.12 m

d = 0.12 m

b/d=25/30

b/d=

25/3

0b/

d=25

/30

b/d=

25/3

0b/

d=25

/30

b/d=

25/3

0

b/d=

25/3

0

b/d=25/30b/d=25/30b/d=25/30b/d=25/30b/d=25/30

b/d=25/20b/d=25/20b/

d=25

/20

b/d=25/20

b/d=

25/2

0

b/d=

25/2

0

b/d=

25/3

0b/

d=25

/20

b/d=25/30

1

3

1

3

1

3

1

3

1

3

1

3

1

3

1

3

13

1

3

1

3

1

3

1

3

1

3

1

3

1

31

3

1

3 1

3

1

3

13

SJEVER

JUG

3.00 4.30 3.25

1.10

3.15

2.10

4.25

2.10

3.85 1.93 5.27

Nivo: Kota tavana [5.80 m]

d = 0.12 mb/d=

25/2

0

b/d=

25/2

0

b/d=25/20

b/d=

25/2

0b/

d=25

/20

b/d=25/20b/d=25/20

1

3 1

3

1

1

3

1

311

5.78 5.27

1.00

1.50

3.85 1.93 5.27

Pogled: J užna kosina

d = 0.12 m

d = 0.12 m

b/d=

25/2

0

b/d=25/20b/d=25/20

b/d=

25/2

01

3

11

1

3

3.00 4.30 3.25

2.50

Pogled: Sjeverna kosina

d = 0.12 m

d = 0.12 m

b/d=25/30b/

d=25

/30

b/d=25/30

b/d=

25/3

0

b/d=

25/3

0

b/d=25/20

b/d=25/20b/d=25/20

b/d=

25/2

0

b/d=25/20

b/d=

25/2

0

b/d=25/20b/d=

25/3

0b/d=25/30

b/d=

25/3

0

b/d=25/20

b/d=

25/2

0

b/d=

25/2

0b/

d=25

/30

1

3

1

3

1

3

1

3

1

3

1

3

1

3 13

1

3

1

31

3

1

3

1

31

3

1

31

3

1

3

13

1

3

3.00 4.30 2.30 0.950.5011.05

2.45

3.15

4.35

2.00

3.85 1.93 5.27

3.35

1.45

1.70

4.35

1.500

.5012

.85

Nivo: Kota prizemlja [0.00 m]

T 55/

80

T 55/

80

T 55/80

T 55/

80

T 55/80

T 55/80

T 55/

80

T 55/80

T 55/

80

T 55/80

T 55/

80

T 55/80

T 55/

80T 55/80

T 55/

80

T 55/80

T 55/

80

b/d=

30/3

0

1

3

1

3

1

31

31

3

1

3

1

31

3

1

3

1

31

3

1

3

1

31

3

1

31

3

1

3

1

3

3.00 4.30 3.25 0.50

0.90

2.45

3.15

4.35

2.00

12.85

11.05

3.85 1.93 5.27

6.50

4.35

2.00

Nivo: Kota suterena [-2.90 m]

H_7

V_7

H_3

H_2

V_3

H_1

V_6

H_4

V_5

V_4

H_6

V_2

H_5

V_1

Dispozicija ramova

27

Page 4: 3. Statički Proračun POS 200,100,000,TT i Seizmika

Ulazni podaci - Opterecenje

Lista slucajeva opterecenjaNo Naziv1 Stalno (g)2 Korisno3 Opterećenje sa krovne kon

strukcije

4 Komb.: I+II+III5 Komb.: 1.6xI+1.8xII+1.8xIII6 Komb.: 1.9xI+2.1xII+2.1xIII

q = -0.50

q = -0.70

p=-3.10p=-3

.10p=

-3.10p=

-3.10

Opt. 1: Stalno (g)

Nivo: Kota tavana [5.80 m]

q = -1.50

q = -1.50

q = -2.50

p=-1

3.16

p=-11.60

p=-11.60

p=-1

1.60

Opt. 1: Stalno (g)

Nivo: Kota mansarde [2.90 m]

q = -2.50

q = -1.50

q = -1.50

p=-1

3.16

p=-1

1.60 p=-11.60

p=-1

1.60

Opt. 1: Stalno (g)

Nivo: Kota prizemlja [0.00 m]

q = -0.70

Opt. 1: Stalno (g)

Pogled: J užna kosina

q = -0.70 q = -0.70

p=-4

.50

p=-4

.50

Opt. 1: Stalno (g)

Pogled: Sjeverna kosina

q = -0.70

q = -0.70

Opt. 2: Korisno

Nivo: Kota tavana [5.80 m]

Page 5: 3. Statički Proračun POS 200,100,000,TT i Seizmika

q = -3.00

q = -3.00

q = -1.50

p=-6

.37

Opt. 2: Korisno

Nivo: Kota mansarde [2.90 m]

q = -1.50

q = -3.00

q = -3.00

p=-6

.37

Opt. 2: Korisno

Nivo: Kota prizemlja [0.00 m]

p=-4

.50

p=-4

.50

p=-4.50

p=-4

.50

p=-4

.50

p=-9.00

p=-9.00

p=-9.00

Opt. 3: Opterećenje sa krovne konstrukcije

Nivo: Kota tavana [5.80 m]

p=-9.00

p=-4.50

p=-4.50

Opt. 3: Opterećenje sa krovne konstrukcije

Pogled: J užna kosina

p=-9.00

p=-4.50 p=-4.50

Opt. 3: Opterećenje sa krovne konstrukcije

Pogled: Sjeverna kosina

Page 6: 3. Statički Proračun POS 200,100,000,TT i Seizmika

MEĐUSPRATNA TAVANICA - POS 200

DIMENZIONISANJE AB PLOČE NA POZICIJI - POS 200

-22.30

-27.09 11.40 -25.98

0.00

-5.42

0.00

0.00 0.000.00

0.00

0.00

-10.8

4 0.00

0.00

-5.42 -5

.42

-5.42 -5.42

-5.42

0.00

0.00 0.00

0.00 0.0

0

-5.42

5.70 -5.420.0

0

-10.84 -10.8

4

0.00

0.00

Opt. 5: 1.6xI+1.8xII+1.8xIII

Uticaji u ploci: max M x= 11.40 / min M x= -27.09 kNm/m Nivo: Kota tavana [5.80 m]

-23.01

7.64

4.22

7.107.51

-22.51

0.00 -4.60 0.00

0.00

-4.60-4.60

3.823.82

0.00

0.00-4.60 -9.20-13.81-13.81 -18.41 -9.20

0.00

0.00 0.00 0.00 3.82

Opt. 5: 1.6xI+1.8xII+1.8xIII

Uticaji u ploci: max M y= 7.64 / min M y= -23.01 kNm/m Nivo: Kota tavana [5.80 m]

4.204.023.96

2.82 -6.57

0.00 0.00 0.00

1.400.00

0.00 0.00 0.00

0.00

1.402.80

-1.641.40 -3.29

2.80 -4.93 0.00

Opt. 5: 1.6xI+1.8xII+1.8xIII

Uticaji u ploci: max M y= 4.20 / min M y= -6.57 kNm/m Pogled: J užna kosina

7.09

-14.39

7.28

6.74-14.17-11.510.00 0.00

0.00

3.64

3.640.00

0.00 0.00

3.640.00

Opt. 5: 1.6xI+1.8xII+1.8xIII

Uticaji u ploci: max M y= 7.28 / min M y= -14.39 kNm/m Pogled: Sjeverna kosina

Aa - d.zona [cm2/m]2.661.330.00

M erodavno opterecenje: 1.60xI+1.80xII+1.80xIII @1@PBAB 87, M B 30, M A 500/560, a=3.00 cm

Aa - d.zona - max Aa,d= 2.66 cm2/m Nivo: Kota tavana [5.80 m]

Aa - g.zona [cm2/m]0.00

-2.54-5.08

M erodavno opterecenje: 1.60xI+1.80xII+1.80xIII @1@PBAB 87, M B 30, M A 500/560, a=3.00 cm

Aa - g.zona - max Aa,g= -5.08 cm2/m Nivo: Kota tavana [5.80 m]

Page 7: 3. Statički Proračun POS 200,100,000,TT i Seizmika

Aa - g.zona [cm2/m]0.00-0.59-1.18

M erodavno opterecenje: 1.60xI+1.80xII+1.80xIII @1@PBAB 87, M B 30, M A 500/560, a=3.00 cm

Aa - g.zona - max Aa,g= -1.18 cm2/m Pogled: J užna kosina

Aa - d.zona [cm2/m]0.910.460.00

M erodavno opterecenje: 1.60xI+1.80xII+1.80xIII @1@PBAB 87, M B 30, M A 500/560, a=3.00 cm

Aa - d.zona - max Aa,d= 0.90 cm2/m Pogled: J užna kosina

Aa - d.zona [cm2/m]1.680.840.00

M erodavno opterecenje: 1.60xI+1.80xII+1.80xIII @1@PBAB 87, M B 30, M A 500/560, a=3.00 cm

Aa - d.zona - max Aa,d= 1.67 cm2/m Pogled: Sjeverna kosina

Aa - g.zona [cm2/m]0.00

-1.28-2.55

M erodavno opterecenje: 1.60xI+1.80xII+1.80xIII @1@PBAB 87, M B 30, M A 500/560, a=3.00 cm

Aa - g.zona - max Aa,g= -2.54 cm2/m Pogled: Sjeverna kosina

Q-221(α1=0°,α2=90°)

Q-221(α1=0°,α2=90°)

Aa - d.zona [cm2/m]2.661.330.00

Usvojena armatura @1@PBAB 87, M B 30, M A 500/560, a=3.00 cm

Aa - d.zona Nivo: Kota tavana [5.80 m]

Q-188(α1=0°,α2=90°)

Q-188(α1=0°,α2=90°)

Ø8/15(α=90°)

Ø8/15(α

=0°)

Ø8/15(α

=0°)

Aa - g.zona [cm2/m]0.00

-2.54-5.08

Usvojena armatura @1@PBAB 87, M B 30, M A 500/560, a=3.00 cm

Aa - g.zona Nivo: Kota tavana [5.80 m]

Q-295(α1=0°,α2=90°)

Aa - d.zona [cm2/m]0.910.460.00

Usvojena armatura @1@PBAB 87, M B 30, M A 500/560, a=3.00 cm

Aa - d.zona Pogled: J užna kosina

Q-188(α1=0°,α2=90°)

Ø8/15(α=0°)

Aa - g.zona [cm2/m]0.00

-0.59-1.18

Usvojena armatura @1@PBAB 87, M B 30, M A 500/560, a=3.00 cm

Aa - g.zona Pogled: J užna kosina

Page 8: 3. Statički Proračun POS 200,100,000,TT i Seizmika

Q-295(α

1=0°,α2=90°

)

Q-295(α

1=0°,α

2=90°)

Aa - d.zona [cm2/m]1.680.840.00

Usvojena armatura @1@PBAB 87, M B 30, M A 500/560, a=3.00 cm

Aa - d.zona Pogled: Sjeverna kosina

Q-188(α

1=0°,α2=90°

)

Q-188(α

1=0°,α

2=90°)

Aa - g.zona [cm2/m]0.00

-1.28-2.55

Usvojena armatura @1@PBAB 87, M B 30, M A 500/560, a=3.00 cm

Aa - g.zona Pogled: Sjeverna kosina

1

2

3

4

@1@PBAB 87, M B 30, M A 500/560, a=3.00 cm

Dispozicija ploca Nivo: Kota tavana [5.80 m]

Page 9: 3. Statički Proračun POS 200,100,000,TT i Seizmika

DIEMNZIONISANJE GREDA NA POZICIJI - POS 200

Nivo: Kota tavana [5.80 m]@1@PBAB 87d,pl=12.0 cmMB 30Gornja zona: MA 500/560 (a=3.0 cm)Donja zona: MA 500/560 (a=3.0 cm)Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Tacka 1X=5.06 m; Y=7.70 m; Z=5.80 mPravac 1: (α=0°)Mu = 11.40 kNmNu = 0.00 kNεb/εa = -1.486/10.000 ‰Ag1 = 0.00 cm2/mAd1 = 2.66 cm2/mUsvojeno (gornja zona):Q-188 Ø6/15 (1.88 cm2/m)Usvojeno (donja zona):Q-221 Ø6.5/15 (2.21 cm2/m)Procenat armiranja: 0.34%

Pravac 2: (α=90°)Mu = 0.69 kNmNu = 0.00 kNεb/εa = -0.302/10.000 ‰Ag2 = 0.00 cm2/mAd2 = 0.15 cm2/mUsvojeno (gornja zona):Q-188 Ø6/15 (1.88 cm2/m)Usvojeno (donja zona):Q-221 Ø6.5/15 (2.21 cm2/m)Procenat armiranja: 0.34%

Tacka 2X=2.50 m; Y=4.39 m; Z=5.80 mPravac 1: (α=0°)Mu = 1.90 kNmNu = 0.00 kNεb/εa = -0.519/10.000 ‰Ag1 = 0.00 cm2/mAd1 = 0.43 cm2/mUsvojeno (gornja zona):Q-188 Ø6/15 (1.88 cm2/m)Usvojeno (donja zona):Q-221 Ø6.5/15 (2.21 cm2/m)Procenat armiranja: 0.34%

Pravac 2: (α=90°)Mu = 7.64 kNmNu = 0.00 kNεb/εa = -1.149/10.000 ‰Ag2 = 0.00 cm2/mAd2 = 1.76 cm2/mUsvojeno (gornja zona):Q-188 Ø6/15 (1.88 cm2/m)Usvojeno (donja zona):Q-221 Ø6.5/15 (2.21 cm2/m)Procenat armiranja: 0.34%

Tacka 3X=3.00 m; Y=7.70 m; Z=5.80 mPravac 1: (α=0°)Mu = -21.18 kNmNu = 0.00 kNεb/εa = -2.377/10.000 ‰Ag1 = 5.08 cm2/mAd1 = 0.00 cm2/mUsvojeno (gornja zona):Ø8/15 (3.35 cm2/m)Q-188 Ø6/15 (1.88 cm2/m)Usvojeno (donja zona):Q-221 Ø6.5/15 (2.21 cm2/m)Procenat armiranja: 0.62%

Pravac 2: (α=90°)Mu = -2.79 kNmNu = 0.00 kNεb/εa = -0.641/10.000 ‰Ag2 = 0.63 cm2/mAd2 = 0.00 cm2/mUsvojeno (gornja zona):Q-188 Ø6/15 (1.88 cm2/m)Usvojeno (donja zona):Q-221 Ø6.5/15 (2.21 cm2/m)Procenat armiranja: 0.34%

Tacka 4X=5.78 m; Y=5.60 m; Z=5.80 mPravac 1: (α=0°)Mu = -5.39 kNmNu = 0.00 kNεb/εa = -0.931/10.000 ‰Ag1 = 1.23 cm2/mAd1 = 0.00 cm2/mUsvojeno (gornja zona):Q-188 Ø6/15 (1.88 cm2/m)Usvojeno (donja zona):Q-221 Ø6.5/15 (2.21 cm2/m)Procenat armiranja: 0.34%

Pravac 2: (α=90°)Mu = -21.06 kNmNu = 0.00 kNεb/εa = -2.365/10.000 ‰Ag2 = 5.05 cm2/mAd2 = 0.00 cm2/mUsvojeno (gornja zona):Ø8/15 (3.35 cm2/m)Q-188 Ø6/15 (1.88 cm2/m)Usvojeno (donja zona):Q-221 Ø6.5/15 (2.21 cm2/m)Procenat armiranja: 0.62%

25.34

23.99

-7.20

33.44

-26.46

28.65

-26.18

-15.21 -9.81 -20.8

3

22.56

11.66

15.93

-23.5

3

-16.10

19.86

-13.17

1.06 -0.83

0.86 0.30

-0.87 1.78

-0.63

0.

07 -0

.11

0.23

-1.87

-4.14

-2.21

1.

27 -4

.03

1.81 -10.43

-2.47

4.91

1.68 -0.63

0.72 -1.30

1.18 1.18 -0.07 0.52 -0.27

Opt. 5: 1.6xI+1.8xII+1.8xIII

Uticaji u gredi: max M 3= 33.44 / min M 3= -26.46 kNm Nivo: Kota tavana [5.80 m]

-23.8

6

23.86

-24.1

6

12.97

-2

8.82

39.11 36.86 24.19 24.33

17.43

-27.61

5.10

-23.32

-57.1

8

23.68

-32.7

8

35.90

49.99

-48.8

1

-21.9

5

50.08

-37.06

35.59 -8.83

4.64

-0.66 1.02 -1.22 0.46

-2.73

4.50 -0.30 1.39 -1.26 0.43 -2.08 -0.91 0.83 -0.48 1.26 -0.88 1.03 -1.49 0.42 -8.56

-3.03

0.10

-0

.49

-0.48

0.02

-0

.23 4.

40

9.03

-1

7.43

-7.19

4.71

20.18

5.95 2.90

-0.65 1.09 -9.35

7.54 -0.49 1.43 -1.35 0.56 -1.85

5.10 -3.70

4.40

Opt. 5: 1.6xI+1.8xII+1.8xIII

Uticaji u gredi: max T2= 50.08 / min T2= -57.18 kN Nivo: Kota tavana [5.80 m]

0.52

2.26 2.26

1.03 0.58

1.65

1.86

1.40

0.95

0.29

0.47

2.

01

2.04

2.85 2.47 2.32 1.80

1.92

0.77

1.29

1.51

0.18

M erodavno opterecenje: 1.60xI+1.80xII+1.80xIII @1@PBAB 87, M B 30, M A 500/560

Armatura u gredama: max Aa2/Aa1= 2.85 cm2 Nivo: Kota tavana [5.80 m]

2Ø14(4.30m)

2Ø14(4.30m)

2Ø14(5.27m)

3Ø14(5.27m)

2Ø14

(6.35

m)

2Ø14

(6.35

m)

2Ø14

(6.35

m)

2Ø14

(6.35

m)

2Ø14(10.55m)

2Ø14(10.55m)

2Ø12(1.93m)

2Ø14

(3.15

m)

2Ø12(1.93m)2Ø14

(3.15

m)

Usvojena armatura @1@PBAB 87, M B 30, M A 500/560

Armatura u gredama: Aa2/Aa1 Nivo: Kota tavana [5.80 m]

Page 10: 3. Statički Proračun POS 200,100,000,TT i Seizmika

Ø8/20(N=21)(m=2)

Ø8/20(N=26)(m=2)

Ø8/

20(N

=32)

(m=2

)

Ø8/

20(N

=32)

(m=2

)

Ø8/20(N=53)(m=2)

Ø8/20(N=10)(m=2)

Ø8/

20(N

=16)

(m=2

)

Usvojena armatura @1@PBAB 87, M B 30, M A 500/560

Armatura u gredama: Aa,uz Nivo: Kota tavana [5.80 m]

11132 11964

111288488

11151

11744

9134

10349

103247770 11481953783465621

7498

2567

7124

3270 6128

11615

6735

11886

10081

11

223 3

4 4

55

66

77

88

99

1010

111112 12

13 13

14 1415 15

16161717

1818

1919

2020

M erodavno opterecenje: 1.60xI+1.80xII+1.80xIII @1@PBAB 87, M B 30, M A 500/560

Dispozicija greda Nivo: Kota tavana [5.80 m]

Greda 6128-7498@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 1-1 x = 0.72m

Ø 8/20(m=2)

2Ø 12

2Ø 12

25

20

[cm]3

2

N1u = 1.23 kNT2u = -0.56 kNT3u = 1.04 kNM3u = 1.27 kNm

εb/εa = -0.460/10.000 ‰Aa1 = 0.18 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.02MPa < τr , τr = 1.10MPaτz = 0.03MPa < τr , τr = 1.10MPaProcenat armiranja: 0.90%

Presek 2-2 x = 1.93m

Ø 8/20(m=2)

2Ø 12

2Ø 12

25

20

[cm]3

2

N1u = -3.75 kNT2u = 2.34 kNT3u = -1.04 kNM1u = -0.03 kNmM3u = -4.03 kNm

εb/εa = -0.931/10.000 ‰Aa1 = 0.00 cm2Aa2 = 0.47 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.10MPa < τr , τr = 1.10MPaτz = 0.06MPa < τr , τr = 1.10MPaProcenat armiranja: 0.90%

Page 11: 3. Statički Proračun POS 200,100,000,TT i Seizmika

Greda 7498-9537@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 3-3 x = 0.00m

Ø8/20(m=2)

2Ø14

2Ø14

25

30

[cm]3

2

N1u = 10.39 kNT2u = -37.06 kNT3u = 1.36 kNM1u = 0.09 kNmM3u = -16.10 kNm

εb/εa = -1.105/10.000 ‰Aa1 = 0.00 cm2Aa2 = 1.40 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.67MPa < τr , τr = 1.10MPaτz = 0.06MPa < τr , τr = 1.10MPaProcenat armiranja: 0.82%

Presek 4-4 x = 1.69m

Ø8/20(m=2)

2Ø14

2Ø14

25

30

[cm]3

2

N1u = -6.70 kNT2u = -1.23 kNT3u = 2.12 kNM1u = -0.06 kNmM3u = 19.81 kNm

εb/εa = -1.346/10.000 ‰Aa1 = 1.51 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.05MPa < τr , τr = 1.10MPaτz = 0.06MPa < τr , τr = 1.10MPaProcenat armiranja: 0.82%

Page 12: 3. Statički Proračun POS 200,100,000,TT i Seizmika

Greda 5621-7770@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 5-5 x = 1.25m

Ø8/20(m=2)

2Ø14

2Ø14

25

30

[cm]3

2

N1u = 2.02 kNT2u = 2.40 kNT3u = 1.18 kNM3u = 15.92 kNm

εb/εa = -1.137/10.000 ‰Aa1 = 1.29 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.04MPa < τr , τr = 1.10MPaτz = 0.02MPa < τr , τr = 1.10MPaProcenat armiranja: 0.82%

Presek 6-6 x = 3.00m

Ø8/20(m=2)

2Ø14

2Ø14

25

30

[cm]3

2

N1u = -3.79 kNT2u = 50.08 kNT3u = 1.06 kNM1u = -0.16 kNmM3u = -23.53 kNm

εb/εa = -1.490/10.000 ‰Aa1 = 0.00 cm2Aa2 = 1.86 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.93MPa < τr , τr = 1.10MPaτz = 0.09MPa < τr , τr = 1.10MPaProcenat armiranja: 0.82%

Page 13: 3. Statički Proračun POS 200,100,000,TT i Seizmika

Greda 7770-8346@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 6-6 x = 0.00m

Ø8/20(m=2)

2Ø14

2Ø14

25

30

[cm]3

2

N1u = -5.91 kNT2u = -48.81 kNT3u = -2.67 kNM1u = 0.08 kNmM3u = -23.43 kNm

εb/εa = -1.494/10.000 ‰Aa1 = 0.00 cm2Aa2 = 1.82 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.87MPa < τr , τr = 1.10MPaτz = 0.08MPa < τr , τr = 1.10MPaProcenat armiranja: 0.82%

Presek 7-7 x = 0.85m

Ø8/20(m=2)

2Ø14

2Ø14

25

30

[cm]3

2

N1u = -10.39 kNT2u = -21.79 kNT3u = -1.53 kNM1u = -0.02 kNmM3u = 6.05 kNm

εb/εa = -0.720/10.000 ‰Aa1 = 0.36 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.38MPa < τr , τr = 1.10MPaτz = 0.03MPa < τr , τr = 1.10MPaProcenat armiranja: 0.82%

Greda 8346-9537@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 8-8 x = 0.48m

Ø8/20(m=2)

2Ø14

2Ø14

25

30

[cm]3

2

N1u = -13.97 kNT2u = -7.13 kNT3u = -1.57 kNM1u = -0.03 kNmM3u = 11.60 kNm

εb/εa = -1.021/10.000 ‰Aa1 = 0.77 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.14MPa < τr , τr = 1.10MPaτz = 0.04MPa < τr , τr = 1.10MPaProcenat armiranja: 0.82%

Presek 9-9 x = 1.93m

Ø8/20(m=2)

2Ø14

2Ø14

25

30

[cm]3

2

N1u = -16.39 kNT2u = 49.99 kNT3u = -1.80 kNM1u = 0.20 kNmM3u = -19.34 kNm

εb/εa = -1.371/10.000 ‰Aa1 = 0.00 cm2Aa2 = 1.37 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.95MPa < τr , τr = 1.10MPaτz = 0.12MPa < τr , τr = 1.10MPaProcenat armiranja: 0.82%

Page 14: 3. Statički Proračun POS 200,100,000,TT i Seizmika

Greda 9537-10324@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 10-10 x = 1.52m

Ø8/20(m=2)

2Ø14

2Ø14

25

30

[cm]3

2

N1u = -4.23 kNT2u = 35.90 kNT3u = 1.49 kNM1u = -0.12 kNmM3u = -20.82 kNm

εb/εa = -1.377/10.000 ‰Aa1 = 0.00 cm2Aa2 = 1.63 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.67MPa < τr , τr = 1.10MPaτz = 0.08MPa < τr , τr = 1.10MPaProcenat armiranja: 0.82%

Greda 10324-11481@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 10-10 x = 0.00m

Ø8/20(m=2)

2Ø14

2Ø14

25

30

[cm]3

2

N1u = -2.43 kNT2u = -57.18 kNT3u = -1.91 kNM1u = 0.21 kNmM3u = -20.83 kNm

εb/εa = -1.370/10.000 ‰Aa1 = 0.00 cm2Aa2 = 1.65 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 1.07MPa < τr , τr = 1.10MPaτz = 0.13MPa < τr , τr = 1.10MPaProcenat armiranja: 0.82%

Presek 11-11 x = 1.75m

Ø8/20(m=2)

2Ø14

2Ø14

25

30

[cm]3

2

N1u = 9.83 kNT2u = 2.36 kNT3u = -0.41 kNM3u = 22.56 kNm

εb/εa = -1.386/10.000 ‰Aa1 = 1.92 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.04MPa < τr , τr = 1.10MPaProcenat armiranja: 0.82%

Page 15: 3. Statički Proračun POS 200,100,000,TT i Seizmika

Greda 7770-9134@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 12-12 x = 0.25m

Ø8/20(m=2)

2Ø14

2Ø14

25

30

[cm]3

2

N1u = -17.43 kNT2u = 5.10 kNT3u = 1.58 kNM1u = 0.05 kNmM3u = -9.81 kNm

εb/εa = -0.953/10.000 ‰Aa1 = 0.00 cm2Aa2 = 0.58 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.11MPa < τr , τr = 1.10MPaτz = 0.05MPa < τr , τr = 1.10MPaProcenat armiranja: 0.82%

Presek 13-13 x = 2.10m

Ø8/20(m=2)

2Ø14

2Ø14

25

30

[cm]3

2

N1u = -33.65 kNT2u = -14.18 kNT3u = 8.45 kNM1u = -0.04 kNmM3u = 26.76 kNm

εb/εa = -1.759/10.000 ‰Aa1 = 1.80 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.26MPa < τr , τr = 1.10MPaτz = 0.16MPa < τr , τr = 1.10MPaProcenat armiranja: 0.82%

Greda 10324-11151@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 14-14 x = 0.25m

Ø8/20(m=2)

2Ø14

2Ø14

25

30

[cm]3

2

N1u = -16.64 kNT2u = 17.43 kNT3u = -0.53 kNM1u = -0.05 kNmM3u = -15.21 kNm

εb/εa = -1.196/10.000 ‰Aa1 = 0.00 cm2Aa2 = 1.03 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.32MPa < τr , τr = 1.10MPaτz = 0.03MPa < τr , τr = 1.10MPaProcenat armiranja: 0.82%

Presek 15-15 x = 2.10m

Ø8/20(m=2)

2Ø14

2Ø14

25

30

[cm]3

2

N1u = -22.55 kNT2u = -24.31 kNT3u = -6.29 kNM3u = 31.39 kNm

εb/εa = -1.903/10.000 ‰Aa1 = 2.32 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.42MPa < τr , τr = 1.10MPaτz = 0.11MPa < τr , τr = 1.10MPaProcenat armiranja: 0.82%

Page 16: 3. Statički Proračun POS 200,100,000,TT i Seizmika

Greda 11964-11744@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 16-16 x = 2.00m

Ø8/20(m=2)

2Ø14

2Ø14

25

30

[cm]3

2

N1u = -0.42 kNT2u = 24.33 kNT3u = -0.17 kNM3u = -26.46 kNm

εb/εa = -1.596/10.000 ‰Aa1 = 0.00 cm2Aa2 = 2.14 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.42MPa < τr , τr = 1.10MPaProcenat armiranja: 0.82%

Greda 11132-10349@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 17-17 x = 2.00m

Ø8/20(m=2)

2Ø14

2Ø14

25

30

[cm]3

2

N1u = -0.01 kNT2u = 24.19 kNT3u = 0.91 kNM3u = -26.18 kNm

εb/εa = -1.581/10.000 ‰Aa1 = 0.00 cm2Aa2 = 2.12 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.41MPa < τr , τr = 1.10MPaτz = 0.01MPa < τr , τr = 1.10MPaProcenat armiranja: 0.82%

Page 17: 3. Statički Proračun POS 200,100,000,TT i Seizmika

Greda 9134-10349@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 13-13 x = 0.00m

Ø8/20(m=2)

2Ø14

2Ø14

25

30

[cm]3

2

N1u = 13.10 kNT2u = 11.88 kNT3u = -1.92 kNM3u = 28.65 kNm

εb/εa = -1.625/10.000 ‰Aa1 = 2.47 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.20MPa < τr , τr = 1.10MPaτz = 0.03MPa < τr , τr = 1.10MPaProcenat armiranja: 0.82%

Presek 17-17 x = 2.25m

Ø8/20(m=2)

2Ø14

2Ø14

25

30

[cm]3

2

N1u = 13.10 kNT2u = 36.86 kNT3u = -1.92 kNM3u = -26.18 kNm

εb/εa = -1.522/10.000 ‰Aa1 = 0.00 cm2Aa2 = 2.26 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.63MPa < τr , τr = 1.10MPaτz = 0.03MPa < τr , τr = 1.10MPaProcenat armiranja: 0.82%

Greda 11151-11744@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 15-15 x = 0.00m

Ø8/20(m=2)

2Ø14

2Ø14

25

30

[cm]3

2

N1u = 10.93 kNT2u = 14.14 kNT3u = 1.09 kNM3u = 33.44 kNm

εb/εa = -1.834/10.000 ‰Aa1 = 2.85 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.24MPa < τr , τr = 1.10MPaτz = 0.02MPa < τr , τr = 1.10MPaProcenat armiranja: 0.82%

Presek 16-16 x = 2.25m

Ø8/20(m=2)

2Ø14

2Ø14

25

30

[cm]3

2

N1u = 10.93 kNT2u = 39.11 kNT3u = 1.09 kNM3u = -26.46 kNm

εb/εa = -1.544/10.000 ‰Aa1 = 0.00 cm2Aa2 = 2.26 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.67MPa < τr , τr = 1.10MPaτz = 0.02MPa < τr , τr = 1.10MPaProcenat armiranja: 0.82%

Page 18: 3. Statički Proračun POS 200,100,000,TT i Seizmika

Greda 11128-8488@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 18-18 x = 2.00m

Ø8/20(m=2)

3Ø14

2Ø14

25

30

[cm]3

2

N1u = 9.31 kNT2u = 1.35 kNT3u = -0.97 kNM1u = -0.01 kNmM3u = 23.99 kNm

εb/εa = -1.449/10.000 ‰Aa1 = 2.04 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.03MPa < τr , τr = 1.10MPaτz = 0.02MPa < τr , τr = 1.10MPaProcenat armiranja: 1.03%

Presek 19-19 x = 5.02m

Ø8/20(m=2)

3Ø14

2Ø14

25

30

[cm]3

2

N1u = -4.52 kNT2u = -28.82 kNT3u = -0.78 kNM1u = 0.03 kNmM3u = -7.20 kNm

εb/εa = -0.748/10.000 ‰Aa1 = 0.00 cm2Aa2 = 0.52 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.50MPa < τr , τr = 1.10MPaτz = 0.02MPa < τr , τr = 1.10MPaProcenat armiranja: 1.03%

Greda 11132-11964@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 20-20 x = 2.15m

Ø8/20(m=2)

2Ø14

2Ø14

25

30

[cm]3

2

N1u = -3.27 kNM3u = 25.34 kNm

εb/εa = -1.561/10.000 ‰Aa1 = 2.01 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

Procenat armiranja: 0.82%

Page 19: 3. Statički Proračun POS 200,100,000,TT i Seizmika

MEĐUSPRATNA TAVANICA - POS 100, 000DIMENZIONISANJE AB PLOČE NA POZICIJI - POS 100 i 000

12.82

10.31-43.49

0.00

0.00

0.00

-8.70

6.41

0.00

0.00 -8

.7 0-1

7.40

0.00

0.00

0.00

0.00

0.00 -8.70 -8.7

0 0.00

0.00

-8.70 0.0

0 0.00

0.00

6.41

-8.70 -8

.70

-17.4

0 0.00

0.00

Opt. 5: 1.6xI+1.8xII+1.8xIII

Uticaji u ploci: max M x= 12.82 / min M x= -43.49 kNm/m Nivo: Kota prizemlja [0.00 m]

8.18

6.20

6.23

-32.71

9.56

8.89

0.00

0.00

4.78

0.00

-6.54

0.00

4.78-6.54 0.00

-6.54

4.78

0.00 0.00

0.00

-6.54 -13.09-13.090.00

4.78

0.000.00-6.54 -6.540.00-19.63 0.00 -6.54

0.00 0.00 0.000.000.00

Opt. 5: 1.6xI+1.8xII+1.8xIII

Uticaji u ploci: max M y= 9.56 / min M y= -32.71 kNm/m Nivo: Kota prizemlja [0.00 m]

Aa - d.zona [cm2/m]3.001.500.00

M erodavno opterecenje: 1.60xI+1.80xII+1.80xIII @1@PBAB 87, M B 30, M A 500/560, a=3.00 cm

Aa - d.zona - max Aa,d= 3.00 cm2/m Nivo: Kota prizemlja [0.00 m]

Aa - g.zona [cm2/m]0.00

-4.55-9.09

M erodavno opterecenje: 1.60xI+1.80xII+1.80xIII @1@PBAB 87, M B 30, M A 500/560, a=3.00 cm

Aa - g.zona - max Aa,g= -9.09 cm2/m Nivo: Kota prizemlja [0.00 m]

Q-295(α1=0°,α2=90°)

Q-295(α1=0°,α2=90°)

Ø8/15

(α=0°)

Ø8/1

5(α=

0°)

Aa - d.zona [cm2/m]3.001.500.00

Usvojena armatura @1@PBAB 87, M B 30, M A 500/560, a=3.00 cm

Aa - d.zona Nivo: Kota prizemlja [0.00 m]

Q-188(α1=0°,α2=90°)

Q-188(α1=0°,α2=90°)

Ø8/15(α=90°)

Ø8/1

5(α=

0°) Ø8/15(α=0°)

Ø8/1

5(α=0

°)

Ø8/15(α

=90°)Ø8/15(α=90°)

Ø8/15(α=0°)Ø8/15(α

=90°)

Aa - g.zona [cm2/m]0.00

-4.55-9.09

Usvojena armatura @1@PBAB 87, M B 30, M A 500/560, a=3.00 cm

Aa - g.zona Nivo: Kota prizemlja [0.00 m]

Page 20: 3. Statički Proračun POS 200,100,000,TT i Seizmika

12

3

@1@PBAB 87, M B 30, M A 500/560, a=3.00 cm

Dispozicija ploca Nivo: Kota prizemlja [0.00 m]

Nivo: Kota prizemlja [0.00 m]@1@PBAB 87d,pl=12.0 cmMB 30Gornja zona: MA 500/560 (a=3.0 cm)Donja zona: MA 500/560 (a=3.0 cm)Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Tacka 1X=8.80 m; Y=1.71 m; Z=0.00 mPravac 1: (α=0°)Mu = 12.82 kNmNu = 0.00 kNεb/εa = -1.610/10.000 ‰Ag1 = 0.00 cm2/mAd1 = 3.00 cm2/mUsvojeno (gornja zona):Q-188 Ø6/15 (1.88 cm2/m)Usvojeno (donja zona):Ø8/15 (3.35 cm2/m)Q-295 Ø7.5/15 (2.95 cm2/m)Procenat armiranja: 0.68%

Pravac 2: (α=90°)Mu = 9.50 kNmNu = 0.00 kNεb/εa = -1.319/10.000 ‰Ag2 = 0.00 cm2/mAd2 = 2.20 cm2/mUsvojeno (gornja zona):Q-188 Ø6/15 (1.88 cm2/m)Usvojeno (donja zona):Q-295 Ø7.5/15 (2.95 cm2/m)Procenat armiranja: 0.40%

Tacka 2X=6.03 m; Y=2.21 m; Z=0.00 mPravac 1: (α=0°)Mu = -20.14 kNmNu = 0.00 kNεb/εa = -2.274/10.000 ‰Ag1 = 4.81 cm2/mAd1 = 0.00 cm2/mUsvojeno (gornja zona):Q-188 Ø6/15 (1.88 cm2/m)Ø8/15 (3.35 cm2/m)Usvojeno (donja zona):Q-295 Ø7.5/15 (2.95 cm2/m)Procenat armiranja: 0.68%

Pravac 2: (α=90°)Mu = -5.60 kNmNu = 0.00 kNεb/εa = -0.953/10.000 ‰Ag2 = 1.28 cm2/mAd2 = 0.00 cm2/mUsvojeno (gornja zona):Q-188 Ø6/15 (1.88 cm2/m)Usvojeno (donja zona):Q-295 Ø7.5/15 (2.95 cm2/m)Procenat armiranja: 0.40%

Tacka 3X=7.30 m; Y=5.60 m; Z=0.00 mPravac 1: (α=0°)Mu = -5.98 kNmNu = 0.00 kNεb/εa = -0.992/10.000 ‰Ag1 = 1.37 cm2/mAd1 = 0.00 cm2/mUsvojeno (gornja zona):Q-188 Ø6/15 (1.88 cm2/m)Ø8/15 (3.35 cm2/m)Usvojeno (donja zona):Q-295 Ø7.5/15 (2.95 cm2/m)Procenat armiranja: 0.68%

Pravac 2: (α=90°)Mu = -20.71 kNmNu = 0.00 kNεb/εa = -2.329/10.000 ‰Ag2 = 4.96 cm2/mAd2 = 0.00 cm2/mUsvojeno (gornja zona):Q-188 Ø6/15 (1.88 cm2/m)Ø8/15 (3.35 cm2/m)Usvojeno (donja zona):Q-295 Ø7.5/15 (2.95 cm2/m)Procenat armiranja: 0.68%

DIMENZIONISANJE GREDA NA POZICIJI - POS 100 i 000

Page 21: 3. Statički Proračun POS 200,100,000,TT i Seizmika

35.08

-10.7

9

-23.42

17.81

-15.06

2.56

-32.01

-25.6

1

36.22

-38.2

4

-37.89

9.00 -1.91

-10.4

8

22.88

-22.27

26.00

-44.96

-24.11

29.06

-51.51

-11.8

9 15

.90

-28.5

1

10.14

-28.3

1

19.84

-29.2

7

Opt. 5: 1.6xI+1.8xII+1.8xIII

Uticaji u gredi: max M 3= 36.22 / min M 3= -51.51 kNm Nivo: Kota prizemlja [0.00 m]

-30.6

5

20.47

-4

2.97

-59.56

29.00 -3.86

-10.11

39.30 -56.9

5

69.57

-71.13

22.27

20.04

-40.79

35.84 -2.96 5.75

-35.25

78.88

-37.31

111.59

-41.5

5

56.66

-4

9.24

44.07

-2

9.99

31.30

-6

5.28

71.08

Opt. 5: 1.6xI+1.8xII+1.8xIII

Uticaji u gredi: max T2= 111.59 / min T2= -71.13 kN Nivo: Kota prizemlja [0.00 m]

Page 22: 3. Statički Proračun POS 200,100,000,TT i Seizmika

0.85

1.91

1.24

2.63

2.16

3.23

3.08

1.84

3.73

2.00

4.36

0.97

2.33

1.36

2.32

2.42

2.87

1.48

0.17

3.01

0.70

1.79

2.13 2.40

1.29

0.83

1.60

M erodavno opterecenje: 1.60xI+1.80xII+1.80xIII @1@PBAB 87, M B 30, RA B500

Armatura u gredama: max Aa2/Aa1= 4.36 cm2 Nivo: Kota prizemlja [0.00 m]

2Ø14(5.27m)

4Ø14(5.27m)

2Ø14

(3.15

m)

2Ø14

(3.15

m)

2Ø14

(2.00

m)

3Ø14

(6.35

m)

2Ø14(4.20m)3Ø14(0.10m)

3Ø14(4.30m)

4Ø14

(0.2m

)2Ø

14(1

.90m

)

3Ø14

(6.35

m)

2Ø14

(2.45

m)

2Ø14

(2.45

m)

2Ø14

(4.25

m)

2Ø14(10.55m)

3Ø14(10.55m)

2Ø14

(4.22

m)

4Ø14

(0.13

m)

Usvojena armatura @1@PBAB 87, M B 30, RA B500

Armatura u gredama: Aa2/Aa1 Nivo: Kota prizemlja [0.00 m]

Ø8/20(N=26)(m=2)

Ø8/

20(N

=16 )

(m=2

)

Ø8/

20(N

=10)

(m=2

)

Ø8/20(N=21)(m=2)Ø

8/20

(N=3

2)(m

=2)

Ø8/

20(N

=12)

(m=2

)

Ø8/20(N=53)(m=2)Ø8/

20(N

=21)

(m=2

8/10

(N=2

)(m=2

)

Usvojena armatura @1@PBAB 87, M B 30, RA B500

Armatura u gredama: Aa,uz Nivo: Kota prizemlja [0.00 m]

81444334

3253

5606

4555

148

6763

8150 10578

9587 11058

89159231

468513521776

534

939

2068

671135341702 11

22

3 34 4

5 56 6

7 78 8

9 9

1010

1111

1212

13 1314 14

1515

1616

Usvojena armatura @1@PBAB 87, M B 30, RA B500

Dispozicija greda Nivo: Kota prizemlja [0.00 m]

Greda 1702-8915@1@PBAB 87MB 30RA B500Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 1-1 x = 8.80m

Ø8/20(m=2)

3Ø14

2Ø14

25

30

[cm]3

2

N1u = 0.68 kNT2u = -0.06 kNT3u = -0.16 kNM3u = 19.84 kNm

εb/εa = -1.314/10.000 ‰Aa1 = 1.60 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

Procenat armiranja: 1.03%

Presek 2-2 x = 10.55m

Ø8/20(m=2)

3Ø14

2Ø14

25

30

[cm]3

2

N1u = 3.32 kNT2u = 71.08 kNT3u = 1.33 kNM1u = -0.14 kNmM3u = -29.27 kNm

εb/εa = -1.696/10.000 ‰Aa1 = 0.00 cm2Aa2 = 2.42 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.64 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 1.28MPa < 3τr , τr = 1.10MPaτz = 0.08MPa < τr , τr = 1.10MPaProcenat armiranja: 1.03%

Page 23: 3. Statički Proračun POS 200,100,000,TT i Seizmika

Greda 3534-6763@1@PBAB 87MB 30RA B500Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 3-3 x = 2.20m

Ø8/20(m=2)

3Ø14

2Ø14

25

30

[cm]3

2

N1u = 3.79 kNT2u = 2.55 kNT3u = -0.62 kNM1u = 0.03 kNmM3u = 29.05 kNm

εb/εa = -1.685/10.000 ‰Aa1 = 2.40 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.06MPa < τr , τr = 1.10MPaτz = 0.02MPa < τr , τr = 1.10MPaProcenat armiranja: 1.03%

Presek 4-4 x = 4.35m

Ø8/10(m=2)

3Ø14

4Ø14

25

30

[cm]3

2

N1u = 2.75 kNT2u = 111.59 kNT3u = -2.00 kNM1u = -0.21 kNmM3u = -51.51 kNm

εb/εa = -2.717/10.000 ‰Aa1 = 0.00 cm2Aa2 = 4.36 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 3.26 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/10(m=2) = 5.03 cm2/m]

τy = 2.00MPa < 3τr , τr = 1.10MPaτz = 0.13MPa < τr , τr = 1.10MPaProcenat armiranja: 1.44%

Page 24: 3. Statički Proračun POS 200,100,000,TT i Seizmika

Greda 6711-9587@1@PBAB 87MB 30RA B500Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 5-5 x = 2.20m

Ø8/20(m=2)

3Ø14

2Ø14

25

30

[cm]3

2

N1u = 1.99 kNT2u = -5.76 kNT3u = 0.26 kNM1u = -0.04 kNmM3u = 26.00 kNm

εb/εa = -1.566/10.000 ‰Aa1 = 2.13 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.12MPa < τr , τr = 1.10MPaτz = 0.02MPa < τr , τr = 1.10MPaProcenat armiranja: 1.03%

Presek 6-6 x = 4.35m

Ø8/20(m=2)

3Ø14

4Ø14

25

30

[cm]3

2

N1u = -1.11 kNT2u = 78.88 kNT3u = -0.40 kNM1u = 0.17 kNmM3u = -44.96 kNm

εb/εa = -2.411/10.000 ‰Aa1 = 0.00 cm2Aa2 = 3.73 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 1.17 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 1.43MPa < 3τr , τr = 1.10MPaτz = 0.09MPa < τr , τr = 1.10MPaProcenat armiranja: 1.44%

Page 25: 3. Statički Proračun POS 200,100,000,TT i Seizmika

Greda 939-2068@1@PBAB 87MB 30RA B500Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 7-7 x = 0.00m

Ø8/20(m=2)

2Ø14

2Ø14

25

30

[cm]3

2

N1u = 0.61 kNT2u = -40.79 kNT3u = 0.10 kNM1u = -0.05 kNm

εb/εa = 10.000/10.000 ‰Aa1 = 0.01 cm2Aa2 = 0.01 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.72MPa < τr , τr = 1.10MPaτz = 0.03MPa < τr , τr = 1.10MPaProcenat armiranja: 0.82%

Presek 8-8 x = 1.23m

Ø8/20(m=2)

2Ø14

2Ø14

25

30

[cm]3

2

N1u = -3.23 kNT2u = 3.46 kNT3u = -0.25 kNM3u = 22.70 kNm

εb/εa = -1.451/10.000 ‰Aa1 = 1.79 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.06MPa < τr , τr = 1.10MPaProcenat armiranja: 0.82%

Page 26: 3. Statički Proračun POS 200,100,000,TT i Seizmika

Greda 9587-10578@1@PBAB 87MB 30RA B500Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 6-6 x = 0.00m

Ø8/20(m=2)

3Ø14

4Ø14

25

30

[cm]3

2

N1u = -3.22 kNT2u = -71.13 kNT3u = 0.46 kNM1u = -0.16 kNmM3u = -37.89 kNm

εb/εa = -2.094/10.000 ‰Aa1 = 0.00 cm2Aa2 = 3.08 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.68 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 1.29MPa < 3τr , τr = 1.10MPaτz = 0.08MPa < τr , τr = 1.10MPaProcenat armiranja: 1.44%

Presek 9-9 x = 1.25m

Ø8/20(m=2)

3Ø14

2Ø14

25

30

[cm]3

2

N1u = -0.76 kNT2u = 9.63 kNT3u = -0.15 kNM1u = 0.12 kNmM3u = 9.00 kNm

εb/εa = -0.823/10.000 ‰Aa1 = 0.70 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.22MPa < τr , τr = 1.10MPaτz = 0.06MPa < τr , τr = 1.10MPaProcenat armiranja: 1.03%

Greda 10578-8150@1@PBAB 87MB 30RA B500Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 10-10 x = 2.00m

Ø8/20(m=2)

3Ø14

2Ø14

25

30

[cm]3

2

N1u = 4.75 kNT2u = -4.15 kNT3u = -0.07 kNM3u = 36.11 kNm

εb/εa = -1.978/10.000 ‰Aa1 = 3.01 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.07MPa < τr , τr = 1.10MPaProcenat armiranja: 1.03%

Presek 11-11 x = 4.30m

Ø8/20(m=2)

3Ø14

3Ø14

25

30

[cm]3

2

N1u = 7.79 kNT2u = 69.57 kNT3u = 0.61 kNM3u = -38.24 kNm

εb/εa = -2.056/10.000 ‰Aa1 = 0.00 cm2Aa2 = 3.23 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.34 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 1.19MPa < 3τr , τr = 1.10MPaτz = 0.01MPa < τr , τr = 1.10MPaProcenat armiranja: 1.23%

Page 27: 3. Statički Proračun POS 200,100,000,TT i Seizmika

Greda 8150-6763@1@PBAB 87MB 30RA B500Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 12-12 x = 0.50m

Ø8/20(m=2)

3Ø14

2Ø14

25

30

[cm]3

2

N1u = -1.71 kNT2u = 1.71 kNT3u = -0.27 kNM1u = 0.05 kNmM3u = 2.49 kNm

εb/εa = -0.419/10.000 ‰Aa1 = 0.17 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.05MPa < τr , τr = 1.10MPaτz = 0.03MPa < τr , τr = 1.10MPaProcenat armiranja: 1.03%

Presek 4-4 x = 2.00m

Ø8/20(m=2)

3Ø14

2Ø14

25

30

[cm]3

2

N1u = 1.91 kNT2u = 26.86 kNT3u = 4.15 kNM1u = 0.06 kNmM3u = -32.01 kNm

εb/εa = -1.815/10.000 ‰Aa1 = 0.00 cm2Aa2 = 2.63 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.48MPa < τr , τr = 1.10MPaτz = 0.09MPa < τr , τr = 1.10MPaProcenat armiranja: 1.03%

Greda 3253-5606@1@PBAB 87MB 30RA B500Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 13-13 x = 0.00m

Ø8/20(m=2)

2Ø14

2Ø14

25

30

[cm]3

2

N1u = 1.73 kNT2u = -59.56 kNT3u = 0.49 kNM1u = 0.20 kNmM3u = -23.42 kNm

εb/εa = -1.460/10.000 ‰Aa1 = 0.00 cm2Aa2 = 1.91 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 1.11MPa < 3τr , τr = 1.10MPaτz = 0.10MPa < τr , τr = 1.10MPaProcenat armiranja: 0.82%

Presek 14-14 x = 1.21m

Ø8/20(m=2)

2Ø14

2Ø14

25

30

[cm]3

2

N1u = 4.93 kNT2u = -13.70 kNT3u = -0.41 kNM1u = 0.02 kNmM3u = 17.81 kNm

εb/εa = -1.205/10.000 ‰Aa1 = 1.48 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.24MPa < τr , τr = 1.10MPaτz = 0.01MPa < τr , τr = 1.10MPaProcenat armiranja: 0.82%

Page 28: 3. Statički Proračun POS 200,100,000,TT i Seizmika

Greda 8144-4334@1@PBAB 87MB 30RA B500Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 15-15 x = 2.00m

Ø8/20(m=2)

4Ø14

2Ø14

25

30

[cm]3

2

N1u = -0.05 kNT2u = -2.86 kNT3u = -0.13 kNM1u = -0.05 kNmM3u = 35.07 kNm

εb/εa = -1.957/10.000 ‰Aa1 = 2.87 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.07MPa < τr , τr = 1.10MPaτz = 0.02MPa < τr , τr = 1.10MPaProcenat armiranja: 1.23%

Presek 16-16 x = 5.02m

Ø8/20(m=2)

4Ø14

2Ø14

25

30

[cm]3

2

N1u = -0.26 kNT2u = -42.97 kNT3u = 0.15 kNM1u = 0.06 kNmM3u = -10.79 kNm

εb/εa = -0.911/10.000 ‰Aa1 = 0.00 cm2Aa2 = 0.85 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.76MPa < τr , τr = 1.10MPaτz = 0.03MPa < τr , τr = 1.10MPaProcenat armiranja: 1.23%

Page 29: 3. Statički Proračun POS 200,100,000,TT i Seizmika

TEMELJNA KONSTRUKCIJA - POS TT

26.02

-2.24

108.75

-82.38

0.13

2.07

-94.7

3

38.14

-52.1

3

49.74

-95.4

1

48.47

2.35

-151.41

2.65

-156.97

154.59

-2.50

39.41

-26.66

0.91

0.29

-0.7

5

19.30

-4.24

151.77

-195

.98

5.95

-2

.44

3.95

-23.4

6

1.29

0.86

-26.75

8.01

38.56

0.61 -23.67

1.46

-6.86

0.14

0.11

-3.91

0.

99

-3.26

0.20

-2.80

9.58

-5.43

0.

81

-13.1

4

42.11

-29.9

6 5.

07

Opt. 5: 1.6xI+1.8xII+1.8xIII

Uticaji u gredi: max M 3= 154.59 / min M 3= -195.98 kNm Nivo: Kota suterena [-2.90 m]

-44.25

44.25 -60.73

182.07

-109.78

119.4

2

-143

.00

113.4

3

-122

.11

60.59

-51.8

4 14

2.84

-150

.06

151.66

-215.16

156.63

-222.68

-2.04 1.11

-27.26 59.63

-19.90 2.80

-1.83 1.67 -7.72

19.29

-43.22 5.91

-15.4

5

56.77

139.81

161.5

2

-168

.65

-142.91

-27.3

1 35

.64

-32.4

0 23.10

-39.81 79.25

53.19

-43.95 7.60

-11.28

11.62

-1.94 0.79

-11.25 9.44

-1

.02 2

.48

-2.24

1.26

-2

.51 0.

64

-2.57

0.58

-3

.03 1

.17

-2.53

0.97

-2

.34 1

.16

-2.15

1.35

-1

.80 1

.35

-2.08

1.77

-1

.81 1

.69

-1.76

1.74

-1

.78 1

.72

-1.96

1.58

-2

.39 1

.16

-3.33

0.22

-13.5

6 5.21

-9.51 7.80

-0

.80 2

.58

-3.26

0.12

-23.3

0 23

.28

-0.18

3.41

-0

.57 3

.02

-1.35

2.24

-2

.83 0

.77

-15.8

4 23

.87

-1.37

2.13

-45.9

9 97

.33

-58.9

5

Opt. 5: 1.6xI+1.8xII+1.8xIII

Uticaji u gredi: max T2= 182.07 / min T2= -222.68 kN Nivo: Kota suterena [-2.90 m]

KONTROLA NAPONA I SLIJEGANJA

150.07

118.9

1

117.9

2

124.8

8

136.16

137.2

1

155.28

155.2

8

153.90

151.2

1 14

3.28

131.2

0

129.02 131.58

Opt. 4: I+II+III

Uticaji u lin. osloncu: max σ,tla= 155.28 / min σ,tla= 109.49 kN/m2 Nivo: Kota suterena [-2.90 m]

-15.01

-11.8

9

-11.7

9

-12.4

9

-13.62

-13.7

2

-15.53

-15.5

3

-15.39

-15.1

2 -1

4.33

-13.1

2

-12.90 -13.16

Opt. 4: I+II+III

Uticaji u lin. osloncu: max s,tla= -10.95 / min s,tla= -15.53 m / 1000 Nivo: Kota suterena [-2.90 m]

Page 30: 3. Statički Proračun POS 200,100,000,TT i Seizmika

2.18

2.51

1.38

2.52

4.04 4.18

0.70

0.02

0.11

5.24

0.61

0.70

0.62

0.12

0.18 0.

10

0.10

0.09

0.07

0.14

0.

34

0.78

2.01

3.00

1.04

1.35

1.32

4.30

1.07

0.52

4.21

0.16

0.

11

0.04

0.22

1.05

0.02

0.04 0.

03 0.

26

1.15

M erodavno opterecenje: 1.60xI+1.80xII+1.80xIII @1@PBAB 87, M B 30, M A 500/560

Armatura u gredama: max Aa2/Aa1= 5.24 cm2 Nivo: Kota suterena [-2.90 m]

0.63 0.77

M erodavno opterecenje: 1.60xI+1.80xII+1.80xIII @1@PBAB 87, M B 30, M A 500/560

Armatura u gredama: max Aa,uz= 0.77 cm2 Nivo: Kota suterena [-2.90 m]

4Ø12

(0.57

m)

3Ø12(0.79m) 2Ø12(6.79m) 3Ø12(0.70m)

4Ø12

(2.33

m)

4Ø12

(2.40

m)

6Ø12(3.22m)

3Ø12

(2.45

m)

3Ø12

(2.45

m)

2Ø12

(6.5m

)2Ø

12(2

.93m

)2Ø

12(3

.00m

)

2Ø12(0.96m) 2Ø12(1.81m)

4Ø12(11.05m)2Ø12

(0.62

m)

2Ø12

(3.39

m)

2Ø12

(4.02

m)

4Ø12

(0.84

m)

2Ø12

(0.59

m)

2Ø12

(3.35

m)

2Ø12

(4.02

m)

4Ø12

(0.84

m)

2Ø12

(9.95

m)

2Ø10

+2Ø

12(9

.95m

)

2Ø12(3.00m)

2Ø10+2Ø12(3.00m)

2Ø12(5.78m)

2Ø10+2Ø12(5.78m)

2Ø12

(1.49

m)2Ø12(0.52m) 2Ø12(0.56m)

2Ø12(4.30m)

2Ø10+2Ø12(5.27m)

2Ø12

(1.49

m)

2Ø12(5.27m)

2Ø12(3.25m)

2Ø10+2Ø12(3.25m)

2Ø12

(4.35

m)

2Ø10

+2Ø

12(4

.35m

)

2Ø10+2Ø12(5.78m)

2Ø12(5.78m)

2Ø12

(6.50

m)

2Ø10

+2Ø

12(6

.50m

)

Usvojena armatura @1@PBAB 87, M B 30, M A 500/560

Armatura u gredama: Aa2/Aa1 Nivo: Kota suterena [-2.90 m]

Ø8/

20(N

=12)

(m=2

)

Ø8/

25(N

=26)

(m=2

)

Ø8/25(N=44)(m=2)Ø

8/25

(N=2

5)(m

=2)

Ø8/

25(N

=25)

(m=2

)

Ø8/

25(N

=40)

(m=2

)

Ø8/25(N=12)(m=2)

Ø8/25(N=23)(m=2)

Ø8/25(N=17)(m=2)

Ø8/25(N=21)(m=2)

Ø8/25(N=13)(m=2)

Ø8/

25(N

=17)

(m=2

)

Ø8/25(N=23)(m=2)

Ø8/

25(N

=26)

(m=2

)

Usvojena armatura @1@PBAB 87, M B 30, M A 500/560

Armatura u gredama: Aa,uz Nivo: Kota suterena [-2.90 m]

265

788

630

3437597 69581753

4637

4586

7732

1

2512

6098 9040

9773

7306

2617434

110 156511

22

33

44

5 5

66

77

8899

1010

11111212

1313

14141515

1616

1717

18 18

1919

2020

21 2122 22

23 2324 24

25 2526 26

2727

2828

29 2930 30

31 31

M erodavno opterecenje: 1.60xI+1.80xII+1.80xIII @1@PBAB 87, M B 30, M A 500/560

Dispozicija greda Nivo: Kota suterena [-2.90 m]

Page 31: 3. Statički Proračun POS 200,100,000,TT i Seizmika

Greda 110-1565@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 1-1 x = 3.85m

Ø8/25(m=2)

2Ø102Ø12

2Ø121Ø102Ø12

2Ø121Ø10

55

5025

80

[cm]3

2

N1u = -0.04 kNT2u = 88.33 kNM1u = 0.37 kNmM3u = 42.11 kNm

εb/εa = -0.592/10.000 ‰Aa1 = 1.15 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

τy = 0.54MPa < τr , τr = 1.10MPaτz = 0.03MPa < τr , τr = 1.10MPaProcenat armiranja: 0.35%

Presek 2-2 x = 5.14m

Ø8/25(m=2)

2Ø102Ø12

2Ø121Ø102Ø12

2Ø121Ø10

55

50

25

80

[cm]3

2

T2u = 23.70 kNT3u = 0.01 kNM1u = 0.37 kNmM3u = -29.96 kNm

εb/εa = -0.313/10.000 ‰Aa1 = 0.00 cm2Aa2 = 0.78 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

τy = 0.17MPa < τr , τr = 1.10MPaτz = 0.03MPa < τr , τr = 1.10MPaProcenat armiranja: 0.35%

Page 32: 3. Statički Proračun POS 200,100,000,TT i Seizmika

Greda 630-1@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 3-3 x = 1.93m

Ø8/25(m=2)

2Ø102Ø12

2Ø121Ø102Ø12

2Ø121Ø10

55

5025

80

[cm]3

2

N1u = 0.06 kNT2u = 19.68 kNM1u = 0.01 kNmM3u = 9.58 kNm

εb/εa = -0.268/10.000 ‰Aa1 = 0.26 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

τy = 0.12MPa < τr , τr = 1.10MPaProcenat armiranja: 0.35%

Presek 4-4 x = 4.75m

Ø8/25(m=2)

2Ø102Ø12

2Ø121Ø102Ø12

2Ø121Ø10

55

50

25

80

[cm]3

2

N1u = -0.02 kNT2u = -2.83 kNM1u = -0.04 kNmM3u = -5.43 kNm

εb/εa = -0.131/10.000 ‰Aa1 = 0.00 cm2Aa2 = 0.14 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

τy = 0.02MPa < τr , τr = 1.10MPaProcenat armiranja: 0.35%

Greda 434-630@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 5-5 x = 0.45m

Ø8/25(m=2)

2Ø12

2Ø121Ø102Ø12

2Ø121Ø10

55

50

25

80

[cm]3

2

N1u = -0.01 kNT2u = -7.29 kNM1u = 0.02 kNmM3u = -3.26 kNm

εb/εa = -0.101/10.000 ‰Aa1 = 0.00 cm2Aa2 = 0.09 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

τy = 0.04MPa < τr , τr = 1.10MPaProcenat armiranja: 0.30%

Page 33: 3. Statički Proračun POS 200,100,000,TT i Seizmika

Greda 2617-434@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 6-6 x = 4.51m

Ø8/25(m=2)

2Ø102Ø12

2Ø121Ø102Ø12

2Ø121Ø10

55

5025

80

[cm]3

2

T2u = -5.16 kNT3u = -0.02 kNM1u = -0.03 kNmM3u = -3.91 kNm

εb/εa = -0.110/10.000 ‰Aa1 = 0.00 cm2Aa2 = 0.10 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

τy = 0.03MPa < τr , τr = 1.10MPaProcenat armiranja: 0.35%

Presek 7-7 x = 5.27m

Ø8/25(m=2)

2Ø102Ø12

2Ø121Ø102Ø12

2Ø121Ø10

55

50

25

80

[cm]3

2

N1u = 0.08 kNT2u = -10.01 kNT3u = -0.27 kNM1u = 0.10 kNmM3u = 0.99 kNm

εb/εa = -0.083/10.000 ‰Aa1 = 0.03 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

τy = 0.07MPa < τr , τr = 1.10MPaProcenat armiranja: 0.35%

Page 34: 3. Statički Proračun POS 200,100,000,TT i Seizmika

Greda 7306-2617@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 8-8 x = 0.90m

Ø8/25(m=2)

2Ø102Ø12

2Ø121Ø102Ø12

2Ø121Ø10

55

5025

80

[cm]3

2

N1u = -0.03 kNT2u = 4.27 kNM1u = 0.55 kNmM3u = -23.67 kNm

εb/εa = -0.277/10.000 ‰Aa1 = 0.00 cm2Aa2 = 0.62 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

τy = 0.07MPa < τr , τr = 1.10MPaτz = 0.04MPa < τr , τr = 1.10MPaProcenat armiranja: 0.35%

Presek 9-9 x = 3.64m

Ø8/25(m=2)

2Ø102Ø12

2Ø121Ø102Ø12

2Ø121Ø10

5550

25

80

[cm]3

2

N1u = 0.06 kNT2u = -1.55 kNM1u = -0.01 kNmM3u = 1.46 kNm

εb/εa = -0.102/10.000 ‰Aa1 = 0.04 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

Procenat armiranja: 0.35%

Greda 6958-7306@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 10-10 x = 0.00m

Ø8/25(m=2)

4Ø12

2Ø121Ø102Ø12

2Ø121Ø10

55

50

25

80

[cm]3

2

N1u = 0.01 kNT2u = 72.25 kNT3u = 0.01 kNM1u = -0.57 kNmM3u = 38.56 kNm

εb/εa = -0.563/10.000 ‰Aa1 = 1.05 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

τy = 0.46MPa < τr , τr = 1.10MPaτz = 0.04MPa < τr , τr = 1.10MPaProcenat armiranja: 0.37%

Page 35: 3. Statički Proračun POS 200,100,000,TT i Seizmika

Greda 9773-6958@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 11-11 x = 2.87m

Ø8/25(m=2)

2Ø102Ø12

2Ø121Ø102Ø12

2Ø121Ø10

55

5025

80

[cm]3

2

N1u = -0.06 kNT2u = -8.05 kNM1u = -0.15 kNmM3u = -26.66 kNm

εb/εa = -0.296/10.000 ‰Aa1 = 0.00 cm2Aa2 = 0.70 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

τy = 0.06MPa < τr , τr = 1.10MPaτz = 0.01MPa < τr , τr = 1.10MPaProcenat armiranja: 0.35%

Presek 12-12 x = 4.35m

Ø8/25(m=2)

2Ø102Ø12

2Ø121Ø102Ø12

2Ø121Ø10

5550

25

80

[cm]3

2

N1u = 0.08 kNT2u = -36.31 kNT3u = 0.02 kNM1u = -0.18 kNmM3u = 8.01 kNm

εb/εa = -0.244/10.000 ‰Aa1 = 0.22 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

τy = 0.23MPa < τr , τr = 1.10MPaτz = 0.01MPa < τr , τr = 1.10MPaProcenat armiranja: 0.35%

Greda 7732-9773@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 13-13 x = 0.25m

Ø8/25(m=2)

2Ø102Ø12

2Ø121Ø102Ø12

2Ø121Ø10

55

50

25

80

[cm]3

2

N1u = 0.04 kNT2u = -23.81 kNM1u = 0.21 kNmM3u = 3.95 kNm

εb/εa = -0.170/10.000 ‰Aa1 = 0.11 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

τy = 0.15MPa < τr , τr = 1.10MPaτz = 0.02MPa < τr , τr = 1.10MPaProcenat armiranja: 0.35%

Presek 14-14 x = 1.50m

Ø8/25(m=2)

2Ø102Ø12

2Ø121Ø102Ø12

2Ø121Ø10

55

50

2580

[cm]3

2

N1u = -0.08 kNT2u = 15.41 kNM1u = 0.20 kNmM3u = -23.22 kNm

εb/εa = -0.276/10.000 ‰Aa1 = 0.00 cm2Aa2 = 0.61 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

τy = 0.10MPa < τr , τr = 1.10MPaτz = 0.01MPa < τr , τr = 1.10MPaProcenat armiranja: 0.35%

Greda 9040-7732@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 15-15 x = 2.00m

Ø8/25(m=2)

4Ø12

2Ø121Ø102Ø12

2Ø121Ø10

55

50

25

80

[cm]3

2

T2u = -133.57 kNM1u = 1.09 kNmM3u = 152.18 kNm

εb/εa = -1.248/10.000 ‰

Aa1 = 4.22 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

τy = 0.86MPa < τr , τr = 1.10MPaτz = 0.08MPa < τr , τr = 1.10MPaProcenat armiranja: 0.37%

Page 36: 3. Statički Proračun POS 200,100,000,TT i Seizmika

Greda 6098-9040@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 16-16 x = 2.15m

Ø8/25(m=2)

2Ø12

6Ø121Ø102Ø12

2Ø121Ø10

55

50

25

80

[cm]3

2

T2u = 25.23 kNM1u = -0.08 kNmM3u = -195.98 kNm

εb/εa = -0.876/10.000 ‰Aa1 = 0.00 cm2Aa2 = 5.24 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

τy = 0.15MPa < τr , τr = 1.10MPaProcenat armiranja: 0.43%

Presek 17-17 x = 4.30m

Ø8/25(m=2)

2Ø12

2Ø121Ø102Ø12

2Ø121Ø10

5550

25

80

[cm]3

2

T2u = -161.12 kNM1u = -0.08 kNmM3u = 5.95 kNm

εb/εa = -0.209/10.000 ‰Aa1 = 0.16 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

τy = 0.95MPa < τr , τr = 1.10MPaProcenat armiranja: 0.30%

Greda 4637-6098@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 18-18 x = 0.00m

Ø8/25(m=2)

4Ø12

2Ø121Ø102Ø12

2Ø121Ø10

55

50

25

80

[cm]3

2

T2u = 130.47 kNM1u = -0.29 kNmM3u = 151.77 kNm

εb/εa = -1.246/10.000 ‰Aa1 = 4.21 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

τy = 0.78MPa < τr , τr = 1.10MPaτz = 0.02MPa < τr , τr = 1.10MPaProcenat armiranja: 0.37%

Greda 2512-4637@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 19-19 x = 2.00m

Ø8/25(m=2)

2Ø102Ø12

2Ø121Ø102Ø12

2Ø121Ø10

55

50

25

80

[cm]3

2

N1u = 0.03 kNT2u = 1.16 kNM1u = -0.13 kNmM3u = 19.20 kNm

εb/εa = -0.387/10.000 ‰Aa1 = 0.52 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

τy = 0.02MPa < τr , τr = 1.10MPaProcenat armiranja: 0.35%

Presek 20-20 x = 3.00m

Ø8/25(m=2)

2Ø102Ø12

2Ø121Ø102Ø12

2Ø121Ø10

55

50

25

80

[cm]3

2

N1u = -0.02 kNT2u = 56.77 kNM1u = -0.13 kNmM3u = -4.24 kNm

εb/εa = -0.114/10.000 ‰Aa1 = 0.00 cm2Aa2 = 0.11 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

τy = 0.34MPa < τr , τr = 1.10MPaProcenat armiranja: 0.35%

Page 37: 3. Statički Proračun POS 200,100,000,TT i Seizmika

Greda 1-2512@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 21-21 x = 2.45m

Ø8/25(m=2)

2Ø102Ø12

2Ø121Ø102Ø12

2Ø121Ø10

55

5025

80

[cm]3

2

N1u = -0.13 kNT2u = 56.24 kNT3u = -0.08 kNM1u = -0.30 kNmM3u = 39.41 kNm

εb/εa = -0.570/10.000 ‰Aa1 = 1.07 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

τy = 0.35MPa < τr , τr = 1.10MPaτz = 0.02MPa < τr , τr = 1.10MPaProcenat armiranja: 0.35%

Presek 22-22 x = 4.39m

Ø8/25(m=2)

2Ø102Ø12

2Ø121Ø102Ø12

2Ø121Ø10

55

50

25

80

[cm]3

2

N1u = -0.08 kNT2u = 11.42 kNM1u = -0.31 kNmM3u = -26.66 kNm

εb/εa = -0.296/10.000 ‰Aa1 = 0.00 cm2Aa2 = 0.70 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

τy = 0.09MPa < τr , τr = 1.10MPaτz = 0.02MPa < τr , τr = 1.10MPaProcenat armiranja: 0.35%

Greda 4586-7732@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 23-23 x = 1.63m

Ø8/25(m=2)

2Ø12

4Ø121Ø102Ø12

2Ø121Ø10

55

50

25

80

[cm]3

2

T2u = 47.08 kNM1u = 0.04 kNmM3u = -156.97 kNm

εb/εa = -0.772/10.000 ‰Aa1 = 0.00 cm2Aa2 = 4.18 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

τy = 0.28MPa < τr , τr = 1.10MPaProcenat armiranja: 0.37%

Presek 24-24 x = 3.81m

Ø8/25(m=2)

2Ø12

2Ø121Ø102Ø12

2Ø121Ø10

55

50

25

80

[cm]3

2

T2u = -222.68 kNT3u = -0.01 kNM1u = 0.04 kNmM3u = 35.58 kNm

εb/εa = -0.540/10.000 ‰Aa1 = 0.97 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.77 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

τy = 1.31MPa < 3τr , τr = 1.10MPaProcenat armiranja: 0.30%

Presek 15-15 x = 4.35m

Ø8/25(m=2)

4Ø12

2Ø121Ø102Ø12

2Ø121Ø10

55

50

25

80

[cm]3

2

T2u = -215.07 kNT3u = -0.01 kNM1u = 0.04 kNmM3u = 154.59 kNm

εb/εa = -1.261/10.000 ‰Aa1 = 4.30 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.60 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

τy = 1.26MPa < 3τr , τr = 1.10MPaProcenat armiranja: 0.37%

Page 38: 3. Statički Proračun POS 200,100,000,TT i Seizmika

Greda 1753-4637@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 25-25 x = 1.63m

Ø8/25(m=2)

2Ø12

4Ø121Ø102Ø12

2Ø121Ø10

55

50

25

80

[cm]3

2

T2u = 44.92 kNM1u = -0.13 kNmM3u = -151.41 kNm

εb/εa = -0.756/10.000 ‰Aa1 = 0.00 cm2Aa2 = 4.04 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

τy = 0.27MPa < τr , τr = 1.10MPaProcenat armiranja: 0.37%

Presek 26-26 x = 3.81m

Ø8/25(m=2)

2Ø12

2Ø121Ø102Ø12

2Ø121Ø10

55

50

25

80

[cm]3

2

T2u = -215.16 kNT3u = 0.02 kNM1u = -0.13 kNmM3u = 36.19 kNm

εb/εa = -0.545/10.000 ‰Aa1 = 0.98 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.63 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

τy = 1.27MPa < 3τr , τr = 1.10MPaProcenat armiranja: 0.30%

Presek 18-18 x = 4.35m

Ø8/25(m=2)

4Ø12

2Ø121Ø102Ø12

2Ø121Ø10

55

50

25

80

[cm]3

2

T2u = -207.55 kNT3u = 0.02 kNM1u = -0.13 kNmM3u = 151.11 kNm

εb/εa = -1.242/10.000 ‰Aa1 = 4.19 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.46 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

τy = 1.22MPa < 3τr , τr = 1.10MPaProcenat armiranja: 0.37%

Greda 597-6958@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 27-27 x = 5.78m

Ø8/25(m=2)

4Ø12

2Ø121Ø102Ø12

2Ø121Ø10

55

50

25

80

[cm]3

2

T2u = -114.33 kNM1u = -0.48 kNmM3u = 49.74 kNm

εb/εa = -0.649/10.000 ‰Aa1 = 1.35 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

τy = 0.70MPa < τr , τr = 1.10MPaτz = 0.04MPa < τr , τr = 1.10MPaProcenat armiranja: 0.37%

Presek 28-28 x = 8.93m

Ø8/25(m=2)

4Ø12

3Ø121Ø102Ø12

2Ø121Ø10

55

50

2580

[cm]3

2

T2u = 29.67 kNM1u = -0.32 kNmM3u = -95.41 kNm

εb/εa = -0.584/10.000 ‰Aa1 = 0.00 cm2Aa2 = 2.52 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

τy = 0.20MPa < τr , τr = 1.10MPaτz = 0.02MPa < τr , τr = 1.10MPaProcenat armiranja: 0.40%

Page 39: 3. Statički Proračun POS 200,100,000,TT i Seizmika

Greda 630-3437@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 29-29 x = 2.45m

Ø8/25(m=2)

4Ø12

2Ø121Ø102Ø12

2Ø121Ø10

55

5025

80

[cm]3

2

N1u = -0.23 kNT2u = 174.72 kNT3u = -0.18 kNM1u = 0.11 kNmM3u = 108.75 kNm

εb/εa = -1.017/10.000 ‰Aa1 = 3.00 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

τy = 1.03MPa < τr , τr = 1.10MPaProcenat armiranja: 0.37%

Presek 30-30 x = 4.55m

Ø8/25(m=2)

2Ø12

2Ø121Ø102Ø12

2Ø121Ø10

55

50

25

80

[cm]3

2

T2u = 8.44 kNM1u = 0.11 kNmM3u = -82.38 kNm

εb/εa = -0.539/10.000 ‰Aa1 = 0.00 cm2Aa2 = 2.18 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/25(m=2) = 2.01 cm2/m]

τy = 0.06MPa < τr , τr = 1.10MPaProcenat armiranja: 0.30%

Greda 265-788@1@PBAB 87MB 30MA 500/560Dimenzionisanje jednog slucajaopterecenja: 1.60xI+1.80xII+1.80xIII

Presek 31-31 x = 1.23m

Ø 8/20(m=2)

3Ø 12

3Ø 12

30

30

[cm]3

2

M3u = 26.02 kNm

εb/εa = -1.328/10.000 ‰Aa1 = 2.01 cm2Aa2 = 0.00 cm2Aa3 = 0.00 cm2Aa4 = 0.00 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

Procenat armiranja: 0.75%

Page 40: 3. Statički Proračun POS 200,100,000,TT i Seizmika
Page 41: 3. Statički Proračun POS 200,100,000,TT i Seizmika

DIMENZIONISANJE VERTIKALNIH ELEMENATA - STUBOVA

-0.06 0.05

-0.15

-4.96 9.84

-10.27 4.65

-6.75 13.21

-13.77 6.56

1.71 -3.94

4.10 -2.66

1.30

10.42 -19.53

18.51

-11.63

-0.84 0.26 -0.32 1.26

-0.21 0.23 -0.53 0.09

-0.66 0.02 -0.40 0.40

1.72 -0.17 0.22 -0.16 -0.11

0.61 -0.59 0.30 -0.59 0.58

-1.01 2.18

-0.33 0.35 -0.25 0.27

Opt. 6: 1.9xI+2.1xII+2.1xIII

Uticaji u gredi: max M 3= 58.50 / min M 3= -113.06 kNm Ram: H_4

-3.63

2.87

-0.09

-2.07

1.32

-0.12 0.24 -0.02 0.04

-0.81 0.09 -0.25 0.13 -0.32 0.03

4.34 -8.37

8.41 -6.19

3.60

-0.70 1.54

-1.70 0.89

-0.19

-0.69 1.59

-1.68 -0.03

1.61

-0.95

0.22 -0.60

6.15

-1.77

11.51

5.83 -10.61

9.93 -3.98

Opt. 6: 1.9xI+2.1xII+2.1xIII

Uticaji u gredi: max M 2= 11.51 / min M 2= -10.61 kNm Ram: H_4

0.03

-0.04 -0.02

0.02 -0.22 -0.19

0.07

-0.60

1.71

6.93

0.95

2.33

9.30

1.67

-0.59

-2.77

-1.37

-13.16

3.04

1.85

-3.92

0.87 2.62

-5.03

0.23 4.39

-7.39

Opt. 6: 1.9xI+2.1xII+2.1xIII

Uticaji u gredi: max T2= 168.84 / min T2= -177.75 kN Ram: H_4

-3.90

4.82

-2.57 1.06

-1.57

2.42

-1.27 1.18 0.87

-0.36

0.23 -1.82

1.50

5.79

3.38

-0.24

-1.12

-0.37

-0.24

-1.13

0.56

-3.20 1.25

-2.00

9.11

-4.63

15.69

-3.13

2.29 7.20

0.89

Opt. 6: 1.9xI+2.1xII+2.1xIII

Uticaji u gredi: max T3= 15.69 / min T3= -4.63 kN Ram: H_4

16.14

-38.01

-51.49

-35.07

-155.04

-322.22

-500.48

-168.23

-362.08

-565.86

-149.51

-292.71

-429.84 -380.82

-67.05

-150.55

-231.28

Opt. 6: 1.9xI+2.1xII+2.1xIII

Uticaji u gredi: max N1= 19.48 / min N1= -565.86 kN Ram: H_4

Page 42: 3. Statički Proračun POS 200,100,000,TT i Seizmika

2.75 2.77

@1@PBAB 87, M B 30, M A 500/560

Armatura u gredama: max Aa2/Aa1= 2.77 cm2 Ram: H_4

0.93 0.91

@1@PBAB 87, M B 30, M A 500/560

Armatura u gredama: max Aa3/Aa4= 0.93 cm2 Ram: H_4

2Ø16

(8.7m

)

2Ø16

(8.7m

)

2Ø16

(8.7m

)

2Ø16

(8.7m

)

3Ø14

+2Ø

16(8

.70m

)

3Ø14

+2Ø

16(8

.70m

)

2Ø16

(8.7m

)

2Ø16

(8.7m

)

2Ø16

(8.7m

)

2Ø16

(8.7m

)

Usvojena armatura @1@PBAB 87, M B 30, M A 500/560

Armatura u gredama: Aa2/Aa1 Ram: H_4

Ø8/

20(N

=43)

(m=2

)

Ø8/

20(N

=43)

(m=2

)

Ø8/

20(N

=43)

(m=2

)

Ø8/

20(N

=43)

(m=2

)

Ø8/

20(N

=43)

(m=2

)

Usvojena armatura @1@PBAB 87, M B 30, M A 500/560

Armatura u gredama: Aa,uz Ram: H_4

11615

10719

9231

7306

10324 114819537834677705621

8700

6711

4586

5710

3534

1753597 6958

7684

5606

3437

3456

1702

10510

8915

11

22

Usvojena armatura @1@PBAB 87, M B 30, M A 500/560

Dispozicija greda Ram: H_4

Page 43: 3. Statički Proračun POS 200,100,000,TT i Seizmika

DIMENZIONISANJE SVIH SAMOSTOJEĆIH STUBOVA DIMENZIJA b/d=25/25cm

Greda 5710-3534@1@PBAB 87MB 30RA B500Dimenzionisanje jednog slucajaopterecenja: 1.90xI+2.10xII+2.10xIIIli,2 = 2.90 m (λ2 = 40.18)li,3 = 2.90 m (λ3 = 40.18)Nepomerljiva konstrukcija

Presek 1-1 x = 1.93m

Ø 8/20(m=2)

2Ø 16

2Ø 16

25

25

[cm]3

2

N1u = -359.21 kNT2u = 9.30 kNT3u = -1.12 kNM2u = -0.62 kNmM3u = -4.77 kNm

Nije potrebna armatura.

DIMENZIONISANJE STUBA DIMENZIJA b/d=75/25cm

Greda 11481-6958@1@PBAB 87MB 30RA B500Dimenzionisanje jednog slucajaopterecenja: 1.90xI+2.10xII+2.10xIIIli,2 = 8.70 m (λ2 = 40.18)li,3 = 8.70 m (λ3 = 120.55)Nepomerljiva konstrukcija

Presek 2-2 x = 5.80m

Ø 8/20(m=2)

2Ø 163Ø 14

3Ø 142Ø 162Ø 16

2Ø 16

75

25

[cm]3

2

N1u = -260.37 kNT2u = -13.13 kNT3u = 1.53 kNM2u = -0.03 kNmM3u = 18.51 kNm

Δe3 = 2.9<e0> + 15.3<eII> = 18.2 cm|ΔM3| = 47.36 kNmεb/εa = -2.264/10.000 ‰Aa1 = 2.77 cm2Aa2 = 2.75 cm2Aa3 = 0.93 cm2Aa4 = 0.91 cm2Aa,uz = 0.00 cm2/m (m=2)[Usvojeno Aa,uz = Ø8/20(m=2) = 2.51 cm2/m]

τy = 0.09MPa < τr , τr = 1.10MPaτz = 0.01MPa < τr , τr = 1.10MPaProcenat armiranja: 1.35%

DIMENZIONISANJE STUBOVA/SERKLAŽA U ZIDOVIMA, DIMENZIJA b/d=25/25cm

Greda 534-110@1@PBAB 87MB 30RA B500Dimenzionisanje jednog slucajaopterecenja: 1.90xI+2.10xII+2.10xIIIli,2 = 2.90 m (λ2 = 40.18)li,3 = 2.90 m (λ3 = 40.18)Nepomerljiva konstrukcija

Presek 1-1 x = 1.36m

Ø 8/20(m=2)

2Ø 14

2Ø 14

25

25

[cm]3

2

N1u = -91.92 kNT2u = -2.04 kNT3u = 0.58 kNM2u = -0.38 kNm

Nije potrebna armatura.

Page 44: 3. Statički Proračun POS 200,100,000,TT i Seizmika

SEIZMIČKI PRORAČUNSeizmicki proracun: JUS (Ekvivalentno staticko opterecenje)

Kategorija tla: IISeizmicka zona: IX (Ks = 0.100)Kategorija objekta: IIVrsta konstrukcije: 3Kota ukljestenja: Zd = 0.00 mMase grupisane u nivoima izabranih tavanicaPloce - redukcija krutosti na savijanje: 0.010Grede - redukcija krutosti na savijanje: 0.010Zidovi - redukcija krutosti na savijanje: 0.010Multiplikator krutosti oslonaca: 1000.000

Ugao dejstva zemljotresa:Naziv T [sec] α [°]

Seizmika X 0.500 0.00Seizmika Y 0.500 90.00

Raspored seizmickih sila po visini objekta (Seizmika X)Nivo Z [m] S [kN]

Kota tavana 5.80 275.40Kota mansarde 2.90 203.02Kota prizemlja 0.00 7.22Kota suterena -2.90 0.00

Σ= 485.64

Raspored seizmickih sila po visini objekta (Seizmika Y)Nivo Z [m] S [kN]

Kota tavana 5.80 275.40Kota mansarde 2.90 203.02Kota prizemlja 0.00 7.22Kota suterena -2.90 0.00

Σ= 485.64

Raspored masa po visini objektaNivo Z [m] X [m] Y [m] Masa [T] T/m2

Kota tavana 5.80 5.39 5.31 121.24 1.75Kota mansarde 2.90 5.28 5.06 161.88 1.41Kota prizemlja 0.00 5.48 5.05 164.92 1.43Kota suterena -2.90 5.18 4.52 108.43Ukupno: 1.54 5.34 5.00 556.47

STATIČKI UTICAJI U ZIDOVIMA USLJED DJELOVANJA VERTIKALNOG OPTEREĆENJA

-305

.15 N = -305.15

M = 20.37

Opt. 6: I+II+III

Vektorski preseci: Nn Ram: H_1

-285

.26 N = -285.26M = 14.85

Opt. 6: I+II+III

Vektorski preseci: Nn Ram: H_2

-199

.34 N = -199.34

M = -21.45

Opt. 6: I+II+III

Vektorski preseci: Nn Ram: H_3

-217

.46 N = -217.46

M = -64.22

-138

.50 N = -138.50

M = 0.95

-68.3

6

N = -68.36M = 6.31

Opt. 6: I+II+III

Vektorski preseci: Nn Ram: H_5

Page 45: 3. Statički Proračun POS 200,100,000,TT i Seizmika

-240

.97 N = -240.97

M = -52.85

-65.8

1

N = -65.81M = 0.61

-150

.21 N = -150.21

M = 4.52

-31.9

8

N = -31.98M = 1.56

Opt. 6: I+II+III

Vektorski preseci: Nn Ram: V_1

-342

.15 N = -342.15

M = -181.68

Opt. 6: I+II+III

Vektorski preseci: Nn Ram: V_3

-84.7

3

N = -84.73M = 0.29

-146

.99 N = -146.99

M = -32.56

Opt. 6: I+II+III

Vektorski preseci: Nn Ram: V_5

-240

.97 N = -240.97

M = -52.85

-65.8

1

N = -65.81M = 0.61

-150

.21 N = -150.21

M = 4.52

-31.9

8

N = -31.98M = 1.56

Opt. 6: I+II+III

Vektorski preseci: Nn Ram: V_1

-342

.15 N = -342.15

M = -181.68

Opt. 6: I+II+III

Vektorski preseci: Nn Ram: V_3

-84.7

3

N = -84.73M = 0.29

-146

.99 N = -146.99

M = -32.56

Opt. 6: I+II+III

Vektorski preseci: Nn Ram: V_5

-83.3

9

N = -83.39M = 6.81

-183

.04 N = -183.04

M = 7.56

-36.1

7

N = -36.17M = 0.05

Opt. 6: I+II+III

Vektorski preseci: Nn Ram: V_6

Page 46: 3. Statički Proračun POS 200,100,000,TT i Seizmika

STATIČKI UTICAJI U ZIDOVIMA USLJED DJELOVANJA SEIZMIČKIH INERCIJALNIH SILA

84.96 N = 84.96

Opt. 5: Seizmika Y

Vektorski preseci: Nns Ram: H_2

-106.39 N = -106.39

Opt. 4: Seizmika X

Vektorski preseci: Nns Ram: H_1

1.21

-96.57 N = -95.36

Opt. 4: Seizmika X

Vektorski preseci: Nns Ram: H_3

-82.22 N = -82.22

29.57 N = 29.57

34.37 N = 34.37

Opt. 5: Seizmika Y

Vektorski preseci: Nns Ram: H_5

Page 47: 3. Statički Proračun POS 200,100,000,TT i Seizmika

-119.67 N = -119.67

-31.03 N = -31.03

-69.52 N = -69.52

-15.68 N = -15.68

Opt. 5: Seizmika Y

Vektorski preseci: Nns Ram: V_1

75.46 N = 75.46

Opt. 4: Seizmika X

Vektorski preseci: Nns Ram: V_3

-32.97 N = -32.97

-61.35 N = -61.35

Opt. 5: Seizmika Y

Vektorski preseci: Nns Ram: V_5

-27.08 N = -27.08

-88.60 N = -88.60

-31.52 N = -31.52

Opt. 5: Seizmika Y

Vektorski preseci: Nns Ram: V_6

Page 48: 3. Statički Proračun POS 200,100,000,TT i Seizmika

Proračun otpornosti zidova na djelovanje seizmičkih sila:

Ram Zid br. L [m] b [m] F [m2] N [kN] T [kN] σ0 [kPa] σgr

[kPa]τ0

[kPa]τn

[kPa]H-1 1-1 5,27 0,25 1,32 305 106 231 180 80 181H-2 2-1 5,78 0,25 1,45 285 85 197 180 59 174H-3 3-1 3,85 0,25 0,96 200 96,5 208 180 100 176

H-55-1 3,00 0,25 0,75 217,5 82 290 180 109 1945-2 1,025 0,25 0,26 138,8 29,5 542 180 115 2405-3 1,025 0,25 0,26 68 34 265 180 133 189

                     

V-1

1-1 3,45 0,25 0,86 241 120 279 180 139 1921-2 0,75 0,25 0,19 66 31 352 180 165 2061-3 1,75 0,25 0,44 150 69 343 180 158 2051-4 0,5 0,25 0,13 32 16 256 180 128 187

V-3 3-1 3,35 0,25 0,84 342 76 408 180 91 217

V-5 5-1 1,00 0,25 0,25 85 33 340 180 132 2045-2 2,15 0,25 0,54 147 61 273 180 113 190

V-66-1 1,00 0,25 0,25 83 27 332 180 108 2026-2 1,70 0,25 0,43 183 88,5 431 180 208 2216-3 0,80 0,25 0,20 36 31,5 180 180 158 170

USOV: τn>τ0

ZAKLJUČAK: Svi zidovi otporni na djelovanje potresa!

Page 49: 3. Statički Proračun POS 200,100,000,TT i Seizmika

STATIČKI PRORAČUN NADVRATNIKA/NADPROZORNIKA

Maksimalno vertikalno opterećenje: q=40 kN/m'Maksimalna dužina otvora 1,35mKoeficijent sigurnosti: ks=1,65Granično opterećenje: qu = 1,65x40=66 kN/m'

Granični moment:

Granični momet nosivosti poprečnog presjeka

b/d=20/25cm; MB30; Aa=3RF12=3,39cm2εa / εb =10/-3,5‰Mu,n=25 kNm > Mu

USVAJA SE: Donja zona: 3RF12 Gornja zona 2RF12 Vilice: uRF8/20